scieee Open visual document viewer

Technical and economic study of striking and clearing operations in buildings under construction. Case study in Bogotá, Colombia

Alvarado Vargas, Yezid Alexander,Pérez Gómez, María Isabel,Castellanos Reyes, John Alexis,Gasch, Isabel

Abstract

[EN] This paper evaluates the economic benefits of shorter construction times that can be attained by applying the New Simplified Procedure (NSP) in multi-storey buildings. The reference building was a multi-storey residential reinforced concrete framework structure with one-way slabs located in Bogotá, Colombia. The study was divided into different phases including the characterization of the components, a study of the different methods to determine load transmissions between slabs and shores, and a review of the cost of renting shoring and formwork materials and labor costs for the building under study. After applying the procedure, an economic assessment was carried out on the execution times obtained in each of the operations studied. The analysis of the construction process of the building structure using the NSP showed that considerable savings can be achieved in construction times without any risk for the integrity of the structure.

Full text

© The au ho ; licensee Uni e sidad Nacional de Colombia. DYNA 83 (199), pp. 102-107, Decembe 2016. Medellín. ISSN 0012-7353 P in ed, ISSN 2346-2183 Online DOI: h p://dx.doi.o g/10.15446/dyna. 83n199.56086 Technical and economic s udy o s iking and clea ing ope a ions in buildings unde cons uc ion. Case s udy in Bogo á, Colombia • Yezid A. Al a ado a, Ma ía Isabel Pé ez-Gómez a, John Alexis Cas ellanos-Reyes a & Isabel Gasch b a Facul ad de Ingenie ía Ci il, Pon i icia Uni e sidad Ja e iana, Bogo á, Colombia, al a ado.y@ja e iana.edu.co, m.pe ezg@ja e iana.edu.co, john.cas ellanos@ja e iana.edu.co b ICITECH, Uni e si a Poli ècnica de València, Valencia, España, [email protected] .es Recei ed: Ma ch 07 h, de 2016. Recei ed in e ised o m: Augus 22 h, 2016. Accep ed: Sep embe 116 h, 2016 Abs ac This pape e alua es he economic bene i s o sho e cons uc ion imes ha can be a ained by applying he New Simpli ied P ocedu e (NSP) in mul i-s o ey buildings. The e e ence building was a mul i-s o ey esiden ial ein o ced conc e e amewo k s uc u e wi h one- way slabs loca ed in Bogo á, Colombia. The s udy was di ided in o di e en phases including he cha ac e iza ion o he componen s, a s udy o he di e en me hods o de e mine load ansmissions be ween slabs and sho es, and a e iew o he cos o en ing sho ing and o mwo k ma e ials and labo cos s o he building unde s udy. A e applying he p ocedu e, an economic assessmen was ca ied ou on he execu ion imes ob ained in each o he ope a ions s udied. The analysis o he cons uc ion p ocess o he building s uc u e using he NSP showed ha conside able sa ings can be achie ed in cons uc ion imes wi hou any isk o he in eg i y o he s uc u e. Keywo ds: New Simpli ied P ocedu e; sho es; ime es ima ions; load es ima ions; es ima ion o pe sonnel and equipmen cos s. Es udio écnico económico de los p ocesos de cimb ado y descimb ado en edi icaciones. Es udio de caso en Bogo á, Colombia Resumen El p esen e a ículo e alúa el bene icio económico de la aplicación del Nue o P ocedimien o Simpli icado (NPS), e lejado en los plazos de cons ucción en edi icaciones de en episos sucesi os. El edi icio de e e encia co esponde a un edi icio esidencial esuel o con pó icos y en episos en una di ección, de conc e o e o zado ubicado en la