Citations refer to the original publication, not to a Scieee localized version.
Noori-Darvish, S., & Tavakkoli-Moghaddam, R. (2012). Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times. Journal of Industrial Engineering International, 8, 1–13. https://doi.org/10.1186/2251-712X-8-25
Noori-Darvish, Samaneh, and Reza Tavakkoli-Moghaddam. “Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times.” Journal of Industrial Engineering International, vol. 8, 2012, pp. 1–13. https://doi.org/10.1186/2251-712X-8-25.
Noori-Darvish, Samaneh, and Reza Tavakkoli-Moghaddam. “Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times.” Journal of Industrial Engineering International 8 (2012): 1–13. https://doi.org/10.1186/2251-712X-8-25.
Noori-Darvish, S. and Tavakkoli-Moghaddam, R. (2012) ‘Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times’, Journal of Industrial Engineering International, 8, pp. 1–13. Available at: https://doi.org/10.1186/2251-712X-8-25.
S. Noori-Darvish and R. Tavakkoli-Moghaddam, “Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times,” Journal of Industrial Engineering International, vol. 8, pp. 1–13, 2012, doi: 10.1186/2251-712X-8-25.
@article{nooridarvish2012minimizing,
author = {Noori-Darvish, Samaneh and Tavakkoli-Moghaddam, Reza},
title = {Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times},
journal = {Journal of Industrial Engineering International},
year = {2012},
volume = {8},
pages = {1--13},
publisher = {Heidelberg: Springer,Heidelberg: Springer},
doi = {10.1186/2251-712X-8-25},
url = {https://doi.org/10.1186/2251-712X-8-25}
}