Full text
Citation: Ruiz-Minguela, P.; Blanco, J.M.; Nava, V.; Jeffrey, H. Technology-Agnostic Assessment of Wave Energy System Capabilities. Energies 2022,15, 2624. https:// doi.org/10.3390/en15072624 Academic Editor: Marco Torresi Received: 17 March 2022 Accepted: 30 March 2022 Published: 3 April 2022 Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. Copyright: © 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https:// creativecommons.org/licenses/by/ 4.0/). energies Article Technology-Agnostic Assessment of Wave Energy System Capabilities Pablo Ruiz-Minguela 1,2,* , Jesus M. Blanco 1,2 , Vincenzo Nava 1,3 and Henry Jeffrey 4 1TECNALIA, Basque Research and Technology Alliance (BRTA), Astondo Bidea, Edificio 700, 48160 Derio, Spain; [email protected] (J.M.B.); [email protected] (V.N.) 2School of Engineering, University of the Basque Country, Plaza Ingeniero Torres Quevedo, 1, 48013 Bilbao, Spain 3Basque Centre for Applied Mathematics (BCAM), Alameda de Mazarredo 14, 48009 Bilbao, Spain 4Institute for Energy Systems, School of Engineering, The University of Edinburgh, Edinburgh EH9 3JG, UK; henry.jeffr[email protected] *Correspondence: jpablo.r[email protected] Abstract: Developing new wave energy technologies is risky, costly and time-consuming. The large diversity of concepts, components and evaluation criteria creates a vast design space of potentially feasible solutions. This paper aims to introduce a novel methodology for the holistic assessment of wave energy capabilities in various market applications based on sound Systems Engineering methods. The methodology provides a consistent hierarchy of performance metrics relevant to the given system of reference, design activity and development stage under consideration as a means to scrutinise wave energy requirements. Full traceability of system requirements and performance metrics is then facilitated by multi-criteria decision tools and aggregation logic, respectively. The qualitative assessment in the case studies has resulted in very different rankings of System Drivers and Stakeholders for the two market applications considered. However, the Stakeholder Requirements and Functional Requirements present a small variation in the weights for the two application markets which results in a quantitative assessment with very similar Global Merit. Finally, the performance benchmark using the Commercial Attractiveness and Technical Achievability concepts enables a more objective comparison in the utility-scale and remote generation markets and a way to concentrate innovation efforts before proceeding to the next development stage. Keywords: commercial attractiveness; design domains; drivers; metrics; requirements; stakeholders; systems engineering; technical achievability; technology-agnostic 1. Introduction Wave energy has attracted the interest of many inventors for more than two centuries. Since the first recorded patent in 1799 [ 1 ], engineers have struggled to unravel the key requirements of wave energy technologies. However, it was not until the early 1970s that the mathematical formulation of wave energy interaction allowed us to understand the capture efficiency of marine devices [ 2 ]. The first attempt to derive a performance assessment of wave energy technologies was proposed by Nielsen [ 3 ]. Suggestions included ratios such as the Capture Width, Energy to Volume or Mass, Power Take-Off Efficiency, Capacity Factor and Capital Cost to Energy. The European project EQUIMAR [ 4 ] added other assessment figures to these metrics such as the Operating Cost, Availability Factor and LCOE. Initial work from Weber [ 5 ] on the Technology Performance Levels (TPL) has been continued in the US to evolve and endorse the TPL design philosophy, assessment criteria and methods [ 6 ]. More recently, IEA-OES has promoted an international evaluation and guidance framework for ocean energy technologies based on the concept of staged development [ 7 ]. Stages are loosely related to the Technology Readiness Level (TRL) scale, Energies 2022,15, 2624. https://doi.org/10.3390/en15072624 https://www.mdpi.com/journal/energies
Energies 2022,15, 2624 2 of 30 and at each stage-gate, an evaluation of the relevant metrics is carried out. The first-of-itskind implementation of this framework has been produced in the DTOceanPlus suite of design tools for ocean energy systems [8]. Clearly, performance requirements are moving from the mere evaluation of the energy production and costs to a more comprehensive assessment. Equally, the evaluation is evolving from the analysis of the basic wave energy subsystems involved in the power conversion to complete wave energy farms including multiple devices, the balance of plant or installation and maintenance activities. Discouragingly, most of the novel wave energy concepts are still focusing their efforts on the optimisation of power capture, leaving out of the initial design considerations of other essential performance requirements and subsystems that later become expensive “add-ons” [ 9 ]. In fact, experience in very diverse engineering sectors has shown that the early stages of technology development are crucial to meet cost and performance expectations [ 10 ] since engineering problems are built at the concept stage. The development of a competitive wave energy technology is a long endeavour faced with many challenges. The increased complexity of the assessments coupled with the large diversity of concepts calls for comprehensive development and evaluation methods. Hence, technology developers are encouraged to move to an integrated systems approach [ 9 ]. In that respect, Systems Engineering (SE) provides a suitable framework to allow progress towards a successful wave energy technology [11]. SE is a holistic, top-down approach to understanding stakeholder needs, exploring opportunities, documenting requirements and assessing alternatives while considering the whole problem [ 12 ]. SE methods have been successfully applied in many industrial sectors (e.g., automotive, aerospace or oil and gas among others) to develop innovative products meeting very diverse and demanding stakeholder needs. Regrettably, the application of SE to wave energy has been much limited and fragmented so far [13]. A thorough and systematic design process should provide engineers with effective means of organising information on system requirements and discriminating it from the information associated with design solutions [ 14 ]. System requirements should be specified at different levels of detail (or hierarchy) and be fully traceable throughout the design process [ 15 ]. Moreover, since the satisfaction of requirements is the driving force behind SE, evaluation and decision making must rely on the use of well-defined and articulated metrics. Finally, the systematic assessment should be flexible and adaptable to changing market conditions and stakeholder expectations, as they define the relative importance of individual requirements and therefore the solution space. This paper aims to introduce a novel technology-agnostic methodology for the holistic assessment of wave energy capabilities for various market applications. Each of these capabilities has been characterised by a function and its level of performance, following the approach in [ 16 ]. The core contribution of this methodology is to provide a consistent hierarchy of performance metrics relevant for the system of reference, design activity and development stage under consideration as a means to scrutinise wave energy requirements. Full traceability of system requirements and performance metrics is then facilitated by multi-criteria decision tools and aggregation logic, respectively. Finally, customisation of assessment criteria thresholds for the market-specific conditions enables a robust benchmarking of different wave energy technology options as well as the identification of outstanding technical challenges, as will be explained in Section 2.3. Two new concepts, commercial attractiveness and technical achievability, are introduced and illustrated through case studies. Assuming the primary product for wave energy is likely to be electricity generation [ 17 ], the case studies focus on the utility-scale generation and powering remote communities’ markets. Hence, this novel approach contributes to overcoming the limitations of pure qualitative or quantitative evaluating methods as well as allows tracking the reduction in technical risks along the various development stages by means of the performance ratio values.
