B idging he Gap?
An analysis o Public-P i a e Pa ne ships as an ins umen o es ablish sus-
ainable models o Faecal Sludge Managemen in Da es Salaam, Tanzania
Jona han Young
Ha enci y Uni e si y
Hambu g / June, 2021
Ma ikel-N : 6058705
Resou ce E iciency in A chi ec u e and Planning
ii
B idging he Gap? An analysis o Public-P i a e Pa ne ships as an ins umen
o es ablish sus ainable models o Faecal Sludge Managemen in Da es Salaam, Tanzania
by
Jona han William Young
MASTER THESIS
Submi ed in pa ial sa is ac ion o he equi emen s o he deg ee o
MASTER OF SCIENCE
in
Resou ce E iciency in A chi ec u e and Planning
Thesis Ad iso s:
P o . D .-Ing. Wol gang Dickhau
Tim Fe back, M.Sc.
June, 2021
iii
© Jona han Young
J. Young
i
Lis o Figu es i
Lis o Tables ii
Lis o Abb e ia ions iii
Acknowledgemen s ix
Abs ac x
Pa One: Se ing he Scene - A Li e a u e Re iew
Chap e 1: In oduc ion 2
1.1 Backg ound & Con ex 5
1.2 Social, Poli ical and Economic 6
1.3 P oblem S a emen 9
1.4 O e all Objec i e 9
1.5 Resea ch Hypo hesis 9
1.6 Resea ch Ques ions 9
1.7 Resea ch F amewo k 10
Chap e 2: Wha is Faecal Sludge Managemen (FSM)? 12
2.1 Wha is Faecal Sludge? 13
2.2 The Need o T ea men 13
2.3 Sani a ion Se ice Chain 15
2.3.1 Con ainmen 16
2.3.2 Emp ying and T anspo 16
2.3.3 T ea men 18
2.3.4 Disposal/Reuse 19
2.4 Enabling En i onmen 20
Chap e 3: PPPs and hei ise o p ominence 22
3.1 An ambiguous e m. De ining Pa ne ships 22
3.2 An impossible ask: De ining Public-P i a e Pa ne ships 22
3.3 PPP ypes and classi ica ions 25
3.4 PPPs in he Public Adminis a ion (PA) con ex 28
3.5 PPPs, a b ie his o y 28
Chap e 4: The Supply and Demand o PPPs and In as uc u e 30
4.1 The di e ence be ween PPPs and adi ional p ocu emen 31
4.2 Financial A angemen s (PPP . TP) 33
4.3 The V M o PPPs s. T adi ional P ocu emen 34
4.4 The ole o PPPs in he wa e supply and sani a ion sec o 35
4.5 PPP Da abases 36
4.6 Dis ibu ion and T ends in he PPP ma ke 37
4.6.1 Dis ibu ion by sec o 37
4.6.2 Dis ibu ion by income g oup 38
4.6.3 Dis ibu ion o ypes o PPPs in WSS 38
4.7 PPPs in de eloping coun ies 39
4.8 Summing up he a gumen s o and agains PPPs 41
4.9 Conclusion 43
Table o Con en s
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
Pa Two: Me hodological analysis and p oposal
Chap e 5: Wha makes p ojec s success ul? 46
5.1 C i ical Success Fac o s o PPPs 46
5.2 Building he amewo k: Syn hesis o C i ical Success Fac o s in WSS in De eloping Regions 47
5.2.1 P ojec Le el 51
5.2.2 O ganiza ion Le el 51
5.2.3 Policy Le el 52
5.2.4 Ins i u ional Le el 52
5.2.5 Mac o Le el 53
5.3 Popula ing he amewo k: De eloping a eadiness ada 53
5.3.1 Limi a ions o his me hod 54
5.3.2 Economis In ascope Repo 54
5.3.3 Wo ld Bank Benchma king In as uc u e Repo 57
5.3.4 GTZ Pa ne ship Landscape 58
5.3.5 GIZ Gap Analysis 58
5.3.6 Filling in he gaps – Assessmen s o PPP eadiness in o he li e a u e 59
5.4 The Readiness Rada - Resul s 62
Chap e 6: Analysis o he PPP enabling en i onmen in Da es Salaam 65
6.1 Expe In e iews 65
6.1.1 Ca oline Chema E ic 65
6.2.2 Eng. Romanus A. Mwang’ingo and Eng. Mu aekulwa Mu egeki 66
6.2.3 Pe e Hawkins 67
6.3 A PESTLE Analysis 68
6.4 Tanzania: An uncon incing en i onmen o PPPs in FSM 70
Chap e 7: Case S udies and business gap analysis 71
7.1 O e iew o wo FSTPs and an E&T business in Da es Salaam 71
7.1.1 Kigamboni FSTP/ UMAWA Was e Managemen Si e 71
7.1.2 Toangoma FSTP 75
7.1.3 Vacuum T uck Business 78
7.2 Analysis o PSPs wi h he p ojec and o ganiza ion le el CSFs 80
7.3 Lessons Lea n 86
Chap e 8: PPPs by any o he name: A p oposal o Open Pa ne ships 88
8.1 The need o a eb anding 88
8.2 A look a non-con en ional PPPs 88
8.3 OPUS: Open Pa ne ships o U ban Sani a ion 90
8.4 Fu he Resea ch 91
8.5 Conclusion 92
Re e ences 94
Appendix A - Full lis o CSFs men ioned in he selec ed li e a u e 101
Appendix B - In e iew Summa ies 102
Appendix C - PPP p ocu emen and app o al p ocess acco ding o 2020 Regula ions 111
Appendix D - Fac shee da a om FSTPs 112
Appendix E - Sou h A ica’s Readiness Rada alues
114
J. Young
i
Lis o Figu es
Figu e 01 View o Da es Salaam Ci y Cen e om
he Kigamboni Fe y 4
Figu e 02 A e age yea ly ain all and empe a u e
(sou ce: Au ho , Da a: clima e-da a.o g) 5
Figu e 03 To al in es men and numbe o PPP
p ojec s in Tanzania om 1990-2020 (sou ce: PPI
Da abase, 2021) 6
Figu e 04 PPPs by sec o in Tanzania (sou ce: Au-
ho , 2021; Da a: PPI Da abase, 2021) 7
Figu e 05 F equency o appea ances o he e m
“public-p i a e pa ne ship” in li e a u e om
1950-2020 (Sou ce: Google ng am iewe , 2021) 10
Figu e 06 The mul iple le els o PPP (sou ce: Au-
ho , adap ed om Hodge & G e e (2016)) 11
Figu e 07 Sludge d ying bed a Kigamboni FSTP
(Sou ce: Au ho , 2021) 12
Figu e 08 Faecal sludge in an unplan ed d ying
bed (sou ce: BORDA, 2021) 13
Figu e 09 Shi - low diag am (SFD) o Da es Sa-
laam, 2015 (Sou ce: Au ho , adap ed om Eawag/
Sandec (2015)) 14
Figu e 10 Sani a ion se ice chain (Sou ce: Wiki-
media Commons) 15
Figu e 11 Vacuum uck se icing a sep ic ank
(Sou ce: BORDA, 2021) 15
Figu e 12 In o mal and unplanned neighbou -
hood in Da es Salaam (Sou ce: BORDA, 2021) 16
Figu e 14 Se ice wi h he mo o ized “Toyo” icy-
cle (Sou ce: BORDA, 2021) 17
Figu e 13 Se ice wi h he Gulpe echnology
(Sou ce: BORDA, 2021) 17
Figu e 15 Emp ying a acuum uck a a DEWATS
FSTP (Sou ce: BORDA, 2021) 18
Figu e 16 D awn schema ic o a DEWATS a BOR-
DA HQ (Sou ce: Au ho , 2021) 18
Figu e 18 Unplan ed d ying bed a Kigamboni
FSTP (sou ce: Au ho , 2021) 19
Figu e 17 Was e S abilisa ion Pond (WSP) in Da
es Salaam (Sou ce: BORDA, 2021) 19
Figu e 19 FS being d ied o use as soil condi ion-
e (sou ce: Au ho , 2021) 20
Figu e 20 FS soil condi ione (sou ce: Au ho ,
2021) 20
Figu e 22 Ae ial iew o Mbu aha i-Ubungo FSTP
(sou ce: BORDA, 2021) 21
Figu e 21 Enabling en i onmen o communi-
y-led u ban sani a ion (CLUES) (sou ce: Lü hi e
al., 2011) 21
Figu e 23 Hodge & G e e’s i e le els o meaning
(sou ce: Hodge & G e e, 2016)) 23
Figu e 24 Con inuum o p i a e sec o in ol e-
men and isk (adap ed om Wo ld Bank, 2021) 27
Figu e 25 In as uc u e in es men gap in A ica
(sou ce: GI Hub, 2021) 30
Figu e 26 Ve ical ela ionship ypical in TP (Au-
ho , 2021) 32
Figu e 27 Ho izon al ela ionship ypical in PPPs
(Adap ed om Nizko odo , 2017) 32
Figu e 28 Dis ibu ion o PPP p ojec s in low, low-
e -middle, and uppe -middle income coun ies by
in es men and numbe , all sec o s, wo ldwide
(sou ce: PPI Da abase, 2021) 35
Figu e 29 Dis ibu ion o PPP p ojec s by in es -
men and numbe o p ojec s o e ime (sou ce:
PPI Da abase, 2021) 37
Figu e 30 Dis ibu ion o PPPs by sec o , wo ld-
wide (sou ce: Au ho , 2021; Da a: PPI Da abase,
2021) 37
Figu e 31 Dis ibu ion o PPP p ojec s by income
le el (sou ce:Au ho , 2021; Da a: PPI Da abase,
2021) 38
Figu e 32 Dis ibu ion o PPP p ojec s in he WSS
sec o in SSA s. he es o he wo ld (sou ce:Au-
ho , 2021; Da a: PPI Da abase, 2021) 38
Figu e 33 Dis ibu ion o PPP p ojec s in he WSS
sec o by ype (sou ce:Au ho , 2021; Da a: PPI Da-
abase, 2021) 38
Figu e 34 Dis ibu ion o PPP p ojec s in he WSS
sec o in SSA s. he es o he wo ld (sou ce:Au-
ho , 2021; Da a: PPI Da abase, 2021) 38
Figu e 35 Dog aking a nap in he sludge d ying
bed o Kigamboni FSTP (sou ce: Au ho , 2021) 45
Figu e 36 Combining he CSFs (sou ce: Au ho ) 47
Figu e 36 Mic o, Meso and Mac o le els o he CSF
F amewo k (sou ce: Au ho ) 51
Figu e 37 Popula ing he CSF amewo k wi h
a eadiness a ing o p oduce a eadiness ada
(sou ce: Au ho ) 62
Figu e 38 Readiness Rada (sou ce: Au ho ) 63
Figu e 39 Compa ison o Tanzania and Sou h A i-
ca’s PPP Readiness (sou ce: Au ho ) 64
Figu e 40 Zoom in e iew wi h Tim Fe back and
Ca oline Chema E ic (sou ce: Zoom/Au ho , 2021) 65
Figu e 41 Zoom in e iew wi h Tim Fe back and
Eng. Romanus A. Mwang’ingo and Eng. Mu aekul-
wa Mu egeki (sou ce: Zoom/Au ho , 2021) 66
Figu e 42 Zoom in e iew wi h Tim Fe back and
Pe e Hawkins (sou ce: Zoom/Au ho , 2021) 67
Figu e 43 Resea ch amewo k o analysis o
bo h Tanzania and Da es Salaam’s PPP eadiness
(sou ce: Au ho , 2021) 68
Figu e 44 Resea ch amewo k o analysis o case
s udies and he de elopmen o Open Pa ne -
ships in Chap e 7 and 8 (sou ce: Au ho , 2021) 70
Figu e 45 M . Milinga si ing in his o ice (sou ce:
Au ho , 2021) 71
Figu e 46 M . Milinga and I eneo Shinga s anding
in on o he Sludge-Go (sou ce: Au ho , 2021) 72
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
ii
Figu e 47 UMAWA scale-up plan (sou ce: Au ho ,
2021) 72
Figu e 48 Sani a ion T aining Cen e (sou ce: Au-
ho , 2021) 73
Figu e 49 Unplan ed sludge d ying bed and d ying
FS soil condi ione (sou ce: Au ho , 2021) 73
Figu e 50 E luen ish pond (sou ce: Au ho , 2021)
73
Figu e 51 Banana and Papaya ees ed wa e om
e luen (sou ce: Au ho , 2021) 73
Figu e 54 M . Milinga showing us his “ loa ing”
compos heap in a nea by ield (sou ce: Au ho ,
2021) 74
Figu e 52 T ac o and icycle o accessing un-
planned a eas (sou ce: Au ho , 2021) 74
Figu e 53 Sludge-Go acuum ank (sou ce: Au ho ,
2021) 74
Figu e 55 UMAWA acuum uck (sou ce: Au ho ,
2021) 75
Figu e 56 Ms. Mhando (sou ce: Au ho , 2021) 75
Figu e 57 Ms. Mhando o e looking Toangoma
om he hill op FSTP (sou ce: Au ho , 2021) 76
Figu e 58 Toangoma FSTP pa ne ship wi h Wa -
e aid (sou ce: Au ho , 2021) 76
Figu e 59 Sludge d ying beds (sou ce: Au ho ,
2021) 77
Figu e 60 Expansion chambe wi h plas ic was e
(sou ce: Au ho , 2021) 77
Figu e 61 Plan ed G a el Fil e s (PGF) (sou ce:
Au ho , 2021) 77
Figu e 62 Biogas se le (sou ce: Au ho , 2021) 77
Figu e 65 Godlo e Ngoda s anding ou side he
BORDA HQ (sou ce: Au ho , 2021) 78
Figu e 63 Used acuum uck (sou ce: Godlo e
Ngoda, 2019) 78
Figu e 64 Vacuum uck wi h expanded capaci y
(sou ce: Godlo e Ngoda, 2019) 78
Figu e 66 Expanded and epain ed acuum uck
(sou ce: Godlo e Ngoda, 2019) 79
Figu e 67 Gap analysis o he Kigamboni FSTP,
Toangoma FSTP and Vacuum T uck business
(sou ce: Au ho , 2021) 82
Figu e 68 Gap analysis o he Kigamboni FSTP
(sou ce: Au ho , 2021) 83
Figu e 69 Gap analysis o he Toangoma FSTP
(sou ce: Au ho , 2021) 84
Figu e 70 Gap analysis o he Vacuum T uck busi-
ness (sou ce: Au ho , 2021) 85
Figu e 71 P o i abili y o acuum uck businesses
based on size o business (sou ce: adap ed om
Kone & Chowdh y, 2012) 87
Figu e 72 Wo d cloud om FSM6 session 4 - How
do we ensu e ha he sludge eaches he ea -
men plan ? (Fe back e al., 2021) 87
Table 01 WHO & UNICEF’s Join Moni o ing P o-
g am (JMP) De ini ions o sani a ion se ice le -
els (sou ce: WHO & UNICEF, 2020) 2
Table 02 Common con ac ual a angemen s in
he WSS sec o (adap ed om GTZ, 2010) 27
Table 03 Ad an ages o PPP o e TP (adap ed
om Col e son & Pe e a, 2012) 41
Table 04 Disad an ages o PPPs o e TP (adap ed
om Boa dman e al., 2016; Col e son & Pe e a,
2012) 42
Table 05 Lis o CSFs wi h mo e han one men-
ion ga he ed om 23 s udies (sou ce: Au ho )
48
Table 06 Lis o CSFs wi h i e o mo e men ions
ga he ed om 23 s udies (sou ce: Au ho ) 49
Table 07 Final lis and de ini ions o CSFs o gan-
ised by le el (sou ce: Au ho ) 50
Table 08 Economis In elligence Uni ’s (EIU)
anking o A ican economies acco ding o PPP
eadiness (sou ce: EIU, 2015) 56
Table 09 Thema ic a eas su eyed in he Wo ld
Banks Benchma king In as uc u e Repo
(sou ce: Wo ld Bank, 2020b) 57
Table 10 De ailed in o ma ion on he epo s
and da abases used o de e mine he alues o
he eadiness assessmen (Sou ce: Au ho ) 61
Table 11 A e aged a ings om a ious sou ces
o de e mine Tanzania’s PPP eadiness (Sou ce:
Au ho ) 63
Table 12 A PESTLE Analysis o he PPP and FSM
enabling en i onmen in Da es Salaam (sou ce:
Au ho , 2021) 69
Table 13 Selec ed applicable CSFs + business el-
emen s amewo k o a ing and gap analysis
(sou ce: Au ho , 2021) 82
Lis o Tables
J. Young
iii
De elopmen
O&M Ope a ion and Main enance
OSS Onsi e Sani a ion
P PPP People- i s Public-P i a e Pa ne ship
PPCP Public-P i a e-Communi y Pa ne ships
PPI P i a e Pa icipa ion in In as uc u e
PPIAF P i a e Pa icipa ion in In as uc u e Ad-
iso y Facili y
PPP Public-P i a e Pa ne ship
PPRA Public P ocu emen Regula o y Au ho i y
PRC People’s Republic o China
PSP P i a e Sec o Pa icipa ion
QCA Quali a i e Compa a i e Analysis
SDG Sus ainable De elopmen Goal
SME Small and Medium-Sized En e p ise
SOE S a e-owned En e p ise
SSA sub-Saha an A ica
T T ea men
TP T adi ional P ocu emen
UMAWA Uhai wa Mazingi a na Wa u
UMIC Uppe Middle Income Coun y
UN Uni ed Na ions
UNDP Uni ed Na ions De elopmen P og amme
UN DESA Uni ed Na ions Depa men o Eco-
nomic and Social A ai s
UNECA Uni ed Na ions Economic Commission
o A ica
UNECE Uni ed Na ions Economic Commission
o Eu ope
UN IATF Uni ed Na ions In e -agency Task Fo ce
on Financing o De elopmen
V M Value o Money
WB Wo ld Bank
WDI Wo ld De elopmen Indica o s
WEF Wo ld Economic Fo um
WSS Wa e Supply and Sani a ion
Lis o Abb e ia ions
A DB A ican De elopmen Bank
AU A ican Union
BOO Build-Ope a e-Own
BOT Build-Ope a e-T ans e
BTI Be elsmann S i ung Index
CETA Ci ic Educa ion Teache s’ Associa ion
CPI Co up ion Pe cep ion Index
DAWASA Da es Salaam Wa e and Sewe age Au ho -
i y
DB Design-Build
DBFMO Design-Build-Finance-Main ain-Ope a e
DSK Dus ha Shas hya Kend a
EISA Elec o al Ins i u e o Sou he n A ica
EPI En i onmen al Pe o mance Index
ET Emp ying and T anspo
FBO Fai h-based O ganiza ion
FS Faecal Sludge
FSM Faecal Sludge Managemen
GCR Global Compe i i eness Repo
GII Global Inno a ion Index
ICT In o ma ion and Communica ions Technology
IFI In e na ional Finance Ins i u ion
JMP Join Moni o ing P og am
KAS Kon ad Adenaue S i ung
LGA Local Go e nmen Au ho i y
LIC Low Income Coun y
LIDC Lowe Income De eloping Coun y
LMIC Lowe Middle Income Coun y
MC Municipal Council
MDB Mul i-la e al De elopmen Bank
MoEST Minis y o Educa ion, Science and Technol-
ogy
MoW Minis y o Wa e
MoWI Minis y o Wa e and I iga ion
MSP Mul i-S akeholde Pa ne ship
NPM New Public Managemen
NPG New Public Go e nance
OECD O ganiza ion o Economic Co-ope a ion and
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
ix
Acknowledgemen s
Fi s and o emos , I would like o hank my daugh e , Noemie Jean, o deciding o
be bo n h ee weeks be o e submission, and my wonde ul wi e, Roya o deli e ing a
baby, pu ing up wi h my long hou s o wo k, and s ill inding ime o e iew his hesis.
You bo h pu e e y hing in o pe spec i e.
I would also like o hank my ad iso s, P o . D .-Ing. Wol gang Dickhau and Tim
Fe back. Wi hou Tim’s guidance and ou long hou s spen discussing he minu iae o
weigh ed a ings and he ole o he p i a e sec o , his hesis would no exis .
I would also like o hank hose who p o ided in aluable insigh by gene ously ag ee-
ing o hold in e iews: Ca oline Chema E ic, Eng. Romanus A. Mwang’ingo, Eng. Mu-
aekulwa Mu egeki, Pe e Hawkins, Godlo e Ngoda, Ma hias Milinga, Cha les Makoye,
Mwanahama Mhando, Joyce Musi a and Eng. Lydia Ndibalema.
Fu he mo e, I would like o hank hose I me o communica ed wi h in Tanzania and
elsewhe e who helped me unde s and he local con ex , a anged si e isi s, showed me
a ound, in oduced me o he igh people, ga e me eedback o poin ed me in he igh
di ec ion: Lau a B igh -Da ies, Alex Mille , Con ad Thombansen, F id jo Behnsen,
A is a ick Mkenda, F anka an Ma ewijk, Ki ya Heinemann and Julia Pleuse .
Finally, I would like o hank he unending suppo o my amily. Momma, his is o
you.
J. Young
6
na ional Mone a y Fund (IMF) suppo ed
s uc u al ma ke e o ms in Tanzania
which we e success ul in inc easing eco-
nomic g ow h, in es men and expo s,
howe e he e u n on o eign- inanced
in es men (aid money) was low, acco d-
ing o a join epo om he WB and IMF
(Ag awal e al., 1993). The low p oduc i i y
o in es men , w o e Ag awal e al. (1993),
“can pa ly be a ibu ed o he domina-
ion o he Tanzanian economy by a la ge
and ine icien pa as a al sec o .” Accele -
a ing he e o m o he public sec o and
imp o ing he enabling en i onmen o
p i a e sec o de elopmen , hey a gued,
could inc ease he p oduc i i y o in es -
men (Ag awal e al., 1993).
This policy ecommenda ion se he
s age o he in oduc ion o one o Tanza-
nia’s i s PPPs in 1995 - he con o e sial
G a Tain s Powe Pu chasing Ag eemen
be ween s a e-owned TANESCO and Inde-
penden Powe Tanzania Limi ed (IPTL)
o a 100 MW diesel powe pu chasing
ag eemen (Fa lam, 2005). A e yea s o
legal ba les and up oa om dono s and
consul an s due o he choice o echnol-
ogy, cos , co up ion allega ions and de-
mand p ojec ion, i was inally commis-
sioned in 2002 and unc ioned a only 10%
o i s capaci y, cos ing he go e nmen 40
million USD in capaci y paymen s in he
i s yea alone (Fa lam, 2005; Mou gues
& Kingombe, 2017).
J. Young
a e age empe a u e is 25.9℃ wi h a ela-
i e humidi y be ween 75 and 84 pe cen
h oughou he yea (clima e-da a.o g,
n.d.).
The ollowing sec ion will gi e a b ie
o e iew o he social, poli ical and eco-
nomic ac o s ha a e ele an o his e-
sea ch and he in ol emen o he p i a e
sec o in FSM se ice p o ision.
1.2 Social, Poli ical and Economic
Fo med in 1964 a e he joining o
Tanganyika and Zanziba , he Uni ed Re-
public o Tanzania shook o i s Ge man
and B i ish colonial pas o become a
P esiden ial Cons i u ional Republic un-
de he leade ship o P esiden Julius K.
Nye e e. A e en belie e in Pan-A i-
canism and sel - eliance, Nye e e im-
plemen ed a o m o A ican socialism
based on he Ma xis -Leninis s ance on
social, poli ical and economic p inciples,
called ‘Ujaamaa’, o b o he hood, which
owned upon p i a e weal h (Ci ic Edu-
ca ion Teache s’ Associa ion/Kon ad-Ad-
enaue -S i ung, 2018).
Unde his sys em o e 400 banks, in-
dus ies and o he en e p ises we e s a e-
owned and du ing his ime he economy
expe ienced only a 1.5 pe cen annual
g ow h un il he mid 1980s (CETA/KAS,
2018). In 1986 he Wo ld Bank and In e -
Figu e 03 To al in es men and numbe o PPP p ojec s in Tanzania om 1990-2020 (sou ce: PPI Da abase, 2021)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
7
a e Pa ne ship Ac , 2010 was passed, and
a yea a e ha The Public-P i a e Pa -
ne ship Ac , Regula ions, 2011. The e ha e
been se e al amendmen s o bo h he Ac
(2014, 2018) and he Regula ions (2015,
2020). The PPP Ac and Regula ions c e-
a e he ins i u ional amewo k o PPP
ag eemen s be ween he p i a e and pub-
lic sec o s in Tanzania and se he “ ules,
guidelines and p ocedu es go e ning
p ocu emen , de elopmen and imple-
men a ion” o PPPs (Ze os, 2020).
The la es se o egula ions (2020) c e-
a es an addi ional PPP desk ha is o be
se up wi hin he espec i e Con ac ing
Au ho i y (Minis y, Go e nmen Depa -
men , Au ho i y o Agency) and also pu s
mo e emphasis on local con en , p io i-
ising local se ice p o ide s and manu-
ac u ed goods, jobs o Tanzanians, and
ha Tanzanian ci izens a e gi en p io i y
in any ma e ela ed o echnology ans-
e , esea ch, de elopmen o inno a ion
(Go e nmen o he Uni ed Republic o
Tanzania, 2020). The amewo k has been
ound o be obus , albei leng hy and
complica ed (see Appendix C o an o e -
iew o he 16 s ep p ocu emen and ap-
p o al p ocess o small-scale PPPs).
This i s b ush wi h PPPs was ollowed
by ano he disas ous PPP in he WSS sec-
o in 2003. Again, a e yea s o a cos ly se-
lec ion p ocess beginning in 1997, he Da
es Salaam Wa e and Sewe age Au ho i y
(DAWASA) en e ed in o a lease ag eemen
wi h Ci y Wa e Se ices (CWS), a p i a e
conso ium including Biwa e Gau Tan-
zania Limi ed (BGT) – a join en u e be-
ween a B i ish i m Biwa e In e na ional
and a Ge man enginee ing i m, HP Gau
Ingenieu e GmbH – and he local i m Su-
pe Doll T aile Manu ac u e Company
Limi ed (STM) (T iche, 2012). The lead
p o essional company, Biwa e , owned
a 41% s ake, while HP Gau owned 10%
and Supe Doll – a company wi h no ex-
pe ience in he WSS sec o - owned 49%
(T iche, 2012). A e wo yea s o inancial
di icul ies and poo pe o mance, he
con ac collapsed and he o eign pa -
ne s we e d ama ically expelled om he
coun y, leading o wo in e na ional i-
bunals and li le, i any, imp o emen in
se ice (T iche, 2012).
