Integration of solar thermal energy in a conventionaf power plant: The Colon solar project

Silva Pérez, Manuel Antonio; Blanco, M.; Ruiz Hernández, Valeriano

Abstract

This paper reports on the first phase of the Colón Solar Project, originally conceived as the hybrid repowering of an existing thermal power plant, with the addition of a gas turbine in a topping configuration integrating thermal energy (steam) produced by a solar system. However, the project developed in a changing economic environment, in which a new legal structure, still incomplete, as of January, 1998 has liberalized the electricity generation market. This forced the original configuration to be modified, resulting in an all-new combined cycle with solar energy integrated into a Heat Recovery Boiler. Basic plant engineering placed special emphasis on the most important solar components (heliostat and receiver), and an economic analysis showed that the plant is profitable under the assumptions of the analysis. Nevertheless, the relatively low IRR, as well as the uncertainty of realization of some of those assumptions, made the utility postpone its decision to build the plant.

Full text

1 Phys. IV F ance 9 (1 999) P 3-189 in eg a ion o sola he mal ene gy in a con en iona powe plan : The Colon sola p ojec M. Sil a, M. Blanco* and V. Ruiz G upo de Te modinamica, Escuela Supe io de Ingenie os, Camino de 10s Descub imien os s/n, 4 1098 Se illa, Spain * CIEMAT, Pla a o ma Sola de Alme ia, Ca e e a de Senes s/n, Tabe nas, Alme ia, Spain Abs ac . This pape epo s on he i s phase o he Col6n Sola P ojec , o iginally concei ed as he hyb id epowe ing o an exis ing he mal powe plan , wi h he addi ion o a gas u bine in a opping con igu a ion in eg a ing he mal ene gy (s eam) p oduced by a sola sys em. Howe e , he p ojec de eloped in a changing economic en i onmen , in which a new legal s uc u e, s ill incomple e, as o Janua y, 1998 has libe alized he elec ici y gene a ion ma ke . This o ced he o iginal con igu a ion o be modi ied, esul ing in an all-new combined cycle wi h sola ene gy in eg a ed in o a Hea Reco e y Boile . Basic plan enginee ing placed special emphasis on he mos impo an sola componen s (helios a and ecei e ), and an economic analysis showed ha he plan is p o i able unde he assump ions o he analysis. Ne e heless, he ela i ely low IRR, as well as he unce ain y o ealiza ion o some o hose assump ions, made he u ili y pos pone i s decision o build he plan . Since Janua y 1, 1998, he Spanish powe ma ke has been libe alized. This means ha om now on, i s ope a ion will be based on a sys em o supply and demand, unde which he exis ing powe demand a any gi en momen is co e ed by he p oduc ion plan s o e ing he cheapes kwh. Thus hose powe p oduc ion plan s o uni s ha can o e he cheapes kWh a e he i s o ope a e o supply he demand, and he e o e, hose ha ha e he bes possibili y o su i ing in he new compe i i e en i onmen . Wi hin his new de egula ed amewo k, howe e , a kWh c edi is planned (no ye exp essly enac ed), o sola o o he enewable ene gy-based p oduc ion. Such a c edi o elec ici y p oduced om enewable esou ces would p o ide some e y ad an ageous oppo uni ies o sola he mal echnology, which, when in eg a ed in o hyb id powe plan s, could be he key o hei lowe ing con en ional gene a ion cos s (because o he mu ual syne gies o he con en ional and sola echnologies) enabling hem o compe e on he new ma ke . I he sa is ac o y in eg a ion o sola he mal and con en ional plan s can be demons a ed, i will hen be he ma ke ha demands he sola echnology, and, accompanied by he ad ances now unde way in R&D, will