A Novel Entropy-Fuzzy PIPRECIA-DEA Model for
Safety Evaluation of Railway Traffic
Aleksandar Blagojevi´c 1, Željko Stevi´c 2, Dragan Marinkovi´c 3,* , Sandra Kasalica 1
and Snježana Rajili´c 4
1Academy of Technical and Artistic Professional Studies Belgrade, College of Railway Engineering,
Zdravka ˇ
[email protected] (S.K.)
2Faculty of Transport and Traffic Engineering, University of East Sarajevo, Vojvode Miši´ca 52,
3
Faculty of Mechanical Engineering and Traffic Systems, TU Berlin, Str. d. 17. Juni 135, 10623 Berlin, Germany
4Bosnia and Herzegovina Railways Public Corporation, Kneza Miloša 105,
*Correspondence: [email protected]
Received: 8 August 2020; Accepted: 4 September 2020; Published: 9 September 2020
Abstract:
The conditions of globalization often dictate the functioning of transport markets, so it is
necessary to conduct frequent research in order to achieve sustainable business. This is achieved
through adequate risk and safety management at all levels. The research carried out in this paper
includes determining the state of railway traffic safety in a total of nine railway sections in Bosnia and
Herzegovina (B&H). The aim of this paper is to develop a new integrated Entropy-Fuzzy PIPRECIA
(PIvot Pairwise RElative Criteria Importance Assessment)-DEA (Data Envelopment Analysis) model
for determining the state of safety in B&H under particular conditions of uncertainty. Additionally, the
aim is to combine the advantages of linear programming (DEA), an objective method (Entropy), and a
subjective method (Fuzzy PIPRECIA). In this way, an integrated objective–subjective model is created
that provides accurate and balanced decision-making through their integration. Eleven sustainable
criteria were defined and divided into six inputs and five outputs. The Entropy model was used to
determine the weight values of the inputs, while due to the nature of the outputs, Fuzzy PIPRECIA
was used to evaluate them. After the application of the two methods, the way of averaging their values
was defined. The DEA model, which implies an input- and output-oriented model, was applied to
determine which railway sections have satisfactory performance in terms of safety. Two sections
were eliminated from further computation due to extremely poor performance and high risk. Then,
the weighted overall efficiency ranking method was applied to determine the final ranking of the
railway sections. The results obtained were verified through a sensitivity analysis, which involved
changing the impact of the five most significant criteria and a comparison with two Multi-Criteria
Decision-Making (MCDM) methods.
Keywords: railway safety; entropy; fuzzy PIPRECIA; DEA model; sustainability
1. Introduction
Due to the changes that have occurred in the process of globalization and liberalization, global
transport markets have become accessible to all companies. However, only efficient and sustainable
companiessurviveinthesingletransportmarket, i.e., thosethathavedevelopedcompetitiveadvantages
over others. Bosnia and Herzegovina, like all Western Balkan countries, has a major problem with the
sustainability of the railway system since the volume of rail transport has decreased compared to the
Symmetry 2020,12, 1479; doi:10.3390/sym12091479 www.mdpi.com/journal/symmetry
Symmetry 2020,12, 1479 2 of 23
period before the economic crisis. The economic crisis has caused reduction in demand by most rail
customers (ironworks, mines, heavy industry) for the transport of goods. In addition, the economic
crisis has caused a reduction in the amount of passenger transport, primarily in international transport,
since railway undertakings in B&H have canceled a certain number of trains for economic reasons.
The decrease in the transport of goods and passengers has resulted in a decrease in the revenues of
railway undertakings. Lower revenues have caused the lower need for maintenance of rolling stock
and railway infrastructure, which negatively affects railway traffic safety. As railway traffic is an
activity of special importance for B&H, it also provokes special attention from society as a whole,
which monitors the situation and takes measures to remedy difficulties and possible negatives in
it. At the same time, special attention is paid to the safety of this type of traffic. Railway traffic
safety basically depends on the state of technical capacity (available rolling stock, railway network
conditions, signaling facilities for securing railway stations, actively and passively protected railway
level crossings, etc.), traffic intensity, and human factor influence. The railway network and transport
capacities in the transition period of railways in B&H were completely neglected and to date have
been partially revitalized. The current state of transport capacities on the railways in Bosnia and
Herzegovina, especially of safety devices, requires a large number of workers, i.e., executive staff,
to participate in organizing the transport of goods and passengers. The participation of a large number
of executive staffin the execution of transport, with the imperfection of human work and the presence
of subjective weaknesses, contributes to errors in work and neglect of important actions in preparing
and organizing the train traffic, which negatively affects traffic safety. Under these circumstances,
accidents and incidents, in which people are killed and injured, occur. In Bosnia and Herzegovina,
an average of twelve (12) people lose their lives in railway traffic every year. Human casualties and
seriously injured persons caused by railway accidents make traffic safety in a self-protection system a
social problem. It can be said that traffic safety is an important factor for transport users in making a
choice of a certain type of transport, and it is thus a significant factor in the size of transport execution,
income, and business results in general. Traffic safety is a mirror of safety, a reflection of transport
organization and discipline, because through it and punctuality, the reputation of railways rises and
falls in the eyes of the public. All this has negative consequences for the position of railways in the
single transport market, because accidents, incidents, and deaths of passengers significantly affect the
reputation of railways and the economic sustainability of railway systems. The problems that manifest
through traffic safety are numerous and very complex because they arise under the influence of many,
often mutually independent criteria. Taking into account the above, and the importance of the research
area, the following aims of this paper can be defined. The first aim relates to the development of a
novel Entropy-Fuzzy PIPRECIA-DEA model as a support in decision-making processes. The second
aim of the paper refers to the application of the developed model for determining the safety level of
railway sections in Bosnia and Herzegovina in the treatment of uncertainties. The third aim of the
research is the development of a model that implies the integration of subjective–objective method
when it comes to the evaluation of inputs and outputs in railway traffic. The last aim of the study
is to enhance the integration of uncertainty theory, such as fuzzy logic, with other techniques, and
the integration of the objective–subjective model in order to achieve more precise and approximately
optimal results. On the basis of the foregoing, we can synthesize one main aim of this study, in that the
developed model should ensure precise answers to various questions and give potential approximately
optimal solutions in various fields while taking into account different constraints.
The paper is structured in a total of six sections. Section 2includes an overview of the state in
the field related to the application of various methodologies primarily in the field of railway safety.
The emphasis is put on the application of different variants of the DEA model. Section 3presents a
detailed methodology with a flow chart of the research. All phases of the research are described in detail
and the applied methodology is presented step by step, with the creation of certain new equations.
Section 4presents a case study defining inputs and outputs and railway sections to be evaluated, and
provides their detailed description with quantitative and qualitative indicators. Section 5consists of
Symmetry 2020,12, 1479 3 of 23
a sensitivity analysis divided into two parts: the change in the influence of the five most significant
criteria and a comparison with two other MCDM methods. Section 6provides a summary of the most
important contributions, results and guidelines for further research.
2. Literature Review
Safety and risk management in rail transport are a key issue in achieving sustainable performance
of this type of transport. Therefore, through numerous studies, models that contribute to the overall
improvement of rail transport are being developed.
Roets et al. [
1
] point out that transport services providers are under increasing pressure because
they need to increase their economy without sacrificing traffic safety. The paper presents the possibility
of applying the DEA method with multiple input and output criteria for monitoring staffefficiency
and detecting operational safety problems. To increase efficiency, Wanke et al. [
2
] developed a
novel super-efficiency Multi-activity Network DEA (MNDEA) model—based on directional distance
functions (DDFs) and capable of handling undesirable outputs—to assess how different contextual
variables impact railway efficiency levels and safety in Asia. Djordjevi´c et al. [
3
] developed a new
approach to the evaluation of safety at railway level crossings based on a non-radial DEA model.
The developed non-radial DEA model was used to evaluate the railway efficiency of European countries
in terms of the level of safety at railway level crossings considering desirable and undesirable criteria.
The results of sensitivity analysis of the developed model indicated certain weaknesses related to the
number of criteria, as well as the inaccuracy of input and output criteria.
Azadeh et al. [
4
] defined a methodology based on AHP and DEA, which was integrated into a
computer simulation in order to solve the problem of increasing the reliability of the railway system
related to passenger trains. The same combination of methods was used by Mohajeri and Amin [
5
] to
select the optimum site for a railway station for the city of Mashhad in northeastern Iran. The results
showed that the priorities obtained by the AHP method can be defined as the multiple outputs of a
DEA model for finding the best site for a railway station.
Cantos et al. [
6
] used the DEA method to analyze the impact of reforms in the railway sector on
productivity and efficiency of railway undertakings on an example of 16 European countries over
the period 1985–2004. The variables used by the authors as input data for DEA were line length
and workforce, as well as rolling stock. The output data used to analyze the impact of the reforms
on railway undertakings is the amount of transported goods, in terms of passenger kilometers and
tonne-kilometers. The results of this empirical research have shown that the vertical separation of
railway undertakings had a positive effect on their productivity. In their research, Lan-Bing Li and
Jin-Li Hu [
7
] modeled railway transport in China from 1999 to 2008 through three processes (production,
consumption and earnings) using the DEA model and Malmquist TFP. The DEA model was used
to evaluate productivity efficiency, consumption effectiveness, and earnings effectiveness from the
static viewpoint. Hansen I.A et al. [
8
], encouraged by the European policy of deregulation of transport
markets, liberalization of railway markets, separation of infrastructure from railway undertakings, used
benchmark analysis and the DEA method on an example of 11 mid-size European railway networks
and railway undertakings to examine their efficiency including relevant technical and economic key
criteria. In their study, Azadeh and Salehi [
9
] defined a methodology based on DEA in order to examine
efficiency and shortcomings in performance between infrastructure managers and railway operators.
