scieee Science in your language
[en] (orig)

Making land available. Cultural legal comparison of the German Building Land Mobilisation Act and the partial revision of the Swiss Spatial Planning Act

Abstract

Planning practice is confronted with seemingly contradictory challenges, such as the qualitative and quantitative provision of housing paired with reducing land consumption. To address this apparent dilemma, legislators are increasingly relying on densification. However, a fundamental prerequisite (and often a significant challenge) for this is the availability of the land required. Recent planning law reforms in Germany and Switzerland aim to increase the effectiveness and speed at which land is made available for inner development, thus meeting the seemingly conflicting planning policy goals. This paper compares recent legislative efforts in Germany and Switzerland using the comparative law method. The German Building Land Mobilization Act includes amendments to the Building Code (Baugesetzbuch) and the Building Use Ordinance (Baunutzungsverordnung), intended to enable faster activation of building land and the creation of more affordable housing. To this end, the amendment expands existing instruments for the activation of building land and introduces simplifications to the planning law. In Switzerland, the Spatial Planning Act has been partially revised to achieve inner urban development through precise regulations on the expansion of building zones and instruments to ensure the implementation of zoning plans.

Read accessible full text

Making land available. Cultural legal comparison of the German Building Land Mobilisation Act and the partial revision of the Swiss Spatial Planning Act

Author: Hengstermann, Andreas,Skala, Nadja
Publisher: oekom verlag
DOI: 10.14512/rur.1655
Source: https://repos.hcu-hamburg.de/bitstream/hcu/957/1/900000_2023_1655_OnlinePDF.pdf
u .oekom.de h ps://doi.o g/10.14512/ u .1655
BEITRAG ARTICLE OPEN ACCESS
Making land a ailable. Cul u al legal compa ison o he
Ge man Building Land Mobilisa ion Ac and he pa ial
e ision o he Swiss Spa ial Planning Ac
And eas Hengs e mann , Nadja Skala
Recei ed: 2 Augus 2022 Accep ed: 10 Janua y 2023 Published online: 14 Feb ua y 2023
Abs ac
Planning p ac ice is con on ed wi h seemingly con adic o y
challenges, such as he quali a i e and quan i a i e p o i-
sion o housing pai ed wi h educing land consump ion. To
add ess his appa en dilemma, legisla o s a e inc easingly
elying on densi ica ion. Howe e , a undamen al p e equisi e
(and o en a signi ican challenge) o his is he a ailabili y
o he land equi ed. Recen planning law e o ms in Ge many
and Swi ze land aim o inc ease he e ec i eness and speed
a which land is made a ailable o inne de elopmen , hus
mee ing he seemingly con lic ing planning policy goals. This
pape compa es ecen legisla i e e o s in Ge many and
Swi ze land using he compa a i e law me hod. The Ge man
Building Land Mobiliza ion Ac includes amendmen s o he
Building Code (Baugese zbuch)and heBuildingUseO di-
nance (Baunu zungs e o dnung), in ended o enable as e
ac i a ion o building land and he c ea ion o mo e a o d-
able housing. To his end, he amendmen expands exis ing
ins umen s o he ac i a iono building landand in oduces
simpli ica ions o he planning law. In Swi ze land, he Spa ial
PlanningAc hasbeenpa ially e ised oachie einne u ban
de elopmen h ough p ecise egula ions on he expansiono
D . And eas Hengs e mann, Uls e Uni e si y, Sho e Road,
Jo dans own Campus, BT37 0QB Bel as , UK
a.hengs e mann@uls e .ac.uk
Nadja Skala, Ha enCi y Uni e si ä Hambu g, Henning-Vosche au-
Pla z 1, 20457 Hambu g, Ge many
nadja.skala@hcu-hambu g.de
© 2023 by he au ho (s); licensee oekom. This Open
Access a icle is published unde a C ea i e Commons A ibu ion
4.0 In e na ional Licence (CC BY).
buildingzonesandins umen s oensu e heimplemen a ion
o zoning plans.
Keywo ds: Planning Law legal inno a ions use and
disposal igh s cul u al legal compa ison
Flächen mobilisie en. Ein kul u elle
Rech s e gleich des deu schen
Baulandmobilisie ungsgese zes und de
Teil e ision des schweize ischen
Raumplanungsgese zes
Zusammen assung
Die plane ische P axis is mi scheinba wide sp üchlichen
planungspoli ischen He aus o de ungen kon on ie , wie
beispielsweisedie quali a i e und quan i a i e Be ei s ellung
on Wohn aum bei gleichzei ige Reduk ion de Flächenin-
ansp uchnahme. Um dem scheinba en Dilemma zu begeg-
nen, se z de Gese zgebe zunehmend au Ve dich ung. Eine
G und o ausse zung (und häu ig g oße He aus o de ung) da-
ü is jedoch die a sächliche Ve ügba kei de benö ig en
Flächen. Jüngs e Re o men des Planungs ech s zielen sowohl
inDeu schlandalsauchinde Schweizda au ebendieseBau-
land e ügba kei zu ö de n, um so die benö ig en Flächen
ü die Innenen wicklung e ek i e und schnelle e ügba
zu machen, um den scheinba kon ä en planungspoli ischen
Zielen zu en sp echen. Diese Bei ag e gleich die jüngs-
en gese zgebe ischen Bemühungen in Deu schland und de
Schweiz mi Hil e de Me hode de Rech s e gleichung. Das
deu sche Gese z zu Mobilisie ung on Bauland (Baulandmo-
bilisie ungsgese z) en häl Ände ungen des Baugese zbuchs
und de Baunu zungs e o dnung, die eine schnelle e Ak i ie-
ung on Bauland und die Scha ung on meh bezahlba em
Wohn aume möglichensollen.Dazuwe dendiebes ehenden
Raum o schung und Raumo dnung | Spa ial Resea ch and Planning (2023) 81/6: 591–604 591
A. Hengs e mann,N. Skala
Ins umen e zu Baulandak i ie ung e wei e und planungs-
ech liche Ve ein achungen einge üh . In de Schweiz wu de
das Raumplanungsgese z eil e idie , um eine Siedlungs-
en wicklung nach innen du ch p äzise Regulie ungen bei de
Auswei ungde BauzonesowieIns umen ezu Siche s ellung
de a sächlichen Umse zung de Nu zungszonenplanung zu
e wi ken.
