User recommendations for the optimized execution of business processes

Barba Rodríguez, Irene; Weber, Barbara; Valle Sevillano, Carmelo del; Jiménez Ramírez, Andrés

Abstract

In order to be able to flexibly adjust a company's business processes (BPs) there is an increasing interest in flexible process-aware information systems (PAISs). This increasing flexibility, however, typically implies decreased user guidance by the PAIS and thus poses significant challenges to its users. As a major contribution of this work, we propose a recommendation system which assists users during process execution to optimize performance goals of the processes. The recommendation system is based on a constraint-based approach for planning and scheduling the BP activities and considers both the control-flow and the resource perspective. To evaluate the proposed constraint-based approach different algorithms are applied to a range of test models of varying complexity. The results indicate that, although the optimization of process execution is a highly constrained problem, the proposed approach produces a satisfactory number of suitable solutions.

Full text

User recommendations for the optimized execution of business processes Irene Barba a, ⁎, Barbara Weber b , Carmelo Del Valle a , Andrés Jiménez-Ramírez a a Departamento de Lenguajes y Sistemas Informáticos, University of Seville, Spain b Department of Computer Science, University of Innsbruck, Austria abstract Inordertobeabletoflexiblyadjustacompany'sbusinessprocesses(BPs)thereisanincreasing interest in flexible process-aware information systems (PAISs). This increasing flexibility, however, typically implies decreased user guidance by the PAIS and thus poses significant challenges to its users. As a major contribution of this work, we propose a recommendation system which assists users during process execution to optimize performance goals of the processes. The recommendation system is based on a constraint-based approach for planning and scheduling the BP activities and considers both the control-flow and the resource perspective. To evaluate the proposed constraint-based approach different algorithms are applied to a range of test models of varyingcomplexity. The results indicate that, although the optimization of process execution is a highly constrained problem, the proposed approach produces a satisfactory number of suitable solutions. Keywords: Business processes Workflow management Business intelligence Flexible process-aware information systems Recommendations Constraint programming Scheduling 1. Introduction Nowadays, there exists a growing interest in aligning information systems in a process-oriented way [9,55]. In the current dynamic business world the economic success of an enterprize increasingly depends on its ability to react to changes in its enterprize in a quick and flexible way [23]. Therefore, flexible process-aware information systems (PAISs) [54,33,32] are required to allow companies to rapidly adjust their business processes (i.e., set of related structured activities whose execution produces a specific service or product required by a particular customer) to changes in the environment [45]. The specification of process properties in a declarative way is an important step towards the flexible management of PAISs [47]. The advantages of using declarative languages for business process (BP) modeling instead of imperative languages, i.e., support for partial workflows [52], absence of over-specification [30], and provision of more maneuvering room for end users [30], are discussed in several studies (e.g., [39,11,12]). Due to their flexible nature, frequently several ways to execute declarative process models exist. Typically, given a certain partial trace (reflecting the current state of the process instances), users can choose from several enabled activities which activity to execute next. This selection, however, can be quite challenging since performance goals of the process (e.g., minimization of overall completion time) should be considered, and users often do not have an understanding of the overall process. Moreover, optimization of performance goals requires that resource capacities are considered. Therefore, recommendation support is needed during BP execution, especially for inexperienced users [49]. In order to support users of flexible PAISs during process execution in optimizing performance goals like minimizing the overall completion time (i.e., time needed to complete all process instances which were planned for a certain period), we propose the generation of optimized enactment plans. For this, activities to be executed have to be selected and ordered (planning problem [18]) considering both the control-flow and resource constraints (scheduling problem [6]) 1 imposed by the declarative specification. In ⁎ Corresponding author. Tel.: +34 954559814. E-mail addresses: [email protected] (I. Barba), [email protected] (B. Weber), [email protected]s (C. Del Valle), [email protected] (A. Jiménez-Ramírez). 1 In the current work the role-based allocation pattern [38], i.e., resources of a specific role are required for activity execution, is considered. general, for the execution of BP activities, the use of shared resources is necessary, which must be managed in an effective way in order to optimize certain objectives of the BP enactment. For planning and scheduling (P&S) the activities in a way that the process goal is optimized, a constraint-based approach is proposed since constraint programming (CP) [35] supplies a suitable framework for modeling and solving problems involving P&S aspects [40]. For this, the declarative model is complemented with information related to estimates regarding the number of instances, activity durations, and resource availabilities. Recommendations on possible next steps are then generated taking the partial trace and the optimized plans into account. Replanning is supported if actual traces deviate from the optimized enactment plans (e.g., because estimates turned out to be inaccurate). In order to evaluate the effectiveness of the proposed constraint-based approach, different algorithms are applied to a range of test models of varying complexity. The suitability of our approach is tested regarding both (1) build-time, i.e., for the generation of complete optimized plans before starting the BP enactment; and (2) run-time, i.e., for the generation of partial, optimized plans by considering