A computational evaluation of constructive and improvement heuristics for the blocking flow shop to minimise total flowtime∗ Victor Fernandez-Viagas1† , Rainer Leisten2, Jose M. Framinan1 1Industrial Management, School of Engineering, University of Seville, Camino de los Descubrimientos s/n, 41092 Seville, Spain, {vfernandezviagas,framinan}@us.es 2Industrial Engineering, Faculty of Engineering, University of Duisburg-Essen Bismarckstr. 90, 47057 Duisburg, Germany, [email protected] May 31, 2016 Abstract This paper focuses on the blocking flow shop scheduling problem with the objective of total flowtime minimisation. This problem assumes that there are no buffers between machines and, due to its application to many manufacturing sectors, it is receiving a growing attention by researchers during the last years. Since the problem is NP-hard, a large number of heuristics have been proposed to provide good solutions with reasonable computational times. In this paper, we conduct a comprehensive evaluation of the available heuristics for the problem and for related problems, resulting in the implementation and testing of a total of 35 heuristics. Furthermore, we propose an efficient constructive heuristic which successfully combines a pool of partial sequences in parallel, using a beam-search-based approach. The computational experiments show the excellent performance of the proposed heuristic as compared to the best-so-far algorithms for the problem, both in terms of quality of the solutions and of computational requirements. In fact, despite being a relative fast constructive heuristic, new best upper bounds have been found for more than 27% of Taillard’s instances. Keywords: Scheduling, Flowshop, Blocking, Heuristics, PFSP, Total Flowtime, Computational Evaluation, Beam Search ∗Preprint submitted to Expert Systems With Applications. http://dx.doi.org/10.1016/j.eswa.2016.05.040 †Corresponding author. 1
1 Introduction The flowshop is a layout employed in many manufacturing scenarios (see e.g. Krajewski et al., 1987 and Storer et al., 1992) where njobs must follow the same processing route on mmachines. The so-called flowshop scheduling problem consists in finding the best sequence of jobs on each machine according to some objective(s). In its classical formulation, unlimited buffers capacity between two consecutive machines is considered (see the full list of assumptions in Section 3). However, zero-buffer flowshops are very common in several industrial sectors, such as iron and steel industry, chemical and pharmaceutical industries, just-in-time production lines and inline robotic cells (see e.g. Reklaitis, 1982, Sethi et al., 1992, Hall and Sriskandarajah, 1996 and Gong et al., 2010). This problem is usually denoted as blocking flowshop scheduling problem (BFSP) since a job blocks a machine until the next machine is available. Therefore, interest in this problem is increasing over the past years (Ribas and Companys, 2015), although there are not many algorithms as compared to the number of heuristics and metaheuristics for the traditional permutation flowshop scheduling problem –denoted as PFSP– (see e.g. Ruiz and Maroto, 2005, Pan and Ruiz, 2013, Ferrer et al., 2016, and Fernandez-Viagas and Framinan, 2015c), which is one of the most studied problems in Operations Research. Commonly used objectives for the BFSP include makespan and total flowtime (see e.g. Ribas et al., 2011 and Ronconi, 2004). Among them, the total flowtime stands out as the most relevant and meaningful for today’s dynamic production environment (Liu and Reeves, 2001). This problem is denoted as Fm|block|∑Cjaccording to the notation by Graham et al. (1979). Note that, as there are zero-capacity buffers between two consecutive machines, several jobs cannot wait at the same time before the machine and the job sequence must therefore be the same on every machine. As a conclusion, n!schedules have to be considered, i.e. the number of solutions is the permutation of njobs. In this paper, we propose an efficient constructive heuristic for the BFSP with flowtime objective based on beam search that outperforms existing heuristics for the problem. Additionally, we test several adaptations of the most efficient algorithms for the Fm|block|Cmax problem as well as for the PFSP to minimise makespan and total flowtime (respectively denoted as Fm|prmu|Cmax 2
and Fm|prmu|∑Cjaccording to Graham et al., 1979). We include them in the comparison since many algorithms originally implemented for the PFSP –such as the the iterated greedy proposed by Ruiz and Stützle (2007) (see e.g. Pan et al., 2008b) or the NEH heuristic by Nawaz et al. (1983) (see e.g. Leisten, 1990)– have turned to be efficient for several decision problems. The resulting computational evaluation is composed of a total of 36 heuristics which are fully recoded and exhaustively compared under the same computer conditions. Additionally, we introduce a speed-up method to accelerate the insertion phases of all algorithms. The rest of the paper is organised as follows. The state of the art is analysed in Section 2. In Section 3, the problem and the notation are described. The beam-search-based constructive heuristic is proposed in Section 4. In Section 5, a complete comparison of heuristics is performed. Finally, the conclusions are discussed in Section 6. 