Developing an appropriate staff mix for anticoagulation clinics: Functional job analysis approach
Abstract
EconStor is a publication server for scholarly economic literature, provided as a non-commercial public service by the ZBW.
Full text
Hailemariam, Desta A. et al. Article Developing an appropriate staff mix for anticoagulation clinics: Functional job analysis approach Journal of Industrial Engineering International Provided in Cooperation with: Islamic Azad University (IAU), Tehran Suggested Citation: Hailemariam, Desta A. et al. (2019) : Developing an appropriate staff mix for anticoagulation clinics: Functional job analysis approach, Journal of Industrial Engineering International, ISSN 2251-712X, Springer, Heidelberg, Vol. 15, Iss. 1, pp. 103-118, https://doi.org/10.1007/s40092-018-0267-5 This Version is available at: https://hdl.handle.net/10419/267602 Standard-Nutzungsbedingungen: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Zwecken und zum Privatgebrauch gespeichert und kopiert werden. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich machen, vertreiben oder anderweitig nutzen. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, gelten abweichend von diesen Nutzungsbedingungen die in der dort genannten Lizenz gewährten Nutzungsrechte. Terms of use: Documents in EconStor may be saved and copied for your personal and scholarly purposes. You are not to copy documents for public or commercial purposes, to exhibit the documents publicly, to make them publicly available on the internet, or to distribute or otherwise use the documents in public. If the documents have been made available under an Open Content Licence (especially Creative Commons Licences), you may exercise further usage rights as specified in the indicated licence. https://creativecommons.org/licenses/by/4.0/
ORIGINAL RESEARCH Developing an appropriate staff mix for anticoagulation clinics: functional job analysis approach Desta A. Hailemariam 1,2 •Xiaojun Shan 1 •Sung H. Chung 1 •Mohammad T. Khasawneh 1 •William Lukesh 2 • Angela Park 2 •Adam Rose 3,4 Received: 24 April 2017 / Accepted: 26 March 2018 / Published online: 22 May 2018 ÓThe Author(s) 2018 Abstract Anticoagulation clinics (ACCs) are specialty clinics that manage patients with blood clotting problems. Since labor costs usually account for a substantial portion of a healthcare organization’s budget, optimizing the number and types of staff required was often the focus, especially for ACCs, where labor-intensive staff-patient interactions occur. A significant portion of tasks performed by clinical pharmacists might be completed by clinical pharmacist technicians, which are lessexpensive resources. While nurse staffing models for a hospital inpatient unit are well established, these models are not readily applicable to staffing ACCs. Therefore, the objective of this paper is to develop a framework for determining the right staff mix of clinical pharmacists and clinical pharmacy technicians that increases the efficiency of care delivery process and improves the productivity of ACC staff. A framework is developed and applied to build a semi-automated fulltime equivalent (FTE) calculator and compare various staffing scenarios using a simulation model. The FTE calculator provides the right staff mix for a given staff utilization target. Data collected from the ACCs at VA Boston Healthcare System is used to illustrate the FTE calculator and the simulation model. The result of the simulation model can be used by ACC managers to easily determine the number of FTEs of clinical pharmacists and clinical pharmacy technicians required to reach the target utilization and the corresponding staffing cost. Keywords Anticoagulation clinics Staffing model Simulation Full-time equivalent Functional job analysis Introduction Warfarin is the most widely used anticoagulant mainly because it is proven to be very effective if used within a narrow therapeutic window as indicated by the international normalized ratio (INR). However, because of its interaction with other medications and foods, its clinical and practical use has been challenged (Garwood et al. 2008). Warfarin therapy is also challenging because the doses of Warfarin given to patients vary significantly from person to person based on individual metabolism factors (Ansell et al. 2004). Moreover, there is no good way to predict the dose a patient needs. Several successive blood tests need to be completed to make sure that the patient takes the right amount. Indeed, Warfarin monitoring is a very labor-intensive process where pharmacists or pharmacist technicians spend a significant amount of time monitoring their patients. Staff working in anticoagulation clinics (ACCs) must manage various tasks: face-to-face (F2F) consultation with new patients, managing F2F and over the phone