Decision in implementation of production capacity planning determinated by usage of sensitive analysis

Poláček, Tomáš,Žákovská, Martina

Abstract

EconStor is a publication server for scholarly economic literature, provided as a non-commercial public service by the ZBW.

Full text

Poláček, Tomáš; Žákovská, Martina Article Decision in implementation of production capacity planning determinated by usage of sensitive analysis Trends Economics and Management Provided in Cooperation with: Faculty of Business and Management, Brno University of Technology Suggested Citation: Poláček, Tomáš; Žákovská, Martina (2018) : Decision in implementation of production capacity planning determinated by usage of sensitive analysis, Trends Economics and Management, ISSN 2336-6508, Brno University of Technology, Faculty of Business and Management, Brno, Vol. 12, Iss. 31, pp. 57-69, https://doi.org/10.13164/trends.2018.31.57 This Version is available at: https://hdl.handle.net/10419/308882 Standard-Nutzungsbedingungen: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Zwecken und zum Privatgebrauch gespeichert und kopiert werden. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich machen, vertreiben oder anderweitig nutzen. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, gelten abweichend von diesen Nutzungsbedingungen die in der dort genannten Lizenz gewährten Nutzungsrechte. Terms of use: Documents in EconStor may be saved and copied for your personal and scholarly purposes. You are not to copy documents for public or commercial purposes, to exhibit the documents publicly, to make them publicly available on the internet, or to distribute or otherwise use the documents in public. If the documents have been made available under an Open Content Licence (especially Creative Commons Licences), you may exercise further usage rights as specified in the indicated licence. https://creativecommons.org/licenses/by/4.0/ 57 Trendy ekonomiky a managemenTu Trends economics and managemenT issn 1802-8527 (Print) / issn 2336-6508 (online) 2018 31(1): 57–69 doi: http://dx.doi.org/10.13164/trends.2018.31.57 Decision in Implementation of Production Capacity Planning Determinated by Usage of Sensitive Analysis Tomáš Poláček, Martina Žákovská Abstract Purpose of article: Effective planning and management of material flow and production resources, i.e. production planning and control is generally regarded as crucial for the success of manufacturing companies. It involves managing all aspects of production, including materials management, planning and scheduling of machines and human resources and coordination of suppliers and key customers. They were followed a more advanced concept MRP II, controls all production resources. Despite production planning using ERP systems, based on MRP II logic. With this tool can company effectively balance all production resources and in the optimal way to schedule production orders according to production capacity. Implementation of capacity planning in the company introduces a number of problems associated with the requirements of quality information and accurate data on which is a production plan created. Decision on the implementation of capacity planning is a challenge associated with high risk and the need to consider the order of several months in advance uncertainty. At points where we do not have full control over decisions, it can be used heuristic methods of decision-making through a decision tree using the known probabilities, and with a partial ignorance of using interval arithmetic. Methodology/methods: Solving within decision tree with known probabilities obtained from expert in capacity planning. Scientific aim: Find the upper limit worth of implementation of capacity planning or MRP-II. Findings: The difference between the implementation the APS and MRP-II based on profits determinate by time. Conclusions: Enterprise should have after implementation of its own data to the model make decision of what kind of capacity planning is profitable for its purpose. Keywords: capacity planning, MRP II, decision making, interval arithmetic, sensitive analysis JEL Classification: O33, O21, D70 Tomáš Poláček, Martina Žákovská: Decision in Implementation of Production Capacity Planning Determinated by Usage ... 58 Introduction The planning process involves planning of the following inputs: material, capacity and information regarding the production order. In addition to these direct inputs the production schedule is affected by changes that may be initiated by the customer or by the company itself (e.g. material unavailable for the start of production order, lack of capacity). The course of the execution of the job order may be associated with bottlenecks (Goldratt, 1981), which may be the material and capacity constraints. In the 90s of the 20th century, the concept of MRP II was expanded with additional functions such as production, marketing, finance, purchasing until the emergence of ERP, when Gartner Group of Stamford, Connecticut, USA coined the term. This ushered in a new era of enterprise