the actual partial trace of the process as the execution of the process proceeds (replanning). For both build-time and run-time evaluations, the results which are obtained by each algorithm are compared to obtain information about which algorithm is better under which circumstances and whether one algorithm is better in general. The results indicate that the proposed approach produces a satisfactory number of suitable solutions, i.e., solutions which are optimal in most cases and quite good in other cases. Initial aspects related to the proposed constraint-based approach and how to use this approach as basis for creating user recommendations have been previously presented in [2] and [5] respectively. However, this paper significantly extends and improves this previous work by: (1) providing background on related areas (cf. Section 2), (2) giving more details about the method for generating recommendations, e.g., by including an algorithm for providing recommendations (cf. Section 3), (3) introducing new and efficient search algorithms for solving the constraint-based problems (cf. Section 4.3), (4) evaluating the effectiveness of the proposed approach over a set of representative problems for testing its suitability regarding both build and run-time, and therefore, demonstrating that it can work in practice for managing realistic problems (cf. Section 6), (5) analyzing the advantages and shortcomings of our approach (cf. Section 7), and (6) extending the related work which is analyzed (cf. Section 8). This paper is organized as follows: Section 2 introduces the related areas, Section 3 includes an overview of our proposal, Section 4 details the method for generating the optimized enactment plans, Section 5 shows the application of the proposed approach to a running example, Section 6 shows some experimental results, Section 7 presents a critical discussion of our proposal, Section 8 summarizes related work, and finally, Section 9 includes conclusions and future work. 2. Background Our work combines aspects of scheduling, planning, and CP to support users during the execution of flexible declarative BPs. Section 2.1 provides backgrounds regarding declarative processes. Section 2.2 gives an overview of planning, scheduling and CP. 2.1. Declarative BP models Recently, constraint-based approaches have received increased interest [51,29], since they suggest a fundamentally different way of describing BPs which seems to be promising in respect to the support of highly dynamic processes [51,29]. Irrespective of the chosen approach, requirements imposed by the BPs need to be reflected by the process model. This means that desired behavior must be supported by the process model, while forbidden behavior must be prohibited [30,47,26]. While imperative process models specify exactly how things have to be done, declarative process models focus on what should be done. In the current approach, we consider declarative BP specifications since, as stated, the specification of process properties in a declarative way is an important step towards the flexible management of PAISs [47]. In the literature, several rule-based and constraint-based languages for declarative BP modeling are proposed (e.g., [46,8,53,25]). In our proposal we use ConDec [46] for the BP control-flow specification. We consider ConDec to be a suitable language, since it allows the specification of BP activities together with the constraints which must be satisfied for correct BP enactment and for the objective to be achieved. Moreover, ConDec allows the specification of a wide set of BP models of varied nature, flexibility and complexity in a simple way. ConDec is based on constraint-based BP models (cf. Definition 1), i.e., including information about (1) activities that can be performed as well as (2) constraints prohibiting undesired process behavior. Definition 1. Aconstraint-based process model S=(A,C) consists of a set of activities A, and a set of constraints Cprohibiting undesired execution behavior. The activities of a constraint-based process model can be executed arbitrarily often if not restricted by any constraints (for a description of the complete set of constraints, cf. [46]). ConDec constraints can be divided into 3 groups: 1. Existence constraints: unary relationships concerning the number of times one activity is executed. As an example, ExactlyN(A) specifies that Amust be executed exactly N times. 2. Relation constraints: positive binary relationships used to establish what should be executed. As an example, Precedence(A,B) specifies that to execute activity B, activity Aneeds to be executed before. 3. Negation constraints: forbid the execution of activities in specific situations. As an example, NotCoexistence(A,B) specifies that if Bis executed, then Acannot be executed, and vice versa. Fig. 1 shows a simple constraint-based model which is composed by activities A,B, and C, and constraints C1 (ExactlyN(A)), C2 (Precedence(A,B)), C3 (Precedence(A,C)), and C4 (NotCoexistence(B,C)). As the execution of a constraint-based model proceeds, information regarding the executed activities is recorded in an execution trace (cf. Definition 2). Definition 2. Let S=(A,C) be a constraint-based process model with activity set Aand constraint set C. Then: A trace σis composed by a sequence of starting and completing events 〈e 1 ,e 2 ,…e n 〉regarding activity executions a i ,a∈A, i.e., events can be: 1. start(a i ,Rj k ,T), i.e., the i-th execution of activity ausing k-th resource with role jis started at time T. 2. comp(a i ,T), i.e., the i-th execution of activity ais completed at time T. A process instance (cf. Definition 3) represents a concrete execution of a constraint-based model and its execution state is reflected by the execution trace. Definition 3. Let S=(A,C) be a constraint-based process model with activity set Aand constraint set C. Then: A process instance I=(S,σ)onSis defined by Sand a corresponding trace σ. A running process instance Iis in state satisfied if its current partial trace σsatisfies all constraints stated in C. Furthermore, an instance is in state violated, if the partial trace violates all constraints stated in Cand there is no suffix that can be added to satisfy them. Fig. 1 includes examples of traces of satisfied and violated instances 2 for a constraint-based model. Considering a constraint-based model and a specific related process instance, only certain activities are enabled to be executed