scieee Science in your language
[en] (orig)

Meta-analysis of performance: summarizing research for Implementation of reconfigurability

Abstract

The aim of this study is to identify the conditions of implementation for reconfigurability in summarizing past flexible manufacturing systems (FMS) research by drawing overall conclusions from many separate High Performance Manufacturing (HPM) studies. Meta-analysis will be applied to links between HPM programs and their practices related to FMS and manufacturing performance with particular reference to responsiveness performance. More specifically, an application of meta-analysis will be made with reference to two of the main steps towards the development of an empirically-tested theory: testing the adequacy of the measurement of variables and testing the linkages between the variables.

Read accessible full text

Meta-analysis of performance: summarizing research for Implementation of reconfigurability

Author: Ortega Jiménez, César Humberto; Eguía Salinas, Ignacio; Garrido-Vega, Pedro; Machuca, José A.D.
Publisher: World Academy of Science, Engineering and Technology (WASET)
Year: 2012
Source: https://idus.us.es/bitstreams/453f2e76-d918-4c5e-b0ee-04f751ace2bb/download
Abs ac —The aim o his s udy is o iden i y he condi ions o
implemen a ion o econ igu abili y in summa izing pas lexible
manu ac u ing sys ems (FMS) esea ch by d awing o e all
conclusions om many sepa a e High Pe o mance Manu ac u ing
(HPM) s udies. Me a-analysis will be applied o links be ween HPM
p og ams and hei p ac ices ela ed o FMS and manu ac u ing
pe o mance wi h pa icula e e ence o esponsi eness pe o mance.
Mo e speci ically, an applica ion o me a-analysis will be made wi h
e e ence o wo o he main s eps owa ds he de elopmen o an
empi ically- es ed heo y: es ing he adequacy o he measu emen o
a iables and es ing he linkages be ween he a iables.
Keywo ds—FMS ( lexible manu ac u ing sys em), HPM (high
pe o mance manu ac u ing), econ igu abili y, RMS ( econ igu able
manu ac u ing sys em), esponsi eness
I. INTRODUCTION
PERATIONS MANAGEMENT (OM) li e a u e has
somehow es ablished ha inc easing global compe i ion
has made he indus y u n i s a en ion o c i ical issues such
as compe i i eness, p oduc i i y, quali y, e c. Hence,
manu ac u e s seek new app oaches o manu ac u ing
p ocesses, and explo e new bounda ies o echnology.
The e o e, plan s a e looking o ways o espond quickly o
changes induced by new egula ions and ma ke . As a esul ,
lexibili y has become an impo an ool in his s uggle o
success, i.e. abili y o mee an inc easing a ie y o cus ome
expec a ions wi hou excessi e cos s, ime, o o ganiza ional
dis up ions, by inc easing he ange o p oduc s a ailable,
imp o ing a i m’s abili y o espond quickly, and achie ing
good pe o mance o e a wide ange o p oduc s. F om his
pe spec i e, one o he equen ly p esc ibed emedies o he
p oblem o dec eased p oduc i i y and declining quali y is he
au oma ion o ac o ies. Mo e speci ically, echnologies such
as Compu e In eg a ed Manu ac u ing Sys ems (CIM’s),
obo ics and Flexible Manu ac u ing Sys ems (FMSs) ha e
been he ocal poin s o much esea ch and explo a ion.
Besides, he a emp o inc ease compe i i eness, h ough
he sea ch and explo a ion o he bes solu ions in o de o
accomplish be e manu ac u ing ope a ions, seems ne e
ending. Al oge he , many imes hese solu ions c ea e new
p ac ices o ini ia i es in ope a ions as gene al endencies
wi hin manu ac u ing plan s.
C. H. O ega is wi h Uni e sidad Nacional Au onoma de Hondu as
(UNAH), Tegucigalpa, Hondu as (phone: 504-22391849; ax: 504-22391849;
e-mail: co ega@ iies-unah.o g).
I. Eguia is wi h Uni e sidad de Se illa (US), Se illa, Spain (e-mail:
[email p o ec ed]).
P. Ga ido is wi h US, Se illa, Spain (e-mail: [email p o ec ed]).
J. D. Machuca is wi h US, Se illa, Spain (e-mail: [email protected]).
This pe manen esea ch, o ge be e and be e
manu ac u ing pe o mances, con inues, and p omises o
con inue d awing mul i ude o p o essionals, manage s and
academics wo ldwide, no only om OM, bu also om he
whole communi y o business adminis a ion, economics and
enginee ing in gene al.
Thus, global ends by manu ac u ing plan s a e o employ
inc easingly lexible manu ac u ing p ac ices. This end is
d i en by he hypo hesis ha hei u iliza ion will esul in
imp o emen s in some measu es o pe o mance such as
highe esponsi eness. Un o una ely, FMS in es men s do no
yield he desi ed esul s as explained nex .
Empi ical s udies show, on he one hand, ha FMS is no
li ing up o i s ull po en ial, and, on he o he , ha e en some
manu ac u e s many ha e pu chased FMS wi h excess capaci y
and ea u es. Besides, he e a e a a ie y o p oblems
associa ed wi h FMS such as aining, econ igu abili y,
eliabili y and main enance, so wa e and communica ions, and
ini ial cos [1]. Pa adoxically, he main disad an age wi h
FMS is i s in lexibili y. I s quali y is o en called “sho - e m”
lexibili y in he li e a u e. The abili y o change he sys em o
p oduce new p oduc s is "long- e m" lexibili y.
This pape akes on he " econ igu abili y" p oblem o FMS.
Recon igu abili y p o ides exac ly he unc ionali y and
capaci y needed, exac ly when needed, pe mi ing educ ion o
lead ime o launching new sys ems and econ igu ing
exis ing sys ems, and he apid modi ica ion and quick
in eg a ion o new echnology and/o new unc ions in o
exis ing sys ems. A Recon igu able Manu ac u ing Sys em
(RMS) is simply one way ha manu ac u e s may achie e
econ igu abili y.
The e a e no p oposed and es ed RMS models in OM, since
i is a he inal p o o ype s age o Use Expe ience [2]. On he
o he hand, many esea che s ha e p oposed and es ed FMS
models, bu all o hem a e isola ed ep esen a ions a he han
cumula i e s udies ha sys ema ically build upon each o he
o econ igu abili y deploymen . This me a-analy ic e iew o
FMS esea ch is simply a i s , bu necessa y s ep in he
p ocess o de eloping a heo y o he nea u u e RMS
deploymen .
