scieee Open visual document viewer

Prospective environmental and economic assessment of solar-assisted thermal energy recovery from wastewater through a sequencing batch biofilter granular reactor

Muñoz Ortiz, Iván,Portillo Rodríguez, Francisco,Rosiek, Sabina,Batlles Garrido, Francisco Javier,Martínez Del Río, Javier,Acasuso, Iñaki,Piergrossi, Valentina,de Sanctis, Marco,Chimienti, Silvia,Di Iaconi, Claudio

Abstract

The integration of an off-grid solar-assisted heat pump (SHP) and a sequencing batch biofilter granular reactor (SBBGR) for thermal energy recovery from wastewater was assessed by means of a prospective life cycle assessment (LCA) and life cycle costing (LCC), by theoretically scaling up a pilot installation in Bari, Italy, to a full-scale unit designed for 5000 person-equivalents. The LCA and LCC included all activities in the life cycle of the SHP and wastewater treatment plant (WWTP), namely construction, operation and end-of-life. The thermal energy produced by the SHP was assessed as supplying heating and cooling for an air-conditioning system, displacing a conventional air-source heat pump powered by electricity from the grid. This integrated systemwas compared to a reference situation where wastewater is treated in a conventional WWTP applying activated sludge with no thermal energy recovery system, showing clear environmental benefits in all impact indicators, such as a 42% reduction in greenhouse-gas emissions and a cost reduction of 53%. Several sensitivity analyses confirmed these findings, with the exception of the price rebound effect, which showed that the lower cost of the integrated system could lead to overturning the environmental benefits. As a limitation of the study, the distribution of the supplied air-conditioning to meet a demand off-site theWWTP premises, such as in residential buildings or hotels, was not included. Therefore, our results constitute only a preliminary positive outcome that should be validated in a real-life application.

Full text

P ospec i e en i onmen al and economic assessmen o sola -assis ed he mal ene gy eco e y om was ewa e h ough a sequencing ba ch bio il e g anula eac o I an Muñoz a, *, F ancisco Po illo b, c, Sabina Rosiek b, c, F ancisco J. Ba lles b, c, Ja ie Ma ínez-Del-Río d, Iñaki Acasuso e, Valen ina Pie g ossi , Ma co De Sanc is , Sil ia Chimien i , Claudio Di Iaconi a 2.-0 LCA Consul an s, Rendsbu ggade 14, Room 2.345, 9000, Aalbo g, Denma k b Depa men o Chemis y and Physics, Uni e si y o Alme ía, 04120, Alme ía, Spain c CIESOL, Join Cen e o he Uni e si y o Alme ía -CIEMAT, 04120, Alme ía, Spain d Depa men o Economics and Business, Uni e si y o Alme ía, 04120, Alme ía, Spain e Hede a Helix I&B, A da. Pu xe a 1, Aban o y Zie bena, 48540, Bizkaia, Spain CNR e Wa e Resea ch Ins i u e, Via F. De Blasio 5, 70132, Ba i, I aly * Co esponding au ho . E-mail add ess: [email p o ec ed] (I. Muñoz). Abs ac The in eg a ion o an o -g id sola -assis ed hea pump (SHP) and a sequencing ba ch bio il e g anula eac o (SBBGR) o he mal ene gy eco e y om was ewa e was assessed by means o a p ospec i e li e cycle assessmen (LCA) and li e cycle cos ing (LCC), by heo e ically scaling up a pilo ins alla ion in Ba i, I aly, o a ull-scale uni designed o 5000 pe son-equi alen s. The LCA and LCC included all ac i i ies in he li e cycle o he SHP and was ewa e ea men plan (WWTP), namely cons uc ion, ope a ion and end-o -li e. The he mal ene gy p oduced by he SHP was assessed as supplying hea ing and cooling o an ai -condi ioning sys em, displacing a con en ional ai -sou ce hea pump powe ed by elec ici y om he g id. This in eg a ed sys em was compa ed o a e e ence si ua ion whe e was ewa e is ea ed in a con en ional WWTP applying ac i a ed sludge wi h no he mal ene gy eco e y sys em, showing clea en i onmen al bene i s in all impac indica o s, such as a 42% educ ion in g eenhouse-gas emissions and a cos educ ion o 53%. Se e al sensi i i y analyses con i med hese indings, wi h he excep ion o he p ice ebound e ec , which showed ha he lowe cos o he in eg a ed sys em could lead o o e u ning he en i onmen al bene i s. As a limi a ion o he s udy, he dis ibu ion o he supplied ai -condi ioning o mee a demand o -si e he WWTP p emises, such as in esiden ial buildings o ho els, was no included. The e o e, ou esul s cons i u e only a p elimina y posi i e ou come ha should be alida ed in a eal-li e applica ion. Keywo