The results of the study showed that the level of sustainability of railway systems depends on the
amount of shortcomings. The fewer the shortcomings in the performance of operators, the more efficient
the operators will be. Marchetti and Wanke [
10
] applied a methodological approach based on DEA to
assess the efficiency of Brazilian rail concessionaires between 2010 and 2014, when new competitive
regulations were introduced. The authors present the increase of cluster efficiency by applying DEA,
addressing options such as upsizing, downsizing and resizing inputs (freight type, track gauge,
track ype), restructuring, best management practices and infrastructure upgrades. Kapetanovic et
al. [
11
] applied the DEA method to assess the efficiency of railway undertakings from Europe, analyzing
Symmetry 2020,12, 1479 4 of 23
different input–output configurations of the model in order to assess the impact of different exogenous
factors on the level of efficiency. Bai et al. [
12
] used the DEA method to assess the efficiency of potential
organizational models of bureaus (institutions) in China over the period from 2011 to 2015. Empirical
research results, comparing three representative bureau schemes, showed that the geographical location
of the bureau is of the greatest importance for increasing the efficiency of the railway sector and network
economics. In their paper, Blagojevi´c et al. [
13
] evaluated the efficiency of railway undertakings for the
transport of goods using the DEA model. The authors used a comprehensive approach to define the
key criteria that affect the efficiency of railway undertakings for the transport of goods. A particular
example of eight freight transport railway undertakings shows that the proposed approach successfully
combines a set of criteria (resource, operational, financial, quality and safety) into a single assessment
of the efficiency of the railway undertakings, while providing information on corrective actions to
improve the efficiency of the railway undertakings. To make transport sustainable, Stefaniec et al. [
14
]
proposed a systemic approach based on the DEA method to assess inland transport in China. The
authors showed that the DEA method could be successfully applied to increase the efficiency of inland
transport, considering social, economic and environmental dimensions of sustainability.
3. Methodology
Figure 1shows the proposed methodology for the evaluation of railway sections in Bosnia and
Herzegovina. It consists of a total of four phases, i.e., 13 steps in total. All phases are interrelated and
represent the entrance to the next phase.
Symmetry 2020, 12, x FOR PEER REVIEW 4 of 23
the DEA method to assess the efficiency of potential organizational models of bureaus (institutions)
in China over the period from 2011 to 2015. Empirical research results, comparing three
representative bureau schemes, showed that the geographical location of the bureau is of the greatest
importance for increasing the efficiency of the railway sector and network economics. In their paper,
Blagojević et al. [13] evaluated the efficiency of railway undertakings for the transport of goods using
the DEA model. The authors used a comprehensive approach to define the key criteria that affect the
efficiency of railway undertakings for the transport of goods. A particular example of eight freight
transport railway undertakings shows that the proposed approach successfully combines a set of
criteria (resource, operational, financial, quality and safety) into a single assessment of the efficiency
of the railway undertakings, while providing information on corrective actions to improve the
efficiency of the railway undertakings. To make transport sustainable, Stefaniec et al. [14] proposed
a systemic approach based on the DEA method to assess inland transport in China. The authors
showed that the DEA method could be successfully applied to increase the efficiency of inland
transport, considering social, economic and environmental dimensions of sustainability.
3. Methodology
Figure 1 shows the proposed methodology for the evaluation of railway sections in Bosnia and
Herzegovina. It consists of a total of four phases, i.e., 13 steps in total. All phases are interrelated and
represent the entrance to the next phase.
Figure 1. Developed methodology for safety evaluation of railway sections.
3.1. The First Phase
In the first phase, after recognizing the needs for research, the railway sections in Bosnia and
Herzegovina were defined. There are a total of nine sections in B&H: Bihać, Novi Grad, Prijedor,
Banja Luka, Doboj, Tuzla, Zenica, Sarajevo and Mostar. Then, literature research and consultation
Figure 1. Developed methodology for safety evaluation of railway sections.
Symmetry 2020,12, 1479 5 of 23
3.1. The First Phase
In the first phase, after recognizing the needs for research, the railway sections in Bosnia and
Herzegovina were defined. There are a total of nine sections in B&H: Biha´c, Novi Grad, Prijedor,
Banja Luka, Doboj, Tuzla, Zenica, Sarajevo and Mostar. Then, literature research and consultation
with experts from Bosnia and Herzegovina and Serbia regarding the definition of inputs and outputs
was done. Experts from the railway sector were consulted, i.e., experts from the Serbian Railways
Directorate, the Center for Research of Traffic Accidents in Serbia, Railway Regulatory Board of
Bosnia and Herzegovina, Ministry of construction, transport and infrastructure Serbia, Ministry of
Communications and Transport Bosnia and Herzegovina, Ministry of Transport and Communications
Republic of Srpska, and Ministry of transport and communications of the Federation of Bosnia and
Herzegovina. Twenty-one experts took part in the discussion. After that, we formed the inputs and
outputs. Each expert had a minimum of five years of professional experience. A list of six inputs was
formed: the total length of railway network in km, the total number of level crossings, the total number
of train-kilometers, the total number of stations, the total number of executive staffand the number
of available vehicles. The outputs were as follows: the number of serious accidents, the number of
accidents, the number of incidents, the number of killed and the number of injured persons. It is
important to emphasize that all the criteria that represent inputs are of benefit type, i.e., they need to be
maximized. All outputs are of minimization type, i.e., they belong to the cost group. This orientation
of inputs and outputs is very important due to the later implementation of CCR model in which the
model operates on the principle of calculating values based on inputs or outputs.
3.2. The Second Phase
In this phase, the significance of inputs and outputs was determined using two different methods:
Entropy [
15
] and Fuzzy PIPRECIA [
16
–
19
]. Since the nature of the criteria marked as inputs allows
objective determination of the weights of criteria, the Entropy method is applied. When it comes to
criteria marked as outputs, the subjective Fuzzy PIPRECIA method is applied since the nature of these
criteria requires such an evaluation. At the end of this phase, the previously calculated values of the
criteria are averaged in order to obtain the final weights of the criteria whose sum is one.
3.2.1. Entropy Method
The Entropy method consists of the following steps.
In the first step, it is necessary to normalize an initial matrix by applying Equation (1).
rij =xij
m
P
i=1xij
(1)
where rij represents normalized values and xij denotes values of initial decision-making matrix.
Inthe secondstep, thecomputationoftheentropy measure e
j
isperformedbyapplyingEquation(2).
ej=−1
ln(m)
m
X
i=1
rij lnnij(2)
where mrepresents number of alternatives.
In the third step, the values of the objective calculation of criterion weight w
j
are obtained by
applying Equation (3).
wj=1−ej
n
P
j=11−ej(3)
where ndenotes number of criteria.
Symmetry 2020,12, 1479 6 of 23
3.2.2. Fuzzy PIPRECIA Method
The Fuzzy PIPRECIA method consists of the steps presented below.
Step 1. Forming a set of criteria and sorting the criteria according to marks from the first to the
last, and this means that they need to be sorted unclassified.
Step 2. Each decision-maker individually evaluates pre-sorted criteria C
j
by starting from the
second criterion, Equation (4).
sr
j=
>1if Cj>Cj−1
=1if Cj=Cj−1
<1if Cj<Cj−1
(4)
sr
jdenotes the assessment of criteria by a decision-maker r
Step 3. Determining the coefficient kj
kj=(=1−if j =1
2−sjif j >1(5)
Step 4. Determining the fuzzy weight qj
qj=
=1if j =1
qj−1
kj
if j >1(6)
Step 5. Determining the relative weight of the criterion wj
wj=qj
n
P
j=1qj
(7)
where nis number of criteria.
In the following steps, the inverse methodology of fuzzy PIPRECIA method needs to be applied.
Step 6. Performing the assessment, but this time starting from a penultimate criterion.
sr
j
0=
>1if Cj>Cj+1
=1if Cj=Cj+1
<1if Cj<Cj+1
(8)
Step 7. Determining the coefficient kj0
kj0=(=1−if j =n
2−sj0if j >n(9)
Step 8. Determining the fuzzy weight qj0
qj0=
=1if j =n
qj+10
kj0if j >n(10)
Step 9. Determining the relative weight of the criterion wj0
wj0=qj0
n
P
j=1qj0
(11)
Symmetry 2020,12, 1479 7 of 23
Step 10. To determine the final weights of criteria, it is first necessary to perform the defuzzification
of the fuzzy values wjand wj0
wj00 =1
2(wj+wj0)(12)
Step 11. Checking the results obtained by applying the Spearman and Pearson
correlation coefficients.
3.2.3. Determining the Final Criteria Weights
In the last step of the second phase, it is necessary to average the values of the criteria that
were previously obtained by applying the stated methods. Since the defuzzified values in the Fuzzy
PIPRECIA method do not provide the sum of weights to be one, for the purposes of this paper,
the following Equation (13) was developed to average the weight values of the criteria using the fuzzy
PIPRECIA method.
wFP
j=
wj−
m
P
j=1wj−1
m
2(13)
where w
j
denotes the values of the criteria obtained using the Fuzzy PIPRECIA method, and mdenotes
the total number of criteria.
The values obtained by applying the Entropy method are divided by two obtaining the final
values of inputs and outputs whose sum is one and which are further inserted in the developed
integrated model.
3.3. The Third Phase
In the third phase, the DEA model was applied. The model was applied to determine the
values based on input orientation and output orientation. After the computation of the DEA model,
the alternatives were identified and inserted further in the overall ranking procedure. For that purpose,
the weighted overall efficiency ranking method was applied [
20
]. In the process, the integration with
previously obtained values of inputs and outputs was performed. Based on the results obtained,
the last step of the third phase, including the ranking of railway sections, was performed.