F om some o exis ing manu ac u ing p og ams, his pape
explo es s age se in o econ igu abili y om he High
Pe o mance Manu ac u ing (HPM) li e a u e (i.e. i is an
in eg a ed se o p ocesses designed o achie e a sus ainable
global compe i i e ad an age h ough he con inuous
imp o emen o manu ac u ing capabili y) o globally examine
p esen non- econ igu able condi ions o p ac ice linkages [3],
[4]. The s a ing poin o his is he concep ualiza ion i sel o
Cesa H. O ega Jimenez, Ignacio Eguia Salinas, Ped o Ga ido Vega and Jose A. Dominguez
Me a-analysis o Pe o mance: Summa izing
Resea ch o Implemen a ion o
O
Recon igu abili y
Machuca
Wo ld Academy o Science, Enginee ing and Technology
In e na ional Jou nal o Economics and Managemen Enginee ing
Vol:6, No:6, 2012
1124In e na ional Schola ly and Scien i ic Resea ch & Inno a ion 6(6) 2012 schola .wase .o g/1307-6892/11941
In e na ional Science Index, Economics and Managemen Enginee ing Vol:6, No:6, 2012 wase .o g/Publica ion/11941
RMS ha e olu ionizes o a leas e ol es om FMS,
imp o ing mul idimensional pe o mance [5], and, hus, RMS
is s udied as pa o HPM. Thus, his pape e iews se e al
s udies ha ha e been p esen ed in majo ope a ions
managemen and o he c oss-disciplina y jou nals.
Cumula i ely hey ep esen he cu en iewpoin s in he
academic a ena on FMS’s ole wi hin he plan s, as a p e ious
s ep o RMS.
Hence, a gene al amewo k o unde s anding he u u e
ole o RMS is p esen ed. I akes in o accoun he ac ha
p esen FMS in e ela es o many o he HPM p og ams such
as jus in ime (JIT), o al quali y managemen (TQM), human
esou ces (HR), manu ac u ing s a egy (MS) and echnology
(T).
Based on he abo e, he ollowing esea ch ques ions a e
p esen ed: a e he e manu ac u ing compe i i e pe o mance
dimensions o e ed by econ igu abili y being cu en ly sough
by cu en non- econ igu able plan s? A e he e o he
echnology p ac ices linked o FMS? A e he e HPM p og ams
linked o FMS? A e he e non- econ igu able echnology
p ac ices ela ed o econ igu able pe o mance dimensions?
To answe hem, he pape ’s objec i es will hen be o e iew
se e al s udies indi idually, o p esen he pe inen pa ame e s
o he esea ch, o e iew exis ing esea ch ac oss hese
pa ame e s in o de o e alua e i s comp ehensi eness as a
whole, o explo e gained insigh s by ela ing pe o mance
dimensions and manu ac u ing p ac ices ha mo i a e need o
u he wo k, and o p esen models o u he esea ch.
II. L
ITERATURE
R
EVIEW
Plan managemen should be e y amilia wi h being
ecommended o adop each and e e y manu ac u ing ini ia i e
appea ing as a end such as lean, manu ac u ing s a egy, e c.
This wo k, on he con a y, ma ks away om such idea, by
associa ing o he company he concep whose ocus is linking
only he manu ac u ing sys em (wi h o wi hou adap a ions)
which join ly achie es a compe i i e o ganiza ion. Bu be o e
such linkage be ween p ac ices, he e mus be a s a egic plan
o con ingency based in he pa icula con ex o he company,
in o de o selec , adap (when needed) and implemen
p ac ices, o he e o s o design will no ha e he desi ed
e ec (a mo e success ul business). This p ocess o
con ingence and linkage mus be uni ed wi h a delibe a ed pa h
o con inuous imp o emen . This app oach, called High
Pe o mance Manu ac u ing (HPM) [3], will subsequen ly be
used o s udy cu en non- econ igu able condi ions se in
s age o u u e RMS implemen a ion.
Thus, he inc emen o wo ld compe i ion and he
assessmen ha managemen app oaches anscend na ional
on ie s ha e c ea ed he mo emen o he in e na ional da a
base p ojec High Pe o mance Manu ac u ing (HPM) in
business and academic ci cles. This mo emen has e ealed a
necessi y o highe in eg a ion o manu ac u ing p ocess,
human esou ces managemen and o ganiza ion cha ac e is ics
o achie e he objec i es o wo ld compe i i eness by means
o highe manu ac u ing managemen . The s age o FMS:
u u e RMS implemen a ion
The sea ch o de elop he echnology o Recon igu able
Manu ac u ing Sys em (RMS) s a ed in he mid-nine ies as a
cos -e ec i e esponse o ma ke demands o esponsi eness
and cus omiza ion. Acco ding o [5], RMS is being designed
o apid change in s uc u e, including bo h ha dwa e and
so wa e componen s, in o de o quickly adjus p oduc ion
capaci y and unc ionali y, wi hin a pa amily, in esponse o
sudden changes in ma ke . Ko en and his colleagues assess
ha o a manu ac u ing sys em o be eadily econ igu able, i
mus possess ce ain key cha ac e is ics which includes: i)
modula i y o componen design, ii) in eg abili y o bo h
eady in eg a ion and u u e in oduc ion o new echnology,
iii) con e ibili y o allow quick changeo e be ween p oduc s
and quick sys em adap abili y o u u e p oduc s, i )
diagnosabili y o iden i y quickly he sou ces o quali y and
eliabili y p oblems, ) cus omiza ion o ma ch designed
sys em capabili y and lexibili y o applica ions, and i)
scalabili y o inc emen ally change capaci y apidly and
economically.
Howe e , cau ious should be aken when calling RMS he
newes and su es ini ia i e o manu ac u ing echnology o ge
high pe o mance o he nea u u e, e en i i is he subjec o
majo esea ch e o s a ound he wo ld. On he one hand, high
pe o me s (i.e. wo ld class manu ac u e s) ha e been in he
ad ance pa y o he “bes p ac ices” in OM. Thei
de elopmen s ha e nu u ed he academic wo ld, which in u n
ha e been a ocus o ep ocessing and/o making knowledge
o ans e o companies. Howe e , he concep behind HPM is
no es ablishing he end o a new p ac ice o p og am, bu
ocusing manu ac u ing in o de o ge global high
pe o mance.
O ganiza ions, which pe manen ly adop HPM philosophy,
look o oppo uni ies o imp o e in mul iple compe i i e
p io i ies, such as quali y, cos , deli e y, lexibili y,
inno a ion, e c. Such imp o emen s a e essen ial in he
company o i s su i al, bene i , and [3].
Hence, he e a e s ill o he key issues o conside when
implemen ing a new manu ac u ing p og am. Fo ins ance,
[39] assesses ha a new manu ac u ing p og am such as lean
manu ac u ing, TQM, TPM, e c., is in oduced e e y i e o
en yea s as he panacea o ge ing high pe o mance; and
e en when hese p og ams ail in p ac ice, he wo main
easons gi en by many academics and p ac i ione s a e pa ial
implemen a ion o he p og ams and incompa ible sys ems
wi hin he plan . Taking in o accoun ha mos o pas
esea ch p ima ily conside s manu ac u ing p og ams in
isola ion, Cua and his coau ho s ha e p oposed o also
conside he linkage o manu ac u ing p og ams by
implemen ing p ac ices common o all exis ing p og ams and
linking new p og ams wi h cu en ly p ac ices.