Despi e hese se backs, Tanzania has
had 25 PPP p ojec s since 1993 in a a ie y
o sec o s including elec ici y (13), in o -
ma ion and communica ions echnology
(ICT) (7), ailways (2), WSS (1), ai po s (1)
and po s (1) (PPI Da abase, 2021) (Figu e
04). In o al, h ee ha e been cancelled,
1 is in dis ess, ou ha e been comple ed
and he es a e s ill ac i e. As can be seen
in Figu e 03, p ojec s peaked be ween 2005
and 2011, and in he las decade only ou
PPPs ha e been implemen ed (PPI Da a-
base, 2021)
Tanzania’s legal amewo k o PPPs
has also been s eadily, and equen ly,
buil up since 2009, beginning wi h he
Na ional Public P i a e Pa ne ship Policy
2009. The ollowing yea , The Public-P i-
PPPs by Sec o
Elec ici y ICT Railways WSS Ai po s Po s
Figu e 04 PPPs by sec o in Tanzania (sou ce: Au-
ho , 2021; Da a: PPI Da abase, 2021)
J. Young
8
basic educa ion su i al a e (pe cen age
o s uden s who a e expec ed o inish
basic educa ion) in Da es Salaam om
23.94% (2016) o 48.29% (2018), hough
he numbe o s uden s who comple ed
basic educa ion dec eased o 43.42% in
2019 (MoEST, 2019). Educa ion is c i ical
o go e nmen s no only o inc ease eco-
nomic ou pu and compe i i eness, bu
also o ha e enough skilled wo ke s o ill
ci il se ice posi ions (a e aking in o
accoun many o he mos skilled will p e-
e highe paid sala ies a p i a e i ms).
Poli ically speaking, Tanzania has been
unde de ac o one-pa y ule by he Cha-
ma Cha Mapinduzi (CCM) pa y since i s
incep ion in 1964. In 1992, he cons i u-
ion was amended o allow o mo e pa -
ies, howe e he CCM has main ained i s
g ip on powe and is he longes se ing
uling pa y in A ica (Campbell, 2020).
While he CCM has emained ela i ely
popula , he e we e allega ions o o e
“opp ession” by he Elec o al Ins i u e o
Sou he n A ica (EISA) in he las elec-
ion, wi h P esiden Maga uli winning in
a landslide ic o y wi h 84% o he o es
(Kombe, 2020).
Those I alked o in Da es Salaam ad-
mi ed Maga uli o his ough s ance on
co up ion and his commi men o in-
c easing in as uc u e, made isible by
he la ge numbe o p ojec s going on
h oughou he ci y. P esiden Maga uli
died om hea complica ions on Ma ch
17, 2021, jus as I was lea ing Tanzania,
and his ice p esiden Salia Suluhu Has-
san ook o e as he i s emale p esiden
o Tanzania.
Beyond PPPs, Tanzania has been g adu-
ally imp o ing i s business en i onmen ,
hough i s ill anks ai ly low wi h an ease
o doing business (DB) sco e o 54.5/100
and anking 141/190 (Wo ld Bank, 2021a).
While his numbe has s ayed ela i ely
le el o e he las 10 yea s (55.1/100 in
2011), he economy has been expe ienc-
ing sus ained g ow h and in July o 2020
unde o me P esiden John Maga uli,
Tanzania hi hei miles ones in he Tan-
zania De elopmen Vision (TDV) 2025 and
became a Lowe Middle-Income Coun y
(LMIC) (Wo ld Bank, 2021c).
The TDV 2025 ou lines he ollowing
key s a egic goals o achie e a s ong and
compe i i e economy in Tanzania, ely-
ing hea ily on indus ialisa ion and in a-
s uc u e o achie e hei a ge s (CETA/
KAS, 2018):
1. Di e si ica ion and semi-indus ialisa-
ion o he economy wi h a p ominen in-
dus ial sec o compa able o ypical mid-
dle-income coun ies
2. Economic s abili y h ough low in la ion
and basic mac oeconomic balances
3. Adequa e le els o in as uc u e o imple-
men he ision in all sec o s
4. Becoming an ac i e and compe i i e play-
e in egional and wo ld ma ke s wi h he
capaci y o a icula e and p omo e na-
ional in e es s and o adjus quickly o
egional and global ma ke ends.
Tanzania has also enac ed a numbe o
policies o imp o e educa ion ou comes,
including he TDV 2025, he Na ional Fi e-
Yea De elopmen Plan (FYDP) 2016-2021,
he Educa ion Sec o De elopmen Plan
(2016-2021) and he Educa ion and T ain-
ing Policy o 2014 (Minis y o Educa ion,
Science and Technology [MoEST], 2019).
These policies ha e posi i ely a ec ed he
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
9
1.4 O e all Objec i e
The objec i e o his esea ch is o
analyse he sui abili y o PPPs as a ool
o b idge exis ing gaps in he sani a ion
in as uc u e and se ice p o ision o
FSM in Da es Salaam. Th ough he use o
C i ical Success Fac o s (CSFs) and a PPP
eadiness ada , Tanzania’s PPP eadiness
will be e alua ed, and ecommenda ions
will be gi en o a pa ne ship model sui -
able o he cu en condi ions. By de e -
mining he mos e ec i e, e icien and
ealis ic means o se ice deli e y in Da
es Salaam, a sui able pa ne ship model
could le e age he s eng hs o bo h he
p i a e and public sec o s o bene i all
s akeholde s and educe he en i onmen-
al and heal h isks associa ed wi h poo
FSM.
1.5 Resea ch Hypo hesis
The e is a clea gap in bo h he amoun
o exis ing in as uc u e needed o ad-
equa ely ea aecal sludge (FS), and in
he implemen a ion o se ice deli e y in
FSM. This gap can be iden i ied, assessed,
and gi en a amewo k o enable success-
ul p i a e sec o pa icipa ion and make
FSM mu ually bene icial o all s akehold-
e s.
1.6 Resea ch Ques ions
1. How sui able a e PPPs o small-
scale FSM se ice deli e y in Da es
Salaam?
2. Wha kind o pa ne ship ame-
wo k would bes sui he enabling
en i onmen in Da es Salaam o
help scale-up FSM?
1.3 P oblem S a emen
By 2030, he UN p ojec s ha Da es Sa-
laam will join he anks o 42 o he Meg-
aci ies wi h a popula ion o 10 million o
mo e - doubling in size in he space o 15
yea s (UN DESA, 2018). This will make a bad
si ua ion, e en wo se. The expansion o
he sewe age sys em is slow and i egula ,
mee ing less han 10 pe cen o he needs
o he ci y (Ndibalema, Eng. L., H., pe son-
al communica ion, June, 2021). This means
on-si e sani a ion (OSS) and decen alized
ea men , wi h suppo om he p i a e
sec o , will ha e o mee his challenge.
While he Go e nmen o Tanzania (GoT)
has passed an inc easing amoun o leg-
isla ion o e he pas se e al decades o
c ea e a amewo k o he in oduc ion o
PPPs as a means o mee hese challenges,
poo pas expe iences wi h p i a e sec o
pa icipa ion in WSS ha e pu a dampe on
PPP up ake in he sec o (Leigland, 2018;
T iche, 2012). Cu en ly, he e a e no o i-
cial FSM-speci ic PPP guidelines, and he
PPP a angemen s ha do exis in he wa e
and sani a ion sec o a e limi ed o a ew
ins ances wi h ad-hoc con ac ual a ange-
men s o se ice con ac s (T ade Was e
Ag eemen s (TWAs) wi h acuum uck
owne s) ha , while imp o ing se ice p o-
ision, a e insu icien o mee he inc eas-
ing needs o he as -g owing popula ion.
Howe e , in e es in imp o ing FSM se -
ice p o ision is g owing, and Tanzania’s
Minis y o Wa e (MoW) and he Ene gy
and Wa e U ili ies Regula o y Au ho i y
(EWURA) came ou wi h onsi e sani a ion
(OSS) and FSM guidelines in 2020 ha men-
ion se e al PPP o PSP a angemen s as
po en ial business models o p o ision o
FSM, indica ing a g owing in e es in FSM
speci ic PPPs (EWURA, 2020).
J. Young
10
single lens and encompasses a a ie y o
elemen s including he p ojec , o ganiza-
ion and pa ne ship s uc u e/ ela ion-
ship, policy, ins i u ional amewo k and
he mac o inancial, en i onmen al, and
communi y le el. By ocusing only on one
app oach, we may miss he o es o he
ees and lose he b oade pic u e.
Hodge and G e e (2013) b eak down
PPP esea ch in o h ee gene a ions:
he i s gene a ion beginning in he 70s
ha ocused on indi idual p ojec s, he
second gene a ion beginning in he 90s
ha ocused on he policy en i onmen
su ounding PPP adop ion, and he la -
es gene a ion ha conce ns he exoge-
nous p essu e o he de eloping wo ld
o adop PPPs as a means o b idge in a-
s uc u e and unding gaps. This can also
be iewed as a mic o, meso and mac o
le el app oach o PPPs, and he in e ac-
ion o ac o s on and be ween hese le els
can in luence he success o ailu e o a
PPP.
The e o e his esea ch will adop a
holis ic, social-ecological model and sys-
ems heo y* app oach adap ed o anal-
1.7 Resea ch F amewo k
O e he pas se e al decades he can-
on o li e a u e on PPPs has g own signi i-
can ly as hey ha e con inued o inc ease
in popula i y as a ool o mee he wo ld’s
in as uc u e needs (Figu e 05).
While he implemen a ion o PPPs has
inc eased, so oo ha e he esea ch ame-
wo ks ha a e used o analyse hei e ica-
cy. Weihe (2008) men ions ou esea ch
lenses o PPPs, 1) he u ban egene a-
ion app oach, 2) he policy app oach, 3)
he in as uc u e app oach, and 4) he
de elopmen app oach. Each wi h hei
own se o ac o s, objec i es and analy-
ses (Nizko odo , 2017). Due o he di e -
en app oaches, Weihe (2008) a gues ha
PPPs exis in di e en con ex s o di e -
en needs, and a single de ini ion is bo h
logically impossible o PPPs and could
lead o alse compa isons. This esea ch
ecognises hese di e en lenses, howe -
e due o he na u e o PPPs ope a ing on
mul iple le els as poin ed ou by Hodge
& G e e (2016), I belie e i is necessa y o
ake a mac o iew o PPPs as a phenom-
enon in hemsel es ha anscends one
*The social-ecological model, i s in oduced by U ie B on enb enne , is a sys ems-based heo y ha
aims o unde s and he dynamic in e ela ions be ween di e en ac o s in di e en se ings. Simply pu ,
one hing a ec s ano he , and no hing occu s in a acuum. The indi idual is in luenced by, and in luences
he en i onmen in which i li es, and each mic o, meso and mac o le el eedback on each o he (B on-
enb enne , 1977).
Figu e 05 F equency o appea ances o he e m “public-p i a e pa ne ship” in li e a u e om 1950-2020
(sou ce: Google ng am iewe , 2021)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
11
ype o p i a e sec o in ol emen wi h
he go e nmen , con en ional PPPs a e
long- e m, con ac ually complex and in-
ol e p i a e sec o in ol emen h ough-
ou he li ecycle o he p ojec (design,
build, ope a e, main ain). A sho - e m
se ice ag eemen , o a design-build con-
ac would no be conside ed PPPs by he
Wo ld Bank’s de ini ion and hus a e no
he subjec o his analysis, hough hey
will be discussed.
The analysis includes a ho ough li -
e a u e e iew o CSFs in de eloping e-
gions and he WSS sec o o iden i y he
mos ci ed CSFs, which will hen be used
o c ea e a “Readiness Rada ” amewo k
o assessmen . Va ious sou ces om he
Wo ld Bank, Economis In elligence Uni
(EIU), Deu sche Gesellscha ü Tech-
nische Zusammena bei (GTZ; since 2010
a pa o GIZ), Deu sche Gesellscha ü
In e na ionale Zusammena bei (GIZ),
Tanzanian in e nal audi epo s, in e -
na ional da abases, li e a u e e iew and
in e iews will be used o de e mine he
deg ee (0-100) o which Da es Salaam’s
enabling en i onmen mee s he “Read-
iness Rada ” o PPP implemen a ion. A
de ailed desc ip ion o he me hodology
begins in Pa II.
The esea ch will co e he ollowing
s eps:
1. Iden i ying he p oblem - insu i-
cien FSM.
2. Analysing a po en ial solu ion - PPPs
o FSM.
3. Gap analysis o p i a e se ice p o-
ide s in FSM in Da es Salaam.
4. P oposal o a pa ne ship model
sui able o he cu en si ua ion ha
would help o scale up FSM in Da
es Salaam.
yse PPPs and hei c i ical success ac-
o s (CSFs) a each le el using Hodge and
G e e’s (2016) amewo k, wi h a speci ic
ocus on he WSS sec o in he de eloping
wo ld (Figu e 06).
As he in e na ional communi y allies
a ound he SDGs as pu o h by he UN, i
is aluable o assess he sui abili y o SDG
17 (c ea ing pa ne ships) o achie e SDG
6 (wa e and sani a ion). Pa ne ships
in hei b oades sense a e undoub edly
necessa y, bu a e PPPs (SDG 17.17) he
igh ins umen o achie e he SDGs in
de eloping egions?
The e a e wo common ypes o con-
en ional PPPs, hose used in social se -
ices (p isons, hospi als, schools, e c.)
and hose used in in as uc u e (Pessoa,
2010). This esea ch will ocus on con-
en ional PPPs as de ined by he Wo ld
Bank and he Uni ed Republic o Tanza-
nia, which a e p ima ily used o in a-
s uc u e and/o se ice deli e y o pub-
lic goods (elec ici y, wa e , sani a ion). I
is impo an he e o dis inguish be ween
con en ional PPPs as de ined by he Wo ld
Bank and PPPs as a e m in common us-
age. While many conside PPPs o be any
Figu e 06 The mul iple le els o PPP (sou ce: Au-
ho , adap ed om Hodge & G e e (2016))
J. Young
12
This inc easing a en ion in he sani a-
ion sec o has c ea ed a body o knowl-
edge suppo ed by eal wo ld successes
and ailu es ha has shi ed he hinking
om sewe -based sys ems o OSS, which
is be e sui ed o ci ies wi h a apidly ex-
panding popula ion and unplanned se le-
men s (Na ayan & Lü hi, 2020; Reymond
e al., 2016; S ande e al., 2014). Depend-
ing on local condi ions, i has been shown
ha FSM echnologies can be i e imes
less expensi e han sewe -based sys ems
(Dodane e al., 2012).
The impo ance o e ec i e FSM is es-
pecially e iden in Da es Salaam, whe e
a ound 90% o he ci y’s inhabi an s use
OSS, mos ly cha ac e ised by pi la ines
and sep ic anks, and a ea men a e o
only 7% (Eawag/Sandec, 2015). The Shi -
Flow Diag am (Figu e 09) below shows
he lows o was ewa e and FS in Da es
Figu e 07 Sludge d ying bed a Kigamboni FSTP (sou ce: Au ho , 2021)
Chap e 2: W h a i s Fa e c a l S l u d g e Ma n a g e m e n ( F S M ) ?
O e 2.7 billion people use on-si e sani-
a ion (OSS) ha is unconnec ed o sewe
sys ems o ea men plan s (Rao e al.,
2016). OSS is especially p e alen in low-
and middle-income coun ies, whe e he
ope a ional capaci y o go e nmen u il-
i ies is no always su icien o p ope ly
ea he aecal sludge and was ewa e
ha is gene a ed. This inabili y o p op-
e ly manage FS has wide- anging heal h,
social, economic and en i onmen al im-
pac s ha has long been o e looked in
he ace o o he c ises ha ge mo e a -
en ion and unding (Annam aju e al.,
2001). Howe e , wi h he Millenium De-
elopmen Goals (MDGs) and subsequen
Sus ainable De elopmen Goals (SDGs),
p ope sani a ion has been inc easingly
pu in o ocus and he e ha e been g ea
s ides owa d inclusi e sani a ion in he
las decades (Na ayan & Lü hi, 2020; Rey-
mond e al., 2016).
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
13
hen disposed o in an unsa e manne in
nea by open spaces, wa e ways, s o m-
wa e d ains o le o be di e ed in o
he en i onmen du ing he ainy season
(Fe back e al., 2021; S ande e al., 2014).
The pa hogenic na u e o FS hen c ea es
a h ea o he heal h o bo h he en i on-
men and public heal h h ough diseases
such as chole a and eu ophica ion in wa-
e bodies (Tayle , 2018).
Fu he mo e, when analysing he busi-
ness case o he euse o FS, i is impe -
a i e o ha e an end-p oduc ha is ee,
o accep ably ee, o pa hogens and con-
aminan s ha could pose a isk o a m-
e s and consume s (Bha e al., 2011).
The ollowing chap e will elabo a e on
he cha ac e is ics o FS, i s need o ea -
men , he sani a ion se ice chain ha in-
ol es a a ie y o s akeholde s, as well as
he ins i u ional amewo k and enabling
en i onmen necessa y o ensu e ha FS
is p ope ly ea ed and doesn’ simply end
up back in he en i onmen . This will p o-
ide he necessa y con ex o unde s and
he challenges ha PPPs a e supposed o
sol e.
Salaam. This illus a es he need o e -
ec i e FSM ha add esses he en i e se -
ice chain, om oile access o p ope
disposal. Cu en ly, he p i a e sec o is
s epping in o y o b idge his gap in se -
ice p o ision h ough he ope a ion o
emp ying and anspo (E&T) and aecal
sludge ea men plan s (FSTPs), howe e
a signi ican gap, especially be ween poo
and nonpoo households, s ill emains
(Jenkins e al., 2015).
2.1 W h a i s Fa e c a l S l ud g e ?
Faecal Sludge (FS) is he mix u e o hu-
man exc e a, wa e and solid was e ( oile
pape , e c.) ha accumula es in OSS like pi
la ines and sep ic anks and is no ans-
po ed h ough a sewe (S ande e al., 2015).
FS is highly a iable in i s consis ency and
depends on die , leng h o ma u a ion, and
ypes o use in e aces as well as he collec-
ion, ea men and s o age pa ame e s (Tay-
le , 2018). Because i is gene ally collec ed a
he sou ce and no mixed wi h s o mwa e
uno and o he pollu an s common in sew-
age, FS has a mo e po en ial o second-
a y uses as e ilize o ene gy eco e y and
wi h p ope FSM, can be a aluable esou ce
o eco e cos s, c ea e jobs and add o he
economy (Bha e al., 2011; Dodane e al.,
2012; Tayle , 2018).
2.2 The Need o T ea men
Wi h he inc easing numbe o OSS
sys ems o make up o he lack o sewe -
age in as uc u e in many low- and mid-
dle-income coun ies, he need o ea -
men o he esul ing FS is only g owing
(Tayle , 2018). Whe e he managemen
o FS is lacking h oughou he en i e
se ice chain, he OSS sys ems o en ill
up o a dange ous le el and he sludge is Figu e 08 Faecal sludge in an unplan ed d ying
bed (sou ce: BORDA, 2021)
J. Young
14
Figu e 09 Shi - low diag am (SFD) o Da es Salaam, 2015 (sou ce: Au ho , adap ed om Eawag/Sandec (2015))
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
15
2.3 Sani a ion Se ice Chain
The sani a ion se ice chain can be
sewe ed o non-sewe ed, and ensu es
ha people a e sepa a ed om con ac
wi h aecal ma e ial all he way om he
cap u e o end-use o euse (Blacke &
Hawkins, 2017). Di e en o ganisa ions
use sligh ly di e en s eps in he chain.
The Wo ld Bank (WB) iden i ies i e links
in he chain: use in e ace/con ain-
men , emp ying/collec ion, con eyance,
ea men , and end-use/disposal. The
Bill & Melinda Ga es Founda ion (BMGF)
“ alue” chain, which emphasises he e-
sou ce po en ial o FS, includes: cap u e,
s o age, anspo , ea men , and euse.
Tayle (2018) poin s ou ha he BMGF
chain is mo e sui able o OSS whe e he e
is gene a ion o FS, and he e o e p o-
poses: Cap u e – S o age – Remo al and
anspo – T ea men – End use/sa e dis-
posal. Fo he pu poses o his esea ch,
he s eps in he se ice chain ha a e o
ele ance a e he emp ying, anspo
and ea men (and o some deg ee e-
use), which in ol e he ac o s ha would
be in ol ed in a pa ne ship model wi h
he go e nmen . Those ac o s a e he pi
emp ie s, who ope a e bo h o mally and
in o mally, acuum uck owne s/ope a-
o s and he owne s/ope a o s o FSTPs.
Figu e 10 Sani a ion se ice chain (sou ce: Wikimedia Commons)
Figu e 11 Vacuum uck se icing a sep ic ank (sou ce: BORDA, 2021)
J. Young
22
ions, majo g oups and o he s s akehold-
e s, which e o s a e con ibu ing o he
implemen a ion o in e -go e nmen ally
ag eed de elopmen goals and commi -
men s.”
These “Mul i-S akeholde ” Pa ne -
ships (MSPs) a e conside ed by he UN
(2021) as “impo an ehicles o mobi-
lizing and sha ing knowledge, expe ise,
echnologies and inancial esou ces o
suppo he achie emen o he sus ain-
able de elopmen goals in all coun ies,
pa icula ly de eloping coun ies.”
Goal 17 o he SDGs aims o
“S eng hen he means o implemen a ion
and e i alize he Global Pa ne ship o Sus-
ainable De elopmen ,”
and a ge 17.17 seeks o
“Encou age and p omo e e ec i e public,
public-p i a e and ci il socie y pa ne ships,
building on he expe ience and esou cing
s a egies o pa ne ships.”
The indica o o eaching his goal is
he “Amoun o Uni ed S a es dolla s com-
mi ed o public-p i a e and ci il socie y
pa ne ships” (UN, 2021).
Public-p i a e pa ne ships a e o icial
policy o he UN. So i hey a e measu -
ing his goal by he money being pu in o
hem, wha a e hey exac ly?
3.2 An impossible ask: De ining
Public-P i a e Pa ne ships
“... nobody seems o know p ecisely wha
hey a e, ye e e yone is alking abou
hem,” (Hodge and G e e, 2005).
De ining he e m ‘Public-P i a e Pa -
ne ship’, some imes known as P3 o sim-
In his chap e , I will discuss he a ied
de ini ions o PPPs, hei co e pu pose and
he ange o ypes used o di e en pu -
poses. I will hen ake a look a hei his o-
y and hei g owing demand, wi h a look a
he cu en a gumen s in li e a u e o and
agains hem. Finally, I will look close a
PPPs in he wa e supply and sani a ion sec-
o , hei ends and sec o al and geog aphi-
cal dis ibu ion.
3.1 An ambiguous e m. De ining
Pa ne ships
“... he e is o en li le p ecision in how ‘pa -
ne ship’ is used, and belie ha wha i e e s
o is ‘a good hing’ seems much mo e a ma e
o ai h han o science,” (We enhall, 2003).
To e ec i ely add ess he global issue ha
is clima e change, pa ne ships (despi e he
imp ecision o hei use) be ween socie ies,
businesses, go e nmen s and ins i u ions
a e essen ial. No one ac o can sol e he
p oblem alone, and he SDGs won’ be able
o be me wi hou hem, which is e lec ed
in SDG 17 “Pa ne ships o he goals” (Choi
e al., 2020; UN, 2021). Bu wha is mean by
“pa ne ships”, and wha kind will be he
mos e ec i e in his igh ?
The Ox o d English Dic iona y (2021) de-
ines pa ne ship as “a ela ionship be ween
wo people, o ganiza ions, e c.; he s a e o
ha ing his ela ionship.” While his de ini-
ion cap u es he essen ial na u e o a pa -
ne ship, ha o a ela ionship be ween pa -
ies, i limi s he numbe o ac o s o wo.
B oadening he de ini ion o pa ne ship,
he UN (2021) de ines pa ne ships o sus-
ainable de elopmen as “mul i-s akeholde
ini ia i es olun a ily unde aken by Go -
e nmen s, in e go e nmen al o ganiza-
Chap e 3: PPPs and hei ise o p ominence
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
23
p oach, he policy app oach, he in a-
s uc u e app oach and he de elopmen
app oach. Wi hin hese s ands he di e -
en quali a i e meanings do no allow o
a logical syn hesis in o a single au ho i a-
i e and comp ehensi e meaning, he e-
o e de ini ions o PPPs should be ele-
ga ed o hei espec i e esea ch s ands
(Weihe, 2009). In o he wo ds, PPPs can’
logically ha e a single de ini ion.
Hodge & G e e (2013; 2016) ake his
beyond he di e en esea ch s ands in
he ques o meaning by poin ing ou
ha de ining PPPs has mo ed beyond jus
a way o implemen a p ojec , bu a he
as a phenomenon in i sel wi h i e le els
o meanings (Figu e 23):
1. p ojec ,
2. o ganiza ional / p ojec deli e y
o m,
3. policy / symbol o p i a e sec o
ole in economy,
4. go e nance ool o s yle, and
5. con ex and cul u e.
PPPs, hey a gue, need o be hough o
in a mo e sophis ica ed way (i.e. he so-
ply PPP, has he inhe en p oblem ound
in de ining any o e ly b oad concep , he
p oblem o pe spec i e. Depending on
whe e one s ands PPPs can look qui e di -
e en . PPPs can be made o sui almos
any con ex in which mo e han one pa y
is in ol ed (Hodge & G e e, 2009). Some
conside any pa ne ship be ween a pub-
lic and p i a e en i y as a PPP. This de i-
ni ion would include hings like adi ion-
al p ocu emen , whe e he public en i y
con ac s a p i a e en i y o design, build
o ope a e in as uc u e. O he s iew
hem mo e igo ously, as con ac ually
igh , bundled, long- e m ag eemen s o
implemen in as uc u e (Hodge e al.,
2018; Weihe, 2009).
This lack o a clea de ini ion o wha
a PPP ac ually is makes hem e en ha d-
e o e alua e, c ea ing an en i e co pus
o li e a u e on how o de ine hem in o -
de o unde s and wha i is ha is being
e alua ed (Hodge & G ee es, 2005; Weihe,
2009; Hayla & We enhall 2010).
Weihe (2009) iden i ied ou di e en
esea ch s ands in he ex an li e a u e
in which he e m PPP akes on di e en
meanings: he u ban egene a ion ap-
Figu e 23 Hodge & G e e’s i e le els o meaning (sou ce: Hodge & G e e, 2016))
J. Young
24
• (c) ecei es a bene i o pe o ming
he con ac ing au ho i y’s unc ion
o om u ilizing he public p ope y,
ei he by way o :
• (i) conside a ion o be paid by he
con ac ing au ho i y which de-
i es om a e enue und o whe e
he con ac ing au ho i y is a cen-
al go e nmen o local go e n-
men au ho i y, om he e enues
o such au ho i y;
• (ii) cha ges o ees o be collec ed by
he p i a e pa y o an agen om
use s o cus ome s; o
• (iii) a combina ion o conside -
a ion and cha ges o ees.