Energies 2022,15, 2624 3 of 30 The outline of this article is as follows. Section 2introduces the methodology and main SE methods and tools used for the assessment of wave energy capabilities. Section 3 describes the specific implementation of this novel methodology in the environmental, stakeholder and functional domains. Furthermore, the results for two different market applications of wave energy technologies are presented and discussed in Section 4, before drawing the conclusions in Section 5. Finally, the prioritisation for the different domain attributes for the case studies along with their respective interactions is included in the Appendix A. 2. Materials and Methods The proposed evaluation approach consists of system analysis, a qualitative assessment and a performance benchmark (i.e., quantitative assessment) as shown in Figure 1. This method merges the engineering design and validation activities together with multicriteria decision-making and benchmarking. Hence, it enables a comprehensive evaluation of wave energy technologies at various development stages. It is important to highlight the inherent flexibility of the proposed method. For instance, the evaluation approach can be expanded by adding more granularity, i.e., finer levels of details, as the technology matures, or the design focus (i.e., system of reference) shifts from the farm and device to subsystem levels. Energies 2022, 15, x FOR PEER REVIEW 3 of 30 The outline of this article is as follows. Section 2 introduces the methodology and main SE methods and tools used for the assessment of wave energy capabilities. Section 3 describes the specific implementation of this novel methodology in the environmental, stakeholder and functional domains. Furthermore, the results for two different market applications of wave energy technologies are presented and discussed in Section 4, before drawing the conclusions in Section 5. Finally, the prioritisation for the different domain attributes for the case studies along with their respective interactions is included in the Appendix A. 2. Materials and Methods The proposed evaluation approach consists of system analysis, a qualitative assessment and a performance benchmark (i.e., quantitative assessment) as shown in Figure 1. This method merges the engineering design and validation activities together with multicriteria decision-making and benchmarking. Hence, it enables a comprehensive evaluation of wave energy technologies at various development stages. It is important to highlight the inherent flexibility of the proposed method. For instance, the evaluation approach can be expanded by adding more granularity, i.e., finer levels of details, as the technology matures, or the design focus (i.e., system of reference) shifts from the farm and device to subsystem levels. Figure 1. Proposed assessment approach. The following sub-sections describe the three components of the systematic design approach for wave energy technologies. Furthermore, the qualitative assessment and performance benchmark are illustrated through a set of case studies comprising two different market applications of wave energy technologies and six hypothetical technology options. 2.1. System Analysis: Requirements, Metrics and System of Reference Despite the relatively short history of SE, their practitioners have produced a wealth of methods and tools that serve different purposes. As far as system analysis is concerned, it is worth mentioning the Axiomatic Design technique [18], which structures the world of design in separate domains. The concept of design domains is very effective to organise the design process by introducing borderlines between various types of design activities for the development of wave energy technologies. Thus, the wave energy problem is represented differently depending on the corresponding design domain. An associated model is attached to each design domain aiming to capture domain-specific information. Different domain models can be used to represent the wave energy system depending on the level of abstraction and degree of detail [19]. A full description of the domain frameworks proposed by various authors can be found in [13]. Currently, there is a lack of consensus on the definition of the domains that are common to all engineering projects. However, existing frameworks often limit their use to a maximum of three or four domains. The proposed assessment method will map the environmental, stakeholder and functional domains (see Figure 2). The transition from left to the right illustrates the engineer’s Figure 1. Proposed assessment approach. The following sub-sections describe the three components of the systematic design approach for wave energy technologies. Furthermore, the qualitative assessment and performance benchmark are illustrated through a set of case studies comprising two different market applications of wave energy technologies and six hypothetical technology options. 2.1. System Analysis: Requirements, Metrics and System of Reference Despite the relatively short history of SE, their practitioners have produced a wealth of methods and tools that serve different purposes. As far as system analysis is concerned, it is worth mentioning the Axiomatic Design technique [ 18 ], which structures the world of design in separate domains. The concept of design domains is very effective to organise the design process by introducing borderlines between various types of design activities for the development of wave energy technologies. Thus, the wave energy problem is represented differently depending on the corresponding design domain. An associated model is attached to each design domain aiming to capture domain-specific information. Different domain models can be used to represent the wave energy system depending on the level of abstraction and degree of detail [ 19 ]. A full description of the domain frameworks proposed by various authors can be found in [ 13 ]. Currently, there is a lack of consensus on the definition of the domains that are common to all engineering projects. However, existing frameworks often limit their use to a maximum of three or four domains. The proposed assessment method will map the environmental, stakeholder and functional domains (see Figure 2). The transition from left to the right illustrates the engineer’s synthesis activity to achieve an effective design that satisfies the requirements. The opposite way reveals the engineer’s analysis activity supporting verification and validation.
Energies 2022,15, 2624 4 of 30 Although shown in the graph for the sake of completeness, the physical domain is out of the scope of this paper since it aims to produce a technology-agnostic assessment of wave energy system capabilities and not a specific physical embodiment or set of Technical Requirements (TR). Energies 2022, 15, x FOR PEER REVIEW 4 of 30 synthesis activity to achieve an effective design that satisfies the requirements. The opposite way reveals the engineer’s analysis activity supporting verification and validation. Although shown in the graph for the sake of completeness, the physical domain is out of the scope of this paper since it aims to produce a technology-agnostic assessment of wave energy system capabilities and not a specific physical embodiment or set of Technical Requirements (TR). Figure 2. Domains of the design world (adapted from [13]). The environmental domain deals with the external factors that impact the wave energy system. This domain is defined by System Drivers (SD) and their interactions [20]. SD encompass the political, economic, social, technical, legal and environmental factors that limit, facilitate or shape the design solution. The stakeholder domain defines the design problem in the customer’s language, which is still general, ambiguous and highly unmeasurable [21]. It is represented by the Stakeholder Requirements (SR), which are a set of desirable characteristics that the final solution should satisfy. Finally, the functional domain aims to produce a complete, unambiguous and technology-agnostic definition of the design problem space [22]. Functions describe the purposes of the wave energy system and Functional Requirements (FR) and specify what the system must do in order to achieve the SR [20]. Once the critical system properties are established in the form of wave energy system requirements, evaluation criteria are assigned to offer a credible means by which to assess various design options. Metrics linked to the upper system attributes (i.e., SR) are usually referred to as Measures of Effectiveness (MOE). They are reduced in number since the lower level evaluation metrics are successively derived from them [23]. Measures of Performance (MOP) are used to gauge the FR of a design solution, whilst Technical Performance Measures (TPM) are used to demonstrate successful delivery of the TR. MOP are technology-agnostic, and traceability should be maintained both throughout the decomposition process and with regard to the higher-level MOE. This hierarchy of evaluation criteria ensures a holistic assessment that captures different levels of detail and granularity in the metrics. It is worth noting that the concept of design domains coupled with this fundamental hierarchy of evaluation criteria is also consistent with the basic design processes in the V-model [24], a well-known SE approach. Since any wave energy system can be successively decomposed into smaller entities, the synthesis and analysis activities can be further expanded by repeating the domain mapping process to each subsystem, assembly or component. Regardless of the system scope under consideration, it is essential to identify the entities that interact with it via the system’s external interfaces (i.e., External Systems) and the wider environment where the system is placed (i.e., Context). The External Systems and the Context play a key role in establishing further system requirements [25,26]. Figure 3 depicts the different interactions among the System, External Systems and Context. Figure 2. Domains of the design world (adapted from [13]). The environmental domain deals with the external factors that impact the wave energy system. This domain is defined by System Drivers (SD) and their interactions [ 20 ]. SD encompass the political, economic, social, technical, legal and environmental factors that limit, facilitate or shape the design solution. The stakeholder domain defines the design problem in the customer’s language, which is still general, ambiguous and highly unmeasurable [ 21 ]. It is represented by the Stakeholder Requirements (SR), which are a set of desirable characteristics that the final solution should satisfy. Finally, the functional domain aims to produce a complete, unambiguous and technology-agnostic definition of the design problem space [ 22 ]. Functions describe the purposes of the wave energy system and Functional Requirements (FR) and specify what the system must do in order to achieve the SR [20]. Once the critical system properties are established in the form of wave energy system requirements, evaluation criteria are assigned to offer a credible means by which