Schlüsselwö e : Planungs ech Rech sneue ungen 
Nu zungs- und Ve ügungs ech e Kul u elle Rech s e gleich
1 Housing supply and educing land
ake: An os ensible con adic ion
Planning p ac ice is con on ed wi h seemingly con adic-
o y planning policy challenges. On he one hand, he is-
sue o housing p o ision has once again become u gen
in many coun ies, bo h in e ms o gene al, quan i a i e
p o ision o housing in ce ain egions (e.g. in me opoli-
an a eas) and in e ms o qualified p o ision (e.g. in e ms
o housing affo dabili y) (Deb unne /Hengs e mann/Ge be
2020). On he o he hand, con olling he ongoing sealing
o g een spaces is a adi ional and mo e p essing planning
challenge o comba clima e change. Rega dless o he ex-
ac defini ion and conc e e measu emen o his new land
ake (Jaege /Schwick 2014; Deco ille/Schneide 2016;Ba -
bosa/Vallecillo/Ba anzelli e al. 2017; Ma on/B ownlie/Bull
e al. 2018; Ma qua d/Ba ke/Gi eu i Fon e al. 2020), i
should be no ed ha a educ ion o ‘ne ze o’ includes bo h
he p o ec ion o g een spaces and he ac i a ion o inne
de elopmen po en ials.
The Eu opean Union (Hennig/Schwick/Soukup e al.
2015; V ebos e al. 2017) and also some Membe S a es
ha e added (mo e o less) conc e e legal objec i es o hei
policy goals in his ega d (Scha z/Bo e /Liede e al. 2021),
such as Belgium (Halleux/Ma cinczak/ an de K abben
2012; Bui elaa /Lein elde 2020), F ance (Jehling/Hech
2022), Aus ia (Meinel/Schumache /Behnisch e al. 2019;
Kanonie 2020), Poland (S ache zak/Hełdak/Hájek e al.
2019) and he Czech Republic (Vejchodská/Pelucha 2019).
The opic is also es ablished as a poli ical issue in Ge -
many and Swi ze land. In i s sus ainabili y s a egy, Ge -
many s a ed ha new daily land ake should be educed om
120 ha o 30 ha (Bundes egie ung 2002: 99). Effec i ely, i
has been possible o educe land ake ( o abou 55 ha pe
day),1bu he o iginal a ge has been pos poned om 2020
o 2030. In addi ion, he e a e demands o implemen ne -
1h ps://www.des a is.de/ans ieg-su .h ml (30.12.2022).
ze o ake-up by 2050, e.g. by he Eu opean Commission,
he Ge man Council o Sus ainable De elopmen (RNE),
he Ge man Council o En i onmen al Ad iso s (SRU) and
he Na u e and Biodi e si y Conse a ion Union (NABU).
A he same ime, he e is a c oss-pa y adi ion o p o-
mo ing housing, mos ecen ly he 400,000 housing a ge
o he cu en go e nmen (Bundes egie ung 2021: 88). In
Swi ze land, he o igin o spa ial planning lies in p o ec ing
ag a ian landscapes (G iffel 2017b: 21). In ecen imes,
legisla o s ha e also come unde p essu e o inc ease he e -
ec i eness o spa ial planning om a ious popula ini ia-
i es (Hengs e mann/Ge be 2015; Aemisegge /Moo /Ruch
e al. 2016a), such as he “Landscape Ini ia i e” (2008),
he “Second Homes Ini ia i e” (2012), he “U ban Sp awl
Ini ia i e” (2019) and cu en ly he “New Landscape Ini-
ia i e” (pending). While affo dabili y is a ocus, he e is
also a poli ical effo o p omo e he p o ision o housing
in gene al.
Wha all app oaches ha e in common is ha expand-
ing housing supply while economising on land ake cons i-
u es an appa en dilemma. This, howe e , can be esol ed
h ough dense cons uc ion and consis en inne de elop-
men . The g ea es challenge o such a s a egy is, again,
accessing he equi ed land, he a ailabili y o which is de-
e mined by he buildabili y o an a ea in planning and legal
e ms, and he willingness o he landowne s o build. The
logic o plan-led planning is based on he ac ha capi-
alisa ion o he land en encou ages building. While he
mechanism wo ks in he as majo i y o cases, in indi id-
ual cases i can be seen ha e en in economically a ac-
i e loca ions some o he sui able land emains effec i ely
una ailable o building de elopmen . Ce ain owne s e-
sis he economic added alue o building de elopmen and
lea e hei land unde used o unused, despi e i being desig-
na ed as sui able o de elopmen (Colsae /Lau ans/Le el
2018; Bo icini/Auzins/Lacoe e e al. 2022). In e ms o he
plan-led planning sys em, owne s hus ha e a e o posi ion
in he implemen a ion o land-use planning, which coun e -
ac s he inc easing pe o mance-based o ien a ion o spa ial
planning (Ge be 2016). Only i he landowne s become ac-
i e h ough building o selling hei p ope y is he plan’s
ac ual implemen a ion possible.
Imp o ing building land a ailabili y is called he mobili-
sa ion o building land. This can be achie ed bo h h ough
a p ope y’s legal s a us as a buildable a ea and by inc eas-
ing he willingness o p ope y owne s o build (o hei
willingness o sell o owne s willing o build).
Recen – and in pa inno a i e – e o ms o planning
law in a ious coun ies aim o inc ease he a ailabili y o
building land, making he land necessa y o inne de el-
opmen a ailable mo e effec i ely and quickly. The seem-
ingly con adic o y planning policy goals ( educing land
592 Raum o schung und Raumo dnung | Spa ial Resea ch and Planning (2023) 81/6: 591–604
Making land a ailable. Cul u al legal compa ison o he Ge man Building Land Mobilisa ion Ac and he pa ial ...
ake and p o iding housing) a e hus econciled h ough
effec i e planning and dense cons uc ion. In legal heo y,
his means ha he ac ions o public au ho i ies egula e he
igh s o use land, while he igh s o dispose o land a e o
be influenced by public policy.
The s uc u e o his pape ollows ou me hodological
app oach (as desc ibed in Sec ion 3). Sec ion 1has al eady
ou lined he subs an i e p oblem in he wo selec ed coun-
ies. Sec ion 2explains he co esponding legal- heo e i-
cal backg ound. Sec ion 3explains he me hodological ap-
p oach using cul u al compa a i e law. Sec ions 4and 5
show he mos ecen egula o y changes made by he e-
spec i e na ional legisla o s. Finally, a sys ema ic legal com-
pa ison is unde aken in Sec ion 6.
2 Gaps and u ban sp awl as
a challenge o planning
In legal e ms, land is a commodified good (Da y 1996;
Ge be /Ge be 2017). Acco dingly, p ope y is no a legal
ela ionship be ween a pe son and a hing bu a iangula
legal ela ionship be ween diffe en pe sons, which in u n
is p o ec ed by s a e ins i u ions (B omley 1992: 15). The
legal ela ionship consis s o se e al elemen s, me apho i-
cally called “bundles o igh s” (Demse z 1974: 163). The
exac classifica ion o hese bundles depends on he con ex
(Thiel 2008;Slae 2016).
