Citations refer to the original publication, not to a Scieee localized version.
Hsiau, H. J., & Lin, C. W. R. (2009). A fuzzy pert approach to evaluate plant construction project scheduling risk under uncertain resources capacity. Journal of Industrial Engineering and Management (JIEM), 2(1), 31–47. https://doi.org/10.3926/jiem.v2n1.p31-47
Hsiau, Hsian Jong, and Chun Wei R. Lin. “A fuzzy pert approach to evaluate plant construction project scheduling risk under uncertain resources capacity.” Journal of Industrial Engineering and Management (JIEM), vol. 2, no. 1, 2009, pp. 31–47. https://doi.org/10.3926/jiem.v2n1.p31-47.
Hsiau, Hsian Jong, and Chun Wei R. Lin. “A fuzzy pert approach to evaluate plant construction project scheduling risk under uncertain resources capacity.” Journal of Industrial Engineering and Management (JIEM) 2, no. 1 (2009): 31–47. https://doi.org/10.3926/jiem.v2n1.p31-47.
Hsiau, H. J. and Lin, C. W. R. (2009) ‘A fuzzy pert approach to evaluate plant construction project scheduling risk under uncertain resources capacity’, Journal of Industrial Engineering and Management (JIEM), 2(1), pp. 31–47. Available at: https://doi.org/10.3926/jiem.v2n1.p31-47.
H. J. Hsiau and C. W. R. Lin, “A fuzzy pert approach to evaluate plant construction project scheduling risk under uncertain resources capacity,” Journal of Industrial Engineering and Management (JIEM), vol. 2, no. 1, pp. 31–47, 2009, doi: 10.3926/jiem.v2n1.p31-47.
@article{hsiau2009fuzzy,
author = {Hsiau, Hsian Jong and Lin, Chun Wei R.},
title = {A fuzzy pert approach to evaluate plant construction project scheduling risk under uncertain resources capacity},
journal = {Journal of Industrial Engineering and Management (JIEM)},
year = {2009},
volume = {2},
number = {1},
pages = {31--47},
publisher = {Barcelona: OmniaScience,Barcelona: OmniaScience},
doi = {10.3926/jiem.v2n1.p31-47},
url = {https://doi.org/10.3926/jiem.v2n1.p31-47}
}