Selomo, Madira R.; Govender, Krishna K. Article Procurement and supply chain management in government institutions: A case study of select departments in the Limpopo Province, South Africa Dutch Journal of Finance and Management Provided in Cooperation with: Veritas Publications, London Suggested Citation: Selomo, Madira R.; Govender, Krishna K. (2016) : Procurement and supply chain management in government institutions: A case study of select departments in the Limpopo Province, South Africa, Dutch Journal of Finance and Management, ISSN 2542-4750, Lectito Journals, The Hague, Vol. 1, Iss. 1, pp. 1-10, https://doi.org/10.20897/lectito.201637 This Version is available at: https://hdl.handle.net/10419/308658 Standard-Nutzungsbedingungen: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Zwecken und zum Privatgebrauch gespeichert und kopiert werden. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich machen, vertreiben oder anderweitig nutzen. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, gelten abweichend von diesen Nutzungsbedingungen die in der dort genannten Lizenz gewährten Nutzungsrechte. Terms of use: Documents in EconStor may be saved and copied for your personal and scholarly purposes. You are not to copy documents for public or commercial purposes, to exhibit the documents publicly, to make them publicly available on the internet, or to distribute or otherwise use the documents in public. If the documents have been made available under an Open Content Licence (especially Creative Commons Licences), you may exercise further usage rights as specified in the indicated licence. https://creativecommons.org/licenses/by/4.0/
*Correspondence to: [email protected] Dutch Journal of Finance and Management, 1:1 (2016), 37 ISSN: 2468-211X Procurement and Supply Chain Management in Government Institutions: A Case Study of Select Departments in the Limpopo Province, South Africa Madira R Selomo1, Krishna K Govender2*, Regenesys Business School1, University of KwaZulu-Natal2, SOUTH AFRICA ABSTRACT INTRODUCTION Procurement reforms in the South African (SA) government started in 1995 and were directed at two broad focus areas, namely, the promotion of the principles of good governance and the introduction of a preference system to address certain socio-economic objectives. The procurement reform processes were supported by the introduction of a number of legislative measures, including the adoption of the Public Financial Management Act (PFMA) and the Preferential Procurement Policy Framework Act (PPPFA) (National Treasury, 2003). The PPPFA was endorsed as a result of Section 217 of the Constitution of the Republic of South Africa which (Republic of South Africa 1996) stipulated the need to implement a procurement policy that will provide preference in the allocation of contracts, and prevent unfair discrimination. PPPFA requires that when government assesses contracts, it must take into consideration the preference point system which prescribes functionality, price, and the Reconstruction Development Programme (RDP) goals. The PPPFA was amended by the Department of Trade and Industry (DTI) and the National Treasury, after the approved B-BBEE Codes of Good Practice in 2006, to advance the objectives of the Broad-Based Black Economic Empowerment Act (B-BBEE Act) and its strategy, as these two legislations were not aligned. The alignment led to the amendment of the Preferential Procurement Regulations (PPR) which was effected in 2011 (National Treasury 2011). The current state of the South African (SA) government’s Supply Chain Management (SCM) is fraught with malpractices which include lack of good governance, fair, equitable, transparent, competitive and cost-effective procurement process. In light of the aforementioned, this paper reports on a study which examined SCM performance, more specifically, procurement management in select provincial government departments in SA. The aim of this exploratory study on which this paper is written, is to determine how procurement planning, execution, control, and monitoring affect SCM performance. Data was collected using self-administered questionnaires which were personally distributed and collected by the primary researcher, from four Limpopo Provincial government departments which were purposively selected. The Statistical Package for Social Sciences (SPSS) was used to analyse the data. Generally, SCM performance in the various surveyed government departments is effective, although it became evident that the departments experience obstacles during the implementation of SCM processes and procedures. Furthermore, procurement planning is inadequate and needs improvement when the departments procure goods, services or works. Procurement