2 Literature Review The classification of algorithms to solve operations research problems is ambiguous, as different classifications have been proposed in the literature (see e.g. Zäpfel et al., 2010, Zanakis et al., 1989). In this paper, we adopt the classification used e.g. by Framinan et al. (2005) and Ruiz and Maroto (2005), thus dividing the algorithms between ad hoc heuristics and generalpurpose metaheuristics. We focus exclusively on heuristics, which can be classified into constructive heuristics and improvement heuristics (Ruiz and Maroto, 2005). Constructive heuristics obtain the final sequence by integrating jobs –usually in an iterative manner– on an incomplete sequence. Improvement heuristics are usually composed of two phases: a construction phase where a complete sequence is formed, and an improvement phase where the solution is improved by means of some method, typically by specific knowledge of the problem. Using this classification, heuristics (constructive and improvements) naturally stop after a predefined number of steps independent of a time limit, whereas metaheuristics require a termination criterion (usually related to the CPU time effort) as an input parameter. Furthermore, metaheuristics require a fast initial solution to start their procedures, and the quality of this initial solution is known to influence the performance of the metaheuristic, so usually the initial solution for 3
the metaheuristics is provided by (constructive and/or improvement) heuristics. The aim of our paper is precisely to assess the state-of-the-art of the heuristics -in the aforementioned sensefor the problem, therefore we have not considered in the computational evaluation very interesting and well-performing procedures as the ones of Ribas et al. (2015) and Khorasanian and Moslehi (2012). Furthermore, note that it is problematic to include these procedures in the comparison since these procedures a) require the other heuristics to provide an initial solution, and b) allow different stopping criteria, whereas that of the heuristics is fixed. In this section, a review of the literature on the problem under consideration is presented. Since there are several heuristics for related scheduling problems that can be adapted to our problem, we also review these contributions. More specifically, we review: •Heuristics for the (classical) permutation flowshop scheduling problem to minimise makespan. •Heuristics for the permutation flowshop scheduling problem to minimise total flowtime. •Heuristics for the blocking flowshop scheduling problem, both with makespan and flowtime objectives. •Speed-up procedures developed for related flowshop scheduling problems. Regarding heuristics for the Fm|prmu|Cmax problem, we focus on the most promising ones and refer the reader to Framinan et al. (2004), Reza Hejazi and Saghafian (2005) or Ruiz and Maroto (2005) for more extensive reviews. Among the available heuristics, the NEH heuristic (Nawaz et al., 1983) is, without doubt, the most efficient heuristic for the problem. Its excellent performance –established by Ruiz and Maroto (2005)– probably lies in the low computational cost of carrying out its insertion phases due to the speed-up by Taillard (1990). Therefore, several papers have focused on improving some of the phases of the NEH, or on proposing NEH-based heuristics. More specifically, improvements in the initial order of the NEH have been proposed by e.g. Framinan et al. (2003) and Vasiljevic and Danilovic (2015). Regarding improvements in the insertion phase of the NEH, Rad et al. (2009) propose several heuristics (denoted as FRB1, FRB2, FRB3, FRB4_k and FRB5) where a partial insertion local search method after the insertion of a job is employed. In a similar way, Ying and Lin (2013) employ another partial local search based 4
on the interchange of jobs. Several works address the problem of breaking the ties of the partial makespans when inserting a job, such as e.g. Ribas et al. (2010), Kalczynski and Kamburowski (2007), Kalczynski and Kamburowski (2008), Kalczynski and Kamburowski (2009), Dong et al. (2008) and Fernandez-Viagas and Framinan (2014). Regarding the Fm|prmu|∑Cjproblem, a recent evaluation carried out by Fernandez-Viagas and Framinan (2015c) shows that, in terms of average relative percentage deviation and average relative percentage computation time, the set of efficient heuristics is formed by the Raj heuristic by Rajendran (1993); the LR heuristic proposed by Liu and Reeves (2001); the RZ heuristic by Rajendran and Ziegler (1997); the RZ-LW proposed by Li and Wu (2005); the LR-NEH heuristic proposed by Pan and Ruiz (2013); the IC1, IC2 and IC3 improvement heuristics by Li et al. (2009); and finally, the PR1 heuristic proposed by Pan and Ruiz (2013). As most of these heuristics include the LR heuristic as initial or main procedure, Fernandez-Viagas and Framinan (2015c) propose an improvement of this method, denoted as FF, which heavily decreases the required CPU time. This procedure has been incorporated in each heuristic using the LR procedure, obtaining excellent results for the following heuristics: FF, FF-FPE (replacing LR by FF in the LR-FPE heuristic by Liu and Reeves, 2001), FF-ICi (ICi heuristics by Li et al., 2009 with FF instead of LR) and FF-PR1 (PR1 heuristic by Pan and Ruiz, 2013 using the FF procedure). Regarding BFSP, several algorithms have been proposed for makespan