ds: Li e cycle assessmen (LCA) Li e cycle cos ing (LCC) Was ewa e -sou ce hea pump Sola - assis ed hea pump The mal ene gy eco e y 1. In oduc ion Was ewa e ea men cons i u es a subs an ial ene gy consume and sou ce o g eenhouse gas (GHG) emissions. Acco ding o Cao (2011), he p o ision o was ewa e ea men se ices ac- coun s o a ound 1% o a coun y's elec ici y consump ion. Also, was ewa e is esponsible o 4% and 2% o me hane and ni ous oxide emissions, espec i ely (USEPA, 2013). A he same ime, u ban was ewa e cons i u es a p omising low-g ade sou ce o he mal ene gy, as i is p oduced s eadily, in high olumes and wi h small empe a u e a ia ions; i is ypically wa me han he en i onmen du ing win e , bu colde in summe , making i sui - able o hea ing and cooling pu poses h ough hea pump sys ems (CWWA, 2009; F ijns e al., 2013; Megge s and Leibundgu , 2011). Tapping his esou ce o hea ing, en ila ion, and ai condi ioning (HVAC) in buildings is o pa icula in e es , gi en ha buildings accoun o a ound 40% o ene gy consump ion (EIA, 2018; Se ino e al., 2018) and ha ene gy consumed by HVAC sys ems is esponsible o he la ges sha e o a building's en i onmen al impac (Ochoa e al., 2005; Aliane e a . 2016; Ge e al., 2018). Cen alized sys ems o he mal ene gy eco e y om was e- wa e ha e been in place since he 1980's in Ge many, Swi ze land and Scandina ia (DWA, 2009), mainly ocused on eco e y om ea ed e luen s o WWTPs, whe eas eco e y wi hin sewe s o was ewa e ea men basins emains elusi e, mainly due o bio ouling o hea exchange s in con ac wi h un ea ed was ewa e (Chao e al., 2012; Liu e al., 2014). In his con ex , he no el sequencing ba ch bio il e g anula eac o (SBBGR) cons i u es a po en ial solu ion o his p oblem. The SBBGR is an a ached- biomass sys em ope a ing wi h a comple e sepa a ion o he biomass om he liquid phase, hus allowing o a eac o zone ee o suspended solids whe e a hea exchange can be placed (Di Iaconi e al., 2010, 2017; De Sanc is e al., 2017). Due o some addi ional ea u es o SBBGR biomass (i.e. long sludge age and concen a ion) i no only p e en s bio ouling o hea exchange s in he bio eac o , bu also a ou s he mal ene gy eco e y by maximising he con e sion o chemical ene gy s o ed in wa e pollu ion in o biochemical hea , as well as by wi hs anding was ewa e empe a u e changes (Pie g ossi e al., 2018). Coupling o a SBBGR wi h a sola -assis ed hea pump (SHP) has been ecen ly demons a ed a pilo - scale in Ba i, I aly (Pie g ossi e al., 2018). While he en i onmen al pe o mance o hese wo echnologies ha e been sepa a ely assessed in he pas by means o li e cycle assessmen (LCA) (Di Iaconi e al., 2017; Ba lles e al., 2010), he esul ing bene i s o o he wise om hei in eg a ion emain o be quan i ied. Fu he mo e, besides en i onmen al sus ainabili y, economic easibili y is also equi ed o a new echnology o ind i s way in o he ma ke and o his eason an e alua ion o li e cycle cos s (LCC) cons i u es an equally necessa y exe cise. In his a icle we p esen he esul s o a p ospec i e LCA and LCC applied o he in eg a ion o a SBBGR and SHP o HVAC pu poses, as desc ibed in Pie g ossi e al. (2018), conside ing i s implemen a ion a a la ge scale, namely in a hypo he ical WWTP designed o 5000 pe son-equi alen s (PE) in a Medi e anean con ex . 2. Ma e ial and me hods 2.1. Pilo plan desc ip ion The basis o he p ospec i e assessmen is a pilo plan ins alled in Ba i, whe e an exis ing SBBGR uni was upg aded wi h a SHP in Sep embe 2016 (Fig. 1). Below we p o ide a b ie desc ip ion o he ins alla ion. Fo de ailed desc ip ions on he SBBGR he eade is e e ed o Pie g ossi e al. (2018). Fig. 1. The THERBIOR pilo plan . The SBBGR p o o ype mainly consis s o wo columns wi h a o al olume o 300 L. One o such column cons i u es he bio il e (3200 mm in heigh and 220 mm in diame e ), which is packed wi h plas ic media whe e he biomass de elops and he biological deg ada ion akes place. The second compa men is known as he ae a o (273 mm in diame e and 3200 mm in heigh ). The eac o is ope a ed as a sequencing- ed ba ch p ocess, consis ing o h ee s ages: anae obic illing, ae obic eci cula ion be ween he wo columns and e en ually a wi hd awal phase. The ea men cycle akes 6 h in o al, a e which he e luen can be discha ged wi hou he need o a se ling ank. Du ing he eci cula ion phase, ai is p o ided by means o discon inuous 5-min blowing pe iods s a ing e e y 25 min. In addi ion, pu e oxygen is con