3.3.1. DEA Model
The CCR model is the most basic model of DEA. The model was introduced by Charnes et al. [
21
].
This section presents two DEA CCR models that were applied to obtain the values of alternatives, i.e.,
DMUs (Decision-Making Units) according to the input-oriented model (max) and the output-oriented
model (min). The orientation is performed because the target function is the determination of efficiency
of railway sections in terms of safety. The DEA CCR input-oriented model (max) is as follows:
DEAinput =max m
P
i=1wixi−input
st :
m
P
i=1wixij −
m+s
P
i=m+1wiyij ≤0, j=1,. . . ,n
m+s
P
i=m+1wiyi−output =1
wi≥0, i=1,. . . ,m+s
(14)
The Decision-Making Unit (DMU) consists of minput parameters for each alternative x
ij
, while s
represents output parameters for each alternative y
ij
, taking into account the weights of the parameters
denoted by wi. Also, nrepresents the total number of DMUs.
Symmetry 2020,12, 1479 8 of 23
The DEA CCR output-oriented model (min) is as follows:
DEAoutput =min m+s
P
i=m+1wiyi−output
st :
− m
P
i=1wixij!+m+s
P
i=m+1wiyij ≥0, j=1,. . . ,n
m
P
i=1wixi−input =1
wi≥0, i=1,. . . ,m+s
(15)
Then, it is necessary to apply Equation (16) in order to determine safe sections at the first level,
which are further inserted into the model.
DEAsafety =minoutput
maxinput (16)
3.3.2. Weighted Overall Efficiency Ranking Method
The additive utility function, when the attributes are mutually preferentially independent, can be
given as below:
u(X1,. . . ,Xk)=
k
X
i=1
ui(Xi)(17)
where u
i
(X
i
) denotes the single-attribute utility function for ith performance measure. For attributes
that belong to the cost group, i.e., need to be minimized, the single-attribute utility function is defined
by Equation (18):
ui(Xi)=Xmax
i−Xi
Xmax
i−Xmin
i
(18)
where Xmax
iand Xmin
idenote the maximum and minimum value of ith attribute, respectively.
When it comes to parameters that belong to the cost group, i.e., need to be maximized,
the single-attribute utility function is defined by Equation (19):
ui(Xi)=Xi−Xmin
i
Xmax
i−Xmin
i
0.5
(19)
After that, the integration with the previously obtained values of the criterion w
j
and summing
up by rows are performed by Equation (20).
u(X1,. . . ,Xk)=
k
X
i=1
wj·ui(Xi)(20)
Finally, the DMUs are ranked in descending order, where the best variant has the highest value.
3.4. The Fourth Phase
In this segment of the developed methodology, a sensitivity analysis, which refers to two parts,
is performed. The first part includes changing the significance of inputs and outputs by applying
Equation (21).
Wnβ=(1−Wnα)Wβ
(1−Wn)(21)
Symmetry 2020,12, 1479 9 of 23
e
Wnα
denotes a reduced value of the criterion whose weight changes,
e
Wβ
denotes the original
value of the criterion under consideration, while
e
Wn
denotes the original value of the criterion whose
value is reduced or increased.
In addition, in the sensitivity analysis, the results obtained were compared with two other
MCDM methods: MABAC [
22
,
23
] and CoCoSo [
24
,
25
]. Comparative analysis can provide exceptional
suggestions in modeling different processes, such as in [
26
]. Based on the change in the weights of
criteria and based on the comparison with other methods, new results and ranks were obtained.
4. Case Study
4.1. Analysis of the Condition of Railway Sections in B&H
The generator of flows of goods and passengers on the railway network in Bosnia and
Herzegovina is the corridor Vc (Šamac–Doboj–Sarajevo–Mostar– ˇ
Capljina–Ploˇce) and the railway
line Zvornik–Tuzla–Doboj–Banja Luka–Novi Grad/Bosanski Novi–Biha´c. The operational railway
network in B&H consists of 1048 km of railways. Most of the network consists of a single-track railway
and 87 km of a double-track railway. The railway network in Bosnia and Herzegovina is shown in
Figure 2. The main electrification system is 25 kV/50 Hz and 776 km of the network is electrified.
There are a total of 94 railway stations in B&H, of which 43 stations with simplified security and 51
with full security. The B&H railway network has 491 level crossings, of which only 59 are actively
protected by traffic lights and/or ramps, and the other 434 are passively protected by St. Andrew’s cross
and a visibility triangle. The railway complies with the structure gauge “GA” and “GB”, established
by the International Union of Railways “UIC”. The railway is capable of speeds of up to 120 km/h.
The ability of the railway to receive loads from vehicles on the B&H railway network are of categories
D4 (22.5 t/axle), and C3 (20 t/axle), expressed in tons per axle. The railway sector in B&H consists
of two railway companies, The Railways of the Federation of B&H (RFB&H) and The Railways of
the Republic of Srpska (RRS), which deal with operations and infrastructure. Both companies have
organized regional services or sections as their organizational units in the field. They are functionally
organized in nine (9) sections (Biha´c, Novi Grad, Prijedor, Banja Luka, Doboj, Tuzla, Zenica, Sarajevo
and Mostar).
Symmetry 2020, 12, x FOR PEER REVIEW 10 of 23
Figure 2. Railway network in B&H.
The current state of transport capacities, executive staff, stations, realized train-kilometers and
the length of the railway network with its sections are explained in Table 1.
Table 1. Description of railway sections (DMUs).
DMU Description
DMU1—
Bihać
covers an area of about 44 train-km. It includes 7 stations. In the area of Section Bihać, there are 45 level
crossings (railway tracks and roads). Road traffic at these level crossings is of low intensity. Section Bihać has
17 vehicles at its disposal (towing and towed). Section Bihać currently employs 146 executive staff. It realized
about 158 thousand train-km in freight and passenger transport.
DMU2—
Novi Grad
covers an area of about 44 train-km. It includes 7 stations. In the area of the section of Novi Grad, there are 57
level crossings (railway tracks and roads). Road traffic at these level crossings ranges from low intensity to
moderate intensity. Section Novi Grad has 61 vehicles at its disposal (towing and towed). Section Novi Grad
currently employs 108 executive staff. It realized about 158 thousand train-km in freight and passenger
transport.
DMU3—
Prijedor
covers an area of about 52 train-km. It includes 7 stations. In the area Section Prijedor, there are 39 level
crossings (railway tracks and roads). Road traffic at these level crossings ranges from low intensity to
moderate intensity. Section Prijedor has 462 vehicles at its disposal (towing and towed). Section Prijedor
currently employs 87 executive staff. It realized about 474 thousand train-km in freight and passenger
transport.
DMU4—
Banja
Luka
covers an area of about 92 train-km. It includes 10 stations. In the area of Section Banja Luka, there are 66 level
crossings (railway tracks and roads). Road traffic at these level crossings ranges from low intensity to
moderate intensity. Section Banja Luka has 168 vehicles at its disposal (towing and towed). Section Banja
Luka currently employs 144 executive staff. It realized about 316 thousand train-km in freight and passenger
transport.
DMU5—
Doboj
covers an area of about 252 train-km. It includes 18 stations. In the area of Section Doboj, there are 134 level
crossings (railway tracks and roads). Road traffic at these level crossings ranges from low intensity to
moderate intensity. Section Doboj has 215 vehicles at its disposal (towing and towed). Section Doboj currently
employs 254 executive staff. It realized 632 thousand train-km in freight and passenger transport.
Figure 2. Railway network in B&H.
Symmetry 2020,12, 1479 10 of 23
The current state of transport capacities, executive staff, stations, realized train-kilometers and the
length of the railway network with its sections are explained in Table 1.
Table 1. Description of railway sections (DMUs).
DMU Description
DMU1—Biha´c
covers an area of about 44 train-km. It includes 7 stations. In the area of Section Biha´c, there are
45 level crossings (railway tracks and roads). Road traffic at these level crossings is of low
intensity. Section Biha´c has 17 vehicles at its disposal (towing and towed). Section Biha´c
currently employs 146 executive staff. It realized about 158 thousand train-km in freight and
passenger transport.
DMU2—Novi Grad
covers an area of about 44 train-km. It includes 7 stations. In the area of the section of Novi Grad,
there are 57 level crossings (railway tracks and roads). Road traffic at these level crossings
ranges from low intensity to moderate intensity. Section Novi Grad has 61 vehicles at its
disposal (towing and towed). Section Novi Grad currently employs 108 executive staff.
It realized about 158 thousand train-km in freight and passenger transport.
DMU3—Prijedor
covers an area of about 52 train-km. It includes 7 stations. In the area Section Prijedor, there are
39 level crossings (railway tracks and roads). Road traffic at these level crossings ranges from
low intensity to moderate intensity. Section Prijedor has 462 vehicles at its disposal (towing and
towed). Section Prijedor currently employs 87 executive staff. It realized about 474 thousand
train-km in freight and passenger transport.
DMU4—Banja Luka
covers an area of about 92 train-km. It includes 10 stations. In the area of Section Banja Luka,
there are 66 level crossings (railway tracks and roads). Road traffic at these level crossings
ranges from low intensity to moderate intensity. Section Banja Luka has 168 vehicles at its
disposal (towing and towed). Section Banja Luka currently employs 144 executive staff.
It realized about 316 thousand train-km in freight and passenger transport.