next (cf. Definition 4). Definition 4. Let S=(A,C) be a constraint-based process model with activity set Aand constraint set C, and I=(S,σ)bea corresponding process instance with partial trace σ. Then: An activity a i of instance Iis enabled at time Tif a i can be started and the instance state of Iis not violated afterwards; i.e., for σ=〈e 1 ,e 2 ,…e n 〉, we obtain σ′l¼e1;e2;…en;start ai;Rjk;T ðÞ hiafterwards and instance (S,σ′) is not in state violated. For example, for the partial trace σ 1 of Fig. 1,Bis enabled, while Ais not enabled due to C1, and Cis not enabled due to C4. Due to their flexible nature, frequently several ways to execute constraint-based process models exist. In general, given a certain partial trace, users can choose from several enabled activities which activity to execute next, which can be a quite challenging decision. The situation is further complicated by the fact that typically multiple instances get concurrently executed within a particular timeframe. In order to ensure that the execution of a business process is optimized at a global level, the decision which activity to best execute next not only depends on a single process instance, but on the whole set of instances which are executed within a particular timeframe. Therefore, recommendation support is usually needed during the execution of constraint-based models [49]. In order to suggest suitable next activities to the user, we propose the generation of optimized enactment plans for the constraint-based model by applying CP for P&S the BP activities (cf. Section 4). 2.2. Planning, scheduling and constraint programming For generating optimized BP enactment plans optimizing the performance goals of constraint-based process models, activities to be executed have to be planned [18] and scheduled [6] by considering the declarative specification. To do this, a constraint-based approach is proposed since, as stated, CP [35] is suitable for modeling and solving P&S problems [40]. The area of scheduling [6] includes problems in which it is necessary to determine an enactment plan for a set of activities related by temporal constraints (in our context the control-flow constraints introduced in Section 2.1). Moreover, the execution of every activity requires the use of resources, hence they may compete for limited resources. In general, the objective in scheduling is to find a feasible plan which satisfies both temporal and resource constraints. Several objective functions are usually considered to be optimized, in most cases related to temporal measures (e.g., minimization of completion time), or considering the optimal use of resources. In a wider perspective, in AI planning [18], the activities to be executed are not established a priori, hence it is necessary to select them from a set of alternatives and to establish an ordering. In most cases, the specification of planning problems includes the initial state of the world, the goal (a predicate representing a set of possible final states) that must be reached, and a set of operators (actions) which can be applied to one state in order to reach another state. Furthermore, in planning problems, usually the optimization of certain objective functions is considered. Constraint programming (CP) [35] (cf. Fig. 2) can be used, among others, for P&S purposes [40]. In order to solve a problem through CP, it needs to be modeled as a constraint satisfaction problem (CSP) (cf. Definition 5). Definition 5. ACSP P=(V,D,R) is composed by a set of variables V, a domain of values Dfor each variable var i ∈V, and a set of constraints Rbetween variables, so that each constraint represents a relationship between a subset of variables and specifies the allowed combinations of values for these variables. 2 For the sake of clarity, only completed events for activity executions are included in the trace representation. A solution (cf. Definition 6) consists of assigning values to CSP variables. Definition 6. Asolution S=〈(var 1 ,val 1 ), (var 2 ,val 2 ), …(var n ,val n )〉for a CSP P=(V,D,R) is an assignment of a value val i to each variable var i ,∀var i ∈V. A solution is partial if there exists one or more CSP variables which are not instantiated. A solution is feasible when the variable-value assignments satisfy all the constraints. In a similar way, a CSP is feasible if there exists at least one feasible solution for this CSP. From now on, S var refers to the value assigned to variable var in the (partial) solution S. Similar to CSPs, constraint optimization problems (COPs) require solutions that optimize objective functions. Definition 7. ACOP P O =(V,D,R,O) is a CSP which also includes an objective function Oto be optimized. A feasible solution Sfor a COP is optimal when no other feasible solution exists with a better value for the variable related to O (var O ). Constraint programming allows the separation of the models from the algorithms, so that once a problem is modeled in a declarative way as a CSP, a generic or specialized constraint-based solver can be used to obtain the required solution. Furthermore, constraint-based models can be extended in a natural way, maintaining the solving methods. Several mechanisms are available for the solution of CSPs and COPs, which can be classified as search algorithms (i.e., for exploring the solution space to find a solution or to prove that none exists) or consistency algorithms (i.e., filtering rules for removing inconsistent values from the domain of the variables). In turn, search algorithms can be classified as complete search algorithms (i.e., performing a complete exploration of a search space which is based on all possible combinations of assignments of values to the CSP variables), and incomplete search algorithms (i.e., performing an incomplete exploration of the search space by repairing infeasible complete assignments or by trying to improve the objective value, so that, in general, to get a feasible or an optimal solution is not guaranteed). Various incomplete search algorithms have demonstrated their ability to obtain good solutions to difficult combinatorial optimization problems. One of the most promising of such techniques is the greedy randomized adaptive search procedure (GRASP) [13,14]. Furthermore, there exist several hybrid search algorithms which combine both complete and local searchtechniques. Large neighborhood search (LNS) [31] is a powerful hybrid technique which has recently shown outstanding results in optimizing various scheduling problems [31]. Fig. 2. Schema of constraint programming. Fig. 1. Simple constraint-based model for a set of activities. 