minimisation. McCormick et al. (1989) implement a constructive heuristic, denoted as PF, to minimise cycle time, that constructs a sequence by progressively inserting an unsequenced job with minimal sum of idle and blocking time. Ronconi (2004) proposes three constructive heuristics (denoted as MM, MME and PFE) to solve the Fm|block|Cmax. MME and PFE are variations of the original NEH heuristic where the initial order is replaced by the MM and PF heuristics respectively. In Ribas et al. (2011), several NEH-based heuristics are proposed using different mechanisms to break ties in the first and second phase of the NEH heuristic. The heuristics are compared with the MME and PFE heuristics. Pan and Wang (2012) propose eight heuristics (the wPF and PW constructive heuristics and the PF-NEH, wPF-NEH, PW-NEH, PF-NEHLS, wPF-NEHLS and PW-NEHLS improvement heuristics) based on NEH and LR. The heuristics clearly outperform MME and PFE in terms of quality of the solution and computational effort. In Ribas et al. (2013), these 5
heuristics have been improved by evaluating the sequences before and after the insertion phase as well as using the reversibility property. Regarding the minimisation of total flowtime in the BFSP, Wang et al. (2010) introduce an adaptation of the NEH algorithm using the non-decreasing sum of processing times as initial order. Note that this order outperforms the original one for the Fm|prmu|∑Cjproblem. This heuristic is used as initial sequence for the metaheuristics proposed by Bao et al. (2012) and Deng et al. (2012). Han et al. (2012) and Han et al. (2013) adapt the MME heuristic to minimise total flowtime as well as propose two new NEH-based heuristics modifying the initial order (denoted as MME-A and MME-B). Finally, Ribas and Companys (2015) propose six new heuristics for the problem. Firstly, they adapt the PF heuristic (McCormick et al., 1989) to the problem and propose two new constructive heuristics denoted as HPF1 and HPF2 modifying the index to choose a job. Then, they propose three NEH-based heuristics (NPF, NHPF1 and NHPF2) using the previous heuristics as initial sequences of the NEH. Finally, regarding speed up methods to accelerate algorithms, they have been successfully applied for several problems related to flowshop scheduling: the PFSP to minimise total flowtime (see e.g. Li et al., 2009); the PFSP to minimise total tardiness (see e.g. Vallada and Ruiz, 2010); the PFSP to minimise makespan subject to maximum tardiness (see e.g. Fernandez-Viagas and Framinan, 2015b); and the distributed PFSP to minimise makespan (see e.g. Naderi and Ruiz, 2010 and Fernandez-Viagas and Framinan, 2015a). However, to the best of our knowledge, they have not been applied to the BFSP so far. 3 Problem statement. Mathematical model The problem under study can be stated as follows: a set Nof njobs have to be scheduled in a flow shop consisting on a set Mof mmachines without intermediate buffers. Each machine is always available and can process at most one job at the same time. Each job j∈ N has a non preemptive processing time pij on each machine i∈ M. Set up times are sequence-independent and non-anticipatory (see Framinan et al., 2014) and thus can be included in the processing times of each job. Given a sequence Π := (π1, ...πn), let cij(Π) and eij(Π) represent the departure and 6
start time of job jfrom (on) machine i, respectively. Note that the departure time of a job must not necessarily be equal to its completion time, as the next machine can block this job after its completion (denoted as blocking time, see Figure 1). Similarly, ci[r](Π) represents the departure time of job in position r∈[1, n]of sequence Πfrom machine i, i.e. ci[r](Π) = ciπr. By means of these variables, the total flowtime, denoted as T F , can be defined by Expression (1). TF = n ∑ r=1 cm[r](1) Where the departure times can be recursively obtained according to the following expressions (Ronconi, 2004): c0[1](Π) = 0 ci[1](Π) = i ∑ q=1 pqπ1, i = 1, ..., m −1 c0[r](Π) = c1,[r−1](Π), r = 2, ..., n ci[r](Π) = max{ci−1,[r](Π) + piπr, ci+1,[r−1](Π)}, r = 2, ..., n, i = 1, ..., m −1 cm[r](Π) = cm−1,[r](Π) + pmπr, r = 1, ..., n Figure 1: Example of the problem under study. 7
4 Proposed Heuristic 4.1 Introduction In this section, a beam-search-based constructive heuristic, BS, is proposed to solve the Fm|block|∑Cj which successfully combines the diversification of population-based metaheuristics with the speed of constructive heuristics. The algorithm simultaneously constructs several partial sequences in each iteration (denoted as candidate nodes) by appending jobs one by one and keeping the best ones (denoted as selected nodes) over all candidates. A simple example of the algorithm with four jobs is shown in Figure 2. More specifically, the algorithm is composed of the following phases: Figure 2: Example of the proposed algorithm. •Obtain the initial selected nodes •For niterations: –Construct candidate nodes –Evaluate candidates nodes –Select the best candidates nodes (selected nodes) These steps are detailed in the next subsections. However, we first must introduce in Section 4.2 some notation required. 8