ciudad de Bogo á. Las ases desa olladas en cumplimien o del obje i o plan eado, cons a on de una ca ac e ización de los componen es, el es udio de dis in as al e na i as pa a de e mina la ansmisión de ca gas en e en episos y pun ales, y una e isión de los p ecios de alquile de equipo auxilia y pe sonal del edi icio de e e encia. Aplicando dicho p ocedimien o se ealizó una e aluación económica de los plazos ob enidos en cada una de las ope aciones es udiadas. Se des aca que el análisis del p oceso cons uc i o de la es uc u a de la edi icación empleando el NPS pe mi e log a aho os conside ables en la ejecución de la edi icación sin pone en iesgo la in eg idad de la es uc u a. Palab as cla e: Nue o P ocedimien o Simpli icado; pun ales; es imación de iempos; es imación de ca gas; es imación cos os pe sonal y equipo. 1. In oduc ion A he p esen ime, building ope a ions in Colombia ela ed o he sho ing and s iking p ocesses used in conc e e ame s uc u es a e mainly based on he de elope ’s indi idual expe ience and li le a en ion is gi en o echnical How o ci e: Al a ado, Y. A., Pé ez-Gómez, M. I., Cas ellanos-Reyes, J. A., & Gasch, I. Technical and economic s udy o s iking and clea ing ope a ions in buildings unde cons uc ion. Case s udy in Bogo á, Colombia. DYNA 83 (199) pp. 102-107, 2016 analyses. This si ua ion is mainly due o he gene al lack o accu a e in o ma ion on his ype o building ope a ion and i o en gi es ise o building imes ha a e longe and, consequen ly, mo e expensi e han necessa y. Acco ding o a s udy ca ied ou by he Cáma a Colombia de la Cons ucción (CAMACOL), be ween 2008 and 2012, he Al a ado e al / DYNA 83 (199), pp. 102-107, Decembe 2016. 103 adi ional amewo k sys em wi h one-way slabs is he mos widely used sys em in he indus y being he one p e e ed by mos Colombian de elope s [1]. Among he mos impo an easons o his p e e ence is he op imiza ion o in e nal spaces, he ease o a chi ec u al design, o he possibili y o ca ying ou eno a ions wi hou endange ing s uc u al s abili y, among o he s. In o he CAMACOL s udies, he s uc u e is conside ed o be among he cos lies wo k s ages o he p ojec [2]; he e o e, he p ocess used in i s cons uc ion will ha e a big in luence on he p ojec budge . Fo his eason, i is necessa y o ind a me hod ha allows keeping he cos s associa ed wi h he cons uc ion o he s uc u e a a minimum. When e iewing he cu en building s anda ds o sho ing and s iking p ocesses in conc e e s uc u es, hey a e ound o be gene al in na u e and do no s a e any speci ic me hod o complying wi h he equi emen s o each s anda d, no do hey gi e clea ecommenda ions o calcula ing s iking imes o abou how o calcula e he loads be ween sho es and slabs du ing he cons uc ion p ocess. In acco dance wi h he abo e, and bea ing in mind ha he sa e y o he s uc u e unde cons uc ion is one o he mos impo an ac o s in de e mining building imes, i is essen ial o know how he loads a e ansmi ed be ween sho es and slabs du ing hese p ocesses, since his will gua an ee he sa e y bo h o he s uc u e i sel and o hose wo king on i . Va ious heo e ical and expe imen al s udies ha e been ca ied ou in o de o sol e his p oblem wi h he pu pose o de e mining how loads a e ansmi ed be ween sho es and slabs. In 1963, G undy & Kabaila [3] p oposed a simpli ied me hod o de e mining hese loads which is s ill in use. This me hod is easy o apply and in mos cases e s on he side o sa e y [4]. In la e s udies [5-9], a ious au ho s ag eed in inding ha G undy & Kabaila’s simpli ied me hod [3] o e es