DMU5—Doboj
covers an area of about 252 train-km. It includes 18 stations. In the area of Section Doboj, there
are 134 level crossings (railway tracks and roads). Road traffic at these level crossings ranges
from low intensity to moderate intensity. Section Doboj has 215 vehicles at its disposal (towing
and towed). Section Doboj currently employs 254 executive staff. It realized 632 thousand
train-km in freight and passenger transport.
DMU6—Tuzla
covers an area of about 136 train-km. It includes 15 stations. In the area of Section Tuzla, there
are 97 level crossings (railway tracks and roads). Road traffic at these level crossings ranges from
low intensity to moderate intensity. Section Tuzla has 359 vehicles at its disposal (towing and
towed). Section Tuzla currently employs 414 executive staff. It realized about 504 thousand
train-km in freight and passenger transport.
DMU7—Zenica
covers an area of about 167 train-km. It includes 8 stations. In the area of Section Zenica, there
are 11 level crossings (railway tracks and roads). Road traffic at these level crossings ranges from
low intensity to moderate intensity. Section Zenica has 487 vehicles at its disposal (towing and
towed). Section Zenica currently employs 306 executive staff. It realized about 855 thousand
train-km in freight and passenger transport.
DMU8—Sarajevo
covers an area of about 127 train-km. It includes 11 stations. In the area of Section Sarajevo, there
are 36 level crossings (railway tracks and roads). Road traffic at these level crossings ranges from
low intensity to moderate intensity. Section Sarajevo has 591 vehicles at its disposal (towing and
towed). Section Sarajevo currently employs 368 executive staff. It realized about 957 thousand
train-km in freight and passenger transport.
DMU9—Mostar
covers an area of about 133 train-km. It includes 11 stations. In the area of Section Mostar, there
are six level crossings (railway tracks and roads). Road traffic at these level crossings ranges
from low intensity to moderate intensity. Section Mostar has 265 vehicles at its disposal (towing
and towed). Section Mostar currently employs 335 executive staff. It realized 844 thousand
train-km in freight and passenger transport.
4.2. Defining Input-Output Parameters
The essence, meaning and reasons of each criterion are explained in the further text.
Note: The transport of dangerous goods in Bosnia and Herzegovina is small in scale, and it is not
possible to take into account the type of goods; for this reason, this criterion has not been considered.
The total length of railway network—I1.
This criterion refers to the characteristics of the network
and greatly affects railway traffic safety. The safety of transport of goods and passengers is significantly
affected by the condition and the degree of wear of the railway network. Even though the technical
condition of the network has been improved by reconstruction and modernization, it still does not
correspond to the condition of modern and safe transport. The technical equipment of the railway, as a
basis of traffic safety, most clearly reflects the ability of railways, signaling and telecommunication
Symmetry 2020,12, 1479 11 of 23
devices and rolling stock. Despite efforts to improve the condition of the railway network, it is still not
at the required level due to a high percentage of wear and tear of materials, especially the superstructure
(tracks, sleepers, track material and ballast) and other facilities. It is estimated that the degree of
wear of track superstructure is over 40%. The level of traffic safety is also affected by a large number
of slow drives, i.e., reduction of speed caused by the deterioration of materials and weak points on
the railway, which cause very frequent speed changes. Thirty to forty permanent slow drives are
introduced annually on the B&H railway network. Due to low temperatures and insufficient ballast,
the track is deformed 10 to 15 times a year, especially on parts of the track with continuous welded rails.
A significant number of railway network sections are exposed to the influence of natural disturbances,
which occasionally endanger traffic and cause its interruptions. The most common are torrential rains,
floods and landslides, which pose a danger to traffic safety because these phenomena usually occur
suddenly. Traffic safety has been reduced due to the condition of tracks, which is determined by the
technical parameters of facilities on particular tracks and the manner and policy of track maintenance.
The total number of stations—I2.
Railway traffic safety, in addition to the human factor, is most
significantly determined by the degree of security of stations with signaling and telecommunication
devices. On the B&H railway network, 54% of stations are protected with modern and more extensive
security, while 46% of stations are protected with simplified security. The degree of modernization
program implementation and installation of modern signaling devices significantly affects the level
of railway traffic safety, reducing the number of staffinvolved in providing and regulating traffic,
reducing delays in technological processes, improving working conditions of station staff, better clarity
of signal items along tracks, etc. The lack of adequate infrastructure has become a limiting factor for
the implementation of new systems for the purpose of safe and regular railway traffic and connecting
the railways in B&H with the railways in the region and beyond with the railways of EU countries.
Raising the level of train traffic safety largely depends on the installation of modern signaling devices.
Some accidents with severe consequences could be avoided if these devices were installed.
The number of level crossings—I3.
Many accidents and incidents, especially those with serious
consequences, occur at the intersections of railway tracks and roads. The number of traffic accidents
and incidents in these places is increasing, and growing with an increase in the number of vehicles in
traffic. It is symptomatic that the number of accidents and incidents at level crossings is growing and
that the number of human casualties and injured persons is increasing as well as material damage.
Accidents at level crossings occur particularly due to the negligence of road vehicle drivers, which
is manifested in disrespect of signs at level crossings, careless crossing of vehicles over tracks, etc.
Accidents occur due to the fault of railway workers in only 1% of cases. Accidents and incidents
occur despite the fact that level crossings are protected by light signals, barriers or half-length barriers.
Level crossings on the B&H railway network are locations that generate great risk in terms of railway
and road traffic safety. Level crossings should be accepted as a necessary evil, i.e., places where there is
a high risk of endangering traffic safety with fatal consequences. To increase traffic safety, it is necessary
to take all available measures to reduce negative consequences of accidents at level crossings.
The number of available vehicles—I4.
A serious problem in transport execution and timetable
realization is poor technical conditions, poor maintenance and a high percentage of immobilization of
rolling stock. It was especially manifested in a large number of immobilized locomotives caused by
poor maintenance, improper handling of vehicles and their devices, lack of spare parts, prolongation
of repairs and damage to locomotives in accidents and incidents. The most common failures in towing
vehicles are on drive and auxiliary devices. Special attention should be paid to those defects of
rolling stock that directly endanger traffic safety, such as axle fractures or gearbox failures, pantograph
fractures on electric locomotives, etc. The number of defects in towing vehicles is very large and is
constantly increasing, and that is the reason radical measures should be taken to improve their technical
functionality. Immobilization of freight and passenger cars as a consequence of their condition and
maintenance adversely affects traffic safety and quality of transport. Due to the unfavorable condition
of rolling stock and inadequate maintenance, the number of vehicles removed from traffic because of
Symmetry 2020,12, 1479 12 of 23
breakdowns is high. Additionally, the number of accidents and incidents due to vehicle breakdowns is
large. According to available data, vehicles in B&H are mostly of old average age, over 41 years, which
represents difficulties in maintaining vehicles in good condition. Railway safety largely depends on a
level of modernization of rolling stock.
The total number of train-kilometers—I5.
Train-kilometers are quantitative indicators that are
able to show a certain amount of work or quantity in the transport of passengers and goods. A railway
undertaking, providing transport, performs a certain amount of work in train-kilometers, which is
considered to be a realized transport service for which a certain price is charged. Train-kilometers
characterize the operation of locomotives and cars (electric or diesel engine sets) on one network or on
particular lines. The most common criterion for determining the reliability of vehicles is their lifespan,
which is expressed in the number of train-kilometers traveled. In essence, the level of railway traffic
safety is reduced if the number of train-kilometers traveled is higher. Thus, in B&H, a serious problem
is the condition of mobile capacities which are mostly of old age and at the end of their lifespan.
The total number of executive staff—I6.
This criterion is the most significant for railway traffic
safety because it is dominant in a chain of railway traffic safety components. It can be freely stated
that in all accidents and incidents except those caused by “force majeure” (a phenomenon that man
cannot predict, manage or control, such as earthquakes, floods, large landslides, large-scale fires,
etc.), a man, compared to the resources he has created, is the most susceptible to deviations from
standard (standardized, prescribed, expected) behavior and hence becomes a (direct or indirect) cause
of most railway accidents and incidents. In some sections, the problem is an insufficient number of
executive staff(train drivers, train dispatchers, shunters and switchers), which requires great efforts
and responsibilities in order to maintain a high level of safety. The lack of executive staffrequires the
introduction of extended work, which increases fatigue and creates unfavorable safety conditions.
Basically, the cause of some railway accidents and incidents is a man who has failed (directly or
indirectly). Thus, he has erred in designing, manufacturing, maintaining, controlling, and handling
of technical means which are the cause of some events (serious accidents, accidents and incidents).
For these reasons, and in order to increase safety, executive staffmust be constantly checked in terms
of: health status, professional skills, fatigue, and work and technical discipline.
Table 2shows the values of all DMUs in relation to input parameters.
Table 2. Section indicators in relation to inputs.
Total Length of
Railway Network
(km)—I1
Total
Number of
Stations—I2
Number of
Level
Crossings—I3
Number of
Available
Vehicles—I4
Total
Number of
Train-km—I5
Total
Number of
Executive
Staff—I6
DMU1—Biha´c 44.900 45 158,000 7 146 17
DMU2—Novi Grad 44.222 57 158,095.3 7 108 61
DMU3—Prijedor 52.500 39 474,285.9 7 87 462
DMU4—Banja Luka 91.600 66 316,190.6 10 144 168
DMU5—Doboj 251.884 134 632,381.2 18 254 215
DMU6—Tuzla 136.000 97 504,200 15 414 359
DMU7—Zenica 166.900 11 854,576 8 306 487
DMU8—Sarajevo 127.200 36 957,420 11 368 591
DMU9—Mostar 133.490 6 844,028 11 335 265
Total 1,048,696 491 94 2162 2625
To maintain safety at a high level, the European Union in its documents [
27
] has prescribed the
definitions of accidents and incidents and limitations of common safety objectives.