execution was also found wanting, especially with regards to procurement governance. The results of this study may assist the participating departments to align their SCM and procurement practices to prescribed legislation in order to increase SCM performance, as well as achieve the objectives of good governance in terms of the Green Paper on Public Sector Procurement Reform in South Africa. Keywords ------------------------------ procurement, public procurement, supply chain management, governance, ------------------------------------- Received: 21 April 2016 Accepted: 28 May 2016 Published Online:08 August 16 ------------------------------------- DOI: 10.20897/lectito.201637 Copyright © 2016 by Author/s and Licensed by Lectito BV, Netherlands. This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Dutch Journal of Finance and Management, 1:1 (2016), 37 © 2016 Selomo & Govender 2 The Constitution of the Republic of South African (108 of 1996 Section 217) states that when an organ of state of the national, provincial and local spheres of government procures goods or services, it must do so in accordance with a system which is fair, equitable, transparent, competitive and cost-effective. However, the practice prior to 2004 was far from the ideal in a sense that procurement and provisioning activities were ruledriven, and value for money was almost always equated to the lowest price tendered; procurement and provisioning activities were not linked to budgetary planning; the bid documentation was not uniform, causing uncertainty to bidders and practitioners; and the Preferential Procurement Policy Framework Act, No 5 of 2000 and its associated regulations were complex and difficult to implement (National Treasury, 2004: 2). The aforementioned led to the approved adoption of a policy strategy to guide uniformity in the Procurement Reform Process in the government by the South African National Cabinet in September 2003. This was done to replace the outdated procurement and provisioning practices across government institutions with Supply Chain Management (SCM) functions that integrate financial management in procurement processes and conform to international best practices (National Treasury, 2004;5;6;11). The SCM which was implemented in 2004, is a tool that government initiated to manage the procurement process to ensure best practices. In order to achieve effective procurement practices, compliance audit is one of the control measures used to establish and prove adherence to legislation, regulations and policies. Cosserat (2004: 21) states that “a compliance audit involves obtaining and evaluating evidence to determine whether certain operational activities of an entity conform to specified conditions, rules and regulations.” According to the Monitoring and Evaluation (M&E) framework, organizations are required to establish policies and procedures that provide reasonable assurance that their quality controls are relevant, adequate and comply with best practice. The process includes both ongoing consideration and evaluation of the elements of the quality control system (Cosserat, 2004: 27). The problem is that since the introduction and implementation of SCM, the SA Auditor General’s (AGSA) reports for 2012 and 2014 on procurement and contract management indicated that there are many malpractices (Auditor- General South Africa 2014). In light of the above, this research focuses on the SCM model with specific reference to supply chain performance within the context of SCM. More specifically, the following objectives guided the research on which this paper is developed, namely, to determine how procurement planning, execution, control and monitoring affects SCM performance in Limpopo Provincial Government Departments; ascertain how effective SCM is in the Limpopo Provincial Government Departments; and establish how institutional factors affects SCM performance. The research was guided by the following hypothesis: SCM performance in Limpopo Provincial Government Departments is not effective. RESEARCH METHODOLOGY The research used a quantitative design to record and investigate aspects of social reality (Bless et al., 2006: 184). Purposive sampling, a non-probability sampling method was considered appropriate for this research. The sample (Table 1) comprised forty-three (43) SCM employees from four (04) governments departments in the Limpopo province in South Africa. The employees included managers, deputy managers and administrative officers. The participants were chosen based on their involvement in the supply chain and accessibility. Table 1: Population Composition No Location Target Population Percentage 1 Limpopo Provincial Treasury (departmental and transversal department) 11 25.6% 2 Department of Roads and Transport 11 25.6% 3 Department of Sports, Art and Culture 11 25.6% 4 Office of the Premier 10 23.3% Total 43 100%
