Backup alternatives for 110 kV lines

Houdek, Vít

Abstract

The paper describes backup alternatives for 110 kV lines. Line backup is one of input parameters used to optimise the renovation of 110 kV lines. The optimisation is based on the principle of reliability centred maintenance (RCM) which depends on the technical condition and importance of a particular element. The paper starts with illustrating the method of reliability schemes. This method enables the evaluation of failure-free operation probability. The probability of a failure-free operation can be estimated for all backup types of 110 kV lines existing in the distribution network. To compare different backup alternatives, type lines were selected and calculated with. The results of the method helped estimate the effects of a line failure for a particular distribution district.

Full text

POWER ENGINEERING AND ELECTRICAL ENGINEERING VOLUME: 11 |NUMBER: 3 |2013 |JUNE Backup Al e na i es o 110 kV Lines Vi HOUDEK1, S anisla RUSEK1, Radomi GONO1 1Depa men o Elec ical Powe Enginee ing, Facul y o Elec ical Enginee ing and Compu e Science, VSB–Technical Uni e si y o Os a a, 17. lis opadu 15, 708 33 Os a a-Po uba, Czech Republic i .houdek@cen um.cz, [email p o ec ed], [email p o ec ed] Abs ac . The pape desc ibes backup al e na i es o 110 kV lines. Line backup is one o inpu pa ame- e s used o op imise he eno a ion o 110 kV lines. The op imisa ion is based on he p inciple o eliabil- i y cen ed main enance (RCM) which depends on he echnical condi ion and impo ance o a pa icula ele- men . The pape s a s wi h illus a ing he me hod o eliabili y schemes. This me hod enables he e alua ion o ailu e- ee ope a ion p obabili y. The p obabili y o a ailu e- ee ope a ion can be es ima ed o all backup ypes o 110 kV lines exis ing in he dis ibu ion ne - wo k. To compa e di e en backup al e na i es, ype lines we e selec ed and calcula ed wi h. The esul s o he me hod helped es ima e he e ec s o a line ailu e o a pa icula dis ibu ion dis ic . Keywo ds Backup, e ec o ailu e, main enance, RCM, eliabili y. 1. In oduc ion Fo a oday’s consume , a eliable and ailu e- ee op- e a ion o elec ici y ne wo k is a i al and na u al hing. Howe e , o a dis ibu ing company espon- sible o he sa e y and eliabili y o ne wo k, mee ing his need is a complica ed ask liable o he “Regula- ions o dis ibu ion ne wo k ope a ion“. I he powe supply is in e up ed, he dis ibu ion company loses p o i on dis ibu ion and powe supply. Mo eo e , he dis ibu o can be ined o he ene gy unsupplied o consume s. To main ain he eliabili y and sa e y o ope a ion, a dis ibu ion ne wo k mus be egula ly se iced as pe he “Schedule o p e en i e main enance“ [1]. To op imise main enance, eliabili y cen e ed main enance (RCM) seems o be he mos app op ia e ool [2]. I is based on he echnical condi ion and impo ance o he equipmen . The e a e wo inpu pa ame e s which help assess he impo ance o a line. Fi s ly, his pape ou lines he back-up al e na i es o a ailed line. An- o he inpu pa ame e is ansmi ed ene gy [3]. Also, we p esen an e alua ion o one dis ibu ion dis ic . 