to assess various design options. Metrics linked to the upper system attributes (i.e., SR) are usually referred to as Measures of Effectiveness (MOE). They are reduced in number since the lower level evaluation metrics are successively derived from them [ 23 ]. Measures of Performance (MOP) are used to gauge the FR of a design solution, whilst Technical Performance Measures (TPM) are used to demonstrate successful delivery of the TR. MOP are technology-agnostic, and traceability should be maintained both throughout the decomposition process and with regard to the higher-level MOE. This hierarchy of evaluation criteria ensures a holistic assessment that captures different levels of detail and granularity in the metrics. It is worth noting that the concept of design domains coupled with this fundamental hierarchy of evaluation criteria is also consistent with the basic design processes in the V-model [24], a well-known SE approach. Since any wave energy system can be successively decomposed into smaller entities, the synthesis and analysis activities can be further expanded by repeating the domain mapping process to each subsystem, assembly or component. Regardless of the system scope under consideration, it is essential to identify the entities that interact with it via the system’s external interfaces (i.e., External Systems) and the wider environment where the system is placed (i.e., Context). The External Systems and the Context play a key role in establishing further system requirements [ 25 , 26 ]. Figure 3depicts the different interactions among the System, External Systems and Context. As the External Systems and Context are defined in relation to the System, it is necessary to clearly delimit the scope of the wave energy system. Most commonly, technology developers identify the system of reference with their Wave Energy Converter (WEC), whereas suppliers consider it to be one of its main constituents, such as the Power Take-Off
Energies 2022,15, 2624 5 of 30 (PTO) or the mooring system. The authors of this paper believe it is more appropriate and unbiased to designate the wave energy farm as the baseline system for the global assessment of technologies since this is the final product that can meet the market need for sustainable, affordable, and secure energy. Moreover, this definition is fully consistent with the system analysis conducted by Babarit et al. for wave energy [ 27 ]. However, this approach can be equally applied to other systems of reference such as the WEC, PTO or mooring system. Energies 2022, 15, x FOR PEER REVIEW 5 of 30 Figure 3. System, External Systems and Context (adapted from [25]). As the External Systems and Context are defined in relation to the System, it is necessary to clearly delimit the scope of the wave energy system. Most commonly, technology developers identify the system of reference with their Wave Energy Converter (WEC), whereas suppliers consider it to be one of its main constituents, such as the Power TakeOff (PTO) or the mooring system. The authors of this paper believe it is more appropriate and unbiased to designate the wave energy farm as the baseline system for the global assessment of technologies since this is the final product that can meet the market need for sustainable, affordable, and secure energy. Moreover, this definition is fully consistent with the system analysis conducted by Babarit et al. for wave energy [27]. However, this approach can be equally applied to other systems of reference such as the WEC, PTO or mooring system. 2.2. Qualitative Assessment: AHP, QFD and LSP Complex engineering problems often require a set of interdependent and competing criteria. The Analytic Hierarchy Process (AHP) is a useful tool that provides a systematic approach to support multi-criteria decision making. Developed by Saaty in 1980 [28], AHP assists in capturing both subjective and objective aspects of an engineering problem by breaking down decisions into a series of pairwise comparisons and combining them into a single scale. Furthermore, AHP includes an effective technique to check the consistency of the evaluation, hence reducing the bias in the final decision. Since its emergence, it has become one of the more widely used multi-criteria analysis methods. AHP is formalised in four main steps. It starts by decomposing the decision problem into a hierarchy of sub-problems. Decision criteria are placed in an nxn squared matrix and two criteria are compared at each time to determine which one is more important. Whenever the criteria in rows are more important than the ones in columns, the 9-point gradation scale [28] shown in Table 1 is used to quantify the comparison, aij. Otherwise, the reciprocal value is assigned, aji = 1/aij. Table 1. Gradation scale for pairwise comparisons [28]. Importance Definition Explanation 1 Equal Factors contribute equally to the objective 3 Moderate One factor is slightly favoured over another 5 Strong One factor is strongly favoured over another 7 Very strong Evidence exists for a factor dominance 9 Extremely strong Highest possible validity of a factor 2, 4, 6, 8 Intermediate values For a compromise between the above values Based on each criteria priority, the overall ranking is developed by normalising the judgement matrix. The relative importance, wi, is calculated as follows: Figure 3. System, External Systems and Context (adapted from [25]). 2.2. Qualitative Assessment: AHP, QFD and LSP Complex engineering problems often require a set of interdependent and competing criteria. The Analytic Hierarchy Process (AHP) is a useful tool that provides a systematic approach to support multi-criteria decision making. Developed by Saaty in 1980 [ 28 ], AHP assists in capturing both subjective and objective aspects of an engineering problem by breaking down decisions into a series of pairwise comparisons and combining them into a single scale. Furthermore, AHP includes an effective technique to check the consistency of the evaluation, hence reducing the bias in the final decision. Since its emergence, it has become one of the more widely used multi-criteria analysis methods. AHP is formalised in four main steps. It starts by decomposing the decision problem into a hierarchy of sub-problems. Decision criteria are placed in an nxn squared matrix and two criteria are compared at each time to determine which one is more important. Whenever the criteria in rows are more important than the ones in columns, the 9-point gradation scale [ 28 ] shown in Table 1is used to quantify the comparison, a ij . Otherwise, the reciprocal value is assigned, aji =1/aij. Table 1. Gradation scale for pairwise comparisons [28]. Importance Definition Explanation 1 Equal Factors contribute equally to the objective 3 Moderate One factor is slightly favoured over another 5 Strong One factor is strongly favoured over another 7 Very strong Evidence exists for a factor dominance 9 Extremely strong Highest possible validity of a factor 2, 4, 6, 8 Intermediate values For a compromise between the above values Based on each criteria priority, the overall ranking is developed by normalising the judgement matrix. The relative importance, wi, is calculated as follows: a0 ij =aij ∑n i=1aij ,i=1, 2, . . . , n;j=1, 2, . . . , n(1) wi=∑n j=1a0 ij n,i=1, 2, . . . , n(2)
Energies 2022,15, 2624 6 of 30 Finally, the degree of consistency among the pairwise comparisons is measured by computing the Consistency Index and Consistency Ratio [ 28 ]. According to this, a Consistency Ratio below 0.1 is deemed satisfactory. Until now, AHP has been only applied in wave energy to rank technology options with regard to techno-economic criteria (e.g., energy capture, cost, reliability, environmental friendliness, adaptability) in a single step [ 29 ]. To limit the subjectivity of and dependence on expert judgements, AHP will be used in the environmental domain to prioritise System Drivers (SD) at the outset of this novel methodology (please see Appendix A). For the rest of the cross-domain assessments, another matrix-based method will be used, namely Quality Function Deployment (QFD). QFD [ 30 ] is another well-known design tool developed in Japan by the end of the 1960s, being first documented at the Kobe shipyards of Mitsubishi Heavy Industries in 1972. It is used to translate the Voice of the Customer (VoC) into system requirements employing a series of matrices called the House of Quality (HoQ). System requirements initially consisted of just customer needs and technical requirements, but they can equally be functions, design parameters or critical process variables. Furthermore, QFD matrices can be linked in a waterfall manner to ensure the full traceability of the requirements. QFD is formalised in 6 main steps: 1. To determine the input requirements and relative importance ratings. In the proposed methodology, AHP is adopted for the prioritisation of initial factors, that is, System Drivers (SD). 2. To benchmark how the input requirements are currently satisfied. This step creates an awareness of what already exists and facilitates assigning target values to these requirements. 3. To generate output requirements, which are the restatement of the design problem in the corresponding domain. The Functional Analysis and System Technique (FAST) can be used for the identification of the output requirements [31]. 4. The relationship matrix is used to relate the input and output requirements. This way the priorities of the input requirements can be translated into the relative importance ratings of output requirements (Step 6). In order to do so, the relationships traditionally expressed in qualitative symbols (e.g., strong, # medium, 4 weak) are converted into numerical coefficients (e.g., 9-3-1). 5. The correlation matrix is added to highlight interrelationships between output requirements. Positive relationships represent supporting requirements, whilst negative linkages help identify conflicts and trade-offs. Qualitative symbols (e.g., +, − ) or numerical ratings (e.g., 1, −1) are used to describe these relationships. 6. To determine relative importance ratings of the output requirements. The absolute level of importance of the output requirement, w j , is obtained by summing the relative importance of the input requirements, d i , multiplied by the quantified numerical coefficients, rij. The relative importance rating, w0 j, is then computed as: wj= n ∑ i=1 di·rij,i=1, 2, . . . , n;j=1, 2, . . . , m(3) w0 j=wj ∑m j=1wj (4) where nand mare the number of input and output requirements, respectively. To determine the relative importance ratings, some authors have proposed normalisation models that also include the correlation matrix. Chen’s approach [ 32 ] is aimed to overcome the limitations of other models that produce unreasonable results. In this method, the numerical coefficients, rij, are normalised according to the following equation:
Energies 2022,15, 2624 7 of 30 r0 ij =∑m k=1ckjrij ∑m j=1∑m k=1ckjrij ,c∈[1, −1](5) where ckj are the number ratings of the correlation matrix. In wave energy, QFD has been applied to assess the potential of wave energy innovations defined by its functions, without any normalisation and in a single step [ 33 ]. The QFD tool with Chen normalisation will be used to link SD to Stakeholders (SH) and assign importance ratings to wave energy requirements in the different domains (please see Appendix A). Lastly, the aggregation concept is a common feature of multi-criteria analysis methods. Even though tools such as AHP or QFD can be used to derive weightings for the various evaluation criteria, combining the lower-level evaluation criteria into an aggregated score is not a simple task. The TPL methodology [ 6 ] introduces four degrees of flexibility to carry out this aggregation into higher-level metrics. The Logical Scoring of Preference (LSP) method proposed by Dujmovic [ 34 ] is used here to capture the underlying functional relationships and add more granularity to the aggregation step by allowing the definition of the degree of simultaneity of the requirements being combined from total disjunction to full conjunction [35]. Conjunction in LSP means that the output utility is predominantly affected by the value of the smallest input, calling for simultaneous high input values. The geometric and harmonic means, respectively, are examples of conventional operators that provide increasing levels of simultaneity. Conversely, disjunction means that the output utility allows the replaceability of low-value inputs. The square mean is an example of partial replaceability. Neutrality, that is, the perfect balance between conjunction and disjunction, is denoted in LSP by the weighted arithmetic mean. When combining mandatory and optional inputs or sufficient and optional inputs, conjunctive or disjunctive partial absorption are used, respectively. The intensity of the simultaneity or replaceability can be continuously adjusted by selecting different operators. Following this approach, the evaluation criteria can be aggregated sequentially into higher hierarchical levels accounting for the degree of simultaneity of the different attributes until the final overarching merit is obtained. The overall suitability can be interpreted as the qualitative degree of satisfaction of all specified requirements. This suitability, s 0 , is computed from the next level of evaluation criteria, si, as follows: s0= n ∑ i=1 wi·sd i!1 d ; n ∑ i=1 i=1, i=1, 2, . . . , n(6) where nis the number of evaluation criteria, w n are their weightings, and dis a coefficient that depends on the degree of simultaneity. Values of drange from −∞ for pure conjunction to + ∞ for pure disjunction. Additional values are provided in [ 34 ] for other alternatives of partial conjunction and disjunction. 2.3. Performance Benchmark: Commercial Attractiveness and Technical Achievability To provide a quantitative assessment, system performance needs to be measured against a specified reference. QFD considers a particular step to benchmark how the system requirements are currently satisfied. Awareness of best practices in wave energy helps to assign acceptable, achievable and desirable ranges for system requirements such as in [ 36 ] for the capture width. These target values enable benchmarking of the relative performance of wave energy technologies in a quantitative manner. Evaluation criteria targets divide technology performance into two separate regions. There is the region of acceptable performance where the technology either meets or exceeds the specified reference for the corresponding metric. By contrast, unacceptable performance pops up
Energies 2022,15, 2624 8 of 30 when the technology falls short with regard to this reference value [ 37 ]. Any wave energy developer aims to reach the acceptable performance region for all mandatory metrics. Notwithstanding the metric under consideration, evaluation criteria can present two different performance behaviours. Whereas some metrics in the evaluation hierarchy must decrease to meet the established target, other metrics display an increasing performance pattern. Let us define the Performance Ratio (PR) to overcome this opposing behaviour. For metrics that exhibit decreasing performance (i.e., lower is better), the PR i is calculated as follows: PRi=Ti Mi (7) where T i and M i are the target and measured performance values, respectively, for the evaluation criteria i. Typical examples of this category of metrics are the Levelized Cost of Energy (LCOE) and the Mean Time to Repair (MTTR). Alternatively, for metrics that show an increasing performance pattern (i.e., higher is better), the PR i is calculated reversing this quotient, which accounts for the percentage that the measured performance exceeds the target value. PRi=Mi Ti (8) Some examples of this category of metrics are the Capacity Factor (CF), Availability Factor (AF) and the Mean Time Between Failures (MTBF). The outcome of performance benchmarking for a wave energy concept gives an estimation of how close or far the technology is to achieving its previously established technical goals. A PR i≥ 1 will mean that the wave energy technology is in the acceptable performance region for the evaluation criteria i. Conversely, a PR i < 1 denotes an unacceptable performance of this evaluation criteria. Technologies that have all mandatory requirements in the acceptable performance region can be benchmarked in terms of their commercial attractiveness. Otherwise, the technical achievability should be investigated. Commercial Attractiveness (CA) is a broad concept that can encompass various aspects ranging from economic profitability to stakeholder acceptability and size of the market opportunity. In the field of wave energy, CA has been defined as the ratio of the target LCOE value to the calculated one for the exploration of concepts beyond the existing technologies [ 38 ]. Note that this ratio fits perfectly within the generic PR definition from Equation (7), but in this case applied to the Levelized Cost of Energy, a common high-level affordability metric. The assessment of CA is also mentioned in the International Evaluation Framework for Ocean Energy Technologies [ 7 ], this time comprising both the cost of energy and sustainability aspects such as environmental and social acceptance. The guideline, however, does not provide any metric for sustainability. To take into consideration the qualitative aspects beyond mere affordability, the proposed method will define CA as the product of the Global Merit (GM), derived from the qualitative assessment, and the PR for the cost of energy when PR ≥ 1. This definition has the advantage of enabling an objective comparison of wave energy technologies in various markets presenting dissimilar energy prices and responding to different stakeholder demands and priorities. If PR ≥1 CA =GM∗PR; else CA =0 (9) For wave energy technologies that are unable to meet one or more of the mandatory requirements and therefore technological improvements are needed, the Technical Achievability (TA) concept is introduced. It offers a measure of the technology development risk, time or effort to meet the target performance. This concept is particularly useful when guiding technologies with long development times such as wave energy. TA has been formulated in [ 38 ] for metrics of power performance and subsystem cost. Improvement factors and learning rates are used to assess the degree of effort needed. Additionally, the
Energies 2022,15, 2624 9 of 30 reverse LCOE engineering method [ 13 ] was proposed to explore the limits for the technical parameters of wave energy technologies. Basically, this is a unidimensional analysis in which all partial evaluation criteria are fixed, and the cost reduction is investigated to achieve a PR = 1. This method proposes an alternative but more comprehensive definition that can be used to assess wave energy performance at any hierarchical level. This TA definition has been adapted from [ 39 ], where it is used to support decisions of new defence technologies through their development lifecycle based on performance assessment. The TA combines the PR and Degree of Difficulty (DD) in the following manner: TA =PR 1+(1−PR)∗DD (10) The DD provides an effective measure of the probability of risk, whilst (1 − PR), the unmet performance is a measure of the severity or importance of risk. Table 2presents the DD levels and their corresponding numerical values. The risk levels are based on [ 39 ] but the assigned numerical values have been resized to a 9-point scale for consistency with the previous ranking methods. The lower bound (0) indicates that there is no risk in meeting the requirement and success is therefore guaranteed. Alternatively, the upper bound (9) means that it is impossible to meet the requirement. Intermediate levels denote different degrees of difficulty. DD measures the learning rate that needs to happen to achieve a PR = 1. Table 2. Technical Difficulty (adapted from [39]). Level Degree of Difficulty (DD) Value 1 Very low uncertainty (certain feasibility) 0 2 Moderate uncertainty 1 3 High uncertainty 3 4 Very high uncertainty (fundamental breakthrough) 9 Figure 4shows four achievability curves for different DD levels. For instance, the TA of one technology with very low uncertainty and PR = 0.6 (point a) is analogous to a technology with a PR = 0.94 (point c) and very high uncertainty, which requires a fundamental breakthrough. Similarly, a technology with very high uncertainty but the same PR = 0.6 (point b) will see its TA severely decrease to 0.13. Energies 2022, 15, x FOR PEER REVIEW 10 of 30 Figure 4. Technical Achievability. 3. Development of the Systematic Design Approach 3.1. Analysis of the Overarching Context 3.1.1. Wave Energy Drivers The environmental domain recognises that the wave energy system exists within a context in which multiple external drivers influence its conception, planning, and operation. These System Drivers (SD) are an essential part of the context and are tightly connected to the intended market application. Two relevant market applications of wave energy technologies have been selected to illustrate this novel methodology, assuming that the main product for wave energy is expected to be power production [17] such as: Market 1: Utility-scale generation. Market 2: Powering remote communities. A detailed characterisation of these two markets is presented in [26] and summarised in Table 3. Table 3. Market characteristics [26]. Market Characteristics Utility-scale generation Attractive but also very competitive. WEC design is mainly driven by this market. Increasing demand for renewable electricity. Legal obligations to meet decarbonisation targets. Remote community generation A narrower span of competition (sometimes just one option—diesel). Low energy security and quality. Consumers are vulnerable to price fluctuation and high energy costs. Simplified market and regulatory conditions. An analysis of wave energy drivers using PESTLE [40] is also presented in [26]. Table 4 summarises the SD for wave energy grouped per category. Table 4. System Drivers for wave energy [26]. Id Category Wave Energy Drivers SD1 Political Favourable policies (e.g., energy security, finance, job creation) Market support mechanisms Figure 4. Technical Achievability.