Dutch Journal of Finance and Management, 1:1 (2016), 37 3 © 2016 Selomo & Govender A self-developed questionnaire comprising Likert-type scales and multiple choice questions was used to gather the data, which was analysed using the Statistical Package for Social Sciences (SPSS) Version 22. The Cronbach’s alpha coefficient of 0.956 indicated that the research instrument was fairly reliable. FINDINGS The majority (58.1%) of respondents were female aged 40 years and above, 51% were graduates, followed by 37.2% diplomates, and 9.3% with only a matric or grade 12 education. The majority (58%) of respondents also represented junior management, followed by operational staff and middle management. The majority of respondents have 10 and more years of work experience, and most participants (37.2%) were from acquisition management, followed by demand management (32.6%); 14% from demand and acquisition; 4.7%, from SCM compliance; 7% in contract management, with a minority (2.3%) from inventory and logistics. PROCUREMENT PLANNING, EXECUTION, MONITORING AND CONTROLLING OF SCM With respect to procurement planning, it became evident that the majority of respondents (53%) are positive that planning is adequate, while the remaining (47%) say that planning is inadequate; however, with regard to procurement execution, an almost equal number of respondents (51%) state that it is inadequate. The majority (65%) of respondents are positive that monitoring is adequate, while the remaining 35% says monitoring is not adequate. Moreover, the majority of respondents (56%) are positive that controlling is adequate. The findings with respect to each specific question pertaining to procurement planning, execution, monitoring and controlling are captured in Tables 2-5. With respect to procurement planning, it was evident that only 53% of the respondents fully understand and agree that planning is the deciding point of the need to procure in terms of what, how, where, when and at what cost (Table 2). Furthermore, planning is not being adequately done when procuring goods, services and works, since over 30% of the respondents indicated that they do not undertake market research, and specifications are not analysed and recommended by the Bid Specification Committee. Moreover, 51% of respondents state that procurement of goods, services or works is not carried out effectively. This shows that SCM procedures are not adhered to when procuring goods, services or works as driven by rules. Over 40% do not publish the list of bidders on the departmental website; 16% of the quotations above R30 000 are not evaluated by Bid Evaluation Committee; 29% do not publish the awarded bidder on the Government Tender Bulletin; and 52% do not evaluate suppliers’ capability before capturing them in the departmental suppliers’ database. The above practices reflect poor governance or lack of implementation of governance principles with regard to procurement by the select government departments. Table 2: Procurement Planning No. Statement Strongly disagree Disagree Neutral Agree Strongly agree Mean Std. deviation N 8 The department’s procurement process starts with planning. 4.7% 2.3 2.3 48.8 41.9 4.21 .965 43 9 The department procures goods, services and works according to approved procurement plan as submitted to the Provincial Treasury. 2.3% 0.0 9.3 41. 46.5 4.30 .832 43 10 The department obtains budget approval for the required goods, services or works before procuring. 2.3% 4.7 4.7 25.6 62.8 4.42 .957 43 11 The department’s need is clearly identified and defined by the requesting division. 2.3% 2.3 9.3 41.9 44.2 4.23 .895 43
Dutch Journal of Finance and Management, 1:1 (2016), 37 © 2016 Selomo & Govender 4 12 The department undertakes market capability analysis to determine the procurement method. 2.3% 2. 25. 6 39.5 30.2 3.93 .936 43 13 The specification for procurement of goods, services or works are analysed and approved by the appointed Departmental Bid Specification Committee. 4.7% 0.0 11. 6 41.9 41.9 % 4.16 .974 43 Mean 4.21 The findings (Table 4) also reveal that 65% of the respondents ‘agree’ that monitoring is conducted effectively; however, over 20% of respondents do not monitor suppliers’ performance; 32 % do not receive goods, services or works on time; and 46% say that SCM does not increase the department’s just-in-time service delivery. Moreover, 56% of respondents ‘agree’ that controlling (Table 5) measures are implemented. Over 40% of the respondents indicated that they do not use electronic suppliers’ database; do not have approved turn-around times; are not trained adequately; do not have procurement risk management policy; and do not have segregation of duties and SCM compliance units. However, 65% of the respondents ‘agree’ that SCM performance in various Limpopo Provincial Government Departments is effective and efficient. Table 3: Procurement Execution No. Statement Strongly disagree Disagree Neutral Agree Strongly agree Mean Std. deviation N 14 The department’s bidding documents are prepared according to the current regulations; specifications are accurately defined and neutral with clear evaluation criteria. 