2. Impo ance o Line The possibili y o a line backup in o ms bes on he impo ance o a line [4]. Howe e , impo ance o a 110 kV line can be also de e mined by i s losses, load o ca ying capaci y. Backup al e na i es o a ailed line mus be speci ied - powe can be supplied by ano he 110 kV line o an MV line. Howe e , some 110 kV lines ha e no backup. I a line ails, localiza ion o a ailu e and manipula ions o deal wi h ailu e, ei he manual o emo e, mus be ca ied ou . In e ms o eliabili y, du a ion o manipula ion is essen ial. 2.1. Reliabili y Scheme Me hod To e alua e backup, we use p obabili y o ailu e- ee ope a ion Rcalcula ed in he ollowing equa ion [5]: R= 1 − λτ 8760.(1) To calcula e he p obabili y o a ailu e- ee ope a- ion, ailu e a e λ(yea −1) and mean ailu e ime τ (hou ) mus be de e mined. The calcula ion is un as pe CEZ 22/80, bu he main enance down imes a e neglec ed. The me hod di e si ies h ee basic ypes o connec ing wo elemen s: •se ies connec ion o elemen s, •pa allel connec ion o elemen s – ho ese e, •pa allel connec ion o elemen s – cold ese e. 1) Se ies Connec ion o Elemen s In se ies connec ion o elemen s ailu e o one elemen causes a ailu e o he whole sys em, e.g. ans o me c 2013 ADVANCES IN ELECTRICAL AND ELECTRONIC ENGINEERING 169 POWER ENGINEERING AND ELECTRICAL ENGINEERING VOLUME: 11 |NUMBER: 3 |2013 |JUNE and line connec ion: λ=λ1+λ2,(2) τ=λ1τ1+λ2τ2 λ.(3) Fig. 1: Se ial connec ion o elemen s. 2) Pa allel Connec ion o Elemen s – Ho Rese e Ho ese e is a pa allel connec ion wi hou he use o manipula ion. I one elemen ails, ano he elemen akes o e i s unc ion, e.g. wo pa allel ans o me s. To al ailu e a e and mean ailu e ime a e de e mined as ollows: λ=1 8760 (λ1λ2(τ1+τ2)) ,(4) τ=λ1λ2τ1τ2 8760λ.(5) Fig. 2: Pa allel connec ion o elemen s – ho ese e. 3) Pa allel Connec ion o Elemen s – Cold Rese e Cold ese e is a connec ion iden ical wi h he ho e- se e. The connec ion is pa allel and wi h manipula- ion, so manipula ion ime mus be included in he calcula ion. Schema ically, he connec ion is se ial- pa allel. Howe e , in case o a ailu e, he ese e ele- men does no swi ch on immedia ely bu wi h a delay. The ailu e a e o manipula ion co esponds wi h he ailu e a e o he i s elemen . The manipula- ion akes place i he i s elemen ails. Cold ese e equa ions a e a combina ion o ela ions o pa allel ho ese e and se ies combina ion. Fig. 3: Pa allel connec ion o elemen s – cold ese e. 2.2. P obabili y o Failu e-F ee Ope - a ion Inpu pa ame e s o he calcula ion i sel [6], ailu e a e and mean ailu e ime, ha e been upda ed in a long- e m moni o ing o ailu es. The upda ed alues a e in he ollowing Tab. 1 [7]: Tab. 1: Inpu pa ame e s. λ(yea −1)τ(hou ) HV line 100 km 0,282 3,155 MV line 100 km 3,623 18,759 HV/MV ans o me 0,048 74,892 Fi e di e en ypes o connec ions we e used. As we sol e HV lines, he e a e se e al condi ions we mus deal wi h: •no backup, •backup by HV line o he same leng h, •backup by HV line o 1,5 mul iple o i s leng h, •backup by MV line o he same leng h, •backup by MV line o 1,5 mul iple o i s leng h. E e y backup has wo al e na i es – one wi hou ma- nipula ion (ho ese e), he o he wi h manipula ion (cold ese e). Manipula ion imes a e 7 minu es o HV backup lines and 20 minu es o MV backup lines. HV lines o a ype we e calcula ed, he leng