4.2 Notation The proposed heuristic appends the jobs at the end of a partial sequence. Note that, when a new job qis placed after the last position (position k+ 1) of a partial sequence Πk:= (π1, . . . , πk)of length k, the departure and the start times of job qcan be computed according to Expressions (2) and (3), respectively. Obviously, ci[k](Π) represents the departure time of the job placed in the last position of Πk(i.e. before job q). Additionally, let tq(Πk)and bq(Πk)be the total idle and the total blocking time induced by job q, respectively, see Expressions (4) and (5). ciq(Πk) = ci[k](Πk) + piq, i = 1 max{ci−1,q(Πk) + piq, ci+1,[k](Πk)},∀i={2, . . . , m −1} ci−1,q(Πk) + piq, i =m (2) eiq(Πk) = ci[k](Πk), i = 1 ci−1,q(Πk),∀i={2, . . . , m} (3) tq(Πk) = m ∑ i=2 max{ei−1,q(Πk) + pi−1,q −ci[k](Πk),0}(4) bq(Πk) = m ∑ i=2 max{ci[k](Πk)−(ei−1,q(Πk) + pi−1,q),0}(5) Let us denote by x(beam width) the number of selected nodes in each iteration. At iteration k(k= 1, . . . , n), selected node l(l= 1, . . . , x) is composed of ksequenced jobs (partial sequence) denoted as Sk l:= (sk 1l, . . . , sk kl), and a set of n−kunsequenced jobs denoted as Uk l:= {uk 1l, . . . , uk n−k,l}. Additionally, as the proposed algorithm is composed of a set of partial sequences in each iteration, let us extend the notation and denote by ck iql and ek iql the departure and start times of job qon machine iof selected node lin iteration k(i.e. ck iql =ciq(Sk l)and ek iql =eiq(Sk l)), respectively. Analogously, tk ql and bk ql represent the total idle and total blocking times of job qon machine iof selected node lin iteration k(i.e. tk ql =tq(Sk l)and tk ql =tq(Sk l)), respectively. Finally, let ck ql represent the departure time of job qfrom the last machine m, i.e. ck ql := ck mql. 9
composed of the set of 120 instances of Taillard (1993), which is the most common benchmark for the studied problems (see e.g. Wang et al., 2010, Han et al., 2011, Han et al., 2012, Han et al., 2013, Ribas et al., 2015, Ribas and Companys, 2015). The benchmark consists of a set of 12 instance sizes for n∈ {20,50,100,200,500}and m∈ {5,10,20}, where the processing times are generated with an uniform distribution [1,99]. For each instance size, 10 instances are constructed. 5.2 Experimental Parameter Tuning In this section, we perform an experimental tuning of parameter ain the proposed heuristic on set B1. Regarding the values for the parameter x, we consider x∈ {2,5,15, n/10, n}(see e.g. Liu and Reeves, 2001; Fernandez-Viagas and Framinan, 2015c for similar values of the parameters in other constructive heuristics working with a pool of partial sequences), since this parameter is directly proportional to the CPU time and complexity of the algorithm. The computational experiments for the parameter aare carried out for the proposed BS(x= 5) and the same value is used for each other value of x. We use the following values for parameter a∈ {1,2,3, ..., 23,24,25}. The relationship between the levels of the parameters is evaluated by means of a nonparametric Kruskal-Wallis test since normality and homoscedasticity assumptions are not fulfilled. Note that the Relative Percentage Deviation RPD1–Expression (15)– is used to measure the quality of the solution of the heuristic for each instance. RPD1 = O−Base Base ·100 (15) As a result of the experiments, it turns out that there are statistically significant differences between the levels of the three parameters, since the p-values obtained for the parameters n,m and aare 0.000. The best value found for parameter ais 14, which is used in Section 5.5 in BS(x)∀x∈ {2,5,15, n/10, n}. 16
5.3 Implemented Heuristics In this section, the heuristics included in the computational evaluation are listed. According to the literature review in Section 2, 11 heuristics have been published so far for this problem. Additionally, we adapt 8 and 18 heuristics for the Fm|block|Cmax and for the classical PFSP problem, respectively, given their excellent performance. Finally, the proposed beam-searchbased constructive heuristic is added to the comparison. In summary, the heuristics implemented are: •Heuristics of the Fm|block|∑Cjproblem: –Heuristic NEH_WPT: Wang et al. (2010). –Heuristic MME: Han et al. (2011) (adapted from Ronconi, 2004 for F m|block|Cmax). –Heuristic MME-A: Han et al. (2013). –Heuristic MME-B: Han et al. (2013) (adapted from Han et al., 2012 for Fm|block|Cmax). –Heuristic NEH-MK: Moslehi and Khorasanian (2013). –Heuristic PF: Ribas and Companys (2015) (adapted from Ronconi, 2004 for Fm|block|Cmax). –Heuristics HPF1 and HPF2: Ribas and Companys (2015). –Heuristics NPF, NHPF1 and NHPF2: Ribas and Companys (2015). –Heuristics BS(x),∀x∈ {2,5,15, n/10, n}: Proposed heuristic. •Heuristics adapted from the Fm|block|Cmax problem: –Heuristics wPF and PW: Pan and Wang (2012). These heuristics are implemented as the original ones. For the final sequence, the total flowtime is calculated. –Heuristics PF-NEH(x), wPF-NEH(x)and PW-NEH(x),∀x∈ {1,2,5}: Pan and Wang (2012). In the NEH-based phase of the algorithms, each evaluation of makespan is replaced by the evaluation of total flowtime. Note that these heuristics include the evaluation of the objective function before applying the NEH-based phase (proposed by Ribas et al., 2013). The other improvement proposed by Ribas et al. (2013) (reversibility property) cannot be applied for total flowtime minimisation. 17