inuously p o ided in o de o main ain a dissol ed oxygen concen a ion in he ae a o wi hin he 15e20 mg/L ange. The in luen ed o he eac o is eal u ban was ewa e om he local sewe in Ba i. The SHP is a sola -assis ed ully o -g id ene gy sys em capable o p oducing, eco e ing and s o ing he mal ene gy. I consis s o he main ollowing componen s: • A hea pump coupled o a i anium ubula hea exchange subme sed in he SBBGR uni , pa icula ly in he ae a o column. • A ecip oca ing comp esso wi h 4810 W e ige a ion capaci y. • Two sho - e m he mal la en ene gy ho and cold s o age uni s illed wi h phase-change ma e ials (PCM), ope a ing a 53 ◦C and 0 ◦C, espec i ely and wi h a capaci y o 0.3 m3 and 0.5 m3, espec i ely. • Ene gy dissipa ion de ices (condense and e apo a o ). • A oo op pho o ol aic plan wi h 5.1 kWp capaci y and 32 m2 module a ea, powe ing he en i e SHP sys em. The SHP is ully o -g id, wi h he excep ion o con ol and HVAC dis ibu ion de ices, which a e supplied om he g id in o de o ensu e 24-h ope a ion. F om a hyd aulic poin o iew, he sys em is composed o a ho wa e line and a cold wa e line. When su icien sola ene gy is a ailable, he SHP p oduces and s o es hea in he o m o PCM. Con e sely, he cold wa e line p oduces and s o es chilled wa e in he cold PCM ank. The SHP is used in a low- empe a u e ai -condi ioning sys em supplying a so-called expe imen al es labo a o y (ETL), a oom ha simula es demand on- si e. 2.2. LCA and LCC me hods LCA was ca ied ou wi h he ISO 14040 and 14044 s anda ds as main me hodological guidelines (ISO, 2006a; 2006b), and consequen ial modelling was used in he in en o y analysis, as de ined in Weidema (2003, 2009). The so wa e used o model he li e cycle was SimaP o e sion 8.5 (P e´, 2016). En i onmen al LCC was ca ied ou as desc ibed in Hunkele e al. (2008), ha is, accoun ing o in e nal cos s associa ed wi h he li e cycle o he p oduc ha a e co e ed by any one o mo e o he ac o s in he p oduc li e cycle. Bo h LCA and LCC we e aligned in e ms o unc ional uni , sys em bounda ies, e c. As highligh ed in he a icle i le, he o e all assessmen is p ospec i e in he sense ha 1) consequen ial modelling is used in he LCA and 2) he assessmen akes a s ep o wa d om i s ac ual pilo scale o a comme cial scale model. These wo me hodological aspec s allow o a mo e ealis ic depic ion o a po en ial deploymen o his echnology in he ma ke . 2.3. Goal and scena ios assessed The goal was o assess he expec ed li e-cycle en i onmen al and economic pe o mance o coupling a SHP o he mal ene gy eco e y om u ban was ewa e wi h a SBBGR uni , wi h he aim o p o iding cooling/hea ing o esiden ial buildings in a ou is ic Medi e anean egion. We call his he THERBIOR scena io. This is compa ed o a e e ence si ua ion o was ewa e ea men , in which u ban was ewa e is ea ed in a con en ional WWTP applying ac i a ed sludge (AS) and wi h no he mal ene gy eco e y sys em. Fig. 2 shows a concep ual low diag am o hese wo scena ios and he espec i e ac i i ies included in he s udy. Fig. 2. Flow diag am o he wo assessed scena ios: e e ence (le ) and THERBIOR ( igh ). AS: ac i a ed sludge; SHP: sola - assis ed hea pump 2.4. Geog aphical scope The case s udy conside s he implemen a ion o he p oposed concep in a hypo he ical WWTP loca ed in Ba i, whe e he pilo plan has been ins alled. This geog aphical se ing is assumed o ep esen a ypical Medi e anean loca ion. The a e age u ban was ewa e p oduc ion in his egion is app oxima ely 0.15 m3 pe pe son-equi alen (PE) and day. 2.5. Technological scope: was ewa e ea men and sludge disposal We conside he deploymen o his echnology in a WWTP designed o ea ing 5000 PE, o 750 m3/day. The decision o conside a highe scale han he ac ual expe imen al one is based on he ac ha esea ch scales such as lab- and pilo -scales a e no sui able o meaning ul en i onmen al (and economic) assessmen s (Munñoz e al., 2015; Ga anka e al., 2015; Piccinno e al.,2016). An impo an aspec linked o he size o he WWTP is he ac ha ou is ic a eas a e commonly subjec o subs an ial popula ion luc ua ions, wi h peaks in he summe season leading o simila luc ua ions in e ms o was ewa e p oduc ion. In o de o cope wi h hese peaks, WWTPs need o be designed o la ge capaci ies, esul ing in subop imal use o he in as uc u e o he mos pa o he yea . In ou s udy we assume ha he WWTP is o e sized by a ac o o 50%. This esul s in an ac ual capaci y o 3333 PE, which equals 500 m3/day o 182,500 