Acco ding o B acke (2004), howe e , a simplified dis-
inc ion can be made be ween he igh s o disposal and he
igh s o use. Righ s o disposal include igh s ha in ol e
a ans e o he objec (e.g. p o isions on sale, pu chase,
en al, leasing, inhe i ance). Lending is also classified as
a igh o disposal. The igh s o disposal a e de e mined
by public and p i a e law. The igh s o use comp ise he
igh s ha de e mine and limi he manne o use o he
objec . This includes, in pa icula , how he p ope y can be
used wi hin he legal amewo k, as de e mined by public
law. Fo his pu pose, subs an i e and es ic i e p o isions
a e enac ed. In addi ion, he e a e easemen s ( igh s o way,
pipeline and access igh s) which, howe e , play a subo di-
na e ole. These can also be designed as conc e e indi idual
ag eemen s o gene al abs ac egula ions.
Spa ial planning is adi ionally land-use planning ha
ac s passi ely by egula ing igh s o use (Da y 1999;
Ha mann/Spi 2015). The cen al planning ques ion has
emained unchanged since on Jus i’s ime: “I is essen ial
o he s a e ha he immo able asse s, and in gene al he
land o he coun y, a e used in he bes possible way” ( on
Jus i 1760; in: Da y 1996: 194). Acco dingly, he pu pose
o planning p ocedu es is o de e mine he bes possible
use – and hus he legal egula ion o igh s o use, e.g. by
de e mining he ype and ex en o pe missible building use
wi hin he amewo k o binding u ban land-use planning
(zoning plan) in he o m o plan-led planning.
Issues conce ning he bes possible land dis ibu ion a e
called land e o m issues, Effec i ely, hey a e ha dly egu-
la ed in building and planning law. Some land managemen
ins umen s se e o esol e p oblems ha a ise om con-
adic o y si ua ions wi hin use and disposal igh s. Fo ex-
ample, (public) land eadjus men ensu es he alignmen o
he plo layou wi h he planning specifica ions o enable he
plan’s ealisa ion (Da y 2007). Building obliga ions (Heng-
s e mann 2017; Hengs e mann/Ge be 2017), g ound land
leases (Ge be /Nah a h/Ha mann 2017) and u ban exp o-
p ia ion/ egula o y akings (Al e man 2010) ha e a simila
effec , e en hough hese ins umen s a e discussed mo e
widely in planning heo y han hey a e used in planning
p ac ice.
Spa ial planning as land-use planning ac s acco ding o
land-use law, which allows de elopmen s o be amed and
undesi able effec s p e en ed. S ill, he gua an ee o plan im-
plemen a ion emains wi h he owne s. In poli ical science,
his is e e ed o as an incohe en egime (Nah a h 2003:
397), as con adic ions can a ise be ween he le els o igh s
o use and igh s o disposal. As a ule, his limi on possible
con ol does no pose a p oblem as long as he public in e -
es s a e la gely cong uen wi h he in e es s o he p i a e
landowne and he (p ima ily economic) incen i es o build-
ing on an a ea lead o i s ac ual use. In indi idual cases, in-
di idual p ope y igh s may ne e heless lead o a eas sui -
able o planning being deemed buildable unde building
law bu hen no being physically buil o e (Blomley 2017;
Jacobs/Paulsen 2009). Despi e he incen i e (capi alisa ion
o land p ices), he e is no exploi a ion because he own-
e s pu sue o he , non-economic goals. The possibili ies o
planning au ho i ies o ensu e he ac ual a ailabili y o land
a e ypically limi ed in such cases. Agains his backg ound
o planning and legal heo y, his a icle’s cen al ques ion
conce ns he ins umen s o u ilisa ion and disposal law ha
legisla o s in Ge many and Swi ze land a e ying o use o
p omo e he mobilisa ion o building land.
3 Cul u al legal compa ison
This pape is based on he app oach o so-called cul u al
compa a i e law (Zweige /Kö z 1998). Compa a i e law
ela es diffe en legal solu ions o a a ie y o simila p ob-
lems in o de o enable eflec ion on legal p ac ice, and,
i necessa y, o acili a e he ecep ion (Kunz 2006: 39) o
ansplan ing (Wa son 1974) o legal solu ions om else-
whe e. A dis inc ion is made be ween unc ional and cul-
u al legal compa isons. While unc ional legal compa isons
Raum o schung und Raumo dnung | Spa ial Resea ch and Planning (2023) 81/6: 591–604 593
A. Hengs e mann,N. Skala
a e desc ip i e and use pu e knowledge o o eign law o
iden i y possible effec s on domes ic subjec s, cul u al le-
gal compa isons ollow he app oach ha na ional law is
an exp ession and mani es a ion o he cul u e o a socie y
(Michaels 2012). Acco dingly, he analysis o law ocuses
on he unde lying mechanism o impac – also called men al-
i y – and is he e o e no limi ed o a na ow in e p e a ion
o he legal ex (black le e law).
Following he app oach o cul u al compa a i e law,
he analysis comp ises h ee essen ial s eps (Zweige /Kö z
1998). Fi s ly, defining he subs an i e p oblem ha was he
poli ical igge and is o be sol ed p ima ily by he legal
sys ems. Secondly, iden i ying he egula ions in na ional
law ha a e in ended o sol e he poli ically subs an i e
p oblem p e iously defined. Thi dly, compa ing he ules,
i.e. an elabo a ion o unc ional diffe ences and he de el-
opmen o a sys em.
The esul s ob ained in he con ex o cul u al compa -
a i e law a e no only in e es ing om a compa a i e law
pe spec i e. Ra he he a icle’s me hodology also enables
legal p ac i ione s and decision-make s in many coun ies o
sha pen hei iew o legisla i e effo s o mobilise building
land and c ea e compac se lemen s uc u es.
