scieee Science in your language
[en] (orig)

Why Do Public Sector Organizations Fail In Implementation Of Strategic Plan In Pakistan?

Read accessible full text

Why Do Public Sector Organizations Fail In Implementation Of Strategic Plan In Pakistan?

Author: Sial, Abdul Wahid; Usman, Muhammad Khawar; Zulfiqar, Sehar; Satti, Arshad Mehmod; Khursheed, Iftekhar
Year: 2013
Source: https://dea.lib.unideb.hu/bitstreams/49584d41-c128-4555-b538-ec81a6414fbb/download
Public Policy and Adminis a ion Resea ch www.iis e.o g
ISSN 2224-5731(Pape ) ISSN 2225-0972(Online)
Vol.3, No.1, 2013
33
Why Do Public Sec o O ganiza ions Fail In Implemen a ion O
S a egic Plan In Pakis an?
Abdulwahid Sial (CMA & MSBA)
[email protected]
Ins i u e o cos and managemen Accoun an s o Pakis an (Islamabad)
Muhammad Khawa Usman (MSBA)
Khawa [email protected]
Na ional Uni e si y o Mode n languages, Islamabad
Seha Zu iqa
seha zul iqa @gmail.com
Na ional Uni e si y o Mode n Languages Islamabad
A shad Mehmod Sa i (MSBA)
a shadsa i@ho mail.com
Na ional Uni e si y o Mode n languages, Islamabad
I ekha Khu sheed (MSBA)
i eda @yahoo.com
Na ional Uni e si y o Mode n languages, Islamabad
Abs ac
Public sec o o ganiza ions ha e bes s a egic policies bu esul s o all o ganiza ion a e no ewa ding in acco dance
o long e m objec i es. Implemen a ion o he s a egic plan is mo e impo an han o mula ion; o he wise i is
no hing excep well documen ed pieces o pape in he o ganiza ion. The pu pose o s udy is o explo e and con i m
he e ec i e ac o s o ailu e o he s a egic plan implemen a ion in public sec o o ganiza ions in Pakis an. The
s udy has been conduc ed on pu ely public sec o o ganiza ions o he Twin Ci y (Islamabad and Rawalpindi). Fo
his s udy close ended Ques ionnai e a e dis ibu ed among sample o ganiza ions. A e he e iew o li e a u e and
expe s opinion he s udy iden i ied 16 ac o s o ailu e. Then by using he explo a i e and con i ma i e ac o
analysis hese dimensions ha e been ca ego ized in o main ou ac o s. The esul s hese ou ac o s a e con ex ual
dimensions (0.89), con en dimensions (0.62), s uc u al dimensions (0.730) and ope a ional dimensions (0.95).
Key Wo ds: S a egy, S a egy Implemen a ion, Failu e o S a egy Implemen a ion, Public Sec o O ganiza ion and
Fac o Analysis.
In oduc ion
• Backg ound
S a egic Managemen is combina ion o he se o decisions and ac ions which a e iewed in he o m o s a egy
o mula ion, implemen a ion and con ol o plans designed o achie e a co po a ion’s ision, mission and long e m
pe o mance o he o ganiza ion. S a egy is mos impo an concep in managemen con ex . S a egy was
in oduced in i s ime by chandle e al. (1975) in second hal o wen ie h cen u y in he managemen sciences
cou se ou line. In ea lie days, a e he s udy o chandle e al. all he esea che s ocused he success ul s a egy
o mula ion. Howe e , in he ecen yea s’ s udies, a en ion has shi ed owa d he success ul s a egic plan
implemen a ion. The bes S a egy o mula ion is an e o like a well-documen ed piece o pape only bu s a egy
implemen a ion is key o be e o ganiza ional pe o mance and e ec i eness, i is mo e impo an han o mula ion
(joos e and Fou ie, 2009). S a egy implemen a ion is becoming mo e di icul a he han s a egy o mula ion and
op managemen is equi ed o keep in mind h ee le els o s a egic planning p ocess con ex o he o ganiza ion,
con en o s a egy and p ocedu e o implemen a ion (Lau 1999). Failu e o s a egic plan implemen a ion consis s o
six een ac o s which ha e been discussed in (kalali e al, 2011). S udy which is conduc ed in I anian heal h sec o ,
Public Policy and Adminis a ion Resea ch www.iis e.o g
ISSN 2224-5731(Pape ) ISSN 2225-0972(Online)
Vol.3, No.1, 2013
34
explo ed he ac o s which cause he ailu e o s a egy plan implemen a ion in public heal h sec o s. Leade ship ole