–Heuristics PF-NEHLS(x), wPF-NEHLS(x)and PW-NEHLS(x),∀x∈ {1,2,5}: Pan and Wang (2012). In both the NEH-based and the local search phases of the algorithms, each evaluation of makespan is replaced by the evaluation of total flowtime. •Heuristics adapted from the traditional PFSP to minimize total flowtime (Fm|prmu|∑Ci). To adapt the heuristics, each evaluation of the total flowtime of a partial sequence is replaced by the evaluation of the total flowtime with blocking. Note that the indexes of initial sequences and FF and LR-based heuristics are not changed since the objective is the same. –Heuristic LR(1): Liu and Reeves (2001). –Heuristic FF(x), ∀x∈ {1,2, n/10, n/m}: Fernandez-Viagas and Framinan (2015c). –Heuristic FF-FPE(x, y), ∀(x, y)∈ {(2, n/10),(15, n/10),(n/10,1),(n/10,1),(n/10, n/10), (n/10, n),(n/m, n),(n, n)}: Liu and Reeves (2001) with FF(x) instead of LR(x) heuristic. –Heuristics FF-ICH1, FF-ICH2 and FF-ICH3: Li et al. (2009) with FF(x) instead of LR(x) heuristic. –Heuristic FF-NEH(x) for x= 5,10: Pan and Ruiz (2013) with FF(x) instead of LR(x) heuristic. –Heuristic Raj: Rajendran (1993). –Heuristic RZ: Rajendran and Ziegler (1997). –Heuristic RZ_LW: Li and Wu (2005). –Heuristics FF-PR1(x) for x= [5,10,15]: Pan and Ruiz (2013) with FF(x) instead of LR(x) heuristic. •Heuristics adapted from the traditional PFSP to minimize makespan (Fm|prmu|Cmax). Given a partial sequence, each evaluation of the makespan of this sequence is replaced by the evaluation of total flowtime with blocking: –Heuristic NEH proposed by Nawaz et al. (1983). 18
–Heuristics FRB2, FRB3, FRB4k(with k= [2,4,6,8,10,12]) and FRB5: Rad et al. (2009). Due to the good results found by the NEH_WPT as compared to the original NEH, these heuristics are initialized in a non-decreasing sum of processing times. Hence, a total of 36 heuristics are compared in this paper. In order to have a fair comparison under the same conditions, the following items are fulfilled: •All 36 heuristics are fully re-coded in C# under the same compiler. Some of them have been executed for different values of the parameters, yielding a total of 70 heuristics which are tested. •The same libraries and common functions are used for all implemented heuristics. •All heuristics are tested under the same computer, an Intel Core i7-3770 with 3.4 GHz and 16 GB RAM. 5.4 Indicators to evaluate heuristics Heuristics are evaluated and compared according to the quality of their solutions and their computational effort. Traditionally, the former is measured by the Average Relative Percentage Deviation –denoted as ARPDhfor heuristic h, see Equation (16)–, while the Average CPU time –denoted as ACPUhfor heuristic h, see Equation (17)– is the indicator used to measure the latter. ARPDh=∑∀sRP D2h,s S(16) ACPUh=∑∀sTh,s S(17) where Sis the total number of instances (with s= 1..S), Th,s is the CPU time of heuristic hin instance s, and RP D2h,s is defined by (18) being Beststhe minimum total flowtime time among the implemented heuristics (available as on-line materials). RPD2h,s =OFh,s −Bests Bests ·100 (18) 19
5.5 Computational Evaluation of Heuristics Each implemented heuristic is tested on benchmark B2. Computational results are shown in Table 1 in terms of ARPD (second and fifth columns) and ACPU (third and sixth columns). The best ARPDs are found by the proposed heuristic BS(x) (∀x∈ {5,15, n/10, n}) being 1.239, 0.687, 1.029 and 0.333 respectively. Note the distance among the best heuristic BS(n) and the best non-proposed heuristics which is 1.682 found by PF-NEHLS(5) heuristic. Furthermore, the BS(n) needs in average 42.73% less CPU time than PF-NEHLS(5), i.e. ACPUBS(n)is 13.148 seconds while ACPUPF-NEHLS(5) is 22.959 seconds. Graphically, the heuristics are shown in Figure 3. More detailed results of ARPD and ACPU for each size for the problem are shown in Tables 2 and 3 respectively. The proposed heuristic BS(x) (∀x∈ {2,5,15, n}) is efficient as there is no other heuristic with lower ACPU and ARPD. The excellent performance of the proposed heuristic is also highlighted by the 33 the new upper bounds found for the problem. Their sequences and the objectives functions are available as on-line material. Note that its good performance presumably lies in the high number and the quality of the sequences evaluated using lower complexity order. On the one hand, let us compare the sequences evaluated and the complexity between BS(x) and the well-known NEH heuristic: the number of sequences evaluated by NEH is n(n+1) 2−1, and its complexity order is O(n3m), whereas the number of sequences evaluated by BS(x) is xn(n+1) 2−1, and its complexity order is O(max{xn2m, x2n2}). Thereby, e.g. BS(1) evaluates the same number of sequences than NEH, but with complexity O(n2m)instead of O(n3m). For BS(n/10), the number of sequences evaluated is n 10 n(n+1) 2−1and its complexity is still lower than O(n3m), since both xn2m=n3m/10 < n3mand x2n2=n4/100 < n3mfor each instance in benchmark B2. On the other hand, each sequence evaluated in BS(x) comes from one of the best sequences in the previous iteration, which ensures the high quality of the sequences to be evaluated. Table 4 summarises the ARPD values of the most promising heuristics for different values of nand m. Each element of the table indicates the average RPD2for each one of the heuristics in the first row, for the parameter value indicated in the first column, e.g. the value 1.11 of the third row and column is ARPDBS(5) =∑∀s|n=50 RPD2BS(5),s ∑∀s|n=50 1. Note that the number of instances for each parameter is not the same in benchmark B2. Results show the good performance of 20