information systems (Chen, 2001). ERP systems are defined as a system framework for organizing, defining and standardizing business processes necessary for effective planning and management of organizations, so that organizations can use their inside knowledge to pursue an external benefit (Chen, 2001). The area of planning and control of productive resources based on MRP II logic constitutes one of the activities of the ERP system. MRP II concept is based on fixed dates of production delivery to shipment. In fact, this term influences many factors, eg. material availability or workload. MRP II also ignores capacity constraints and leaves capacity problems to planners (Taal, Wortmann, 1997). At the end of the 90s it became clear that the ERP system is not an adequate instrument to cover all requirements, whether it was the diversity of the materials and manufacturing capabilities, the ability to meet customer requirements and shortening of lead times (Stadtler, Kilger, 2005). This is dealt with by APS systems of advanced planning and scheduling representing state- of-the-art methods that use information technology to simulate, optimize, streamline production and logistics. APS is able to combine the diversity of production process, plan different scenarios and take into account a number of limitations (David et al., 2006). They apply “what-if” simulations of alternative plans, under which it is possible to evaluate the impact of the changes performed, such as specification of the time for planning of the job-order, changes in the quantity or cancellation of orders, transfer of technological operations using alternative procedures, increase or decrease of the capacity of critical sites (Grimson, Pyke, 2007; Michel, 2007). The advantage of APS compared to MRP II technologies consists in taking into account all requirements for the production and also the consideration of material and capacity constraints, which means that it considers available capacities over time in the planning and scheduling process. Thereby, the plan becomes more realistic and feasible, production is not loaded with excess inventory and the company is able to realistically propose and then meet deadlines given to the customer (Stadtler, 2005). All calculations are performed by APS closely linked to the enterprise information system, ie. APS does not retain any information and data of the company, but performs calculations over the data base in the IS and Figure 1. ERP system structure. Source: Chen, 2001, custom processing. Source: own work. Tomáš Poláček, Martina Žákovská: Decision in Implementation of Production Capacity Planning Determinated by Usage ... 59 reimports the resulting plan into the information system (Stadtler, Kilger, 2005). This method of plan calculation of and transfer of data constitutes further benefit of the APS system, which is the speed of planning incorporation (Stadtler, 2005). Decision about implementation of new system (APS) or improving the current MRP II planning process involve risks, which should be considered, same as for exemple in the entering on capital markets (Meluzín et al., 2012). Output from both of the systems is not comparable. This information could be managed using a decision making trees. For the determination of implementation of capacity planning is used heuristics Decision theory (Blavatskyy, 2013), where a decision tree (see p. 22) subjected to expert heuristics unlike so. Machine theory (Bringmann, Zimmermann, 2007; Yu, Severin, Lendasse, 2014) where the decision tree generated from the selected data from a predetermined set of statistics (data mining). There are many different algorithms to evaluate the results to determine the return on insolvency see, e.g. (Rose, 1976). Decision–Making Trees IB decision trees are based on nodes, branches, endpoints, strategy, payoff distribution, certain equivalent, and the rollback method, see e.g. (Rose, 1976, Olivas, 2007). An example of a decision tree is given in Figure 2. Nodes are divided into single decision root nodes, decision nodes and lotteries/chance nodes see e.g. (Magee, 1964). The root node is the top of any decision tree; see the node L Figure 2. Oriented arcs that connect nodes are called branches. Decision – making node represents a decision made by a decision maker. A choice from r discrete set of choices must be done. A square indicates a decision node in this paper; see the root node, Figure 2. There is a simple algorithm how to evaluate the decision node value – DNV, see Figure 3: DNV = max {P1, P2, ... Pr}. (1) The formula (1) reflects common-sense reasoning of the decision maker – choose the variant which offers the highest profit. Figure 4. Lottery nodes are plotted as small circles, see nodes no. 2 and 3 Figure 4. Each lottery branch has its probability p, and its profit P, see Figure 4. There are many different algorithms how to evaluate LNV (lottery node value), see e.g. (Rose, 1976). For example, risk aversions are sources of different modifications LNV modifications, see e.g. (Rose, 1976). The following simple formula will be used in this paper LNV = (p1P1 + p2P2 + . . . . + pnPn), (2) where: p1 + p2 + ... pn = 1. Figure 2. Lottery node. Source: own work. Figure 3. Decision node. Source: own work. Tomáš Poláček, Martina Žákovská: Decision in Implementation of Production Capacity Planning Determinated by Usage ... 