is impo an in o mula ion and s a egic plan implemen a ion and i he s a egic leade is no in ol ed in s a egy
implemen a ion, leade ship is no able o c ea e a i id ision o any s a egic p og am (Mape e e, 2012). The e is
clea ly epo ed in he whi e pape o s a egy implemen a ion o Chinese co po a ion in 2006 ha s a egy
implemen a ion has become e y high le el challenges o he managemen o all kinds o o ganiza ions. The su ey
also desc ibed ha ou o 100% su eyed o ganiza ions 83% o ganiza ions ail in implemen a ion o hei s a egy
smoo hly and only 17% o ganiza ions we e success ul in implemen a ion. I canno be ejec ed ha he s a egic
decision is mos impo an o he o ganiza ional su i al and g ow h. No doub in Pakis an public sec o
o ganiza ions ha e bes s a egic policies bu all policies do no ha e app op ia e and ui ul esul s. Insu icien
endea o o he managemen and ineligible managemen a e he g ea es challenges o he policy and decisions
make s in public sec o o ganiza ion in Pakis an, while hey implemen he s a egic decisions due o sho comings
almos s a egic decisions ail du ing he implemen a ion p ocess. Li e a u e shows ha many esea che s ha e been
conduc ed o ind he ac o s which in ol e in success o ailu e o he s a egic plan in many coun ies. In Pakis an
au ho s’ s udies show ha he no esea ch has been ye conduc ed o iden i y hose ac o s which cause he ailu e o
he policies in Pakis an. This negligence shows how we a e since e wi h ou public sec o o he p og ess o
o ganiza ions and g ow h o he economy. Hence, i is impo an issue o he cu en s udy o iden i y he main
easons o ailu e o s a egic plan implemen a ion.
1.2 Objec i es o he S udy
This s udy se s ollowing impo an objec i es:
• To explo e he ac o s which cause he ailu e o implemen a ion o he s a egic plan om p e ious
li e a u e and expe s’ opinions.
• To con i m hese explo a i e ac o s which cause he ailu e o implemen a ion o he s a egic plan in
public sec o o ganiza ions in Pakis an.
• Resea ch Ques ions
The mos impo an ques ions o he esea ch a e:
• Wha a e he mos impo an ac o s behind he ailu e o he s a egic plans implemen a ion in
public sec o s o ganiza ions in Pakis an?
• Wha is he mos impo an a e o he desc ibed ac o s in ailu e o s a egic plans implemen a ion
among he public sec o o ganiza ions in Pakis an?
1.3S a emen o he P oblem
Implemen a ion o he s a egic plan is mo e impo an han o mula ion; o he wise i is no hing excep well
documen ed pieces o pape in an o ganiza ion (joos e and Fou ie, 2009).In Pakis an public sec o o ganiza ions
pe o mance has been declining since las many yea s, while he public sec o o ganiza ions has he bes s a egic
policies. Keeping in iew ha ha ing he bes policies, public sec o o ganiza ions ail in implemen a ion o hese
s a egic plans, due o ailu e o plans pe o mance o he public sec o o ganiza ion is declining day by day. This
s udy will explo e and con i m he ac o s which cause he ailu e o he s a egic plans in Pakis an.
• Signi icance o he S udy
The s udy has academic impo ance as well as has impo ance in s a egic policy making and s a egic plan
implemen a ion; he e a e no s udies abou he ac o s which cause he ailu e o he s a egic plan implemen a ion in
Pakis an. This s udy akes in o accoun he academic esea ch as well as p ac ical li e si ua ions o sugges he
easons and causes which in luence he success ul implemen a ion o he s a egic plan in public sec o o ganiza ion
in Pakis an.
• Scope o he S udy
The s udy se s he h ee majo de e mined objec i es o con ibu e in academic li e a u e o public policy and
business managemen as well as adds he impo an ac ics o success ul s a egic plan implemen a ion in p ac ical
li e o he public sec o o ganiza ions in Pakis an. The s udy encompasses majo ac o s which cause he ailu e o
s a egic plan implemen a ion in shape o con ex ual, con en , ope a ional and s uc u al dimensions.