The Wo ld Bank (2021) de ines hem
mo e simply as:
“a long- e m con ac be ween a p i a e
pa y and a go e nmen en i y, o p o-
iding a public asse o se ice, in which
he p i a e pa y bea s signi ican isk and
managemen esponsibili y and emune -
a ion is linked o pe o mance” (Wo ld
Bank PPP Knowledge Lab, 2021).
Acco ding o he Wo ld Bank (2021),
“ he e m should always be long enough
o he p i a e pa y o ha e an incen i e
o in eg a e se ice deli e y cos s consid-
e a ions in o he design phase o he p oj-
ec .” This is o ensu e ha he ade-o s
be ween he ini ial in es men s cos and
u u e main enance and ope a ion cos s
a e op imized, wi h an emphasis on he
“whole-li e” o he p ojec . This should in
heo y maximize he e iciency o se ice
deli e y because he pa y esponsible
o deli e ing he se ice is also espon-
sible o he quali y o he in as uc u e
and has an inhe en in e es in keeping
e e y hing up and unning.
cial-ecological model), wi h di e en
meanings on mul iple le els.
Howe e , while de ini ions abound and
hei undamen al meaning is elusi e, a
e iew o he li e a u e e eals a numbe
o commonali ies in con en ional PPPs.
These include:
1. A con ac ual pa ne ship o some
leng h be ween public and p i a e
pa ne s,
2. a ce ain alloca ion o isks, and
3. a sha ing o he cos s, esou ces
and ewa ds o mu ual coope a ion
( an Ham & Koppenjan, 2001; We -
enhall, 2003; Hodge & G e e, 2007;
Weihe, 2009).
Because his hesis conce ns he Tan-
zanian con ex , he wo de ini ions o p i-
ma y in e es a e hose om he Wo ld
Bank, which is ac i ely p omo ing PPPs
in Tanzania, and he Tanzanian go e n-
men i sel . Because o icial de elopmen
assis ance (ODA) is o en used o und PPP
p ojec s (Ens, 2019; Mudde, 2017), i is
logical o use he de ini ions gi en by he
p o ide and ecipien o ha aid.
Tanzania’s Public-P i a e Pa ne ship
Ac (2015) de ines PPPs as:
“A con ac ual a angemen be ween a
con ac ing au ho i y and a p i a e pa y in
which he p i a e pa y:
• (a) unde akes o pe o m a con ac -
ing au ho i y’s unc ion on behal o
he con ac ing au ho i y o a speci-
ied pe iod;
• (b) assumes subs an ial inancial,
echnical and ope a ional isks in con-
nec ion wi h he pe o mance o he
con ac ing au ho i y’s unc ion o use
o go e nmen p ope y in acco dance
wi h ag eed ou pu speci ica ions;
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
25
a e adap ed om he Wo ld Bank’s PPP
Knowledge Lab. The Wo ld Bank as one
o he majo p oponen s o PPPs, and
hei widely ci ed P i a e Pa icipa ion in
In as uc u e Ad iso y Facili y (PPIAF)
da abase ha acks PPP p ojec s in low-
and middle-income coun ies, helps o
ensu e a leas a consis ency o analysis
o PPP ypes and sub ypes, i no o al ac-
cu acy (see chap e 4.4).
Acco ding o he Wo ld Bank’s PPP
Knowledge Lab (2021):
PPPs can be desc ibed in h ee b oad pa-
ame e s:
1. Asse ype;
2. unc ions o he p i a e pa y; and
3. how he p i a e pa y is paid.
Asse Types: Can be di ided in o con ac -
ing a p i a e en i y o build new p ojec s
(g een ield), o he ehabili a ion o al-
eady buil public in as uc u e (b own-
ield). Examples o g een ield p ojec s in-
clude new FSTPs, hospi als, o was ewa e
ea men plan s. Examples o b own ield
p ojec s include upg ading a sewe age
ne wo k, o aking o e a wa e dis ibu-
ion sys em and adding connec ions.
Func ions o he p i a e pa y: The unc-
ions o he p i a e pa y can a y g ea -
ly, depending on he sec o and cu en
needs o he go e nmen . The ypical
unc ions include:
• Design - in ol es de eloping he
p ojec om ini ial concep and
ou pu equi emen s o cons uc-
ion- eady design speci ica ions.
• Build, o Rehabili a e - when PPPs
a e used o new in as uc u e as-
se s, hey ypically equi e he p i-
a e pa y o cons uc he asse and
ins all all equipmen . Whe e PPPs
Though legally de ined, con usion e-
mains in bo h he p i a e and public sec-
o s in Tanzania (and elsewhe e) abou
wha a PPP eally is. A s udy by Bengesi
(2016) looking a he pe cep ions o PPP
p ojec s in Tanzania iden i ied his dis-
c epancy, s a ing “Some iew PPP as be-
ing applicable only when he e is p i a e
in es men , while o he s con end ha
PPP includes all o ms o in e ac ions
be ween he public sec o and p i a e
sec o ; om consul a ions o policy dia-
logues and collabo a ions o p i a e p o-
ision o asse s and se ices.” I is his
b oad, o e lapping iew o wha PPPs a e
ha con ibu es o much o he con usion
su ounding hem.
3.3 P P P y p e s a n d c l a s s i i c a i o n s
Alongside he di icul y in de ining
PPPs, schola s ha e also had a ha d ime
classi ying hem. A emp s ha e been
made o so PPP p ojec s acco ding o
he pa ne ship s uc u e and he deg ee
o in e ac ion be ween p i a e and public
en i ies; owne ship o asse s; p ojec pu -
pose; policy objec i es; and he deg ee
o ansac ion cos s (Nizko odo , 2017).
Though hese classi ica ions gi e lexibili-
y, hey can also lead o alse compa isons
and inaccu a e gene aliza ions – a unda-
men al issue wi h PPPs.
While he e a e many ypes o PPPs,
his esea ch will ocus on in as uc u e
PPPs, ha is, PPPs ha a e used o design,
build, inance, ope a e and/o main ain
he “basic physical and o ganiza ional
s uc u es” needed o make economic,
social, and go e nmen ac i i y possible
(Ox o d English Dic iona y, 2021). Due
o he ocus o his hesis on he ypes o
PPPs used in he WSS sec o in low-in-
come coun ies, he ollowing de ini ions
J. Young
26
Paymen : The e a e wo ypes o common
paymen schemes in PPPs. The i s is a
“use -pays” sys em, in which he end-us-
e pays a p i a e se ice p o ide o he
se ice, o example, a oll- oad o o
wa e p o ision. These ypes o schemes,
especially in he wa e sec o , a e o en
suppo ed by he go e nmen h ough
subsidies, ei he o ensu e enough p o i
o he p i a e pa ne , o o inc ease se -
ice p o ision in poo e a eas ha would
o he wise be igno ed due o a lack o cus-
ome s who can a o d he se ice (PPP
Knowledge Lab, 2021).
The second ype is a “go e nmen -pays”
sys em, in which he go e nmen is he
sole sou ce o income o he p i a e
se ice p o ide who mee s con ac-
ually ag eed upon s anda ds o a se -
ice ou pu . These can be in he o m o
“a ailabili y paymen s”, in which a PSP is
paid o keeping he asse a ailable and
unc ioning (e.g. a ee highway), o “ ol-
ume-based paymen s”, in which a se ice
is paid o by he amoun p oduced (e.g.
elec ici y o wa e ) (PPP Knowledge Lab,
2021).
Bo h o hese paymen s a e pe o -
mance-based o ensu e ha he PSP has
an incen i e o p o ide high-quali y se -
ice and will incu hea y e mina ion
paymen s i he p ojec is cancelled.
These con ac ypes exis on a con in-
uum o inc easing p i a e sec o pa ici-
pa ion, in which inc easing isks aken on
by he p i a e sec o should lead o g ea -
e ewa ds (Figu e 24).
in ol e exis ing asse s, he p i a e
pa y may be esponsible o eha-
bili a ing o ex ending he asse .
• Finance - when a PPP includes
building o ehabili a ing he asse ,
he p i a e pa y is ypically also e-
qui ed o inance all o pa o he
necessa y capi al expendi u e.
• Main ain - PPPs assign esponsi-
bili y o he p i a e pa y o main-
aining an in as uc u e asse o a
speci ied s anda d o e he li e o
he con ac . This is a undamen al
ea u e o PPP con ac s.
• Ope a e - he ope a ing esponsi-
bili ies o he p i a e pa y o a PPP
can a y widely, depending on he
na u e o he unde lying asse and
associa ed se ice. Fo example, he
p i a e pa y could be esponsible
o :
Ȃ Technical ope a ion o an asse ,
and p o iding a bulk se ice o
a go e nmen o - ake — o ex-
ample, a bulk wa e ea men
plan
Ȃ Technical ope a ion o an asse ,
and p o iding se ices di ec ly
o use s — o example, a PPP o
a wa e dis ibu ion sys em
Ȃ P o iding suppo se ices, wi h
he go e nmen agency emain-
ing esponsible o deli e ing
he public se ice o use s —
o example, a PPP o a school
building ha includes jani o i-
al se ice (PPP Knowledge Lab,
2021).
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
27
The e a e a wide a ay o con ac ual a angemen s ha can be mixed and ma ched
acco ding o need (BOT, BTO, DBO,DBOM, DBOFM, e c.), he e o e he ollowing able
men ions he mos ele an ypes o he WSS sec o (Table 02).
Pa ne ship
Type P i a e Sec o Du ies Con ac leng h Owne ship o asse
Responsibili y
Finance
Design/Build
Main ain/Ope a e
Typical
p o i /paymen
mechanism o
ope a o
Se ice
Ag eemen
Pe o m emp ying &
anspo o FS 0-2 yea s Public
Public
Public
Public
Fee om use o
con ac ing au ho i y
Managemen
Con ac
Supplies managemen
se ices o he u ili y in
e u n o a ee
2-5 yea s Public
Public
Public
P i a e
Fixed ee + bonus usually
co e s manage 's sala ies
and ela ed expenses
Design Build Design & build FSTP 0-5 yea s Public
Public
Public
Public
Fee om con ac ing
au ho i y
Ope a ion and
Main enance
Ag eemen s /
A e mage
Ope a e and Main ain
FSTP 5-15 yea s Public
Public
Public
P i a e
Fee x olume o wa e
sold/ ea ed
Ope a ional
Concession
Runs he business,
inances in es men
10-15 yea s (and
longe ) Public
Public
Public
P i a e
Re enue om use s
minus concession ee
DBFMO and
a ian s
Designs, builds, inances,
main ains and/o
ope a es asse o he
pe iod o he con ac
15-30 yea s (and
longe )
Public (o p i a e
ans e ed o public a
end o con ac )
P i a e
P i a e
P i a e
A ailabili y and
olume ic paymen om
ei he Con ac ing
Au ho i y o end use s
BOT
Builds, ope a es and
ans e s asse back o he
go e nmen a he end o
he con ac
15-30 yea s (and
longe )
Public (o p i a e
ans e ed o public a
end o con ac )
P i a e
P i a e
P i a e
A ailabili y and
olume ic paymen om
ei he Con ac ing
Au ho i y o end use s
BOO Builds, ope a es and owns
he asse in pe pe ui y 15-30 yea s P i a e
P i a e
P i a e
P i a e
A ailabili y and
olume ic paymen om
ei he Con ac ing
Au ho i y o end use s
P i a isa ion Full du ies o unning he
business unlimi ed P i a e
P i a e
P i a e
P i a e
A ailabili y and
olume ic paymen om
ei he Con ac ing
Au ho i y o end use s
Non-PPP PPP Full
p i a isa ion
Figu e 24 Con inuum o p i a e sec o in ol emen and isk (adap ed om Wo ld Bank, 2021)
Table 02 Common con ac ual a angemen s in he WSS sec o (adap ed om GTZ, 2010)
-
J. Young
28
and subsequen c ash o he wo ld’s i-
nancial ma ke s in 2007/8 in a ou o
o he o ms o public adminis a ion (PA)
such as New Public Go e nance (NPG)
and Neo-Webe ian S a e (NWS). These
heo ies o go e nance pu an inc eased
impo ance on he ole o egula , ans-
pa en go e nmen and bu eauc a ic due
p ocesses ha ypically eschew he no-
ion ha p i a isa ion is a cu e-all.
Howe e , many o he ideologies ha
we e inhe en o NPM, such as low-cos ,
e iciency and speed, ha e emained em-
bedded in he o icial policy o banks and
go e nmen s (D echsle , 2005; Fly bje g
2005). While he e icacy o NPM has been
soundly challenged, i s ideology, namely
ea ing he go e nmen like a business,
is s ill ali e and well in he con en ion-
al PPP concep . So how did PPPs ise o
p ominence, su i e mul iple global i-
nancial c ises and make hei way in o
o icial UN policy?
3.5 PPPs, a b ie his o y
Though oday’s PPPs a e a mode n
capi alis phenomenon, pa ne ships
be ween he p i a e sec o and go e n-
men s ha e been in use o cen u ies in
coun ies a ound he wo ld (KS e al.,
2016). Fo ms o PPPs we e implemen ed
in Egyp , F ance, he Uni ed S a es and
elsewhe e o build ail oads, highways,
po s and elec ic g ids (Klein, 2015). The
in ol emen o he p i a e sec o in pub-
lic wo ks can e en be aced back o Ro-
man oll oads, ba hs and ma ke s (Fo e
e al., 2010; KS e al., 2016).
Howe e , he mode n ebi h o PPPs
i s began in he 1970s as a c i ique o
go e nmen ine iciency and he pe -
cei ed poo pe o mance o s a e-owned
Now ha we’ e aken a look a he
b ead h and a ie y o PPPs, le ’s ake a
s ep back and look a he heo e ical con-
ex o PPPs in socie y om a public ad-
minis a ion (PA) pe spec i e.
3.4 PPPs in he Public Adminis a-
ion (PA) con ex
Public-P i a e Pa ne ships ha e had
a ema kable ise in popula i y o e he
las se e al decades. This ise has la gely
coincided wi h, and could e en be con-
side ed a undamen al aspec o , he shi
o go e nmen s and in e na ional inanc-
ing ins i u ions (IFIs) owa d he neo-lib-
e al heo y o New Public Managemen
(NPM) (Rakić & Rađeno ić, 2011). NPM is
cha ac e ised by he ans e o business
managemen and ma ke p inciples om
he p i a e in o he public sec o , anging
om pa ial o ull p i a isa ion o public
se ices (D echsle , 2005). NPM unc ions
unde he assump ion ha all human
beha iou is mo i a ed by sel -in e es
and in pa icula , p o i maximiza ion
(D echsle , 2005; Robe s, 2010).
NPM g ew ou o he same hinking
ha was ou lined in he Washing on Con-
sensus, a e m coined by economis John
Williamson in 1989, ha was a se o p e-
sc ip i e iews abou e ec i e de elop-
men s a egies associa ed wi h he Wash-
ing on-based ins i u ions: he IMF, he
Wo ld Bank, and he US T easu y (Se a
& S igli z, 2008). The main ocus o he
consensus was ha p i a isa ion, ma ke
libe aliza ion and mac oeconomic s abil-
i y, in sho “ he ma ke ” can sol e mos ,
i no all, economic p oblems on i s own
(Se a & S igli z, 2008).
NPM and neolibe alism in gene al has
been widely dispu ed since he mid-2000s
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
29
e m ha claims all o i s ad an ages and
none o i s condemna ions (We enhall,
2003; Klein, 2015).
This “success s o y” hen began o gain
s eam no only in de eloped economies,
bu in he de eloping wo ld as well. In
2015, in pa allel wi h he UN SDGs, he
Addis Ababa Ac ion Agenda (AAAA) o
he Thi d In e na ional Con e ence on Fi-
nancing o De elopmen was launched.
This agenda p omo ed blended inance
(a mix o public and p i a e inancing)
and “p o ides a new global amewo k
o inancing sus ainable de elopmen by
aligning all inancing lows and policies
wi h economic, social and en i onmen al
p io i ies” (UN DESA, 2015).
This agenda, and SDG 17.17, solidi ied
PPPs as o icial UN policy. Thei p omise
o “build capaci y o en e in o public-p i-
a e pa ne ships, including wi h ega d
o planning, con ac nego ia ion, man-
agemen , accoun ing and budge ing o
con ingen liabili ies,” has had a di ec
impac on he numbe o new PPP laws
in de eloping coun ies a ound he wo ld
(Uni ed Na ions, 2015b). Th ough his i-
nancing scheme, he UN hopes o b idge
he massi e unding gaps necessa y o
supply he in as uc u e needed in de-
eloping coun ies.
en e p ises (SOEs), and we e seen as a
means o downsize he ole o he go -
e nmen (KS e al., 2016). In he 1980s he
Ne he lands began o implemen a sla e
o PPP p ojec s (Van Ham & Koppenjan,
2014), and by he 1990s mode n PPPs ha
elied hea ily on p i a e inance came o
ui ion in he Uni ed Kingdom.
In 1992, he conse a i e go e nmen
in he UK led by P ime Minis e John
Majo launched he P i a e Finance Ini-
ia i e (PFI), which aimed o educe he
budge de ici by p omo ing PPPs (We -
enhall, 2003). In his way, up on in es -
men s in in as uc u e we e inanced by
he p i a e a he han he public sec o ,
wi h o he u u e cos s (such as ans e
o asse s o main enance) no pu on he
books (Hall, 2015).
This ype o c ea i e accoun ing has la -
e been condemned and e en banned in
some coun ies (Boa dman e al., 2016).
In 1997, P ime Minis e Tony Blai and
he New Labou Pa y con inued he ex-
pansion o he PFI by c ea ing a dedica ed
semi-independen PPP uni , Pa ne ships
UK, which was ins umen al in making
PPPs bo h he p e e ed e minology and
ool o choice in in as uc u e p ojec s
in he UK (We enhall, 2003), accoun ing
o a ound 12% o o al capi al expendi-
u e h oughou Blai ’s enu e (Bu ge &
Hawkeswo h, 2011).
Once he appa en ly success ul PFI
ook o , o he coun ies a ound he wo ld
ollowed sui , no ably in Aus alia, Sou h
Ko ea, F ance and Ge many (Bu ge &
Hawkeswo h, 2011). The simplici y o he
name, e oking ci il du y and he gene al-
ly posi i e ole o pa ne ships, was a PR
success s o y, a oiding he conno a ion o
cynical sel -in e es and p o i ee ing in-
he en in ‘P i a iza ion’ and shi ing i o a
J. Y o u n g
3 0
o b usi n ess s al es ( R e n s c hl e e al., 2 0 1 9).
F u h e m o e, e q u e n u b a n l o o di n g
c a us e d b y a l a c k o e e c i e d ai n a g e s ys-
e ms d es o ys b o h p u bli c a n d p i a e as-
s e s a n d b i n gs li e o a s a n ds ill, i n c e as-
i n g h e is k o w a e - b o n e dis e as es o m
i n a d e q u a e s a ni a i o n s ys e ms a n d o c-
i n g i ms o i n es i n e x p e nsi e c o pi n g
m e as u es li k e w a e a n ks a n d di es el g e n-
e a o s ( R e n s c hl e e al., 2 0 1 9). A c c o d-
i n g o R e n s c hl e e al. ( 2 0 1 9), “ O e all,
h e l a c k o e e c i e d ai n a g e s ys e ms a n d
eli a bl e a ns p o a n d el e c i ci y s ys e ms
is a d e i ni n g a c o o h e u b a n e c o n o m y,
i n l u e n ci n g h e i n es m e n a n d is k- a k-
i n g b e h a i o s o all”.
I n as u c u e d e el o p m e n h as l o n g
b e e n s e e n as h e m e a ns o a d d essi n g
h es e c h all e n g es a n d a c hi e i n g e c o n o mi c
g o w h ( K o d o n g o & Oj a h, 2 0 1 6). H o w e -
T h e l a c k o n e w a n d eli a bl e i n a-
s u c u e ass e s a n d s e i c es c a n h a m p e
g o w h, es p e ci all y i n d e el o pi n g e gi o ns
i n A i c a ( M o u g u es & Ki n g o m b e, 2 0 1 7).
A c c o di n g o h e W o l d B a n k ( 2 0 1 8 a),
p o o p e o m a n c e o i n as u c u e is
o e n h e es ul o i ns u i ci e n s p e n di n g;
p o o pl a n ni n g, i ns u i ci e n i n e - mi nis e-
i al p oli c y c o o di n a i o n a n d w e a k a n al y-
sis; c o u p i o n a n d h e p u s ui o p oli i c al
g ai n; a n d p o o m ai n e n a n c e – all o w hi c h
c a n b e o bs e e d i n T a n z a ni a.
D u i n g m y es e a c h i n D a es S al a a m,
I e x p e i e n c e d a n a e a g e o 4 p o w e o u -
a g es a w e e k, a n gi n g o m 3 0 mi n u es o
5 h o u s. G e i n g w o k d o n e, es p e ci all y
w h e n s o m u c h o i h as m o e d o nli n e, w as
a c h all e n g e. T a nz a ni a e x p e i e n c es cl os e
o 6 0 h o u s o p o w e o u a g es p e m o n h
w hi c h es ul i n a l oss o a o u n d 1 2 p e c e n
* T h e Gl o b al I n as u c u e H u b is a G 2 0 I ni i a i e h a es i m a es h e n e e d o u n di n g i n 5 6 c o u n i es
a o u n d h e w o l d. I is a n es i m a e o h e g a p i n cl u di n g all h e y e a s o m n o w ( 2 0 2 1) u n il 2 0 4 0.
C h a p e 4: T h e S u p pl y a n d D e m a n d o P P Ps a n d I n as uc u e
T h e d e m a n d o i n as u c u e is e n o m o us, es p e ci all y i n A i c a. T h e c u e n i n a-
s u c u e i n es m e n g a p i n A i c a is $ 3. 3 illi o n U S D, $ 2 5 1 billi o n o w hi c h is h e g a p i n
w a e i n as u c u e ( Gl o b al I n as u c u e H u b, 2 0 2 1)*. T h e u n di n g g a p is e e n l a g e
w h e n a c c o u n i n g o h e c os s ass o ci a e d wi h m e e i n g h e S D Gs ( Fi g u e 2 5).
2007 2012 2017 2022 2027 2032 2037
$ 0
$50 bn
$100 bn
$150 bn
$200 bn
$250 bn
$300 bn
$350 bn
$400 bn
$450 bn
I n a s u c u e i n e s m e n a c u e n e n d s a n d n e e d
�C u e n e n d s
�In es men need
�I n e s m e n n e e d i n c. S D G s
Fi g u e 2 5 I n as u c u e i n es m e n g a p i n A i c a (s o u c e: GI H u b, 2 0 2 1)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
31
ec s on socie y. Howe e , i is c ucial ha
p ojec s a e a ge ed and necessa y, wi h
ealis ic cos /bene i assessmen s ha a e
ee om manipula ion (Fly bje g, 2005;
We enhall, 2003).
4.1 The di e ence be ween PPPs
and adi ional p ocu emen
By now, one may wonde how PPPs a e
any di e en om adi ional p ocu e-
men (TP). A e all, go e nmen s ha e
been wo king wi h he p i a e sec o o
cen u ies o build la ge in as uc u e
p ojec s o en h ough con ac ing ou o
cons uc ion and/o se ices. The e a e
key di e ences, howe e .
PPPs a e usually ocused on ou pu s
a he han inpu s, which a e o en pe -
o mance-based (amoun o FS ea ed
o wa e deli e ed a he han ea men
capaci y o leng h o pipe laid) (Sulse ,
2018). They a e also supposed o ac o
in he whole li e o he p ojec because o
he leng hy na u e o he con ac s. I a
i m in cha ge o designing and building
a FSTP also has o main ain i , hey ha e
mo e incen i e o build wi h be e quali-
y o educe main enance cos s down he
oad. The ac ha he p i a e pa y is
supposed o ake on subs an ial inancial
isk, also gi es an incen i e o educe cos
o e uns and ‘app aisal op imism’ – ha
is, unde es ima ed cos s and ime ame
and o e es ima ed bene i s – which a e a
common p oblem in TP (T ebilcock & Ro-
sens ock, 2015).
The e also exis s a undamen al di e -
ence in he ela ionship s uc u e be ween
he public (p inciple) and p i a e (agen )
pa ies in PPPs and TP. In adi ional p o-
cu emen , a e ical ela ionship akes
place (Figu e 26), in which he p inciple
e , he e ha e been c i ical challenges o
his “my h”, and e idence is mixed i high
le els o in es men in in as uc u e au-
oma ically lead o sus ained economic
g ow h (Ansa e al., 2016). Ansa e al.
(2016) ound ha la ge-scale in as uc-
u e p ojec s ypically don’ b ing a posi-
i e isk-adjus ed e u n and “o e in es -
ing in unp oduc i e p ojec s esul s in he
build-up o deb , mone a y expansion,
ins abili y in inancial ma ke s, and eco-
nomic agili y.”
Using e idence om se e al hund ed
p ojec s in 20 coun ies, Fly bje g (2005)
p oposed ha “in o de o ge an in a-
s uc u e p ojec buil a ‘Machia ellian’
o mula is ollowed:
(unde -es ima e cos s)
+ (o e -es ima e e enues)
+ (unde - alue en i onmen al and so-
cial impac s)
+ (o e - alue wide economic de elop-
men e ec s, o spillo e e ec s)
= (win p ojec app o al).”
Wi h hese s a egies esul ing in a ‘su -
i al o he un i es ’ by which he ‘wo s
in as uc u e ge s buil ’ (Ansa e al.,
2016; Fly bje g, 2005).
The same pi alls ha occu in in a-
s uc u e p ojec s in gene al a e he same
p oblems ha can plague PPPs, which
can go w ong in a numbe o di e en
ways when hey a en’ p ope ly p epa ed
(Boa dman e al., 2016; Rome o, 2018).
These usually occu as a esul o in es o s
‘miscalcula ions’, decep i e echniques o
assessing V M and manipula ions o isk
ans e s (KS e al., 2016; Mou gues & Kin-
gombe, 2017).