patient follow-ups, and other clinical and administrative tasks. Majority of ACCs in the VA Boston Healthcare System are currently staffed with clinical pharmacists (CPs). In the current practice, CPs are the only personnel performing the &Desta A. Hailemariam [email protected] 1 Systems Science and Industrial Engineering, Binghamton University, Binghamton, NY, USA 2 New England Veterans Engineering Resource Center, Jamaica Plain Veterans Affairs Medical Center, Boston, USA 3 Center for Healthcare Organization and Implementation Research, Edith Nourse Rogers Memorial Veterans Affairs Hospital, Bedford, MA, USA 4 Department of Medicine, Section of General Internal Medicine, Boston University School of Medicine, Boston, MA, USA 123 Journal of Industrial Engineering International (2019) 15:103–118 https://doi.org/10.1007/s40092-018-0267-5(0123456789().,-volV)(0123456789().,-volV)
tasks in the majority of the ACCs. Having only CPs in such clinics will force CPs to perform many tasks for which they are overqualified (Hysong et al. 2007). Recent practices suggest that clinical pharmacy technicians (CPTs) could complete some clinic tasks that do not require knowledge or skills of CPs (Desselle and Holmes (2017). This is important for several reasons. First, it was reported that hospital pharmacist achieve more job satisfaction when working to the top of their licensure (Ferguson et al. 2011; Cox and Fitzpatrick 1999; Liu and White 2011). Second, adequate staffing of ACCs with pharmacists and pharmacy technicians is identified as one the characteristics of highperforming ACCs (Rose et al. 2012). Third, ACCs operated by only CPs are much more expensive when compared to clinics which have both CPs and CPTs. Furthermore, studies have also reported that multitasking and interruption of clinicians by clerical and administrative tasks led to reduced performance and increased error rates (Bailey and Konstan 2006; Laxmisan et al. 2007; Westbrook et al. 2010). In light of these findings, it is imperative for ACCs to have the right mix of CPs and CPTs with appropriate work assignments. However, in the current practice, there is no systematic approach to determine the right staff mix for ACCs. The objective of this paper is to propose a framework to determine the right staff mix that increases the efficiency of care delivery at ACCs and improves the productivity of ACC staff. First, a conceptual framework for determining the required staff mix is developed. As part of the developed framework, functional job analysis (FJA) is applied to classify ACC care services into various categories of tasks. The task classification is used to determine the appropriate task assignment among CPs and CPTs. A time study is conducted to determine the standard time of each task at ACCs. Finally, the results of the FJA and time-study are used to develop a simulation model, in which several staffing scenarios are compared based on the staffing cost and staff utilization as performance measures. The remainder of the paper is organized as follows: ‘‘Literature review’’ Section provides a literature review. In ‘‘Methodology’’ section, the detailed methodology is presented. The fourth section provides the results and discussion. Finally, conclusions and future work are presented in fifth section. Literature review The advent of ACCs has improved the way that Warfarin and other anticoagulation drugs are managed and monitored. When compared to the routine medical care, Warfarin therapy managed by ACCs has shown improvements in quality of anticoagulation control and cost. Recent studies related to anticoagulation therapy have mainly focused on the implementations of pharmacist-managed anticoagulation clinics (Norton and Gibson 1996; Wellman et al. 2011; Singh et al. 2015). However, studies related to process improvements and staffing modeling for ACCs are limited. Studies conducted in relation to ACCs and staff mix are reviewed. A number of studies have been conducted in the Veterans Affairs anticoagulation clinics around the New England area. The studies mainly focus on the effect of other diseases on the quality of anticoagulation control, comparison of different patient groups (e.g., based on race) on the INR and therapeutic time in range (TTR), predictors of anticoagulation control, and the comparison of performance among ACCs. In particular, Razouki et al. (2014a,b) examine the prediction of adverse events by using the variability of INR and TTR. They conclude that the variability in INR, independent of TTR, can be used to predict Warfarin adverse effects. Rose et al. (2011) examine the relationship between anticoagulation control and follow-up intervals after obtaining an in-range INR. Although shorter intervals are generally associated with better anticoagulation control, some long intervals