lead o i s wide-scale u iliza ioa in he Medi e anean basin and elsewhe e. This demons a ion is one o he main objec i es o he Colon Sola P ojec , which is suppo ed by he The mie p og am o he Eu opean Commission. The ecen ly comple ed i s phase o his p ojec in ol ed 9 o ganiza ions (u ili ies, equipmen manu ac u z s, enginee ing i ms and esea ch cen e s) om 4 di e en Eu opean coun ies, led by one o he u ili ies, Se illana de Elec icidad. This is one o he dis inc i e aspec s o he p ojec compa ed o o he sola ene gy p ojec s, since he leade is a inal use o he echnology, ins ead o an R&D ins i u ion. A icle published online by EDP Sciences and a ailable a h p://dx.doi.o g/10.1051/jp4:1999328 JOURNAL DE PHYSIQUE IV 2. BACKGROUND Fi s concei ed as hyb id epowe ing o an exis ing he mal powe plan wi h a opping con igu a ion based on he exis ing plan , an added gas u bine and an in eg a ed sola ield, he Col6n Sola P ojec employs he SOLGAS concep [I], as de eloped in he APAS SOLGAS P ojec [2]. The SOLGAS concep pos ula es hyb idiza ion o high-e iciency powe plan s (combined B ay on-Rankine cycle, cogene a ion cycles) and he use o Cen al Recei e Sys ems (CRS) as a ealis ic and iable pa h owa ds ma ke able sola he mal ene gy applica ions. Hyb idiza ion has adi ionally been conside ed a means o o e ide he mos signi ican d awbacks o sola ene gy, which is in e mi en and andom, o elec ici y p oduc ion. This poin o iew concei es he ossilpa o he hyb id powe plan p ima ily as auxilia y suppo o adap p oduc ion o he demand when sola ene gy is una ailable o insu icien . Howe e , despi e he conside able p og ess in sola echnology in ecen yea s, none o he p oposals o build sola (hyb id o s and-alone) powe plan s has succeeded, wi h he ema kable excep ion o he SEGS plan s in Cali o nia. Sola he mal echnology seems o be apped in a icious ci cle [2] impeding ma ke access. The concep o he Op imized Powe Plan , which is he co e o he SOLGAS p oposal, is a ealis ic, inno a i e app oach o hyb idiza ion, emphasizing iabili y in he eal-wo ld scena io, in which a la ge sola ac ion o he hyb id plan is no longe ele an . In he p esen si ua ion, any p og ess in ma ke ing sola he mal echnology makes sense. In he same ega d, he SOLGAS concep ad oca es he use o p o en, eliable componen s o he Cen al Recei e Sys em (CRS) echnology, in o de o con ince po en ial use s (u ili ies) and inancial ins i u ions ha he sola he mal (and mo e speci ically, CRS) echnology is no imma u e. This does no imply ha o he mo e ambi ious schemes ha ake ull ad an age o sola adia ion's po en ial o high exe gy a e o go en o may no be easible in he u u e. The sola sys em, which s a s up a sligh ly unde he sa u a ion poin , is used o boil wa e , wi h he ollowing ad an ages: a) Fo he hea exchange ( he "hea eco e y" uni ): I lessens he empe a u e d op be ween he ho gases lea ing he u bine and he coolan in he Rankine cycle. I all bu elimina es he hea -exchange pinch. I does no was e high- empe a u e gas in he ene gy-guzzling e apo a i e p ocess. b) Fo he sola sys em: I alle ia es ope a ing condi ions by elimina ing high empe a u es and ins abili ies associa ed wi h supe hea ing. I inc eases he he mal e iciency o collec ion by aking ad an age o wo-phase hea ans e h oughou mos o o he en i e ecei e . I elimina es he need o s o age. I signi ican ly educes plan s a up ime. c) Fo he o e all sys em: I enables all o he collec ed sola ene gy o be used as a subs i u e o he ossil uel. The sola con ibu ion jus i ies a modes amoun o combus ion in he Rankine cycle, o main ain boiling du ing cloudy pe iods o ea ly and la e in he day 3. PROJECT