Energies 2022,15, 2624 16 of 30 Energies 2022, 15, x FOR PEER REVIEW 17 of 30 Figure 9. FAST diagram for the wave energy system. It is worthwhile mentioning that the TPL assessment method [6] also provides an analysis of requirements including various levels of functions. The top-level functions are directly linked to the SR and the system mission. The next breakdown level compares with the FR, whereas the lower levels should be related to the TR. The functional tree is not developed to the same depth in all its branches which makes it difficult to apply the design domains method. Moreover, the combination of individual weightings is not traced in the various domains but is assigned through expert judgement. Figure 9. FAST diagram for the wave energy system. It is worthwhile mentioning that the TPL assessment method [ 6 ] also provides an analysis of requirements including various levels of functions. The top-level functions are directly linked to the SR and the system mission. The next breakdown level compares with the FR, whereas the lower levels should be related to the TR. The functional tree is not developed to the same depth in all its branches which makes it difficult to apply the design domains method. Moreover, the combination of individual weightings is not traced in the various domains but is assigned through expert judgement.
Energies 2022,15, 2624 17 of 30 3.2.2. Functional Requirements (FR) and Metrics The FAST diagram has been used to identify the FR. Measures of Performance (MOPs) are used to specifically gauge the capabilities of a design solution. They are assigned to each requirement to enable the technology-agnostic assessment of wave energy alternatives in an objectivised manner. The wave energy system has 10 main FR as shown in Table 9. Table 9. Functional Requirements and Metrics. Id Functional Requirements Measures of Performance (MOP) FR1 Capture energy from waves Normalised Capture Width (Cwn) [50] FR2 Transform into useful energy Transformation Efficiency (ηt) [7] FR3 Deliver energy to point of consumption Delivery Efficiency (ηd) [51] FR4 Maximise total uptime Reliability (MTBF = 1/λ1) [7] FR5 Minimise total downtime Maintainability (MTTR = 1/µ2) [7] FR6 Manufacture by industrial processes Manufacturability (MANEX) [7] FR7 Install/retrieve by service vessels Installability (INSTEX) [7] FR8 Maintain by service vessels Repairability (REPEX) [7] FR9 Survive the harsh environment Survivability (SURV) [7] FR10 Avoid risks to receptors Environmental Impact Score (EIS) [52] 1λ= failure rate, 2µ= repair rate. Once again, QFD has been used to prioritise FR in the proposed method. Since SR are only coupled to a reduced number of FR (1 to 3 max), the relative importance ratings of FR have been directly established from literature analysis. The same importance rating scale shown in Table 5is used to derive SR–SH relationships. The results are presented in Section 4and further completed in the Appendix A. Figure 10 presents the aggregation logic of the different MOP. The weights above each arrow, w i , represent the relative importance ratings of the FR. Converting wave energy into consumable power (SR1) requires capturing, transforming, and delivering the energy. These functions have their own efficiency ratings and are combined using the weighted geometric mean (G). Operating when needed (SR2) entails maximising the total uptime and minimising the total downtime. These ratios are combined into the system availability factor employing the harmonic mean (H) which calls for a higher degree of simultaneity. Reducing upfront costs (SR3) involves manufacturing and installation. The neutral arithmetic mean (A) is used in this case as the different cost centres can be compensated. Reducing annual costs has not been split into different functions and the repairability is matched to the operational costs. Finally, preventing business risks require surviving the harsh ocean environment and avoiding risks to receptors. The Quasi-Conjunction (QC) operator is employed to penalise a low utility value of each individual functional requirement. Energies 2022, 15, x FOR PEER REVIEW 18 of 30 3.2.2. Functional Requirements (FR) and Metrics The FAST diagram has been used to identify the FR. Measures of Performance (MOPs) are used to specifically gauge the capabilities of a design solution. They are assigned to each requirement to enable the technology-agnostic assessment of wave energy alternatives in an objectivised manner. The wave energy system has 10 main FR as shown in Table 9. Table 9. Functional Requirements and Metrics. Id Functional Requirements Measures of Performance (MOP) FR1 Capture energy from waves Normalised Capture Width (Cwn) [50] FR2 Transform into useful energy Transformation Efficiency (ηt) [7] FR3 Deliver energy to point of consumption Delivery Efficiency (ηd) [51] FR4 Maximise total uptime Reliability (MTBF = 1/λ 1) [7] FR5 Minimise total downtime Maintainability (MTTR = 1/μ 2) [7] FR6 Manufacture by industrial processes Manufacturability (MANEX) [7] FR7 Install/retrieve by service vessels Installability (INSTEX) [7] FR8 Maintain by service vessels Repairability (REPEX) [7] FR9 Survive the harsh environment Survivability (SURV) [7] FR10 Avoid risks to receptors Environmental Impact Score (EIS) [52] 1 λ = failure rate, 2 μ = repair rate. Once again, QFD has been used to prioritise FR in the proposed method. Since SR are only coupled to a reduced number of FR (1 to 3 max), the relative importance ratings of FR have been directly established from literature analysis. The same importance rating scale shown in Table 5 is used to derive SR–SH relationships. The results are presented in Section 4 and further completed in the Appendix A. Figure 10 presents the aggregation logic of the different MOP. The weights above each arrow, wi, represent the relative importance ratings of the FR. Converting wave energy into consumable power (SR1) requires capturing, transforming, and delivering the energy. These functions have their own efficiency ratings and are combined using the weighted geometric mean (G). Operating when needed (SR2) entails maximising the total uptime and minimising the total downtime. These ratios are combined into the system availability factor employing the harmonic mean (H) which calls for a higher degree of simultaneity. Reducing upfront costs (SR3) involves manufacturing and installation. The neutral arithmetic mean (A) is used in this case as the different cost centres can be compensated. Reducing annual costs has not been split into different functions and the repairability is matched to the operational costs. Finally, preventing business risks require surviving the harsh ocean environment and avoiding risks to receptors. The Quasi-Conjunction (QC) operator is employed to penalise a low utility value of each individual functional requirement. Figure 10. Aggregation of MOP. Figure 10. Aggregation of MOP. As mentioned before, the reader should bear in mind that the utility assigned to each MOP might differ from the values estimated with numerical methods, since the aggregation