• S udy Plan
The s udy is compiled in he main i e chap e s; he i s chap e consis s o backg ound, p oblem s a emen ,
objec i es, esea ch ques ions and a ea o he esea ch while he nex chap e consis s o e iew o li e a u e
p e iously done by a ious au ho s abou his s udy and expe s opinion abou he implemen a ion. I encoun e s he
Public Policy and Adminis a ion Resea ch www.iis e.o g
ISSN 2224-5731(Pape ) ISSN 2225-0972(Online)
Vol.3, No.1, 2013
35
obse a ions o ele an s udies ound in li e a u e his o y. In he hi d chap e Me hodology and sou ces o da a a e
gi en which s a e he con en s o s udy like popula ion, sample and analysis ools o be used. The las wo chap e s
a e composed o all discussion and da a analysis ega ding he s a is ical indings o he s udy and also conclusion o
he esul .
Li e a u e Re iew
2.1 S a egy
Hiksen e al. (1986) de ines he s a egy as he decisions which a e ela ed o he long e m pe o mance and p og ess
o he o ganiza ion. S a egyis a combina ion o he se o decisions and ac ions which a e iewed in he o m o
s a egy o mula ion, implemen a ion and con ol o plans designed o achie e a co po a ion’s ision, mission and
long e m pe o mance o he o ganiza ion. S a egy is de e mina ion o he basic long e m goals, objec s and
pe o mance o he o ganiza ion and aking ac ions, decisions and alloca ion o he esou ces essen ial o o ca y
ou goals o he o ganiza ions (chandle e al., 1975)
2.2 S a egy Implemen a ion
The e is a la ge pool o li e a u e abou he s a egic planning, om o mula ion o implemen a ion and assessmen
and con ol. Mille e al (2007) s a es ha s a egic decisions’ scope is e y wide; hese a e he combina ion o he
in oducing new p oduc s and se ices, huge ad e isemen , me ge and accusa ion and change in s uc u e o
o ganiza ions. S a egy o mula ion is i s s ai in s a egic planning in business. Howe e , s a egic planning
p ocedu e does no come o inish he e and i goes on o o he wo s eps namely s a egy implemen a ion and
assessmen & con ol. S a egy implemen a ion is combina ion o necessa y ac ions and s eps o implemen s a egic
plan in o ganiza ion. The bes S a egy o mula ion is an e o like a well documen a ion only bu s a egy
implemen a ion is key o be e o ganiza ional pe o mance, i is mo e impo an han o mula ion (joos e and Fou ie
2009).In ea lie days a e he s udy o (chandle e al. 1975) all he esea ches ocused he success ul s a egy
o mula ion, howe e , in he ecen yea s’ s udies, a en ion has been shi ed owa d he success ul s a egic plan
implemen a ion.
2.3 Failu e o S a egy Implemen a ion
S a egy implemen a ion is mo e impo an o he o ganiza ion han he s a egy o mula ion, because i he s a egic
plan is no success ully implemen ed by he s a and managemen , i s cos and damages g ow mo e han he ailu e
o s a egy o mula ion. I is necessa y o he managemen and s a o use he app op ia e and au hen ic models and
amewo k o he implemen a ion o he s a egic plan in an o ganiza ion. The main eason o ailu e o he s a egic
plan implemen a ion is lack o app op ia e models and amewo ks o guide he managemen and s a which a e
in ol ed in implemen a ion o he s a egic plan in well-known o ganiza ions (Alexande , 1991). Feu e e al. (1995)
iden i ied he o he signi ican ac o s o he ailu es o he s a egic plan a e he lack o communica ion among he
s a egy make s and s a and managemen o he o ganiza ion. They conduc ed he s udy a Hewle -Packa d in
which op managemen used he e icien ask o ce o he o mula ion o he s a egy and hen implemen a ion was
done by he in e io business managemen eam which sol ed many p oblems in implemen a ion o he plan in
app op ia e way. Kalali e al (2011) explo ed and con i med he main ac o s which a e bases and causes o ailu e o
he I anian heal h sec o in I an. They ha e iden i ied and con i med ou ac o s which in ol ed in ailu e o he
s a egic plan in I anian heal h sec o a e con ex , con en , s uc u e as well as ope a ional amewo k o he
o ganiza ion.