The need o in as uc u e is eal, and
in es men in i can ha e e y posi i e e -
J. Young
38
ec s a 36 pe cen , di es i u es a 3.7 pe -
cen and he emaining 3.3 pe cen a e
managemen and lease con ac s (Figu e
33)(PPI Da abase, 2021). Almos a qua -
e (23.3%) o WSS PPPs a e cancelled
o dis essed, he highes o any sec o
(Figu e 34). While b own ield p ojec s
a e he mos common, hey a e also he
mos cancelled and dis essed, wi h o e
a hi d (36.5 pe cen ) no eaching com-
ple ion. This could be due o he di icul-
4.6.2 Dis ibu ion by income g oup
When looking a he u ilisa ion o PPPs
by income le el, i is e iden ha hey
emain a mos ly uppe -middle income
(UMIC) phenomenon, wi h only 2.5 pe -
cen o PPPs coming om low-income
(LIC) coun ies (Figu e 31). Fu he mo e,
only 5 pe cen o PPPs come om he SSA
egion, and 22 pe cen o hose a e om
Sou h A ica, an uppe middle-income
coun y (PPI Da abase, 2021). When look-
ing a he numbe o WSS PPPs in low-in-
come coun ies he numbe is e en small-
e , a less han 1 pe cen .
F om his da a we can see clea ly ha
PPPs a e e y a e in LICs, especially in
SSA, and a as majo i y o PPPs in he
WSS sec o (99%) a e u ilised in middle-
o uppe -income coun ies.
4.6.3 Dis ibu ion o ypes o PPPs
in WSS
Only 33 p ojec s ou o he 1117 PPPs
(3%) in he WSS sec o we e implemen ed
in SSA (Figu e 32) (PPI Da abase, 2021).
These can be u he b oken down by
ype. A majo i y o PPPs a e b own ield
(exis ing asse s) a a ound 57 pe cen ,
ollowed by g een ield (new asse s) p oj-
Figu e 31 Dis ibu ion o PPP p ojec s by income
le el (sou ce:Au ho , 2021; Da a: PPI Da abase,
2021)
Figu e 32 Dis ibu ion o PPP p ojec s in he WSS
sec o in SSA s. he es o he wo ld (sou ce:Au-
ho , 2021; Da a: PPI Da abase, 2021)
Figu e 33 Dis ibu ion o PPP p ojec s in he WSS
sec o by ype (sou ce:Au ho , 2021; Da a: PPI Da-
abase, 2021)
Figu e 34 Dis ibu ion o PPP p ojec s in he WSS
sec o in SSA s. he es o he wo ld (sou ce:Au-
ho , 2021; Da a: PPI Da abase, 2021)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
39
4.7 PPPs in de eloping coun ies
PPPs ha e played a a smalle ole
han o iginally expec ed by he Wo ld
Bank and o he lending ins i u ions in
deli e ing in as uc u e o low-income
coun ies, amoun ing o somewhe e in
he ange o 15 o 20 pe cen o o al in-
as uc u e (Leigland, 2018). In he coun-
ies whe e he need o in as uc u e is
g ea es , p i a e in ol emen is lowes .
Why is his?
The e a e a numbe o key obs acles
o PPP p omulga ion, especially in A i-
ca, whe e a g owing amoun o e idence
poin s o he impo ance o a a ou able
egula o y en i onmen and a obus
legal amewo k o ensu e sus ainable
and e icien PPPs (The Economis In-
elligence Uni [EIU], 2015). Gi en hei
complex na u e, high cos s and sizeable
isks, a numbe o c i e ia need o be me
be o e enough in es o s, i ms, IFIs and
go e nmen s eel com o able enough
o launch PPPs in de eloping coun ies
whe e he legal and poli ical en i onmen
is o en qui e enuous (Mou gues & Kin-
gombe, 2017).
Acco ding o Kociemska (2019), Lei-
gland (2018), Mou gues & Kingombe
(2017) and o he s, obs acles o PPP imple-
men a ion in de eloping egions include:
• Lack o enabling en i onmen
• Lack o capaci y in cen al and local
go e nmen and public adminis a-
ions
• False pe cep ion o he po en ial o
PPPs and how hey can be used
• Ideological esis ance o p i a isa-
ion
• Lack o commi men by go e n-
men s
y in assessing exis ing WSS ne wo ks, as
p e iously men ioned. Only 10 pe cen
o g een ield p ojec s, on he o he hand,
a e cancelled o dis essed. Managemen
and Lease con ac s seem o be he mos
s able, wi h less han 1 pe cen cancelled
o dis essed. Impo an o no e, howe -
e , is ha less han 5 pe cen (4.92%) ha e
eached comple ion. This can easily be
a ibu ed o he long- e m na u e o WSS
PPP con ac s, usually 20-30 yea s, how-
e e his lea es plen y o ime o eme g-
ing issues such as clima e change, poli -
ical ins abili y, changing demog aphics
o a combina ion o all o hem o u he
inc ease he sha e o cancelled o dis-
essed p ojec s.
PPPs in LICs a e a e. WSS PPPs in
Sub-Saha an A ica a e e en a e . Con-
clusions ha can be easonably d awn
om his a e ha :
1. The WSS sec o in LICs a e less p o -
i able and mo e isky, and a e he e-
o e less a ac i e han o he sec-
o s, such as hose in he Elec ici y,
Po s o ICT sec o ha make up he
bulk o PPPs in LICs.
2. PPPs a e seen as a mo e iable op ion
in middle- and high-income econo-
mies wi h mo e obus enabling en-
i onmen s and legal amewo ks.
3. SSA in pa icula is pe cei ed by
he p i a e sec o as a isky and un-
a ac i e en i onmen o in es -
men , a ac ing less han 5 pe cen
o o al in es men in PPPs, wi h
only he Middle Eas and No h A -
ica (MENA) egion a ac ing less
(3.24 pe cen ). Fu he mo e, a qua -
e o he in es men comes om
mul i-la e al de elopmen banks
(MDBs) a he han he p i a e sec-
o .
J. Young
40
as uc u e p ojec s o be comple ed by
2025 is wo h $2.5 illion, and includes
bo h g een ield and b own ield p ojec s –
a numbe o which will almos ce ainly
be s uc u ed as PPPs (Lakmeeha an e
al., 2020).
This appe i e is especially ue o he
People’s Republic o China (PRC), which
is in es ing hea ily in he in as uc u e
o A ica, o en wi h a ewe condi ions
on policy e o m o good go e nance
han hose imposed by mul ila e al ins i-
u ions like he Wo ld Bank (Head, 2008).
How hese condi ion-less loans will a ec
he u u e o A ica a e ou side he scope
o his hesis, bu i is clea ha no hing
occu s in a acuum and a b oad ange o
geopoli ical o ces a e a play he e.
In i s 2015 In ascope Repo , he Econ-
omis In elligence Uni (EIU) a ed he
PPP enabling en i onmen s o 15 A i-
can coun ies and only one, Sou h A ica,
was a ed as “de eloped” wi h a sco e o
70.7 ou o a 100. The emaining 14 coun-
ies anged om 51.8 (Mo occo) o 20.6
(Democ a ic Republic o he Congo), wi h
common challenges including: a need o
ha monisa ion wi hin he go e nmen s;
dependence on o eign inancing; lack o
s akeholde engagemen ; and slow PPP
p ocesses ha de e in es o s and go -
e nmen o icials alike (EIU, 2015).
I is no wonde hen ha SSA expe i-
ences some o he lowes amoun o PPP
in es men in he wo ld.
• Weak o non-exis en legal ame-
wo ks
• Lack o a ac i eness in he inan-
cial and economic en i onmen
• Co up ion and lack o anspa en-
cy in ende s and p ocu emen
These obs acles can be o e come only
when a p ope enabling en i onmen
is in place, one ha is capable o mee -
ing he basic needs o i s ci izens and is
commi ed o imp o ing hei li es. An
enabling en i onmen ha is conduci e
o p ope FSM is one ha is also condu-
ci e o s a ing a business en u e, as e -
e y hing is in e ela ed and dependen
on ac o s like peace and s abili y, ule o
law, good go e nance wi h accoun abili-
y, anspa ency and clea igh s. A s udy
by Mou gues & Kingombe (2017) ound
ha dec easing co up ion by 10 poin s
can inc ease p i a e pa icipa ion in in-
as uc u e (PPI) by 15% and ha ing one
mo e p ojec going o cou can dec ease
in es men by 4%. Measu able e ec s in-
luenced by he s abili y o poli ical and
economic condi ions.
The global inancial c ises o he las
wo decades ha e also le hei ma k on
he economies o SSA, wi h hei sha e o
global ade alling om 4% in 1970 o 2%
in 2007, wi h only a sligh imp o emen
o 3% since (Kociemska, 2019). Howe e ,
A ica’s abundance o na u al esou ces
and apidly g owing popula ions make
i an a ac i e in es men oppo uni y
none heless. Acco ding o he global con-
sul ing i m Mckinsey, he appe i e o
in es men in A ica’s in as uc u e is
conside able, es ima ing as much as $550
billion in asse s om go e nmen agen-
cies, p i a e-sec o pension unds and
in es men companies (Lakmeeha an
e al., 2021). The cu en pipeline o in-
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
41
Summing up he a gumen s o and agains PPPs
Ad an ages o PPPs
Value o Money By u ilizing p i a e sec o skills and echnology o deli e p ojec s in a mo e e icien manne ,
esul ing in ei he lowe cos s o a supe io p oduc o he same in es men .
Op imiza ion o
design/ope a ion
Using ou pu s based speci ica ion allows oom o and p omo es inno a i e solu ions om he
p i a e sec o on he design, ope a ion and main enance aspec s o he p ojec , wi h he in en ion o
imp o ing e ec i eness whils educing cos s o e he whole li e cycle.
Quicke deli e y o
p ojec
P i a e sec o capaci y and lexibili y a e seen o be supe io o he public sec o , and PPPs he e o e
allow p ojec s o be inished mo e quickly and on schedule han hose a ibu ed o public sec o
p o ision.
Risk ans e
P ojec isks (e.g., inance, ime ame, planning pe mi s, communi y consul a ions) a e ans e ed
o he pa y bes equipped o deal wi h i , bo h in e ms o expe ise and cos s, o he s abili y and
bene i o he p ojec .
Inc eased in es men
in public
in as uc u e
Go e nmen s a e able o implemen p ojec s mo e equen ly and on a la ge scale because he
p i a e sec o inance elemen educes i s need o aise o budge addi ional unds, as is he case in
s anda d p ocu emen .
Inc eased
budge / inancing
ce ain y
The ans e o esponsibili y (and isk) o he p i a e sec o o some o he p ojec elemen s shields
go e nmen s om un o eseen inancial liabili ies ollowing cos o e uns, delays, o ope a ional
di icul ies ha would o he wise impac he budge 's bo om line.
Imp o ed se ice
deli e y
- Allows bo h sec o s o ope a e wi hin hei sphe e o expe ise, he go e nmen in policy and
go e nance, he p i a e sec o in he echnical aspec s o design, cons uc ion, ope a ion, and
managemen .
- Paymen s ha a e linked o pe o mance a ge s o equi emen s p o ide an incen i e o pe o m
ha is oo o en absen in public p o ision o
se ices.
Whole o li e cycle
app oach
- Because he design, cons uc ion and ope a ion a e o en unde aken by one conso ium he e is a
g ea e in eg a ion o he
di e en elemen s and mo e cohe ence o he inal p oduc , unlike s anda d p ocu emen op ions
which may see se e al di e en subcon ac o s ope a ing in
loose coope a ion.
- Mo i a ed by he desi e o p ese e long- e m alue o asse s and o minimize cos s, whole o li e
cycle esponsibili ies encou age he p i a e sec o o choose he mos app op ia e echnology o he
long e m and adequa ely main ain i . This may be in con as o decisions by go e nmen s ha a e
o en guided mo e by sho - e m inancial p essu es and hink in much sho e cycles acco ding o
poli ical e ms and budge cons ain s
Access o addi ional
capi al/o -balance
shee inancing
Because a la ge pe cen age o inance in PPP is p o ided by he p i a e sec o , he go e nmen is no
esponsible o aising unds om wi hin i s own co e s o adjus ing budge s o allow o la ge
in as uc u e spending. This is pa icula ly ad an ageous du ing imes o iscal c isis whe e he
go e nmen is al eady sho o unds o whe e he go e nmen may ha e a poo c edi a ing and is
no able o aise he necessa y inance. In e na ional and na ional accoun ing s anda ds do p o ide
some guidance as o wha and how PPPs a e eco ded on balance shee s, bu he issue is a om
secu e.
P i a e sec o g ow h
and s abili y
PPPs p o ide he p i a e sec o wi h access o educed isk, secu e, long- e m in es men
oppo uni ies ha a e unde w i en by go e nmen con ac s. Such ag eemen s ensu e p i a e
capi al lows, p o ide in es men oppo uni ies, and s imula e local indus y and job ma ke s.
Adapa ed om Col e son & Pe e a (2012)
4.8 Summing up he a gumen s o and agains PPPs
I is clea ha whe he PPPs wo k is highly dependen on hei con ex and enabling
en i onmen . When con on ed wi h he choice o using PPPs o TP, i is hen help ul o
add ess he associa ed ad an ages and disad an ages o de e mine i he ewa ds ou -
weigh he isks. The ollowing ables lis he main ad an ages and disad an ages o PPPs
(Table 03 and Table 04).
Table 03 Ad an ages o PPP o e TP (adap ed om Col e son & Pe e a, 2012)
J. Young
42
Disad an ages o PPPs
Highe cos
- The bo owing a es gi en o he p i a e sec o a e usually highe han hose ypically a ailable o
go e nmen s.
- An expensi e ende and nego ia ion p ocess, including highe con ac ansac ion cos s paid o
legal and accoun ing i ms, can neu alize any sa ings made in design and cons uc ion phases.
- T ans e ing isk om one pa y o ano he has i s p ice, and he p i a e sec o will expec
gua an ees o income p opo iona e o i s isk bu den
Reduced
compe i i eness
- High ende and ansac ion cos s, along wi h complica ed and long- e m con ac s educe he pool
o p i a e sec o companies wi h he capaci y o apply o ce ain p ojec s, educing he go e nmen ʼs
choice and compe i i e ende p ocesses.
- Exclusi i y ag eemen s awa ded o winning companies lock hem in o gua an eed p o i s and, in
eali y, c ea es monopoly ma ke s, educing compe i i e p essu e o educe cos s and enhance
se ices.
Complica ed and
leng hy ende
p ocess
PPP con ac and nego ia ion pe iods a e o en mo e complex and p o ac ed due o he na u e o he
mul i-pa y, inancially in ica e, and long ag eemen e ms inhe en in he ela ionship.
Lack o capaci y
- I is necessa y o bo h he public and p i a e sec o s o possess PPP-speci ic capaci y o an
ag eemen o be signed and adminis e ed success ully. Such capaci y is absen
om many ju isdic ions, bo h a a na ional and egional le el, and i akes bo h ime and expe ience
o es ablish i .
- An o e - eliance on ex e nal consul an s also leads o an expe ise ligh , whe e any knowledge
ga he ed h oughou p ojec s is no e ained by public bodies o p i a e companies, bu a he los o
ex e nal sou ces, making i di icul o build knowledge and lessons o he u u e.
Rigid and in lexible,
long con ac s
- In o de o p o ide s abili y and secu i y o e ime, long con ac s can become igid and in lexible,
e lec ing poin -in- ime ci cums ances and hen locking hem in o e he con ac pe iod.
- I emains di icul o go e nmen s o adequa ely s uc u e con ac s ha ake in o accoun u u e
un o eseen e en s o ci cums ances, and i is o en di icul o adap and change con ac ual
esponsibili ies as he con ex changes.
- Fu u e gene a ions canno espond o hei indi idual ci cums ances bu mus adhe e o ou da ed
ope a ions om p e ious decades.
- Building lexibili y in o con ac s is an expensi e p oposi ion because as he in es men become less
secu e i may become necessa y o u he incen i ize he p i a e sec o .
Delays and holdups
-The p i a e sec o is no impe ious o p ojec s oppages, and he complica ed na u e o he
ag eemen s be ween PPP pa ne s can inc ease delays, as dispu es ake longe o be se led and any
un o eseen e en uali ies ha akes place in u u e yea s in ol e a leng hy enego ia ion o he
con ac .
- The s a o p ojec s is also delayed by complex pa ne nego ia ions, some imes u he
exace ba ed by he poli ical deba e and public opposi ion ha can su ound PPP p ojec s.
Highe consume
p ices
- D i en by a need o co e high le els o cos plus make a e u n on in es men , ma ke -d i en
p icing can see se ices cos he consume mo e han i deli e ed by he public sec o .
- The issues o compe i i eness and monopolies also mean he e is po en ial o abuse in ega ds o
use ees.
"Double axa ion"
- The gene al public may pe cei e use ees as a o m o “double axa ion” whe eby hey a e paying
o se ices hey eel hei axes should be p o iding o al eady ha e paid o . This will be no iceable
in he case o oll ways, o example, whe e olls ha e no exis ed unde p e ious public sec o
p o ision and whe e he e was no angible cos o he use .
Less
accoun abili y/ ansp
a ency
- P ojec anspa ency is weakened unde he PPP model because o he di icul y in accessing p i a e
sec o in o ma ion, now conside ed o comme cial alue o comme cial-in-con idence by he
conso ium.
- Whole o p ojec e alua ion becomes p oblema ic o simila easons, as da a is sp ead o e
nume ous sou ces, compiled di e en ly, and no always a ailable o public sc u iny
Lack o Communi y
In ol emen
Because con ac s a e nego ia ed be ween he public and p i a e pa ne s behind closed doo s, he
communi y is o en le ou o he p ocess comple ely, o only pa ly consul ed in communi y
mee ings. Li le o no decision making powe is in hei hands.
Go e nmen is always
he esidual isk
holde
The e is always he isk ha he i ms in ol ed in he conso ium go bank up , o ha he p ojec
ails. In his case, i is he go e nmen ha is s ill esponsible o se ice p o ision, and hey will ha e
o use he esou ces o do so.
Adapa ed om Col e son & Pe e a (2012), Boa dman e al. (2016)
Table 04 Disad an ages o PPPs o e TP (adap ed om Boa dman e al., 2016; Col e son & Pe e a, 2012)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
43
Mo al haza ds esul om in o ma ion
asymme y and di e ing objec i es. Ex-
amples o mo al haza ds o en a ise in he
case o insu ance, whe e knowing one is
insu ed may lead o aking mo e isks (e.g.
aking a en ed ca o a joy ide). In he
p e iously men ioned example in Tanza-
nia o he G a Tain s Powe Pu chasing
Ag eemen , mo al haza d was p esen in
he o e o ecas ing o demand ha wasn’
me , and didn’ need o be me , because o
he gua an eed capaci y paymen s om
he go e nmen (Fa lam, 2005).
This ype o mo al haza d is known
as he p incipal-agen p oblem (agen-
cy p oblem). Because he agen (p i a e
pa ne ) has mo e in o ma ion (asym-
me ical in o ma ion), he p incipal (go -
e nmen ) canno ensu e ha he agen is
ac ing in hei bes in e es . In ac , he
in e es s a e undamen ally di e en in
PPPs, because he p i a e sec o wan s
o maximise hei p o i , while he public
sec o wan s o p o ide a se ice (o u -
he hei poli ical agenda).
The only majo in e es ha is aligned
is he success ul implemen a ion o he
p ojec i sel , howe e , how his in e es
is ealised can a y g ea ly a di e en
cos s o he communi y. When he p i a e
pa ne ails o make a p o i , leng hy
and cos ly enego ia ions ypically ol-
low (Fa lam, 2005; Loxley, 2013; Ma in,
2009). I he p ojec is success ul and he
p i a e pa ne ge s p o i s, he e is li le
o ensu e ha he p o i s a e ein es ed
o p o ide be e se ice, and ins ead,
PPPs could encou age en -seeking be-
ha iou , ac ing as “ex ac i e” inancial
ins umen s ha unnel money in o he
SPV and ou o he coun y in which hey
ope a e (Hildya d, 2014).
4.9 Conclusion
The e is li le ques ion ha PPPs can,
and some imes do, pe o m be e han
TP. A common e ain when combing
h ough he li e a u e, especially ha o
he Wo ld Bank, UNECE, OECD and o h-
e IFIs, is his: “When designed well and
implemen ed in a balanced egula o y
en i onmen , PPPs can b ing g ea e
e iciency and sus ainabili y o he p o-
ision o public se ices such as ene gy,
anspo , elecommunica ions, wa e ,
heal hca e, and educa ion” (Wo ld Bank,
2021c).
The impo an ca ea he e is he i s
quali ying pa o he sen ence – “When
designed well and implemen ed in a bal-
anced egula o y en i onmen .” This
one sen ence encapsula es he g ea es
challenge when implemen ing PPPs in
de eloping egions wi h li le expe ise
in PPP design, and o en a egula o y
en i onmen ha is a om balanced
(Tshombe & Molokwane, 2016).
Due o a local lack o expe ience (con-
en ional, con ac ually complex PPPs
a e a ela i ely mode n in en ion), o -
eign i ms (usually jus a ew majo play-
e s) a e o en called in o do he p ojec
o con ac “design” (Ki kpa ick e al.,
2006). This small pool o bidde s leads
o ad e se selec ion, which akes he
o m o sub-op imal con ac s om he
beginning, esul ing om oppo unis ic
beha iou o a ange a ou able e ms
o he p i a e pa y (Ki kpa ick e al.,
2006). Fu he mo e, when one pa y has
an incen i e o inc ease i s exposu e o
isk because i won’ ha e o ace he
ull consequences, such as in he case o
go e nmen gua an ees, mo al haza d
can a ise (Fly bje g e al., 2009).
J. Young
44
To hose in a ou o PPPs, hey p om-
ise inc eased pe o mance and e icien-
cy, access o inance and expe ise, be e
isk alloca ion and mo e oppo uni ies o
p o i maximiza ion. Fo o he s, w i es
Hayla & We enhall (2010), he p omises
o PPPs appea o be exagge a ed, down-
igh alse and a wo s , po en ially dam-
aging o he public in e es . In he igh
en i onmen , wi h balanced in o ma ion
and s ong and compe en pa ne s, PPPs
can pe o m well. Bu is Tanzania he
igh en i onmen o PPPs? Pa wo will
a emp o answe his ques ion.
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
45
Pa Two: Me hodological
Analysis and P oposal
De elopmen o a me hodology o a e he eadiness o Da
es Salaam’s PPP en i onmen , a gap analysis o h ee PSPs
and a p oposal o Open Pa ne ships.
Figu e 35 Dog aking a nap in he sludge d ying bed o Kigamboni FSTP (sou ce: Au ho , 2021)
J. Young
46
he iew o one pa y may no be deemed
a success by he o he , he e o e suc-
cess c i e ia should be p ope ly de ined
(Meng e al., 2011). Because success can
be iewed h ough he lens o h ee main
pa ies – he p i a e and public pa ies
and he communi y ha is se ed – he e
a e bo h indi idual and collec i e goals
(Ameyaw & Chan, 2016). The p i a e pa y
is in e es ed in achie ing a p o i able en-
u e, he public is in e es ed in p o iding
an e icien and e ec i e public se ice
a educed cos and he communi y is in-
e es ed in a eliable, sa e and a o dable
se ice – and all h ee pa ies mee hei
goals h ough success ul implemen a ion
and comple ion o he p ojec (Ameyaw &
Chan, 2016).
Comple ing he p ojec , p ope ly ac-
coun ing o i , doing i on- ime and on
budge , wi h maximum e iciency and
good go e nance a e all measu es o
success, howe e hey can o en unda-
men ally con lic (G. Hodge e al., 2018).
Fu he mo e, success can be iewed na -
owly (achie emen o ou pu s as ou lined
in he pa ne ship ag eemen ), o mo e
b oadly as he con inua ion o he ela-
ionship be ween he public and p i a e
en i ies and he wide bene i s he p oj-
ec has o i s use s and he communi y a
la ge (Je a es e al., 2013).
A g owing numbe o s udies a e also
showing ha a ia ions in PPP success
and up ake is o en due bo h o he poli -
ical and ins i u ional con ex o di e en
coun ies as well as non-ins i u ional el-
emen s no di ec ly unde he con ol o
go e nmen (Soecip o & Ve hoes , 2018).
A quali a i e compa a i e analysis (QCA)
pe o med by Ve hoes e al. (2015), com-
The li e a u e is mixed on whe he
PPPs wo k be e han adi ional means
o p ocu emen (Fly bje g, 2005; Hall,
2015; G. A. Hodge & G e e, 2017; Mena d,
2011). Fu he mo e, i is no always clea
wha c i e ia should be used o de ine he
‘success’ o a PPP – as hey a e o en o i-
en ed jus as much owa d poli ical and
go e nance aspec s as hey a e owa d
he adi ional u ili a ian iew o p ojec
deli e y o V M (G. A. Hodge & G e e,
2017). Wha is clea , is ha ce ain ac-
o s a e conside ed essen ial o achie ing
he p ojec ’s goal, and hese a e known as
c i ical success ac o s (CSFs) (Ameyaw &
Chan, 2016; G. Hodge e al., 2018; Meng e
al., 2011; Zhang, 2005).
5.1 C i ical Success Fac o s o PPPs
CSFs o iginally came ou o manage-
men li e a u e in he la e 1970s and ha e
been used in a a ie y o ields o a emp
o make explici he key a eas ha equi e
a en ion o success ul p ojec imple-
men a ion (Li e al., 2005).
CSFs ope a e on mul iple le els and can
be in e nal o ex e nal poli ical, econom-
ic, social o p ojec - ela ed cha ac e is ics
ha a e equi ed in o de o maximise he
likelihood o p ojec success (Nizko o-
do , 2017). A wide- ange o CSFs in PPPs
ha e been iden i ied by schola s, usually
h ough su eys o PPP s akeholde s in
he public and p i a e sec o s, wi h some
schola s ocusing on he p ocu emen
s age (Zhang, 2005) and o he s aking a
b oade , p ojec li e-cycle iew o CSFs (Li
e al., 2005; Meng e al., 2011).
Success, howe e , is in he eye o he
beholde , and a success ul p ojec om
Chap e 5: Wha makes p ojec s success ul?
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
47
a u e su ey o syn hesise he mos com-
monly ci ed CSFs speci ic o de eloping
egions and he WSS sec o .
In o de o de e mine i adi ional
PPPs a e i o pu pose in small-scale
FSM, I i s pe o med a comp ehensi e
li e a u e e iew o examine he cu en
esea ch on PPPs, especially hose in
• de eloping economies / egions,
and
• he wa e supply and sani a ion
(WSS) sec o .