Energies 2022,15, 2624 18 of 30 logic also accounts for the relative importance expressed by the stakeholders, the underlying degree of simultaneity and the flexibility allowed to the various requirements. 4. Results and Discussion 4.1. Qualitative Assessment According to the survey results in [ 26 ], the ranking of wave energy drivers considerably differs between the two application markets. Utility-scale is a very competitive market and mainly motivated by Economic and Political factors, whereas the remote community generation market is driven by Social factors. The application of AHP provides more granularity to compare this outcome. The weights resulting from pairwise comparisons are reliable since the Consistency Ratio yields a satisfactory value below 0.1 in both cases. As we can see in Figure 11, the Economic, Political and Technological factors are very important drivers in the utility-scale generation, accounting for almost 85% of the total ratings. However, in remote communities, more drivers come into play. Economic, Political and Technological factors are still important, but the Social factors dominate. Altogether, they account for 92% of the total ratings. It is somehow surprising that the Legal and Environmental factors are considered to have minor importance for both markets, and that also the Social factors score last in the utility-scale market when it is the major motivation for a remote community market. It can be inferred from these results that if wave technology is proven to work, the legal and permitting side will eventually follow. Energies 2022, 15, x FOR PEER REVIEW 19 of 30 As mentioned before, the reader should bear in mind that the utility assigned to each MOP might differ from the values estimated with numerical methods, since the aggregation logic also accounts for the relative importance expressed by the stakeholders, the underlying degree of simultaneity and the flexibility allowed to the various requirements. 4. Results and Discussion 4.1. Qualitative Assessment According to the survey results in [26], the ranking of wave energy drivers considerably differs between the two application markets. Utility-scale is a very competitive market and mainly motivated by Economic and Political factors, whereas the remote community generation market is driven by Social factors. The application of AHP provides more granularity to compare this outcome. The weights resulting from pairwise comparisons are reliable since the Consistency Ratio yields a satisfactory value below 0.1 in both cases. As we can see in Figure 11, the Economic, Political and Technological factors are very important drivers in the utility-scale generation, accounting for almost 85% of the total ratings. However, in remote communities, more drivers come into play. Economic, Political and Technological factors are still important, but the Social factors dominate. Altogether, they account for 92% of the total ratings. It is somehow surprising that the Legal and Environmental factors are considered to have minor importance for both markets, and that also the Social factors score last in the utility-scale market when it is the major motivation for a remote community market. It can be inferred from these results that if wave technology is proven to work, the legal and permitting side will eventually follow. Figure 11. Relative importance of SD for the application market. Additionally, the application of QFD provides further insight into the conclusions obtained in [26]. It confirms that the development of wave energy technologies will be primarily influenced by the needs of the Owner (19%) for utility-scale generation and the Government (17%) for remote community projects. Additionally, it was concluded that the Owner, Lenders, EPCI contractor and O&M provider are slightly more influential in the utility-scale application. This behaviour is reversed for the Regulators, Pressure groups and Consumers in the remote community generation. From Figure 12 it can be concluded that the Government has the same importance for both markets. Actually, it is the second-ranked SH for the utility-scale market. On the other hand, the Owner scores second (15.5%) after the Government for the remote community generation. Both the Owner and Government play a fundamental role in both markets. The relative weights of the different stakeholder groups for each market will Figure 11. Relative importance of SD for the application market. Additionally, the application of QFD provides further insight into the conclusions obtained in [ 26 ]. It confirms that the development of wave energy technologies will be primarily influenced by the needs of the Owner (19%) for utility-scale generation and the Government (17%) for remote community projects. Additionally, it was concluded that the Owner, Lenders, EPCI contractor and O&M provider are slightly more influential in the utility-scale application. This behaviour is reversed for the Regulators, Pressure groups and Consumers in the remote community generation. From Figure 12 it can be concluded that the Government has the same importance for both markets. Actually, it is the second-ranked SH for the utility-scale market. On the other hand, the Owner scores second (15.5%) after the Government for the remote community generation. Both the Owner and Government play a fundamental role in both markets. The relative weights of the different stakeholder groups for each market will determine the global merit and final suitability of wave energy technologies in the qualitative assessment.
Energies 2022,15, 2624 19 of 30 Energies 2022, 15, x FOR PEER REVIEW 20 of 30 determine the global merit and final suitability of wave energy technologies in the qualitative assessment. Figure 12. Relative importance of SH for the application market. It can be observed in Figure 13 that SR have a relatively similar importance for the two application markets under consideration (variability below 10%). The conversion of wave energy into consumable power, the continuous operation and the annual costs reduction have greater influence in the remote community market. Alternatively, the utilityscale generation market puts more emphasis on the prevention of business risks and the reduction in upfront costs. This qualitative assessment assigns weights above the average importance rating (20%) to wave energy conversion and risk prevention for both markets. Figure 13. Relative importance of SR for the application market. Likewise, as depicted in Figure 14, FR have relatively equal importance for the two application markets under consideration (variability lower than 9%). The functions contributing to each SR follow the same pattern as before. However, we can appreciate that capturing and transforming wave energy, minimising total downtime and surviving the harsh environment are the most relevant requirements, all of them above the average importance rating (10%). Figure 12. Relative importance of SH for the application market. It can be observed in Figure 13 that SR have a relatively similar importance for the two application markets under consideration (variability below 10%). The conversion of wave energy into consumable power, the continuous operation and the annual costs reduction have greater influence in the remote community market. Alternatively, the utility-scale generation market puts more emphasis on the prevention of business risks and the reduction in upfront costs. This qualitative assessment assigns weights above the average importance rating (20%) to wave energy conversion and risk prevention for both markets. Energies 2022, 15, x FOR PEER REVIEW 20 of 30 determine the global merit and final suitability of wave energy technologies in the qualitative assessment. Figure 12. Relative importance of SH for the application market. It can be observed in Figure 13 that SR have a relatively similar importance for the two application markets under consideration (variability below 10%). The conversion of wave energy into consumable power, the continuous operation and the annual costs reduction have greater influence in the remote community market. Alternatively, the utilityscale generation market puts more emphasis on the prevention of business risks and the reduction in upfront costs. This qualitative assessment assigns weights above the average importance rating (20%) to wave energy conversion and risk prevention for both markets. Figure 13. Relative importance of SR for the application market. Likewise, as depicted in Figure 14, FR have relatively equal importance for the two application markets under consideration (variability lower than 9%). The functions contributing to each SR follow the same pattern as before. However, we can appreciate that capturing and transforming wave energy, minimising total downtime and surviving the harsh environment are the most relevant requirements, all of them above the average importance rating (10%). Figure 13. Relative importance of SR for the application market. Likewise, as depicted in Figure 14, FR have relatively equal importance for the two application markets under consideration (variability lower than 9%). The functions contributing to each SR follow the same pattern as before. However, we can appreciate that capturing and transforming wave energy, minimising total downtime and surviving the harsh environment are the most relevant requirements, all of them above the average importance rating (10%).