Serious accident—O1.
A serious accident means any train collision or derailment of trains
resulting in the death of at least one person, serious injuries to five or more persons or extensive
damage to rolling stock (extensive damage means damage that can be immediately assessed by the
Symmetry 2020,12, 1479 13 of 23
investigating body to cost at least EUR 2 million), infrastructure or the environment, and any other
accident which has an obvious impact on railway safety or safety management.
Accident—O2.
An accident is an unwanted or unintended sudden event or a specific chain
of such events which have harmful consequences (collisions, derailments, level crossing accidents,
accidents to persons involving rolling stock in motion, fires, etc.).
Incident—O3.
An incident is any occurrence, other than an accident or serious accident, and
which is related to the traffic of trains or shunting rolling stock and affects the safety of railway traffic.
Killed persons—O4.
Killed persons are any persons killed immediately or dying within 30 days
as a result of an accident, serious accident or incident, except persons who committed suicide.
Injured persons—O5.
Injured persons are any persons injured who were hospitalized for more
than 24 h as a result of an accident, serious accident or incident, except suicide attempt.
Table 3shows the values of all DMUs in relation to output parameters.
Table 3. Section indicators in relation to outputs.
Serious Accident
(Number)—O1
Accident
(Number)—O2
Incident
(Number)—O3
Killed Persons
(Number)—O4
Injured Persons
(Number)—O5
DMU1—Biha´c 1 1 2 1 0
DMU2—Novi Grad 1 0 0 1 0
DMU3—Prijedor 1 0 2 1 0
DMU4—Banja Luka 1 7 26 1 3
DMU5—Doboj 2 5 11 2 4
DMU6—Tuzla 4 13 55 4 12
DMU7—Zenica 2 1 0 2 0
DMU8—Sarajevo 2 2 0 2 1
DMU9—Mostar 0 2 2 0 2
4.3. Determining the Weight Values of Criteria
As already mentioned in the previous section of the paper, two methods were applied to determine
the weights of the criteria. The Entropy method was used to determine the weight values of inputs,
and Fuzzy PIPRECIA was used to compute the values of outputs.
4.3.1. Determining the Weight Values of Inputs Using the Entropy Method
Table 4shows a normalized matrix obtained by applying Equation (1).
Table 4. Normalized decision matrix.
I1I2I3I4I5I6
DMU10.043 0.092 0.032 0.074 0.068 0.006
DMU20.042 0.116 0.032 0.074 0.050 0.023
DMU30.050 0.079 0.097 0.074 0.040 0.176
DMU40.087 0.134 0.065 0.106 0.067 0.064
DMU50.240 0.273 0.129 0.191 0.117 0.082
DMU60.130 0.198 0.103 0.160 0.191 0.137
DMU70.159 0.022 0.174 0.085 0.142 0.186
DMU80.121 0.073 0.195 0.117 0.170 0.225
DMU90.127 0.012 0.172 0.117 0.155 0.101
Examples of calculations for the Entropy method are shown in Appendix A.
4.3.2. Determining the Weight Values of Outputs Using the Fuzzy PIPRECIA Method
The following section of the paper presents the calculation of the weight values of outputs using
the Fuzzy PIPRECIA method. As this is a subjective MCDM method, the first evaluation was performed
by three experts in the field of railway safety. The evaluation was performed on the basis of linguistic
scales defined in [16], the quantification of which is shown in Table 5.
Symmetry 2020,12, 1479 14 of 23
Table 5. Evaluation of outputs by an expert team.
Fuzzy PIPRECIA
O2O3O4O5
DM1 (0.667, 1, 1) (0.4, 0.5, 0.667) (1.3, 1.45, 1.5) (0.286, 0.333, 0.4)
DM2 (0.5, 0.667, 1) (0.5, 0.667, 1) (1.3, 1.45, 1.5) (0.4, 0.5, 0.667)
DM3 (0.5, 0.667, 1) (0.4, 0.5, 0.667) (1.4, 1.6, 1.65) (0.333, 0.4, 0.5)
AV (0.556, 0.778, 1) (0.433, 0.556, 0.778) (1.333, 1.5, 1.55) (0.34, 0.411, 0.522)
Inverse Fuzzy PIPRECIA
O4O3O2O1
DM1 (1.4, 1.6, 1.65) (0.25, 0.286, 0.333) (1.2, 1.3, 1.35) (1, 1, 1.05)
DM2 (1.2, 1.3, 1.35) (0.333, 0.4, 0.5) (1.1, 1.15, 1.2) (1.1, 1.15, 1.2)
DM3 (1.3, 1.45, 1.5) (0.286, 0.333, 0.4) (1.2, 1.3, 1.35) (1.1, 1.15, 1.2)
AV (1.3, 1.45, 1.5) (0.29, 0.34, 0.411) (1.167, 1.25, 1.3) (1.067, 1.1, 1.15)
As already mentioned, the evaluation is performed starting from the second, i.e., the penultimate
criterion. Therefore, Table 5shows the evaluation of O
2
and O
4
, respectively. Examples of calculations
for fuzzy PIPRECIA are shown in Appendix B, and for inverse fuzzy PIPRECIA in Appendix B.
4.4. Application of DEA Model
In this section, of the paper, input- and output-oriented models of DEA are presented in order
to determine which sections, i.e., DMUs, are efficient and will be inserted further in the model and
then ranked. Linear programming problems are set and then solved in Lingo 17. As an example of an
input-oriented model, shown by Equation (14), Section Biha´c is presented in Appendix C. Then, as an
example of an output-oriented model, Section Banja Luka, defined by Equation (15), is presented in
Appendix C.
Solving all DEA models for all railway sections, the values shown in Table 6are obtained. The final
DEA values obtained by applying Equation (16) are also presented.
Table 6. Results of DEA model.
DEA-Input DEA-Output DEA-Final
Biha´c 1.000 1.000 1.000
Novi Grad 1.000 1.000 1.000
Prijedor 1.000 1.000 1.000
Banja Luka 0.943 1.061 1.125
Doboj 1.000 1.000 1.000
Tuzla 0.387 2.581 6.669
Zenica 1.000 1.000 1.000
Sarajevo 1.000 1.000 1.000
Mostar 1.000 1.000 1.000
The railway sections DMUs Banja Luka and Tuzla are not safe, and it is necessary to implement
certain corrective measures in order to improve safety. It can be seen from Table 7that these two
sections have values higher than one and are not inserted further into the model. The highest values
are removed, since Equation (16), which defines risk and not efficiency, is applied.
Symmetry 2020,12, 1479 15 of 23
Table 7. A new initial decision matrix.
I1I2I3I4I5I6O1O2O3O4O5
DMU
144.900 45
158,000
7 146 17 1 1 2 1 0
DMU
244.222 57
158,095.3
7 108 61 1 0 0 1 0
DMU
352.500 39
474,285.9
7 87 462 1 0 2 1 0
DMU
5
251.884
134
632,381.2
18 254 215 2 5 11 2 4
DMU
7
166.900
11
854,576
8 306 487 2 1 0 2 0
DMU
8
127.200
36
957,420
11 368 591 2 2 0 2 1
DMU
9
133.490
6
844,028
11 335 265 0 2 2 0 2
4.5. Application of Weighted Overall Efficiency Ranking Method
Based on the previously applied DEA, we determined the DMUs that represent the greatest risk:
DMU
4
and DMU
6
, while other DMUs are relatively safe sections. To determine the difference among
the seven DMUs that have obtained the values of one in DEA, the weighted overall efficiency ranking
method is applied. First, a new initial matrix is formed consisting of seven railway sections and is
shown in Table 7.
Examples of calculation are shown in Appendix D.
The final values of all railway sections and their ranks are obtained, which is shown in Table 8.
Table 8. Final results after applying the integrated Entropy-Fuzzy PIPRECIA-DEA model.
Results Rank
Biha´c 0.447 6
Novi Grad 0.510 5
Prijedor 0.601 2
Doboj 0.417 7
Zenica 0.563 4
Sarajevo 0.583 3
Mostar 0.687 1
After the application of the integrated Entropy-Fuzzy PIPRECIA-DEA model, the results show that
the railway section Mostar is the safest in Bosnia and Herzegovina, with a value of 0.687. The second
safest section is Prijedor, with a value of 0.601. The railway sections Tuzla and Banja Luka, which are
characterized as the sections with the highest risk within the DEA model, are followed by the sections
Doboj and Biha´c, applying the weighted overall efficiency ranking method.
5. Sensitivity Analysis
5.1. Changing the Significance of Criteria
When creating a model and calculating the results, it is very important to determine how sensitive
the model is to changes in input parameters. Therefore, in this section, the impacts of inputs and
outputs are changed by applying Equation (21) [
28
]. Thirty scenarios were formed with completely
new values of the criteria, as shown in Table 9.
For each of the newly formed scenarios, the calculation was performed again using the weighted
overall efficiency ranking method, and the results presented in Figure 3were obtained.