ima es he loads on sho es and slabs. The mos ecen o hese s udies, by Calde ón e . al [10], p oposed a new p ocedu e based on a simpli ied me hod ha allows es ima ing sho e/slab loads du ing di e en cons uc ion p ocesses. This new simpli ied me hod was alida ed expe imen ally and h ough nume ical models [11-13]; i is cu en ly ega ded as he bes me hod o es ima ing sho e/slab loads. This pape desc ibes a s udy o di e en al e na i es o cons uc ion p ocesses o a conc e e ame sys em wi h one- way slabs; i s pu pose is o de ine a iable cons uc ion p ocess as ega ds building imes and cos s. Calde ón e al New Simpli ied P ocess [10] was used o calcula e he loads on slabs. 2. Desc ip ion o he building used as a case s udy The building used o he s udy is pa o a la ge p ojec composed o eigh adi ionally buil esiden ial apa men blocks wi h a conc e e ame s uc u e and one-way slabs si ua ed be ween 64 h and 66 h S ee s in he Modelo Popula dis ic o Bogo á, Colombia. The owe block is Nº 5 wi h 16 loo s (13 abo e g ound and 3 in he unde g ound loo s). All he slabs we e composed o a 0.50 cm hick ligh ened slab wi h a 0.05 cm uppe laye . The heigh be ween loo s is 2.45 m and he unde g ound loo - o-ceiling heigh is 2.35 m. The cen al and co ne spans, measu ing 6.17 x 5.5 m and 3.8 x 5.63 m, espec i ely, we e selec ed o s udying he slab/sho e loads since hese we e subjec o he highes o ces. 2.1. Sho e cha ac e is ics In o de o de e mine he s eel sho es elas ic beha io , comp ession es s we e ca ied ou on wo sho es i ed wi h s ain gauges supplied by he building equipmen en al company con ac ed o he cons uc ion o he building unde s udy. The esul s o he es s on bo h sho es a e gi en in Table 1. 2.2. Conc e e p ope ies 28 MPa conc e e was used o slabs and ounda ions and 35 MPa o columns. The in o ma ion on he e olu ion o he conc e e supplied by he manu ac u e s was checked h ough es s on he conc e e used in he p ojec . Table 2 shows he esul s o he lab es s pe o med a 3, 7, 14 and 28 days. 3. S udy o load ansmission in a ious cons uc ion p ocesses A s udy on al e na i e cons uc ion p ocesses o he p ojec unde s udy was made in o de o de ine a iable cons uc ion p ocess as ega ds building imes and cos s. The New Simpli ied P ocess [10] was used o calcula e he loads on slabs unde cons uc ion. This me hod is eminen ly sui able, as loads can be es ima ed on any o he sho es unde a slab, meaning ha i is possible o de e mine de o ma ions and mean loads on sho es and slabs. Table 1. Modulus o elas ici y o he s eel sho es. Sho e Maximum load applied (N) S ain (%) Modulus o elas ici y (MPa) 1 20064.54 0.019 196855 2 20046.00 0.016 208947 Sou ce: The au ho s. Table 2. Resul s o e olu ion and conc e e p ope ies. Tes Day S eng h (MPa) Simple Comp ession (ASTMC39) 3 7 14 28 20.39 25.23 26.95 31.64 Modulus o Elas ici y (ASTMC469) 3 7 14 28 17609 19589 20247 21937 Spli ing Tensile S eng h (ASTMC496) 3 7 14 28 2.17 2.28 2.44 3.06 Flexu al S eng h (ASTMC78) 3 7 14 28 3.02 3.30 3.32 4.19 Sou ce: The au ho s. Al a ado e al / DYNA 83 (199), pp. 102-107, Decembe 2016. 