m3/yea . In bo h scena ios he WWTPs need o discha ge a ea ed e luen complying wi h he Eu opean Di ec i e 91/271/EEC conce ning u ban was ewa e ea men . The AS plan conside ed as e e ence includes he ollowing uni ope a ions: mechanical p e- ea men , p ima y se ling, biological ea men wi h ni ogen emo al, seconda y se ling, sand il a ion and disin ec ion. Excess sludge is subjec o ae obic es abiliza ion and dewa e ing. The SBBGR WWTP in ol es subs an ially less uni ope a ions, namely only mechanical p e- ea men and biological ea men in he SBBGR uni (ae a o -bio il e ). Excess sludge does no equi e a s abiliza ion p ocess in his case, bu only dewa e ing. Conce ning nu ien (ni ogen and phospho us) emo al, his is in p inciple no equi ed by cu en legisla ion gi en he size o he assessed WWTPs, howe e o ni ogen we see in he Eu opean En i on- men Agency's WATERBASE da abase (EEA, 2016) ha 37% o plan s in I aly designed o 5000 PE do ea u e ni ogen emo al and o his eason we decided o include i o he e e ence AS plan . On he o he hand, chemical phospho us emo al is less common in hese plan s, wi h only 13% o hem ea u ing his ope a ion; o his eason, i is no included in ou model. In he case o he SBBGR, bo h ni ogen and (biological) phospho us emo al a e conside ed, based on p e ious expe imen al esul s wi h his pilo plan (De Sanc is e al., 2017). Sludge disposal in he wo scena ios is assumed o be h ough incine a ion. This is based on an analysis o sludge disposal ends in Eu ope, using Eu os a da a (see SM). This analysis shows ha om ou main disposal op ions (use in ag icul u e, land illing, incine a ion and compos ing), only incine a ion and compos ing show a g ow h end o e ime, wi h his end being mo e han h ee imes highe o incine a ion compa ed o compos ing. 2.6. Technological scope: sola -assis ed hea pump Simila size conside a ions apply o he SHP as hose discussed o he WWTPs. The SHP ins alla ion a he pilo plan , coupled o a SBBGR ea ing 269 L was ewa e /day, does no p ope ly e lec he expec ed size and numbe o componen s o coupling wi h a WWTP ea ing 500 m3/day. In o de o o e come his limi a ion, we ca ied ou a heo e ical scale-up o he pilo SHP, by e- dimensioning he indi idual equipmen and/o inc easing he numbe o uni s. This p ocess was done in de ail o he mos impo an componen s such as pho o ol aic plan , anks, comp esso , e c. Also, equipmen conside ed o be pa o he pilo plan only o esea ch pu poses was disca ded in he ull-scale design. The esul ing SHP model had a capaci y o 244 kW hea - ing and 160 kW cooling, powe ed by 1225 m2 o pho o ol aic modules. 2.7. Technological scope: subs i u ed g id powe -d i en hea pump The hea ing and cooling se ice ul illed by he implemen a ion o he p oposed concep is assumed o subs i u e hea ing and cooling supplied by an ai -sou ce hea pump d i en by elec ici y om he g id, ha ing he same hea ing and cooling capaci y as he SHP. This is in acco dance wi h a simila s udy (Ba lles e al., 2010) e alua ing a sola HVAC sys em in Alme ía, Spain, wi h e y simila clima ic condi ions o Ba i. The choice o a single hea pump o e e.g. a combined hea pump ( o cooling) and a boile ( o hea ing) can be jus i ied based on he ac ha gi en he ela i ely mild win e s in he Medi e anean egion, he ins alla ion o wo di e en sys ems is no jus i ied, as he hea pump can deli e bo h unc ions. A su ey in Spain (IDAE, 2016) shows ha in he Medi- e anean egions o he coun y hea pumps a e mo e commonly used o esiden ial and comme cial uses compa ed o he No he n A lan ic egions, wi h colde clima e, whe e lowe cooling and highe hea ing equi emen s a e ound. As o he ype o hea pump, his same su ey in Spain shows ha ai -sou ce hea pumps domina e bo h in e ms o ins alled uni s (78% o o al) and ins alled capaci y (71% o o al) o e wa e -sou ce and geo he mal hea pumps. 