4 Ge man Building Land Mobilisa ion
Ac (2021)
A e decades o con o e sial land policies, he Building
Land Mobilisa ion Ac 2is an a emp o acili a e he p o-
ision o building land as a cen al p e equisi e o hous-
ing cons uc ion and o push o physical cons uc ion o
coun e ac he exis ing housing sho age. The decisi e ac-
o was he go e nmen ’s coali ion ag eemen o 12 Ma ch
2018, in which he coali ion pa ies ag eed o suppo mu-
nicipali ies o ac i a e building land and secu e affo dable
housing (Bundes egie ung 2018: 109). Acco dingly, wi hin
he amewo k o he Housing Summi on 21 Sep embe
2018, wi h app oxima ely 120 pa icipan s om all 16 ed-
e al s a es, a ious measu es o in ensi y housing cons uc-
ion and imp o e housing affo dabili y we e de e mined,
and, as a esul , a join housing offensi e was adop ed by
he ede al go e nmen , he ede al s a es and he munici-
pali ies. In addi ion, an expe commission o sus ainable
building land mobilisa ion and land policy (Baulandkom-
mission) was es ablished o deal wi h his issue in dep h
(B eue 2022: 585). Membe s o he commission we e ep-
esen a i es o he go e nmen ac ions, he s a es, he mu-
2Gese z zu Mobilisie ung on Bauland (Baulandmobilisie ungs-
gese z) om 14. Juni 2021 (BauMobG).
nicipal umb ella o ganisa ions, housing and u ban de el-
opmen policy associa ions, ade unions and cons uc ion
indus y associa ions, as well as expe s om academia and
municipal p ac ice.3On 2 July 2019, he commission p e-
sen ed i s ecommenda ions, which became he basis o he
d a bill o 9 June 2020 o changing he Building Code4
and he Building Use O dinance.5These amendmen s a e
collec i ely e e ed o as he Building Land Mobilisa ion
Ac , which came in o o ce on 23 June 2021.
4.1 Re o m’s con ex
In he a ea o public building law, he legisla i e compe-
ence lies wi h he s a es, inso a as he Ge man Cons i-
u ion6does no exp essly assign legisla i e powe s o he
ede al go e nmen (A . 30 GG, A . 70 GG). Fo a eas
o concu en legisla ion, he s a es ha e he powe o enac
laws only as long as and inso a as he ede a ion has no
made use o i s compe ence by means o laws (A . 72 Pa a.
1 GG). Unde A icle 74 Pa ag aphs 1 and 18 o he Cons i-
u ion, his also applies o he a ea o planning law. He e, he
ede al go e nmen has used i s legisla i e compe ence by
enac ing he Building Code (BauGB) and legal o dinances
based on i (BauNVO and o he s), hus p o iding he munic-
ipali ies wi h a legal basis o egula ing land use. Wi hin he
esul ing legal amewo k, howe e , he municipali ies ha e
he igh o egula e all ma e s o he local communi y hem-
sel es (A . 28 Pa a 2 o he Ge man Cons i u ion). Wi h
he enac men o he Baulandmobilisie ungsgese z, he ed-
e al go e nmen in ended o s eng hen he municipali ies’
scope o ac ion ega ding he c ea ion o housing.
Ge man planning law dis inguishes be ween h ee a eas
in which buildings can be cons uc ed: he ( ully o pa -
ially) planned a ea (§30 BauGB), he unplanned inne a ea
(§34 BauGB) and he unplanned ou e a ea (§35 BauGB).
A clea dis inc ion mus be made be ween he diffe en un-
planned a eas, as he inne a ea may be buil upon unde
3h ps://www.bmi.bund.de/Sha edDocs/p essemi eilungen/
DE/2018/11/baulandkommission.h ml(02.01.2023).
4Baugese zbuch (BauGB) in de Fassung de Bekann machung
om 3. No embe 2017 (BGBl. I S. 3634), das du ch A ikel 2 des
Gese zes om 4. Janua 2023 (BGBl. I N . 6) geände wo den is .
5Baunu zungs e o dnung (BauNVO) in de Fassung de Bekann -
machung om21. No embe 2017(BGBl. IS. 3786), diedu chA ikel
3 des Gese zes om 4. Janua 2023 (BGBl. I N . 6) geände wo den
is .
6G undgese z ü die Bundes epublik Deu schland (GG) in de
im Bundesgese zbla Teil III, Gliede ungsnumme 100-1, e ö -
en lich en be einig en Fassung, das zule z du ch A ikel 1 des
Gese zes om 19. Dezembe 2022 (BGBl. I S. 2478) geände wo den
is .
594 Raum o schung und Raumo dnung | Spa ial Resea ch and Planning (2023) 81/6: 591–604
Making land a ailable. Cul u al legal compa ison o he Ge man Building Land Mobilisa ion Ac and he pa ial ...
ce ain condi ions while he ou e a ea is o be kep ee o
any building de elopmen as a ma e o p inciple.
The amendmen s o he Baulandmobilisie ungsgese z a e
in ended, on he one hand, o c ea e oppo uni ies o make
land a ailable o housing cons uc ion mo e quickly o e -
ficien ly, e.g. by ex ending he possibili ies o exemp ion
om de elopmen plans and making i easie o build in
inne and ou e a eas. On he o he hand, he de elopmen
o p e iously unused a eas is o be p omo ed. This is done
p ima ily by expanding he scope o he applica ion o mu-
nicipal p e-emp ion igh s and he building o de o a eas
wi h igh housing ma ke s.
Some o he amendmen s in he Baulandmobilisie ungs-
gese z aim o acili a e o accele a e he possibili y o build-
ing and hus ha e an effec a he usage igh s le el. O he
egula ions, howe e , a e in ended o p omo e physical con-
s uc ion and hus ha e affec disposal igh s. The mos
impo an inno a ions o he Baulandmobilisie ungsgese z
– diffe en ia ed acco ding o hei effec le el – a e p e-
sen ed below.
4.2 Componen s a ec ing he usage igh s
le el
The ollowing inno a ions conce n bo h he planned and
unplanned inne a ea as well as he unplanned ou e a ea
and a e in ended o make i easie o mobilise building land.
4.2.1 U ban de elopmen concep o s eng hen inne
de elopmen (§176a BauGB)
The in oduc ion o §176a BauGB is in ended o make i
easie o municipali ies o use municipal a eas wi h dis-
pe sed and unde eloped b ownfield si es o cons uc ion
pu poses. The aim is o make i easie o u ilise land o
housing. Howe e , he p epa a ion o such a de elopmen
concep does no ha e a di ec ex e nal effec on p ope y
owne s o o he pe sons bu is a he in ended o jus i y
he necessi y o u ban de elopmen planning and measu es
(Rixne /Dü sch 2022: 1306).
