Formal techniques improve connectivity in supervisory systems

Luque Rodríguez, Joaquín; Gonzalo, Fernando; Pérez García, Francisco; Mejías Risoto, Manuel

Abstract

The need to provide communication among the various computers that make up supervisory control and data acquisition (SCADA) systems is encountered more and more frequently. This equipment is usually from various generations, technologies, and manufacturers. Much effort has been made to define a set of standard protocols for both center-remote communications and to center-to-center links of similar or different levels. Nevertheless, the future role of these standards is not clear, and the problem still remains of how to ensure communication among the systems working presently. The authors describe CUP, a protocol conversion tool that enables communication among the multiple components of SCADA systems. CUP is the Spanish equivalent of universal protocol conversion

Full text

Formal Techniques Improve Connectivity in Supervisory Systems Joaquin Luque', Fernando Gonzalo', Francisco Perez', and Manuel Mejias' he need to provide commu- T nication among the various computers that make up supervisory control and data acauisiniques (FDTs) to specify the protocol and converter behavior. Several methods (Finite State Machines. Petri Nets, CUP is a protocol conversion tool that tion (SCADA) systems is encountered more and more frequently. This eauiDment is enables communication among the multiple components Temporal Logic, etc.) have been proposed to describe pre tocols in a more Drecise man- -. usually from various generations, technologies, and manufacturers. Much effort has been of SCADA systems ner than just narrative text. The trend in data communications made to define a set of standard protocols for both center-remote communications and to center-tcwenter links of similar or different levels. Nevertheless, the future role of these standards is not clear, and the problem still remains of how to ensure communication among the systems working presently. The most common solution for the problem of communications between two incompatible systems is to build a piece of equipment that is capable of converting the protocols involved. This equipment is typically called a protocol converter. This task is performed using ad-hoc techniques, dealing with and solving each peer protocol conversion problem in a particular manner. Every converter is normally designed and built from scratch, without taking advantage of their common characteristics. This procedure leads to a longer develop ment time, a less efficient product, and a higher number of bugs and errors. As an alternative, Sevillana de Electricidad (the electric utility company covering southern Spain), the University of Seville, and local vendors of control systems have jointly developed a project to solve this problem in a more general manner, through the development of an automatic conversion tool, called CUP. These letters denote the Spanish equivalent of universal protocol conversion (converter). This project has been sponsored by the Spanish Ministry of Industry, through the National Electrical Research Plan. Formal Description Techniques Two main ideas support the universal protocol conversion tool. The first is the use of formal description tech- ' University of Seville Compaia Sevillana de Electricidad tends towards the use of highly formal methods, defining languages that support them and enable automatic processing. Some of these languages have been standardized: ESTELLE and LOTOS (ISO), and SDL (CCITT). The entire protocol engineering problem can be dealt with through the application of these languages, but some of them (e.g. ESTELLE) focus on the specification and automatic implementation phase, while others (e.g. LOTOS) focus on validation and testing. For this reason, the converter featured in this article uses ESTELLE. This language is based on Finite State Machines (ESM), itself a well-known engineering tool. The second and main idea behind the converter is the use of a service adapter rather than the message converter approach to convert protocols. The latter implements an FSM (or a set of FSMs) to accept protocol messages from protocol A and convert them to protocol B. This FSM is usually quite complex and must be designed heuristically. The service adapter approach uses three FSMs (or set of FSMs): one each to describe protocols A and B, and one that describes a fictitious user of both protocols A and B. If a message requesting information is received from the center according to protocol A, the fictitious user interprets it and uses protocol B to request a similar service from the RTU (Figure 1). If similar services are provided by protocols A and B (as is usually the case in SCADA systems), the fictitious user or service adapter can be described by a very simple EM. On the other hand, the FSMs describing protocols A and B are used in the systems to be connected, and are therefore very accessible, thus reducing the effort involved to develop the protocol converter. Converter Tool These two main concepts have been implemented in a computer system based on a low-end IBM-compatible 30 IEEE ComputerApplications in Power ISSN 08954156/94/$4.