104 The ollowing we e he hypo heses conside ed when ca ying ou he New Simpli ied P ocedu e [10]: • Va ia ions in he elas ici y modulus wi h ime o conc e e elemen s. • In ini ely s i ounda ion. • Inc emen al model – conside ing he accumula ion o loads and displacemen s. • Sho es a e elemen s wi h elas ic beha io and ini e s i ness. • Uni o mly dis ibu ed loads be ween sho es and slabs. • The de o ma ion o he slab a any poin coincides wi h ha o he sho e a ha poin ; hus, mean slab de o ma ion coincides wi h mean de o ma ion o sho es placed unde he slab. • Di e en slab bounda y condi ions; de o mabili y measu ed by Scanlon & Mu ay’s me hod [14]. • Negligible sh inkage and c eep e ec s. 3.1. S iking c i e ia The cu en Colombian and in e na ional building codes sha e he same gene al c i e ia o he s iking p ocess. Howe e , no me hods a e p oposed o calcula ing sho e/slab loads du ing he cons uc ion o buildings. 3.1.1. Colombian Ea hquake-Resis an Building Code NSR-10 [15] The Colombian egula ions speci y he minimum wo ke and public sa e y equisi es o sho ing and o mwo k. Sho es and o mwo k o conc e e, including hei design, cons uc ion and emo al equi e he s ic es c i e ia and co ec planning o achie e sa e sho ing and o mwo k. Cons uc ion loads and possible de lec ions mus be aken in o conside a ion in o de o de e mine s iking ime. The NSR-10 emphasizes he ACI-347 speci ica ions. 3.1.2. Building Code ACI-347.2-R05 [16] ACI-347.2-R05 p oposes a a ional analysis ha conside s di e en ac o s o de e mine he numbe o sho ed slabs unde cons uc ion and o de e mine he loads ansmi ed be ween slabs and sho es. This analysis includes: • Analysis o he di e en loads and li e loads applied o he s uc u e. • Conside a ion o dead load o conc e e plus weigh o o mwo k. • Cons uc ion li e loads including any wo k done on he slab and he accumula ion o ma e ials. • Conc e e design s eng h. • Time cycle o he pou ing o successi e slabs. • Conc e e s eng h equi ed o suppo sho ing loads om abo e when pou ing successi e slabs. • Dis ibu ion o loads be ween loo s, sho es and esho es, o backsho es, a he ime o placing conc e e, s ipping o mwo k and emo ing backsho ing. • Slab spans o s uc u al membe s suppo ed by sho es. • Types o o mwo k and componen dimensions. • Dis ibu ion o loads on indi idual sho es. • Minimum age a which conc e e can esis cons uc ion and sho e loads when pou ing uppe slabs. As ega ds ca ying ou sho ing and s iking ope a ions, special emphasis is gi en o sa e y p ecau ions when sho ing and s iking he s uc u e and when sho ing and esho ing successi e loo s. 3.1.3. Me hod p oposed by Cala e a & Fe nández [17] Deciding he s iking age in ol es e i ying ha , unde he loads applied in his p ocess, he o ces c ea ed can be sa ely esis ed by he s eng h o he conc e e a his age (Cala e a 1981). Cala e a [17] p oposes ha i he load ac ing on a slab on s iking is 𝛼𝛼∙p; p being he o al p ojec cha ac e is ic load (sel -weigh plus dead loads plus li e loads), he sho es can be emo ed om he slab when he slab conc e e has a ensile s eng h ck ,j such ha : 𝑓𝑓 𝑐𝑐𝑐𝑐𝑐𝑐,𝑗𝑗≥ 𝛼𝛼 ∙ 𝑓𝑓 𝑐𝑐𝑐𝑐𝑐𝑐,28 (1) ck ,28: Cha ac e is ic s eng h o conc e e a he age o 28 days. 𝛼𝛼=𝑞𝑞𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑝𝑝∙𝛾𝛾′𝑓𝑓𝑓𝑓 𝛾𝛾𝑓𝑓𝑓𝑓 (2) Whe e qcons is he cons uc ion load, p is he p ojec ’s load, γ’ g is he ac o o sa e y o cons uc ion ac ions and γ g is he ac o o sa e y o p ojec ac ions. The alue o 𝛼𝛼 canno be highe han he uni ; o he wise, he loads suppo ed by a slab loo in he cons uc ion s age would be highe han hose designed, he eby making he cons uc ion p ocess un easible. Eq. (1) is he p incipal c i e ion used by a la ge numbe o au ho s o calcula e he imes o ca ying ou he di e en cons uc ion p ocesses. 