3. Method for generating recommendations As stated, constraint-based processes offer much flexibility. Typically, given a constraint-based process model and a certain partial trace, users can choose from several enabled activities which activity to execute next, which is a challenging selection in most cases. In order to address this challenge we propose an approach to assist users during process execution in optimizing performance goals like minimizing the overall completion time (OCT). Specifically, users of flexible PAISs are supported during process execution by a recommendation service which provides recommendations on how to proceed best with the execution. Hereby, a recommendation (cf. Definition 8) is composed by one or more enabled activities (cf. Definition 4) to be executed next, together with their resource allocations since both control-flow and resource perspectives are considered. Definition 8. Arecommendation Rec is composed by a set of pairs (a i ,Rj k ) suggesting to start the i-th execution of activity ausing resource Rj k . 3 For example, the recommendation 〈(A 1 ,R0 1 ),(B 2 ,R1 2 )〉suggests to start the first execution of activity Ausing resource R0 1 and the second execution of activity Busing resource R1 2 . The recommendation service is based on optimized enactment plans which are already generated during build-time (cf. Section 3.1) by P&S all BP activities and further optimized during run-time. At specific times of the process execution, the recommendation system generates the recommendations by considering: (1) the optimized enactment plans, (2) the partial traces (cf. Definition 2)oftheprocess instances to be optimized, and (3) the resource availabilities (cf. Section 3.2). In order to determine the recommendations, different strategies can be used (which will be described in Section 4.3). Thereby, the recommendation service ensures that not only single process instances get optimized, but the whole set of instances which is planned to be executed within a certain timeframe, hence allowing for a global optimization. 3.1. Build-time: generation of optimized execution plans The generation of optimized execution plans comprises 3 steps (cf. Fig. 3): (1) Create declarative specification. In a first step, a constraint-based model (cf. Definition 1) of the BP to be supported is created covering the control-flow through the ConDec language [46] (cf. Section 2.1). An example is depicted in Fig. 5(1), which is fully detailed in Section 5. (2) Extend declarative specification (including estimates and resource perspective). In order to plan and schedule the process activities and to cover the resource perspective, our proposal extends the constraint-based specification (cf. Definition 1) by considering resource requirements for each BP activity execution and estimates for activity durations, number of process instances executed per planning period, and resource availabilities (cf. Definition 9). Estimates can be obtained by 3 Rj k refers to the k-th resource with role j. Fig. 3. Overview of our proposal for generating optimized execution plans at build-time and generating recommendations at run-time. interviewing business experts or by analyzing past process executions (e.g., by calculating the average values of the parameters to be estimated from event logs). Moreover, both approaches can be combined to get more reliable estimates. Definition 9. AConDec-R process model (extendedconstraint-basedprocessmodel)CR=(Acts,C,Res,NInst)relatedtoaconstraint-based process model S=(A,C) is composed by a set of BP activities Acts which includes the estimated duration and the role of the required resource for each BP activity a∈A; a set of ConDec constraints C;asetofavailableresourcesRes; and the estimated number of process instances NInst. In Fig. 5(1) and (2), an example of an extended constraint-based (ConDec-R) specification is depicted, which is fully detailed in Section 5. (3) Generate Optimized Enactment Plans. Based on the extended constraint-based specification (cf. Definition 9) optimized enactment plans (cf. Definition 10) are generated for an estimated number of process instances (NInst) by applying AI techniques for P&S the BP activities (cf. Fig. 4). We propose an efficient and innovative approach for P&S the BP activities to get BP optimized plans (cf. Section 4). Definition 10. ABP enactment plan EP is composed by: (i) the number of times each BP activity is executed, (ii) the start and the completion times for each activity execution, and (iii) the resource which is used for each activity execution. The enactment plans can be graphically represented by a Gantt chart [16], which illustrates the start and completion times of each activity execution together withthe resource allocation. InFig. 5(3),an example of an optimized BP enactment planis depicted, which is fully detailed in Section 5. Since the generation of optimal plans presents NP-complexity [17], it is not possible to ensure the optimality of the generated plans for all cases. The developed constraint-based approach (cf. Section 4), however, allows solving the considered problems in an efficient way, i.e., plans of high quality (cf. Definition 11) are generated, as demonstrated in Section 6. Definition 11. The quality of a BP enactment plan EP (cf. Definition 10) related to a ConDec-R process model CR (cf. Definition 9)is defined by EP∗ OCT /EP OCT , where EP OCT is the value of OCT in the plan EP, and EP∗ OCT is the optimal value of OCT for CR. 4 3.2. Run-time: generating recommendations on possible next execution steps This section describes how the optimized plans are then used for assisting users during process execution. At run-time, process instances (cf. Definition 3) are executed by authorized users (a in Fig. 3). At any point during the execution of a process instance, the user can select from the set of enabled activities (cf. Definition 4) what to do next. However, to guide the user to optimize the overall process goals, recommendations (cf. Definition 8) are provided by the recommendation service (b in Fig. 3). Note that the Fig. 4. Generating BP enactment plans from ConDec-R specifications through constraint programming. 