Kaplan and No on (1996) also ecommended he o he ou key ac o s which assu e he success o implemen a ion
o he s a egic plan. They collec ed da a o 6 companies, cla i ied and ansla ed s a egy acco ding o he s uc u e
o he o ganiza ion, links and ela ionship wi h he execu i e eam, planning and goal se ing and s a egic eedback
and lea ning. Mille (1997) iden i ied he mo e ac o s a he han hese commonly used in almos s udies and
ca ego ized hese ac o s in o wo g oups acco ding hei e ec s as achie e and enable as well as backing,
speci ici y, cul u al ecep i i y, auspicious amilia i y, a ailabili y o esou ces, and s uc u al p io i y.
Joos e and Fou ie (2009) wo ked on he s a egic plan implemen a ion in A ican cul u e and also e alua ed he
ac o s and easons o he ailu e in A ican coun ies. They a gued ha he e a e many o ganiza ions which ha e
igo ous s a egies bu due o lack o commi men s o he policy make s and lack o s a egic leade ship, hese
igo ous s a egies do no gene a e he ui ul esul s. The main easons behind he ailu e o he s a egy a e lack o
in e es , commi men and e icien leade ship o implemen a ion. Mape e e .al (2012) s a ed ha he easons which
cause he ailu e o he s a egic plan and despi e he bes s a egies, hey could no b ing o h ui ul esul s in
Zimbabwe i was only on accoun o nega i e leade ship beha io which shows he s a egy execu i e people we e
Public Policy and Adminis a ion Resea ch www.iis e.o g
ISSN 2224-5731(Pape ) ISSN 2225-0972(Online)
Vol.3, No.1, 2013
36
no liable, hey we e less commi ed o s a egy. Lack o c ea i e s a egic ision in he o ganiza ion hey could no
mo i a e and boo up mo als o he s a o ob ain he de e mined objec i es, besides, communica ion among he
middle le el managemen and high le el managemen in o ganiza ion emained e y low. Owing o lack o
communica ion, he op le el managemen could no he con ey hei app op ia e messages o low le el managemen
and he las mos impo an eason o he ailu e is lack o he leade ship skills in leade s which engende ed many
ambigui ies among he wo king s a and leade s who could no unde s and he si ua ions o he o ganiza ion.
Mackenzie e al (2001) also ocused he leade ship s yle o an o ganiza ion by which one can ob ain he desi ed goals
and objec i es o he company h ough c ea ing he ision o he o ganiza ion acco ding o he se up o he i m,
aligning he s a o he achie emen o he goals o he i m a he han he pe sonal goals, p o iding he assis an o
he in ellec ual indi iduals in complica ed hings and cla i ying expec a ions o he o ganiza ion om he eam and
hei pe o mance o he o ganiza ion.
Aal onen and Ika alko (2002) also explo ed he h ee main ac o s which cause he success o he s a egy
implemen a ion a e p ope and signi ican communica ion among he execu o and op managemen , s a egic ac ing,
iden i ying, suppo ing and assis ing he majo key playe o he s a egy implemen a ion and also es ablish he
ela ionship be ween he sys em and s uc u e o he o ganiza ion wi h he con en and con ex o he s a egy. B enes
e al (2007) iden i ied he majo key ac o s which in luenced he success o he s a egy implemen a ion in
o ganiza ion; he iden i ied he execu ion p ocess in o ganiza ion, s a egy o mula ion p ocedu e om in e nal
scanning o ex e nal scanning o he o ganiza ion, s a egy con ol p ocess and mo i a ion o he op le el
managemen and s a egic leade o achie e objec i es o he o ganiza ion, and co po a e go e nance issues in and
o ganiza ion.
A e analyzing all he p e ious li e a u e o s udies, he esea ch has ag eed on he main six een ac o s which a e
used epea edly and equen ly in almos all esea ches and also aken by kalali e al (2011) which is conduc ed in
I anian heal h sec o . All he ac o s which a e aken by he esea che s a e shown in he ollowing able o he s udy
o kalali e al (2011).