Figure 3: ARPD against ACPU.X-axis (ACPU) is shown in logarithmic scale. For sake of clarity, only the name of the most representative heuristics is depicted. The full results are shown in Tables 1. the proposed heuristics BS(n/10) and BS(n) with the increase in n, which probably lies in the proportional relationship between nand the beam width in both heuristics. Regarding m, the ARPD of the proposed heuristic decreases with m, whereas the performance of the improvement heuristics PF-NEHLS(2), FF-FPE(n/10,n), FF-ICH1 and FF-ICH2 decrease as mincreases. Regarding heuristics adapted from related decision problems, some of them yield an excellent performance as compared to heuristics specifically implemented for the problem under study. Thereby, e.g. the heuristics PF-NEH(2), FF-FPE(n/10,1) and PF-NEH(5) (with an ARPD of 3.22, 3.27 and 2.67 respectively) clearly outperform NEH_WPT, MME_A, MME, MME_B and NPF (ARPDs of 4.82, 4.55, 4.58, 4.80 and 3.56 respectively) using less ACP U. PF-NEH(5) even slightly outperforms NHPF1 and NHPF2 with 3.08, and 2.92 of ARPD respectively. In fact, the best ARP D among the non-proposed heuristics is found by PF-NEHLS(5), which was originally proposed for the Fm|block|Cmax problem. In order to statistically justify the efficiency of the proposed heuristic, we compare it with the best heuristics requiring higher ACPU. We use a Holm’s procedure (Holm, 1979) to contrast the following hypotheses: •H1: BS(5) = PF-NEH(2) 21
Table 1: ARPDs and ACPUs of the implemented heuristics (ordered by increasing ACPU). In bold it is indicated the proposed set of heuristics. Heuristic ARPD ACPU Heuristic ARPD ACPU PF 4.529 0.004 FF-NEH(5) 3.340 0.813 HPF2 3.349 0.005 FF-FPE(n/10,n/10) 2.945 0.890 HPF1 3.813 0.005 PW-NEH(5) 3.828 1.091 FF(1) 4.028 0.006 FRB423.452 1.509 wPF 6.423 0.007 FF-NEH(10) 3.286 1.623 FF(2) 3.750 0.012 FRB443.025 2.386 BS(2) 2.614 0.019 FRB482.807 3.205 BS(5) 1.239 0.043 FRB482.684 3.946 wPF-NEH(1) 4.915 0.044 FF-ICH1 2.313 4.271 PF-NEH(1) 3.670 0.051 PF-NEHLS(1) 2.462 4.548 Raj 6.184 0.063 FRB410 2.584 4.723 wPF-NEH(2) 4.304 0.087 FF-FPE(n/10,n) 2.258 4.776 PF-NEH(2) 3.221 0.101 PW-NEHLS(1) 3.560 4.847 FF(n/m) 3.573 0.117 FF-FPE(n/m,n) 2.250 5.058 BS(15) 0.687 0.127 wPF-NEHLS(1) 3.508 5.225 PW 5.926 0.182 FRB412 2.558 5.372 LR(1) 4.039 0.184 FF-FPE(n,n) 2.209 6.943 wPF-NEH(5) 3.732 0.216 PF-NEHLS(2) 2.120 9.504 PW-NEH(1) 4.885 0.219 RZ_LW 3.891 9.651 FF(n/10) 3.548 0.224 PW-NEHLS(2) 3.197 10.164 FF-FPE(n/10,1) 3.266 0.234 FF-ICH2 1.896 10.745 PF-NEH(5) 2.669 0.250 wPF-NEHLS(2) 3.056 11.037 NEH 9.043 0.262 BS(n) 0.333 13.148 NEH_WPT 4.816 0.264 FRB2 3.814 13.749 MME_A 4.553 0.266 PF-NEHLS(5) 1.682 22.959 MME 4.576 0.267 FF-PR1(5) 1.978 26.477 MME_B 4.797 0.268 PW-NEHLS(5) 2.647 28.197 NHPF1 3.080 0.277 wPF-NEHLS(5) 2.516 29.102 NHPF2 2.921 0.277 FF-ICH3 1.902 29.157 NPF 3.563 0.277 FF-PR1(10) 1.801 34.279 BS(n/10) 1.029 0.403 FF-PR1(15) 1.720 35.965 PW-NEH(2) 4.375 0.439 FRB3 2.321 96.546 FF-FPE(15,n/10) 2.879 0.732 NEH-MK 2.229 96.771 RZ 6.066 0.792 FRB5 2.269 176.403 FF-FPE(2,n/10) 3.057 0.801 22
Table 2: Detailed values of ARPD for each size of the problem. The proposed set of heuristics is indicated in bold. Heuristic Size of the problem (nxm)ARP D 20x5 20x10 20x20 50x5 50x10 50x20 100x5 100x10 100x20 200x10 200x20 500x20 NEH_WPT 2.92 2.84 3.39 5.03 4.31 3.56 6.70 5.31 4.39 6.97 5.36 7.00 4.816 MME 2.88 2.74 2.17 5.16 3.81 3.31 5.94 5.27 3.81 7.08 5.67 7.06 4.576 MME_A 2.76 2.69 2.20 5.02 3.88 3.21 5.90 5.26 4.30 7.03 5.35 7.05 4.553 MME_B 3.39 3.26 3.34 4.89 4.15 3.35 6.40 5.41 4.84 6.69 5.17 6.69 4.797 NEH-MK 1.13 0.92 0.69 2.42 1.51 0.93 3.50 2.42 1.84 4.22 2.82 4.35 2.229 PF 4.78 4.63 4.23 5.26 3.90 4.81 7.80 4.47 3.96 4.16 3.39 2.94 4.529 HPF1 4.04 4.74 3.87 3.12 4.12 4.64 2.92 3.59 4.48 3.26 3.86 3.11 3.813 HPF2 3.71 3.02 3.80 2.99 2.50 3.96 2.73 2.94 4.72 2.94 3.64 3.25 3.349 NPF 2.62 2.49 2.65 4.15 2.94 3.34 6.41 4.18 3.49 4.16 3.39 2.94 3.563 NHPF1 2.60 2.58 2.67 2.89 2.99 3.26 2.86 3.42 3.69 3.15 3.74 3.11 3.080 NHPF2 2.73 2.21 2.58 2.71 2.50 3.14 2.74 2.94 3.80 2.83 3.63 3.25 2.921 BS(2) 1.64 1.90 2.34 2.65 2.25 2.99 2.65 2.51 3.04 2.73 3.50 3.18 2.614 BS(5) 0.50 1.04 1.72 1.17 0.71 1.44 1.25 1.09 1.60 1.33 1.46 1.56 1.239 BS(15) 0.17 1.13 1.64 0.33 0.41 0.94 0.68 0.49 0.41 0.67 0.54 0.84 0.687 BS(n/10) 1.64 1.90 2.34 1.17 0.71 1.44 0.71 0.48 0.74 0.44 0.39 0.39 1.029 BS(n) 0.21 1.09 1.56 0.11 0.12 0.58 0.12 0.03 0.07 0.00 0.09 0.00 0.333 wPF 6.11 4.77 3.58 8.64 7.08 4.06 10.47 7.10 4.18 9.29 5.73 6.07 6.423 PW 7.22 2.73 2.62 9.58 6.11 2.46 10.57 6.60 3.63 8.67 5.14 5.77 5.926 PF-NEH(1) 2.87 2.49 2.73 4.35 2.90 3.87 7.10 4.02 3.75 4.17 2.98 2.81 3.670 PF-NEH(2) 2.45 2.08 2.13 4.29 2.15 2.88 6.55 3.45 3.03 4.02 2.89 2.72 3.221 PF-NEH(5) 1.96 1.45 1.63 3.52 1.97 2.26 5.57 2.43 2.67 3.51 2.62 2.43 2.669 wPF-NEH(1) 2.87 2.22 2.40 6.16 4.98 3.04 8.75 5.40 3.60 8.73 5.18 5.64 4.915 wPF-NEH(2) 2.61 1.92 1.88 5.50 3.58 2.44 8.00 5.26 3.11 7.47 4.53 5.35 4.304 wPF-NEH(5) 1.81 1.74 1.47 4.68 3.06 1.73 7.25 4.86 2.51 6.69 3.86 5.14 3.732 PW-NEH(1) 2.84 2.58 2.86 6.78 4.44 1.89 9.52 5.85 3.29 8.15 4.82 5.61 4.885 PW-NEH(2) 2.62 2.39 1.63 5.61 3.88 1.77 9.25 5.32 2.80 7.68 4.23 5.34 4.375 PW-NEH(5) 1.96 1.73 1.44 5.26 3.09 1.50 7.54 4.97 2.60 6.74 3.90 5.21 3.828 PF-NEHLS(1) 1.52 1.08 1.04 