Energies 2022,15, 2624 20 of 30 Energies 2022, 15, x FOR PEER REVIEW 21 of 30 Figure 14. Relative importance of FR for the application market. The proposed method differs from the TPL scoring methodology [6] as it considers that most of the capabilities have equal influence. For instance, the same weights are assigned to equivalent pairs of requirements FR6 and FR7, FR2 and FR3, and FR4 and FR5. The traceability of design information and requirements through the different domains offers a more objective way to account for those differences without assuming either a flat distribution or any other arbitrary distribution of weights. 4.2. Performance Benchmark To compare different wave energy options, a utility function was defined for each MOE. The function was normalised considering maximum (1) and minimum (0) utility values as shown in Table 10. Wave energy literature was examined to assign maximum and minimum bounds. Table 10. Stakeholder Requirements and Utility. Id MOE Min = 0 Max = 1 Utility Function SR1 Capacity Factor (CF) 0% 50% CF/Max SR2 Availability Factor (AF) 75% 100% (AF-Min)/(Max-Min) SR3 Capital Expenditure (CAPEX) 5 M EUR 0 M EUR 1–CAPEX/Min SR4 Operational Expenditure (OPEX) 0.5 M EUR 0 M EUR 1–OPEX/Min SR5 Fixed Charge Rate (FCR) 20% 5% 1–(FCR-Max)/(Min-Max) Table 11 presents the Global Merit (GM) for the six illustrative cases of hypothetical wave energy technologies previously defined in Table 8. The suitability scores were calculated using the aggregation logic as shown in Figure 6 and the weights presented in Figure 13 for each application market. First, the CF and AF as well as the CAPEX and FCR were aggregated as the weighted geometric mean, respectively. Then, the latter was combined with the OPEX through the weighted arithmetic mean. Finally, the resulting values were combined again using the weighted geometric mean. The affordability (LCOE) for the case studies is also shown in Table 8. Table 11. Qualitative assessment of wave energy options. Global Merit (GM) Case 1 Case 2 Case 3 Case 4 Case 5 Case 6 Utility-scale 0.77 0.71 0.73 0.65 0.60 0.51 Remote community 0.77 0.70 0.74 0.66 0.59 0.51 It can be noted that the small variation in the weights for the two application markets results in very similar global merits in all six case studies. This result suggests that the Figure 14. Relative importance of FR for the application market. The proposed method differs from the TPL scoring methodology [ 6 ] as it considers that most of the capabilities have equal influence. For instance, the same weights are assigned to equivalent pairs of requirements FR6 and FR7, FR2 and FR3, and FR4 and FR5. The traceability of design information and requirements through the different domains offers a more objective way to account for those differences without assuming either a flat distribution or any other arbitrary distribution of weights. 4.2. Performance Benchmark To compare different wave energy options, a utility function was defined for each MOE. The function was normalised considering maximum (1) and minimum (0) utility values as shown in Table 10. Wave energy literature was examined to assign maximum and minimum bounds. Table 10. Stakeholder Requirements and Utility. Id MOE Min = 0 Max = 1 Utility Function SR1 Capacity Factor (CF) 0% ≥50% CF/Max SR2 Availability Factor (AF) ≤75% 100% (AF-Min)/(Max-Min) SR3 Capital Expenditure (CAPEX) ≥5 M EUR 0 M EUR 1–CAPEX/Min SR4 Operational Expenditure (OPEX) ≥0.5 M EUR 0 M EUR 1–OPEX/Min SR5 Fixed Charge Rate (FCR) ≥20% ≤5% 1–(FCR-Max)/(Min-Max) Table 11 presents the Global Merit (GM) for the six illustrative cases of hypothetical wave energy technologies previously defined in Table 8. The suitability scores were calculated using the aggregation logic as shown in Figure 6and the weights presented in Figure 13 for each application market. First, the CF and AF as well as the CAPEX and FCR were aggregated as the weighted geometric mean, respectively. Then, the latter was combined with the OPEX through the weighted arithmetic mean. Finally, the resulting values were combined again using the weighted geometric mean. The affordability (LCOE) for the case studies is also shown in Table 8. Table 11. Qualitative assessment of wave energy options. Global Merit (GM) Case 1 Case 2 Case 3 Case 4 Case 5 Case 6 Utility-scale 0.77 0.71 0.73 0.65 0.60 0.51 Remote community 0.77 0.70 0.74 0.66 0.59 0.51
Energies 2022,15, 2624 21 of 30 It can be noted that the small variation in the weights for the two application markets results in very similar global merits in all six case studies. This result suggests that the application market is less significant than the overall technology performance. In general, the global merit decreases as the affordability (LCOE) increases. However, the qualitative assessment provides a way to disambiguate between technologies with different levels of evaluation criteria leading to the same LCOE. For instance, Case 3 has higher merit than Case 2 although they share the same cost, 100 EUR/MWh. This means that a selection of a wave energy alternative exclusively based on either the LCOE or global merit might yield an unsuitable decision. Precisely, the EU’s SET-Plan implementation plan for Ocean Energy [ 53 ] establishes a target LCOE of 100 EUR/MWh by 2035. This target LCOE can be used as the reference price of energy for the utility-scale generation market. By contrast, according to the World Bank [ 54 ], the average price of energy in 30 of the Small Island Development Country States (SIDS) ranges between 160–330 EUR/MWh. Given these high generation costs, wave energy technologies that are not currently affordable in the utility-scale markets may be already cost-competitive in these remote communities. Let us assume 300 EUR/MWh as the reference energy price for the remote community market for this study. The threshold value of the LCOE divides the technology suitability into acceptable and unacceptable regions. Table 12 presents the Commercial Attractiveness (CA) results for the utility-scale and the remote community markets considering the 100 EUR/MWh and 300 EUR/MWh thresholds, respectively. Cases 1–3 have a combination of MOE that yields a suitable cost of energy for the utility-scale generation market. However, Cases 4–6 can only be compatible with the remote community market. Table 12. Wave energy attractiveness. Utility-Scale (100 EUR/MWh) Case 1 Case 2 Case 3 Case 4 Case 5 Case 6 GM 0.77 0.71 0.73 0.65 0.60 0.51 PR 2.00 1.00 1.00 0.67 0.50 0.40 CA 1.54 0.71 0.73 0 0 0 Remote Community (300 EUR/MWh) Case 1 Case 2 Case 3 Case 4 Case 5 Case 6 GM 0.77 0.70 0.74 0.66 0.59 0.51 PR 5.99 3.01 3.01 2.00 1.50 1.20 CA 4.60 2.11 2.24 1.32 0.89 0.62 The concept of CA not only allows selecting the most suitable wave energy option when the LCOE or the global merit are identical for the same market application, but also comparing technologies for different market applications. For instance, Case 4 for remote community generation (CA = 1.32) is more attractive than Case 3 for utility-scale generation (CA = 0.73). Let us focus now on the Technical Achievability (TA) of a wave energy technology option with PR < 1. This applies to Case 4 for the utility-scale market (see Table 8). This technology option is assumed to be in the design optimisation stage (TRL 4). Case 2 ratings are taken as reference values to compute the PR (see Table 8). For metrics that exhibit decreasing performance, PR is calculated using Equation (7). Otherwise, Equation (8) is used. When PR ≥ 1, the DD is obviously zero as shown in Table 13. For unmet performances, the DD level was estimated. The aggregated DD for the higher-level evaluation criteria was calculated as a weighted average of individual DD. The TA is then computed using Equation (10). The DD is moderate to high (1.32) resulting in a TA of 0.46. This analysis provides a means to concentrate the innovation efforts on improving those areas with the greatest impact on technology performance, in this particular case the CAPEX (0.14) and the OPEX (0.16). The analysis can be replicated at a lower hierarchical level in the functional domain to identify specific improvement areas in the technology capabilities.
Energies 2022,15, 2624 22 of 30 Table 13. TA for the utility-scale generation market. Eval Criteria Case 2 Case 4 Reference Ratings PR DD TA CF (%) 25 40 1.60 0.00 1.60 AF (%) 97 98 1.01 0.00 1.01 CAPEX (M EUR) 1.2 3 0.40 3.00 0.14 OPEX (k EUR) 92 210 0.44 3.00 0.16 FCR (%) 10 10.2 0.98 1.00 0.96 LCOE (EUR/MWh) 100 150 0.67 1.32 0.46 Assigning the DD level to the system requirements of a wave energy technology under development seems a quite subjective and challenging task. Despite the difficulties, too little time spent in the early design phases can lead to gaps in understanding the problem requirements, limited opportunities for novel concept generation and wasted time and money developing a concept that is unable to perform well enough to become a viable solution [55]. The ability of new technology to meet its performance targets will depend on its maturity and innovation capability. As the development advances, the expected accuracy of the estimates will improve; thus, the uncertainty band will narrow. Figure 15 presents indicative upper (desired) and lower (threshold) bounds for five development stages derived from [ 56 , 57 ]. Stage 1 refers to concept design, Stage 2 to detailed design, Stage 3 to scaled demonstration, Stage 4 to the validation of a single device and finally Stage 5 to the validation of a complete wave energy farm [7]. Energies 2022, 15, x FOR PEER REVIEW 23 of 30 Table 13. TA for the utility-scale generation market. Eval Criteria Case 2 Case 4 Reference Ratings PR DD TA CF (%) 25 40 1.60 0.00 1.60 AF (%) 97 98 1.01 0.00 1.01 CAPEX (M EUR) 1.2 3 0.40 3.00 0.14 OPEX (k EUR) 92 210 0.44 3.00 0.16 FCR (%) 10 10.2 0.98 1.00 0.96 LCOE (EUR/MWh) 100 150 0.67 1.32 0.46 Assigning the DD level to the system requirements of a wave energy technology under development seems a quite subjective and challenging task. Despite the difficulties, too little time spent in the early design phases can lead to gaps in understanding the problem requirements, limited opportunities for novel concept generation and wasted time and money