4 Since the generation of optimal plans presents NP complexity (and hence, the optimal plan can be unknown), the quality value is approximated by EP′ OCT / EP OCT , where EP′ OCT is the value for OCT in the best feasible plan which is known for CR when the optimum is unknown. user is not obliged to follow the recommendations but she can select any of the enabled activities, i.e., all the flexibility of the declarative specification is kept. To provide recommendations, the recommendation service proposes the most suitable activity to execute next, i.e., proposes the recommendation with the highest quality (cf. Definition 12). Note that the quality of the recommendations which are generated is determined by the quality of the BP enactment plans (cf. Definition 11) which are used. 5 Definition 12. The quality of a recommendation Rec (cf. Definition 8) related to a ConDec-R process model CR (cf. Definition 9)is equal to the quality of the BP enactment plan (cf. Definition 11) which was used for generating Rec. Algorithm 1 shows how the recommendations are generated. As input data some information is required: (i) the ConDec-R specification of the problem (cf. Definition 9) and (ii) the initial optimized enactment plans (cf. Definition 10) generated during the build-time phase. As stated, for a particular timeframe a BP enactment plan for a set of instances (cf. Definition 3) is generated. Algorithm 1 starts at the beginning of such a timeframe and lasts until all the planned instances have completed (line 15 in Algorithm 1). Algorithm 1. Provide recommendations Algorithm 1 continuously generates recommendations (line 11) on how to proceed with process execution considering (1) the best available enactment plan (d in Fig. 3) meeting the constraints imposed by the constraint-based specification (e in Fig. 3), and (2) all events that occurred during process execution (i.e., allEvents). This includes (1) the current partial traces of the process instances (c in Fig. 3), and (2) the current information about resource availabilities (c in Fig. 3), e.g., (!Rj k ,T)meansthat k-th resource with role jbecomes unavailable at time T(cf. Fig. 6). In the case that a recommendation is suggested (line 12), the recommendation system sends it to the user (line 13). As execution proceeds, the BP enactment and the resource availabilities are monitored (f in Fig. 3). If there are new events at time T(line 6 in Algorithm 1), i.e., activities get started/completed or resources become available/unavailable (g in Fig. 3), then Fig. 5. Running example (built-time perspective): generating optimized execution plans from a ConDec-R specification. 5 For the current work, the durations of the recommendation generation is considered negligible compared to the duration of the process activities. the set of events allEvents, which includes both the partial trace and theresource availability events, is updated (line 7 in Algorithm 1). By doing this, the proposed approach is able to deal with the uncertainty involved (i.e., inaccurate estimates, unexpected changes in resource availabilities, and user deviations). Whenever events are updated the replanning module (h in Fig. 3) analyzes the optimized plans (iin Fig. 3) as well as the events. In particular, it checks if the current execution traces match with any of the optimized enactment plans (and if a recommendation can be made) or whether updates of the execution plans are needed (j in Fig. 3). In general, updates of the execution plan can become necessary due to deviations (line 8 in Algorithm 1), i.e., (i) the execution trace is not part of one of the optimized enactment plans (e.g., the user is not always following the recommendations), (ii) estimates are incorrect (e.g., when activity executions take longer/ shorter than estimated, or more or less instances than expected get executed), or (iii) resource availabilities change (i.e., resources become unavailable). Note that not every deviation requires replanning (some examples are given in Section 5). Moreover, the replanning module is continuously searching for a better plan by considering the event log during BP execution, provided that the current plan is not optimal. In this way, plan updates are conducted whenever the replanning module finds a solution which is better than the current optimized plans (lines 9 and 10 in Algorithm 1). If plan updates are required, the replanning module needs to access the extended constraint-based specification of the process (k in Fig. 3) to generate new optimized plans considering both the estimates and the constraint-based specification. If necessary, the replanning, i.e., the generation of new optimized enactment plans, is carried out by applying a constraint-based approach for P&S the BP activities (cf. Section 4). Despite the NP-complexity of the considered problems, replanning is usually less time consuming than initial planning, since most of the information about previous generated plans can usually be reused, and CSP variable values become known as execution proceeds (cf. Section 6). A running example illustrating the complete process is detailed in Section 5. 4. Method for generating optimized BP enactment plans As stated during build-time optimized execution plans are generated. 6 In this work, CP is selected for the generation of the optimized plans since it supplies a suitable framework for modeling and solving problemsinvolving P&S [40]. Moreover, CP allows the Fig. 6. Running example (run-time perspective): giving recommendations on possible next steps. 6 A proof-of-concept prototype has been implemented through a web-based application, which allows for the generation of optimized enactment plans from constraint-based specifications. It can be accessed at http://regula.lsi.us.es/OptBPPlannerV2/. separation of the models from the algorithms, so that once a problem is modeled as a CSP, a generic or specialized constraint-based solver can be used to obtain the required solution. In this work, we present a new and efficient constraint-based approach for P&S the BP activities specified through the ConDec-R language (i.e., ConDec specification, resource requirements and estimates) optimizing process performance goals. To improve the modeling of the problems (cf. Section 4.1) and to efficiently handle the constraints in the search for solutions, our constraint-based proposal includes for each ConDec template a filtering rule (responsible for removing values which do not belong to any solution) (cf. Section 4.2). Moreover, efficient search algorithms for solving the CSP are described in Section 4.3. Fig. 4 shows the complete process which is proposed to generate BP enactment plans from a ConDec-R specification through CP. Step 1 consists of the specification of the BP model through ConDec-R, i.e., including the constraint-based specification, the resource requirements and the estimates. This ConDec-R specification is then translated into a CSP (cf. Step 2) based on which optimized enactment plans are obtained using different search algorithms (cf. Step 3), and visualized as a Gantt chart (cf. Step 4). 