such as 28 days after obtaining the first or second in-range value and a longer interval after obtaining the third in-value range may be considered as appropriate. Therefore, frequent monitoring of patients in terms of INR is necessary. Efird et al. (2014) focus on identifying which patients with liver disease might safely receive Warfarin. They show that patients with liver disease have lower TTR and more hemorrhages. Rao et al. (2014) discuss racial disparity in the anticoagulation control. They report that the mean unadjusted TTR for black patients is 6.5% lower than that for white patients. However, the process of care measures has minimal additional effect on the racial disparity. Therefore, anticoagulation treatments need to be individualized, which calls for the consistent interactions between patients and their care providers. A number of other studies have focused on identifying the predictors associated with anticoagulation control. Razouki et al. (2014a b) investigate the predictors that lead to poor anticoagulation control. They find that alcohol abuse, taking more than 16 medications, and having four or more hospitalizations during the study were among the predictors associated with poor control. Rose et al. (2011) identify patient-level predictors of oral anticoagulation control in the outpatient setting. They identify hospitalizations, medications, alcohol abuse, cancer, bipolar disorder, female sex, dementia, non-alcohol substance abuse, and chronic liver disease as significant predictors of anticoagulation control. The study by Rose et al. (2012) compares the organization and management of top-per- forming ACCs with those of bottom-performing ones. The 104 Journal of Industrial Engineering International (2019) 15:103–118 123
result of their study identifies six factors, including adequacy of staffing (pharmacist) and effective use of (nonpharmacist) support personnel, as the characteristics of the top-performing ACCs. FJA is a standard method that analyzes tasks for a particular job (Best et al. 2007). In FJA, tasks are considered as building blocks of human resource management (Moore 1999). In this method, each task is described by a statement which specifies the worker performing the task, actions performed, the tools and instructions used, and the accomplished goal (Best et al. 2007). FJA was applied in the Veterans Health Administration (VHA) primary care centers in the United States to examine the task assignment overlaps among different occupational groups and identify opportunities for delivery system redesign (Hysong et al. 2007). The study reported 60–96% task overlaps among the different occupational groups working at VHA primary care centers. Time studies are mainly applied to determine the standard times and right staff mix. Several studies focus on determining the standard times for nursing activities and the best nursing ratios (Kuhn et al. 2016, Roddy et al. 1987; Myny et al. 2010). Kuhn et al. (2016) applied time study and a modified Delphi approach to determine the proportion of ACC tasks that can potentially be assigned to pharmacy technicians. In Roddy et al. (1987), work sampling and time studies are conducted to determine the amount of staff time at nursing homes required to perform specific functions for patients, such as assistance in bathing, and to determine the overall resource requirement of specific patient types. In Myny et al. (2010), time studies and observations at 48 wards in the Belgian acute hospital setting are performed to generate the standard times for nursing activities and to discover the proportion of nursing time (out of the total shift time) covered by nursing activities. Due to the differences between nursing activities and tasks performed at ACCs, the staffing models developed for nursing are not readily applicable to ACCs. Methodology Determination of right staff mix is a multi-stage process. A comprehensive framework is developed to be used as a guideline for determining staff mix as in Fig. 1. The framework combines FJA, time study, and simulation as the main approaches to identify the right staff mix. FJA is applied to categorize ACC care services into various categories of tasks and to determine the appropriate task assignment among the CPs and CPTs. The result of the time study is used to determine the standard time required to complete each task. The results of the FJA and time study are used as inputs to develop an Excel Visual Basic for Applications (VBA)-based tool staff mix calculator. The results of the FJA and time study are also used as inputs to compare different staffing scenarios using a simulation model, implemented in Simio simulation software, Version 7. The OptQuest tool in Simio is used to generate and compare various staffing scenarios using staffing cost and staff