Twen y h ee s udies we e selec ed ha
a e ei he speci ic o WSS, de eloping e-
gions, o we e commonly ci ed and hus
ounda ional o a b oad ange o PPPs
(Figu e 36). F om hese 23 s udies, 85
CSFs we e indica ed by he au ho s. Some
o he CSFs iden i ied in he s udies we e
simila enough o combine in o one CSF,
he e o e he ac ual numbe o unique
CSFs was highe . While some s udies ank
he CSFs in o de o impo ance using
me hods such as he uzzy syn he ic e al-
ua ion (FSE) me hod (Ameyaw & Chan,
2016) o signi icance indexes (Zhang,
2005), due o he comp ehensi e na u e
o his s udy as a b oad o e iew o CSFs
wi hou p ima y su ey da a, he mos im-
po an CSFs o de eloping egions and
WSS we e de e mined by he numbe o
imes hey we e men ioned in he selec -
ed li e a u e as was done in s udies such
as Osei-Kyei & Chan (2015). The iden i ied
CSFs, excluding hose ha only appea ed
once, a e in he able below (Table 05, o
ull lis see Appendix A).
pa ed he ins i u ional amewo k o 20
Eu opean coun ies and ound ha ins i-
u ional suppo could be a necessa y, bu
no su icien , ac o in PPP success and a
complex in e ac ion o ac o s all play a
ole in PPP success (Soecip o & Ve hoes ,
2018; Ve hoes e al., 2015).
Because o he mul i-le el, mul i-s ake-
holde na u e o PPPs his esea ch will
use his b oad iew o in e playing ac-
o s o success, and u he mo e, due
o he unique cha ac e is ics o he WSS
sec o , will unde sco e he need o p oj-
ec s o go beyond na ow concep ions o
success (p o i o p ojec comple ion) o
achie e he ul ima e goal o public heal h
and social, economic and ecological sus-
ainabili y.
The ollowing chap e will discuss CSFs
in he de eloping wo ld and he WSS sec-
o , and a emp o inco po a e he hun-
d eds o CSFs iden i ied in he li e a u e
in o a amewo k sui able o assessing
he eadiness o de eloping coun ies o
implemen PPPs in he WSS sec o .
5.2 Building he amewo k: Syn-
hesis o C i ical Success Fac o s in
WSS in De eloping Regions
The e ha e been a numbe o s udies
looking a he CSFs o de eloping coun-
ies (Baba unde e al., 2012; Chileshe e
al., 2020; Chileshe & Ka ishe, 2020; Debe-
la, 2019; Ismail, 2013; Tshombe & Molok-
wane, 2016), and a numbe looking in o
he CSFs o he wa e sec o (Ke emane
& McKay, 2009; Meng e al., 2011; Ta iq
& Zhang, 2020, Tshombe), bu ewe look
in o bo h (Ameyaw & Chan, 2016; Finizola
e Sil a e al., 2020; Wu e al., 2016).
This esea ch will con ibu e o he li -
e a u e by conduc ing an ex ensi e li e -
Figu e 36 Combining he CSFs (sou ce: Au ho )
J. Young
54
e alize ha he e hasn’ been a signi ican
deg ee o change.
Ano he limi a ion is he long his o y o
inaccu a e and missing da a om Tanza-
nia and hei Na ional Bu eau o S a is ics
(Edwa ds, 2014). While o ganiza ions such
as he Wo ld Bank ha e a ious me hods
o compa ison and analysis o y o mi i-
ga e he e ec o poo da a quali y, he e -
ec emains and any conclusions d awn
om such da a equi e an as e isk.
Addi ionally, while I looked in o he
me hodology and speci ic indica o s o
each epo and a ing, he e is ine i a-
bly some amoun o o e lap be ween he
CSFs which equi ed judgemen calls on
which da a poin i bes in o which ca e-
go y. Fo da a poin s ha pe ained o se -
e al CSFs, he same da a poin was used.
In summa y, a “pe ec ly” accu a e eadi-
ness a ing is unlikely due o he di e en
me hodologies used o each epo and
index. Howe e , by a e aging he alues
ac oss he 12 epo s, audi s, indices and
a ings an o e all pic u e eme ges ha is
bo h gene ally accu a e and sui able o
he ask a hand. Fu he mo e, he pu -
pose o his analysis was o a e he eadi-
ness o Tanzania and Da es Salaam o im-
plemen PPPs, no o analyse and equa e
a ious sou ces o da a. I belie e i has
accomplished ha pu pose.
5.3.2 Economis In ascope Repo
The Economis In elligence Uni , he
esea ch a m o The Economis G oup
(publishe o The Economis ), is a key
playe in he wo ld o coun y in elli-
gence (EIU, 2015). Pa ne ing wi h and
unded by The Wo ld Bank G oup and P i-
a e Pa icipa ion in In as uc u e Ad i-
so y Facili y (PPIAF), he EIU publishes a
Ve y low/ e y poo / comple e lack o = 10
Low / poo / lack o = 30
Adequa e / su icien = 50
High = 70
Ve y high = 90
While he e is oom o in e p e a ion in
he in en and meaning o he o iginal au-
ho s, a g ea e numbe o da a sou ces
educes he isk and e ec o misin e -
p e a ion and gi es a mo e obus pic u e
han a single sou ce.
Fo no malising he da a o he scale o
0-100, he ollowing o mula was used:
5.3.1 Limi a ions o his me hod
While he e we e a ela i ely la ge num-
be (12) o s udies, epo s, audi s and
da a sou ces used o de e mine he eadi-
ness a ing ha ed in o he Readiness Ra-
da , he e a e some limi a ions. One such
limi a ion is he na u e o PPP laws and
egula ions which a e in a nea cons an
s a e o lux, wi h i e i e a ions o PPP
policies (2009), ac s (2010) egula ions
(2011, 2020) and amendmen s (2013,2014,
2018) passed since 2009 (PPP Knowledge
Lab, 2021). This makes i di icul o e -
ec i ely assess he o e all quali y, and
ins ead, gi es a pic u e o only a momen
in ime. Howe e , his was pa ially o e -
come wi h he addi ion o ecen (2020)
epo s ha assessed PPP eadiness and
ound many o he same p oblems iden i-
ied in ea lie epo s, leading one o gen-
- deno es he minimum ange
- deno es he maximum ange
- deno es he minimum o he ange o desi ed scale
- deno es he maximum o he ange o desi ed scale
- deno es measu emen o be scaled
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
55
men ’s abili y o uphold laws and egula-
ions o concessions, as well as he num-
be and success a e o pas p ojec s (EIU,
2015). The indica o s a e:
3.1 Public capaci y o plan and o e see
PPPs
3.2 Me hods and c i e ia o awa ding
p ojec s
3.3 Regula o s’ isk-alloca ion eco d
3.4 Expe ience in anspo , wa e and
elec ici y concessions
3.5 Quali y o anspo , wa e and
elec ici y concessions
4. In es men clima e (weigh ed 15%)
This ca ego y measu es he business,
poli ical and social en i onmen o in-
es men (EIU, 2015). The indica o s a e:
4.1 Poli ical dis o ion
4.2 Business en i onmen
4.3 Poli ical will
5. Financial acili ies (weigh ed 15%)
This ca ego y measu es he inancial
acili ies o unding in as uc u e (EIU,
2015). The indica o s a e:
5.1 Go e nmen paymen isk
5.2 Capi al ma ke : p i a e in as uc-
u e inance
5.3 Ma ke able deb
5.4 Go e nmen suppo and a o d-
abili y o low-income use s
6. Subna ional adjus men ac o (weigh -
ed 10%)
This ca ego y measu es he quali y o
sub-na ional amewo ks and expe ienc-
es in PPPs (EIU, 2015). This ca ego y is no
longe a pa o he newe In ascopes,
and i is also i ele an o his esea ch
egula epo measu ing and anking he
enabling en i onmen o go e nmen s o
“implemen sus ainable and e icien ”
public-p i a e pa ne ships wi h he aim
o “unlock he powe o PPPs” o u he
he de elopmen agenda (EIU, 2015). The
EIU measu es PPP eadiness by indexing
19 indica o s g ouped in o six ca ego ies
ha a e bo h quali a i e and quan i a-
i e, d awing hei da a om a ange o
p ima y sou ces (legal ex s, go e nmen
websi es, p ess epo s and in e iews) as
well as seconda y epo s and da a sou c-
es (EIU, 2015). They a e he ollowing ca -
ego ies:
1. Legal and egula o y amewo k
(weigh ed 25%)
This ca ego y e alua es a coun y’s
legal and egula o y amewo k o p i-
a e pa icipa ion in in as uc u e (EIU,
2015). The indica o s a e:
1.1 Consis ency and quali y o PPP
egula ions
1.2 E ec i e PPP selec ion and deci-
sion-making
1.3 Fai ness/openness o bids, con-
ac changes
1.4 Dispu e- esolu ion mechanisms
2. Ins i u ional amewo k (weigh ed
20%)
This ca ego y measu es he design and
esponsibili ies o ins i u ions ha p e-
pa e, awa d and o e see p ojec s (EIU,
2015). The indica o s a e:
2.1 Quali y o ins i u ional design
2.2 PPP con ac , hold-up and exp o-
p ia ion isk
3. Ope a ional ma u i y (weigh ed 15%)
This ca ego y measu es he go e n-
J. Young
56
The epo commends Tanzania o
passing legisla ion o c ea e a singula
PPP Cen e ha will “p o ide a mo e e -
icien and cen alised sys em o in es-
o s o in e ac wi h” (EIU, 2015). I also
gi es Tanzania high ma ks o hei in-
eg a ion o unsolici ed p oposals in o a
legal amewo k and equi ing he imple-
men a ion o a bidding p ocess o ensu e
compe i i e bidding. Key challenges ha
he epo iden i ies include he “lack o
capaci y and expe ience in go e nmen ,”
inadequa e isk-sha ing mechanisms and
he “pauci y o long- e m local inancing
ins umen s” such as gua an ees and pe -
o mance bonds (EIU, 2015).
While he epo gi es a ai ly com-
p ehensi e o e iew o he enabling en-
i onmen on he poli ical, inancial and
p ojec le els pe aining o PPPs, o he
impo an mac o, meso and mic o ac o s
such as public pe cep ion, echnical ea-
sibili y and accep able a i s a e igno ed.
To ge a mo e comple e pic u e o he en-
and he a ing will no be used. The indi-
ca o is:
6.1 Subna ional adjus men
The 2015 In ascope epo b eaks
down he ca ego ies o PPP eadiness in o
Nascen (0-29.9), Eme ging (30-59.9), Ma-
u e (60-79.9) and De eloped (80-100), and
bo h in he naming o he ca ego ies and
hei anges, one could in e hei p o-
PPP s ance. A nascen o eme ging ead-
iness sounds a lo mo e op imis ic han a
e y low o low eadiness, pe haps gi ing
an indica ion o he ype o audience his
epo is aimed a (in es o s, i ms and
go e nmen s). F om he 15 A ican coun-
ies a ed in his epo , 13 ou o 15 all
in o he “Eme ging” ca ego y, wi h only
Sou h A ica conside ed a ”Ma u e” en-
abling en i onmen (70.7), and he Dem-
oc a ic Republic o Congo conside ed a
“Nascen ” en i onmen (20.6) – wi h Tan-
zania “Eme ging” in o i h a 48.6 (Table
08) (EIU, 2015).
Table 08 Economis In elligence Uni ’s (EIU) anking o A ican economies acco ding o PPP eadiness
(sou ce: EIU, 2015)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
57
public o icials, chambe s o comme ce,
academics and consul an s (Wo ld Bank,
2021a). Regula o y and p ac ice-based
ques ions a e used o de e mine bo h he
enabling amewo k and how PPPs a e
implemen ed in he eal wo ld.
Two key limi a ions o his epo a e:
1. Tha i is su ey-based, meaning he
esul s come om he opinions o a
pool o esponden s ha migh no
always be ep esen a i e, and
2. he egula o y-based ques ions do
no conside he “capaci y o imple-
men ing agencies as demons a ed by
s a ing numbe s, s a compe ence
le els, p o essionalism, and expe i-
ence, and mac oeconomic s abili y
o he p e alence o he co up ion in
each economy” (Wo ld Bank, 2021a).
Needless o say, hese a e impo an
ac o s in any coun y.
abling en i onmen and he abili y o Da
es Salaam o mee he CSFs, he ollowing
epo s and da a we e also ga he ed o
build a mo e obus amewo k o anal-
ysis.
5.3.3 Wo ld Bank Benchma king
In as uc u e Repo
The Wo ld Bank G oup’s Benchma king
In as uc u e De elopmen 2020 “assess-
es he quali y o egula o y amewo ks
wo ldwide o de elop la ge in as uc u e
p ojec s, benchma king hem wi h in-
e na ionally ecognized good p ac ices”
(Wo ld Bank, 2021a; Wo ld Bank 2020b).
The a eas o ocus in he Wo ld Bank’s
epo a e he key cha ac e is ics o he
egula o y en i onmen h oughou he
li ecycle o a PPP – om p epa a ion o
con ac managemen (Table 09).
The Wo ld Bank ga he ed he in o -
ma ion o his assessmen by using
s anda dised ques ionnai es o close o
20,000 con ibu o s - including lawye s,
Table 09 Thema ic a eas su eyed in he Wo ld Banks Benchma king In as uc u e Repo (sou ce:
Wo ld Bank, 2020b)
J. Young
58
limi a ion is he age o he epo , which
is o e en yea s old. They also make a
dis inc ion be ween “classical PPPs” and
c oss-sec o pa ne ships, howe e in
hei analysis hey o en lump he wo o-
ge he , which makes compa isons o pe -
o mance and he challenges hey ace
di icul o sepa a e.
5.3.5 GIZ Gap Analysis
The GIZ Public-P i a e Pa ne ship Op-
e a ional Guidelines o he Wa e Sup-
ply and Sani a ion Sec o : F amewo k
Gap Analysis Repo and Recommenda-
ions (2017), was a collabo a ion be ween
GIZ, Rebelg oup In e na ional and local
consul an and Wo ld Bank PPP expe ,
Ca oline Chema E ic, who was also in-
e iewed in he esea ch s ages o his
hesis. The pu pose o his epo was o
analyse he 2015 PPP Regula ions, ind
he gaps and make ecommenda ions o
add ess hem.
They ound “ he main obs acles o he
implemen a ion o PPPs in he wa e sup-
ply and sani a ion sec o do no de i e
om gaps in he egula o y amewo k,
bu om a lack o capaci y o con ac ing
au ho i ies and po en ial p i a e con ac-
o s” (GIZ, 2017). Fu he mo e,
“... he p ocedu e o he p epa a ion and
app o al o a PPP p ojec se ou in he PPP
Regula ions 2015 is oo complex o small-
scale p ojec s. The cos s o unde aking all
s udy and assessmen ac i i ies equi ed by
he egula ions a e disp opo ionally la ge
compa ed o he con ac alue o small-
scale p ojec s, and subs an ially inc ease
he p ice o he consume o wa e supply
and sani a ion se ices. Consequen ly, he
p ocedu al amewo k discou ages he use
5.3.4 GTZ Pa ne ship Landscape
This epo was commissioned by GTZ
(me ged wi h GIZ since 2010) o assess
he “po en ial o PPPs in Tanzania wi h a
speci ic ocus on he a eas o Heal h, Wa-
e and Local Go e nance” (Gesellscha
ü Technische Zusammena bei [GTZ],
2010). The epo was commissioned by
GTZ o assess he mac o challenges ha
need o be add essed and deba ed by he
go e nmen , p i a e sec o and ci il so-
cie y in o de o mee de elopmen goals
(GTZ, 2010).
The epo ound ha Tanzania has pu
in o place “adequa e policies and egula-
o y amewo k o guide he wa e sec o ,
howe e , mo e has o be done in e ms o
sec o coo dina ion and simpli ica ion o
con lic ing laws which hinde he pe o -
mance o he sec o ” (GTZ, 2010). They
also s essed he need o capaci y build-
ing a he local le el in he wa e and san-
i a ion au ho i ies o ensu e be e pe -
o mance; a need o mo e accu a e da a
(especially in p ojec ions) when conduc -
ing easibili y s udies; he need o mo e
policy cla i y and con ac speci ica ions;
g ea e anspa ency; and he need o
economies o scale o comme cial ia-
bili y in wa e and sani a ion businesses
(GTZ, 2010).
O he challenges ha he epo iden i-
ied include con ac en o cemen , which
hey called “highly bu eauc a ic and
p ocess a he han esul s d i en, o en
wi hou a eal unde s anding o wha he
laws a e designed o achie e” (GTZ, 2010).
They go on o epo ha he judicial p o-
cesses “a e no as anspa en as hey
should be” and a e “ he e o e open o co -
up ion and bu eauc acy” (GTZ, 2010).
While ho ough in i s analysis, a majo
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
59
s udy su eyed PPP p ac i ione s wi hin
he sec o and ele an go e ning bodies
h ough semi-s uc u ed in e iews. They
ound a “lack o awa eness and usage o
PPPs amewo k models du ing he ea-
sibili y and subsequen implemen a ion
p ocess,” which is suppo ed by simila
indings in he GTZ (2010) and GIZ (2017)
epo s (Chileshe & Ka ishe, 2020). Fu -
he mo e, hey ound he main ac o s
in luencing he eadiness o Tanzania o
implemen PPPs we e he “limi ed knowl-
edge and skills equi ed o PPP p ac i-
ione s”; “Poo capaci y building”; “Lack
o engagemen o expe s du ing he ia-
bili y and assessmen p ocess”; and “Poo
selec ion p ocess o p i a e pa ne s gi -
ing ising (sic) o unsolici ed p oposals”
(Chileshe & Ka ishe, 2020).
In o de o s eng hen and op imise he
PPP en i onmen in Da es Salaam, Chil-
eshe & Ka ishe (2020) poin ou ou a eas
in need o s eng hening:
1. p ocu emen p ocesses
2. enabling en i onmen ( egula ions
and policies),
3. in o ganiza ions (i.e. PPP s uc u e,
policies and p ocedu es),
4. and wi hin indi iduals (i.e. skills,
expe ience and knowledge).
In his assessmen o PPP’s in he ans-
po a ion sec o in Tanzania, Bengesi
(2016) u he con i med co up ion and
nepo ism as con ibu ing ac o s inhibi -
ing PPP up ake. Th ough in e iews wi h
he p i a e sec o and public o icials, o-
cus g oup discussions and su eys, hey
ound ha no only was he e a lack o un-
de s anding o wha PPPs we e, bu also
“issues o economic iabili y o p ojec s
in ques ion, good go e nance and adhe -
ence o he code o conduc by he go e n-
o PPP in he case o small-scale p ojec s,
which ep esen he majo i y o p ojec s in
he wa e sec o ” (GIZ, 2017).
They also iden i ied he “weak” echni-
cal and inancial capaci y o he p i a e
sec o o unde ake PPPs in he wa e
sec o , and a lack o expe ience o domes-
ic banks wi h p ojec inancing. Adding
ha high in e es a es o p i a e in es-
o s (10% p.a. eal) also make he cos s o
long- e m inancing “no easible” (GIZ,
2017). This epo was qui e ho ough and
some o he ecommenda ions, such as
lowe ing he benchma k o “small-scale”
PPPs, we e pa ly ollowed in subsequen
legisla ion (e.g. de ining small-scale PPPs
as any hing unde $20 million USD, a he
han $100 million USD, hough o small-
scale FSM his is s ill a much la ge scale
han ypical cos s).
5.3.6 Filling in he gaps – Assess-
men s o PPP eadiness in o he li -
e a u e
While he a o emen ioned epo s a e
he mos comp ehensi e epo s I ound
speci ic o PPPs in Tanzania, o he sou c-
es we e used o ill in he gaps, some e-
la ed o PPPs in Tanzania/Da es Salaam
and some a ing mac o le el indica o s
in Tanzania ha ma ch he selec ed CSFs
o he Readiness Rada . The sou ces and
hei mos ele an indings will be men-
ioned below, and a able wi h o he im-
po an in o ma ion is a he end o his
chap e (Table 10).
A ecen s udy pe o med by Chileshe
& Ka ishe (2020), examined he eadiness
o de eloping coun ies o adop PPPs,
using he case s udy o Tanzania. Focus-
ing on PPPs in he housing sec o , he
J. Young
60
Municipal Council (MC) and he Minis y
o Wa e and I iga ion (MoWI), espec-
i ely.*
O he sou ces used o de e mine he
alue o he eadiness a ing include: The
Co up ion Pe cep ion Index (CPI) om
T anspa ency In e na ional; he Wo ld
De elopmen Indica o s (WDI) om The
Wo ld Bank G oup; The Global Inno a-
ion Index (GII) om Co nell Uni e si y,
Ins i u Eu opéen d’Adminis a ion des
A ai es (INSEAD), and he Wo ld In el-
lec ual P ope y O ganiza ion (WIPO);
The Global Compe i i eness Repo om
he Wo ld Economic Fo um; he T ans-
o ma ion Index (BTI) om Be elsmann
S i ung; and he En i onmen al Pe o -
mance Index (EPI) om Yale Uni e si y.
De ailed in o ma ion on hese and he
o he epo s can be ound in Table 10.
The alues ga he ed om hese ead-
iness assessmen s and da abases we e
hen abula ed and a e aged (Table 11).
The ollowing sec ion will p esen he
indings om his analysis.
men , and an unsuppo i e en i onmen
especially ci ed in weak local capi al ma -
ke s” (Bengesi, 2016).
Du ing my esea ch a emp s we e
made o con ac he PPP node/cen e in
Tanzania, which is he cen al PPP au-
ho i y, howe e he email add esses did
no wo k and he websi e (www.pppnode.
go. z) was only pa ially buil (a he ime
o w i ing - May, 2021). Howe e , he
mo e es ablished (since 2005) p i a e
sec o au ho i y, he Public P ocu emen
Regula o y Au ho i y (PPRA), did ha e a
unc ioning websi e and had published an
audi o p ocu emen s in 2018/2019 ( he
la es epo a ailable). The Annual Pe o -
mance E alua ion Repo o Financial Yea
2018/19 measu es he pe o mance o he
p ocu emen sec o h ough compliance
audi s and V M assessmen s, and is a le-
gal manda e o he Public P ocu emen
Ac (2001, eplaced 2011).
This epo was used o assess co up-
ion wi hin he p ocu emen sec o a a
g ea e deg ee o g anula i y han hose
ound in o he in e na ional co up ion
indices. The PPRA uses a “ ed lag” check-
lis o es ablish he p esence o co up-
ion symp oms in audi ed ende s. When
ed lags ise abo e 20 pe cen , a deepe
pa e n o co up ion may exis . The as-
sessmen conduc ed 104 audi s on public
en e p ises (PEs) and ound 39 PEs (and
a o al o 131 con ac s) o ha e a “high-
e co up ion ed lags in ei he one o
i s phases o on i s o e all assessmen ”
(Public P ocu emen Regula o y Au ho i-
y [PPRA], 2019). O hose ha ing high ed
lags, wo PEs we e assessed o ha e he
o e all ed lags o 20 and 21 – Kigamboni
*To no malise he co up ion a e he e o use in he eadiness ada , he a io o audi s pe o med o
hose wi h co up ion p esen (104/39) was used in he Readiness Ra ing.
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
61
Repo Au ho /O ganiza io
nYea Funding /
Suppo ed by Ta ge Audience Me hodology Focus Sco ing
2015 A ica In ascope Economis
In elligence Uni 2015 The Wo ld Bank
G oup, PPIAF
P i a e Fi ms,
In es o s, Public
Sec o
Quali a i e and
Quan i a i e
legal ex s,
go e nmen
websi es, p ess
epo s and
in e iews) as well
as seconda y epo s
and da a sou ces
Mac o Enabling
En i onmen
PPP eadiness
(0-100)
Benchma king
In as uc u e Repo The Wo ld Bank 2020 The Wo ld Bank
G oup
P i a e i ms,
esea che s,
go e nmen s
Su eys
Regula ing
en i onmen o
PPP li e cycle
PPP eadiness
(0-100)
Pa ne ship Landscape GTZ 2010 GTZ Policymake s Coun y Expe
Assessmen
PPP enabling
en i onmen Quali a i e
F amewo k Gap Analysis
Repo and
Recommenda ions
GIZ, Rebelg oup
In e na ional,
Ca oline Chema E ic
2017 GIZ
EWURA, MoWI
and o he
policymake s
Gap analysis o legal
ex
PPP egula ions
o he wa e
and sani a ion
sec o
Quali a i e
Readiness assessmen o
public–p i a e
pa ne ships
(PPPs) adop ion in
de eloping
coun ies: he case o
Tanzania
Ka ishe, Nicholas;
Chileshe, Neema 2020
Uni e si y o Sou h
Aus alia; A dhi
Uni e si y
Resea che s and
Policymake s
Semi-s uc u ed
in e iews wi h PPP
p ac i ione s in
Tanzania
PPP enabling
en i onmen
and he housing
sec o
Quali a i e
Co up ion Pe cep ion
Index (CPI)
T anspa ency
In e na ional 2020
go e nmen
agencies,
mul ila e al
ins i u ions,
ounda ions, he
p i a e sec o and
indi iduals
Public and
Policymake s
Da a agg ega ion
om pe cep ions o
business people and
coun y expe s
abou co up ion
Co up ion
Le el o
pe cei ed
co up ion (0-
100), 0 is mos
co up , 100 is
leas co up
ANNUAL PERFORMANCE
EVALUATION REPORT
FOR FINANCIAL YEAR
2018/19
Tanzania Public
P ocu emen
Regula o y Au ho i y
(PPRA)
2017/18 Go e nmen o
Tanzania
Public and
Policymake s Audi s Co up ion and
Pe o mance
Pe cen age o
audi ed i ms
wi h highe ed
lags o
co up ion (39
PEs wi h highe
ed lags ou o
104 = 37.5/100)
Wo ld De elopmen
Indica o s
The Wo ld Bank
G oup 2019 The Wo ld Bank
G oup
Public and
Policymake s
Analysis o da a
compiled om
in e na ional and
go e nmen
agencies
Mac o ac o s
in luencing
de elopmen
(1-6) low o high
Global Inno a ion Index
Soumi a Du a,
B uno Lan in, and
Sacha Wunsch-
Vincen
2020
Co nell Uni e si y,
INSEAD, and he
Wo ld In ellec ual
P ope y
O ganiza ion
(WIPO)
Public and
Policymake s Da a anking
Measu ing
inno a ion in
he economy
Sco e (0-100)
and anking (1-
131)
Global Compe i i eness
Repo
Wo ld Economic
Fo um
2017/18/
19
Indus ies,
businesses,
indi iduals
Businesses
analysis o s a is ics
om in e na ional
o ganiza ions and
su eys o
execu i es
Compe i i enes
s o economy a
a na ional le el
Sco e (1-7)
T ans o ma ion Index
(BTI) Be elsmann S i ung 2020 Be elsmann
S i ung - Dono s
Public and
Policymake s
Expe assessmen
o indica o s
h ough su eys
T ans o ma ion
owa d
democ acy and
ma ke
economy and
quali y o
go e nance
Sco e (1-10)
En i onmen al
Pe o mance Index (EPI)
Wendling, Z. A.;
Eme son, J. W.; de
She binin, A.; Es y,
D. C.; e al.
2020
The McCall
MacBain
Founda ion
Public and
Policymake s
Co ela ion analysis
o da a om a ious
sou ces (WB, IMF,
He i age
Founda ion, e c.)