4.1. Representing the constraint-based model as CSP model As stated, BP activities and constraints are specified in a ConDec-R model so that frequently several feasible ways to execute this model exist. Each specific feasible execution of a ConDec-R model leads to a specific value for the function to optimize, i.e., the overall completion time of the process instances. In general, multiple optimal executions, i.e., feasible solutions leading to a minimal completion time, may exist. In order to generate optimal (or optimized) execution plans (cf. Definition 10) for a specific ConDec-R model, we propose a constraint-based approach for P&S the BP activities. The first step for solving a problem through CP consists of modeling the problem as a CSP. Regarding the CSP model of the proposed constraint-based approach, BP activities(repeated activities, cf. Definition 13), which can be executed arbitrarily often if not restricted by any constraints, are modeled as a sequence of optional scheduling activities (cf. Definition 14), since each execution of a BP activity is considered as one single activity which needs to be allocated to a specific resource and temporarily placed in the enactment plan, i.e., stating values for its start and end times. Definition 13. Arepeated activity a is a BP activity which can be executed several times, i.e., several instances of the same activity can exist for one process instance. Definition 14. Ascheduling activity (or each repeated enactment of an activity) a i represents the i-th execution of a repeated activity a, i.e., a specific BP activity instance. In this way, there are two main typesin the proposed CSP model: (1) a type representing the BP activities, named RepeatedActivity, and (2) a type representing each execution of the BP activity, named SchedulingActivity. The properties of RepeatedActivity (cf. Definition 9)are:(i)duration: represents the estimated duration of the BP activity (the same estimated duration is considered for all the executions of a BP activity), (ii) role: indicates the role of the required resource for the activity execution (the same required resource is considered for all the executions of a BP activity), and (iii) nt: showing the actual number of times the BP activity is executed. In ConDec-R, nt can be unknown or have a value (if the number of activity executions is restricted in the ConDec model through existence constraints), and hence nt is a CSP variable which needs to be instantiated during the CSP solving process. There are lower and upper bounds for nt,asdepictedinFig. 4 (LB(var)andUB(var) refer to the lower and upper bounds of the domain of CSP variable var,respectively).TheRepeatedActivity type is composed of nt SchedulingActivities.EachSchedulingActivity includes: (i) st: indicating the start time of the activity execution, (ii) et: indicating the end time of the activity execution (each execution of a BP activity needs to be temporarily placed in the enactment plan), and (iii) sel: indicating whether or not the SchedulingActivity is selected to be executed. As stated, in ConDec-R, the number of times each BP activity is to be executed can be unknown (nt variable), and hence each associated scheduling activity can potentially be executed (i.e., included in the enactment plan), which is modeled through the sel variable, i.e., sel is equal to 0 if it is not executed, 1 otherwise. Henceforth, st(a i ) and et(a i ) represent the start and the end times of activity a i , respectively. In our approach, considering the minimization of the overall completion time of the process enactment, a CSP variable for this function, named OCT, is also included in the CSP model: OCT=max a∈A (et(a nt(a) )). Definition 15. ACSP-ConDec problem related to a ConDec-R process model CR=(Acts,C,Res,NInst)(cf.Definition 9) is a COP P O =(V,D,R,O)(cf.Definition 7)where: 1. The set of variables Vis composed by all the CSP variables included in the presented CSP model plus the CSP variable related to the overall completion time (OCT), i.e., V={nt(a), ∀a∈Acts}∪{st(a i ), et(a i ), sel(a i ), ∀i∈[1…UB(nt(a))],∀a∈Acts}∪OCT. 2. The set Ris composed by the global constraints (implemented by the filtering rules, cf. Section 4.2) related to the ConDec-R constraints included in Ctogether with the constraints from the proposed CSP model, i.e., ∀i:1≤ibnt(a): et(a i )≤st(a i+1 ), ∀i:1≤i≤nt(a): sel(a i )=1 and ∀i>nt(a):sel(a i )=0 for each repeated activity a∈Acts. 3. The set of domains Dis composed by the domains for each variable included in V. 4. The objective function Ois minimizing the OCT variable. In the proposed constraint-based approach resources are implicitly constrained since most constraint-based systems provide a high-level constraint modeling specific to scheduling which includes an efficient management of shared resources. Note that, R2, N5}, {E1, R2, N6}, {E1, R3, N4}, {E1, R3, N5}, and {E1, R3, N6}. Specifically, for each group of templates, a representative item (in bold in Table 3) is selected for the tests. Moreover, in the case of Existence templates, a value for label Nmust be established (N∈{10,20,30,40,50} is considered). Regarding the number of available resources, in turn, for all the generated test models, two available resources of two kinds of roles (i.e., R1andR2) are considered. In addition, different durations and required resources for each BP activity are considered (game, G), since these aspects have a great influence on the complexity of the search of optimal solutions due to the fact that the considered problems are an extension of typical scheduling problems. Specifically, in order to average the results over a collection of randomly generated ConDec models, 30 instances are randomly generated for each specific ConDec model by varying activity durations between 1 and 10 and role of required resources between R1 and R2. Independent variables: Considering the generated test models and search algorithms (cf. Section 4.3), Table 4 depicts the independent variables which are considered for the empirical evaluation. Response variables: As stated, the suitability of our approach is tested regarding both build-time and run-time phases, analyzing different response variables. 