4.2.2 Exemp ions om he land-use plan in a ou o
housing de elopmen (§31 pa a. 3 BauGB)
§31 BauGB offe s a municipali y he possibili y o making
excep ions and exemp ions om he land-use plan. Wi h
he new §31 pa a. 3 BauGB, a u he case o exemp ion in
a ou o housing cons uc ion was included in he Building
Code. Fo his exemp ion o apply a all, he p ojec mus be
loca ed in an a ea wi h a igh housing ma ke and mus be
designa ed as such by a co esponding legal o dinance o
he s a e go e nmen acco ding o §201a BauGB (Cha lie
2022: 436). An a ea is defined as a igh housing ma ke i
he e is a isk ha he popula ion in a municipali y o pa
o a municipali y canno be supplied wi h en al housing on
easonable e ms (§201a BauGB). The egula ion is limi ed
un il 31 Decembe 2026. Acco ding o his p o ision, an
exemp ion is also possible in indi idual cases i he basic
p inciples o planning a e affec ed (Cha lie 2022: 431).
This inno a ion hus opens up he possibili y o c ea ing
housing unde ce ain condi ions on land p e iously no
in ended o housing cons uc ion.
In addi ion o his egula ion, u he inno a ions acili-
a e he app o al o esiden ial cons uc ion p ojec s in in-
di idual cases. Fo example, he “ esiden ial needs o he
popula ion” a e now explici ly ci ed as being o public in-
e es and g ounds o exemp ions om he p o isions o
he land-use plan (§31 pa a. 2 no. 1 BauGB). Fu he mo e,
in he case o he cons uc ion o buildings o esiden ial
pu poses i is now possible no only o de ia e om he e-
qui emen o fi ing in o he cha ac e o he immedia e su -
oundings in indi idual cases, bu also in a numbe o com-
pa able cases (§34 pa a. 3a BauGB). Finally, he amended
§35 BauGB con ains u he modifica ions in ended o sim-
pli y he c ea ion o esiden ial space in ou lying a eas.
4.2.3 In oduc ion o a new sec o al land-use plan
ype o (social) housing (§9 pa a. 2d BauGB)
This sec o al land-use plan o he p o ision o housing,
newly in oduced by he Baulandmobilisie ungsgese z (§9
pa a. 2d BauGB), is in ended o p omo e he c ea ion o sub-
sidised housing, pa icula ly in unplanned inne a eas (§34
BauGB) (Bo he 2022: 200). Wi h such a land-use plan,
he use o land can be es ic ed o esiden ial buildings
ha mee he s anda ds o social housing p omo ion o o
which he de elope has en e ed in o an u ban de elopmen
con ac o comply wi h he p omo ion condi ions o social
housing (Deu sche Bundes ag 2020: 19). This egula ion
p ima ily se es o speed up he p epa a ion o specific a -
eas unde planning law, as ce ain pa icipa ion s eps can
be omi ed in he plan p epa a ion p ocedu e. This sub-
planning is also possible e en i o e all planning has no
ye been comple ed. The possibili y o d awing up a sec o al
land-use plan is limi ed un il 31 Decembe 2024.
4.2.4 Re ision o §17 BauNVO: The p e ious uppe
limi s o he ex en o building use become
o ien a ion alues
The alues o he ex en o building use, p e iously de-
fined as uppe limi s in §17 BauNVO, a e con e ed in o
o ien a ion alues by he new e sion o he egula ion. The
p e ious egula o y sys em s ipula ed compliance wi h he
uppe limi s in u ban land-use planning so ha exceeding
hese limi s was only possible as an excep ion equi ing jus-
ifica ion. This app oach has been abandoned. The e is no
longe an obliga ion o compensa e, as p e iously egula ed
Raum o schung und Raumo dnung | Spa ial Resea ch and Planning (2023) 81/6: 591–604 595

A. Hengs e mann,N. Skala
in §17 pa a. 2 BauNVO as a p e equisi e o exceeding
he uppe limi s acco ding o §17 pa a. 1 BauNVO. This
conside ably expands he municipali ies’ scope o decision-
making abou he s ipula ions in he land-use plan on he
ex en o building use, so ha in he exis ing building a eas
i is possible o build mo e densely han be o e (Deu sche
Bundes ag 2020: 34).
4.2.5 In oduc ion o a new building a ea ca ego y (§5a
BauNVO)
On he commission’s ecommenda ion, “ u al esiden ial
a ea” is included in he Baunu zungs e o dnung as a new
esiden ial a ea ca ego y (Fimpel/Mülle 2022: 19). Such a -
eas se e esiden ial pu poses as well as he accommoda ion
o pa - ime ag icul u al and o es y businesses and com-
me cial en e p ises ha do no cause a significan dis u b-
ance (§5a BauNVO). Unlike illage a eas (§5 BauNVO),
such a eas a e no cha ac e ised by ull- ime ag icul u al
businesses bu by he coexis ence o housing, pa - ime busi-
nesses and non-dis u bing comme cial uses. This means ha
a land-use plan can now be d awn up o addi ional a eas
p e iously assigned o he unplanned ex e nal a ea acco d-
ing o §35 BauGB.
4.2.6 Ex ension o §13b BauGB
The egula ion §13b BauGB includes he possibili y o in-
cluding ou e a eas in an accele a ed p ocedu e, hus acili-
a ing building in unplanned ou e a eas. The p o ision was
in oduced in 2017 o be able o c ea e housing o e ugees
as quickly as possible and was ini ially limi ed un il 31
Decembe 2019. Now, in he cou se o he Baulandmobili-
sie ungsgese z, i has been ex ended un il he end o 2022
on he g ounds o he exis ing housing sho age. Howe e ,
he no m con adic s he p o ec ion o he ou e a ea and he
p io i y o inne -u ban densifica ion (Kmen 2020: 180).
4.3 Componen s a ec ing he disposal igh s
le el
The ollowing inno a ions a e in ended o s eng hen he
ac ual land mobilisa ion by he municipali ies.
4.3.1 S eng hening he municipal igh o p e-emp ion
(§§24, 25 BauGB)
Ge man building law p o ides o a municipal igh o fi s
e usal. In planning p ac ice, howe e , his has so a only
played a subo dina e ole. The Baulandmobilisie ungsge-
se z is in ended o inc ease he applicabili y o p e-emp ion
igh s unde §§24, 25 BauGB. Pu ely specula i e p ope ies
a e o be wi hd awn om he ma ke by making hem a ail-
able o de elopmen a e a building o de (§176 BauGB),
ei he on he pa o he owne o on he pa o he munic-
ipali y h ough a esale in connec ion wi h building o de s
(Fimpel/Mülle 2022: 20).
