Citations refer to the original publication, not to a Scieee localized version.
Suryadhini, P. P., Sukoyo, S., Suprayogi, S., & Halim, A. H. (2021). A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time. Journal of Industrial Engineering and Management, 14(3), 520–537. https://upcommons.upc.edu/handle/2117/356703
Suryadhini, Pratya Poeri, et al. “A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time.” Journal of Industrial Engineering and Management, vol. 14, no. 3, 2021, pp. 520–537. https://upcommons.upc.edu/handle/2117/356703.
Suryadhini, Pratya Poeri, Sukoyo Sukoyo, Suprayogi Suprayogi, and Abdul Hakim Halim. “A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time.” Journal of Industrial Engineering and Management 14, no. 3 (2021): 520–537. https://upcommons.upc.edu/handle/2117/356703.
Suryadhini, P. P. et al. (2021) ‘A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time’, Journal of Industrial Engineering and Management, 14(3), pp. 520–537. Available at: https://upcommons.upc.edu/handle/2117/356703.
P. P. Suryadhini, S. Sukoyo, S. Suprayogi, and A. H. Halim, “A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time,” Journal of Industrial Engineering and Management, vol. 14, no. 3, pp. 520–537, 2021. [Online]. Available: https://upcommons.upc.edu/handle/2117/356703
@article{suryadhini2021batch,
author = {Suryadhini, Pratya Poeri and Sukoyo, Sukoyo and Suprayogi, Suprayogi and Halim, Abdul Hakim},
title = {A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time},
journal = {Journal of Industrial Engineering and Management},
year = {2021},
volume = {14},
number = {3},
pages = {520--537},
publisher = {OmniaScience},
url = {https://upcommons.upc.edu/handle/2117/356703}
}