Figu e 3.1 Fac o De ail
1.Con en dimension
Con en dimensions include he ing edien s in ol ed in s a egy o mula ion
2.Con ex ual dimensions Con ex ual dimensions include he in e nal and ex e nal en i onmen al o he
s a egy implemen a ion in public sec o o ganiza ions.
3.Ope a ional dimensions Ope a ional dimensions e e o he p oblems which happen in he ope a ional
le el du ing he
s a egy implemen a ion.
4.S uc u al dimensions S uc u al dimensions poin ou he o ganiza ional s uc u e and powe and
esponsibili ies dis ibu ions
Public Policy and Adminis a ion Resea ch www.iis e.o g
ISSN 2224-5731(Pape ) ISSN 2225-0972(Online)
Vol.3, No.1, 2013
37
Figu e 3.2 De ail o he ac o s dimensions which cause he ailu e o he plan in public sec o o Pakis an.
1 Resou ce limi a ion Budge , echnology, ools and human esou ces a e inadequa e o
s a egic decision implemen a ion in Pakis an.
2 Backg ound I is cul u e o public sec o o ganiza ion o always ail in
implemen a ion.
3 Lack o in eg a ion ( Poo
communica ion)
All Mos depa men s o he public sec o o ganiza ion a e no
in eg a ed o each o he .
4 Con lic ing goals and p io i ies
Goals and p io i ies a e in luenced by pe sonal in e es .
5 En i onmen al unce ain y Unp edic ed p oblems happen due o change in go e nmen ,
poli ical, social and leade ship.
6 Non
-
con e gence
Coo dina ion o co e playe ac i i ies is poo and ine icien .
7 lack o compe en people The employees who a e in ol ed in he s a egy implemen a ion
a e no compe en and ecommended people.
8 lack o eam managemen
Ins uc ion and in ol emen o eam leade is insu icien .
9 ine ec i e ope a ional a angemen Responsibili ies o people a e no assigned and de ined in p ope
manne .
10 lack o suppo o Top le el Insu icien suppo o Di ec o and head o depa men in
implemen a ion o s a egic plan implemen a ion.
11 Unclea Ta ge o success
The c i e ia o he success o s a egic decision a e no speci ic
and clea .
12 Non-accep o o ganiza ional
Cul u e
Belie s and alues o he employees o o ganiza ion a e
con lic ing wi h implemen ing he conside ed s a egy
13 Di e gen o ganiza ional s uc u e The cu en o ganiza ion s uc u e p e en s om he
implemen a ion o he s a egy.
14 lack o commi men o decision-
make s
Decision make s do no ha e in e es and commi men o
implemen he s a egy
15 Ambiguous s a egy
The decided s a egy is no unde s andable and well
-
de ined
16 Non con e gence o o ganiza ional
a ied aspec s o
conside ed s a egy
The e is no a angemen be ween p ocesses, wo k sys ems and
o he dimensions o he o ganiza ion wi h he o ganiza ional
s a egy
Figu e 4.1
KMO and Ba le 's Tes
Kaise -Meye -Olkin Measu e o Sampling Adequacy.
0.724
Ba le 's Tes o Sphe ici y
App ox. Chi-Squa e
215.55
D
120
Sig.
.000

Public Policy and Adminis a ion Resea ch www.iis e.o g
ISSN 2224-5731(Pape ) ISSN 2225-0972(Online)
Vol.3, No.1, 2013
38
Figu e 4.2 De ail o he ac o s dimensions
De ail Con en
dimension
Con ex ual
dimensions
Ope a ional
dimensions
S uc u al
dimensions
1 En i onmen al unce ain y
.659
2 Backg ound
.616
3 Non-accep o o ganiza ional Cul u e
.584
4 Non con e gence o o ganiza ional a ied
aspec s o conside ed s a egy
.573
5 Unclea s a egy
.624
6 Con lic ing goals and p io i ies
.702
7 lack o suppo o Top le el
.608
8 lack o commi men o decision make s
.650
9 Non-assess abili y o implemen ed s a egic
decision
.643
10 Resou ce limi a ion
.502
11 lack o eam managemen
.614
12 Unclea Ta ge o success
.578
13 Lack o in eg a ion ( Poo
communica ion)
.626
14 Disha mony
.614
15 lack o compe en people
.592
16 Di e gen o ganiza ional s uc u e
.568
Va iances
10.73%
13.45%
21.711%
14.576%
Cumula i e Va iances
60.47%
49.74%
36.288%
14.57%
Eigen alue
1.376
2.332
3.474
1.494
Rela ionship con en o Fac o in o e all Failu e
Ope a ional .95
Con ex 0.89
Fac o s (1)
S uc u al .73
Con en .62
5. Resea ch Me hodology and P ocedu e
S udy is conduc ed o i s iden i y he ac o s o he ailu e o he s a egic plans implemen a ion and hen o
con i m hem in public sec o o ganiza ion o he Pakis an.