In pa icula , i is cla ified ha mee ing a housing need
in he municipali y and p omo ing inne de elopmen based
on an u ban de elopmen concep a e public wel a e con-
ce ns ha can jus i y he exe cise o he igh o fi s e usal
(§24 pa a. 3 p. 2 BauGB). In addi ion o unde eloped a eas,
p ope ies which a e al eady sligh ly de eloped a e now also
eligible o he exe cise o p e-emp i e igh s (§24 pa a. 1
p. 1 no. 6 BauGB). In addi ion, new municipal p e-emp i e
igh s a e in oduced o p ope ies in a deplo able (u ban
de elopmen ) s a e (§24 pa a. 1 p. 1 no. 8 BauGB) and o
unde eloped o ma ginally de eloped and de elic p ope -
ies in municipali ies wi h igh housing ma ke s as defined
in §201a BauGB (§25 pa a. 1 p. 1 no. 3 BauGB).
4.3.2 Ex ension o he building o de o a eas wi h
a igh housing ma ke (§176 pa a. 1 no. 3 (new)
BauGB)
In p inciple, building planning law only defines he ame-
wo k o pe missible de elopmen , bu i does no c ea e any
obliga ion o physically cons uc he pe missible de elop-
men . In ce ain cases, howe e , he municipali y can issue
a building o de agains he owne s o o ce he implemen-
a ion o a building measu e. Howe e , high legal equi e-
men s a e a ached o his, which is why he ins umen has
ecei ed mo e academic han p ac ical a en ion.
The exis en building o de was ex ended by he Bauland-
mobilisie ungsgese z in ha i is now possible o munici-
pali ies o o de owne s in a eas wi h igh housing ma ke s
o build on hei land wi h esiden ial uni s, p o ided ha
esiden ial use is pe mi ed in he land-use plan (§176 pa a.
1 no. 3 BauGB). The limi o his is he economic eason-
ableness o he owne . Wha is new he e is ha e en si es
wi h mino de elopmen a e now conside ed unde eloped,
which ex ends he applicabili y o he building o de . I he
owne is unable o comply wi h he building o de , hey can
demand ha he municipali y ake possession o he land in
ques ion o he benefi o hi d pa ies, whe eby he land
may only be ans e ed o municipal housing associa ions,
non-p ofi housing cons uc ion companies, coope a i es o
ounda ions. In his case, i is con ac ually s ipula ed as
a condi ion and equi emen ha he specific p ojec be e-
alised wi hin a pe iod o be de e mined.
4.4 E ec o Baulandmobilisie ungsgese z on
mobilising building land
The Baulandmobilisie ungsgese z aims o s eng hen he
municipali ies’ abili ies o ac i a e building land mo e
quickly and secu e affo dable housing, hus coun e ac ing
596 Raum o schung und Raumo dnung | Spa ial Resea ch and Planning (2023) 81/6: 591–604
Making land a ailable. Cul u al legal compa ison o he Ge man Building Land Mobilisa ion Ac and he pa ial ...
he igh housing ma ke in Ge man ci ies. I is ques ionable
whe he his has been achie ed wi h hese amendmen s.
The new egula ions ocus on measu es ha pu ely im-
pac usage igh s and ha e li le o no influence on he phys-
ical de elopmen o he land. In addi ion, he amendmen s
o en only affec indi idual cases, such as he amended ex-
emp ion op ions unde §31 pa a. 2 and 3 BauGB. The new
egula ions wi h an effec on disposal igh s, on he o he
hand, a e only selec i ely ela ed o indi idual de ailed as-
pec s. The amendmen s o he p e-emp ion igh s in §§24,
25 BauGB expand he exis ing legal op ions o he munici-
pali ies. S ill, i is ques ionable whe he hey can help ease
he si ua ion in he housing ma ke since hey a e pu ely
eac i e ins umen s and he municipali ies canno ac on
hei own ini ia i e (Kmen 2020: 181).
The amendmen s o he building o de (§176 BauGB)
expand he egula ion’s field o applica ion, bu he ex en
o which hey can make a eal con ibu ion o he mobilisa-
ion o building land emains o be seen. E en in p e ious
planning p ac ice, he building o de did no play a signifi-
can ole, as i was conside ed oo “complica ed and cou -
hea y” (Pa ze all 2020: 27), a “blun swo d” (K au zbe ge /
S üe 2021: 37) wi h oo many obs acles o en o ceabili y.
In summa y, i can be said ha apa om new possibili-
ies o imp o e buildabili y, he e a e s ill ha dly any ins u-
men s a ailable o en o ce physical de elopmen . I emains
o be seen whe he he legisla i e changes lis ed he e can
ulfil he legisla o s’ in en ions. The Building Land Mobili-
sa ion Ac cu en ly seems o be only one s ep on he long
way o effec i e building land mobilisa ion.
5 Fi s pa ial e ision o he Swiss
Spa ial Planning Ac (2012)
In 2012, he Fede al Assembly passed a pa ial e ision o
he Spa ial Planning Ac (RPG).7The change ep esen s he
mos significan amendmen o Swiss planning law since
he o iginal codifica ion in 1979 (Knoep el/Csikos/Ge be
e al. 2012: 417–418). On he mobilisa ion o building land,
he e a e wo majo changes. Fi s ly, A icle 15 RPG speci-
fies he p o isions ha a e binding unde ede al law when
expanding he building zone, implici ly enla ging he c i-
e ia ca alogue o land-use designa ion. Secondly, explici
p o isions o p omo e he a ailabili y o building land we e
added and inco po a ed in o he law in a new A icle 15a
RPG. In addi ion, he p esc ip ions o compensa ing added
alue (A . 5, A . 38a RPG) and o s uc u e planning
7Bundesgese z übe die Raumplanung (Raumplanungsgese z)
(RPG) om 22. Juni 1979, S and am 1. No embe 2012.
(esp. A . 8a RPG) we e e o med as well, al hough hese
mechanisms o ac ion do no di ec ly affec he mobilisa ion
o building land.
5.1 Re o m’s con ex
Since 1969, spa ial planning has been explici ly lis ed in he
ca alogue o s a e esponsibili ies in he Swiss Cons i u ion
(BV).8Since hen, public ins i u ions ha e been empow-
e ed and obliged “ o ensu e he app op ia e and econom-
ical use o he land and i s p ope ly o de ed se lemen ”
(A . 75 pa a. 1 BV). Achie ing his cons i u ional objec-
i e is he esponsibili y o he can ons (A . 3, 42, 43 and
75 BV). Howe e , wi hin he amewo k o limi ed egu-
la o y powe , he Con ede a ion can also define p inciples
and e en conclusi ely egula e indi idual sub-a eas (G i -
el 2017a). In Swiss spa ial planning, a legal sys em has
de eloped in which he ede al go e nmen egula es he
o e a ching objec i es and p inciples and conclusi ely eg-
ula es hei applica ion in selec ed a eas (especially con-
s uc ion ou side he building zone). In essen ial a eas (es-
pecially cons uc ion wi hin he building zone), he can-
ons a e gi en amewo k condi ions, he implemen a ion
o which emains wi hin hei decision-making and legisla-
i e so e eign y.
