Citations refer to the original publication, not to a Scieee localized version.
Ortiz Pimiento, N. R., & Diaz-Serna, F. J. (2018). The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review. Journal of Industrial Engineering and Management, 11(1), 116–134. https://doi.org/10.3926/jiem.2492
Ortiz Pimiento, Nestor Raul, and F. Javier Diaz-Serna. “The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review.” Journal of Industrial Engineering and Management, vol. 11, no. 1, 2018, pp. 116–134. https://doi.org/10.3926/jiem.2492.
Ortiz Pimiento, Nestor Raul, and F. Javier Diaz-Serna. “The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review.” Journal of Industrial Engineering and Management 11, no. 1 (2018): 116–134. https://doi.org/10.3926/jiem.2492.
Ortiz Pimiento, N. R. and Diaz-Serna, F. J. (2018) ‘The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review’, Journal of Industrial Engineering and Management, 11(1), pp. 116–134. Available at: https://doi.org/10.3926/jiem.2492.
N. R. Ortiz Pimiento and F. J. Diaz-Serna, “The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review,” Journal of Industrial Engineering and Management, vol. 11, no. 1, pp. 116–134, 2018, doi: 10.3926/jiem.2492.
@article{ortizpimiento2018project,
author = {Ortiz Pimiento, Nestor Raul and Diaz-Serna, F. Javier},
title = {The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review},
journal = {Journal of Industrial Engineering and Management},
year = {2018},
volume = {11},
number = {1},
pages = {116--134},
publisher = {OmniaScience},
doi = {10.3926/jiem.2492},
url = {https://doi.org/10.3926/jiem.2492}
}