60 The following IB analysis can be easily based on different modification of formulas (1) and (2). The decision tree terminals are plotted as triangles, see nodes 4, 5, 6, and 7. Each terminal has its given payoff value. Figure 4 represents a simple decision tree and it gives all numerical values needed to it using the formulas (1, 2). The decision maker has to choose one out of two lotteries. The corresponding tree evaluation follows: LNV1 = 0.65 × 100,000 + 0.31 × × (–60,000) + 0,04 × 30,000 = 47,000, LNV2 = 0.67 × 0 + 0.33 × 0 = 0, DNV1 = max [LNV1, LN2] = = [47,000; 0] = 47,000. (3) The decision maker chooses the lottery No. 2, it means he/she chooses the variant – Take Loan. However, IB decisions are often based on trees, which numerical values are not, knows completely. The most sensitive and difficult to evaluate are probabilities of lotteries (Watson, 1994). 1. Case study Case company is one of Czech leading producer of a precision optics and assembly of complex optical and opt mechanical products. In 2015, management of company established two groups of specialists who analysed the company’s production system and had to prepare a set of information for oncoming decision – implement an APS system as a superstructure to a current ERP system or improve existing ERP. Data collection Typically, the prime source of data collection in case study research are structured interviews, often backed up by unstructured interviews and interactions. This principle was followed also in the first part of this research. Other sources of data used in this research were gained by an attendance at the management meetings, surveys, and collection of internal reports. Case study – description of the background The case company had to face a long term problem with delivering the product to the customer on time. The problem had been fixed by a high level of storage, which was inefficient according to the capital bounded in stock. Production managers were forced to decrease a level of stock and with this decision had started to appear problems with delivering the product from production process on time. After a short analysis it was discovered, Figure 4. Simple decision tree. Source: own work. Tomáš Poláček, Martina Žákovská: Decision in Implementation of Production Capacity Planning Determinated by Usage ... 61 that production process is not planned effectively, there are many buffers, constraints, missing material and inaccuracies. The decision was to improve the production planning and scheduling process. Two main opportunities to solve this problem were – implementation of an APS system as a superstructure to an existing ERP system or improving current MRP II logic in the existing ERP system. Both of the variants, in a case of successful implementation bring an estimated increase of the company’s turnover through increased value of production orders processed by the same capacities. Both of the variants are connected with costs of the realization and with the risk of unsuccessful implementation. Figure 5. Decision tree of whole process. Source: own work. Tomáš Poláček, Martina Žákovská: Decision in Implementation of Production Capacity Planning Determinated by Usage ... 62 These risks could be managed by using a decision making tree, which is presented in this article. To determine the expected increase of a company’s turnover was used an expert estimation. The estimation of increased production output is in the case of an MRP II improvement by 10 mil CZK per month (120 mil CZK per year). In a case of APS implementation, which is more detailed in production planning and scheduling and it is able to cover detailed gaps in production, could be the estimated increasing of output by 15 mil CZK per month (180 mil CZK per year). Percentages of probabilities of an unsuccessful implementation were obtained from 5 companies, which had improved the production planning process previously, by structured interview with the production manager. Decision making tree description (1) Decision of an APS implementation or an improvement of MRP II. (2) Uncertainty of a success of an implementation. The success of APS implementation is based on a forwardness of a planning process. APS system is very sensitive on input data and complete structure of data for production planning. During the implementation is being uncovered the real structure and completeness of information. In this case is important for the company to complete the information structure in the short term. From that depends the next success of the implementation. (3) Decision about a success of APS implementation. The company execute a check planning of all production orders and then decide, if the plan is sufficient and APS planning can be activated (9). The