Symmetry 2020,12, 1479 16 of 23
Table 9. New values of criteria through 30 formed scenarios.
w1w2w3w4w5w6w7w8w9w10 w11
S10.078 0.134 0.078 0.030 0.064 0.127 0.118 0.102 0.073 0.114 0.081
S20.080 0.137 0.080 0.031 0.065 0.130 0.121 0.104 0.075 0.094 0.083
S30.082 0.140 0.082 0.032 0.067 0.132 0.124 0.106 0.077 0.074 0.085
S40.084 0.143 0.084 0.033 0.068 0.135 0.126 0.109 0.078 0.054 0.086
S50.086 0.146 0.086 0.033 0.070 0.138 0.129 0.111 0.080 0.034 0.088
S60.087 0.149 0.087 0.034 0.071 0.141 0.132 0.113 0.082 0.013 0.090
S70.078 0.111 0.078 0.030 0.064 0.127 0.118 0.102 0.073 0.138 0.081
S80.080 0.091 0.080 0.031 0.065 0.129 0.121 0.104 0.075 0.141 0.083
S90.082 0.072 0.082 0.032 0.067 0.132 0.123 0.106 0.076 0.144 0.084
S
10 0.083 0.052 0.084 0.032 0.068 0.135 0.126 0.108 0.078 0.147 0.086
S
11 0.085 0.033 0.085 0.033 0.070 0.138 0.128 0.111 0.080 0.150 0.088
S
12 0.087 0.013 0.087 0.034 0.071 0.141 0.131 0.113 0.081 0.153 0.090
S
13 0.078 0.133 0.078 0.030 0.064 0.105 0.118 0.102 0.073 0.137 0.081
S
14 0.080 0.136 0.080 0.031 0.065 0.087 0.120 0.104 0.075 0.140 0.082
S
15 0.081 0.139 0.082 0.032 0.067 0.068 0.123 0.106 0.076 0.143 0.084
S
16 0.083 0.142 0.083 0.032 0.068 0.050 0.125 0.108 0.078 0.146 0.086
S
17 0.085 0.144 0.085 0.033 0.069 0.031 0.128 0.110 0.079 0.149 0.087
S
18 0.086 0.147 0.086 0.034 0.071 0.012 0.130 0.112 0.081 0.152 0.089
S
19 0.078 0.133 0.078 0.030 0.064 0.126 0.098 0.101 0.073 0.137 0.081
S
20 0.080 0.136 0.080 0.031 0.065 0.129 0.081 0.103 0.074 0.140 0.082
S
21 0.081 0.138 0.081 0.032 0.066 0.131 0.064 0.105 0.076 0.142 0.084
S
22 0.083 0.141 0.083 0.032 0.067 0.133 0.046 0.107 0.077 0.145 0.085
S
23 0.084 0.143 0.084 0.033 0.069 0.136 0.029 0.109 0.079 0.148 0.087
S
24 0.086 0.146 0.086 0.033 0.070 0.138 0.012 0.111 0.080 0.150 0.088
S
25 0.078 0.133 0.078 0.030 0.064 0.126 0.117 0.085 0.073 0.137 0.080
S
26 0.079 0.135 0.079 0.031 0.065 0.128 0.119 0.070 0.074 0.139 0.082
S
27 0.080 0.137 0.080 0.031 0.066 0.130 0.121 0.055 0.075 0.141 0.083
S
28 0.082 0.139 0.082 0.032 0.067 0.132 0.123 0.040 0.076 0.143 0.084
S
29 0.083 0.141 0.083 0.032 0.068 0.134 0.125 0.025 0.078 0.146 0.086
S
30 0.084 0.144 0.084 0.033 0.069 0.136 0.127 0.010 0.079 0.148 0.087
Symmetry 2020, 12, x FOR PEER REVIEW 17 of 23
For each of the newly formed scenarios, the calculation was performed again using the weighted
overall efficiency ranking method, and the results presented in Figure 3 were obtained.
Figure 3. Results of sensitivity analysis with changes of the impact of the five most significant criteria.
Figure 3 shows that the model is sensitive to changes in the significance of the criteria in the
following cases. The first change of ranks is in the fourth scenario when the third (Prijedor) and the
sixth alternative (Sarajevo) change their positions, and Sarajevo is in the second position. The reason
for this change is the reduction of the most significant criterion w10 by 60%. This ranking is maintained
in the fifth scenario, and the biggest changes in the rankings occur in the sixth scenario, when the
first-ranked alternative (Mostar) falls to second place, and the sixth alternative (Sarajevo) comes in
the first place. This is caused by reducing the value of the most significant criterion w10 to a value of
0.013, i.e., the significance is reduced by as much as 90%. In all other scenarios, the railway section
Mostar retains the first position. In scenarios S7–S12, there is no change in the initial ranks, which
practically implies that any change of criterion w2 does not affect the stability of the model. However,
the change of the third most significant criterion w6 leads to the change of the original ranks. With
the reduction of the significance of this criterion by 15, 30 and 45% (S13, S14 and S15), the railway
sections Novi Grad and Zenica change their positions (fourth and fifth position). When the criterion
w6 is reduced by 60% (S16), there are new changes in the rankings which include the following: the
first alternative (Bihać) comes to the fifth from the sixth place, while the reverse situation occurs for
the section Zenica. In addition, in this set, Novi Grad and Sarajevo change their positions (third and
fourth place). In sets S17 and S18, when the criterion w6 is reduced by 75 and 90%, there are major
changes in the ranks. Namely, Bihać changes its rank by two places (from the sixth to the fourth),
while Sarajevo falls from the third to the fifth place compared to the initial rank. In the following sets,
in S22–S24 is there a change in only one position, and in other scenarios, the initial rank is retained.
Based on the analysis of the impact of changes in the weight values of the criteria, it can be concluded
that the model is sensitive in certain scenarios, with an emphasis that the biggest changes in ranks
occur when the significance of the last input, i.e., the value of criterion w6 changes.
5.2. Comparison with MABAC and CoCoSo Methods
In this part of the sensitivity analysis, the previously obtained results created by integrating the
Entropy-Fuzzy PIPRECIA-DEA-weighted overall efficiency ranking method are confirmed by
comparison with two MCDM methods, MABAC and CoCoSo. The results are presented in Table 10.
Figure 3.
Results of sensitivity analysis with changes of the impact of the five most significant criteria.
Symmetry 2020,12, 1479 17 of 23
Figure 3shows that the model is sensitive to changes in the significance of the criteria in the
following cases. The first change of ranks is in the fourth scenario when the third (Prijedor) and the
sixth alternative (Sarajevo) change their positions, and Sarajevo is in the second position. The reason
for this change is the reduction of the most significant criterion w
10
by 60%. This ranking is maintained
in the fifth scenario, and the biggest changes in the rankings occur in the sixth scenario, when the
first-ranked alternative (Mostar) falls to second place, and the sixth alternative (Sarajevo) comes in the
first place. This is caused by reducing the value of the most significant criterion w
10
to a value of 0.013,
i.e., the significance is reduced by as much as 90%. In all other scenarios, the railway section Mostar
retains the first position. In scenarios S
7
–S
12
, there is no change in the initial ranks, which practically
implies that any change of criterion w
2
does not affect the stability of the model. However, the change
of the third most significant criterion w6leads to the change of the original ranks. With the reduction
of the significance of this criterion by 15, 30 and 45% (S
13
, S
14
and S
15
), the railway sections Novi Grad
and Zenica change their positions (fourth and fifth position). When the criterion w
6
is reduced by 60%
(S
16
), there are new changes in the rankings which include the following: the first alternative (Biha´c)
comes to the fifth from the sixth place, while the reverse situation occurs for the section Zenica. In
addition, in this set, Novi Grad and Sarajevo change their positions (third and fourth place). In sets S
17
and S
18
, when the criterion w
6
is reduced by 75 and 90%, there are major changes in the ranks. Namely,
Biha´c changes its rank by two places (from the sixth to the fourth), while Sarajevo falls from the third
to the fifth place compared to the initial rank. In the following sets, in S
22
–S
24
is there a change in only
one position, and in other scenarios, the initial rank is retained. Based on the analysis of the impact of
changes in the weight values of the criteria, it can be concluded that the model is sensitive in certain
scenarios, with an emphasis that the biggest changes in ranks occur when the significance of the last
input, i.e., the value of criterion w6changes.
5.2. Comparison with MABAC and CoCoSo Methods
In this part of the sensitivity analysis, the previously obtained results created by integrating
the Entropy-Fuzzy PIPRECIA-DEA-weighted overall efficiency ranking method are confirmed by
comparison with two MCDM methods, MABAC and CoCoSo. The results are presented in Table 10.
Table 10. Results of sensitivity analysis—comparison with MCDM methods.
Proposed Model MABAC CoCoSo
Biha´c 6 6 6
Novi Grad 5 5 5
Prijedor 2 2 3
Doboj 7 7 7
Zenica 4 4 4
Sarajevo 3 2 2
Mostar 1 1 1
The originally obtained ranks were confirmed through comparison with the MABAC and CoCoSo
methods. Based on the presented ranks, it can be noticed that they are in a very high correlation.
The results obtained by implementing the MABAC method show the same ranks, except for the section
Sarajevo, which shares the second position. The situation is similar with the CoCoSo method when
Prijedor and Sarajevo change positions, while other railway sections keep their initial positions.