En ionmen al
Pe o mance
Sco e (0-100)
and anking (1-
180)
Table 10 De ailed in o ma ion on he epo s and da abases used o de e mine he alues o he eadiness assessmen (sou ce:
Au ho )
J. Young
62
5.4 The Readiness Rada - Resul s
Now ha we ha e a “Combined CSF” amewo k o assessmen (based on a ho ough
analysis o he li e a u e on de eloping egions, he WSS sec o and commonly ci ed
CSFs) and he alues o popula e i (based on a ious eadiness assessmen s), an analy-
sis o Tanzania’s PPP eadiness can be pe o med.
The sco es based on ma ching a ing ac o s we e en e ed in o he amewo k om
each epo and da abase, and he a e age was calcula ed o gi e i a inal sco e in each
ca ego y. The amewo k and Readiness Rada on he nex page display he esul s.
Using he anges:
0-20 = Ve y Low Readiness
21-40 = Low Readiness
41-60 = Adequa e Readiness
61-80 = High Readiness
81-100 = Ve y High Readiness
Tanzania was ound o ha e an a e age o 39.3, and he e o e a “Low Readiness” o
PPPs. Due o i ’s p oximi y o he “Adequa e” ange, Tanzania could be said o be an
en i onmen ha is almos adequa e o PPPs, howe e only i no able imp o emen
is made ac oss he en i e p ojec le el, compe ency and commi men o pa ne s, isk
sha ing, anspa ency in he p ocu emen p ocess, egula o y quali y, co up ion, i-
nancial ma ke s, public accep ance and in ol emen , and e o s o bene i all s ake-
holde s and no jus he p ojec pa ne s. Fo sake o compa ison, he same amewo k
was used o a e Sou h A ica’s PPP eadiness, a “De eloped” PPP ma ke (Figu e 39).
Figu e 37 Popula ing he CSF amewo k wi h a eadiness a ing o p oduce a eadiness ada (sou ce:
Au ho )
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
63
TANZANIA
Sou ce
EIU (2015)
WB (2020)
GTZ (2010)
GIZ (2017)
Chileshe & Ka ishe (2020)
T anspa ency In l.
PPRA Repo
WDI - Wo ld Bank
Global Inno a ion Index
WEF
BTI
EPI
A e age Sco e
P ojec Le el
Technical Feasabili y 30 30 30 30.0
Financial Viabili y 32 30 30 30.7
Tho ough Cos /Bene i
E alua ion 43.8 32 37.9
Technology T ans e 12.1 42.9 27.5
O ganiza ion
S ong and Compe en
Pa ne s 43.8 30 30 34.6
S ong Commi men and
clea oles 32 32.0
App op ia e Risk Sha ing 43.8 32 30 35.3
Flexible Con ac s 43.8 53 30 42.3
Policy
Poli ical Suppo 58.1 58.1
T anspa en P ocu emen 50 32 30 37.3
Compe i i e Bidding 50 71 30 40 47.8
PPP Uni and policy 50 53 30 44.3
Ins i u ional
S ong legal amewo k 50 71 50 70 40 48.3 54.9
Poli ical S abili y 43.8 40 53.6 40 55.6 31.1 44.0
Regula o y Quali y 40 31.1 35.6
Lack o Co up ion 38 37.5 40 36 44.4 39.2
Good Go e nance 52 33.2 40 38.6 41.0
Mac o
S able Mac oeconomic
condi ions 58.1 70 43.6 74.3 43.7 31.1 53.5
Adequa e Financial Ma ke 38.9 30 40 43.6 35.70 55.60 31.10 39.3
Public
Accep ance/In ol emen 22.2 22.2
Bene i s all S akeholde s 38.9 38.9
O he s
T us
Communica ion
Accep able Ta i
Soundness o Banks
SOUTH AFRICA
Sou ce
Econ
WB
GTZ
Ka ishe
T anspa ency In l.
PPRA Repo
WB Da a
Global Inno a ion Index
WEF
BTI
EPI
A e age Sco e
P ojec Le el
Technical Feasabili y #DIV/0!
Financial Viabili y 76 76.0
Tho ough Cos /Bene i
E alua ion 70 76 73.0
Technology T ans e 32.67 48.6 40.6
O ganiza ion
S ong and Compe en
Pa ne s 70 70.0
S ong Commi men and
clea oles 76 76.0
App op ia e Risk Sha ing 75 76 75.5
Con ac Managemen 70 82 76.0
Policy
Poli ical Suppo 46.1 46.1
T anspa en 75 76 75.5
Compe i i e 70 62 66.0
PPP Uni and policy 70 82 76.0
Ins i u ional
S ong legal amewo k 70 62 66.0
Poli ical S abili y 70 75 72.5
Regula o y Quali y 61.54 61.5
Lack o Co up ion 63.46 63.5
Good Go e nance 58 74.5 66.3
Mac o
S able Mac oeconomic
condi ions 46.4 61.4 53.9
Adequa e Financial Ma ke 91.7 80.00 85.9
Public
Accep ance/In ol emen 76 76.0
Bene i s all S akeholde s 91.7 91.7
Le el CSF
EIU (2015)
WB BID (2020)
GTZ (2010)
GIZ (2017)
Chileshe & Ka ishe (2020)
T anspa ency In l. (2021)
PPRA Repo (2019)
WDI - Wo ld Bank (2019)
GII (2020)
WEF (2017/18/19)
BTI (2020)
EPI (2020)
Sco e
P ojec
Technical Feasabili y 30 30 30 30.0
Financial Viabili y 32 30 30 30.7
Tho ough Cos /Bene i E alua ion 43.8 32 37.9
Technology T ans e 12.1 42.9 27.5
O ganiza ion
S ong and Compe en Pa ne s 43.8 30 30 34.6
S ong Commi men and clea oles 32 32.0
App op ia e Risk Sha ing 43.8 32 30 35.3
Flexible Con ac s 43.8 53 30 42.3
Policy
Poli ical Suppo 58.1 58.1
T anspa en P ocu emen 50 32 30 37.3
Compe i i e Bidding 50 71 30 40 47.8
PPP Uni and policy 50 53 30 44.3
Ins i u ional
S ong legal amewo k 50 71 50 70 40 48.3 54.9
Poli ical S abili y 43.8 40 53.6 40 55.6 31.1 44.0
Regula o y Quali y 40 31.1 35.6
Lack o Co up ion 38 37.5 40 36 44.4 39.2
Good Go e nance 52 33.2 40 38.6 41.0
Mac o
S able Mac oeconomic condi ions 58.1 70 43.6 74.3 43.7 31.1 53.5
Adequa e Financial Ma ke 38.9 30 40 43.6 35.70 55.60 31.10 39.3
Public Accep ance/In ol emen 22.2 22.2
Bene i s all S akeholde s 38.9 38.9
To al A e age 39.3
P ojec Le el
O ganiza ion Le el
Policy Le el
Ins i u ional Le el
Mac o Le el
Figu e 38 Readiness Rada (sou ce: Au ho )
Table 11 A e aged a ings om a ious sou ces o de e mine Tanzania’s PPP eadiness (Sou ce: Au ho )
J. Young
70
6.4 Tanzania: An uncon incing en-
i onmen o PPPs in FSM
The en i onmen in Da es Salaam in
gene al and in he small-scale FSM sec o
mo e b oadly, is no sui able o con en-
ional PPPs as de ined by he Wo ld Bank
and Tanzania’s PPP egula ions. Despi e
he p omises o PPPs – p i a e inancing,
g ea e e iciency and he ans e o isk
– he eco d o hese achie emen s is ew
and a be ween in he de eloping wo ld.
The hope ha p i a e inancing would
b idge he gaps in unding we e la gely
misplaced, due o he high capi al cos s
o epai ing and expanding ne wo ks, he
a iabili y in se ice demand o FSM and
lowe p o i ma gins (Ma in, 2009). Many
p i a e inance s see his sec o (FSM and
WSS in gene al) as oo high o a isk, es-
pecially in SSA, as e idenced by he iny
o al sha e o he wo ld’s PPP ma ke ha
exis s in SSA low-income coun ies (2.2%)
and he high pe cen age o Mul ila e al
De elopmen Bank (MDB) unding (48%)
in hese coun ies as compa ed o unding
o PPPs wo ldwide (18.6% MDB unded)
(Ma in, 2009; PPI Da abase, 2021).
While some epo s ind gains in e i-
ciency in wa e sec o PPPs (Es ache &
Philippe, 2012; Ma in, 2009), due o he na-
u e o SPVs ha educe he isk o each
membe o he conso ium, he eal isk
when PPPs ail mos o en lies wi h he
communi ies ha su e om poo se -
ice p o ision and he go e nmen ha
needs o pick up he pieces a e a ailed
p ojec . I he wa e sec o , which has a
cap i e and s able demand, is deemed oo
isky by in es o s, FSM – wi h i s uns able
demand, small-scale and unp o ed busi-
ness model – is e en iskie .
In summa y, he cu en enabling en-
i onmen in Da es Salaam is no con-
duci e o con en ional PPPs. So wha is?
The ollowing chap e s will discuss h ee
case s udies o FSM a angemen s in Da
es Salaam, iden i y he oppo uni ies o
scaling up, and p opose an “open pa -
ne ship” (OP) s uc u e mo e sui able o
small-scale FSM.
Figu e 44 Resea ch amewo k o analysis o case s udies and he de elopmen o Open Pa ne ships in
Chap e 7 and 8 (sou ce: Au ho , 2021)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
71
come s eams a e a ough es ima e based
on da a collec ed in he in e iews, and
may no be ully accu a e as I was unable
o examine eceip s and p o i /loss s a e-
men s.
7.1.1 Kigamboni FSTP/ UMAWA
Was e Managemen Si e
“I ’s a good business, bu you need o be
ough” (M . Milinga, 2021)
Cons uc ed in 2012/13, he Tungi-Ki-
gamboni FSTP was a pa ne ship be-
ween BORDA and Ma hias Milinga. The
i s o i s kind in Tanzania, he FSTP was
designed and unded by BORDA wi h
DEWATS echnology ha ea s aw FS,
p oducing biogas ( o pe sonal cooking),
ea ed e luen (used o a banana plan a-
ion and ish pond) and d ied FS used o
soil condi ione .
In o de o ge a be e unde s anding o he on he g ound si ua ion in Da es Salaam,
I spen six weeks in Feb ua y and Ma ch, 2021, in e iewing a ious s akeholde s, FSTP
ope a o s, acuum uck owne s, go e nmen o icials and egula o s, NGO employees,
legal expe s and o he s. Fi e small-scale FSTPs we e isi ed, wo o which, along wi h
one en ep eneu acuum uck owne , will be discussed in he ollowing sec ions.
As he esea ch ip occu ed wi hin he con ex o he SARS-CoV-2 no el co ona i us
pandemic, some di icul ies a ose in e ms o pe sonal in e iews, and many we e pe -
o med online ia Zoom, some o which occu ed ou side o his six week ime ame.
Howe e , each o hese case s udies was pe sonally isi ed and he owne /ope a o s we e
pe sonally in e iewed. The ollowing in o ma ion came di ec ly om hese semi-s uc-
u ed in e iews unless o he wise ci ed. Fac shee da a and an analysis o each case
s udy’s p ojec and o ganiza ion le el CSFs can be ound in Appendix D.
7.1 O e iew o wo FSTPs and an E&T business in Da es Salaam
The ollowing sub-sec ions will gi e a b ie o e iew o he backg ound, issues aised
du ing he in e iews, and he challenges hey pe sonally men ion in unning hei
businesses. A e hese sub-sec ions, I will pe o m a gap analysis on hese case s ud-
ies o de e mine wha a eas could imp o e o inc ease hei abili y o scale-up. The in-
Chap e 7: Case S udies and business gap analysis
Figu e 45 M . Milinga si ing in his o ice (sou ce:
Au ho , 2021)
J. Young
72
Business Model and Pa ne ship S uc-
u e
M . Milinga has an ag eemen wi h DA-
WASA o se e his communi y in Kigam-
boni (40,000 people) and he men ioned
ha DAWASA has gi en him pe mission
o s a simila businesses in o he ci ies
h oughou Tanzania (Figu e 47). Howe -
e , s a -up capi al is a limi ing ac o . DA-
WASA also se es as he moni o ing eg-
ula o and es s he e luen e e y h ee
mon hs.
M . Milinga has se e al income
s eams and cos a oidance mechanisms.
P io o owning and ope a ing he FSTP,
M . Milinga was in ol ed in solid was e
collec ion and ope a ed a small ans e
s a ion o FS (B emen O e seas Resea ch
and De elopmen Agency [BORDA], 2018).
BORDA pa ne ed wi h M . Milinga by
cons uc ing an FSTP on his p i a e land,
hus enabling him o ea he FS di ec -
ly and inc ease his p o i . Beginning wi h
jus a gulpe and a wheelba ow, M . Mil-
inga began his own business “Uhai wa
Mazingi a na Wa u” UMAWA and also
owns se e al pieces o equipmen , which
include a 1m3 sludge ac o (Sludge-Go,
de eloped by BORDA), wo mo o ised i-
cycles (3m3 each) and a ecen ly acqui ed
used acuum uck (6m3). In addi ion o
he FSTP, a aining cen e was also es ab-
lished in 2016. M . Milinga employs six
ull- ime ope a o s and ou pa - ime op-
e a o s o he busy ainy seasons.
Figu e 46 M . Milinga and I eneo Shinga s anding in on o he Sludge-Go (sou ce: Au ho , 2021)
Figu e 47 UMAWA scale-up plan (sou ce: Au ho ,
2021)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
73
majo income s eam seems o come
om he Kigamboni T aining Cen e (Fig-
u e 48), om which he no mally ains 50
o 60 people pe yea , hough 140 people
we e ained he e las yea alone (2020).
Cha ges o aining a y, depending on
whe e hey a e om and hei abili y o
pay, anging om 300,000 o 600,000 TZS
(105-210€) pe pe son.
O he income s eams include selling
he d ied FS as soil condi ione , hough
p ices a e qui e low o his (Figu e 49)
(a ound 1,000 TZS pe 50kg bag). He also
collec s ees om o he ucks ha occa-
sionally dump FS a his FSTP. Fu he -
mo e, as his ope a ion is a well-known
pilo he ecei es 100s o isi o s pe yea ,
and dona ions om hese isi s a e like-
ly o be a conside able side income. I was
o iginally asked o dona e 300,000 TZS
(105€) o my isi , hough ended up do-
na ing 100,000 TZS (35€). I his is a s an-
His p ima y business is ha o emp y-
ing, anspo ing and ea ing FS, om
which he cha ges 30,000 TZS (10.50€) o
2m3, 40,000 TZS (14€) o 3m3, and up o
100,000 TZS (35€) o si es u he away.
F om hese se ices he has an es ima ed
income o 2.5 million TZS/mon h (890€/
mon h), wi h associa ed cos s o 1.2 mil-
lion TZS/mon h (423€/mon h).
While his p ima y business is he emp-
ying, anspo and ea men o FS, his
Figu e 48 Sani a ion T aining Cen e (sou ce: Au-
ho , 2021)
Figu e 49 Unplan ed sludge d ying bed and d ying
FS soil condi ione (sou ce: Au ho , 2021)
Figu e 50 E luen ish pond (sou ce: Au ho , 2021) Figu e 51 Banana and Papaya ees ed wa e om
e luen (sou ce: Au ho , 2021)
J. Young
74
da d dona ion, a leas ano he 3,500€ is
made h ough dona ions.
Las ly, cos s o cooking uel a e o -
se by he biogas ha is p oduced in he
FSTP, in addi ion o he bananas, papayas
(Figu e 51) and ish (Figu e 50) ha a e
ed om he e luen .
The ollowing is a ough es ima e o his
yea ly income:
• Ne income/yea om E, T, T: 5,500€
• G oss income om aining cen e
in 2020: 14,700€ - 29,400€
• Income om soil condi ione pe
yea : 200 50kg bags/yea a 1k each
= 70€
• Fees om o he ucks: ?
• Dona ions: 3,500€ / yea ?
• Cos a oidance: ?
• Ne Income: 23,770€ - 38,470€ / yea
Figu e 52 T ac o and icycle o accessing un-
planned a eas (sou ce: Au ho , 2021)
Figu e 53 Sludge-Go acuum ank (sou ce: Au ho ,
2021)
Figu e 54 M . Milinga showing us his “ loa ing” compos heap in a nea by ield (sou ce: Au ho , 2021)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
75
• Banks a en’ amilia wi h he busi-
ness model and don’ o e loans
7.1.2 Toangoma FSTP
“Wha we need is mo e educa ion, o p o-
ide mo e jobs and lowe he p ice o pi
emp ying o he local communi y” (Ms.
Mhando, 2021).
Implemen ed by Wa e aid and he
People’s De elopmen Fo um (PDF) in
collabo a ion wi h DAWASA and Temeke
Municipali y in 2018 on land owned by
Mwanahamia Mhando (Figu e 56), he
Toangoma FSTP lies on op o a hill o e -
looking he ou e dis ic o Temeke in Da
es Salaam (Figu e 57). One hou om he
Msasani dis ic whe e I was s aying, and
non-exis en on Google Maps, we eached
ou des ina ion h ough a se ies o phone
calls wi h Ms. Mhando ha led us o a gas
s a ion om which an o ange- es ed bo -
da-bo da mo o bike d i e guided us he
es o he way up he windy, po holed
lanes.
As can be seen, hese es ima es a y
widely and his is only a ough es ima e,
howe e he income is many imes he a -
e age income in Da es Salaam (Tanzania
Na ional Bu eau o S a is ics, 2021).
S a ed key challenges:
• Pi s ull o mixed and solid was e
• Sys em incompa ibili ies wi h he
uck o machines ha a e sen
he e and a e unable o emp y pi
• Beha iou change is necessa y o
he communi y o ecognise he
need o p ope ea men a he
han illegal emp ying
• The acili y was buil 10 yea s ago,
and since hen he communi y has
g own oo la ge o his one small
FSTP o ea all he FS
• Tank emp ying akes ime, and
du ing he busy seasons i is di icul
o se ice e e yone on demand, bu
communi y doesn’ always unde -
s and when hey need he se ice
immedia ely because hei ank is
o e lowing
• F ogmen and illegal emp ying un-
de cu p ices
• The e is no enough capi al in es -
men s o s a hese businesses
Figu e 55 UMAWA acuum uck (sou ce: Au ho ,
2021)
Figu e 56 Ms. Mhando (sou ce: Au ho , 2021)
J. Young
76
indi idual con ac wi h DAWASA bu is
s ill wai ing o a license.
In no mal yea s she ecei es a ound
100 isi o s pe yea , om which she
also collec s dona ions. The dona ion e-
ques ed o me was 30,000 TZS (10.60€).
Howe e , due o he co ona i us, she had
ecei ed e y ew isi o s his pas yea .
She has no o he paid employees, hough
she had a young man who assis ed he in
showing me a ound and she hoped o be
able o one day p o ide him and o he s a
Ms. Mhando, who used o li e in Chica-
go o en yea s, mo ed back o ca e o
he amily es a e and ope a e he FSTP
ha became ope a ional in 2018. She has
a 50/50 pa ne ship wi h DAWASA, whe e-
by hey spli equally he dumping ees
(1,000 TZS pe m3). F om his income she
ecei es an es ima ed 150,000 TZS (53€)
pe mon h, on a e age. He only o he
sou ce o income is selling he d ied FS
as soil condi ione , om which she sells
a ound 200 50kg bags pe yea a 1,000
TZS (0.35€) each. In e ms o cos a oid-
ance, he ea ed e luen is used o wa e
he banana plan a ion and (when unc-
ioning) she uses he biogas o cooking.
When I a i ed, he plan was no in
ope a ion o he las se e al mon hs and
she said hey we e pe o ming yea ly
main enance, which DAWASA is espon-
sible o . She is esponsible o all day o
day and mino main enance. She has an
Figu e 57 Ms. Mhando o e looking Toangoma om he hill op FSTP (sou ce: Au ho , 2021)
Figu e 58 Toangoma FSTP pa ne ship wi h Wa -
e aid (sou ce: Au ho , 2021)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
77
job. Cu en ly, howe e , he FSTP is no
p o i able. She was op imis ic abou he
u u e, hough, and belie es i hey ac-
qui e a holding ank o expand hei ca-
paci y, hey could ge mo e dumping ees
and p oduce mo e soil condi ione . She
would also like o implemen a aining
cen e in o de o inc ease he income
and help educa e he local communi y.
S a ed key challenges:
• Sludge ha is dumped he e is o en
e y wa e y and doesn’ p oduce a
lo o biogas and soil condi ione
• Capaci y is oo low o mee demand
• Loca ion is di icul o access
• Many unplanned se lemen s in he
a ea
• No p o i able enough o hi e addi-
ional wo ke s
Figu e 59 Sludge d ying beds (sou ce: Au ho ,
2021)
Figu e 60 Expansion chambe wi h plas ic was e
(sou ce: Au ho , 2021)
Figu e 61 Plan ed G a el Fil e s (PGF) (sou ce:
Au ho , 2021)
Figu e 62 Biogas se le (sou ce: Au ho , 2021)
J. Young
78
7.1.3 Vacuum T uck Business
Godlo e Ngoda is an en ep eneu and
enginee a BORDA who, in his spa e
ime, s a ed an emp ying and anspo
business wi h a pa ne . M . Ngoda and
his pa ne bough a used acuum uck
in 2019 o 32,000,000 (13,800 USD). A e
making some mino epai s and pu chas-
ing new i es, hey decided o expand he
olume o he ank om 3m3 o 4.7m3 in
o de o se ice he mo e luc a i e com-
me cial con ac s ha ha e la ge anks
(Figu e 63-64).
Acco ding o M . Ngoda, he p ocess o
acqui ing he license only ook 1-2 weeks
and was ela i ely s aigh o wa d. While
M . Ngoda and his pa ne own he uck,
hey hi e a d i e and ope a o o pe o m
he emp ying and anspo o he FS. The
d i e hen pays M . Ngoda a la ee o
70,000 TZS (25€) pe day (6 days a week). I
he d i e and ope a o emp y mo e han
Figu e 63 Used acuum uck (sou ce: Godlo e
Ngoda, 2019)
Figu e 64 Vacuum uck wi h expanded capaci y
(sou ce: Godlo e Ngoda, 2019)
Figu e 65 Godlo e Ngoda s anding ou side he BORDA HQ (sou ce: Au ho , 2021)
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
79
o he Wa e Supply and Sani a ion
(P o ision and Managemen o Sew-
age and Was ewa e Se ices) Regula-
ions, 2019, he Ope a o shall no dis-
cha ge gaseous, liquid and solid was e
which con ains any a , g ease, oil,
pe oleum spi i s, aba oi was e, hos-
pi al was e, sand, de i us, chemicals
om mining o simila ma e in o he
ea men plan ;
g) keep a eco d o i s se ices in a
o m speci ied by a WSSA and submi
he epo o he WSSA a in e als as
speci ied by he WSSA; and
h) pay dumping ees.pe mi om he
LGA a e ensu ing ha he essel
mee s he ollowing condi ions:
a) has a con ainmen mechanism o
conceal he con en s excep du ing
loading and unloading;
b) is wa e and ai igh manu ac u ed
o p e en leakage h ough cleaning;
wo pi s, hey gene ally ea n a p o i .
The p ocess o ge ing a TWA license is
as ollows:
a) pay s a u o y paymen s including,
business license ees, TRA income ax
paymen , LATRA and NEMC ees;
b) p o ide necessa y s a , ma e ial
and equipmen o e ec i e se ice
deli e y;
c) comply wi h he a i as app o ed
by EWURA;
d) comply wi h he se ice quali y
s anda ds as issued by he EWURA
om ime o ime;
e) ope a e in acco dance wi h exis -
ing, s anda ds, laws, S anda d Ope a -
ing P ocedu es (SOP)
and egula ions ela ed o he se ices
o be p o ided;
) subjec o egula ion 24 (1) o he
Figu e 66 Expanded and epain ed acuum uck (sou ce: Godlo e Ngoda, 2019)
J. Young
86
segmen s o he se ice chain, e y li le
p o i can be made solely om owning
and ope a ing a single FSTP. By emp y-
ing pi s and anspo ing i di ec ly o he
FSTP, he owne can ensu e he sludge is
o a high enough quali y (no jus he we
supe na an laye ) o alo isa ion in o
soil condi ione .
Da a Ma e s – Two ypes o da a a e
c i ical in he FSM business. Da a on
cus ome s, which includes he size and
loca ion o he ank, ime o las emp y-
ing, accessibili y e c., and inancial da a
ha is c ucial o gene a ing p o i /loss
s a emen s and making a clea business
plan ha could a ac inancing. Scaling
up will be ex emely di icul in de el-
oping egions wi hou a o dable loans
om banks. Ze o in e es loans om aid
agencies, while help ul, a e no easible
beyond he pilo s age, and wi hou he
incen i e o pay back loans on ime, bo -
owe s may become complacen and lack
incen i e o inc ease hei cus ome base
and associa ed p o i s.
Mo e can make i wo k – Once a busi-
ness case is made and inancing is se-
cu ed, ope a ing mo e han one uck
can u n a business ha is jus ge ing by
in o one ha is making a sizable p o i .
One s udy, by Kone & Chowdh y (2012),
analysed da a om 30 ci ies in A ica
and Asia, inding ha businesses wi h
only one uck we e he leas p o i able
by a , and medium (2-4 ucks) and la ge
(5+) made a a g ea e p o i (Figu e 71).
This could be due o less suscep ibili y o
down ime o a single uck, and he p e-
iously men ioned abili y o cap u e com-
me cial con ac s ha ha e la ge anks
and equi e mo e ucks wi h g ea e ca-
paci y. The s udy showed ha medium
sized businesses gained 22% o hei e -
ou his in o ma ion i is di icul o ell i
he business could be mo e p o i able by
cha ging highe ees o he d i e /ope a-
o .
Human Resou ces: The eliance on
hi ing ou he uck o a d i e and ope -
a o no di ec ly employed by M . Ngoda,
makes i di icul o gauge he ull pic u e
o he business. Because he d i e and
ope a o a e no esponsible o main e-
nance, hey also ha e li le incen i e o
ake ca e o he uck and may make isk-
ie decisions in ying o each di icul
pi s, he eby causing mo e wea and ea
on he uck ha will be paid o by M .
Ngoda.
O ganisa ional: The se ice le el con-
ac s (T ade Was e Ag eemen s (TWA))
be ween DAWASA and M . Ngoda and
pa ne a e clea ly de ined. Howe e , he
isk o owning a acuum uck alls mos -
ly on he p i a e pa ne , as DAWASA can
simply ely on hei own lee o ucks o
o he acuum uck ope a o s.