The e o e, econ igu able echnology canno be an end in
i sel , since i has o be linked o o he p ac ices and a eas o a
plan in he pa h owa d high pe o mance. Fo s a e s, he
Wo ld Academy o Science, Enginee ing and Technology
In e na ional Jou nal o Economics and Managemen Enginee ing
Vol:6, No:6, 2012
1125In e na ional Schola ly and Scien i ic Resea ch & Inno a ion 6(6) 2012 schola .wase .o g/1307-6892/11941
In e na ional Science Index, Economics and Managemen Enginee ing Vol:6, No:6, 2012 wase .o g/Publica ion/11941
pu sui o be e pe o mance and compe i i e ad an age o ce
manu ac u ing plan s no o jus ob ain he la es equipmen bu
o also de elop esou ces and capabili ies ha canno be easily
duplica ed, and o which eady subs i u es a e no a ailable.
Besides, using he HPM concep abo e, one may say ha
e en i all indus ies we e o expe ience e e -changing
en i onmen s, i is e y unlikely ha all plan s be o ced
(especially in he sho e m), o eassess hei manu ac u ing
p og ams, so ha a new echnology sys em such as RMS can
be designed and ope a ed e icien ly. I will jus no be easible
o all plan s o jus abandon many o hei manu ac u ing
p og ams in o de o adop RMS. Fo ins ance, i aking FMS
(one o hese cu en p og ams and conside ed he p e ious
s ep o RMS), i has been s udied in HPM as pa o lexible
au oma ion (FA) (Fig. 1).
Fig. 1 FMS as p e ious s ep o RMS
FA, o i s pa , is an a emp o combine ad an ages o
ixed au oma ion wi h hose o p og ammed au oma ion. Using
his me hod, plan s a e able o ob ain simul aneously low cos s
pe uni and a high deg ee o lexibili y. FA is hen de ined as
an ad anced in eg a ed sys em o ha dwa e and so wa e ha
makes i possible o design and p oduce au oma ically a
p ede ined a ie y o p oduc s. The e a e a ious ypes o FA,
besides FMS, such as au oma ed anspo and wa ehousing,
p oduc ion cells and nume ical p oduc ion, compu e
nume ically con olled (CNC)/di ec nume ically con olled
(DNC) p oduc ion, e c. Due o RMS’ echnological
cha ac e is ics, i is conside ed he nex s ep o FMS, and as
such, i mus be amed wi hin FA as well.
Thus, om he poin o iew o echnology (FMS), his
pape conside s RMS bes i as pa o FA, which has
componen s om all h ee a eas o echnology:
1. P ocess/manu ac u ing echnology may be de ined as he
equipmen and he p ocesses o making p oduc s (e.g.
Maie , 1997).
2. P oduc echnology is de ined as he equipmen and
p ocesses o design and build new p oduc s.
3. In o ma ion echnology is conce ned wi h he p ocesses and
equipmen o in o ma ion ea men .
In addi ion, he e ec i eness o all HPM p og ams is
closely in e ela ed wi h echnology, and, bidi ec ionally, his
in e ela ion in luences he success o any echnological
sys em in a plan : echnology and o he HPM p ac ices
oge he a ec pe o mance. A possible missing link be ween
echnology and o he a eas o a plan is an impo an cause o
ailu e.
Fu he mo e, wha a plan does (and e en wha a plan does
no do) will e lec on i s ou come. The e o e, he decision o
use ce ain echnology p ac ices, o o he s, o none al oge he
(no ac ion aken) always has an impac on pe o mance. This
makes oom o some di e ences ha may dis inguish high
om s anda d pe o me s. Fo ins ance, conside ing di e en
echnologies in use, high pe o me s a e mo e inno a i e and
a e mo e likely o in oduce inno a ions such as CAD,
CNC/DNC, FMS, o soon RMS han s anda d pe o me s.
In conclusion, e en a e RMS is ully a ailable and
ope a ional (deli e ing all p omised ea u es) he e is s ill he
undamen al ma e o whe he RMS will be a “bes p ac ice”
o all plan s in all indus ies. The con ingency a gumen , om
HPM, has some hing o say abou his ma e : i depends on
he plan . O cou se, his should no be an excuse o doing
no hing. The e o e, as gene al li e a u e sugges s ha global
economic compe i ion and apid social and echnological
changes ha e o ced indus ies in gene al o ace
manu ac u ing esponsi eness (i.e. he main cha ac e is ic
o e ed by RMS), i is impo an o know wha high pe o me s
a e doing now globally o mee equi emen s o esponsi eness
pe o mance wi h a ailable manu ac u ing p ac ices and
con ex s.
III. S
TAGE
F
OR
RMS:
A
N
HPM
F
RAMEWORK
So a , he pape has se a s age, which may ela e some
HPM p ac ices, om p esen FMS, in o de o analyze u u e
RMS implemen a ion and ope a ions, using plan con ingency,
p ac ice linkages and mul idimensional pe o mance. The e a e
wo main aspec s o such amewo k in he p esen s udy: 1)
he echniques and p ac ices o HPM p og ams; and 2) he
e ec o hese p og ams on pe o mance. In his sec ion, each
componen o he amewo k and he p oposi ions a e
de eloped.
A. Compe i i e Pe o mance
Al hough adi ional hinking has been ha high
pe o mance in one capabili y is necessa ily aded o o low
pe o mance in o he s, specialized li e a u e shows his
pe spec i e is no ha gene al. One eason o his may be he
necessi ies in con ex s o global compe i ion and de elopmen
and dissemina ion o ad anced manu ac u ing echnologies
such as lexible au oma ion, whe e he no ion o ade-o s may
be i ele an due o he in ensi ied p essu es on plan s o
imp o e on all dimensions. Fu he mo e, “cumula i e
capabili ies” desc ibes high pe o mance in mul iple
capabili ies simul aneously. Capabili ies a e desc ibed as
cumula i e because hey build upon each o he and a e
mu ually ein o cing. The op imal sequence o cumula i e
capabili ies is used he e mo e gene ically o desc ibe a
si ua ion whe e a plan has a high le el o pe o mance in mo e
han one capabili y [38].