The main body o ede al law is he 1979 Spa ial Plan-
ning Ac (RPG) and he p inciple o sepa a ion con ained
he ein, i.e. he di ision o land in o he building zone and
he non-building zone. The o me can be u he diffe -
en ia ed by can onal law, while he la e is conclusi ely
egula ed by ede al law (Hänni 2016: 255; G iffel 2017b:
58, 137). In he building zone, he e is eedom o build,
al hough a building pe mi is equi ed up on o ensu e con-
o mi y wi h planning and building law (Aemisegge /Moo /
Ruch e al. 2016a: 289). In he non-building zone, he e is
no eedom o build as long as he e is no explici excep-
ion unde ede al law (e.g. o ag icul u al buildings, in a-
s uc u e, o o he place- ela ed issues) (G iffel 2017b: 22).
In addi ion, he main p ocedu al ins umen s o planning
wi hin he building zone a e p edefined in he Spa ial Plan-
ning Ac , such as he s uc u e plan (usually a he can onal
le el) and he zoning plans (usually a he communal le el).
While he s uc u e plan is only binding o he au ho i ies,
he zoning plans a e di ec ly binding o he owne s: hus,
hey o m he legal basis o building pe mi s (Aemiseg-
ge /Moo /Ruch e al. 2016b: 65). The ede al go e nmen
me ely lays down abs ac condi ions abou which aspec s
8Bundes e assung de Schweize ischen Eidgenossenscha (BV)
om 18. Ap il 1999, S and am 13. Feb ua 2022.
Raum o schung und Raumo dnung | Spa ial Resea ch and Planning (2023) 81/6: 591–604 597
A. Hengs e mann,N. Skala
mus be conside ed in zoning planning. The conc e e deci-
sion is he esponsibili y o he municipali ies.
The sys em aims o legally define he limi s and es ic-
ions on he owne s’ land use (Be isha/Co ella/Ri olin e al.
2021: 195). The ac ual implemen a ion o cons uc ion wo k
is a decision made by he owne s. In his espec , he sys-
em is passi e (Hengs e mann 2019). Building use o he
land is made possible and he co esponding incen i es a e
c ea ed. Howe e , he planning au ho i ies canno gua an ee
he physical implemen a ion o building wo k, so he p op-
e y owne s ha e a e o. Despi e he economic incen i es,
conside able a eas emain unused o unde used, e en in
high-p iced loca ions. P ecise quan ifica ion is difficul , bu
es ima es sugges ha Swi ze land’s building land ese es
could p o ide addi ional housing o 0.7 o 1.94 million in-
habi an s (Nebel 2014: 146). Howe e , i he de elopmen
p essu e is ins ead me by expanding he building zone, hen
his will esul in p ecisely hose sp awling spa ial s uc-
u es ha con adic he cons i u ional goals and he en i e
poli ical legi imacy o spa ial planning. P omo ing he mo-
bilisa ion o building land hus se es he achie emen o
objec i es and is no only sensible in planning e ms bu
legally equi ed.
Howe e , he ac ha he sys em does no wo k so e -
ec i ely in e e yday poli ical li e became clea o poli i-
cians and he elec o a e h ough he so-called Galmiz case
(Hengs e mann/Ge be 2015). Al hough he planning and
na u e conse a ion egula ions s ipula ed o he wise, a 55-
ha a ea in he municipali y o Galmiz in he can on o F i-
bou g was zoned o enable an indus ial de elopmen o
sa is y economic policy. The p ocedu e is ques ionable o
legal easons. Poli ically, howe e , i shows he weakness
o spa ial planning: he planning sys em canno p e en u -
ban sp awl i i p ima ily ies o p e en ex e nal de elop-
men (nega i e planning) (Koll-Sch e zenmay 2021). Wha
is needed is effec i e inne de elopmen (posi i e planning),
which equi es asse i e spa ial planning and ins umen s
o mobilising building land. This ealisa ion is he main
mo i e behind he pa ial e ision o he planning law (so-
called RPG1- e o m), which he Fede al Assembly enac ed
in 2012, which was app o ed by he elec o a e in 2013 wi h
62.9% in a ou , and which en e ed in o o ce on 1 May
2014.
5.2 Componen s a ec ing he usage igh s
le el
The RPG-1 e o m aims o inc ease he effec i eness o spa-
ial planning. In addi ion o A icle 8a RPG (can onal plan-
ning) and A icle 5 RPG (compensa ion o added alue)
(Hengs e mann/Scheiwille 2021), A icle 15 RPG (build-
ing zones) was e o med as well. This con ains he ede al
equi emen s o he local planning au ho i ies (usually he
municipali ies). Howe e , i is also indi ec ly essen ial o
p ope y owne s, as i de e mines which building zone hei
p ope y belongs o and hus whe he i can be buil on.
In he old e sion, A icle 15 RPG included h ee c i e ia
ha mus be ulfilled o land o be eligible o be assigned o
he building zone by municipal planning (so-called zoning).
The land mus be sui able, be se iced by he municipali ies
wi hin he nex 15 yea s and be expec ed o be needed
wi hin he same pe iod (A . 15 pa a. 2 RPG old e sion). In
compa ison, he new wo ding o he same a icle includes
u he quan i a i e and quali a i e gene al p inciples o he
building zone (A . 15 pa a. 1, 2, 3 and 5), as well as fi e
cumula i e c i e ia unde which condi ional land can be
newly assigned o he building zone (see Table 1).
The quan i a i e dimensions o he building zone mus
(as in he old e sion) be based on he an icipa ed demand
o he subsequen 15 yea s (A . 15 pa a. 1 RPG). I he
exis ing building zone al eady exceeds his an icipa ed de-
mand, he e is now an obliga ion o educe i (A . 15 pa a.
2RPG)(Huse 2019: 107). In addi ion, he calcula ion o
his equi emen is egula ed in de ail and made binding in
he o m o a echnical guideline (A . 15 pa a. 5 RPG).
The municipali ies a e also explici ly bound by planning
law equi emen s ega ding he quali y o he building zone
(A . 15 pa a. 3 RPG). Explici e e ence is made o he
binding con o mi y wi h he objec i es and p inciples o
planning (A . 1 and 3 RPG). In addi ion, he p inciple o
unc ional, i.e. c oss-bo de planning, applies (A . 15 pa a.
3 RPG) (Aemisegge /Moo /Ruch e al. 2016a). Taken as
a whole, hese new egula ions esul in he gene al p inci-
ples o building zones being defined much mo e p ecisely
(G iffel 2017b). They also esul in legally binding ame-
wo k condi ions wi hin which municipal zoning mus ake
place.