utilization as performance measures. Data collection A case study was conducted within the VA Boston Healthcare System. ACCs at five different locations (i.e., West Roxbury, Brocton, Manchester, Providence, and Causeway) were visited and observed for 15 days, between February 20, 2015 and June 12, 2015. The details are provided in ‘‘Appendix’’. During the clinic observations, the face-to-face (F2F) and telephone-based clinical care processes of more than 440 patients of different categories (i.e., new patients, follow-up patients, etc.) were observed and time studied. The details of the collected data are provided in Table 1. Besides, the interactions among the ACCs staff and communications with providers, nurses, and others staff outside ACCs were observed. Other input data to the Excel VBA model such as volume of patients, salary rate of CPs and CPTs, vacation and holiday allowances, and others were retrieved from the databases of VA Boston Healthcare System. Determination of full-time equivalents Once the standard times are estimated and the proportion of workload for the CPs and CPTs is determined, the next important step is to estimate the base FTEs of each staff category required to serve an ACC with a given annual volume of patients. The FTE calculation is following the step-by-step procedure introduced in Ozcan (2005) and shown in Table 2. According to this method, annual volume of patient visits, the proportion of each task, and the standard time for each task are used to determine the total direct hours per year which represents the total the staffs spend giving services to the patients. On top of the direct hours, it is assumed that each ACC staff spends 20% additional indirect hours. The indirect hours represent the time that ACC staff spends performing indirect tasks such as meetings, housekeeping, private time, additional communication with patients and their families, etc. The standard time determined from the time study is used to determine the direct hours. Finally, vacation, holiday, and sick leave allowances are added to the direct and indirect hours to determine the required FTEs. Journal of Industrial Engineering International (2019) 15:103–118 105 123
Results and discussion Applying FJA, ACCs job are classified as clinical, administrative, and staff-to-staff communications as shown in Fig. 2. Each task category is further divided into a list of tasks that can be assigned to either CPs or CPTs. For instance, the clinical tasks are further classified into incoming calls, outgoing calls, F2F meeting, and other clinical tasks such as calculating patient dose. The tasks are then prepared as task statements following the FJA methodology (Best et al. 2007; Moore 1999). The appropriate assignment of each task to either the CPs or CPTs is determined in two ways. First, from the clinic visits and observations, the tasks that are currently being performed by CPTs are deemed as appropriate for CPTs to perform them. Second, for those tasks whose appropriate assignments are not clear, the results of a meeting with subject-matter experts which is reported in Kuhn et al. (2016) were used. In the meeting, ACC coordinators from eight ACC sites were asked to rate whether it is appropriate for a given task to be performed by a CPT or not. They identified that CPTs can perform ACC tasks such as triaging incoming calls, providing in-range patient advices (both F2F and telephone) with the support of CPs, call no-show patients, order labs, and do other administrative tasks. The CPTs were classified based on their experience and training levels into regular CPTs and advanced practice CPTs (AP-CPTs). Regular CPTs are recent graduates with no experience in the ACC delivery care processes. On the other hand, AP-CPTs have experience and extra training in the ACC services. Based on this distinction, if a regular CPT is employed to work with the CP, the appropriate workload assignment is to assign 31% of the ACC workload to the CPT and the remaining 69% to the CP, as shown in Fig. 3a. On the other hand, an AP-CPT can perform around 59% of ACCs workload, as shown in Fig. 3b. Determination of standard times The standard time for each of the major tasks identified by the FJA is determined by following the steps presented in Ozcan (2005), which provides a method to estimate standard times, namely: determining the observed times, normal times, and standard times, respectively. The observed time is defined as the average of the recorded times obtained from the time study. The normal time is defined as the amount of time it takes an average or ‘‘normal’’ worker Fig. 1 Research framework for developing staffing models 106 Journal of Industrial Engineering International (2019) 15:103–118 123