3.2. Al e na i es s udied The e is a numbe o di e en cons uc ion p ocesses o consecu i e slab loo cons uc ion. Al a ado [18] gi es he mos impo an as: Sho ing and S iking (SS), Sho ing, Resho ing and S iking (SRS), and Sho ing, Clea ing and S iking (SCS). These h ee al e na i es (see below) we e conside ed o he equen ly used 1, 2, 3 and 4 consecu i ely sho ed loo s in o de o ind he execu ion imes. 3.2.1. Sho ing and S iking (SS) The e a e only wo clea ly de ined s ages in his p ocess: i) placing he sho es whe e he conc e e is pou ed and ii) i s la e emo al. The equi ed numbe o se s o sho es is used in his p ocess, and wo, h ee o mo e loo s may be consecu i ely sho ed in his way. Table 3 gi es he mean loads on slabs (QEmed) ob ained by he New Simpli ied P ocedu e [10] o he mos c i ical ope a ions in he di e en cases s udied. Al a ado e al / DYNA 83 (199), pp. 102-107, Decembe 2016. 105 Table 3. Mean load on slabs in c i ical ope a ions (CO). Span Consecu i ely sho ed loo s C.Op. Floo Q Emed (kN/m 2 ) Cen al 1 Conc e e Placemen Floo 2 1 16.24 2 Conc e e Placemen Floo 4 2 17.13 3 Conc e e Placemen Floo 6 3 16.63 4 Conc e e Placemen Floo 6 2 16.81 Co ne 1 Conc e e Placemen Floo 2 1 16.24 2 Conc e e Placemen Floo 5 3 16.46 3 Conc e e Placemen Floo 6 3 17.53 4 Conc e e Placemen Floo 8 4 16.94 Sou ce: The au ho s. 3.2.2. Sho ing, Clea ing and S iking (SCS) o pa ial s iking, consis s o emo ing o mwo k and mo e han 50% o he sho es ha suppo he slab a ew days a e pou ing he conc e e so he ma e ial equi ed o sho ing and o mwo k is conside ably educed. This echnique educes building cos s and a ionalizes he cons uc ion p ocess. The mean loads on slabs (QEmed) o he mos c i ical ope a ions o he cases s udied ob ained by he New Simpli ied P ocedu e [10] a e shown in Table 4. 3.2.3. Sho ing, Resho ing and S iking (SRS) In his p ocess, he sho es a e emo ed om ce ain loo s, hus comple ely unloading he sho es so ha he loads a e edis ibu ed among he di e en loo s. The slabs a e hen esho ed, ensu ing con ac be ween sho es and slabs so ha he sho es will bea pa o he u u e load inc emen s. The slabs a e made o bea solely hei own sel -weigh when esho ed a an ea ly age h ough his me hod. Table 5 shows he mean loads on slabs (QEmed) ob ained by he New Simpli ied P ocedu e [10] o c i ical ope a ions in he di e en cases s udied. 4. Economic s udy o he di e en al e na i es 4.1. Re iew o he p ices and imes used in he building used as case s udy The in o ma ion ela i e o he p ojec budge , p ocesses and building imes was ob ained om he building company in ol ed. I e e s only o he s a ha ac ually ook pa in he cons uc ion p ocesses analyzed including: si e manage , o eman, building su eyo and cons uc ion wo ke s. The o ice s a consis ed o he p ojec supe iso , p ojec manage , sa e y manage , assis an sa e y manage , s o eman, assis an s o eman, sec e a y, and p i a e secu i y gua ds. The auxilia y equipmen was composed o : sho es, s aining pieces and o he equipmen necessa y o he cons uc ion o slabs wi h an Clea ing, a ea o 714 m2. Table 6 shows he daily cos o s a and equipmen o he case s udy in 2013. Table 4. Mean loads on slabs in c i ical ope a ions (SCS). Span Consecu i ely sho ed loo s C i .Op. Slab Q Emed (kN/m 2 ) Cen al 1 Conc e e Placemen Slab 2 1 16.24 2 Conc e e Placemen Slab 4 2 13.17 3 Conc e e Placemen Slab 5 2 11.95 4 Conc e e Placemen Slab 6 2 11.68 Co ne 1 Conc e e Placemen Slab 2 1 16.24 2 Conc e e Placemen Slab 5 3 13.87 3 Conc e e Placemen Slab 6 3 13.77 4 Conc e e Placemen Slab 8 4 13.21 Sou ce: The au ho s. Table 5. Mean loads on slabs in c i ical ope a ions (SRS). Span Consecu i ely sho ed loo s C i . Op. Slab Q Emed (kN/m 2 ) Cen al 1 Conc e e Placemen Slab 2 1 16.24 2 Conc e e Placemen Slab 3 2 13.39 3 Conc e e Placemen Slab 6 5 12.90 4 Conc e e Placemen Slab 3 2 12.84 Co ne 1 Conc e e Placemen Slab 2 1 16.24 2 Conc e e Placemen Slab 3 2 13.39 3 Conc e e Placemen Slab 4 3 13.04 4 Conc e e Placemen Slab 4 3 12.80 Sou ce: The au ho s. Al a ado e al / DYNA 83 (199), pp. 102-107, Decembe 2016. 