ORGANIZATION The i s phase o he p ojec in ol ed 10 o ganiza ions led by one o he u ili ies, Se illana de Elec icidad. This is one o he dis inc i e aspec s o he p ojec compa ed o o he sola ene gy p ojec s, since he leade is a inal use o he echnology, ins ead o an R&D ins i u ion. The pa icipan s we e: STCT 9 P 3-191 U ili ies: Se illana de Elec icidad, ENDESA (Spain), EDP (Po ugal) Manu ac u e s / Enginee ing i ms: ABB S all (Sweden), INABENSA, BWE (Spain), PROET (Po ugal) Resea ch ins i u ions: CIEMAT, AICIA (Spain), DLR (Ge many). The h ee g oups we e coo dina ed by Se illana. 4. RESULTS As a consequence o he changes in he legal amewo k since he p ojec was i s p oposed (June, 1996), he ini ial scheme ( opping) p o ed economically un easible in he new elec ici y gene a ion scena io. The plan con igu a ion e ol ed du ing p ojec de elopmen in o a hyb id powe plan in which he powe block is a comple ely new combined cycle (Figu e 1) o which only some auxilia y sys ems o he exis ing powe plan a e eused. Na u al Ga The ABB GTX-100, 43-MW nominal powe gas u bine wo ks a ull load unde no mal ope a ing condi ions. The dual p essu e Hea Reco e y Reco e y Boile , has wo Boile addi ional bu ne s o con ol he low o s eam o he s eam u bine in di e en ope a ing modes and in he e en o sudden changes in sola adia ion. S eam Tu bine design powe is 30-MW, wi h a s eam low o 78.8 /h a 510°C in he high-p essu e (99.8 ba ) sec ion and 15.5 lh a 181°C in he low- S eam Tu bine p essu e (2.76 ba ) sec ion. Table shows he main Figu e 1. Colon Sola plan inal con igu a ion pe o mance pa ame e s o he Colon Sola Plan . Table 1. Main pe o mance pa ame e s o he Colon Sola Plan The Colbn Sola powe plan is loca ed in Huel a (Sou he n Spain) whe e annual i adiance is 2063 kWh/m2. The sola pa is a Cen al Recei e Sys em wi h a collec o subsys em o 489 helios a s (each wi h a 70-m2 e lec i e su ace) and a 21.8 MW,,, s eam ca i y ecei e (powe o luid unde design condi ions), on a owe a a heigh o 109 m. The land allo ed o he p ojec is app oxima ely iangula , bu non-symme ical, c ossed by powe lines and supply duc s. Because o hese cha ac e is ics, he helios a ield (Figu e 2) and he lux on he abso be a e no symme ical and he owe is alle han usual. Howe e , he sola sys em pe o mance pa ame e s a e no e y di e en om hose o a symme ical ield and ecei e beha io is una ec ed. Wi h Sun 28.4 42.7 71.1 70.4 114.8 61.3 Wi hou Sun 20.0 42.7 62.7 60.0 114.8 54.0 S eam Tu bi ie Powe Gas Tu bine Powe To al G oss Powe To al Ne Powe Fuel Consump ion Ne E iciency Uni MW MW MW MW MW s/LHP % s/LHP P 3-192 JOURNAL DE PHYSIQUE IV Figu e 2. Colon Sola helios a ield The main cha ac e is ics and pe o mance pa ame e s o he sola sys em a e p esen ed in Table 2. STCT 9 P 3-193 Table 2. Main cha ac e is ics and pe o mance pa ame e s o he sola sys em The mos signi ican componen s o he sola plan , helios a s and ecei e enginee ing ha e been wo ked ou in g ea de ail. Powe o luid (desipn poin ) .Helios a ield e icienc (desim poin ) Recei e e icienc (design ooin ) Sola s s em e iciency (sola o he mal, design ooin ) Ene gy collec ed by luid (excludins ope a ional losses. ea l ) Helios a ield e icienc ( ea ly) Sola sys em e ciency (yea ly) The non-symme ical shape o he land a ailable (Figu e 2) and he es ic ions on i s use made necessa y a new helios a design ha would make he bes possible use o he land. 21.8 MW 0.805 0.935 0.753 43.5 GWh 0.747 0.619 A helios a p o o ype wi h 21 3-x-1.1-m ace s, 70-mZ e lec i e su ace and no cen al gap has been designed and buil and es ed a he Pla a o ma sola de Alme ia. Tes esul s show ha he helios a mee s