Citations refer to the original publication, not to a Scieee localized version.
Ahmadpour, S., & Ghezavati, V. (2019). Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition. Journal of Industrial Engineering International, 15(S1), 179–197. https://doi.org/10.1007/s40092-019-00328-w
Ahmadpour, Sama, and Vahidreza Ghezavati. “Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition.” Journal of Industrial Engineering International, vol. 15, no. S1, 2019, pp. 179–197. https://doi.org/10.1007/s40092-019-00328-w.
Ahmadpour, Sama, and Vahidreza Ghezavati. “Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition.” Journal of Industrial Engineering International 15, no. S1 (2019): 179–197. https://doi.org/10.1007/s40092-019-00328-w.
Ahmadpour, S. and Ghezavati, V. (2019) ‘Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition’, Journal of Industrial Engineering International, 15(S1), pp. 179–197. Available at: https://doi.org/10.1007/s40092-019-00328-w.
S. Ahmadpour and V. Ghezavati, “Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition,” Journal of Industrial Engineering International, vol. 15, no. S1, pp. 179–197, 2019, doi: 10.1007/s40092-019-00328-w.
@article{ahmadpour2019modeling,
author = {Ahmadpour, Sama and Ghezavati, Vahidreza},
title = {Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition},
journal = {Journal of Industrial Engineering International},
year = {2019},
volume = {15},
number = {S1},
pages = {179--197},
publisher = {Heidelberg: Springer,Heidelberg: Springer},
doi = {10.1007/s40092-019-00328-w},
url = {https://doi.org/10.1007/s40092-019-00328-w}
}