to perform the job without interruption or delay. It is obtained by multiplying the observed time and the performance rating (PR) of the observed worker. PR would be greater than 1 if the observed worker is a faster-than-av- erage worker, and vice versa. Finally, the standard time is obtained by multiplying the normal time by an allowance factor (AF). AF accounts for the natural inefficiencies or variations in the performance of the worker. The summary of the standard time determination is provided in Table 3. After discussion with subject-matter experts, the values of PR and AF are set to 1.3 and 1.2, respectively. Table 1 Summary of observed task times Task Observed time (min) Staff assignment Average S.D. F2F follow-up, in-range patient 5.03 1.91 CPT F2F, new consult 32.20 23.60 CP F2F follow-up, out-of-range patient 7.92 3.70 CP Incoming calls, patient 3.02 7.10 CPT In-range, message 1.65 3.50 CPT In-range, reached 2.98 7.23 CPT Other outgoing calls 1.94 8.53 CPT Out-of-range, message 1.76 3.17 CP Out-of-range, reached 3.66 8.72 CP VNA 3.63 6.80 CPT NOAC patient 3.57 5.17 CP No-show 1.58 2.62 CPT Voicemail 4.62 10.12 CPT Entering note 5.45 2.45 CPT Lab order, in batch 12.05 5.79 CPT Accession report 1.47 1.04 CPT Administrative activities 4.36 3.39 CPT Calculate dose 4.51 0.59 CP Staff-to-staff 3.17 3.25 CP POC testing 8.59 4.32 CP Please refer to ‘‘Appendix’’ for more description of the tasks, VNA visiting nurse assistant, NOAC new oral anticoagulant, POC point-of-care, S.D. standard deviation Table 2 Steps for determining required FTEs (adopted from Ozcan 2005) Step Description Calculation steps 1 Identify the tasks that generate staff workload 2 Calculate the total direct hours per year, L D 3 Determine the indirect support hours as the percentage of the direct hours, w[e.g., 0.2 9(1)] (assume ACC staff spend 20% of their time doing indirect activities such as meetings, quality control, housekeeping, etc.), L I L I =w9L D 4 Subtotal variable hours required [(2) ?(3)], LL=L D ?L I 5 Set the department utilization target, l 6 Calculate the total target hours required per year (normalized) [(4) 7(5)], T y Ty¼L l 7 Calculate the target worked hours required per week [(6) 752 weeks/year], T w Tw¼ Ty 52 8 Determine the number of hours per FTE per week [7.5 h/day 95 day/week], H w H w = 37.5 9 Determine the target FTEs required per week [(7) 7(8)], FTE t FTEt¼Tw Hw 10 Find the vacation/holiday/sick FTE allowance [(9) 99.8%] (percentage varies by ACC), assume allowance factor of a, FTE v FTE v =a9FTE t 11 Determine the total required adjusted paid FTEs per week [(9) ?(10)], FTE FTE = FTE v ?FTE t Journal of Industrial Engineering International (2019) 15:103–118 107 123
Semi-automated FTE calculator A semi-automated FTE calculator (shown in Fig. 4)is developed to facilitate the FTE determination. In this tool, users can enter the annual number of scheduled patient visits, the different task categories and their proportions, and other parameters such as the target staff utilization level of the clinic and the holidays and leave allowances. The output of the semi-automated FTE calculator is the right FTEs for each type of staff that would be hired to operate an ACC. In Fig. 4, three types of outputs are shown based on the types of staff mix hired. For instance, a clinic with 17,933 annual patient visits would need around 4.33 CP FTEs and 2.62 AP-CPT FTEs. Fig. 2 ACC task breakdown (a) (b) 69% 31% Proportion of Task Assignment with CPT CP CPT 41% 59% Proportion of Task Assignment with AP-CPT CP AP-CPT Fig. 3 Workload assignment among ACC staff aaCP working with a CPT and baCP working with an AP-CPT 108 Journal of Industrial Engineering International (2019) 15:103–118 123
Simulation model The FTEs determined by the step-by-step procedure are used for developing a baseline staff mix model. Then, various staff mix scenarios were compared using a simulation model. The simulation model is built using Simio simulation software, Version 7. In building the simulation model, three types of task flow cases were considered. 1. With no task transfer The tasks that are originally assigned to CPTs cannot be transferred to CPs. This task flow is represented by Fig. 5. 