developing a concept that is unable to perform well enough to become a viable solution [55]. The ability of new technology to meet its performance targets will depend on its maturity and innovation capability. As the development advances, the expected accuracy of the estimates will improve; thus, the uncertainty band will narrow. Figure 15 presents indicative upper (desired) and lower (threshold) bounds for five development stages derived from [56,57]. Stage 1 refers to concept design, Stage 2 to detailed design, Stage 3 to scaled demonstration, Stage 4 to the validation of a single device and finally Stage 5 to the validation of a complete wave energy farm [7]. Figure 15. Expected accuracy range per development stage. For instance, the OPEX performance ratio of 0.44 in Table 11 could have had a DD level 1 at concept design (Stage 1) but would increase to 3 in the design phase (Stage 2, TRL 4) or even could be rated 9 for later stages. The innovation capability is limited as the technology matures and therefore the PR should be penalised with a higher DD at later design stages. Conversely, an early TRL opens the room for improvements through innovation. The same underlying idea is expressed by Weber [5] in the generic WEC development trajectories displayed over a TRL-TPL matrix. Fundamental system changes are only feasible and affordable at low TRLs. Cost reduction and improved performance for mature technologies are mainly limited to learning by doing and economies of scale. Figure 15. Expected accuracy range per development stage. For instance, the OPEX performance ratio of 0.44 in Table 11 could have had a DD level 1 at concept design (Stage 1) but would increase to 3 in the design phase (Stage 2, TRL 4) or even could be rated 9 for later stages. The innovation capability is limited as the technology matures and therefore the PR should be penalised with a higher DD at later design stages. Conversely, an early TRL opens the room for improvements through innovation. The same underlying idea is expressed by Weber [ 5 ] in the generic WEC development trajectories displayed over a TRL-TPL matrix. Fundamental system changes are only feasible and
Energies 2022,15, 2624 23 of 30 affordable at low TRLs. Cost reduction and improved performance for mature technologies are mainly limited to learning by doing and economies of scale. As mentioned in Section 2.3, the DD may also be defined by fundamental limits. Table 14 presents the list of FR, MOP and possible factors that may restrict the innovation capability. It can be noted that the fundamental limits are defined either by attributes of the system design or the External Systems that interact with it. For instance, the deployment site defines the wave energy resource and the distance to the point of connection. Similarly, the service vessels available dictate the charter cost. The technology developer cannot modify the attributes of the External Systems but selects those locations that are most appropriate, thus constraining the total addressable market of the technology. Table 14. Degree of difficulty factors for FR. Id MOP Factors FR1 Normalised Capture Width (Cwn) Wave energy resource at the deployment site FR2 Transformation Efficiency (ηt) No. of transformation steps FR3 Delivery Efficiency (ηd) Distance to point of connection FR4 Reliability (MTBF = 1/λ) No. of components in series FR5 Maintainability (MTTR = 1/µ) Time of maintenance operation FR6 Manufacturability (MANEX) Cost of raw materials FR7 Installability (INSTEX) Cost of vessels FR8 Repairability (REPEX) No. of trips FR9 Survivability (SURV) Safety class FR10 Environmental Impact Score (EIS) Environmental pressure Other fundamental limits are related to the design of the wave energy device. The number of transformation steps in the PTO, the complexity of the product with components connected in series or the safety class are examples of attributes in which the technology developer has full control. Discontinued technologies such as “WaveBob” or “Pelamis”, with proven components but complex PTOs [ 58 ], should have had extremely high component reliability to meet appropriate system reliability. In fact, to achieve system reliability of 90% with five components in series, the individual reliability should be 98%. The same could be said for the PTO efficiency. The number of transformation steps will restrict the capability of the technology to meet the given thresholds. 5. Conclusions This paper has presented a novel methodology for the holistic assessment of wave energy capabilities in various market applications. It has been implemented in the environmental, stakeholder and functional domains. In this approach, two matrix-based modelling methods, namely AHP and QFD, are combined in a waterfall manner to ensure the proper connectivity of weights and to limit the subjectivity of and dependence on expert judgements. So far, methods based on weights have only been applied separately and in a single step in wave energy. Moreover, the combination with LSP adds more granularity to the aggregation step than current methods. The qualitative assessment has resulted in very different rankings of System Drivers (SD) and Stakeholders (SH) for the two market applications considered. Utility-scale is mainly motivated by Economic and Political factors, whereas the remote community generation market is mainly driven by Social factors. The development of wave energy technologies is primarily influenced by the needs of the Owner for utility-scale generation and the Government for remote community projects. However, when analysing Stakeholder Requirements (SR) and Functional Requirements (FR), the influence of the application market in the development of wave energy technologies is greatly reduced. The quantitative assessment supports the previous finding. The small variation in the weights for the two application markets results in very similar Global Merit (GM) in all six case studies. In general, the GM decreases as the affordability (LCOE) increases.
Energies 2022,15, 2624 24 of 30 The Commercial Achievability (CA) enables comparing technologies for different market applications in a more objective manner. For instance, case study 4 is more attractive with a reference price of 300 EUR/MWh than cases 2 and 3 for utility-scale generation. The Technical Achievability (TA) concept offers a means to concentrate the innovation efforts before proceeding to the next development stage. The technology-agnostic evaluation of wave energy capabilities can be used by whatever stakeholder and at any stage of technology development. However, the method relies upon the estimation of the different evaluation criteria. To overcome this limitation, future work will extend the implementation of this methodology to the physical domain. The functional allocation to physical realisations will allow detection of conflicts leading to trade-offs which must be addressed with structured innovation methods such as TRIZ [ 59 ]. Author Contributions: Conceptualization, P.R.-M., V.N. and J.M.B.; Methodology, investigation and writing, P.R.-M.; Validation, review and editing, V.N., J.M.B. and H.J.; Funding acquisition, J.M.B. All authors have read and agreed to the published version of the manuscript. Funding: This research received no external funding. Informed Consent Statement: Not applicable. Data Availability Statement: Not applicable. Acknowledgments: The authors would like to thank the Basque Government through the research groups IT1514-22 and GIU19-029. They are also grateful to the 64 international experts in wave energy that voluntarily contributed to the prioritisation exercise of external forces for the two market applications. The knowledge gained from the analysis of responses provides a solid basis for the objective evaluation of wave energy technologies. Conflicts of Interest: The authors declare no conflict of interest. The funders had no role in the design of the study; in the collection, analyses, or interpretation of data; in the writing of the manuscript, or in the decision to publish the results. Abbreviations The following abbreviations are used in this manuscript: A Arithmetic mean AF Availability Factor AHP Analytical Hierarchy Process CA Commercial Attractiveness CAPEX Capital Expenditure CF Capacity Factor CW Capture Width DD Degree of Difficulty EIS Environmental Impact Score EPCI Engineering, Procurement, Construction and Installation FAST Functional Analysis and System Technique FCR Fixed Charge Rate FR Functional Requirements G Geometric mean GM Global Merit H Harmonic mean HoQ House of Quality LCOE Levelized Cost of Energy LSP Logic Scoring of Preference MOE Measures of Effectiveness MOP Measures of Performance MR Manufacturing Requirements
Energies 2022,15, 2624 25 of 30 MTBF Mean Time between Failures MTTR Mean Time to Repair O&M Operation and Maintenance OPEX Operational Expenditure PESTLE Political, Economic, Social, Technological, Legal and Environmental PPA Power Purchase Agreement PR Performance Ratio PTO Power Take-Off QC Quasi-Conjunction QFD Quality Function Deployment TA Technical Achievability TPL Technology Performance Levels TPM Technical Performance Measures TR Technical Requirement TRIZ Teoriya Resheniya Izobretatelskikh Zadatch (theory of inventive problem solving) TRL Technology Readiness Levels SE Systems Engineering SIDS Small Island Development Country States SD System Drivers SH Stakeholders SPV Special Purpose Vehicle SR Stakeholder Requirements VoC Voice of Customer WEC Wave Energy Converter Appendix A The prioritisation for the different domain attributes used in the case studies along with their respective interactions is included below. Table A1. System Drivers (SD) for Utility-scale generation. System Drivers SD1 SD2 SD3 SD4 SD5 SD6 Political Factors Economic Factors Social Factors Technological Factors Legal Factors Environmental Factors Total Weight SD1 Political factors 0.28 0.34 0.27 0.22 0.29 0.29 1.68 28% SD2 Economic factors 0.28 0.34 0.30 0.43 0.33 0.36 2.04 34% SD3 Social factors 0.04 0.04 0.03 0.03 0.02 0.02 0.18 3% SD4 Technological factors 0.28 0.17 0.23 0.22 0.24 0.22 1.37 23% SD5 Legal factors 0.04 0.04 0.07 0.04 0.04 0.04 0.26 4% SD6 Environmental factors 0.07 0.07 0.10 0.07 0.08 0.07 0.46 8%