3.30 2.04 1.21 5.41 3.17 2.30 3.70 2.37 2.39 2.462 PF-NEHLS(2) 1.03 0.89 0.71 3.10 1.30 1.01 4.92 2.58 1.85 3.54 2.22 2.27 2.120 PF-NEHLS(5) 0.65 0.47 0.33 2.48 0.97 0.71 4.03 1.88 1.48 3.12 1.95 2.10 1.682 wPF-NEHLS(1) 1.78 1.21 0.98 4.59 3.13 1.47 5.52 4.32 2.87 6.53 4.45 5.25 3.508 wPF-NEHLS(2) 1.09 1.01 0.66 3.88 2.38 1.22 4.87 4.13 2.38 6.15 4.00 4.93 3.056 wPF-NEHLS(5) 0.62 0.49 0.30 3.16 1.97 0.65 4.22 3.64 1.92 5.23 3.31 4.69 2.516 PW-NEHLS(1) 1.91 0.81 0.77 5.12 3.29 1.31 6.20 4.34 2.74 6.67 4.24 5.33 3.560 PW-NEHLS(2) 1.37 0.68 0.63 4.40 2.63 1.20 6.16 3.98 2.33 6.06 3.82 5.10 3.197 PW-NEHLS(5) 0.94 0.48 0.37 3.60 1.93 0.78 4.72 3.40 1.97 5.25 3.49 4.82 2.647 LR(1) 4.30 2.99 2.25 6.00 3.50 2.25 7.13 5.11 2.60 5.59 2.94 3.81 4.039 FF(1) 3.99 2.74 2.34 6.21 3.36 2.38 6.74 5.68 2.63 5.28 3.21 3.77 4.028 FF(2) 3.64 2.63 1.96 5.65 3.30 2.28 6.33 5.23 2.35 4.92 3.10 3.61 3.750 FF(n/10) 3.64 2.63 1.96 5.21 3.14 2.21 6.17 4.43 2.10 4.74 2.95 3.38 3.548 FF(n/m) 3.47 2.63 2.34 5.15 3.14 2.28 6.10 4.43 2.18 4.74 2.97 3.43 3.573 FF-FPE(2,n/10) 2.54 2.04 1.53 4.82 2.91 1.71 5.19 3.83 2.03 4.13 2.78 3.18 3.057 FF-FPE(15,n/10) 2.46 2.04 1.51 4.30 2.72 1.55 4.91 3.46 1.83 3.99 2.70 3.07 2.879 FF-FPE(n/10,1) 3.07 2.19 1.54 4.92 2.98 1.95 5.88 4.05 1.97 4.52 2.86 3.26 3.266 FF-FPE(n/10,n/10) 2.54 2.04 1.53 4.57 2.95 1.56 5.10 3.60 1.83 3.99 2.71 2.93 2.945 FF-FPE(n/10,n) 1.53 1.43 1.10 3.22 1.99 1.28 3.30 2.93 1.65 3.41 2.53 2.73 2.258 FF-FPE(n/m,n) 1.57 1.43 1.12 3.07 1.99 1.27 3.17 2.93 1.70 3.41 2.50 2.84 2.250 FF-FPE(n,n) 1.57 1.43 1.11 3.07 1.91 1.14 3.17 2.88 1.65 3.36 2.51 2.72 2.209 FF-ICH1 1.74 0.96 0.78 3.19 2.03 1.12 4.28 2.85 1.64 3.72 2.51 2.93 2.313 FF-ICH2 1.46 0.76 0.72 2.38 1.64 0.92 2.94 2.39 1.51 2.99 2.27 2.78 1.896 FF-ICH3 1.55 0.76 0.77 2.41 1.74 0.84 2.93 2.21 1.48 3.08 2.29 2.76 1.902 FF-NEH(5) 2.60 2.01 1.60 5.09 2.89 1.93 5.98 4.53 2.16 4.75 2.96 3.57 3.340 FF-NEH(10) 2.60 2.01 1.59 5.02 2.89 1.92 5.93 4.23 2.06 4.69 2.96 3.54 3.286 Raj 4.42 3.20 3.54 6.22 4.91 4.96 9.43 6.62 6.21 9.28 6.52 8.89 6.184 RZ 3.68 2.29 2.01 6.52 5.11 3.46 9.07 7.48 5.40 10.33 7.62 9.83 6.066 RZ_LW 1.48 1.81 0.92 4.12 3.39 2.51 5.67 4.77 3.65 6.35 5.06 6.96 3.891 FF-PR1(5) 0.59 0.65 0.29 2.37 1.35 0.60 4.02 2.98 1.55 3.78 2.36 3.19 1.978 FF-PR1(10) 0.43 0.39 0.22 2.05 1.31 0.42 3.85 2.60 1.38 3.53 2.26 3.17 1.801 FF-PR1(15) 0.37 0.36 0.21 2.05 1.09 0.41 3.57 2.38 1.31 3.51 2.22 3.17 1.720 NEH 6.26 5.27 3.69 11.27 8.53 6.51 12.93 10.74 8.09 13.83 9.87 11.55 9.043 FRB2 1.48 1.75 0.62 4.07 3.07 1.52 6.24 5.06 3.05 7.19 4.92 6.81 3.814 FRB3 1.30 0.88 0.71 2.73 1.58 1.15 3.82 2.57 1.87 4.05 2.88 4.31 2.321 FRB421.95 1.67 1.65 3.40 2.92 1.71 5.27 3.58 3.02 6.13 4.17 5.95 3.452 FRB441.62 1.16 1.13 3.10 2.43 1.73 4.65 3.62 2.47 5.24 3.69 5.46 3.025 FRB481.49 1.23 0.75 2.96 2.37 1.52 4.23 3.07 2.52 4.87 3.46 5.21 2.807 FRB481.31 1.02 0.86 2.90 1.84 1.41 4.32 3.01 2.28 4.84 3.49 4.93 2.684 FRB410 1.30 0.96 0.77 2.93 1.75 1.40 4.22 2.81 2.08 4.49 3.28 5.01 2.584 FRB412 1.30 0.96 0.81 2.74 1.69 1.40 4.13 2.72 2.36 4.44 3.21 4.93 2.558 FRB5 1.25 0.94 0.69 2.58 1.63 0.79 3.87 2.56 1.76 4.13 2.86 4.16 2.269 23
Table 3: Detailed values of CPU times for each size of the problem. The proposed set of heuristics is indicated in bold. Heuristic Size of the problem (nxm)ACP U 20x5 20x10 20x20 50x5 50x10 50x20 100x5 100x10 100x20 200x10 200x20 500x20 NEH_WPT 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.02 0.07 0.16 2.89 0.264 MME 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.07 0.16 2.91 0.267 MME_A 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.02 0.07 0.16 2.90 0.266 MME_B 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.02 0.07 0.16 2.92 0.268 NEH-MK 0.00 0.00 0.01 0.03 0.06 0.11 0.39 0.72 1.53 10.39 24.24 1123.77 96.771 PF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.03 0.004 HPF1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.04 0.005 HPF2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.04 0.005 NPF 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.03 0.08 0.17 3.02 0.277 NHPF1 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.03 0.08 0.17 3.02 0.277 NHPF2 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.03 0.08 0.17 3.02 0.277 BS(2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.04 0.14 0.019 BS(5) 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.03 0.05 0.07 0.33 0.043 BS(15) 0.00 0.00 0.00 0.01 0.01 0.02 0.03 0.04 0.06 0.12 0.18 1.04 0.127 BS(n/10) 0.00 0.00 0.00 0.00 0.00 0.01 0.02 0.03 0.04 0.16 0.25 4.33 0.403 BS(n) 0.00 0.00 0.00 0.04 0.05 0.06 0.28 0.33 0.45 4.10 5.03 147.44 13.148 wPF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.05 0.007 PW 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.02 0.07 0.14 1.92 0.182 PF-NEH(1) 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.02 0.03 0.07 0.48 0.051 PF-NEH(2) 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.03 0.05 0.13 0.96 0.101 PF-NEH(5) 0.00 0.00 0.00 0.01 0.01 0.02 0.02 0.03 0.07 0.13 0.32 2.39 0.250 wPF-NEH(1) 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.02 0.03 0.06 0.41 0.044 wPF-NEH(2) 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.03 0.05 0.11 0.82 0.087 wPF-NEH(5) 0.00 0.00 0.00 0.01 0.01 0.02 0.02 0.03 0.06 0.12 0.28 2.05 0.216 PW-NEH(1) 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.03 0.09 0.19 2.27 0.219 PW-NEH(2) 