h o he o iginal line is 100 km. The backup line is ei he o he same leng h o o he 1,5 mul iple o i s leng h o bo h HV and MV. Al oge he , nine al e na i es we e calcula ed. The calcula ion is o he same leng h o longe , i.e. 150 km. 1) No Backup The scheme has one elemen . To calcula e he p ob- abili y o ailu e- ee ope a ion, pa ame e s o 110 kV line mus be subs i u ed in ela ion R= 0,999898434, 1. c 2013 ADVANCES IN ELECTRICAL AND ELECTRONIC ENGINEERING 170 POWER ENGINEERING AND ELECTRICAL ENGINEERING VOLUME: 11 |NUMBER: 3 |2013 |JUNE Fig. 4: No backup – powe and eliabili y scheme. 2) Backup by HV Line o he Same Leng h In his case, pa allel connec ion is a ailable. This al- e na i e can be wi h o wi hou manipula ion. Relia- bili y scheme is used o he calcula ion o p obabili y (Fig. 5). Fi s , pa allel combina ion is calcula ed and hen manipula ion is added o o al calcula ion, de- pending on he al e na i e: •no manipula ion: R= 0,999999989, •wi h manipula ion: R= 0,999996234. Fig. 5: Backup by HV line – powe and eliabili y scheme. 3) Backup by HV Line o 1,5 Mul iple o i s Leng h Schemes a e iden ical wi h he p e ious al e na i e (Fig. 5), backup line is longe : •no manipula ion: R= 0,999999985, •wi h manipula ion: R= 0,999996229. 4) Backup by MV Line o he Same Leng h In his connec ion (Fig. 6) he e a e wo ans o m- e s in he backup line in he se ial combina ion. This combina ion is sol ed i s , la e he pa allel line is cal- cula ed and inally he manipula ion depending on he al e na i e: •no manipula ion: R= 0,999999129, •wi h manipula ion: R= 0,999988398. Fig. 6: Backup by MV line - powe and eliabili y scheme. 5) Backup by MV Line o 1,5 Mul iple o i s Leng h The calcula ion is iden ical o he p e ious one (Fig. 6): •no manipula ion: R= 0,999998735, •wi h manipula ion: R= 0,999988004. 3. Backup Ranking Wi h he help o p obabili y o ailu e- ee ope a ion, all he al e na i es o backup we e anked (Tab. 2). The bes backup is p o ided by backup wi hou ma- nipula ion – ho ese e. The second is backup wi h manipula ion - cold ese e. The wo s op ion is a line wi h no backup. The anking illus a es heo e ical assump ions, howe e o he inal e alua ion o op- imisa ion accu a e da a on p obabili y o ailu e- ee ope a ion is needed. Fo me ela i e alues o backup al e na i es we e imp ecise and he e o e eplaced by new ones. The HV abb e ia ion in Tab. 2 means ha he backup is ia HV line, l1=l2means ha he leng hs o c 2013 ADVANCES IN ELECTRICAL AND ELECTRONIC ENGINEERING 171 POWER ENGINEERING AND ELECTRICAL ENGINEERING VOLUME: 11 |NUMBER: 3 |2013 |JUNE Tab. 2: Backup anking. Ranking Iden i ica ion Backup ype No manipula ion – ho ese e 1. HV l1=l2HV line o same leng h 2. HV l1< l2HV line o 1,5 mul iple o i s leng h 3. MV l1=l2MV line o same leng h 4. MV l1< l2MV line o 1,5 mul iple o i s leng h Wi hou manipula ion – cold ese e 5. HV l1=l2MAN HV line o same leng h 6. HV l1< l2MAN HV line o 1,5 mul iple o i s leng h 7. MV l1=l2MAN MV line o same leng h 8. MV l1< l2MAN MV line o 1,5 mul iple o i s leng h O he 9. No No backup he backed up line and he backup lines a e he same, l1< l2means ha he leng h o he backup line is 1,5 longe han ha o he backed up line. Backups us- ing MV