106 Table 6. Daily cos o s a and auxilia y equipmen . Desc ip ion Uni s Cos O ice S a Day $ 1,040,217 COP Building S a Day $ 311,127 COP Auxilia y equipmen Day $ 199,935 COP To al $ 1,551,278 COP COP = Colombian Pesos 1.00 USD = 2,615 COP (Augus , 2016) Sou ce: Cons uc o a Ma quis S.A. In addi ion o he abo e cos s, a owe c ane was hi ed a a o al cos o $12m COP pe mon h, including he ope a o . Fo he cons uc ion o he owe blocks in he case s udy, only wo se s o sho es we e used and he cons uc ion p ocess chosen was ha o Sho ing and S iking. The ime o laying he slab was se a se en days, including i e days o anspo ing and ins alling auxilia y equipmen and wo days o placing he conc e e. S iking ime was se a 10 days. Table 7. To al imes o he al e na i es s udied ( esul s in days). Consecu i ely sho ed slabs SS SCS SRS Cen al Span Co ne Span Cen al Span Co ne Span Cen al Span Co ne Span 1 225 225 225 225 225 225 2 87 83 56 56 62 60 3 72 67 61 54 61 61 4 66 66 65 59 66 66 Sou ce: The au ho s Table 8. Pe cen age sa ings o excess cos s o he economic a iables analyzed o each cons uc ion p ocess. Consecu i ely sho ed slabs Building S a O ice S a Auxilia y Equipmen Towe C ane SS SCS SRS SS SCS SRS SS SCS SRS SS SCS SRS 2 2% -9% -7% 6 -30% -23% 5% -48% -52% 6 -30% -23% 3 -3% -7% -7% -11% -24% -24% 22% -29% -43% -11% -24% -24% 4 -6% -6% -6% -18% -20% -18% 40% -12% -32% -18% -20% -18% Sou ce: The au ho s 4.2. S udy o imes The execu ion imes o he di e en al e na i es s udied we e ob ained om he analysis o he load ansmissions (Table 7) and hey ag ee wi h he s iking imes p oposed in Cala e a [17]. 4.3. S udy o cos s The esul s o he s iking ime calcula ions we e used o de e mine he execu ion cos s, which we e hen compa ed wi h he ac ual cos s in ol ed in he cons uc ion o he p ojec used o he case s udy. The di e en esul s o each cons uc ion p ocess and he economic a iables analyzed can be seen in Table 8. Nega i e alues signi y sa ings and posi i e alues signi y excess cos s. 5. Analysis o he esul s The beha io o loads on one-way slabs and sho es in a conc e e ame s uc u e was analyzed o a se ies o cons uc ion p ocesses. Also analyzed we e he imes equi ed o each o he cons uc ion p ocesses s udied and an assessmen was made o hei economic cos s using he ac ual cos s o building an eigh -s o ey block as a e e ence. The slab design load was no exceeded in any o he p ocesses showing ha all o hem a e iable. Acco ding o he subsequen analysis, he bes beha io was ob ained by he SCS p ocess. In his echnique, a e clea ing, only 50% o he sho ing was equi ed o suppo he loads be ween he slabs. Cons uc ion cycles play an impo an ole, as building imes can be educed when he sho ing assembly p ocess is op imized. F om he esul s ob ained in he building imes, i can be concluded ha as e execu ion imes a e no always achie ed by using mo e sho es. In ac , he bes esul s a e ob ained by an SCS p ocess wi h wo consecu i ely sho ed loo s. The esul s om using only one se o sho es indica e ha his sys em is no ad isable due o he long execu ion imes equi ed, which we e he same in all he cons uc ion p ocesses. As ega ds cos s, he bigges sa ings (app oxima ely 30%) a e ob ained by implemen ing SCS wi h wo se s o sho