2.8. Func ional uni The unc ion o he sys em unde s udy is es ablished as p o iding ea men o u ban was ewa e . The THERBIOR scena io, howe e , p o ides an addi ional unc ion, namely he eco e y o he mal ene gy o be used o cooling/hea ing. This addi ional unc ion is deal wi h in he LCA and LCC by means o subs i u ion. The unc ional uni and e e ence low used in he s udy is he ea men o 1 m3 o u ban was ewa e wi h he ollowing composi ion, ob ained om he WWTP a Pu ignano (Sou he n I aly): 937 mg chemical oxygen demand (COD)/L, 93 mg o al ni- ogen (TN)/L, 625 mg suspended solids (SS)/L and 10 mg o al phospho us (TP)/L. 2.9. Limi a ions We can highligh wo main limi a ions in ou assessmen , one ela ed o ene gy use and he o he ela ed o was ewa e ea men . F om he ene gy poin o iew, he pu pose o ou esea ch p ojec was o assess he po en ial o he mal ene gy eco e y om was ewa e h ough he inno a i e SHP. In he pilo plan he eco e ed ene gy is used o p o ide hea ing and cooling o he simula ed ETL a ached o he plan . In a ull-scale deploymen o his echnology, howe e , he hea ing and cooling demand could be loca ed ou side o he WWTP p emises, in ho els, esidences o o ice buildings. In ou s udy we do no include he anspo o he p oduced ene gy o a hypo he ical building o -si e. We ins ead quan i y he se ice as i i was supplied on-si e (no dis ibu ion ne wo k, no losses). F om he was ewa e ea men side, a ele an aspec ha could be add essed is he a e and po en ial oxici y impac s o hea y me als and o ganic mic opollu an s p esen in he aw was ewa e and how hese di e when a SBBGR is used ins ead o ac i a ed sludge. Un o una ely, in his s udy we lacked in o ma ion on he co esponding pe o mance o SBBGR s. ac i a ed sludge wi h ega d o hese pollu an s. The concen a ion o some hea y me als and o ganic mic opollu an s in SBBGR in luen and e luen was measu ed du ing a p e ious s udy on was ewa e euse in ag icul u e (De Sanc is e al., 2017). Mos o he selec ed mic o- pollu an s we e no de ec ed in he was ewa e used in ha s udy. In he in en o y analysis we do no quan i y emissions o ai , wa e o soil om hese pollu an s in was ewa e . 2.10. Impac assessmen me hod The me hod used o impac assessmen in he LCA s udy is S epwise 2006, e sion 1.5. The me hod is desc ibed and documen ed in Annex II in Weidema e al. (2007) and in Weidema (2009). S epwise is capable o p o iding esul s a he le el o midpoin s (cha ac e iza ion) and endpoin s (damage). A he endpoin le el, each impac ca ego y is exp essed in mone a y uni s (Eu o), measu ing en i onmen al damage. In o al, S ep- wise2006 includes a o al o 16 impac ca ego ies commonly used in LCA, howe e , gi en he lack o da a a he in en o y le el on he p esence and a e o mic opollu an s in was ewa e , we decided o exclude eshwa e eco oxici y om he se o en i onmen al impac ca ego ies assessed. 2.11. Da a collec ion o li e cycle assessmen The li e cycle model was buil using he consequen ial lib a y a ailable in ecoin en .3.2 (Ecoin en , 2018) as backg ound da a- base, whe eas a a ie y o p ima y da a sou ces we e used in he in en o y analysis. In his sec ion we ou line he main sou ces and assump ions, whe eas a summa ised mass and ene gy balance is p o ided in Fig. 3 o he wo scena ios (excluding sludge disposal, capi al equipmen and he backg ound sys em). Fo comple e and de ailed in en o y ables he eade is e e ed o he SM. Fig. 3. Summa ised mass and ene gy balance o he wo assessed scena ios du ing he ope a ion li e cycle phase: e e ence (le ) and THERBIOR ( igh ). * 0.14 kWh is he elec ici y consump ion o SHP and all pe iphe al componen s such as ci cula ion pumps and an-coil uni . Cons uc ion o a con en ional WWTP designed o ea ing 750 m3/day was es ima ed wi h a linea eg ession using exis ing in en o ies o WWTPs o di e en capaci ies in Swi ze land, a ailable in he ecoin en da abase. These same da a we e he basis o he SBBGR WWTP cons uc ion, o which no da a we e ound. We ook he assump ion ha in as uc u e ma e ial inpu s a e p opo ional o in es men cos s, meaning ha he lowe in es - men cos o a SBBGR WWTP (see 2.12) leads o a p opo ional in as uc u e ma e ial educ ion. WWTP ope a ion included in- pu s o elec ici y, sodium hypochlo i e o disin ec ion, poly- elec oly e o sludge dewa e ing, sodium hyd oxide o sand il e cleaning and sand eplacemen s o his il e . All ma e ial inpu s we e quan i ied based on li e a u e (see SM) wi h he excep ion o elec ici y consump ion, which was aken om he WWTP a Pu ignano. This plan has ecen ly been pa ially upg aded o a SBBGR ea men , allowing us o ge accu a e da a o bo h con en ional (ac i a ed sludge) and SBBGR ea men . A de ailed heo e ical mass balance was es ablished o he WWTPs, based on he in luen and e luen composi ion, using WW LCI, a li e cycle in en o y model o chemicals discha ged in was ewa e (Muñoz e al., 2016; Kalba e al., 2017). Wi h his model we es ima ed di ec emissions om he WWTP o ai (CO2, N2O), o wa e (NO3, NH4, TP) as well as sludge p oduc ion, which esul ed in 0.51 kg d y mass/m3 o he con en ional WWTP