2.3% 0.0 11.6 32.6 53.5 4.35 .870 43 15 The department use appropriate procurement methods and award the contract according to procurement law and regulations. 2.3% 0. 4.7 37.2 55.8 4.44 .796 43 16 The department procures goods, services or works according to approved thresholds without splitting orders to avoid bid threshold. 4.7% 0.0 23.3 34.9 37.2 4.00 1.024 43 17 The department receives a minimum of three quotations for procurement transactions equal and less than R500 000.00 4.7% 0.0 2.3 30.2 62.8 4.47 .935 43 18 The department acquires approval from the Accounting Officer for any deviations from the procurement processes and those deviations are recorded in the deviation register and reported to Provincial Treasury and Auditor General within 10 working days. 2.3% 0.0 14.0 37.2 46.5 4.26 .875 43 19 The department publishes advertisement of bids in the departmental website, Government 2.3% 2.3 14.0 32. 48.8 4.23 .947 43
Dutch Journal of Finance and Management, 1:1 (2016), 37 5 © 2016 Selomo & Govender Tender Bulletin and any other media for a minimum period of 21 days. 20 The department close and open bids on the date stipulated on the bid document as well as other means where the bid was published with the dispatch list acknowledged and signed by the opening committee. 2.3% 2.3 7.0 34.9 53.5 4.35 .897 43 21 The department publishes the list of bidders after closing date in the departmental website. 4.7% 11. 6 23.3 30.2 30.2 3.70 1.166 43 22 The evaluation of bids and quotations above R30 000.00(evaluation of administrative documents, technical evaluation and comparison of price) is done by the appointed Bid Evaluation Committee following criteria set in the bidding document without any amendment. 4.7% 2.3 9.3 39.5 44.2 4.16 1.022 43 23 The appointed Bid Adjudication Committee considers evaluation report the bids and quotations above R30 000.00 then determines the award contract. 2.3% 7.0 7.0 37.2 46.5 4.19 1.006 43 24 The department conducts verification on PERSAL, SARS, National Treasury’s list of Restricted Suppliers and register of Tender Defaulters for the recommended bidders prior awarding the contract. 2.3% 0.0 2.3 32.6 62.8 4.53 .767 43 25 The department awards publish the names of the warded bidder in the Government Tender Bulletin and other media by means which the bid was advertised. 4.7% 4.7 20.9 30.2 39.5 3.95 1.112 43 26 The awarded bidder receives purchasing order and signs the contract before delivering of goods or providing services or works. 2.3% 0.0 11.6 32.6 53.5 4.35 .870 43 27 The department evaluates and approves suppliers’ capability before capturing in the departmental suppliers’ database. 7.0% 7.0 37.2 27.9 20.9 3.49 1.121 43 28 The department create a greater level of trust among the supply chain practitioners 2.3% 2.3 16.3 53.5 25.6 3.98 .859 43 29 The department has improved integrated activities across the SCM. 2.3% 2.3 37.2 41.9 16.3 3.67 .865 43 Mean 4.08
Dutch Journal of Finance and Management, 1:1 (2016), 37 © 2016 Selomo & Govender 6 Table 4: Procurement Monitoring No. Statement Strongly disagree Disagree Neutral Agree Strongly agree Mean Std. deviation N 30 SCM increases the department’s Justin-Time capabilities. 4.7% 0.0 41.9 34.9 18.6 3.63 .952 43 31 The department improved on-time delivery of goods, services or works from the appointed company. 2.3% 2.3 27.9 51.2 16.3 3.77 .841 43 32 The department monitors suppliers’ performance as per agreed terms and conditions. 4.7% 0.0 25.6 51.2 18.6 3.79 .914 43 33 The SCM division communicates with end-user of the good, services or works to get feedback on the quality of goods supplied or services rendered or works performed. 4.7% 2.3 20.9 55.8 16.3 3.77 .922 43 34 The department has updated procurement report and submitted to Provincial Treasury as required. 4.7% 0.0 11.6 39.5 53.5 4.19 .982 43 35 The department has updated progress report of all procurement transactions 2.3% 2.3 18.6 46.5 30.2 4.00 .900 43 Total mean 3.93 Table 5: Procurement Controlling No. Statement Strongly disagree Disagree Neutral Agree Strongly agree Mean Std. deviation N 36 The department uses quotation or tender box for all procurement of good, services or works above the value of R30 000.00. 2.3 % 0.0 4.7 39.5 53.5 4.42 .794 43 37 The department uses an electronic system for suppliers’ database. 11.6% 11.6 14.0 27.9 34.9 3.63 1.381 43 38 The department has approved turn-around times and project plan for procurement of goods, services or works. 0.0% 4.7 37.2 44.2 14.0 3.67 .778 43 39 The department has approved financial delegations. 2.3% 0.0 9.3% 41.9 46.5 4.30 .832 43 40 The department segregates procurement duties. 4.7% 2.3 16.3 41.9 34.9 4.00 1.024 43