Es ablishing links be ween an ini ia i e and pe o mance
ou come is, pe haps, he mos c i ical and in e es ing aspec o
a s udy on manu ac u ing p ac ices, pa icula ly when s udying
si ua ions, whe e plan s need o pe o m well in a
mul idimensional le el. Howe e , mos exis ing li e a u e o en
igno es he ole o manu ac u ing goals and uses a one-
dimensional pe o mance measu e in he models and empi ical
es s. Re e ence [6] a gues ha in o de o do jus ice o he
con ingency a gumen bo h he mul idimensionali y o
Wo ld Academy o Science, Enginee ing and Technology
In e na ional Jou nal o Economics and Managemen Enginee ing
Vol:6, No:6, 2012
1126In e na ional Schola ly and Scien i ic Resea ch & Inno a ion 6(6) 2012 schola .wase .o g/1307-6892/11941
In e na ional Science Index, Economics and Managemen Enginee ing Vol:6, No:6, 2012 wase .o g/Publica ion/11941
pe o mance and he s a egic goals mus be inco po a ed in o
he analysis. Thei posi ion is ha h ee componen s mus be
explici ly measu ed: (1) goals; (2) p ac ices; and (3)
mul idimensional pe o mance.
Following he abo e, in o de o examine he ela ionship
be ween ini ia i es and pe o mance, his s udy ocuses no
only on he wo compe i i e p io i ies om manu ac u ing,
cos and esponsi eness, which li e a u e, e.g. [5], claims RMS
will p o ide bu also on quali y, whe e all h ee a e closely
linked o plan ope a ions. Fo he e i ica ion o he exis ing
p ac ices being ollowed by plan s o ge cos , quali y, and
esponsi eness is necessa y o iden i y he d i e s o high
pe o mance and sus ainabili y o hese compe i i e
pe o mances. Ope a ions managemen esea che s ha e
con ibu ed o he li e a u e by examining he condi ions unde
which speci ic p ac ices, esou ces o s uc u al a angemen s
a e aluable.
Following a gumen s ha esponsi eness suppo s quali y,
imp o es cos pe o mance and can subsume speed,
dependabili y and lexibili y, his s udy uses he se o
compe i i e p io i ies o quali y, cos , speed, dependabili y and
lexibili y [7]. The las h ee p io i ies a e being used as he
in eg a ed pa s o esponsi eness. These au ho s assess ha
esponsi eness no only co e s hem bu add esses how o
u ilize and manage hese p io i ies in a pu pose ul manne .
Mo eo e hey no ed ha he le el o esponsi eness needed is
di e en in e e y i m and depends on he indi idual business
s a egy, backing up he con ingency undamen . All hese i e
basic compe i i e p io i ies o manu ac u ing pe o mance
(cos , quali y, deli e y/dependabili y, ime and lexibili y)
ep esen one o mos common app oaches o pe o mance
measu es. The i e p io i ies a e b ie ly summa ized in Table
1.
TABLE
I
P
ERFORMANCE
D
IMENSIONS
Pe o mance
Dimension In e nal e ec s Ex e nal e ec s
1. Cos High o al
p oduc i i y Low p ice
2. Quali y E o - ee p ocess Speci ica ion p oduc
3. Responsi eness
a. Speed/Time
b. Dependabili y
c. Flexibili y
Abili y o espond
• as h oughpu
• eliable op.
• abili y o change
Desi ed esul
• a sho deli e y lead ime
• dependable deli e y
• equen new p oduc
se ice, wide p oduc
ange, olume and
deli e y adjus men
The p esen s udy goes beyond such li e a u e, by
de eloping en manu ac u ing compe i i e pe o mance
dimensions om he i e p e ious compe i i e p io i ies
(Fig1). Pe o mance on cos s may be es ima ed h ough he
uni cos o manu ac u ing. Quali y pe o mance is based on
con o mance o s anda ds and i may be assessed by e alua ing
he pe cen age o sc ap o ewo k. Fo ime pe o mance, h ee
di e en dimensions a e conside ed: speed o new p oduc
in oduc ion, lead ime, and cycle ime. The dimensions o
dependabili y pe o mance a e wo: on ime new p oduc
launch and on ime deli e y. The dimensions o lexibili y a e
h ee: lexibili y o change p oduc mix, lexibili y o change
olume, and he ime ho izon adop ed o eeze planning ( his
las one on he basis ha a sho e ime o e s mo e lexibili y).
Fig. 1 Compe i i e pe o mance
A. Manu ac u ing p ac ices and pe o mance
A good unde s anding o a plan may help iden i ying
manu ac u ing p ac ices which mee pe o mance dimensions,
p o iding basis o why and how p ac ices ha e compe i i e
alue. In o de o do so, his s udy builds on wo key oles in
es ablishing he heo e ical a gumen o why p ac ices ma e
[6]:
• The esou ce-based ( ou ine-based) iew o he i m (RBV).
Based on he idea ha he manu ac u ing p ac ices (no
he esou ces hemsel es) a e subjec o inimi abili y,
causal ambigui y and a e con ex -speci ic. The e o e, hey
o e alue o he o ganiza ion ha makes use o hem.
• The e olu iona y heo y. F om he li e a u e, hey a e
suppo ed on he p oposal ha he o ganiza ional
p ocesses (e.g. ou ines) a e shaped o e ime and a e
subjec o pa h dependency and ine ia. So, a leas in he
sho e m, ou ines a e di icul o imi a e. The ou ines
a e also embedded in he o ganiza ional con ex , which
makes hei po en ial con ingen alue highe han in any
o he con ex .
Taking hese wo a gumen s in o conside a ion, he p ac ices
a e selec ed and measu ed acco ding o he speci ica ion
p o ided below.
While he e a e many p ac ices and p og ams in
manu ac u ing managemen , he nex ou easons a e ollowed
o choose he speci ic p ac ices and p og ams o examina ion
(Fig. 2):
1. P og ams and p ac ices and ecognized as HPM [3].
2. HPM p og ams wi h links o FMS.
3. Technology p ac ices which ha e been heo e ically o
empi ically associa ed wi h one o mo e speci ic
dimensions o ope a ional pe o mance (included
esponsi eness dimensions o e ed by econ igu abili y).
Wo ld Academy o Science, Enginee ing and Technology
In e na ional Jou nal o Economics and Managemen Enginee ing
Vol:6, No:6, 2012
1127In e na ional Schola ly and Scien i ic Resea ch & Inno a ion 6(6) 2012 schola .wase .o g/1307-6892/11941
In e na ional Science Index, Economics and Managemen Enginee ing Vol:6, No:6, 2012 wase .o g/Publica ion/11941
FMS: p e ios
s ep o RMS
Flexible
au omaion
Technology:
p oduc , p ocess
and in o ma ion
FMS-HPM
p og ams
links
Technology p ac ices
imp o e pe o mance
Fig. 2 HPM amewo k: s age o RMS
Thus, based on he abo e, he ollowing p oposi ions on
econ igu abili y a e p esen ed:
P oposi ion 1. FMS is linked o HPM p og ams.
P oposi ion 2. FMS is linked o o he echnology p ac ices.
P oposi ion 3. The e will be ce ain combina ions o non-
econ igu able echnology p ac ices in e connec ed wi h FMS
ha migh enhance dimensions o pe o mance ela ed o
RMS.