a e ae obic diges ion and 0.14 kg d y mass/m3 o he SBBGR WWTP. WW LCI was also used o model wo addi ional p ocesses. Fi s ly, emissions o CO2 and N2O esul ing om he ul ima e deg ada ion in he aqua ic en i onmen o o ganics and nu ien s in he ea ed e luen . Secondly, o model sludge disposal by incine a ion, which in ol es anspo o dewa e ed sludge, d ying o a con en o 90% d y mass and combus ion wi h ene gy eco e y (see SM o de ails). The in en o y o cons uc ion o he SHP, based on a heo e ical scale-up o he pilo , was accomplished by i s compiling a de ailed bill o ma e ials o his pilo , which esul ed in 1.7 onnes o equipmen . In he scale-up we enla ged, changed and adap ed all his equipmen , esul ing in a SHP embedding 56 onnes o equipmen , including a 190 kWp pho o ol aic plan wi h 1225 m2 module a ea. In o de o annualize he consump ion o equipmen , se ice li es in yea s we e de ined o each ype o componen , anging om 7 yea s o elec onics o 30 yea s o s uc u al elemen s. One o he di icul ies aced o build his in en o y lies in he cu en lack o da a se s in ecoin en o ep esen some o he machine y and equipmen ins alled in he SHP. In he SM we epo in de ail how we adap ed and linked ou da a o he ecoin en da abase. The ope a ion o he SHP includes some g id elec ici y needed o keep he hea ing/cooling dis ibu ion unning du ing he nigh , bu mo e impo an ly, he amoun o hea ing/cooling p oduced and eco e ed by his sys em, exp essed in MJ. This consis s o wo con ibu ions: he sola -powe ed hea pump i sel and he he mal ene gy eco e y om was ewa e . The i s con ibu ion is quan i ied conside ing he SHP hea ing and cooling capaci y, o 244 kW and 160 kW, espec i ely and an end- use hea ing and cooling demand o 632 h/yea and 864 h/yea , espec i ely o a Medi e anean loca ion (Ba lles e al., 2010). Conce ning he mal ene gy eco e y om was ewa e , as desc ibed in Pie g ossi e al. (2018), i was ound ha a subs an ial sha e o he eco e ed he mal ene gy was sensible hea om sola adia ion, i.e. hea ing o he SBBGR columns by di ec exposu e o sunligh , as hey a e placed abo e g ound (see Fig. 1). Howe e , in a ull-scale SBBGR uni he anks would be ins ead placed on he g ound (simila ly o con en ional ac i a ed sludge anks), and he e o e he hea ing con ibu ion om sunligh would no occu . A de ailed ene gy balance o he SBBGR eac o e ealed ha in a e age, app oxima ely 50% o he eco e ed ene gy is due o sola exposu e o he eac o (Po illo, 2017). In ou scale-up calcula ions we excluded his con ibu ion and quan i ied he eco e able he mal ene gy as 13.8 MJ pe m3 was ewa e , and he ac ually eco e ed ene gy as 4.6 MJ/m3, gi en ha he SHP can only ope a e du ing dayligh (8 h/day). Conside ing he wo con ibu ions (SHP and was ewa e ), he o al he mal ene gy eco e ed is 10.4 MJ/m3. The in en o y o he subs i u ed ai -sou ce hea pump was quan i ied based on a mi o design o he up-scaled SHP whe e he pho o ol aic sys em was emo ed and powe om he g id was ins ead conside ed. Finally, elec ici y p oduc ion in I aly, which supplies all he abo e ac i i ies, was modelled conside ing only lexible supplie s in he pe iod 2012e2020, esul ing in a g id mix con aining 88% enewably-sou ced elec ici y (see SM o de ails). 2.12. Da a collec ion o li e cycle cos ing Cos s assessed included in es men and ope a ion, whe eas decommissioning cos s we e neglec ed (Muñoz, 2006). In es men cos s we e annualized using he so-called capi al eco e y ac o (CRF), as a unc ion o se ice li e in yea s and in e es a e. The la e was aken as 1%, which co esponds o he GDP-weigh ed Eu o a ea en-yea so e eign bond yield, acco ding o he Eu o- pean Cen al Bank a he beginning o 2018 (ECB, 2018). As in he p e ious sec ion, below we only p o ide a summa y o he main da a sou ces and assump ions, whe eas de ailed cos calcula ions a e a ailable in he SM. In es men cos s o a con en ional and SBBGR WWTP we e es ablished as 350V and 224V pe PE, espec i ely, based on in- o ma ion supplied by he in eg a ed wa e se ices ope a o in he Apulia egion, which ope a es he Pu ignano WWTP upg aded o SBBGR. In es men cos o he up-scaled SHP was es ima ed close o 906,000 V, based on he o al equipmen cos plus ins alla ion, enginee ing cos s, e c. The CRF o hese in es men s was calcula ed assuming a se ice li e o 30 yea s o he WWTP and 20 yea s o he SHP. Ope a ion cos s o he WWTP included elec ici y cos s, o he ope a ion cos s and sludge disposal. Elec ici y cos s