1. Build-time phase. For the build-time evaluation, a 5-minute time limit is established, since, in general, the initial optimized plans are generated prior to BP enactment, i.e., the search algorithms can be run for a long time. The optimality of the initially Fig. 7. Generic ConDec models. Table 3 Type and complexity of the filtering rules related to the ConDec templates. Template Type Complexity Group ExistenceN(A) Existence Θ(1) E1 AbsenceN(A) Existence Θ(1) E1 ExactlyN(A) Existence Θ(1) E1 Responded Existence(A,B) Relation O(n)R2 CoExistence(A,B) Relation O(n)R2 Precedence(A,B) Relation O(n)R2 Response(A,B) Relation O(n)R2 Succession(A,B) Relation O(n)R2 Alternate Precedence(A,B) Relation O(n×nt 3 )R3 Alternate Response(A,B) Relation O(n×nt 3 )R3 Alternate Succession(A,B) Relation O(n×nt 3 )R3 Chain Precedence(A,B) Relation O(n×nt 3 )R3 Chain Response(A,B) Relation O(n×nt 3 )R3 Chain Succession(A,B) Relation O(n×nt 3 )R3 Responded Absence(A,B) Negation O(n)N4 Negation Response(A,B) Negation O(n)N4 Negation Alternate Precedence(A,B) Negation O(n×nt 2 )N5 Negation Alternate Response(A,B) Negation O(n×nt 2 )N5 Negation Alternate Succession(A,B) Negation O(n×nt 2 )N5 Negation Chain Succession(A,B) Negation O(n×nt 3 )N6 generated plans is considered as a relevant aspect for giving good recommendations. Furthermore, the time spent for obtaining the optimal plans is a rather relevant response variable to be analyzed. The performance measures depicted in Table 5 are studied. 2. Run-time phase. Assuming that the actual trace deviated (e.g., user deviated) from the initially generated optimized execution plan, replanning has to be conducted and new optimized execution plans have to be obtained for the partial trace executed so far. The focus of the run-time evaluation is therefore to test the quality of solutions (i.e., the quality of BP enactment plans, cf. Definition 11) that can be found for given partial traces when replanning is needed due to deviations. Since at run-time the user is probably expecting for a recommendation the search algorithms for generating optimized plans swiftly need to find a suitable solution. Therefore, for the run-time evaluation, a short time limit (i.e., 5-s) is established. In order to mimic that the deviations happen at different stages in the process, i.e., early versus late, partial traces of different sizes (0%, 25%, 50%, and 75% of the overall process enactment) are considered. For generating the partial traces for the experiments, several strategies can be used. We generated the partial traces by considering the initial parts of the best plans which have been previously generated by any search algorithm (cf. Section 4.3). The reasons for taking initial parts of the best plans include (1) to easily get feasible traces and (2) to be able to compare the quality of the plans which are generated in 5-s versus the ones which are generated in 5-min. The selection of the traces clearly has an impact on the overall completion time (i.e., OCT). However, we believe that this does not bias our results, since we are not interested in absolute overall completion times, but we rather wanted to show that the constraint-based approach is able to find (optimized) execution plans for given partial traces even within 5 s when any plan which has been previously generated is useless. As explained before (cf. second paragraph of this section), we simulate that any plan which has been previously generated is useless by managing the partial traces in the same way as if they were completely new. Therefore, for performing these experiments the constraint-based search algorithms (cf. Section 4.3) do not use any information about plans which have been previously generated with the goal of checking the behavior of the approach in the worst case, i.e., when a good plan needs to be swiftly generated and any plan which has been previously generated is useless. The performance measures depicted in Table 6 are studied. For both build-time and run-time evaluation, the results which are obtained by each search technique are compared in order to obtain information about which technique is better in general, or to solve some specific kinds of problems. Experimental design: For each of the 6 generic models, 150 problem instances are generated considering different values for variable N (5 values) and G (30 values which represent the 30 games which are randomly generated by varying activity durations and role of required resources) using each of the search algorithms. The response variables are then calculated by considering average values for all 150 problem instances. 8 Experimental execution: The machine for all experiments is an Intel Core2, 2.13 GHz, 1.97 GB memory, running on Windows XP. In order to solve the constraint-based problems (cf. Section 4), the system COMET [10] is used, which is able to generate high-quality solutions for highly constrained problems in an efficient way. 6.2. Experimental results and data analysis 6.2.1. Build-time For the experiments of the build-time phase, the constraint-based search algorithm is run until a 5-minute CPU time limit is reached. Fig. 8 shows for each search algorithm: (a) the average percentage of optimal solutions which are found, (b) the average time for getting optimal solutions, considering the cases in which the optimal solution is found, and (c) the average percentage of cases in which a specific technique gets a better solution (i.e., less overall completion time) than the other ones (response variables %Opt,T Opt , and %Best respectively) versus the problem to be solved. For all the tables and figures presented in this section the considered problems are grouped according to the generic model, i.e., M10A, M10B, M10C, M20A, M20B, M20C, and the response 8 However, notice that problems stated by a simple model with a high value for Ncan entail a higher complexity than complex models with lower value for N. Table 4 Independent variables which are considered for the empirical evaluation. Name Description Values Model Generic ConDec model {M10A,M10B,M10C,M20A,M20B,M20C} Relation Value for the label Relation in the specific ConDec model {Response,AlternateResponse} Negation