6. Conclusions
European transport policy emphasizes that the introduction of an efficient, clean and safe freight
and passenger transport system requires an appropriate, dynamic, railway system that will directly
contribute to the creation and development of the single European market. The position of transport
policy is that the transport system must be viewed as a whole in which all modes of transport are
Symmetry 2020,12, 1479 18 of 23
complementary and compatible with the ultimate goal of providing end users with high-quality service,
greater safety, lower costs, and more innovation, with fewer negative impacts on environment. As the
transport sector is the driving force of the B&H economy, it is crucial that the railway system in B&H
continues to develop and rebuild in a sustainable manner. To maintain a competitive position in terms
of transport, it is necessary to establish a framework for its sustainable functioning. Through the
research conducted, a new subjective–objective model was developed for determining the level of safety
in railway traffic and sustainable functioning, which is one of the most important contributions of the
paper. Primarily, it was noticed the need for the research, initiated by the liberalization of the market
in B&H. Inputs and outputs were defined, and quantitative indicators were collected for all railway
sections in B&H. Due to the specificity of the problem being treated, a new integrated Entropy-Fuzzy
PIPRECIA-DEA-weighted overall efficiency ranking method was developed. The Entropy method
was used to determine input weights, while the Fuzzy PIPRECIA method was used to determine
output weights in order to insert their values further into the model. Two DEA models were defined,
showing that two railway sections, Tuzla and Banja Luka, had poor performance in terms of the level
of railway traffic safety, and were eliminated from further calculations. The weighted overall efficiency
ranking method was then applied to determine the ranks of the remaining seven sections. The obtained
results were modeled through a sensitivity analysis. The comparison with two other MCDM methods
confirmed the results previously obtained by the developed methodology. Then, the results were
modeled in terms of changing the significance of the five most important criteria, which showed that
the model was sensitive to certain changes in the weights of criteria. The biggest deviations, i.e.,
changes in ranks, were when the third criterion in terms of significance, w
6
, was decreased by 75 or
90%. In these scenarios of modeling the impact of criteria, when one criterion decreases, the others
increase proportionally.
The results show that the railway section Mostar has the best performance in terms of safety and
could be a benchmark in future research with respect to certain corrective measures for other railway
sections. Regarding the liberalization of the transport market and the possibility of providing services
by foreign operators, it is necessary to define performance improvement measures and a standard risk
management procedure as soon as possible. The model developed in this paper can serve in a risk
management standardization procedure in railway sections.
Author Contributions:
Conceptualization, A.B. and S.K.; methodology, Ž.S. and D.M.; validation, Ž.S. and S.K.;
investigation, A.B. and S.K.; data curation, A.B. and S.R.; writing—original draft preparation, Ž.S. and A.B.;
writing—review and editing, D.M. and S.R.; All authors have read and agreed to the published version of
the manuscript.
Funding: This research received no external funding.
Conflicts of Interest: The authors declare no conflict of interest.
Appendix A
The normalization of the initial matrix is performed as follows.
n11 =44.9
1048.7 =0.043
In the second step, the computation of the entropy measure is performed by applying Equation (2)
and the following values
e1=0.933, e2=0.855, e3=0.933, e4=0.974, e5=0.945, e6=0.891
are obtained as follows:
e1=−1
ln(9)(−2.050)=0.933
Symmetry 2020,12, 1479 19 of 23
In the third step, the values of the objective calculation of criterion weights are obtained by
applying Equation (3).
w1=0.153, w2=0.261, w3=0.153, w4=0.060, w5=0.125, w6=0.248 as follows :
w1=1−0.933
0.439 =0.153
To aggregate these values with the output values, it is necessary to divide the stated values by
two and the final input values are obtained:
w1=0.077, w2=0.131, w3=0.077, w4=0.030, w5=0.063, w6=0.124
Appendix B
Averaging the estimates given by the expert team, a matrix
sj
, i.e.,
s0
j
is obtained. The coefficient
kj
is calculated by applying Equation (5) as follows.
k1= (1.000, 1.000, 1.000)
k2= (2−1.000, 2 −0.788, 2 −0.556) = (1.000, 1.222, 1.444)
When Equation (6) is applied, the values qjare obtained as follows:
q1= (1.000,1.000, 1.000)
q2=1.000
1.444,1.000
1.222,1.000
1.000=(0.692,0.818,1.000)
q3=0.692
1.567,0.818
1.444,1.000
1.222=(0.442,0.566,0.818)
To obtain the weight values from the fifth step, it is necessary to apply Equation (7) as follows:
n
P
j=1qj=(3.196,4.230,5.867)
=(1.000 +0.692 +0.442 +0.663 +0.399)=3.196
=(1.000 +0.818 +0.566 +1.133 +0.713)=4.230
=(1.000 +1.000 +0.818 +1.818 +1,230)=5.867
w1=1.000
5.867,1.000
4.230,1.000
3.196=(0.170,0.236,0.313)
The equation
dfcrisp =l+4m+u
6
is applied to perform the defuzzification of the values as shown in
the penultimate column of Table A1. Additionally, in Table A1, the results obtained by using the fuzzy
PIPRECIA method and the values of the criteria, i.e., outputs are shown.
Table A1. Details of the calculation carried out using fuzzy PIPRECIA.
sjkjqjwjDFwj
O1 (1, 1, 1) (1, 1, 1) (0.17, 0.236, 0.313) 0.238
O2 (0.556, 0.778, 1) (1, 1.222, 1.444) (0.692, 0.818, 1) (0.118, 0.193, 0.313) 0.201
O3 (0.433, 0.556, 0.778) (1.222, 1.444, 1.567) (0.442, 0.566, 0.818) (0.075, 0.134, 0.256) 0.144
O4 (1.333, 1.5, 1.55) (0.45, 0.5, 0.667) (0.663, 1.133, 1.818) (0.113, 0.268, 0.569) 0.292
O5 (0.34, 0.411, 0.522) (1.478, 1.589, 1.66) (0.399, 0.713, 1.23) (0.068, 0.169, 0.385) 0.188
SUM (3.196, 4.23, 5.867)
In the following, the inverse fuzzy PIPRECIA methodology is applied, i.e., Equations (8)–(11) are
applied. The results are shown in Table A2.
Symmetry 2020,12, 1479 20 of 23
Table A2. Details of the calculation carried out using fuzzy PIPRECIA-I.
s0
jk0
jq0
jw0
jDFwj
O1(1.067, 1.1, 1.15) (0.85, 0.9, 0.933) (1.074, 1.622, 2.116) (0.131, 0.232, 0.396) 0.243
O2(1.167, 1.25, 1.3) (0.7, 0.75, 0.833) (1.002, 1.46, 1.798) (0.123, 0.209, 0.337) 0.216
O3(0.29, 0.34, 0.411) (1.589, 1.66, 1.71) (0.835, 1.095, 1.259) (0.102, 0.157, 0.236) 0.161
O4(1.3, 1.45, 1.5) (0.5, 0.55, 0.7) (1.429, 1.818, 2) (0.175, 0.26, 0.375) 0.265
O5(1, 1, 1) (1, 1, 1) (0.122, 0.143, 0.187) 0.147
SUM (5.34, 6.996, 8.172)
To determine the final weight values of the outputs, Equations (12) and (13) are applied as follows;
Equation (12) is first applied to obtain the following values:
w100 =1
2(0.238 +0.243) = 0.240
w200 =0.208, w300 =0.153, w400 =0.278, w500 =0.167
and then Equation (13) is applied in order to obtain the final values of the outputs, which are further
inserted into the model, and they are
O1=0.115, O2=0.099, O3=0.072, O4=0.135, O5=0.079 obtained as follows :
O1=0.240 −1.047−1
5
2=0.115
Spearman’s correlation coefficient is 0.900, while Pearson’s correlation coefficient is 0.884, which
is a very high correlation of both the ranks and values.
Appendix C
DEAinput−Bihac =MAX =98.844w1+51w2+158000w3+9w4+146w5+17w6;
98.844w1+51w2+158000w3+9w4+146w5+17w6−(1w7+1w8+2w9+1w10 +0w11)<=0;
44.222w1+57w2+158095.3w3+7w4+108w5+61w6−(1w7+0w8+0w9+1w10 +0w11)<=0;
52.5w1+39w2+474285.9w3+7w4+87w5+462w6−(1w7+0w8+2w9+1w10 +0w11)<=0;
91.6w1+66w2+316190.6w3+10w4+144w5+168w6−(1w7+7w8+26w9+1w10 +3w11)<=0;
229.1w1+134w2+632381.2w318w4+254w5+215w6−(2w7+5w8+11w9+2w10 +4w11)<=0;
141.855w1+107w2504200w3+18w4+414w5+359w6−(4w7+13w8+55w9+4w10 +12w11)<=0;
167.673w1+11w2+854576w3+12w4+306w5+487w6−(2w7+1w8+0w9+2w10 +0w11)<=0;
135.087w1+37w2+957420w3+15w4+368w5+591w6−(2w7+2w8+0w9+2w10 +1w11)<=0;
133.490w1+6w2+844028w3+17w4+335w5+265w6−(0w7+2w8+2w9+0w10 +2w11)<=0;
1w7+1w8+2w9+1w10 +0w11=1;
w1 >0;w2 >0;w3 >0;w4 >0;w5 >0;w6 >0;w7 >0; w8 >0; w9 >0; w10 >0;w11 >0;
Symmetry 2020,12, 1479 21 of 23
After solving this model, the objective function is 1.000.
DEAoutput−Banja Luka =MIN =1w7+7w8+26w9+1w10 +3w11;
−98.844w1−51w2−158000w3−9w4−146w5−17w6+(1w7+1w8+2w9+1w10 +0w11)>=0;
−44.222w1−57w2−158095.3w3−7w4108w5−61w6+(1w7+0w8+0w9+1w10 +0w11)>=0;
−52.5w1−39w2−474285.9w3−7w4−87w5−462w6+(1w7+0w8+2w9+1w10 +0w11)>=0;
−91.6w1−66w2−316190.6w3−10w4−144w5−168w6+(1w7+7w8+26w9+1w10 +3w11)>=0;
−229.1w1−134w2−632381.2w3−18w4−254w5−215w6+(2w7+5w8+11w9+2w10 +4w11)>=0;
−141.855w1−107w2−504200w3−18w4−414w5−359w6+(4w7+13w8+55w9+4w10 +12w11)>=0;
−167.673w1−11w2−854576w3−12w4−306w5−487w6+(2w7+1w8+0w9+2w10 +0w11)>=0;
−135.087w1−37w2−957420w3−15w4−368w5−591w6+(2w7+2w8+0w9+2w10 +1w11)>=0;
−133.490w1−6w2−844028w3−17w4−335w5−265w6+(0w7+2w8+2w9+0w10 +2w11)>=0;
91.6w1+66w2+316190.6w3+10w4+144w5+168w6=1;
w1 >0;w2 >0;w3 >0;w4 >0;w5 >0;w6 >0;w7 >0; w8 >0; w9 >0; w10 >0;w11 >0;
After solving this model, the objective function is 1.061.