lines a e ma ked MV. The MAN abb e ia ion means ha he backup is wi h manipula ion. Theo e - ical indings o anking o all backup al e na i es can be used o de e mine line impo ance o a pa icula ne wo k. P ima ily i can be used as a weigh c i e ion o he inal algo i hm. 4. E ec o Line Failu e To op imise eno a ion o 110 kV in, algo i hms on he basis o eliabili y cen e ed main enance mus be de e - mined. Backup al e na i es we e de e mined o e e y line in a dis ibu ion dis ic . The abo e men ioned me hod was used o do ha . The possibili y o backup was subs i u ed by he e ec o a line ailu e. This e - ec o ailu e ells us wha happens a e a line ails. In heo e ical analysis educed ansmi ed powe was neglec ed. Howe e , in a inal ield e alua ion his pa- ame e mus be aken in o accoun . Ano he eason o using he e ec o ailu e is ha i gi es a be e pic u e o he line backup. The e ec s o ailu e we e discussed and de e mined by he echnicians ope a ing in he dis ibu ion dis ic and hey co espond wi h he ield p ac ice. The e a e no exis ing lines wi hou a backup in he a ea. Al o- ge he , se en ypes o e ec s o ailu e exis : •1: ”No e ec ” – no manipula ion necessa y, •2: Back-up by 110 kV line o app ox. he same leng h, •3: Back-up by 110 kV line o app ox. he same leng h wi h limi ed powe , •4: Back-up by a longe 110 kV line, •5: Back-up by a longe 110 kV line - limi ed powe , •6: Back-up by MV line, •7: Back-up by MV line - limi ed powe . The e a e o al o 168 powe lines in one dis ibu ion ne wo k. The esul s o e alua ion a e shown in Tab. 3 and in ba g aph (Fig. 7). Ba g aph does no show he e ec numbe 7, because he alue is ze o. Fig. 7: E ec o line ailu e – ba g aph. The e alua ion shows ha app ox. 56 % o lines equi e no manipula ion. In ac , hese lines a e backed up by pa allel lines which a e pe manen ly connec ed. Theo e ically, we speak abou a ho ese e. The e a e 72 lines which equi e manipula ion a e a ailu e, and a e ha ull load can be ansmi ed. Only wo lines a e backed up by lines which ca y educed load. The e a e nine lines ha a e backed up by MV lines. Tab. 3: Inpu pa ame e s. E ec o Failu eCoun [-] Coun [%] 1 94 55,95 2 51 30,36 3 1 0,60 4 12 7,14 5 1 0,60 6 9 5,36 7 0 0,00 To al o : 168 c 2013 ADVANCES IN ELECTRICAL AND ELECTRONIC ENGINEERING 172 POWER ENGINEERING AND ELECTRICAL ENGINEERING VOLUME: 11 |NUMBER: 3 |2013 |JUNE Also, du ing manipula ion, lines can only ca y e- duced load and he e o e he du a ion o manipula ion is impo an . Backup ia HV line needs max. 20 min. manipula ion and backup ia lowe ol age lines may need as much as minu es manipula ion. 5. Conclusion Theo e ical assessmen o sequencing di e en backups will be used as a weigh c i e ion in he algo i hm o op imised eno a ion o 110 kV line. The line backup is exp essed by he e ec o a ailu e. The weigh will show how impo an a pa icula alue o a ailu e e ec is. In case o he bes backup al e na i e 1, his pa ame e is insigni ican . On he con a y, he alue is i al in case o backup al e na- i e 5. The echnical condi ion is assessed on he basis o he ailu e da abase. Impo ance o a line is de e - mined by ansmi ed ene gy and possibili y o backup. The pape ou lines backup al e na i es o 110 kV lines