P oposi ion 4. FMS by i sel does no deli e all pe o mance
dimensions o e ed by RMS.
P oposi ion 5. Non- econ igu able plan s a e sea ching o
pe o mance dimensions o e ed by RMS.
These p oposi ions a e based on he hypo hesis ha RMS
can be bes implemen ed i i is ca e ully linked o cu en
con ex s, especially FMS. Hence, all i e p oposi ions a e
c i ical i his pape is o de elop a “ heo y o RMS
implemen a ion om FMS and i s linkages wi h o HPM
p og ams and p ac ices”. In addi ion, hese p oposi ions mus
be e alua ed in he con ex o p io published li e a u e wi hin
he domain o FMS e ec i eness. Towa ds his end, a me a-
analysis o majo jou nals yielded 33 HPM models wi h
p og ams ela ed o FMS ha a e ele an o RMS’ discussion.
They a e e iewed in he ollowing h ee sec ions.
IV. O
VERVIEW
O
F
L
INKAGES
A
ND
C
ONTINGENCY
In o de o p ope ly me a-analyze, acili a ing compa ison o
s udies, he ollowing was done:
• To de ine clea and homogeneously concep s om HPM
p og ams, echnology a eas (p oduc , p ocess and in o ma ion)
and hei p ac ices, FMS as pa o echnology, and
pe o mance.
• To use mainly pape s om he HPM in e na ional p ojec .
• To complemen wi h pape s om sou ces o he han he
HPM p ojec wi h he ollowing equi emen s:
o Scien i ic measu es ha we e alid, eliable, sha ed.
o De ailed in o ma ion on sampling design and esul ing
samples.
o Use ul in o ma ion o u u e compa isons: mean,
s anda d de ia ion o each a iable; co ela ion ma ix,
sample size, missing alues, and ea men s.
• To inc ease explici ness le el wi h espec o assump ions,
condi ions, and hypo heses.
Thus, o answe all p oposi ions om p e ious sec ion, he e
was an o e iew o cu en FMS, manu ac u ing p ac ices and
p og ams, and pe o mance dimensions, in o de o be g ouped
acco ding o HPM amewo k (Fig. 2). Hence, se e al
p ominen jou nals we e e iewed o esea ch on FMS-HPM
p og ams and pe o mance ela ionships, since 1984. The
jou nals included mo e han 49 pape s in ope a ions
managemen (Jou nal o Ope a ions Managemen , P oduc ion
and Ope a ions Managemen , In e na ional Jou nal o
Ope a ions and P oduc ion Managemen , e c.). The goal was
o p o ide a easonable ep esen a ion o he heo e ical and
empi ical esea ch on FMS o a po en ial RMS deploymen .
Then, a ca ego iza ion o he HPM g oups (p og ams and
pe o mance) was made. The ocus was o compa e and
con as hem wi h espec o se e al impo an issues,
summa izing he scope o he g oups’ de ini ions and hei
empi ical ela ionships. Besides, his pape akes he
concep ualiza ion o RMS, whe e [5] de ine i along he same
line o FMS. Thus, since FMS is pa o lexible au oma ion
[25] his pa explained “manu ac u ing echnology p og am”
om which he lexible au oma ion is pa o . Thus,
ela ionships be ween FMS and some HPM p og ams a e also
shown.
The i s 27 models ha ocused on FMS deploymen and i s
e1ec i eness a ound HPM p og ams p o ide a easonable
ep esen a ion o he heo e ical and empi ical esea ch on
e1ec i e RMS deploymen .
A e iew o he models e ealed wo dis inc le els o
analysis in he ela ionship o FMS ep esen ed in he nex wo
Tables: 21 models om HPM p og ams in e connec ed o
FMS, and 6 models om echnology p ac ices (o he han
FMS), whe e FMS is inse ed. Table II illus a es he li e a u e
o linkages be ween lexible au oma ion (i.e. which includes
FMS) and he HPM p og ams JIT, TQM, HR, MS, and
p ac ices om echnology (T) di e en om FMS. Thus, i
p o ides a e y gene al summa y o he models o HPM
p og ams wi h links o FMS, which a e discussed below
ch onologically. The Table p esen s a amewo k o hese
models wi h p oposed s uc u es o HPM p og ams-FMS
ela ionships wi hin manu ac u ing plan s, and whe he o no a
model is amed wi hin he da a base o he HPM in e na ional
p ojec .
TABLE
II
L
INKAGES
B
ETWEEN
FMS
A
ND
HPM
P
ROGRAMS
Au ho s HPM p og ams HPM p ojec
[8]
JIT
Yes
[9]
JIT
Yes
[10]
JIT
Yes
[11]
JIT
No
[12] JIT Yes
[13] JIT No
[14] JIT Yes
[15] JIT, TQM, HR, MS No
[16] JIT Yes
[17]
HR, MS
No
[
18]
HR, T
No
[19]
JIT, TQM, MS
No
[20]
JIT, TQM, HR, MS, T
Yes
Wo ld Academy o Science, Enginee ing and Technology
In e na ional Jou nal o Economics and Managemen Enginee ing
Vol:6, No:6, 2012
1128In e na ional Schola ly and Scien i ic Resea ch & Inno a ion 6(6) 2012 schola .wase .o g/1307-6892/11941
In e na ional Science Index, Economics and Managemen Enginee ing Vol:6, No:6, 2012 wase .o g/Publica ion/11941

Au ho s HPM p og ams HPM p ojec
[21]
HR
No
[22] T No
[23] TQM, HR No
[24] JIT, TQM. HR, MS, T Yes
[25] JIT, TQM, HR, T Yes
[26] TQM, T Yes
[27]
TQM, HR
No
[28]
TQM
No
Technology: lexible au oma ion (FMS, CNC, CAD, e c.)
As a as he HPM co e p og ams being conside ed in Table
II, OM li e a u e ag ees ha manu ac u ing s a egy (MS), jus -
in- ime (JIT), manu ac u ing echnology, o al quali y
managemen (TQM), and human esou ce (HR) a e
concep ually, heo e ically, and empi ically well es ablished.
All i e a e ecognized HPM p og ams. Success ul
Implemen a ion o hese p og ams is ound o imp o e
manu ac u ing pe o mance and help companies gain a
compe i i e edge.
Tu ning o FMS, al eady ecognized in his pape as pa o
echnology, he li e a u e seen abo e asse s ha o FMS o
gi e compe i i e esul s mus ha e linkages o JIT, TQM, HR,
and manu ac u ing s a egy. Thus, Table II shows signi ican
suppo o p oposi ion 1.
On he o he hand, he selec ion o p ac ices shown in Table
III is no exhaus i e no is i he only app op ia e one.