o I alian indus ial consume s was ob ained om EUROSTAT (2018) as 0.185 V/kWh. O he ope a ion cos s we e es ima ed as 3% o he in es men cos , annually (COWI, 2010), and sludge disposal cos s included anspo and incine a ion cos s, es ima ed o I aly as 203 V pe onne in we weigh , based on Diaz e al. (2015) and UN- Habi a (2008). Ope a ion cos s o he SHP included g id elec ici y consump ion o equipmen unning 24 h and main enance cos s. The la e we e es ima ed as 3% o he in es men cos s, annually. This is he a e age alue ob ained om a s udy on li e cycle cos s o HVAC sys ems (Wu and Clemen s-C oome, 2007). The subs i u ed ai -sou ce hea pump cos s we e quan i ied ollowing a simila app oach as in he SHP. In es men cos s we e es ima ed as 167,600V wi h a se ice li e o 15 yea s. Ope a ion cos s included elec ici y and main enance, aking he same app oach as in he SHP. In his case, he g id elec ici y consump ion is 0.144 kWh pe MJ hea ing/cooling. O e all, he uni a y cos o his pump esul s in 0.043V pe MJ hea ing/cooling. 3. Resul s and discussion 3.1. Li e cycle impac assessmen Table 1 shows he li e cycle impac assessmen esul s o he wo scena ios, a bo h midpoin and endpoin le el. While a midpoin each indica o has i s own speci ic uni s, a endpoin le el hey a e all exp essed in mone a y uni s. A midpoin le el we can see ha he THERBIOR scena io shows lowe en i onmen al impac in all 15 indica o s, wi h a educ ion in impac anging om 19% in mine al ex ac ion o 93% in ozone laye deple ion. In na u e occupa ion, he THERBIOR scena io p esen s a nega i e sco e, meaning a ne bene icial e ec on his indica o . The inclusion o esul s a endpoin le el is use ul o iden i y hose impac indica o s whe e he sys em has he highes con ibu ion o en i onmen al damages. I can be seen in Table 1 ha in ou case s udy his co esponds o global wa ming, espi a o y ino ganics and eshwa e eu ophica ion, wi h he i s one o hese h ee ha ing he highes magni ude. Table 1. Li e cycle impac assessmen esul s a midpoin and endpoin le el pe m3 was ewa e . Impac ca ego y Midpoin Endpoin Uni Re e ence THERBIOR Uni Re e ence THERBIOR Human oxici y, ca cinogens kg C 2 H 3 Cl-eq in o ai 0.023 0.011 V 0.006 0.003 Human oxici y, non-ca cinogens kg C 2 H 3 Cl-eq in o ai 0.042 0.015 V 0.011 0.004 Respi a o y ino ganics kg PM 2.5 -eq 0.00086 0.00035 V 0.058 0.024 Ionizing adia ion Bq Ca bon-14 in o ai 0.60 — 0.19 V 1.2E-05 —3.8E-06 Ozone laye deple ion kg CFC11-eq 7.5E-08 5.0E-09 V 7.7E-06 5.2E-07 Eco oxici y, e es ial kg ie hylene glycol-eq in o soil 5.5 3.1 V 1.2E-04 1.7E-04 Na u e occupa ion m 2 ag . land 0.037 — 0.001 V 0.0045 — 0.0001 Global wa ming kg CO 2 -eq 0.82 0.47 V 0.068 0.039 Acidi ica ion m 2 unp o ec ed ecosys em 0.044 0.015 V 0.0003 0.0001 Eu ophica ion, aqua ic kg NO 3 -eq 0.33 0.21 V 0.033 0.021 Eu ophica ion, e es ial m 2 unp o ec ed ecosys em 0.11 0.03 V 0.0014 0.0004 Respi a o y o ganics Pe son$ppm$h 0.00059 0.00023 V 1.5E-04 6.0E-05 Pho ochemical ozone, ege a ion m 2 $ppm$hou 6.8 2.4 V 0.0025 0.0009 Non- enewable ene gy Megajoule 8.9 2.5 V 0 0 Mine al ex ac ion Megajoule 0.12 0.10 V 5.0E-04 4.0E-04 Fig. 4 shows a con ibu ion analysis o he global wa ming indica o , exp essing GHG emissions in CO2-eq. I mus be s essed ha biogenic CO2 emissions om he deg ada ion o o ganic ma e in was ewa e a e conside ed o be clima e-neu al in ou analysis. The g aph shows ha GHG emissions a e especially lowe o he THERBIOR scena io in wo aspec s: sludge disposal and hea pump subs i u ion. Wi h ega d o sludge disposal, he e is a clea ad an age o he SBBGR due o i s subs an ially lowe sludge p oduc ion. This means less anspo , less uel equi emen s o d y sludge p io o incine a ion, and less incine a ion emissions. O e all, GHG emissions ela ed o sludge disposal a e educed by a ac o ou . Conce ning hea pump subs i u ion, his is shown wi h a nega i e sign in he g aph, meaning ha 0.27 kg CO2-eq a e a oided pe m3 was ewa e . These emissions a e ela ed o he (a oided) p oduc ion, ope a ion and end o li e o a con en ional hea pump powe ed by he g id. The e is no such sa ing in he e e ence scena io, as he e is no he mal ene gy p oduc ion in ha case. O e all, in he THERBIOR scena io he SHP leads o a o al emission o e he li e cycle (cons uc ion, ope a ion, end o li e) o 0.16 kg CO2-eq/m3, bu his is mo e han compensa ed by he a o emen ioned sa ing o 0.27 kg CO2-eq/m3. I is also wo h men ioning ha he THERBIOR scena io also