Dutch Journal of Finance and Management, 1:1 (2016), 37 7 © 2016 Selomo & Govender 41 The department has clear and safe record keeping for all procurement transactions. 2.3% 0.0 20.9 46.5 30.2 4.02 .859 43 42 The department trains all staff involved in procurement activities to identify procurement fraud and risks as well as any SCM related. 2.3% 4.7 32.6 32.6 27.9 3.79 .989 43 43 The department communicates new development in SCM Instruction, laws and regulations to all staff involved in procurement activities. 2.3% 2.3 23.3 34.9 37.2 4.02 .963 43 44 The department has an approved procurement procedure manual. 4.7% 2.3 30.2 34.9 27.9 3.79 1.036 43 45 The department has an approved SCM policy. 4.7% 2.3 14.0 41.9 37.2 4.05 1.022 43 46 The department has an approved Procurement Risk Management Policy. 4.7% 2.3 37.2 37.2 18.6 3.63 .976 43 47 The department has efficient and forceful demand and acquisition structures to support SCM activities. 4.7% 9.3 20.9 32.6 32.6 3.79 1.146 43 48 The department has an effective compliance office that monitors SCM performance and compliant to enhance success. 7.0% 7.0 25.6 41.9 18.6 3.58 1.096 43 49 SCM practitioner has signed a code of conduct for SCM practitioner. 2.3% 2.3 4.7 41.9 48.8 4.33 .865 43 Mean 3.93 Table 6 reflects the factors impacting SCM in the various government departments surveyed. The major factors highlighted which obstruct the effectiveness of SCM are late submission of requests to procure by end-users; nonresponsive by suppliers on request to quote; and lack of suitable suppliers on departmental suppliers database. Table 6: Factors Impacting SCM No. Statement Strongly disagree Disagree Neutral Agree Strongly agree Mean Std. deviation N 50 Lack of a refined information system for information sharing among supply chain practitioners. 4.7 % 11. 32. 41. 9.3 3.40 .979 43 51 Lack of trust and cooperation among supply chain practitioners. 11.6% 14.0 39.5 20.9 14.0 3.12 1.179 43 52 Last minutes submission of request to procure by end-user. 4.7% 4.7 14.0 39.5 37.2 4.00 1.069 43
Dutch Journal of Finance and Management, 1:1 (2016), 37 © 2016 Selomo & Govender 8 53 Suppliers’ geographical distance from the department’s facilities. 7.0% 9.3 32.6 32.6 18.6 3.47 1.120 43 54 Non-responsive on the request to quote by invited suppliers. 7.0 % 0.0 30.2 34.9 27.9 3.77 1.088 43 55 Lack of suitable suppliers on the departmental suppliers’ database. 11.6% 7.0 23.3 34.9 23.3 3.51 1.261 43 Mean 3.54 Table 7 provides the R, R², adjusted R², and the standard error of the estimate used to determine how well a regression fits the data. The R column represents the value of R, the multiple correlation coefficient, which is considered a measure of the quality of the prediction of the dependent variable which in this case is SCM performance. The value of 0.494 indicates the level of prediction. The R² value (0.244) which is the coefficient of determination indicates that independent variables explain 24.4% of the variability of dependent variable; which implies that 75.6% of variations is explained by other factors not reflected in this model. Table 7 Model Summary Model R R Square Adjusted R Square Std. Error of the Estimate 1 .494a .244 .165 4.320 a. Predictors: planning, execution, monitoring, controlling Table 8 shows that the independent variables (planning, execution; monitoring and eventually) statistically predict the dependent variable (SCM performance), F (4, 38) = 3.069 and p<0.05 = 0.028. Table 8: ANOVA Results Model Sum of Squares Df Mean Square F Sig. 1 Regression Residual Total 229.092 4 57.273 3.069 .028b 709.095 38 18.660 938.186 42 a. Dependent variable: SCM performance b. Predictors: (constant), planning, execution, monitoring, controlling c. The general form to predict SCM performance from planning, execution, monitoring and controlling is: d. Predicted gcontrollinmonitoringExecutionplanninganceSCMperform XXXXY 43210 e. Predicted gcontrollinmonitoringExecutionplanninganceSCMperform XXXXY 036.0182.0116.0315.0658.5 Table 9: Coefficientsa Model Unstandardized Coefficients Standardized Coefficients t Sig. B Std. Error Beta 1 (Constants) Planning Execution Monitoring 5.658 4.787 1.182 .245 .315 .219 .281 1.441 .158 .116 .109 .280 1.061 .296 -.182 .405 -.120 -.448 .656