Addi ionally, hese dimensions may no be unique o he
echnology HPM p og am, bu a e ep esen a i e o he
pu poses o p esen ing he heo e ical a gumen s. F om he
li e a u e e iew, he Table shows in ch onological o de
models o p ac ices, o he han FMS ( lexible au oma ion and
g oup echnology), om he h ee a eas o echnology
(p ocess, p oduc and in o ma ion) b ie ly men ioned in
sec ion 2. These p ac ices a e in e ela ed wi h FMS, gi ing
suppo o p oposi ion 2.
TABLE
III
C
ONTINGENCY
:
O
THER
T
ECHNOLOGY
P
RACTICES
Au ho
s A ea o T Manu ac u ing
p ac ices HPM
p ojec
Basic p emise
and/o indings
[20] P oduc
echnology Concu en
enginee ing/phase
o e lapping
Yes P oduc
echnology. I
was ound as
an in e media e
(be ween ha d
and so )
echnology
p ac ice
Au ho
s A ea o T Manu ac u ing
p ac ices HPM
p ojec
Basic p emise
and/o indings
[29] P oduc ,
p ocess and
in o ma io
n
echnology.
P oduc design
simplici y,
Concu en
enginee ing/phase
o e lapping,
In e unc ional
design e o ,
Willingness o
In oduce New
Technology,
An icipa ion o
New
Technologies,
E ec i e P ocess
Implemen a ion,
P op ie a y
equipmen , IT
Yes P oduc ,
in o ma ion
and p ocess
echnology. All
h ee in luence
plan
compe i i enes
s
[30] P ocess
echnology Willingness o
In oduce New
Technology,
An icipa ion o
New
Technologies,
E ec i e P ocess
Implemen a ion,
P op ie a y
equipmen
Yes P ocess
echnology. A
key ac o o
plan success
[31] P ocess
echnology Willingness o
In oduce New
Technology,
An icipa ion o
New
Technologies,
E ec i e P ocess
Implemen a ion,
P op ie a y
equipmen
Yes P ocess
echnology. I
was de ined as
a echnology
p ac ice needed
o
compe i i enes
s
[32] P oduc
and p ocess
echnology
P oduc design
simplici y,
Concu en
enginee ing/phase
o e lapping,
In e unc ional
design e o ,
Willingness o
In oduce New
Technology,
An icipa ion o
New
Technologies,
E ec i e P ocess
Implemen a ion,
P op ie a y
equipmen
Yes P oduc and
p ocess
echnology.
They we e
ound as a
compe i i e
echnology
p ac ices
[33] P oduc
and p ocess
echnology
P oduc design
simplici y,
In e unc ional
design e o ,
E ec i e P ocess
Implemen a ion
Yes P oduc and
p ocess
echnology.
E idence was
shown bo h by
hemsel es and
combined wi h
o h
e p ac ices
V. A
NALYSIS
:
HPM
TECHNOLOGY
A
ND
P
ERFORMANCE
A. Ca ego iza ion o he models: speci ic linkages in FMS
The ocus in he ollowing discou se will be o compa e and
con as models o echnology p ac ices, whe e FMS is
Wo ld Academy o Science, Enginee ing and Technology
In e na ional Jou nal o Economics and Managemen Enginee ing
Vol:6, No:6, 2012
1129In e na ional Schola ly and Scien i ic Resea ch & Inno a ion 6(6) 2012 schola .wase .o g/1307-6892/11941
In e na ional Science Index, Economics and Managemen Enginee ing Vol:6, No:6, 2012 wase .o g/Publica ion/11941
inse ed, wi h espec o pe o mance. Table IV summa izes
ch onologically he scope o he model de ini ions and hei
empi ical alidi y. As i has been shown, RMS is being
compa ed mos ly, and e en conside ed he nex s ep, o FMS,
and since he la e is pa o echnology p og am, he Table
p esen s eigh p ac ices wi hin his p og am ( om i s h ee
a eas: in o ma ion, p oduc and p ocess echnology), which
may lead o imp o emen s in cos , quali y, cycle ime, new
p oduc in oduc ion speed, lead ime, on ime deli e y, as
deli e y, p oduc mix, olume mix, and ho izon p oduc ion
schedule.
TABLE
IV
P
ERFORMANCE AND
T
ECHNOLOGY
Au ho s Technology
a ea Manu ac u ing
p ac ices HPM
p ojec Pe o mance
ela ionship
[29] P oduc ,
p ocess and
in o ma ion
echnology
P oduc design
simplici y,
Concu en
enginee ing/phase
o e lapping,
In e unc ional
design e o ,
Willingness o
In oduce New
Technology,
An icipa ion o
New Technologies,
E ec i e P ocess
Implemen a ion,
P op ie a y
equipmen ,
in o ma ion
echnology
Yes P oduc and
in o ma ion
echnology
posi i ely a ec
lead ime, on
ime deli e y,
p oduc and
olume mix and
ho izon
p oduc ion
schedule, bu
only when
combined wi h
p ocess
echnology.
P ocess
echnology
p ac ices
di ec ly leads o
be e
pe o mance on
he same 5
dimen
sions.
[30] P ocess
echnology Willingness o
In oduce New
Technology,
An icipa ion o
New Technologies,
E ec i e P ocess
Implemen a ion,
P op ie a y
equipmen
Yes P ocess
echnology
p ac ices leads
o be e
pe o mance on
cos by
educ ion o
de ec s, quali y
(de ec
educ ion), on
ime deli e y
and all h ee
dimensions o
lexibili y.
[31] P oduc and
P ocess
echnology
P oduc design
simplici y,
Concu en
enginee ing/phase
o e lapping,
In e unc ional
design e o ,
Willingness o
In oduce New
Technology,
An icipa ion o
New Technologies,
E ec i e P ocess
Implemen a ion,
P op ie a y
equipmen
Yes P oduc
echnology
p ac ices
combined
imp o es
quali y
( educ ion o
de ec s), cos
(by educ ion o
de ec s), lead
ime, on ime
deli e y, and all
h ee
dimensions o
lexibili y, bu
need o be i ed
Au ho s Technology
a ea Manu ac u ing
p ac ices HPM
p ojec Pe o mance
ela ionship
wi h p ocess
echnology.
P ocess
echnology
p ac ices
di ec ly
imp o e same 7
pe o mance
dimensions.
[32] P oduc and
p ocess
echnology
P oduc design
simplici y,
Concu en
enginee ing/phase
o e lapping,
In e unc ional
design e o ,
Willingness o
In oduce New
Technology,
An icipa ion o
New Technologies,
E ec i e P ocess
Implemen a ion,
P op ie a y
equipmen
Yes When
combined wi h
p ocess
echnology,
p oduc
echnology
p ac ices
imp o e quali y
( educ ion
de ec s), cos
(by educ ion o
de ec s), lead
ime, on ime
deli e y, and all
h ee
dimensions o
lexibili y
(p oduc and
olume mix and
ho izon
p oduc ion
schedule).