es, since as e imes a e ob ained wi h sa ings in bo h equipmen and labo cos s. 6. Conclusions Using he New Simpli ied P ocedu e [10] o calcula e sho e/slab loads p o ides de elope s wi h a ool ha gua an ees co ec building p ac ice wi hou exceeding he pe mi ed loads on slabs du ing his cons uc ion s age. Secondly, calcula ing s iking imes by Cala e a’s me hod, as alida ed by Fe nandez [17], aids in planning conc e e ame p ojec s wi hou any isks o sa e y. This sys em allows loads o be analyzed in o de o es ablish he minimum ime equi emen s o gua an ee he s abili y o he slabs. The cos analysis o hese wo me hods showed ha conside able sa ings can be made o e he adi ional me hods used o his ype o p ojec , achie ing sa ings be ween 6 and 33% in equipmen and labo cos s. Al a ado e al / DYNA 83 (199), pp. 102-107, Decembe 2016. 107 As ega ds he cons uc ion p ocesses s udied, all o hese a e alid as long as he app op ia e analyses a e ca ied ou on loads and imes. The bes esul s a e achie ed by using he SCS sys em. These me hods should be ecommended in Building Codes in o de o gua an ee he sa e and e ec i e laying o slabs in ein o ced conc e e amewo k s uc u es. Re e ences [1] Es udios económicos CAMACOL, E olución de las no mas écnicas y la inclusión de nue os sis emas cons uc i os. Re is a Coo denada U bana. 44, Diciemb e, 2012. [2] Es udios Económicos CAMACOL, Tendencia ecien e de los cos os en cons ucción de i ienda en Colombia. Re is a Coo denada U bana. 31, Oc ub e 2011. [3] G undy, P. and Kabaila, A., Cons uc ion loads on slabs wi h sho ed o mwo k in mul is o y buildings, ACI S uc u al p oceedings, 60(12), pp. 1729-1738, 1963. [4] S i a os, P. and Hal o sen, G., Equi alen ame analysis o conc e e buildings du ing cons uc ion, Conc e e In e na ional, 13(8), pp. 57- 62, 1991. [5] Duan, M.Z. and Chen, W.F., Imp o ed simpli ied me hod o slab and sho e load analysis du ing cons uc ion. P ojec epo CE-STR-95- 24, Pu due Uni e si y, Wes La aye e, Ind., USA, 1995. [6] Mo agues, J.J., Ca alá, J. and Pellice , E., An analysis o conc e e amed s uc u es du ing he cons uc ion p ocess, Conc e e In e na ional, 18(11), pp. 44-48, 1996. [7] Rosowsky, D.V., Philb ick, T.W. and Hus on, D.R., Obse a ions om sho e load measu emen s du ing conc e e cons uc ion. Jou nal o Pe o mance o Cons uc ed Facili ies, 11(1), pp. 18-23, 1997. DOI: 10.1061/(ASCE)0887-3828(1997)11:1(18) [8] Fang, D.P., Zhu, H.Y., Geng, C.D. and Liu, X.L., Floo load dis ibu ion in ein o ced conc e e buildings du ing cons uc ion. ACI S uc u al Jou nal, 98(2), pp. 149-156, 2001. DOI: 10.14359/10183 [9] Al a ado, Y.A., Calde ón, P.A., Gasch, I. and Adam, J.M., A nume ical s udy in o he e olu ion o loads on sho es and slabs du ing cons uc ion o mul is o ey buildings. Compa ison o pa ial s iking wi h o he echniques, Enginee ing S uc u es, 32(10), pp. 3093-3102, 2010. DOI: 10.1016/j.engs uc .2010.05.028 [10] Calde ón, P., Al a ado, Y.A. and Adam, J.M., A new simpli ied p ocedu e o es ima e loads on slabs and sho ing du ing he cons uc ion o mul is o ey buildings, Enginee ing S uc u es, 33(5), pp. 1565-1575, 2011. DOI: 10.1016/j.engs uc .2011.01.027 [11] Gasch, I., Es udio de la e olución de ca gas en o jados y es uc u as auxilia es de apun alamien o du an e la cons ucción de edi icios de ho migón in si u median e p ocesos de cimb ado, cla eado y descimb ado de plan as consecu i es, PhD Tesis, Uni e si a Poli ècnica de València, Valencia, Spain, 2012. [En línea]. Disponible en: h p://hdl.handle.ne /10251/15407 [12] Gasch, I., Al