he speci ica ions ( o al e o I 2.9m ad) wi h low powe consump ion. The sa u a ed s eam ecei e has been designed o maximum eliabili y and pe o mance. The mal and s ess analyses show ha hese objec i es ha e been achie ed wi h a simple, du able design. The ecei e demons a es excellen e iciency (abo e o close o 90% in an ope a ing ange up o 20% pa load) and due o wo-phase luid condi ions du ing mos o i s ansi h ough he ecei e ubes, limi ed empe a u e g adien s. Figu e 3. F on iew o he Colon Sola helios a JOURNAL DE PHYSIQUE IV 5. ECONOMIC AND PROFITABILITY ANALYSIS The p ojec budge was based on o e s om quali ied supplie s. Acco ding o hese o e s, he o al Col6n Sola Plan in es men will be 7933 Mp as., 36% o which co esponds o he sola pa . Among o he hypo heses, he p o i abili y analysis assumes ha subsidies om he EU and o he will be 2417 Mp as and c edi (p ice suppo ) o he elec ici y o sola o igin will be 15 p as/kWh. Elec ici y sales and ope a ing cos s o a 15-yea pe iod unde he new egula ions we e es ima ed using a model o ha gene a ion scena io. Acco ding o his model, he plan is p o i able, wi h IRR o 8.36% and NPV o 1085 Mp as, assuming a 12%.discoun a e. Howe e , because o he unce ain y ega ding he abo e men ioned assump ions (enac men o he law egula ing subsidies o enewable elec ici y is s ill in p ocess) and he ac ha he IRR is lowe han ha equi ed by he u ili y o new in es men s led o he u ili y's decision o pos pone he decision o build he plan . 6. CONCLUSIONS The new de egula ed legal amewo k o he powe gene a ion ma ke subs an ially modi ied some o he p emises ha led o he o iginal Coldn Sola p oposal, equi ing addi ional e o o adap o his changing en i onmen , while main aining he quali y o he p ojec and keeping, in so a as possible, on schedule. The mos ele an conclusions o his phase o he p ojec a e he ollowing: The o iginal plan con igu a ion ( epowe ing he C is dbal Coldn The mal Powe Plan Uni I wi h a opping scheme), was disca ed in a o o a con igu a ion based on a new combined cycle, in which sola gene a ed s eam is in eg a ed in o he Hea Reco e y Boile ). This new con igu a ion mee s he echnical and economic c i e ia o iabili y in he compe i i e en i onmen . Economic analysis o he new con igu a ion showed ha he Col6n Sola p ojec is iable in he new compe i i e en i onmen , p o ided ha he hypo heses used in he analysis (c edi o sola powe p oduc ion, subsidies om he UE and o he inancing bodies, p ices o na u al gas and elec ici y) a e ealized, in which case, Coldn Sola plan income would be g ea e han i s ope a ing cos s. Howe e , p ojec e u ns (IRR = 8.36%) a e s ill less han equi ed by he u ili y o new in es men s. This, in iew o he unce ain y ega ding some o he hypo heses o he economic analysis, led he u ili ies o pos pone hei decision o build he plan un il he unce ain ies a e esol ed. When designing he main plan sys ems, special emphasis was placed on he non-con en ional equipmen , ha is, sola ecei e , helios a s and hea eco e y boile ecei ed. Comme cial quo a ions o sys em componen s ecei ed om expe ienced manu ac u ing and enginee ing i ms a e no only a eliable basis o a plan cons uc ion budge , bu also show ha he e is a sound echnological base in he indus y, which a i ms he ma u i y o he Cen al Recei e Sys em echnology. Bibliog aphy [I] M. Blanco and V. Ruiz. The Solgas P ojec . P oceeding o he Eu opean Con e ence and Con ac o s Mee ing. Venice, I aly. No embe , 1995. [2] M. Blanco (coo dinado ) e al . SOLGAS P ojec ,: Hyb id Combined Cycle Cogene a ion Plan Based on Cen al Recei e Technology. Final Repo . Con a c APAS RENA-CT94-0043. Se illa, 1996.