P ocess
echnology
p ac ices
di ec ly
imp o e same 7
pe o mance
dimensions.
[34] In o ma ion
echnology In o ma ion
echnology Yes In o ma ion
echnology
posi i ely
in luences all 9
pe o mance
dimensions.
[33] P oduc and
p ocess
echnology
P oduc design
simplici y,
In e unc ional
design e o ,
E ec i e P ocess
Implemen a ion,
Yes P oduc and
p ocess
echnology
p ac ices
imp o e cos ,
quali y cycle
ime, speed NP
in oduc ion, on
ime deli e y,
p oduc ion and
olume mix,
bu be e ye
when in eg a ed
wi h o he
p og ams
Al hough all p ac ices will lead o be e pe o mance in
cos , dependabili y (on ime deli e y), and lexibili y (p oduc
mix, olume mix, and ho izon p oduc ion schedule), he use o
each indi idual o hese p ac ices will no mean highe
pe o mance in he o he e e ed dimensions. Be e quali y is
mo e likely o be ob ained by all p ac ices bu willingness o
in oduce new echnology, an icipa ion o new echnologies,
Wo ld Academy o Science, Enginee ing and Technology
In e na ional Jou nal o Economics and Managemen Enginee ing
Vol:6, No:6, 2012
1130In e na ional Schola ly and Scien i ic Resea ch & Inno a ion 6(6) 2012 schola .wase .o g/1307-6892/11941
In e na ional Science Index, Economics and Managemen Enginee ing Vol:6, No:6, 2012 wase .o g/Publica ion/11941
and p op ie a y equipmen . These same h ee p ac ices, as well
as concu en enginee ing/phase o e lapping, do no show o
lead o as new p oduc in oduc ion and cycle ime. Finally,
only concu en enginee ing/phase o e lapping, p op ie a y
equipmen , and IT ha e shown imp o emen s in lead ime.
Hence, he combina ion o hese eigh p ac ices om all h ee
echnology a eas, which a e in e connec ed wi h FMS, migh
enhance all pe o mance dimensions bu on ime new p oduc
lunch om dependabili y ( he o he se en dimensions ela ed
o all h ee esponsi eness p io i ies a e p esen : speed,
lexibili y and dependabili y). The e o e, his gi es suppo
o p oposi ion 3.
VI. R
ESEARCH
C
OMPARISON
T
O
T
HE
HPM
F
RAMEWORK
A e iew o he las six models e ealed h ee le els o
analysis: indi idual by FMS p ac ices, combined by FMS and
o he echnology p ac ices, and o ganiza ional by FMS wi hin
he HPM p og ams. Table V p o ides a gene al summa y o
he models, which a e discussed below in ch onological o de .
A b ie synopsis ela ed o pe o mance o hese models is
p esen ed, along wi h p oposed s uc u es o he h ee
echnology a eas wi hin he plan , and gene al indings
ega ding hese ela ionships. Tables V–VI p esen a
depic ion o he causal ela ionships p ac ices-pe o mance. I
should be no ed ha in some cases he model depic ions
ep esen in e p e a ions o how he models we e p oposed o
es ed. They include wo FMS p ac ices, lexible au oma ion
and g oup echnology, since bo h a e pa icula ly impo an ,
no only because o cu en lexible au oma ion needing g oup
echnology, bu because u u e RMS may be enclosed he e, as
well as hey bo h suppo ge ing high pe o mance in mul iple
dimensions: cos , quali y, speed (cycle ime, new p oduc
in oduc ion speed and lead ime), dependabili y (on ime
deli e y), and ( lexibili y p oduc mix, olume mix and
ho izon p oduc ion).
Table V shows ha bo h FMS p ac ices oge he may
p oduce highe pe o mance in all scales bu in cycle ime, and
new p oduc (NP) in oduc ion speed. G oup echnology may
be he only o ge be e pe o mance in cycle ime and NP
in oduc ion speed. This means ha FMS all a bi sho e on
imp o ing speed, gi ing some suppo o p oposi ion 4.
TABLE
V
P
ERFORMANCE AND
FMS
Au ho
s Tech. a ea Manu ac u ing
p ac ice HPM
p ojec Pe o mance
Rela ionship
[19] P oduc ,
p ocess and
in o ma ion
echnology
Flexible
au oma ion
(CAD/CAM/CIM/
FMS/CNC)
No FMS p ac ice
implemen a ion
imp o es quali y,
lead ime, and on
ime deli e y
when combined
wi h p ac ices
om o he HPM
p og ams
Au ho
s
Tech. a ea Manu ac u ing
p ac ice
HPM
p ojec
Pe o mance
Rela ionship
[20] P oduc ,
p ocess and
in o ma ion
echnology
Flexible
au oma ion
(CAD/CAM/CIM/
FMS/CNC), G oup
echnology-cellula
manu ac u ing
Yes Bo h FMS
p ac ices ha e a
posi i e e ec on
cos , quali y, lead
ime and on ime
deli e y, bu only
when combined
wi h o he FMS
p ac ices
[23] P oduc ,
p ocess and
in o ma ion
echnology
Flexible
au oma ion
(CAD/CAM/CIM/
FMS/CNC)
No FMS p ac ice
imp o es bo h
lexibili y mix
dimensions
(p oduc and
olume mix), bu
combined wi h
p ac ices om
o he HPM
p og ams
[35] P oduc ,
p ocess and
in o ma ion
echnology
Flexible
au oma ion
(CAD/CAM/CIM/
FMS/CNC), G oup
echnology-cellula
manu ac u ing
Yes Bo h FMS
p ac ices imp o e
all lexibili y
dimensions
(p oduc and
olume mix and
ho izon
p oduc ion
schedule
[36] P ocess and
in o ma ion
echnology
G oup echnology-
cellula
manu ac u ing
Yes This pape
con i ms
co ela ion
be ween FMS
modula iza ion
and bo h cycle
ime and NP
in oduc ion
speed, bu o be
e ec i e i needs
unc ional
coo dina ion
[37] P ocess and
in o ma ion
echnology
G oup echnology-
cellula
manu ac u ing
Yes I shows a
co ela ion
be ween FMS
modula iza ion
and bo h cycle
ime and NP
in oduc ion
speed
Table VI sums up pe o mance dimensions imp o ed by
FMS p ac ices and o he echnology p ac ices. This p esen s a
b oade iew o FMS om a HPM pe spec i e, whe e he
s udies analyzed show ha p ac ices om he echnology HPM
p og am may help ge ing high pe o mance in quali y, cos ,
cycle ime and lead ime, speed new p oduc in oduc ion, on
ime deli e y, p oduc mix, olume mix, and ho izon
p oduc ion schedule (in dimensional e ms i means h ee
elemen s o speed, one elemen o dependabili y, and h ee
elemen s lexibili y, espec i ely). This gi es signi ican
suppo o p oposi ion 5, since plan s seem o be sea ching o
nine ou o he en p oposed dimensions.