Appendix D
Since the inputs are of benefit type, i.e., they need to be maximized, Equation (19) is applied as
follows:
u1(I1)= (44.9 −44.222)
(251.884 −44.222)!0.5
=0.057
while the outputs are of minimization type, and Equation (18) is applied as follows:
u1(O1)=2−1
2−0=0.500.
Normalization is performed in an identical way for all other elements of the initial matrix
depending on the type of orientation. The entire normalized matrix obtained as described above is
shown in Table A3.
Table A3. Normalized matrix.
I1I2I3I4I5I6O1O2O3O4O5
DMU
1
0.057 0.552 0.000 0.000 0.458 0.000 0.500 0.800 0.818 0.500 1.000
DMU
2
0.000 0.631 0.011 0.000 0.273 0.277 0.500 1.000 1.000 0.500 1.000
DMU
3
0.200 0.508 0.629 0.000 0.000 0.880 0.500 1.000 0.818 0.500 1.000
DMU
5
1.000 1.000 0.770 1.000 0.771 0.587 0.000 0.000 0.000 0.000 0.000
DMU
7
0.769 0.198 0.933 0.302 0.883 0.905 0.000 0.800 1.000 0.000 1.000
DMU
8
0.632 0.484 1.000 0.603 1.000 1.000 0.000 0.600 1.000 0.000 0.750
DMU
9
0.656 0.000 0.926 0.603 0.939 0.657 1.000 0.600 0.818 1.000 0.500
After that, the integration with the previously obtained values of the criteria wjis performed:
w1=0.077,w2=0.131,w3=0.077,w4=0.030,w5=0.063,w6=0.124,w7=0.115,w8=0.099,
w9=0.072,w10 =0.135,w11 =0.079
and the values for DMUs are summed by rows. Therefore, by applying Equation (20), the final values
of all railway sections and their ranks are obtained, which is shown in Table 8.
References
1.
Roets, B.; Verschelde, M.; Christiaens, J. Multi-output efficiency and operational safety: An analysis of
railway traffic control centre performance. Eur. J. Oper. Res. 2018,271, 224–237. [CrossRef]
Symmetry 2020,12, 1479 22 of 23
2.
Wanke, P.; Chen, Z.; Liu, W.; Antunes Jorge, J.M.; Azad, M.A.K. Investigating the drivers of railway
performance: Evidence from selected Asian countries. Habitat Int. 2018,80, 49–69. [CrossRef]
3.
Djordjevi´c, B.; Krmac, E.; Mlinari´c, T.J. Non-radial DEA model: A new approach to evaluation of safety at
railway level crossings. Saf. Sci. 2018,103, 234–246. [CrossRef]
4.
Azadeh, A.; Ghaderi, S.F.; Izadbakhsh, H. Integration of DEA and AHP with computer simulation for railway
system improvement and optimization. Appl. Math. Comput. 2008,195, 775–785. [CrossRef]
5.
Mohajeri, N.; Amin Gholam, R. Railway station site selection using analytical hierarchy process and data
envelopment analysis. Comput. Ind. Eng. 2010,59, 107–114. [CrossRef]
6.
Cantos, P.; Pastor, J.M.; Serrano, L. Vertical and Horizontal Separation in the European Railway Sector and
its Effects on Productivity. J. Transp. Econ. Policy 2010,44, 139–160.
7.
Li, L.-B.; Hu, J.-L. Efficiency and productivity of the Chinese railway system, Application of a multi-stage
framework. Afr. J. Bus. Manag. 2011,5, 8789–8803.
8.
Hansen, I.A.; Wiggenraad, P.B.L.; Wolff, J.W. Benchmark Analysis of Railway Networks and Undertakings.
In Proceedings of the International Seminar on Railway Operations Modelling and Analysis, Copenhagen,
Denmark, 13–15 May 2013; pp. 1–20.
9.
Azadeh, A.; Salehi, V. Modeling and optimizing efficiency gap between managers and operators in integrated
resilient systems. Process Saf. Environ. Prot. 2014,92, 766–778. [CrossRef]
10.
Marchetti, D.; Wanke, P. Brazil
0
s rail freight transport: Efficiency analysis using two-stage DEA and
cluster-driven public policies. Socio-Econ. Plan. Sci. 2017,59, 26–42. [CrossRef]
11.
Kapetanovic, M.; Milenkovic, M.; Bojovic, N.; Avramovic, Z. Evaluation of European Railway Companies
Efficiency: Application of a Two-Stage Analysis. Tehnika 2017,72, 403–410. [CrossRef]
12.
Bai, X.-J.; Zeng, J.; Chiu, Y.-H. Pre-evaluating efficiency gains from potential mergers and acquisitions based
on the resampling DEA approach: Evidence from China
0
s railway sector. Transp. Policy
2019
,76, 46–56.
[CrossRef]
13.
Blagojevic, A.; Veskovi´c, S.; Kasalica, S.; Gojic, A.; Allamani, A. The application of the fuzzy ahp and dea for
measuring the efficiency of freight transport railway undertakings. Oper. Res. Eng. Sci. Theory Appl.
2020
,
3, 1–23. [CrossRef]
14.
Stefaniec, A.; Hosseini, K.; Xie, J.; Li, Y. Sustainability assessment of inland transportation in China: A triple
bottom line-based network DEA approach. Transp. Res. Part D Transp. Environ.
2020
,80, 102258. [CrossRef]
15.
Shannon, C.E.; Weaver, W. The Mathematical Theory of Communication; The University of Illinois Press: Urbana,
IL, USA, 1947.
16.
Stevi´c, Ž.; Stjepanovi´c, Ž.; Božiˇckovi´c, Z.; Das, D.K.; Stanujki´c, D. Assessment of conditions for implementing
information technology in a warehouse system: A novel fuzzy piprecia method. Symmetry
2018
,10, 586.
[CrossRef]
17.
Memi¸s, S.; Demir, E.; Karama¸sa, Ç.; Korucuk, S. Prioritization of road transportation risks: An application in
Giresun province. Oper. Res. Eng. Sci. Theory Appl. 2020,3, 111–126. [CrossRef]
18.
Ðali´c, I.; Stevi´c, Ž.; Karamasa, C.; Puška, A. A novel integrated fuzzy PIPRECIA–interval rough SAW model:
Green supplier selection. Decis. Mak. Appl. Manag. Eng. 2020,3, 126–145. [CrossRef]
19.
Ðali´c, I.; Ateljevi´c, J.; Stevi´c, Ž.; Terzi´c, S. An integrated SWOT—Fuzzy PIPRECIA model for analysis of
competitiveness in order to improve logistics performances. Facta Univ. Ser. Mech. Eng. 2020. [CrossRef]
20.
Mondal, S.; Chakraborty, S. A solution to robot selection problems using data envelopment analysis. Int. J.
Ind. Eng. Comput. 2013,4, 355–372. [CrossRef]
21.
Charnes, A.; Cooper, W.W.; Rhodes, E. Measuring the efficiency of decision making units. Eur. J. Oper. Res.
1978,2, 429–444. [CrossRef]
22.
Pamuˇcar, D.; ´
Cirovi´c, G. The selection of transport and handling resources in logistics centers using
Multi-Attributive Border Approximation area Comparison (MABAC). Expert Syst. Appl.
2015
,42, 3016–3028.
[CrossRef]
23.
Muravev, D.; Mijic, N. A Novel Integrated Provider Selection Multicriteria Model: The BWM-MABAC
Model. Decis. Mak. Appl. Manag. Eng. 2020,3, 60–78. [CrossRef]
24.
Yazdani, M.; Zarate, P.; Zavadskas, E.K.; Turskis, Z. A Combined Compromise Solution (CoCoSo) method
for multi-criteria decision-making problems. Manag. Decis. 2019. [CrossRef]
25.
Biswas, T.; Chatterjee, P.; Choudhuri, B. Selection of commercially available alternative passenger vehicle in
automotive environment. Oper. Res. Eng. Sci. Theory Appl. 2020,3, 16–27. [CrossRef]
Symmetry 2020,12, 1479 23 of 23
26.
Petrovi´c, G.; Mihajlovi´c, J.; ´
Cojbaši´c, Ž.; Madi´c, M.; Marinkovi´c, D. Comparison of three fuzzy MCDM
methods for solving the supplier selection problem. Facta Univ. Ser. Mech. Eng.
2019
,17, 455–469. [CrossRef]
27.
Directive (EU) 2016/798 of the European Parliament and of the Council of 11 May 2016 on Railway Safety; Official
Journal of the European Union; European Union: Brussels, Belgium, 2016.
28.
Veskovi´c, S.; Stevi´c, Ž.; Karabaševi´c, D.; Rajili´c, S.; Milinkovi´c, S.; Stoji´c, G. A New Integrated Fuzzy Approach
to Selecting the Best Solution for Business Balance of Passenger Rail Operator: Fuzzy PIPRECIA-Fuzzy
EDAS Model. Symmetry 2020,12, 743. [CrossRef]
©
2020 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access
article distributed under the terms and conditions of the Creative Commons Attribution
(CC BY) license (http://creativecommons.org/licenses/by/4.0/).