7.3 Lessons Lea n
The business case o o malised FSM
is e y much in i s in ancy, wi h pilo
p ojec s a ound he wo ld sha ing hei
expe iences ha ha e a ely scaled up o
mee he needs o an en i e ci y. Mos cas-
es ha e been hea ily suppo ed by NGOs,
go e nmen s o aid agencies and a e
he e o e di icul o assess in he “wild”
o he open ma ke . Looking a he p e i-
ously men ioned case s udies, a ew les-
sons om he Da es Salaam con ex ha e
eme ged.
Ve ical In eg a ion – While p o i s
can be made when an owne /ope a o
u ilises e ical in eg a ion h ough he
emp ying, anspo , ea men and euse
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
87
ing a nigh . By gaining he us o he
communi y, he iew o he business can
become mo e posi i e, wi h he bene i s
o he se ice easily isible.
Regula ion is necessa y – P ope egu-
la ion goes hand in hand wi h p o iding
a se ice ha is us ed and demanded
by he communi y, balancing he in e -
es s o all s akeholde s (WSUP & ESAWAS,
2020). One key ou pu o he session “How
can we ensu e ha he sludge eaches
he ea men plan ?” a he global FSM
con e ence, FSM6 session 4 (2021), was
a b ains o ming session o de e mine he
mos impo an aspec s o his opic, and
egula ion was he mos ci ed (Figu e 72).
To imp o e he image o he sec o , egu-
la ion is essen ial o cu ail illegal emp y-
ing and i s ad e se e ec s on heal h and
he en i onmen h ough o malisa ion,
and he p i a e sec o mus be incen i -
ised o p o ide p o-poo se ice. I he
p i a e sec o is le wi hou egula ion,
hey would ha e li le incen i e o se e
di icul o each in o mal neighbou -
hoods. Fu he mo e, Key Pe o mance
Indica o s (KPIs) could be used o mon-
i o o pe o mance and ensu e quali y
s anda ds a e being me (AMCOW, 2021a).
enue om comme cial con ac s whe e-
as single- uck ope a o s only ecei ed
7% om comme cial con ac s (Koné &
Chowdh y, 2012).
Dis ance makes a di e ence – In e y
la ge ci ies like Da es Salaam, dis ance o
he si e and ime spen in a ic is c ucial
o p o i abili y. The same s udy by Kone &
Chowdh y (2012), ound ha 40% o ope -
a ing cos s in A ica we e om uel due o
longe dis ances and he olde age o he
ucks which consume mo e uel. He e,
decen alised ea men and/o ans e
s a ions could help educe dis ances and
ime spen pe ip.
Communi y In ol emen is c ucial –
The us o he communi y is c ucial in
p o iding a se ice ha has adi ionally
been elega ed o illegal ope a o s wo k-
Figu e 71 P o i abili y o acuum uck businesses
based on size o business (sou ce: adap ed om
Kone & Chowdh y, 2012)
Figu e 72 Wo d cloud om FSM6 session 4 - How do we ensu e ha he sludge eaches he ea men
plan ? (Fe back e al., 2021)
J. Young
88
These PPPs a e wha a e used as an
indica o o SDG 17.17. The e o e i is
impo an o d aw a dis inc ion be ween
hese PPPs and p i a e sec o in ol e-
men in gene al.
Tha ’s no o say hese PPPs a e always
a bad idea (e en hough he e is sca ce
da a on hei pe o mance o e TP). Many
coun ies ha e had a numbe o g ea ex-
pe iences wi h PPPs whe e hey li ed up
o hei p omises o maximizing e icien-
cy and minimizing he inancial bu den
on he go e nmen , bu hese ha e gene -
ally been coun ies wi h s ong enabling
en i onmen s and obus legal ame-
wo ks like he UK, Aus alia, Ge many,
F ance, he Ne he lands and he USA.
In coun ies wi h inexpe ienced go e n-
men s and a p opensi y o co up ion,
he in o ma ion asymme y in PPP con-
ac nego ia ion and lack o anspa ency
make PPPs a isky en u e indeed.
So while he success o many small-
scale “PPP”-like a angemen s ge lumped
in wi h PPPs as de ined by he Wo ld
Bank, he e is a muddying o he wa e s.
Do PPPs wo k o FSM (o WSS) o don’
hey? How could we know when we don’
know wha we’ e measu ing.
8.2 A look a non-con en ional
PPPs
The na ow “Wo ld Bank” lens o iew-
ing PPPs as long- e m wi h signi ican
isk bo ne by he p i a e sec o has i s
uses, especially in e ms o la ge-scale,
con ac ually igid in as uc u e p ojec s
ha o en cos hund eds o millions o dol-
la s. Bu his lens is unsui able o small-
C ea ing a success ul FSM business
is di icul , and he conclusion o his
analysis is ha con en ional PPPs will
only make i mo e so. No only a e PPP
con ac s much oo complica ed o he
a e age pe son o unde s and, hey a e
leng hy and exclusiona y. P ope ly unc-
ioning and comp ehensi e FSM equi es
pa ne ships om all co ne s – om in-
o mal ogmen, o en ep eneu s, com-
muni y leade s and he go e nmen . An
open ne wo k o ac o s achie ing a mu u-
ally bene icial goal.
So i pa ne ships a e wha ’s needed,
why no jus call hem PPPs? They a e
pa ne ships be ween he public and p i-
a e sec o s, igh ?
8.1 The need o a eb anding
B oadly speaking, PPPs a e used o de-
sc ibe a wide ange o pa ne ships be-
ween he p i a e and public sec o s. I ’s
in he name. Bu he p oblem is, o hose
wi h he money and powe o a ec go -
e nmen s (The Wo ld Bank, OECD, A DB
e c.), PPPs a e no simply a pa ne ship
be ween he public and p i a e sec o s.
PPPs a e long- e m, con ac ual ag ee-
men s be ween a p i a e pa y o con-
so ium, wi h a dash o isk ans e and
a sligh (legally necessa y) lack o ans-
pa ency ( o p o ec business in e es s).
They a e a ehicle o i ms and in es o s
o make e u ns on de eloping ma ke s.
And hese a e wha IFIs and MDBs like
he Wo ld Bank and A DB a e p omo ing
o go e nmen s, p o iding unding o he
es ablishmen o enabling en i onmen s
o hese ypes o PPPs, comple e wi h
PPP uni s and all (Ens, 2019).
Chap e 8: PPPs by any o he name: A p oposal o Open
Pa ne ships
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
89
and p o ec ing he en i onmen , seem o
be ha dly di e en om ypical PPPs in
ha decision-making powe emains wi h
he public and p i a e pa ne s (UNECE,
2021). In A ns ein’s seminal wo k, A Lad-
de o Ci izen Pa icipa ion (1969), his
ype o s akeholde engagemen would be
in he middle o he ladde , on he consul-
a ion ung, and “i consul ing hem is no
combined wi h o he modes o pa icipa-
ion, his ung o he ladde is s ill a sham
since i o e s no assu ance ha ci izen
conce ns and ideas will be aken in o ac-
coun ” (A ns ein, 1969). She adds
“pa icipa ion wi hou edis ibu ion o
powe is an emp y and us a ing p ocess
o he powe less. I allows he powe - hold-
e s o claim ha all sides we e conside ed,
bu makes i possible o only some o hose
sides o bene i . I main ains he s a us
quo.”
PPCPs on he o he hand, while also
conside ing he bene i s o he wide
communi y as a p ima y de ini ion o
success, also include he communi y as
a pa ne in he planning/design o he
p ojec (Koppenjan, 2015). Acco ding o
he Penabulu Founda ion (2015), an In-
donesian-based non-p o i , he PPCP ap-
p oach
“is a syne gis ically ope a ional model ha
is used o achie e sus ainable de elopmen
in which he h ee pa ies join ly de elop
a business uni /se ice o mu ual bene i
and p o ide maximum bene i o he wide
communi y.”
In his a angemen , he bene i s o a
long- e m inancial ela ionship go o he
p i a e pa ne , he public sec o gains ad-
di ional esou ces and e ains owne ship
o he asse s and he communi y bene i s
om he skills, knowledge, se ices and
new echnologies (Penabulu Founda ion,
scale FSM se ice p o ision ha is o en
in o mally a anged, wi h se ice-based
ag eemen s on an ad-hoc basis (Wa e
& Sani a ion o he U ban Poo [WSUP],
2017). These lexible pa ne ships be-
ween public and p i a e pa ne s, NGOs
and he communi y, o en inaccu a ely
pu unde he “PPP” label, a e essen ial
o he de elopmen o success ul u ban
FSM se ices (B inke ho & B inke ho ,
2011).
Non-con en ional “PPPs” include pub-
lic-p i a e-communi y pa ne ships
(PPCPs), Adminis a ion-Business-Ci -
il socie y (ABC) Pa ne ships ( his e m
ne e seemed o ake o ) and people- i s
public-p i a e pa ne ships (P PPPs),
among o he s. These pa ne ships can
a y g ea ly, bu gene ally aim o ep e-
sen he in e es s o he communi y as
well as he public and p i a e pa ne s
(Adnyana e al., 2015; Koppenjan, 2015;
Mou gues & Kingombe, 2017).
Acco ding o he UNECE’s (2021) In e -
na ional PPP Cen e o Excellence (ICoE)
People- i s PPPs
“ensu e ha ou o all s akeholde s, ‘people’
a e on he op. I s ocus is on imp o ing he
quali y o li e o he communi ies, pa icu-
la ly hose ha a e igh ing po e y, by c e-
a ing local and sus ainable jobs, hose ha
igh hunge and p omo e well-being, p o-
mo e gende equali y, access o wa e , en-
e gy, anspo , and educa ion o all, and
ha p omo e social cohesion, jus ice and
disa ow all o ms o disc imina ion based
on ace, e hnici y, c eed and cul u e.”
How P PPPs “ensu e” ha people a e
on op is h ough s akeholde engage-
men , hough i is unclea wha o m his
akes. These ypes o PPPs, while igh ly
expanding he de ini ion o success om
a pu ely p o i able one o imp o ing li es
J. Young
90
8.3 OPUS: Open Pa ne ships o
U ban Sani a ion
PPPs ha in ol e he communi y as an
equal pa ne a e essen ial o long- e m
sus ainabili y o FSM in as uc u e. The
p e iously men ioned case s udy is a good
example o his, and can se e as a mod-
el o pa ne ships in de eloping egions.
Howe e , i is my opinion ha PPCPs
su e om ying o build o a model o
PPPs ha is undamen ally unsui able o
small-scale FSM in de eloping egions,
and ha a new e m would be e se e
bo h he na u e and pe cep ion o pa -
ne ships be ween he p i a e and public
sec o s: Open Pa ne ships (OP).
OPs in oke an open handed app oach
ha is a ailable o pa ne s and s ake-
holde s on all le els, educa ed o unedu-
ca ed, wi h o wi hou esou ces. Whe e
PPPs a e he handshake deal be ween a
public and p i a e en i y, OPs a e an open
hand ha is a ailable o anyone willing o
be a pa o he solu ion. Some key ec-
ommenda ions o he cha ac e is ics o
an OP a e:
1. Simple, lexible and sho - e m
con ac s
Con ac s o PPPs a e much oo com-
plica ed o an a e age small-scale en e-
p eneu o sani a ion se ice p o ide o
be able o handle wi hou assis ance. Cu -
en ly, T ade Was e Ag eemen s (TWA) a e
in place in Tanzania ha mee his need
o simplici y, while s ill ensu ing ce ain
s anda d ope a ing p ocedu es (SOPs),
se ice quali y, s anda ds, a i s, eco ds
e c. a e kep and main ained (EWURA,
2020). These TWAs howe e a e o he
emp ying and anspo s eps in he se -
ice chain, and could also be ex ended o
small-scale FSTPs and he ea men and
2015). These ypes o PPPs can be ailo ed
o FSM and o en wo k well by o maliz-
ing he in o mal sec o while gi ing go -
e nmen al suppo o ensu e p o-poo
se ice and egula ions o p o ec public
heal h and he en i onmen .
Examples o hese kind o pa ne ships
a e o en seen in he non-p o i sec o ,
whe e an NGO (such as BORDA in Tanza-
nia and elsewhe e) ac s as in e media y
be ween he go e nmen and small-scale
PSPs.
One good example o a non-con en ion-
al PPP can be seen in Dhaka, Bangladesh.
The e, he na ional NGO Dus ha Shas hya
Kend a (DSK) pa ne ed wi h Dhaka Wa-
e Supply and Sewe age Au ho i y (DWA-
SA) and communi y-based o ganiza ions
(CBOs) ha ep esen ed in o mal slum
a eas o expand access o he wa e sup-
ply sys em (Hossain & Ahmed, 2015).
DSK se up wa e poin connec ions
unde hei name while acili a ing he
legi imiza ion o he CBOs in he eyes o
DWASA h ough capaci y building, e en-
ually handing o e he wa e poin s o
be managed and paid o by he CBOs. To
legi imize he ela ionship, CBOs signed
ipa i e “Wa e poin Hando e Ag ee-
men s” wi h DWASA and ensu e ha hei
membe s pay he ees. The in ol emen
o he communi y in he planning, ope a-
ion and main enance o he wa e poin s
was a key ac o o hei success, p o id-
ing a sense o owne ship o e he in a-
s uc u e ha was in u n be e main-
ained and a highe pe cen age o wa e
ees we e collec ed (Hossain & Ahmed,
2015). This PPCP was able o scale-up o
se e 200 slums and p o ide o e 100,000
slum dwelle s legal access o wa e .
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
91
subsidies o less p o i able sec o s such
as FSM h ough ee dumping, main-
enance, ax c edi s, subsidised CapEx
(T ucks, FSTPs), e c.
6. Regula ion
P ope egula ion is essen ial o bal-
ancing he in e es s o all he s akehold-
e s. Regula ion and en o cemen is nec-
essa y o cu ail illegal emp ying and i s
ad e se e ec s on heal h, en i onmen
and legal business models. This can be
done h ough o malising he in o mal
sec o h ough capaci y building, assis-
ance h ough CBOs, NGOs o wo ke s’
unions. Fu he mo e, egula ion is neces-
sa y o ensu e s anda ds and KPIs a e be-
ing me ha a e i al o sus ainable FSM.
8.4 Fu he Resea ch
The pu pose o his hesis was o de e -
mine how sui able PPPs we e o FSM in
Da es Salaam, and subsequen ly o p o-
pose a pa ne ship s uc u e ha would
be mo e sui able han PPPs we e ound o
be. This has been accomplished, howe e
he e a e se e al a eas ha could ecei e
u he esea ch.
1. The eadiness ada could be u -
he de eloped h ough in e iews wi h
s akeholde s wi h expe ience in PPPs in
Da es Salaam, o de e mine a weigh ed
CSF amewo k ha is pe haps mo e ac-
cu a e o assessing PPPs in hei pa icu-
la con ex .
2. The con ac ual amewo k and
pa ne ship s uc u e o an OP could be
u he de eloped o accoun o speci ic-
i ies ega ding isk-sha ing, obliga ions,
paymen s uc u es, dispu e esolu ions,
and he like.
3. Financial a angemen s wi hin he
disposal/ euse s eps in he chain as well.
Fu he mo e, lexible con ac s could
ake ad an age o mul i-sec o al e icien-
cies, such as combining solid was e se -
ice wi h he emp ying and anspo o
FS.
2. T anspa en
T anspa en con ac s, da a collec ion
and se ice ag eemen s would ease ac-
cess in o he ma ke , inc ease compe i-
ion and ul ima ely acili a e be e se -
ice p o ision.
3. Communi y led
Open pa ne ships a e designed o acil-
i a e bo om-up pa icipa ion in he FSM
ma ke , h ough communi y ou each,
oppo uni ies o jobs could be ad e -
ised o locals who know and a e known
by he neighbou hood. This could c ea e
a sense o us and des igma ize he ma -
ke , while inc easing li ing s anda ds and
c ea ing weal h. When he communi y is
a pa o he e o , owne ship o he in-
as uc u e and se ices c ea es mo e in-
cen i e o sus ain hem.
4. Equal powe
In o de o balance he powe be ween
he WSSA (DAWASA) and se ice p o id-
e , i is ecommended o c ea e a CBO, o
wo ke ’s union o ep esen he collec i e
in e es s and needs o sani a ion wo ke s.
5. Financing
Local banks and inance ins i u ions
need o be in ol ed and in o med o
he business case o FSM. The wo ke ’s
union o CBO could acili a e loan appli-
ca ions and c ea ing business plans o
a ac inancing. I p o i able business
cases canno be made due o logis ics o a
lack o ma ke demand, he go e nmen
mus ealloca e esou ces o p o ide
J. Young
92
men and in la ge-scale p ojec s ha jus-
i y he ansac ion cos s associa ed wi h
PPPs (Es ache & Philippe, 2012). Ano he
key inding o his esea ch was he con-
usion su ounding hem, and a lack o a
clea de ini ion which has se e al e ec s:
i s , hose who belie e PPPs can in-
clude a wide spec um o pa ne ships
wi h he p i a e sec o end up seeing PPPs
as ob iously necessa y o add ess gaps in
in as uc u e and se ice deli e y, espe-
cially in de eloping egions wi h go e n-
men s ha a e s uggling o p o ide hese
se ices hemsel es.
The ques ion isn’ i hey a e sui able,
goes hei line o easoning, bu which
kind is sui able.
The p oblem wi h his iew, is ha
while PPPs do in ol e a wide spec um
o a angemen s, he spec um is small-
e han mos hink, and acco ding o he
Wo ld Bank and o he IFIs, only includes
long- e m pa ne ships ha include he
ope a ions, inancing and/o main ain-
ing o asse s o ensu e a en ion is paid o
whole-o -li e cos s. By mis akenly lump-
ing in PPPs wi h se ice le el ag eemen s
o managemen con ac s, holde s o his
iew may be mo e p one o p omo e PPP
legisla ion and PPP as a cu e-all, which is
simply o e -kill in mos cases ha in ol e
small-scale p ojec s and can add inc eas-
ing cos s o ime and money which a e al-
eady in sho supply
The second e ec o a clea de ini ion,
is ha jus like he e a e p oponen s o
p i a e sec o pa icipa ion, he e a e op-
ponen s, who iew PPPs as p i a isa ion,
and p i a isa ion as he co po a e ake-
o e o he public sphe e and he dea h-
knell o democ acy. This a i ude equally
lumps a a ie y o pa ne ship s uc u es
in o he same ca ego y and can c ea e a
go e nmen ega ding ing encing could
be u he explo ed, as inancing om
he go e nmen o subsidize FSM will al-
mos ce ainly be necessa y. The e is one
go e nmen paymen sys em, does mon-
ey ha is collec ed by DAWASA go in o he
same accoun as he uni e si y, o do hey
ha e sepa a e accoun s based on hei
con ol numbe . How do we ensu e he
public and p i a e pa ne s ecei e he
money om se ice p o ision?
8.5 Conclusion
“The p i a e sec o has much o o e , and
in many o ms. To ackle he immense
challenges acing he u ban wa e sec o in
de eloping coun ies, policy make s need
all he help hey can ge . I migh jus be
ime o a b oade concep o pa ne ship,
one ha includes all and excludes none”
(Ma in, 2009).
So a , he ole o he p i a e sec o in
FSM se ice p o ision has been o mee
demand ha is no being me by he pub-
lic sec o – bu i is a om b idging he
gap. Human and en i onmen al heal h,
in he o m o wa e bo ne diseases like
chole a, and en i onmen al h ea s like
eu ophica ion a e he consequences o
his ailu e o p ope ly ea FS. Tap wa-
e ha mus be boiled, and plas ic bo les
illing land ills – women walking long dis-
ances o e ch clean wa e and gi ls d op-
ping ou o school. And as ci ies con inue
o ill, he p oblem is only ge ing wo se.
Pa one o his hesis discussed his
gap in FSM and i PPPs we e a sui able
ins umen o b idging i . The li e a u e
is mixed on PPPs, and while his esea ch
ound ha hey a e unsui able o small-
scale FSM, PPPs su ely ha e hei uses in
con ex s wi h a s ong enabling en i on-
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
93
1. Capaci y building o inancial plan-
ning and a ac ing loans
2. Da a keeping and collec ion is nec-
essa y o businesses o g ow
3. Ve ical in eg a ion be ween mul-
iple s eps o he se ice chain has
clea ad an ages
4. P o i abili y equi es a minimum
scale
5. Regula ion and en o cemen o
s anda ds and KPIs is necessa y o
p o ec he in e es s o all s ake-
holde s
Finally, due o he unsui abili y o PPPs
o b idge his gap in se ice p o ision, I
p oposed an open pa ne ship s uc u e
ha is mo e sui able o he wide ange
o ac o s in ol ed in se ice p o ision.
Open Pa ne ships a e communi y-led,
lexible, less complex and open o all ac-
o s ac oss he sani a ion se ice chain in
o de o mee he g owing needs o quick-
ly g owing ci ies like Da es Salaam.
I is clea ha lis ing wha is needed
o sus ainable FSM is no enough, and
ha pu ing hese p o isions in o place
is whe e he ha d wo k lies. A i s s ep
owa d his p ocess, howe e , is simply
engaging wi h he p i a e sec o , bo h
o mal and in o mal, ha a e al eady in-
ol ed in FSM se ice p o ision and in-
s ead o compe ing wi h hem and limi -
ing hei in ol emen wi h unnecessa y
legal hu dles, gi ing hem space and op-
po uni ies o build hei businesses, p o-
ide jobs and weal h, and se e hei own
communi ies. As Julius Nye e e pu i ,
“I eal de elopmen is o ake place, he
people ha e o be in ol ed.” The people,
i seems, a e he missing ‘P’ in public-p i-
a e pa ne ships.
nega i e public a i ude owa d p i a e
pa icipa ion which is coun e p oduc i e
o sol ing p oblems ha can’ be sol ed by
he public sec o alone. Wi hou commu-
ni y suppo , p omising p ojec s can ail.
The hi d e ec due o a lack o a clea
de ini ion, is ha i is inc easingly di i-
cul o compa e hei e icacy. How can
one compa e a $500 million hyd opowe
p ojec wi h a small-scale FSTP ha cos
a ound $50,000? This inabili y o anal-
yse hei e icacy is ce ainly e ec i e in
keeping schola s busy ca ego ising hem,
bu i muddies he wa e s o sensible pub-
lic policy.
This akes us o pa wo o his hesis,
which analysed he PPP eadiness o Tan-
zania, wi h a speci ic look a Da es Sa-
laam. The indings om he analysis we e
ha he e is a low eadiness o PPPs due
o se e al easons:
1. Lack o knowledge and capaci y
conce ning PPPs
2. Lack o inancial ma ke s
3. P esence o co up ion and a lack
o anspa ency in many s ages o
he PPP p ocess (bidding, p ocu e-
men , nego ia ions, con ac ual ob-
liga ions, echnology)
4. P ocedu al hea y PPP p ocess ha
discou ages p i a e-sec o pa ici-
pa ion (especially small-scale)
5. Unce ain legal and egula o y en i-
onmen
A e looking a he PPP eadiness, I
ook a close look a h ee case s udies
o PSP in he FSM se ice chain – emp y-
ing, anspo and ea men (and euse
po en ial). The gap analysis o hese PSPs
iden i ied se e al a eas ha need a en-
ion in o de o scale-up se ices o ully
b idge ha gap in se ice p o ision in Da
es Salaam. These included:
J. Young
94
Re e ences
Adnyana, I. B. P., Anwa , N., Soemi o, R. A., & U omo, C. (2015). C i ical Success Fac o s o Public-P i-
a e-Communi y Pa ne ship in Bali Tou ism In as uc u e De elopmen . Jou nal o Sus ainable De el-
opmen , 8(6). h ps://doi.o g/10.5539/jsd. 8n6p208
A ican Minis e s' Council on Wa e (2021a). A ican Sani a ion Policy Guidelines.
A ican Minis e s' Council on Wa e (2021b). A ican Sani a ion Policy Guidelines: Media B ie .
Ag awal, N., Ahmed, Z., Me ed, M., & No d, R. (1993). S uc u al adjus men , Economic Pe o mance,
and Aid Dependency in Tanzania.
Ameyaw, E. E., & Chan, A. P. (2016). C i ical success ac o s o public-p i a e pa ne ship in wa e
supply p ojec s. Facili ies, 34(3/4), 124–160. h ps://doi.o g/10.1108/F-04-2014-0034
Amo ić, G., Maksimo ić, R., & Bunčić, S. (2020). C i ical Success Fac o s o Sus ainable Public-P i a e
Pa ne ship (PPP) in T ansi ion Condi ions: An Empi ical S udy in Bosnia and He zego ina. Sus ainabili-
y, 12(17), 7121. h ps://doi.o g/10.3390/su12177121
Annam aju, S., Calguas, B., & Gu ie ez, E. (2001). Financing wa e and sani a ion: Key issues in in-
c easing esou ces o he sec o .
Ansa , A., Fly bje g, B., Budzie , A., & Lunn, D. (2016). Does in as uc u e in es men lead o econom-
ic g ow h o economic agili y? E idence om China. Ox o d Re iew o Economic Policy, 32(3), 360–390.
h ps://doi.o g/10.1093/ox ep/g w022
A ns ein, S. R. (1969). A Ladde O Ci izen Pa icipa ion. Jou nal o he Ame ican Ins i u e o Planne s,
35(4), 216–224. h ps://doi.o g/10.1080/01944366908977225
Baba unde, S. O., Opawole, A., & Emmanuel Akinsiku, O. (2012). C i ical success ac o s in public-
p i a e pa ne ship (PPP) on in as uc u e deli e y in Nige ia. Jou nal o Facili ies Managemen , 10(3),
212–225. h ps://doi.o g/10.1108/14725961211246018
Bengesi, K. M. K. (2016). Resea ch Repo on Assessmen o Public P i a e Pa ne ship (PPP) in T ans-
po a ion In as uc u e in Tanzania: The Way PPP is Unde s ood, Challenges and he Way Fo wa d.
h ps://doi.o g/10.13140/RG.2.2.25032.72960
Be elsmann S i ung (2020). Be elsmann S i ung's T ans o ma ion Index (BTI) 2020.
Bha , N., Vashish a, A., Baska an, C., & Na in, C. (2011). Landscape Analysis and Business Model As-
sessmen in Fecal Sludge Ex ac ion and T anspo a ion Models in India.
Blacke , I., & Hawkins, P. (2017). FSM Inno a ion: Case S udies on he Business, Policy and Technology
o Faecal Sludge Managemen .
Boa dman, A. E., Siemia ycki, M., & Vining, A. R. (2016). The Theo y and E idence Conce ning Pub-
lic-P i a e Pa ne ships in Canada and Elsewhe e, 9(12).