5.1 Popula ion: S udy co e s he win ci y (Islamabad and Rawalpindi) and su ounding a eas ‘ ede al o ganiza ions
among popula ion. In popula ion all he o ganiza ion a e ully public sec o o ganiza ions ( ully depend on he
ede al go e nmen in e m o inancing and s a egy) and semi go e nmen , public sec o s co po a ions and
au onomous bodies a e no in ol ed.
5.2 Sample: Wapda, Na ional sa ings, Pakis an su ey ins i u e, Pakis an ag icul u e esea ch ins i u e, PARC, FBR,
and CDA a e he samples o he s udy. Abou Two hund eds Ques ionnai es a e dis ibu ed in men ioned
o ganiza ions o he collec ion o he da a. Bu only 150 Ques ione s ha e been collec ed om hese o ganiza ions.
5.3 Ins umen : o he da a collec ion close ended Ques ionnai e a e used which con ain i e op ions as S ongly
Ag ee, Ag ee, Nei he , S ongly disag ee and disag ee. The scales (Ques ionnai e) ha a e used in s udy a e he
posi i e and nega i e a ec scale. Wes on, Cla k and Tellegen (1988) s a ed ha o he ac o analysis i is
compulso y ha he ques ions o he scale mus be in posi i e and nega i e o m. So in he s udy scale has o al 16
ques ions in which he 8 a e posi i e in na u e and 8 a e in nega i e o m.
5.4 Reliabili y: Ques ionnai e is e iewed in e m o he eliabili y and alidi y, c onba ch’s alpha is used in SPSS
e sion 20. The esul o alpha is in he e m o alidi y is 95 % and eliabili y is 73.1% which shows he signi ican
esul o he eliabili y and alidi y.
Public Policy and Adminis a ion Resea ch www.iis e.o g
ISSN 2224-5731(Pape ) ISSN 2225-0972(Online)
Vol.3, No.1, 2013
39
5.5 Explo a ion: To conduc he esea ch o he easons o he ailu e o he s a egic plan implemen a ion in
public sec o o ganiza ion esea che ini ially ied o explo e he ac o s o ailu e om p e ious esea ches li e a u e
by using he Delphi echniques and hen dimensions a e su ey by explo a o y ac o s analysis.
5.6 Con i ma ion: o he ac o analysis i is ini ially equi ed ha hese numbe o da a a e sui able o he ac o s
analysis, hen esea che pu he Ques ionnai e in SPSS o he KMO measu es and Ba le ’s es . Acco ding o
KMO’s measu emen 0.734 which is g ea e han 0.6 and signi icance le el is .000 which is less han 0.05 shows ha
he da a a e sui able o he ac o analysis.
5.7 Con i ma o y Fac o analysis: The esul om he con i ma o y ac o analysis is ha Roo mean squa e e o
o app oxima ion (RMSEA) is equal o 0.067 which is less han 0.1 and Goodness o i index (GFI) 0.72 and
adjus ed goodness o i index (AGFI) 0.74 which a e be ween he 0 and 1 shows he model i ness is good. Chi-
squa e215.457 and eedom deg ee a e is 120 so he a io is1: 2.09 which is also less han he 3. So i is concluded
ha ou ac o s a e i o he model o ac o analysis.
The ob ain esul om ac o analysis abou he ac o a e as ope a ional dimensions (0.95), con ex dimensions
(0.89), s uc u al dimensions (0.73) and con en dimensions a e (0.620) e ec i e ac o s in ailu e o public sec o .
Ope a ional dimension is a op (0.95) which shows ha ope a ional dimensions include; esou ces limi a ion,
incompe en managemen and s a , poo planning o execu ion and lack o in eg a ion among he depa men a e
he main easons o ailu e, a e ha con ex dimensions, s uc u al and con en dimensions.