2. With task transfer The tasks that are originally assigned to CPTs can be transferred to CPs when all the CPTs are busy. This task flow is designed to make maximum use of the time of the CPs. This is shown in Fig. 6. In this task flow, two types of queuing systems are considered: (a) Threshold-based transfer Tasks are transferred to CPs when the number of a tasks waiting in a queue for the CPTs exceeds a threshold. (b) Common-waiting queue Tasks wait in a single queue and will be handled by whichever staff is available first. System description and assumptions It is assumed that the simulated clinic is opened at 8:00 am and closed at 4:30 pm with the ACC staff taking a onehour break. Hence, the system is modeled as a terminating simulation where the systems start and end when the clinic is opened and closed, respectively. The sequential procedure presented in Kelton and Law (2007) was applied to determine the number of replications for the simulation model. The number of replications is determined in such a way that the average utilization levels for the CPs and CPTs have 95% confidence intervals. For a= 0.05 and r= 0.05, the number of replications was selected when the relative error reaches r/(1 ?r) = 0.0476 as summarized in Table 4. For the analysis, 20 replications were used and the simulation was run for 20 weeks. Input data modeling The input parameters for the simulation model include task times and annual patient volume. One of the important steps in developing and analyzing a simulation model is to use appropriate distributions for the input parameters. ExpertFit software, version 7.0 is used to choose the best Table 3 Summary of standard time determination steps Task Observed time, OT (min) Normal time, NT (PR = 1.3), OT 9PR (min) Standard time (AF = 1.2), NT 9AF (min) F2F follow-up, in-range patient 5.03 6.53 7.84 F2F, new consult 32.20 41.86 50.23 F2F follow-up, out-of-range patient 7.92 10.29 12.35 Incoming calls, patient 3.02 3.93 4.71 In-range, message 1.65 2.15 2.57 In-range, reached 2.98 3.87 4.65 Other outgoing calls 1.94 2.52 3.03 Out-of-range, message 1.76 2.29 2.75 Out-of-range, reached 3.66 4.76 5.71 VNA 3.63 4.71 5.66 NOAC patient 3.57 4.64 5.57 No shows 1.58 2.05 2.46 Voicemail 4.62 6.01 7.21 Entering note 5.45 7.08 8.50 Lab order, in batch 12.05 15.67 18.80 Accession report 1.47 1.91 2.29 Administrative activities 4.36 5.67 6.80 Calculate dose 4.51 5.86 7.03 Staff-to-staff 3.17 4.12 4.95 POC testing 8.59 11.16 13.4 Please refer to ‘‘Appendix’’ for more description of the tasks, VNA visiting nurse assistant, NOAC new oral anticoagulant, POC point-of-care Journal of Industrial Engineering International (2019) 15:103–118 109 123
fitted task-time distribution for each task. The summary of the fitted distributions for each task are and the result of Goodness of Fit Test given in Table 5. A 1-year patient volume data (from July, 2014 to June, 2015) was pulled from databases of VA Boston Healthcare System. For those tasks whose sample size is small, a triangular distribution is used. Majority of the patient visits occur in the morning. The arrival rate of patients is assumed to vary by hour of the day with more patient arrivals in the morning as shown in Table 6. Fig. 5 Model with no task transfer Fig. 4 Semi-automated FTE calculator 110 Journal of Industrial Engineering International (2019) 15:103–118 123
questions, provide new dose adjustment, ask for refill, reschedule next appointment, provide hand-written dose instructions, enter note on CPRS, notify pharmacist to co-sign, to: monitor/manage a Coumadin patient with POC testing. 17. Calculate patient’s dose Pull patient’s chart, review patient’s previous INR results, calculate new dose, prepare a dose plan, to provide patient with optimal dose plan. 18. Communicate with patient’s provider/nurse Call/receive a call from patient’s provider/nurse, discuss about the patient’s upcoming procedure, hospitalization, Warfarin bridging, medication reconciliation, or other patient’s concerns, to: consult with the provider/nurse about the patient. I. Administrative/miscellaneous tasks 19. Run lab accession report Open Vista, run lab accession list, view and sort incoming INRs, enter INRs into database, print and distribute to pharmacists to: see new INR results entered into the system. 20. Manage secure message Manage emails, send/receive secure message, and communicate via Lync, to: send and receive messages. 21. Enter outside patient INR result Obtain INR result from outside clinic, enter INR into CPRS using outside lab health factor, to: update the latest outside INR result of patients. 22. Place lab orders, in batch Pull patients’ chart one at a time, place lab order for all patients scheduled for the next clinic day, to: inform the laboratory unit with the list of patients coming for blood draw for the appointment day. 23. Print, fax, or mail letters Print off appointment letters, INR results, lab order labels, dose instructions, etc., fax/mail them to the patient, to provide a written information to the patient. 24. Track patients Track patients who frequently miss their visits, make arrangements for traveling veterans, etc., to: help patients continue with their Coumadin treatment. 25. Organize clinic database Maintain and update clinic database, manage and monitor TTR dashboard for quality assurance, to: have an organized database system. 