BORDA (2017). DEWATS implemen a ion by BORDA.
B andes, K., Schoebi z, L., Kimwaga, R., & S ande, L. (2015). SFD Da es Salaam, Tanzania, 2015.
B emen O e seas Resea ch and De elopmen Agency (2018). De ailed Re iew o Faecal Sludge Man-
agemen (FSM) In e en ions in Da es Salaam: Technologies, successes, challenges and oppo uni ies
based on case-s udies and lessons lea n du ing implemen a ion o ou FSM pilo p ojec s.
B inke ho , D. W., & B inke ho , J. M. (2011). Public-p i a e pa ne ships: Pe spec i es on pu pos-
es, publicness, and good go e nance. Public Adminis a ion and De elopmen , 31(1), 2–14. h ps://doi.
o g/10.1002/pad.584
B on enb enne , U. (1977). Towa d an expe imen al ecology o human de elopmen . Ame ican Psy-
chologis , 32(7), 513–531. h ps://doi.o g/10.1037/0003-066X.32.7.513
Bu ge , P., & Hawkeswo h, I. (2011). How o A ain Value o Money: Compa ing PPP and T adi ional
In as uc u e Public P ocu emen .
Campbell, J. (2020). Maga uli is T ans o ming Tanzania's Ruling Pa y F om a "Benign Hegemon" In o
a Male olen One. Council on Fo eign Rela ions. h ps://www.c .o g/blog/magu uli- ans o ming- anza-
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
95
nias- uling-pa y-benign-hegemon-male olen -one
CETA/KAS (2018). Economic O de in Tanzania: P inciples, Oppo uni ies and Challenges o Social
Ma ke Economy.
Chan, A. P. C., Lam, P. T. I., Chan, D. W. M., Cheung, E., & Ke, Y. (2010). C i ical Success Fac o s o PPPs
in In as uc u e De elopmen s: Chinese Pe spec i e. Jou nal o Cons uc ion Enginee ing and Manage-
men , 136(5), 484–494. h ps://doi.o g/10.1061/(ASCE)CO.1943-7862.0000152
Chao, J. (2016). How a e PPPs eall inanced? Wo ld Bank. h ps://blogs.wo ldbank.o g/ppps/how-a e-
ppps- eally- inanced
Chileshe, N., & Ka ishe, N. (2020). Readiness assessmen o public–p i a e pa ne ships (PPPs) adop-
ion in de eloping coun ies: he case o Tanzania. Buil En i onmen P ojec and Asse Managemen ,
11(1), 71–87. h ps://doi.o g/10.1108/BEPAM-12-2019-0133
Chileshe, N., Njau, C. W., Kibichii, B. K., Macha ia, L. N., & Ka ishe, N. (2020). C i ical success ac o s
o Public-P i a e Pa ne ship (PPP) in as uc u e and housing p ojec s in Kenya. In e na ional Jou nal
o Cons uc ion Managemen , 1–12. h ps://doi.o g/10.1080/15623599.2020.1736835
Clima e-da a.o g. (n.d.). Da es Salaam Clima e (Tanzania). h ps://en.clima e-da a.o g/a ica/ anzania/
da -es-salaam/da -es-salaam-518/
Debela, G. Y. (2019). C i ical success ac o s (CSFs) o public–p i a e pa ne ship (PPP) oad p ojec s in
E hiopia. In e na ional Jou nal o Cons uc ion Managemen , 1–12. h ps://doi.o g/10.1080/15623599.201
9.1634667
UN DESA (2015). Addis Ababa Ac ion Agenda o he Thi d In e na ional Con e ence on Financing o
De elopmen .
UN DESA. (2018). 68% o he wo ld popula ion p ojec ed o li e in u ban a eas by 2050, says UN. UN
DESA. h ps://www.un.o g/de elopmen /desa/en/news/popula ion/2018- e ision-o -wo ld-u baniza-
ion-p ospec s.h ml
UN DESA. (2019). Wo ld Popula ion P ospec s 2019. h ps://popula ion.un.o g/wpp/
Desg ees Lou, A. (2012). Value o Money e alua ion in PPPs: di icul ies and de elopmen s. KTH, De-
pa men o U ban Planning and En i onmen , S ockholm.
Dodane, P.-H., Mbégué é, M., Sow, O., & S ande, L. (2012). Capi al and ope a ing cos s o ull-scale
ecal sludge managemen and was ewa e ea men sys ems in Daka , Senegal. En i onmen al Science &
Technology, 46(7), 3705–3711. h ps://doi.o g/10.1021/es2045234
Dulaimi, M. F., Alhashemi, M., Ling, F. Y. Y., & Kuma aswamy, M. (2010). The execu ion o public–p i-
a e pa ne ship p ojec s in he UAE. Cons uc ion Managemen and Economics, 28(4), 393–402. h ps://
doi.o g/10.1080/01446191003702492
Du a, S., Lan in, B., & Wunsch-Vincen , S. (Eds.). (2020). Global Inno a ion Index: Who Will Finance
Inno a ion?
The Economis In elligence Uni (2015). E alua ing he en i onmen o public-p i a e pa ne ships in
A ica: The 2015 In ascope.
Edwa ds, S. (2014). Toxic Aid: Economic Collapse and Reco e y in Tanzania.
Ens, K. (2019). Public-P i a e Pa ne ship Funding h ough O icial De elopmen Assis ance: E alua -
ing E iciency in he case o Ky gyzs an.
Es ache, A., & Philippe, C. (2012). The Impac o P i a e Pa icipa ion in In as uc u e in de eloping
coun ies: Taking s ock o abou 20 yea s o expe ience.
EWURA (2020). GUIDELINES FOR ONSITE SANITATION AND FAECAL SLUDGE MANAGEMENT FOR
WATER AND SANITATION AUTHORITIES.
Fa lam, P. (2005). Public-P i a e Pa ne ships in A ica.
Fe back, T., Edahoo , A., & Schmid , A. (Eds.) (2021). How can we ensu e ha he sludge eaches he
J. Young
102
Appendix B - In e iew Summa ies
Ca oline Chema E ic Pe sonal In e iew - Summa y Repo
Da e: 27.01.2021
Time: 1 h . 15 min.
Place: Online ia Zoom
Ca oline Chema E ic is a PPP ope a ions o ice a he Wo ld Bank, who, in collabo-
a ion wi h GIZ and Rebelg oup In e na ional in 2017, pe o med a gap analysis epo
on he PPP legisla ion in Tanzania. The epo , i led F amewo k Gap Analysis Repo
and Recommenda ions was a key esou ce in my esea ch. Ms. E ic ag eed o hold a
semi-s uc u ed in e iew wi h Tim Fe back and I on he 27 h o Janua y, 2021.
Exce p s and key poin s:
• Minis y o Finance and he PPP Cen e a e he cus odians o all PPPs, ega dless
o wha sec o
• To s a a PPP, mus be app o ed by Dawasa, hen app o ed by MOWI, hen sen
o he PPP Cen e
• “You see how i is p ocedu ally hea y. And ano he p oblem ha we see, is ha
he e is no ma ying o echnical (wa e ) and echnical (PPPs) so you ind you
ha e people si ing a Dawasa wi h knowledge o PPP, and no people a MOW wi h
knowledge o sani a ion.”
• “Now o e e y p ojec he e is a p ojec managemen commi ee, whe eby he e
will be eps om bo h con ac ing au ho i y (DAWASA), MOW and PPP Cen e, ha
join commi ee is mean o in o m each o he o he echnical aspec s o he wa e
sec o and PPPs.”
• “All hese decen alized sys ems de eloped in he pe iphe als o Da es Salaam,
ha a e no connec ed o he main sys em.”
• “A d i e o p i a e sec o pa icipa ion would be, hey need suppo o hese
new echnologies, which a e mo e sus ainable and scalable. Ano he d i e is he
inancing side. These decen alized sys ems a e e icien bu hey don’ ha e bud-
ge s. These a e he wo main d i e s.”
• “DAWASA p e e s DBT and would p e e ha ope a ions a e done by he wa e
u ili y and no by a p i a e company” and doesn' like p i a e ope a o s due o pas
expe iences wi h Ci y Wa e and la e DAWASCO.
• Ano he challenge ha you see in pa icula in he wa e sec o , i is di icul o
b ing in an in e na ional in es o , especially o hese small scale communi y
based p ojec s. So we need o wo k ou a mechanism o p epa ing hese p ojec s,
5-10 yea s is jus oo sho a ime o a company o ge all he in o ma ion and ex-
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
103
pe ise o managing hese DEWATS.
• Can we s anda dize se ice ag eemen s? So we always ge he same p ocess-
es, clauses, same p o isions. The e is po en ial and MoW is looking o models
ha a e mo e sus ainable, en i onmen ally iendly, and can inc ease access o
planned and unplanned se lemen s.
• IGA - cen alized go e nmen paymen sys em
• All he money goes in o one go e nmen accoun , wi h pe haps sub accoun s o
di e en depa men s. Li le ing encing o ea ma king o unds.
• Can hey ensu e ha he money om a PPP goes back o i ?
• How gua an eed is he p i a e ope a o ha he will ge he money back?
• “A he momen his money si s in one po , and he go e nmen is a libe y o in-
es in educa ion, o you know. I is di icul o ing ence, so ing encing is key o
a ac inancing.”
• This a ec s all SOEs
• “The e is s ill hope, hey a e ying o open an accoun wi hin he accoun s o he
easu y, o be o he whole u al sec o . I his goes h ough, we ha e disco e ed
an ins i u ional a angemen o inancial a angemen s o PPPs. So we will y o
pilo his and see how i goes.”
• “To hem, se ice p o ision is abou collec ing e enue, hey don’ wan he p i-
a e sec o o ge ich on public p ojec s, so le ’s see how i goes. They need o ge
on one o wo PPP p ojec s o in ol emen wi h he p i a e sec o o see o su e
i hey s ill wan o ope a e.”
Appendix B - In e iew Summa ies con .
J. Young
104
Appendix B - In e iew Summa ies con .
Eng. Romanus A. Mwang’ingo and Eng. Mu aekulwa Mu egeki Pe sonal In e iew -
Summa y Repo
Da e: 16.03.2021
Time: 1 h . 3 min.
Place: Online ia Zoom
Eng. Mwang’ingo was he ac ing CEO o DAWASA un il 2018, and cu en ly se es as
a consul an and ad iso . Toge he wi h Eng. Mu egeki, hey w o e he Guidelines o
Onsi e Sani a ion and Faecal Sludge Managemen o Wa e and Sani a ion Au ho i ies,
2020. This publica ion is he la es s ep in p o iding guidance o he in eg a ion and
egula ion o he p i a e sec o in FSM.
Exce p s and key poin s:
• Mu egeki: “We don’ ha e a s uc u ed PPP o sani a ion in Tanzania, which is
s uc u ed acco ding o he PPP guideline as gi en by he minis y. The e a e some
PPP in e en ions which a e somehow managed, bu we didn’ go a in o how
hese people a e wo king.”
• “They seem o be e y complex, ha is why EWURA is p epa ing one speci ically
o u ili ies o wa e supply and sani a ion. Bu ye , o implemen i no one has
ied, because he p ocedu es - concep no e, p e easibili y, easibili y, app o ed,
hen MoW and easu y - so p ocedu es seem o be leng hy and cumbe some, so
hey a e eluc an o pu sue”
• Rega ding Toangoma FSTP:
• “The PPP model which hey op ed o , I hink i wo ked, because when we in e -
iewed he ope a o , she said he p ojec is p o i able, and he e is demand. Bu
wha happened in ha scheme, DAWASA p o ided he asse s, he ope a o p o id-
ed he land. DAWASA is no eco e ing any cos s. The ope a o was complaining
no enough capaci y.”
• Financing - Romanus was o p ope y ax collec ed h ough LGAs, “We need also
o see how hey manage hese unds. Some imes he e is expe ience o misapp o-
p ia ion o misuse o hese unds. You migh ind he unds a e collec ed bu hey
a e used o o he se ices wi hin he LGAs.
• Mu egeki is in a ou o a sani a ion le y - bo h a e op imis ic ha i is easible and
has ad an ages.
• Only abou 50% o DAR a e connec ed o wa e supply (800,000 p ope ies and
400,000 connec ions) so i migh no be e y ai .
• Da a: NSMIS - LGA o WASH, mo e ocused on supe s uc u e, no con ainmen ,
annual Audi epo s should be a ailable, bu no including much da a, mos /all
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
105
o he da a collec ion is no ye implemen ed o FSM.
• Scheduled emp ying is app ecia ed o p o iding a consis en e enue s eam o
se ice ope a o s.
• DAWASA mainly keeps eco d o dumping ees, because whoe e wan s o dump
in ponds has o pay. So his in o ma ion is a ailable, bu he de ails on he ucks,
hey ha e jus s a ed. They jus p ocu ed hem las yea . All he ponds also ecei e
sewage om he ne wo k, so i ’s ha d o sepa a e FSM.
• How bes o in eg a e he p i a e sec o ?
• Romanus - “The in es men cos is on he high side, so p i a e sec o is no keen
o in es in his because hey can’ se hei own a i o eco e cos . So you see
mos o he ime he in es men is done by he go e nmen … In Da es Salaam you
canno ha e di e en a i s o di e en pa o he ci ies, so his is a challenge.
Fo ope a ions his migh be possible because in es men s a e no oo much and
hey can eco e cos s.
• “No p i a e ope a o has a b and new uck, new ucks a e qui e expensi e. As
o now he a es o emp ying a e no egula ed, especially he emp ying. so he
people wi h cheap ucks, hey can o e a low a e, so i you ha e p i a e ucks
you need o compe e. This a challenge. The in es men cos is less, so hey can
su i e.”
• Mu ugeki - in oduc ion o sani a ion le y. I hey can in oduce his in Da es Sa-
laam and scheduled emp ying, his would ensu e income o he u ili y and hey
can as well pay he p i a e sec o . Then hey don’ ha e o wo y i acili y ge s ull
o ank is o e lowing. I hink his could wo k o Da es Salaam i EWURA could
in oduce he sani a ion le y. The plan o EWURA is o ing ence ha le y, and
used jus o sani a ion, because sani a ion has been neglec ed and people would
like o see imp o emen .
• The le y Mu egeki p omo es would be one bill o he wa e supply and sani a ion.
Fo hose no connec ed o he wa e supply, le y‘s would be collec ed a wa e
kiosks (indi ec ly also o e he wa e bill, as he wa e kiosk pays o he wa e
supply)
• Zambia is an example which can be ollowed. Ring - encing o unds om le y
is possible, and accep able, as sani a ion has been a much neglec ed sec o and
needs mo e a en ion.
• “Make i one bill, hese hings belong oge he , ha is he way we can ake his
o wa d.”
• Household Income Su ey could be used o es ima e cos o le y - a ound 5-6 pe -
cen
Appendix B - In e iew Summa ies con .
J. Young
106
Appendix B - In e iew Summa ies con .
Pe e Hawkins In e iew Summa y Repo
Da e: 21.05.2021
Time: 1 h . 3 min.
Loca ion: Online Via Zoom
Pe e Hawkins is pa o he Wo ld Bank’s global u ban sani a ion eam, speci ically
ocusing on p ojec suppo in A ica. He has wo ked in Mozambique, Tanzania, Ghana
and a ious La in Ame ican coun ies, S i Lanka and Indonesia. F om 2007 o 2016, he
headed he WSP eam in Mozambique, and he is cu en ly se ing in a global consul an
ole o he Wo ld Bank and o he o ganiza ions, based in he UK. He has w i en many
a icles and books on FSM and sani a ion, including FSM Inno a ion Case S udies - Case
S udies on he Business, Policy and Technology o Faecal Sludge Managemen (second
edi ion).
Exce p s and key poin s:
• “O e he yea s he u ban de elopmen has made hings much wo se. Whe e you
could once each places wi h acuum ucks, ha ’s no longe he case.”
• “The p i a e sec o is making a p o i , ha ’s why hey’ e he e, bu i ’s no a e y
luc a i e business. You don’ see oo many uck ope a o s d i ing a ound in ancy
ca s.”
• DAWASA is ge ing hei own ucks and now compe ing wi h he p i a e sec o .
• “Scheduled emp ying model has a lo going o i . Bu i ’s challenging. You ge o
he house and no one’s he e. The whole hing has o be eliable and well o ga-
nized. The idea o paying a egula ee, especially o poo people, is a ac i e.
Paying a ew dolla s a mon h is mo e easible o hem. I ’s a blun ool, bu i ’s less
wo se han he o he ones.”
• “Sou h A ica is in e es ing because i ’s abou he only coun y in A ica whe e
he go e nmen has he commi men o p o ide ee basic se ices o e e ybody,
whe e in some ways hey leas need he p i a e sec o .”
• “I ’s no so much i PPPs a e sui able, bu wha kind o PPP is sui able. I ’s almos
con en ional wisdom now ha we need he p i a e sec o he e.”
• “We had an inciden in Mozambique whe e hey passed some e y hea y handed
PPP legisla ion, whe e i was basically o deal wi h somebody building hyd opowe
o a majo mine als p ojec , and suddenly i u ned ou ha unde his legisla ion
ha some li le wa e company in a small own se ing a own o 10,000 people
had o hi e a ba e y o lawye s. I was clea ly nonsense, i ac ually caused a lo o
p oblems.”
• Rega ding he size, complexi y and scale o PPP con ac s: “Some hing ha is sui -
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
107
able o 100 million is clea ly no sui able o a guy wi h a couple o gulpe s and a
mo o cycle.”
• “Regula ion is an impo an pa o i . You’ e dealing wi h in o mal businesses o
mic o-en e p ises ha a e jus abou o mal, maybe ha e a business license om
he ci y council, and pa icula ly in he FS business hey’ e no qui e su e wha
is legal o no because o he public heal h legisla ion. I ’s a bi o a mine ield o
hem. A numbe o ope a o s I spoke o a e ac ually qui e in a ou o legisla ion.
They know wha he goalpos s a e, and ha e an en i onmen in which hey a e
willing o in es . We’ e no p epa ed o in es ou money now because we don’
know wha ’s going o be illegal.”
• “You see he same hing in his massi e la ge scale PPP legisla ion. They can be
doing some hing pe ec ly good and innocen and suddenly ind ha i s illegal. So
ha ing clea legisla ion abou wha is supposed o be done and no done is use ul
o bo h sides.”
• I p ope ly managed, egula ion ha is no oo hea y can be a use ul ool in ha
en i onmen .
• Recommended o us o alk o Felix Ngamgosi, he old head o EWURA conce n-
ing egula ion.
• Wo king wi h he local inancial sec o - “They may ha e a pe ec ly iable busi-
ness p oposi ion bu hey don’ know how o go o he bank.. Jus gi ing some
business skills o hese guys, and in o ming he inance people abou wha so o
business his is, looking a app op ia e inancial ins umen s - ways o secu i izing
he business. So ha banks ha e mo e willingness o lend. Pe haps a gua an ee
und ha le e ages he inancial sys em. Then hese small businesses ha e he
means o ge beyond he one uck kind o en e p ise.”
• Men ioned he impo ance o euse - looking a local ma ke s
• “Some imes he e's a lo o oman ic hinking abou euse ha needs o be ho -
oughly examined.”
• Men ioned he impo ance o scalabili y
• Rega ding egula ion - a i se ing: “I i ’s a monopoly si ua ion, a i capping
is o cou se necessa y, bu i you ha e 30-40 di e en businesses, you can ely on
compe i ion o keep he p ices easonable.”
• Whe e should he p i a e sec o be in ol ed? (E&T & T, o jus E&T)
• “I could be ei he way. The e a e echnical ad an ages o combining i . One ad-
an age o ha ing e ically in eg a ed sys ems, hey’ e no going o allow ha
(chemical dumping) o happen.”
• The sensible way o do i is o wo k wi h he se ice p o ide s. They’ e he guys
ha know wha ’s easible and wha isn’ .
• Whe e does he inancing come om? “Sani a ion le y is a good way o wa d.”
• Rega ding he analysis I p esen ed o him. “I seems like you’ e doing a p e y sen-
sible piece o wo k.”
Appendix B - In e iew Summa ies con .
J. Young
108
Appendix B - In e iew Summa ies con .
Kigamboni FSTP si e isi and M . Milinga In e iew Summa y Repo
Da e: 15.02.2021
Time: 12-3 PM
Loca ion: Kigamboni
Took he e y and hopped on a back o a mo o bike axi o ge o he si e. They we e
su p ised o see me by mysel wi hou a BORDA ehicle.
Fac s and Figu es:
• M . Milinga owns he si e and he equipmen . He go a new 60 m3 acuum uck.
Also has wo icycles (3 m3) and a sludge ac o (1m3).
• Se es 40,000 people - said his was he only si e in Kigamboni.
• Cha ges 30,000 o 2 m3, 40,000 o 3m3 - 100,000 o si es ha a e u he away.
• Has a con ac wi h Dawasa who es he e luen e e y h ee mon hs. DAWASA
also ga e him pe mission o s a business in o he ci ies h oughou Tanzania.
• T ained 140 ope a o s las yea - ees a y depending on whe e hey a e om -
300,000-600,000.
• Has six ull- ime employees and 4 pa ime.
• Income: 2.5 million/mon h (890 Eu o) o emp ying business, excluding income
om euse, aining, dona ions e c.
• Cos s: 1.2 million/mon h
• O he income s eams: aining cen e , e ilize and compos , ui and ish, loa -
ing ga den, solid was e managemen , o he ucks dumping he e
• “I ’s a good business. I s a ed wi h he gulpe , ook loans and paid back no p ob-
lem.”
CHALLENGES:
• Pi s ull o mixed and solid was e. Sys em incompa ibili ies wi h he uck o ma-
chines ha a e sen he e and a e unable o emp y pi . Beha io change is neces-
sa y.
• The acili y was buil by esea che s 10 yea s ago, he communica ion and people
included in numbe is oo low o numbe o people ha a e now li ing in he
wa d.
• As a business model - anke is expensi e, bu communi y doesn’ always unde -
s and. Oh is i ull now why don’ you come…
• F ogmen and illegal emp ying
• P oblem wi h unding. No enough capi al in es men s o s a hese businesses
al hough he e is a clea business case o hem.
• Banks a en’ amilia wi h he business model and don’ o e loans.
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
109
CCBRT, Mbu aha i, Kigamboni FSTP si e isi s and Godlo e Ngoda In e iew Sum-
ma y Repo
Da e: 17.02.2021
Time: 08:00 - 2 PM
Loca ion: Da es Salaam
• Fi s si e a he CCBCR Hospi al - The DEWATs was in good condi ion - owned and
ope a ed by he hospi al.
• Cu en ly hey bu n he gas because he cooks don’ like i . No ho enough/comes
om aeces.
• They had a la ge DEWAT and a smalle one ha led o he same ea men pond
and PGF.
• Mbu aha i: DEWATs o DAR, now owned and ope a ed by DAWASA. F eshly pain -
ed, e y clean, no so busy. Se e al gua ds we e si ing a ound, bu no one o op-
e a e he icycle.
• One uck, which was gone.
• Godlo e: ‘Do you hink icycle would be si ing he e i i we e p i a ely ope a ed?
This is subsidized, hey ge paid no ma e wha by he go e nmen .’
• Li le incen i e o ge mo e business.
Challenges acco ding o Godlo e:
• Now we ha e he in as uc u e bu s ill 90% isn’ being ea ed. I mus no be he
unding o he in as uc u e hen.
• Could be he willingness o pay
• Some places a e oo ha d o each
• He belie es beha io change is one o he bigges challenges.
• T ucks don’ illegally dump because o big ine (250$ he es ima ed). En o cemen
o his is widesp ead and d i e s could lose hei license. Jus akes someone ak-
ing a pic u e and sending i in o hem illegally dumping.
• Howe e , some ha d o each places ha e no o he op ion han o illegally emp y
hei sep ic. No one can each hem and hey ha e no money.
• DAWASA didn’ ake new d i e s because o bu eauc acy, no deg ee.
• The e is a lack o expe ience and desi e om plan manage s a DAWASA o wo k
in FSM.
• he e is enough legisla ion, bu en o cing he a e age poo pe son o ogman is
a e. This is whe e a majo i y o he was e low goes.
• on Maga uli: No one’s pe ec , he’s a human being. Bu you see esul s wi h all his
new in as uc u e.
Appendix B - In e iew Summa ies con .
J. Young
110
Appendix B - In e iew Summa ies con .
Toangoma FSTP si e isi and Ms. Mhando In e iew Summa y Repo
Da e: 17.03.2021
Time: 2-4 PM
Loca ion: Toangoma
Founded in 2018 - now a 50/50 pa ne ship wi h DAWASA - spli ing he ea nings om
he dumping ees collec ed. Mwanahama keeps he p o i s om ui s and ege ables,
e ilize and uses he biogas. DAWASA pays o he la ge main enance cos s - such as
cleaning and equipmen b eakage (es ima ed 1 million TZS/Yea ), she pays o mino
hings (500k/yea ).
They ha e a con ac - bu no a o mal PPP. Cu en ly wai ing o a license.
The si e was clean, bu cu en ly ou o commission because o a b oken mixe ? in he
holding ank. Had a big clean a ew mon hs ago wi h desludging, now emp y excep o
wa e .
Specs:
• 20,000 L Holding ank
• 50,000 L Biogas ixed dome
Can ea up o 20,000 L/day, bu be e 10,000 L. So abou 1 anke pe day. (la ge one).
200 50kg bags o e ilize pe yea . Sold a 1k each. 200k p o i . No p ope ly es ed o
pos ea ed. Sludge is sho eled igh in o bag. DAWASA checks quali y o wa e e luen
hough once a mon h, also he bananas.
300k pe mon h income, 150k each o DAWASA and he .
She is sa is ied wi h he pa ne ship, bu would like a bigge holding ank (30,000 L
ank is in discussion wi h DAWASA). She has a lo o demand bu no he capaci y o mee
i o u n a p o i . The FSTP is no p o i able. She is he only employee. Would like o
acqui e oyo uck o ge p ope sludge, and no he mos ly wa e ha he ucks dump
he e. Would like o hi e employees and p o ide wo k and se ice o he communi y.
She is op imis ic o he u u e and belie es his could be a p o i able business. Belie es
educa ion is equi ed o in o m people abou he impo ance o DEWATS. She would like
o also ha e a aining cen e like M . Milinga o supplemen he income and p o ide
mo e jobs.
Bigges challenges:
• no enough capaci y
• oo much wa e in ucks, no enough sludge
• no equipmen ( oyo o emp ying ucks)
• unplanned na u e o neighbo hoods
B idging he Gap? An analysis o PPPs as an ins umen o es ablish sus ainable models o FSM in Da es Salaam
111
Appendix C - PPP p ocu emen and app o al p ocess acco ding o 2020 Regula ions