Conclusion:
Due o globaliza ion he compe i ion among o ganiza ions has signi ican ly inc eased and ough ime job o he
mange s o main ain he le el o o ganiza ion in ma ke and su i e in compe i ion. Today i is e y di icul o
managemen o make accu a e and igo ous decision and implemen a ion o he plan in success ul manne . A single
mis ake by managemen in s a egy o mula ion and implemen a ion can d op whole he o ganiza ion s a us om
peak poin o shu down si ua ion. The e o e i is necessa y o he manage o in case o public sec o o ganiza ion
head o he depa men , di ec o s and op le el managemen o ake he ac ion in igh ime, wi h adequa e esou ces
and compe en labo o ces. As a men ioned in las chap e o he s udy, he ac o s which a e he easons o he
ailu e o he s a egic plan in public sec o o ganiza ions o Pakis an. Re iewing he p e ious li e a u e and expe
Bau u cu a e opinion esea che has enable o explo e he 16 dimensions as e ec i e ac o s on he ailu e o he
s a egic plan implemen a ion in Pakis an. The esul o he ac o analysis in bo h o ms explo a i e and
con i ma i e classi ied hese dimension in o ou main ac o s con ex ual dimension (0.89), con en dimensions
(0.62), s uc u al dimensions (0.730) and ope a ional Dimensions (0.95).
The esul shows ha he mos impo an eason o he ailu e o he s a egic plan implemen a ion in public sec o s
o ganiza ion in Pakis an is ope a ional plan o he implemen a ion. Ope a ional dimensions include; esou ces
limi a ion, incompe en managemen and s a , poo planning o execu ion and lack o in eg a ion among he
depa men a e he main easons o ailu e, a e ha con ex dimensions, s uc u al and con en dimensions.
The e o e paying he mo e a en ions on plan implemen a ion o he public sec o can achie e he desi ed esul in
shape goals, bene i , su plus budge and long e m su i al in ma ke by hi ing he compe en s a acco ding o
equi emen (a oid om idle labo .i.e. PIA has 45000employees o 36 ai planes), hi e he compe en people, P ope
mone ize he plan and inc ease he communica ion among he depa men s equen ly.
Fu u e Resea ches Guideline:
The e a e no only he abo e men ioned ac o s which cause he ailu e o he s a egic plan implemen a ion in public
sec o o ganiza ion. Many o he s dimension also ha ing he de imen e ec o ailu e in Public sec o o ganiza ions
a e:
• Imp ope mone iza ion
• Poli ical in luence
• Lack o esponsibili y accep ance
• Idle human esou ces
• Inc emen al budge a he han ac i i y base budge .
Re e ences
Aal onen, P., Ika alko, H. (2002) 'Implemen ing s a egies success ully',In eg a ed Manu ac u ing Sys ems, 13 (6),
pp. 415-418
Public Policy and Adminis a ion Resea ch www.iis e.o g
ISSN 2224-5731(Pape ) ISSN 2225-0972(Online)
Vol.3, No.1, 2013
40
ALEXANDER, L.D. 1991, “S a egy implemen a ion: na u e o he p oblem”, in Hussey, D. (Ed.), In e na ional
Re iew o S a egic Managemen , 2(1),John Wiley & Sons,Chiches e /NewYo k. 2(1): 73-96.
B enes ER, Mena M, Molina GE (2007). Key Success Fac o s o S a egy Implemen a ion in La in Ame ica. J. Bus.
Res., pp 1-9.
Chanadle , A. (1995). S a egy and s uc u e.MIT p ess.
Den e Mape e e, Se e inoMa hiki, Tonde aiNyamwanza, Shingi aiSikomwe and Ch is ophe Mhonde (2012)
S a egic Role o Leade ship in S a egy Implemen a ion in Zimbabwe's S a e Owned En e p ises. Vol. 3 No. 16
Feu e , R. and. Chaha baghi K., (1995) S a egy de elopmen : pas , p esen & u u e. Managemen Decision, Vol. 33,
No. 6. Chesb ough, H. (2002).