in ol es a GHG educ ion du ing WWTP cons uc ion, howe e his esul is subjec o unce ain y, as we ha e assumed ha in as uc u e impac s a e di ec ly linked o in es men cos s. I seems easonable hough ha he much simple layou o a SBBGR WWTP should in ol e, o some ex en , a lowe need o cons uc ion ma e ials such as conc e e and ein o ced s eel, among o he s. F amewo k. In e na ional S anda d O ganiza ion (ISO), Gene e. ISO, 2006b. ISO 14044 En i onmen al Managemen - Li e Cycle Assessmen e Requi emen s and Guidelines. In e na ional S anda d O ganiza ion (ISO), Gene e. Kalba , P., Mun~oz, I., Bi k ed, M., 2017. WW LCI 2: a second-gene a ion li e cycle in en o y model o chemicals discha ged o was ewa e sys ems. Sci. To al En i on. 622e623, 1649e1657. Liu, Z., Liangdong, M., Jili, Z., 2014. Applica ion o a hea pump sys em using un- ea ed u ban sewage as a hea sou ce. Appl. The m. Eng. 62, 747e757. Megge s, F., Leibundgu , H., 2011. The po en ial o was ewa e hea and exe gy: decen alized high- empe a u e eco e y wi h a hea pump. Ene gy Build. 43 (4), 879e886. Muñoz, I., 2006. Li e Cycle Assessmen as a Tool o G een Chemis y: Applica ion o Di e en Ad anced Oxida ion P ocesses o Was ewa e T ea men . PhD Thesis. Uni e si a Au o`noma de Ba celona, Spain. Muñoz, I., de V ies, E., Wi ebol, J., Aamand, J., 2015. P ospec i e en i onmen al and economic assessmen o bio ea men o mic opollu an s in d inking wa e esou ces in Denma k. Wa e Science and echnology, Wa e Science and Technology: Wa e Supply 15 (6), 1405e1413, 2015 Dec. Muñoz, I., O e, N., Van Hoo , G., Riga ls o d, G., 2016. A model and ool o calcula e li e cycle in en o ies o chemicals discha ged down he d ain. In . J. Li e Cycle Assess. 22 (6), 986e1004. Ochoa, L., Hend ickson, C., Ma hews, H.S., Ries, R., 2005. Li e cycle assessmen o esiden ial buildings. In: P oceedings o he ASCE Cons uc ion Resea ch Cong ess; San Diego, CA, Ap il 5-7, p. 2005. Piccinno, F., Hischie , R., Seege , S., Som, C., 2016. F om labo a o y o indus ial scale: a scale-up amewo k o chemical p ocesses in li e cycle assessmen s udies. J. Clean. P od. 135, 1085e1097. Pie g ossi, V., De Sanc is, M., Chimien i, S., Di Iaconi, C., 2018. Ene gy eco e y ca- paci y e alua ion wi hin inno a i e biological was ewa e ea men p ocess. Ene gy Con e s. Manag. 172, 529e539. Po illo, F., 2017. Ene gy balance and he mal ene gy eco e y a e e alua ion. Repo p epa ed o he THERBIOR p ojec . h p://www2.ual.es/ he bio /? ddownload¼271. (Accessed 20 Sep embe 2018). P e´ Consul an s, 2016. SimaP o. h ps://simap o.com/. (Accessed 10 Ap il 2017). Se ino, J., San , T., Micalle , C., Fa ugia, M., S aines, C.S., Li-ca i, J., Micalle , A., 2018. O e iew o sola echnologies o elec ici y, hea ing and cooling p oduc ion. Renew. Sus ain. Ene gy Re . 90 (2018), 892e909. Schmid , J.H., Weidema, B.P., B and~ao, M., 2015. A amewo k o modelling indi ec land use changes in li e cycle assessmen . J. Clean. P od. 99 (15), 230e238. UN-Habi a , 2008. Global a las o exc e a, was ewa e sludge, and biosolids managemen : mo ing o wa d he sus ainable and welcome uses o a global esou ce. P epa ed by he Uni ed Na ions Human Se lemen s P og amme (UN- HABITAT), Nai obi, Kenya. h ps://esa.un.o g/iys/docs/san_lib_docs/ habi a 2008.pd . (Accessed 1 Ma ch 2018). USEPA, 2013. Global Mi iga ion o Non-CO2 G eenhouse Gases: 2010-2030. Uni ed S a es En i onmen al P o ec ion Agency, O ice o A mosphe ic P og ams (6207J),EPA-430-R-13-011, Washing on, DC 20005. Weidema, B.P., 2009. Using he budge cons ain o mone a ise impac assessmen esul s. Ecol. Econ. 68 (6), 1591e1598. Weidema, B.P., Hauschild, M.Z., Jollie , O., 2007. P epa ing cha ac e isa ion me hods o endpoin impac assessmen . In: Weidema, B.P., Wesnæs, M., He mansen, J., K is ensen, T., Halbe g, N., Ede , P., Delgado, L. (Eds.), En i onmen al Imp o e- men Po en ials o Mea and Dai y P oduc s. Ins i u e o P ospec i e Techno- logical S udies, Se illa, 2008. (EUR 23491 EN). Annex II. Wood, R., S adle , K., Bula skaya, T., Lu e , S., Giljum, S., de Koning, A., Kuenen, J., ández, J., Usubiaga, A., Simas, M., I ano a, O., Weinze el, J., Schmid , J.H., Me ciai, S., Tukke , A., 2015. Global sus ainabili y accoun ing e de eloping EXIOBASE o mul i- egional oo p in analysis. Sus ainabili y 7 (1), 138e163. Wu, S., Clemen s-C oome, D., 2007. Ra io o ope a ing and main enance cos s o ini ial cos s o building se ices sys ems. Cos Eng. Vol. 49 (12). Decembe 2007.