TABLE
VI
P
ERFORMANCE
,
T
ECHNOLOGY
A
REAS
A
ND
FMS
FMS Technology Pe o mance
Wo ld Academy o Science, Enginee ing and Technology
In e na ional Jou nal o Economics and Managemen Enginee ing
Vol:6, No:6, 2012
1131In e na ional Schola ly and Scien i ic Resea ch & Inno a ion 6(6) 2012 schola .wase .o g/1307-6892/11941
In e na ional Science Index, Economics and Managemen Enginee ing Vol:6, No:6, 2012 wase .o g/Publica ion/11941
a ea
Dimension Responsi eness
p io i y P io i y
Bo h 1, 2, 3 Cos Cos Cos
Bo h 1 pa ial, 2 ,
3 Quali y Quali y Quali y
One 1&2pa ial,3 Cycle ime
Speed
Responsi enes
s
One 1&2pa ials,
3
Speed NP in o
Bo h
2pa ial,3
Lead ime
Bo h 1,2,3 On ime
deli e y Dependabili
y
Bo h 1,2,3 P oduc mix
Flexibili y
Bo h 1,2,3 Volume mix
Bo h 1,2,3 Ho izon
p oduc ion
1: p ocess, 2: p oduc , 3: in o ma ion. Pa ial means ha no all p ac ices
o he pa icula p og am posi i ely impac on pe o mance.
Finally, some linkages be ween FMS, lexible au oma ion
(FA) and some HPM p og ams a e shown in he gene al model
in Fig. 3, which comes om he li e a u e in Tables II-VI. I is
ne e oo epe i i e o say ha FA is no a s andalone
ini ia i e, bu i is in insically pa o he HPM echnology
p og am, and i enci cles non- econ igu able FMS as he
p e ious s ep o econ igu able RMS. Fu he mo e, in he
implemen a ion o RMS, o he HPM p og ams should also be
conside ed, when looking o ge high pe o mance in a
mul idimensional way. This Fig. is only an illus a i e model,
and d aws i s a iables mainly om he s udies e iewed. As
such, i needs o be leshed ou in g ea e de ail and be e
g ounded in heo y.
Fig. 3 Gene al model o ansi ion om FMS o RMS
Thus, his esea ch p o ides signi ican suppo o he
p oposed HPM amewo k. As s a ed in P oposi ion 1, he e
a e ce ain condi ions o HPM p og ams link o FMS. This
esea ch p o ides suppo o P oposi ion 1: he e we e
signi ican indings in e e y s udy on he linkages o JIT, HR,
TQM, MS and o he T p ac ices wi h FMS.
The e idence o echnology p ac ices be ween he a iables
as p oposed in P oposi ion 2 also ound suppo in he
esea ch. These las p ac ices posi i ely impac pe o mance
dimensions, gi ing e idence o P oposi ion 3. The e was also
e idence ha FMS by i sel does no comple ely impac all
pe o mance dimensions o e ed by RMS, inding suppo o
P oposi ion 4. Finally, P oposi ion 5 s a ed ha plan s a e
looking o pe o mance dimensions o e ed by RMS, which
hey we e, excep o on ime NP launch. I may equi e
u he ing es ing he impac on his dimension om he
combina ion o no only FMS and o he echnology p ac ices,
bu also he o he HPM p og ams ound he e o ha e links wi h
FMS (e.g. JIT, TQM, e c.)
VII. C
ONCLUSION
RMS e1ec i eness is c i ical in cu en en i onmen s o
economic and inancial c isis ha p omo e inc easing
deploymen o echnological ini ia i es due o cons an ma ke
changes. Un o una ely, me e exis ence o echnology is no
su icien . I has o be imbibed in o i s con ingen con ex in
o de o be e1ec i e. While he e has been subs an ial esea ch
on echnology e1ec i eness, RMS elec i eness in OM has no
been e iewed. This a icle akes he modes s ep o p esen ing
a synopsis o RMS e1ec i eness om a pe spec i e o FMS
and HPM esea ch ha has been published in majo jou nals
associa ed wi h he managemen sciences. This esea ch is
in e p e ed in ligh o a b oad HPM based amewo k ha
espouses no ions o “links and con ingency” be ween
manu ac u ing ini ia i es. Thi y h ee models a e e iewed
and i is a gued ha hese models p o ide a ounda ion upon
FMS and i s link o HPM p og ams. In gene al, he e seems o
be suppo o he alidi y o he in e ac ions be ween no only
FMS and o he echnology p ac ices, bu also JIT, TQM, MS
and HR. The e o e, i is appa en om his e iew ha FMS
echnology is no and canno be implemen ed independen o
i s en i onmen . Thus, g oups examining ela ionships we e
summa ized and me a-analyzed in an a emp o p o ide a
mo e in eg a ed pe spec i e. The e was a majo amoun o
suppo o he in e ela ionships p esen ed in he HPM model,
p o iding s ong alida ion o i as p esen ed in P oposi ions
1-5. The indings consis en ly suppo JIT, TQM, MS, HR,
FMS, and o he echnology p ac ices as impo an pa ame e s
o RMS pe o mance. Pe o mance dimensions which will be
deli e ed by RMS we e al eady being a ge ed by se s o non-
econ igu able p ac ices such as FMS and he es o HPM
p ac ices and p og ams seen he e. They can howe e be
imp o ed and ex ended wi h he conside a ion o ime and
changes. Al hough HPM g oups we e e alua ed on hei
common p ac ices and dimensions ela ed o RMS, inding ha
he “links and con ingency” no ion is also suppo ed, he
limi a ions o his esea ch make i di icul o compa e he
models and hei empi ical esul s. Hence, hese limi a ions
b ing oppo uni ies and help o iden i y insigh s o u he
esea ch. The e o e, o s a e s, P oposi ions 4 and 5 needs
mo e ex ensi e empi ical examina ion o pe o mance h ough
es ing a combina ion o all HPM p og ams in ol ed.
Besides, a HPM amewo k o u he examining FMS in
i s con ex will lead o be e heo y building ha can allow
examining esul s ac oss i sel . The use o HPM models o
explo ing he balancing o he a ious HPM le e s wi h FMS
will hen allow esea che s o de elop a “ heo y o
implemen ing, ope a ing and managing RMS”.
The esea ch summa ized he e has c ea ed a ounda ion o
such a heo y. Hence, a esea ch plan, along wi h a RMS
Wo ld Academy o Science, Enginee ing and Technology
In e na ional Jou nal o Economics and Managemen Enginee ing
Vol:6, No:6, 2012
1132In e na ional Schola ly and Scien i ic Resea ch & Inno a ion 6(6) 2012 schola .wase .o g/1307-6892/11941
In e na ional Science Index, Economics and Managemen Enginee ing Vol:6, No:6, 2012 wase .o g/Publica ion/11941