Hicksen DJ, Bu le RJ, C ay D, Mallo y GR, Wilson DC (1986). TopDecisions: S a egic Decision-Making in
O ganiza ions. SanF ancisco: Jossey-Bass, pp. 26-42.
Joos e&Fou ie (2009) he ole o s a egic leade ship in e ec i e s a egy implemen a ion: pe cep ion o Sou h
A ican s a egic leade s. Sou h A ican business Re iew, 13(30, 51-68
kalali S, An a i M, Asgha A and Ka imay (2011),Why does s a egic plans implemen a ion ail? A s udy in he
heal h se ice sec o o I an. Vol. 5(23), pp. 9831-9837, 7 Oc obe , 2011
Kaplan RS, No on DP (1996).The Balanced Sco eca d – T ansla ing S a egy in o Ac ion Ha a d Business
School P ess. Bos on, MA.
Mackenzie, D. L., Wilson, D. B., & Cide , S. B. (2001). E ec s o Co ec ional Boo Camps on O ending. The
ANNALS o he Ame ican Academy o Poli ical and Social Science, 578(1), 126-143.
Mille S (1997). Implemen ing S a egic Decisions: Fou key Success Fac o s. O gan. S ud., 18(4): 577-602.
Mille D (2007). Success ul Change leade s: Wha Makes Them? Wha Do They Do Tha Is Di e en ? J. Change
Manage., 2(4): 359-68.
Wa son, D., Cla k, L. A., &Tellegen, A. (1988). De elopmen and alida ion o b ie measu eso posi i e and
nega i e a ec : The PANAS scales. Jou nal o Pe sonali y and SocialPsychology, 54(6)
Resea ch Ques ionnai e
Why do public sec o o ganiza ions ail in Implemen a ion o s a egic plan in Pakis an?
Na ional Uni e si y o Mode n Languages H-9 Islamabad
Name o O ganiza ion______________________________
Designa ion_____________________
E-mail____________________________________
SA =S ongly
Ag ee , A=Ag ee, N=Nei he , SD= S ongly Disag ee , D= Disag ee
Selec only one column
SA
A
N
SD
D
1
Limi ed esou ces cause o implemen o accomplish s a egic plan.
2 You o ganiza ion can’ implemen s a egic plan o he eason ha i is
Public sec o o ganiza ion.
3 S a egic plans ail due o de icien communica ion sys em o you
o ganiza ion.
4 The di e ence o opinion among you and you highe managemen in he
way o objec i e a ec s pe o mance o you o ganiza ion.
5
New p oblems may occu while implemen ing he s a egic plan.
6
The people who execu e he s a egic plan may ag ee o ano he plan oo.
7
The people who a e assigned o execu e he s a egic plan mus ha e
Public Policy and Adminis a ion Resea ch www.iis e.o g
ISSN 2224-5731(Pape ) ISSN 2225-0972(Online)
Vol.3, No.1, 2013
41
educa ion and expe ise.
8 Lack o leade ship o ins uc ions o leade ship cause ailu e o he
s a egic plan implemen a ion.
9 The Execu i e o o ganiza ion may help you in implemen a ion o he
s a egic plan.
10 Be o e implemen a ion o he s a egic plan all ma e ial o impo an
in o ma ion is necessa y o be achie ed.
11 A e ha ing de eloped he s a egic plan opinion o he people mus be
ob ained o i s implemen a ion, ejec ion o accep ance.
12 The s uc u e o an o ganiza ion may become a ba ie in implemen a ion
he s a egic plan.
13 Wha e e he s a egic plan is, i mus be p epa ed in acco dance o
in o ma ion o he objec i es.
14 The s a egic plan mus be p epa ed in acco dance o he sys em o an
o ganiza ion.
15 The manage s mus adop s ic a i ude o implemen he s a egic plan
once de eloped.
16 Be o e implemen a ion hese s a egic plan, du ies and na u e o
assignmen s o he manage s mus clea ly be de ined.
• No e: Pu pose o Ques ionnai e is only o collec he da a o esea ch which is conduc ed in NUML.
• Copy igh o his Ques ionnai e is p ope y o MSBA-1 sec ion (A) NUML which is sa ed in IISTE-
accele a ing Global knowledge sha ing
• I any pe son wan s o use his Ques ionnai e hen con ac wi h Muhammad
Khawa Usman( Negyal Rajpo ) a NUML.