26. Manage clinic inventory Check clinic supplies regularly, stock supplies when required, print educational materials, to maintain supplies needed for the clinic. References Ansell J, Hirsh J, Poller L et al (2004) The pharmacology and management of the Vitamin K antagonists: the seventh ACCP conference on antithrombotic and thrombolytic therapy. Chest 126(3):204–233 Bailey BP, Konstan JA (2006) On the need for attention-aware systems: measuring effects of interruption on task performance, error rate, and affective state. Comput Hum Behav 22(4):685–708 Best RG, Hysong SJ, Moore FI (2007) Task overlap among primary care team members: an opportunity for system redesign? J Healthc Manag 51(5):295–307 Cox ER, Fitzpatrick V (1999) Pharmacists’ job satisfaction and perceived utilization of skills. Am J Health Syst Pharm 56(17):1733–1737 Desselle SP, Holmes ER (2017) Results of the 2015 national certified pharmacy technician workforce survey. Am J Health Syst Pharm 74(17):1303–1304 Efird LM, Mishkin DS, Berlowitz DR et al (2014) Stratifying the risks of oral anticoagulation in patients with liver disease. Circ Cardiovasc Qual Outcomes 7(3):461–467 Ferguson J, Ashcroft D, Hassell K (2011) Qualitative insights into job satisfaction and dissatisfaction with management among community and hospital pharmacists. Res Social Adm Pharm. 7(3):306–316 Garwood CL, Dumo P, Baringhaus SN, Laban KM (2008) Quality of anticoagulation care in patients discharged from a pharmacistmanaged anticoagulation clinic after stabilization of warfarin therapy. Pharmacotherapy 28(1):20–26 Hysong SJ, Best RG, Moore FI (2007) Are we under-utilizing the talents of primary care personnel? A job analytic examination. Implement Sci 2(1):10 Kelton WD, Law AM (2007) Simulation modeling and analysis. McGraw Hill, Boston Kuhn H, Park A, Kim B, Lukesh W, Rose A (2016) Proportion of work appropriate for pharmacy technicians in anticoagulation clinics. Am J Health-Syst Pharm 73(5):322–327 Laxmisan A, Hakimzada F, Sayan OR et al (2007) The multitasking clinician: decision-making and cognitive demand during and after team handoffs in emergency care. Int J Med Inf 76(11):801–811 Liu CS, White L (2011) Key determinants of hospital pharmacy staff’s job satisfaction. Res Social Adm Pharm 7(1):51–63 Moore RI (1999) Functional job analysis: guidelines for task analysis and job design. Prepared for the World Health Organization. http://www.who.int/hrh/tools/job_anaiysis.pdf. Accessed 16 May 2015 Myny D, Van Goubergen D, Lime `re V et al (2010) Determination of standard times of nursing activities based on a nursing minimum dataset. J Adv Nur 66(1):92–102 Journal of Industrial Engineering International (2019) 15:103–118 117 123
Norton JL, Gibson DL (1996) Establishing an outpatient anticoagulation clinic in a community hospital. Am J Health-Syst Pharm 53(10):1151–1157 Ozcan YA (2005) Quantitative methods in health care management: techniques and applications, vol 4. Wiley, San Francisco Rao SR, Reisman JI, Kressin NR et al (2014) Explaining racial disparities in anticoagulation control results from a study of patients at the Veterans Administration. Am J Med Qual 30:214–222 Razouki Z, Ozonoff A, Zhao S, Jasuja GK, Rose AJ (2014a) Improving quality measurement for anticoagulation adding international normalized ratio variability to percent time in therapeutic range. Circ Cardiovasc Qual Outcomes 7(5):664–669 Razouki Z, Ozonoff A, Zhao S, Rose AJ (2014b) Pathways to poor anticoagulation control. J Thromb Haemost 12(5):628–634 Roddy PC, Liu K, Meiners MR (1987) Resource requirements of nursing home patients based on time and motion studies. US Department of Health and Human Services Publication No. 87-3708 Rose AJ, Ozonoff A, Berlowitz DR et al (2011) Reexamining the recommended follow-up interval after obtaining an in-range international normalized ratio value follow-up interval for patients with good control results from the Veterans Affairs study to improve anticoagulation. Chest 140(2):359–365 Rose AJ, Petrakis BA, Callahan P et al (2012) Organizational characteristics of high-and low-performing anticoagulation clinics in the Veterans Health Administration. Health Serv Res 47(4):1541–1560 Sargent RG (2005) Verification and validation of simulation models. In Proceedings of the 37th conference on winter simulation conference, Orlando, FL, 4–5 December 2005 Singh LG, Accursi M, Black KK (2015) Implementation and outcomes of a pharmacist-managed clinical video telehealth anticoagulation clinic. Am J Health-Syst Pharm 72(1):70–73 Wellman JC, Kraus PS, Burton BL et al (2011) Development and implementation of a pharmacist-managed inpatient anticoagulation monitoring program. Am J Health-Syst Pharm 68(10):934–939 Westbrook J, Woods A, Rob M et al (2010) Association of interruptions with an increased risk and severity of medication administration errors. Arch Intern Med 170(8):683–690 118 Journal of Industrial Engineering International (2019) 15:103–118 123