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.03 0.06 0.18 0.37 4.58 0.439 PW-NEH(5) 0.00 0.00 0.00 0.01 0.02 0.03 0.04 0.07 0.15 0.44 0.91 11.41 1.091 PF-NEHLS(1) 0.00 0.00 0.00 0.01 0.02 0.04 0.06 0.11 0.23 1.00 2.37 50.74 4.548 PF-NEHLS(2) 0.00 0.00 0.01 0.02 0.03 0.07 0.11 0.23 0.48 1.84 5.07 106.19 9.504 PF-NEHLS(5) 0.00 0.01 0.01 0.03 0.07 0.17 0.28 0.50 1.30 4.50 12.51 256.12 22.959 wPF-NEHLS(1) 0.00 0.00 0.00 0.01 0.02 0.04 0.07 0.11 0.25 1.25 2.25 58.69 5.225 wPF-NEHLS(2) 0.00 0.00 0.01 0.02 0.03 0.07 0.13 0.21 0.47 2.27 5.03 124.21 11.037 wPF-NEHLS(5) 0.00 0.01 0.01 0.04 0.08 0.16 0.34 0.55 1.28 5.75 13.88 327.12 29.102 PW-NEHLS(1) 0.00 0.00 0.00 0.01 0.02 0.03 0.08 0.13 0.29 1.25 3.12 53.22 4.847 PW-NEHLS(2) 0.00 0.00 0.01 0.02 0.04 0.07 0.15 0.24 0.58 2.72 6.28 111.86 10.164 PW-NEHLS(5) 0.00 0.01 0.01 0.04 0.08 0.16 0.37 0.59 1.43 6.35 14.57 314.74 28.197 LR(1) 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.07 0.14 1.95 0.184 FF(1) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.05 0.006 FF(2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.10 0.012 FF(n/10) 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.08 0.16 2.40 0.224 FF(n/m) 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.08 0.08 1.20 0.117 FF-FPE(2,n/10) 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.04 0.14 0.38 9.01 0.801 FF-FPE(15,n/10) 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.03 0.06 0.20 0.45 7.99 0.732 FF-FPE(n/10,1) 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.03 0.09 0.17 2.49 0.234 FF-FPE(n/10,n/10) 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.03 0.05 0.22 0.49 9.86 0.890 FF-FPE(n/10,n) 0.00 0.00 0.00 0.01 0.01 0.03 0.07 0.11 0.23 1.04 2.41 53.40 4.776 FF-FPE(n/m,n) 0.00 0.00 0.00 0.01 0.01 0.03 0.08 0.11 0.22 1.04 2.33 56.86 5.058 FF-FPE(n,n) 0.00 0.00 0.00 0.02 0.03 0.05 0.11 0.20 0.40 1.73 3.76 77.00 6.943 FF-ICH1 0.00 0.00 0.00 0.01 0.02 0.03 0.07 0.11 0.25 0.90 1.97 47.88 4.271 FF-ICH2 0.00 0.00 0.01 0.02 0.03 0.06 0.14 0.23 0.46 2.42 5.90 119.68 10.745 FF-ICH3 0.00 0.00 0.01 0.03 0.04 0.08 0.34 0.50 0.82 6.42 10.97 330.67 29.157 FF-NEH(5) 0.00 0.00 0.00 0.01 0.01 0.01 0.02 0.03 0.07 0.22 0.50 8.88 0.813 FF-NEH(10) 0.00 0.00 0.00 0.01 0.01 0.02 0.04 0.06 0.13 0.43 1.00 17.76 1.623 Raj 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.04 0.67 0.063 RZ 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.03 0.06 0.20 0.47 8.71 0.792 RZ_LW 0.00 0.00 0.00 0.01 0.02 0.04 0.08 0.14 0.41 1.60 4.42 109.08 9.651 FF-PR1(5) 0.00 0.01 0.01 0.04 0.07 0.15 0.26 0.55 1.20 4.97 12.14 298.32 26.477 FF-PR1(10) 0.01 0.01 0.02 0.08 0.14 0.31 0.54 1.13 2.44 10.20 23.93 372.53 34.279 FF-PR1(15) 0.01 0.02 0.03 0.11 0.21 0.47 0.83 1.68 3.81 15.22 36.66 372.54 35.965 NEH 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.07 0.16 2.87 0.262 FRB2 0.00 0.00 0.01 0.01 0.03 0.14 0.06 0.23 0.97 1.67 8.19 153.68 13.749 FRB3 0.00 0.00 0.01 0.03 0.06 0.11 0.38 0.70 1.49 10.25 23.88 1121.64 96.546 FRB420.00 0.00 0.00 0.01 0.01 0.02 0.03 0.05 0.11 0.38 0.89 16.60 1.509 FRB440.00 0.00 0.00 0.01 0.01 0.03 0.04 0.08 0.17 0.59 1.41 26.29 2.386 FRB480.00 0.00 0.00 0.01 0.02 0.03 0.06 0.11 0.23 0.77 1.86 35.38 3.205 FRB480.00 0.00 0.00 0.01 0.02 0.04 0.07 0.13 0.28 0.95 2.29 43.56 3.946 FRB410 0.00 0.00 0.01 0.01 0.02 0.04 0.08 0.15 0.32 1.12 2.69 52.23 4.723 FRB412 0.00 0.00 0.01 0.02 0.03 0.05 0.09 0.17 0.37 1.28 3.06 59.39 5.372 FRB5 0.00 0.00 0.01 0.04 0.08 0.17 0.62 1.11 2.61 17.50 41.14 2053.54 176.403 24
Parameter BS(2) BS(5) BS(15) BS(n/10) BS(n) HPF2 PF-NEH(5) PF-NEHLS(2) FF-FPE(n/10,n) FF-ICH1 FF-ICH2 n=20 1.96 1.09 0.98 1.96 0.95 3.51 1.68 0.49 1.35 1.16 0.98 n=50 2.63 1.11 0.56 1.11 0.27 3.15 2.58 1.39 2.16 2.11 1.65 n=100 2.73 1.31 0.52 0.64 0.08 3.46 3.56 2.46 2.63 2.92 2.28 n=200 3.11 1.39 0.61 0.41 0.05 3.29 3.06 2.53 2.97 3.12 2.63 n=500 3.18 1.56 0.84 0.39 0.00 3.25 2.43 2.10 2.73 2.93 2.78 m=5 2.31 0.97 0.39 1.18 0.15 3.14 3.68 2.39 2.68 3.07 2.26 m=10 2.35 1.04 0.68 0.88 0.31 2.85 2.34 1.61 2.44 2.39 1.95 m=20 3.01 1.56 0.87 1.06 0.46 3.87 2.32 1.31 1.86 1.80 1.64 Table 4: ARPDs of the most promising heuristics depending on the parameters nand m i Hip-value Mann-Whitney α/(k−i+ 1) Holm’s Procedure 1 BS(5) = PF-NEH(2) 0.000 R 0.0167 R 2 BS(15) = FF-ICH2 0.000 R 0.0250 R 3 BS(n) = PF-NEHLS(5) 0.000 R 0.0500 R Table 5: Holm’s procedure. •H2: BS(15) = FF-ICH2 •H3: BS(n) = PF-NEHLS(5) We use a non-parametric Mann-Whitney test assuming a 0.95 confidence level (i.e. α= 0.05) to establish the p-value of each hypothesis (see e.g. Pan et al., 2008a and Fernandez-Viagas and Framinan, 2015b for similar statistical approach). In Holm’s procedure, a hypothesis iamong a total of k(ordered in ascending order of p-values) is rejected if its p-value is lower than α/(k−i+ 1). The results of the procedure are shown in Table 5. Each p-value is 0.000 and therefore, each hypothesis can be rejected. Regarding the fastest heuristics, i.e. HPF1, HPF2, PF, wPF, FF(1) and FF(2), the best ARPD is found by HPF2. We perform again a Mann-Whitney test to establish the efficiency of HPF1 using the same confidence. We compare it with both HPF2 and FF(2). Results are shown in Table 6. There is no statistical significant difference between HPF2 and FF(2). Hypothesis p-value Mann-Whitney HPF2 = HFP1 0.043 R HPF2 = FF(2) 0.129 Table 6: Comparison of HPF2 against HPF1 and FF(2) using a Mann-Whitney nonparametric test. 25