~1994 IEEE The second process is simulation, which allows the designer to verify the CONTROL CEYTER PROTOCOLCONVERTER RTU and textual representations of the FSMs and their evolution, step-by-step execw tion, break points, and other features make simulation an invaluable tool to refine the converter specification. The last process is the conuersion module, which uses the debugged converter generated by the other two modules to make the actual connection between the incompatible center and RTU. Extensive graphic Figure 3) and textual (Figure 4) monitoring of the communication lines and their conversion are available during this process. Operating Experience Four scenarios were used to test the capability of the whole system to deal with real interconnection problems. The first was the Sevillana Main Dispatching Center, based on Westinghouse 2500 with Redac protocol, and regional nonnative RTUs, based on Motorola 6800 with Teletransa protocol (Figure 5). The second scenario was an inverse situation using a Sevillana Regional Center, based on Digital PDP- 11 with Teletransa protocol, and an RTU of the main dispatching center (Redac protocol). The third scenario was a Setrillana Regional Center (Teletransa protocol) and a relocatable RTU (Issocorn protocol). The fourth situation consisted of a Regional Center (Teletransa protocol) with two different RTUs (Teletransa and Isocom) concentrated by the converter system (Figure 6). All the systems found in the four scenarios were of different vendors, corresponding to different technological generations. -7 ,&er structure Based on this cited experience, three different phases were necessary to build each protocol converter accordingly: Formal specification of the protocols Automatic generation of the converters m Laboratory and field testing. The formal specification phase was the most effortconsuming (it took approximately 90 percent of the total human resources). This was prindpally due to the fact that the descriptions available of protocols to be con- I verted are clearly insufficient, incomplete, and ambigw bre 2. CUP vtem diagram April1991 31 ous. This is not unusual, contives and PDUs) and dynamic sidering that the specification has been made using a uictorian novel stvle narrative text, This PC-based system uses a serviceixdapter behavior (FSMs) are expressed using ESTELLE. The auxiliary processing functions of the serwith no formal structure, and approach rather than a &e adapter are also expressed .- using no description tool. messageconverter approach in ESTELLE. The converter sYs- The following steps are necessarv to obtain a formal tem is used to verify the service adapter description syntax. to convert protocols description of a protocol con- Step 7. Assisted by the converter: verter system, the service Step 1. Each of the two proadapter and the two protocols tocols to convert is layered according to the OS1 model. I to be converted are simulated. Steps 5 through 7 are Functions, services, and primitives are established for repeated until the whole protocol works properly. TELETRANSA-ISOCOM CONVERSION machine IAEBDR AINI A EBDR APIIA INIAEBDR T AF (1) Positive acknowledgement Fignre 3. Service adapter ISM each level in both the control center and the remote. The protocol data units (PDUs) or messages are defined for each level in the model. Step 2. The FSMs describing the dynamic behavior of each level in both protocols are drawn. Step 3. ESTELLE is used to write the static descrip tions (primitives and messages) and the dynamic behavior (FSMs) of both protocols. Awrilhry process functions are also written in ESTELLE. The converter system is used to check and verify the syntax of the complete specification for both protocols. Step 4. Both protocols are independently simulated, with the assistance of the converter system. Steps 1 through 4 are repeated until the two protocols work properly. Step 5. The FSM describing the dynamic behavior of the service adapter between the two protocols is depicted. The required static adaptations (of primitives and PDUs) are also described. Step 6. The service adapter static descriptions (primi- 32 EEE Computerapplications in Power The full process of specifying a formal converter for two typical, welldocumented, telecontrol protocols can be done by a welltrained, two-person team in about 2 or 3 months. If any or both protocols are already known and have been formally described (preferably in ESTELLE), the time required to specify the converter is decreased dramatically. Once the formal specification (in ESTELLE) was obtained, the generation of each converter was confronted. The converter system accomplishes this process automatically, and for any of the four sce narios tested, it takes a few minutes (2 or 3 minutes in the platform previously described). The third and last stage of the process was the testing of the converters, first in the laboratory and then in the field. Since the original protocols had already been simulated and tested, and the generation process, being automatic, introduces no implementation errors, testing the converters is a relatively simple task, which, in the worst case, clearly ~~ OWMIC REPORT OF ACTUAL STATUS : CENTER Name of module Number of machine : 0 last state : SERVlCE last input : AEBD-request Last action : TD-request Actual state :ACKNOWLEDGED Push FE to continue RLrn to Menu -re 4. Textual data presentation shows any difference between placed close to either the control the protocol documentation and The program helps center or the remote; conseits actual operation. At the end of quently, one of the links is very this stage, one of the converters protocol short, and its speed can easily be obtained from the converter sys- COnUer&?r SpeCifiCatiOnS increased by a factor of at lest 10, tem (that corresponding to the and the specified thus decreasing the delay caused third conversion scenario) was by the second link by more than fully tested in the field of teleconprotocols in real time 90 Dercent. A 600-bos remote link bits per second (bps) links). Nevertheless, much more significant is the delay introduced by going from a single link between the center and the remote, to a new situster and the converter, and the other between the converter and the remote. If the transmission speed of the channels is maintained constant, a second link doution where two links are One between the troi in Islas, a small rural 50 kV substation, located 40 kilometers from Seville. In the test, the converter connected a control center and an RTU in actual operation and obtained adequate results for over 1,000 hours. The delay introduced for the conversion process is negligible (typically less than 10 milliseconds), as compared with the time employed by message transmission through the low-speed channels, like those commonly Joaquin Luque received his Industrial Engineer degree in 1980 and his Industrial Engineer Doctorate in 1986 from the University of Seville (Spain). Since 1980, he has worked for several companies in the area of SCADA systems for electrical networks, participating in sor of electronic engineering at the University in Seville. He is a member of the IEEE. Femaudo Gonzalo received his Telecommunications Engineer Some of the main EMS projects in Spain, He is currently a profesani a 9600-bps loial link were used in the experiments in such a way that a total delay of less than 50 milliseconds was introduced by the converter; this figure complies with most SCADA system requirements. System Interconnections The use of Formal Description Techniques described in this article, and their application to the specification and implementation of telecontrol protocol converters, is a -ele,,a"sa Regional RTU Figure 5. Typical conversion scenario Seville. Since then, he has worked in planning, design, construction, and maintenance of both telecommunication networks and very interesting alternative that enables easier interconnection of different supervisory systems. The results obtained, not only at the converters specification stage, but also regarding the performance of the implemented solution, clearly show the feasibility of the proposed methodology. Telelranea ~ RegIon.1 PrOtOCol CUP Ce"W telecontrol systems for Compaia Sevillana de Electricidad. He is currently manager of Telecommunication and Telecontrol in this I- I -~ power utility. He is a member of IEEE. Francisco Perez received his MS degree in 1985 and Ph.D. degree in 1992, both in Dhvsics. from the Universitv of Seville. He Relocalable RTU hag participated in several brojects in the field of robotics, control, and security sys- Figure 6. Concentration and conversion scenario bles the time required to send messages between the center and the remote. In most cases, the use of lowspeed channels is due to the restricted bandwidth of the modulated signal generated for long-distance transmission. However, when a converter is used, it is commonly tems. Since 1987, he has been a professor in the Department of Electronic Technob gy at the University in Seville, where he teaches Logic Design and Computer Networks. Manuel Mejh received his Industrial Engineer degree in 1982 from the University of Seville. Since 1982, he has worked for several companies in the area of computer sciences, participating in some projects of Central Thermical supervision systems. He is currently a professor of software engineering at the University of Seville. April 1994 33