a ado, Y.A., Calde ón, P.A. y To es, B., T ansmisión de ca gas en e o jados y pun ales en un edi icio de o jado e icula de case ón pe dido u ilizando cla eado, In o mes de la Cons ucción, 65(530), pp. 195-202, 2013. DOI: 10.3989/ic.12.046 [13] Gasch, I., Al a ado, Y.A., Calde ón, P.A. and I o a, S., Cons uc ion loads using a sho ing-clea ing-s iking p ocess, P oceedings o ICE S uc u es and Buildings, 167(SB4), pp. 217-229, 2014. DOI: 10.1680/s bu.12.00006 [14] Scanlon, A. and Mu ay, D.B., P ac ical calcula ion o wo-way slab de lec ion, Conc e e in e na ional, 4(11), pp. 43-50, 1982. [15] Minis e io de Ambien e, Vi ienda y Desa ollo, Reglamen o colombiano de cons ucción sismo esis en e NSR-10, Bogo á D.C., Colombia, 2010. [16] ACI Commi ee 347. ACI 347.2R-05: Guide o sho ing/ esho ing o conc e e mul is o y buildings. Ame ican Conc e e Ins i u e, Fa ming on Hills, MI, USA, 2005. [17] Cala e a, J. and Fe nández, J., Cuade no Nº 3: C i e ios pa a el descimb ado de es uc u as de ho migón, Mad id: INTEMAC, 1991. [18] Al a ado, Y.A., Es udio expe imen al y numé ico de la cons ucción de o jados ho migonados in si u median e p ocesos de cimb ado, cla eado y descimb ado de plan as consecu i es, PhD Tesis, Uni e si a Poli ècnica de València, Valencia, España, 2009. [En línea]. Disponible en: h p://hdl.handle.ne /10251/7285 Y.A. Al a ado, is Full P o esso in he Depa men o Ci il Enginee ing a he Pon i icia Uni e sidad Ja e iana Bogo á, Colombia. Is PhD om he Depa men o Cons uc ion Enginee ing o he UPV. He eaches, mainly, in he Deg ee o Ci il Enginee ing and in he Mas e o Ci il Enginee ing o he Pon i icia Uni e sidad Ja e iana. He has also pa icipa ed in se e al eaching inno a ion p ojec s, publishing a icles a con e ences in his ield. The esea ch ac i i y is ca ied ou a he Ci il Enginee ing Depa men o Pon i icia Uni e sidad Ja e iana wi hin he esea ch o “Conc e e” and “Building cons uc ion sys ems”. ORCID: 0000-0002-1260-8211. M.I. Pé ez-Gómez, is Consul an in INGETEC. BSC. Ci il Enginee wi h a MSc. deg ee in Cons uc ion om he Pon i icia Uni e sidad Ja e iana Bogo á, Colombia. ORCID: 0000-0002-7657-8162. J.A. Cas ellanos-Reyes, is Consul an . Ci il Enginee wi h a MSc. deg ee in Cons uc ion om he Pon i icia Uni e sidad Ja e iana Bogo á Colombia. ORCID: 0000-0002-3899-3920. I. Gasch, is Full P o esso in he Depa men o Con inuous Medium Mechanics and Theo y o S uc u es a he Uni e si a Poli ècnica de València (UPV), Spain. PhD om he Depa men o Cons uc ion Enginee ing o he UPV. She eaches, mainly, in he Deg ee o Mechanical Enginee ing since 2007. She has also pa icipa ed in se e al eaching inno a ion p ojec s, publishing a icles a con e ences in his ield. She is also co-au ho o ou eaching books. The esea ch ac i i y is ca ied ou a he Ins i u e o Science and Technology o Conc e e (ICITECH) o he UPV wi hin he esea ch "Building Cons uc ion sys ems". Cu en ly, she is also esea ching wi h he Pon i icia Uni e sidad Ja e iana in Bogo á, whe e she has pa icipa ed, among o he s, in he p ojec "Expe imen al and nume ical s udy o he load ansmission be ween sho es and slabs du ing he cons uc ion o buildings wi h indus ial sys ems". ORCID: 0000-0001-7036-4481. Á ea Cu icula de Ingenie ía Ci il O e a de Posg ados Especialización en Vías y T anspo es Especialización en Es uc u as Maes ía en Ingenie ía - In aes uc u a y Sis emas de T anspo e Maes ía en Ingenie ía – Geo ecnia Doc o ado en Ingenie ía - Ingenie ía Ci il Mayo in o mación: E-mail: [email protected] Telé ono: (57-4) 425 5172