company can decide to delay the start of APS planning and take care about additional completion of data structure. After this phase is executed other check planning of all production orders (7), which shows if the additional adjustments were enough and the system is prepared for using (10) or it involves other inaccuracies, which weren’t possible to think ahead (8) which lead to additional adjustments and then activation of APS planning (11) or to the termination of an effort and return to the prime planning system (12). APS implementation could also end with failure (5) in the case that the company doesn’t fill the algorithm of the system with complete structure on data. Then the management has to decide about termination of APS implementation (15) or to continue with the additional project, which objective would be to complete the gaps in information structure (8). On the result of the check planning of production orders would be the system activated (13) or the project terminated (14). The company can decide to improve the existing MRP II, which is similar time demanding as an APS implementation. The improvements process has similar obstacles like an APS implementation and can lead to successful results (17) or to a failure (16) because company is not able to cover all of requirements with the MRP II logic and then decide to implement APS system (6). After the adjustments described in the previous paragraph can the implementation lead to a successful initiation of capacity planning (20) or to a failure of development (21). 2. Solving by the known probabilities In the first case there have been use all known probabilities at all chance nodes, which have been obtained on the basis of statistical data and conversion to percentage probability, then applying of the basic calculations of decision tree have been determined total potential profits see e.g. (3) (Winston; Albright, 2010). The following Table 2 shows the profits of the individual variants of the decision and the relevant known probabilities. In Table 3 can be seen calculated profits for selected routes from a decision tree, where Tomáš Poláček, Martina Žákovská: Decision in Implementation of Production Capacity Planning Determinated by Usage ... 63 route 1–3 is the averaged result of previous subresults. Solving by interval arithmetic After solving a decision tree of capacity planning process using known probabilities obtained from statistics it is obvious to undergo sensitivity analyse the decision- -making process and alter the probability of chance nodes. Node no. 2 in APS process and node no. 2 in developing of MRP II. After consultation with the Head of company was the probability in selected nodes altered by the variance of practice. Let us suppose that the following probabilities are not know exactly. The following Table 1. Probability of each variant. Variant Probability Variant Probability 2–4 0.4 8–14 0.3 2–5 0.6 3–16 0.3 8–11 0.7 3–6 0.7 8–12 0.3 8–20 0.7 8–13 0.7 8–21 0.3 Source: own work. Table 2. Profit and the specified probabilities. Variant Probability Cost of imp. [mil. CZK] Possible TYR1 [mil. CZK] Possible TR2 in 26 mth [mil. CZK] 4–9 0.4 6.5 69.4 150.4 7–10 0.4 6.8 69.3 138.6 8–11 0.28 7 48.4 88.8 8–12 0.12 7 –7.0 0.0 8–13 0.42 8.5 72.0 48.0 8–14 0.18 8.5 –8.5 0.0 5–15 0.6 6.5 –6.5 0.0 3–16 0.3 2 –2.0 0.0 6–17 0.7 2 179.2 179.0 5–18 0.42 8.5 –8.5 0.0 4–19 0.28 8.5 48.0 12.0 8–20 0.196 8.8 33.6 4.2 8–21 0.084 8.8 –8.8 0.0 Source: own work. 1 Total year revenue. 2 Total revenue. Table 3. Average of the profit. Variant 2–4 2–5 3–16 3–6 Average Profit [mil. CZK] 45.03 19.01 –2 29.38 Possible TR in 26 mth [mil. CZK] 94.40 16.00 0 39.00 Source: own work. Tomáš Poláček, Martina Žákovská: Decision in Implementation of Production Capacity Planning Determinated by Usage ... 64 uncertainties musts be taken into consideration (Table 4). <a,b> <c,d> The following combinations are studied: variant 1 – ac, variant 2 – bd, variant 3 – ad, Table 4. Combinations of variants. 2–4 2–5 2–4 MRP II 2–5 MRP II a 0.32 0.68 b 0.58 0.42 c 0.224 0.476 d 0.406 0.294 Source: own work. Table 5. Splitting ratio of changed nodes. Variant 1 Splitting ratio Splitting ratio Branch 2–4 0.32 2–4 MRP II 0.224 Branch 2–5 0.68 2–5 MRP II 0.476 Variant 2 Splitting ratio Splitting ratio Branch 2–4 0.58 2–4 MRP II 0.406 Branch 2–5 0.42 2–5 MRP II 0.294 Variant 3 Splitting ratio Splitting ratio Branch 2–4 0.32 2–4 MRP II 0.406 Branch 2–5 0.68 2–5 MRP II 0.294 Variant 4 Splitting ratio Splitting ratio Branch 2–4 0.58 2–4 MRP II 0.224 Branch 2–5 0.42 2–5 MRP II 0.476 Source: own work. Table 6. Variant 1Profit and the specified probabilities. Variant Probability Cost of imp. [mil. CZK] Possible TYR [mil. CZK] Possible TR in 26 mth [mil. CZK] 4–9 0.32 6.5 55.5 120.3 7–10 0.32 6.8 55.4 110.8 8–11 0.224 7.0 38.8 71.0 8–12 0.096 7.0 –7.0 0.0 8–13 0.476 8.5 81.6 54.4 8–14 0.204 8.5 –8.5 0.0 5–15 0.68 6.5 –6.5 0.0 3–16 0.3 2.0 –2.0 0.0 6–17 0.7 2.0 82.6 179.0 5–18 0.476 8.5 –8.5 0.0 4–19 0.224 8.5 38.4 6.4 8–20 0.1568 8.8 26.8 2.2 8–21 0.0672 8.8 –8.8 0.0 Source: own work.