Since he e o m, fi e cumula i e c i e ia mus be ul-
filled when assigning land o he building zone (A . 15
pa a. 4 RPG): (i) sui abili y, which e e s o bo h echni-
cal and legal aspec s; (ii) need, se icing and de elopmen
wi hin he nex 15 yea s; (iii) he ese a ion ha cul i a ed
land is no agmen ed; (i ) he legal gua an ee o ac ual
a ailabili y; and ( ) compliance wi h he equi emen s o
he s uc u e plan. Wi h his ca alogue o c i e ia, he ede al
legisla u e has now gi en he municipali ies mo e p ecise
guidelines o hei spa ial de elopmen , which hey mus
ansla e in o binding specifica ions o he ype and ex en
o pe missible building use o land.
O e all, he densi y o land-use egula ions has inc eased
significan ly. While A icle 15 RPG in he 1980 e sion
se ed o p o ide an ini ial, na ionwide, uni o m defini ion
o building zones, he can ons now ha e significan ly mo e
p ecise equi emen s unde ede al law ega ding he quan-
598 Raum o schung und Raumo dnung | Spa ial Resea ch and Planning (2023) 81/6: 591–604
Making land a ailable. Cul u al legal compa ison o he Ge man Building Land Mobilisa ion Ac and he pa ial ...
Table 1 Compa ison o A icle 15 RPG old and new e sions o Swiss Spa ial Planning Ac (RPG)
A . 15 RPG
Ve sion in o ce 1980-
2014
A . 15 RPG
Ve sion in o ce since 2014
Building zones shall
include land ha is
sui able o de elop-
men and
a) is al eady la gely
de eloped, o
b) will p obably be
needed and de eloped
wi hin 15 yea s.
1Building zones mus be de ined in such a manne ha hey mee he an icipa ed needs o he ollowing 15
yea s.
2Excessi ely la ge building zones mus be educed in size.
3The loca ion and sizeo he building zones mus be de ined in a manne no es ic ed by communalbound-
a ies, espec ing he aims and p inciples o spa ial planning. In pa icula , c op o a ion a eas mus be main-
ained and na u e and landscape p ese ed.
4Land may be assigned o a buildingzone o he i s ime i :
a. i is sui able o de elopmen ;
b. i will p obably also be needed, made eady o de elopmen and de eloped wi hin he nex 15 yea s e en
hough in e nal use ese es in exis ing building a eas ha e been exploi ed o hei ull po en ial;
c. a able land is no agmen ed as a esul ;
d. i s a ailabili y is gua an eed by law; and
e. he equi emen s o he s uc u e plans a e me he eby.
5The Con ede a ion and can ons shall oge he d aw up echnical guidelines o assigning land o building
zones, and in pa icula o calcula ing he a ea equi ed.
O icial ansla ion in Fedlex, p o ided by he Fede al Chancelle y
i y, quali y and condi ions o expanding he building zone.
The can ons’ scope o in e p e a ion (e.g. he in e p e a ion
o he an icipa ed demand) and legal loopholes (e.g. he
compensa ion o planning- ela ed added alue) ha e been
educed as a esul , e en hough his can lead o an inc ease
in equi emen s and conside able addi ional expendi u e in
local planning p ac ice.
5.3 Componen s a ec ing he disposal igh s
le el
The RPG-1 e o m also includes new p o isions ha affec
he le el o disposi ion law. Fo example, ac ual a ailabili y
is explici ly men ioned in A icle 15 RPG o new building
zones and is e en ex ended o old building zones wi h he
con empo a y A icle 15a RPG.
The a o emen ioned legally binding cumula i e c i e ia
o expanding he building zone also include ac ual a ail-
abili y (A . 15 pa a. 4 li . a and d RPG new e sion). Fi s ,
he echnical and legal sui abili y o he land o building
on (A . 15 li . b RPG old e sion) is adop ed om he old
egula ion as a manda o y c i e ion. In addi ion, i is now
compulso y ha he land is needed, se iced and buil on
wi hin he nex 15 yea s (A . 15 pa a. 4 li . b RPG new
e sion). In his lis , he legisla o hus adds a “de ac o
building obliga ion” (Hengs e mann/Ge be 2017) o heex-
is ing in as uc u e se ice obliga ion and he an icipa ed
need. Acco dingly, municipali ies mus legally ensu e ha
he land hey wan o assign o he building zone is ac ually
buil on. They mus also legally ensu e his ou come (A .
15 pa a. 4 li . d RPG new e sion), which can be achie ed
h ough gene al building code egula ions o indi idual con-
ac s wi h he landowne s. The la e means linking zoning
decisions o he consen and con ac ual ag eemen o he
landowne s. The conc e e building in en ion, schedule and
consequences in he e en o non-occu ence a e hen laid
down in he con ac . I applied, he legal consequence is
mos o en he akeo e o he land by he municipali y so
ha he implemen a ion o he zoning plans is also ensu ed,
unde he law o disposal i necessa y.
All in all, hese wo egula ions (A . 15 pa a. 4 li . a and
d RPG new e sion) mean ha in addi ion o he igh s o
use, he zoning p ocess now also includes deadlines wi h an
obliga ion o use he land, hus p e en ing u u e building
land om being hoa ded. I physical de elopmen does no
occu wi hin he ime limi , he o iginal zoning becomes
null and oid. I is hus wi hd awn wi hou compensa ion
(non-zoning) o he land is aken o e by he municipali y
a he gene al ma ke alue (exp op ia ion) and used o
de elopmen .
No included in he p o isions o A icle 15 RPG is build-
ing land unde he old law, i.e. land ha had al eady been
assigned o he building zone when he pa ial e ision came
in o o ce in 1980. To p omo e he a ailabili y o his land,
he legisla o has added he new A icle 15a RPG and es ab-
lished wo essen ial mechanisms in he p ocess. The a icle
s a es: “The can ons shall wo k wi h he communes o ake
he measu es ha a e equi ed so ha building zones a e
used o hei assigned pu pose” (A . 15a pa a. 1 RPG new
e sion). Apa om a e e ence o building land eadjus -
men (acco ding o A . 20 RPG), he conc e e measu es
a e no defined. Mo eo e , he idea o a building obliga-
ion is also aken up. Acco dingly, he can ons mus enac
conc e e, applicable egula ions wi h which building obli-
ga ions can be imposed (A . 15a pa a. 2 RPG new e sion)
(Hengs e mann/Ge be 2017: 16–17). Compa ed o A icle
Raum o schung und Raumo dnung | Spa ial Resea ch and Planning (2023) 81/6: 591–604 599