in one dis ibu ion a ea. This a ea was e alua ed in he p e ious sec ion. O e all, app oxima ely 56 % o lines ha e adequa e backup and he e o e equi e no manipula ion in he dis ibu ion ne wo k. On he con a y, lines wi h dec eased load backup a e ew. Acknowledgmen This wo k was suppo ed by he Czech Science Foun- da ion (No. 102/09/1842), by he G an o SGS VSB- Technical Uni e si y o Os a a (No. SP2013/137) and by he p ojec ENET (No. CZ.1.05/2.1.00/03.0069). Re e ences [1] SKOG, J. E. Main enance ask in e al de e mina- ion. In: 66 h Annual In e na ional Con e ence o Doble Clien s: P oceedings Main enance and Tes Enginee ing. Bos on: M. A., 1999, pp. 158–169. [2] MOUBRAY, J. Reliabili y-cen e ed main enance. 2. ed., [3. e .]. New Yo k: Indus ial P ess, 2000. ISBN 978-083-1131-463. [3] HOUDEK, P., V. KRAL, S. RUSEK and R. GONO. Reliabili y o 110 kV Lines. In: ELNET 2012. Os a a: VSB–Technical Uni e si y o Os- a a, 2012. pp. 1–6. ISBN 978-80-248-2926-5. [4] MARTINEK, Z. and V. KRALOVCOVA. The So- lu ion o Repai able Uni s. In: P oceedings o he 11 h In e na ional Scien i ic Con e ence Elec ic Powe Enginee ing 2010. B no: B no Uni e si y o Technology, 2010. pp. 593–597. ISBN 978-80- 214-4094-4. [5] CHOWDHURY, Ali A. and D. KOVAL. Powe dis ibu ion sys em eliabili y: p ac ical me hods and applica ions. 2. ed., [3. e .]. Hoboken: John Wiley, 2009. ISBN 978-0470292280. [6] BROWN, Richa d E. and D. KOVAL. Elec ic powe dis ibu ion eliabili y: p ac ical me hods and applica ions. 2. ed., [3. e .]. New Yo k: Ma - cel Dekke , 2002. ISBN 08-247-0798-2. [7] TUMA, J. and D. KOVAL. Spolehli os elek- oene ge ice: p ac ical me hods and applica ions. P ague: Czech Technical Uni e si y in P ague, 2006. ISBN 80-239-6483-6. Abou Au ho s Vi HOUDEK was bo n in Ch udim. In 2011 he g adua ed VSB–Technical Uni e si y o Os a a, Facul y o Elec ical Enginee ing and Compu e Science, elec ical powe enginee ing. Today he is Ph.D. s uden in he Depa men o Elec ical Powe Enginee ing, VSB–Technical Uni e si y o Os a a and he applies himsel o he issue o eliabili y o elec ical ne wo ks. S anisla RUSEK was bo n in Ha i o -Sucha. In 1981 he g adua ed VSB–Technical Uni e si y o Os a a, Facul y o Mechanical Enginee ing and Elec ical Enginee ing, powe enginee ing ield. He g adua ed scien i ic pos g adua e a Facul y o Elec i- cal Enginee ing and Compu e Science B no, elec ical machines and de ices, in 1989. Pos -g adua e educa- ion a Facul y o Science Palacky Uni e si y Olomouc in uni e si y educa ion g adua ed in 1991. He was habili a ed a he Facul y o Elec ical Enginee ing and Compu e Science, VSB–Technical Uni e si y o Os a a in 1991. He is p o esso om 2001. Radomi GONO was bo n in Bilo ec. In 1995 he g adua ed om VSB–Technical Uni e si y o Os- a a, Facul y o Elec ical Enginee ing and Compu e Science. He ecei ed his Ph.D. om VSB–Technical Uni e si y o Os a a in 2000. He was habili a ed a Facul y o Elec ical Enginee ing and Compu e Science, VSB–Technical Uni e si y o Os a a in 2008. Today he is ice-head o he Depa men o Elec ical Powe Enginee ing. Resea ch wo k is ocused on eliabili y o elec ic powe sys ems and enewable ene gy sou ces. c 2013 ADVANCES IN ELECTRICAL AND ELECTRONIC ENGINEERING 173