Value for the label Negation in the specific ConDec model {NegationResponse,NegationAlternateResponse,NegationChainSuccession} NValue for the label Nin the specific ConDec model {10,20,30,40,50} GGame containing duration and required resource for each BP activity {1,2,…,30} Search Search algorithms used for solving the generated models {CP,IBG,GRASP-LNS} variable is represented versus specific problems which are obtained after instantiating the relations and negations of the generic model as stated in Table 7, i.e., 6 specific problems ({1, …,6}) for each generic model are considered. Fig. 8(a) shows that CP search reaches the optimum solution for a greater number of problems than IBG and GRASP-LNS when the complexity of the problems is low, i.e., for models M10A, M10B and M10C. As the complexity of the problem increases, IBG and GRASP-LNS reach the optimal solutions for a greater number of problems than CP, i.e., M20A, M20B and M20C, presenting the highest difference for model M20A. These results can be explained by the fact that CP is a good strategy for getting the optimal solutions for problems which present a low complexity, since for small problems almost the entire search space can be explored. However, for problems with high complexity, an exhaustive search is not a good strategy for searching the optimal solution, since the search area explored by CP is not diversified enough and hence only a part of the possible solutions is analyzed in a limited time. Thus, incomplete techniques are better in general. Furthermore, the evaluation shows that in most cases, IBG outperforms GRASP-LNS. This result can be explained by the fact that the considered IBG is implemented in an efficient way due to the considered heuristic, and GRASP techniques require greater parameter tuning [13,14], and hence more tests need to be done to get the best setting for this technique. On the other hand, regarding the results which can be obtained by combining all the search algorithms, Table 8 shows the average number of optimal solutions which are found by any of the techniques (response variable %Opt ANY ) versus the problem to be solved. It can be seen that for models M10A and M10C, the percentage of optimal solutions which are found is rather high (more than 77% in all cases), regardless of the relationships which are given between the activities. However, for models M20A, M20B, and M20C, this measure highly depends on the relationships which are given between the BP activities, finding the fewest values when alternate response (relationships 4–6) is given. On the other hand, for relationships 1 and 3, the percentage of optimal solutions which are found is rather high (more than 78% in all cases), regardless of the specific model. However, for relationships 4, 5 and 6, this measure highly depends on the model, finding the fewest values for models of 20 activities. Taking these results into account, in general, the specific Relation and the number of activities of the BP model seem to be much more influential than the other considered aspects. Furthermore, the average value for all cases is 72.94%, the minimum value is 23.33%, and the maximum value is 100%, which can be considered rather good results. Fig. 8(b) shows that for all search algorithms, for the same model the response variable greatly increases as the complexity of the filtering rules increases. Furthermore, for the same filtering rules the response variable greatly increases as the complexity of the models increases. Moreover, in most cases, CP reaches the optimum swifter than the other techniques. In turn,GRASP, seems to be the slowest of the three techniques. For CP search, most of these optimums are obtained for the simplest models (cf. Fig. 8(a)), and hence, less time is required. In general, it can be seen that the average time for getting optimums is less than 100 s, which can be considered a rather good result. Fig. 8(c) shows that for all search algorithms, for the same model the response variable increases as the complexity of the filtering rules increases, i.e., all techniques present a similar behavior regarding getting optimums for low-complex filtering rules and this behavior highly differs as the complexity of the filtering rules increases. Furthermore, for the same filtering rules the response variable greatly increases as the complexity of the models increases, i.e., all techniques present a similar behavior regarding getting optimums for low-complex models and this behavior highly differs as the complexity of the models increases. Therefore, the use of the considered techniques in a coordinated way is highly recommendable for complex problems, since their behavior is highly different and their result can be combined for obtaining solutions of high quality. In brief, various conclusions can be drawn after analyzing the results: •CP search obtains better results than IBG and GRASP-LNS for simple problems (cf. Fig. 8(a)). •IBG and GRASP-LNS searches obtain better results than CP for complex problems (cf. Fig. 8(a)). Table 5 Response variables which are considered for the empirical evaluation at build-time. Name Description %Opt Average percentage of optimal solutions which are found by each technique (cf. Fig. 8(a)) %Opt ANY Average percentage of optimal solutions which are found by any technique (Table 8) T Opt Average time for getting optimal solutions for each technique, considering the cases in which the optimal solution is found (cf. Fig. 8(b)) %Best Average percentage of cases in which a specific technique gets a better solution (i.e., less overall completion time) than the other ones (cf. Fig. 8(c)) Table 6 Response variables which are considered for the empirical evaluation at run-time. Name Description %Q X ,X∈{0,25,50,75} Average quality of solutions which are found by each technique regarding the best solution which is known for each problem after X% of the optimized plan is executed (cf. Fig. 9) %Q ANY Average quality of solutions which are found by any technique regarding the best solution which is known for each problem after 0%, 25%, 50% and 75% of the optimized plan is executed (cf. Fig. 10) •The percentage of optimum solutions is very high for almost all cases when considering all techniques (Table 8). •The average time for getting optimums is quite low (cf. Fig. 8(b)). •The use of a combination of all techniques in a coordinated way highly increases the quality of the solutions, especially for complex problems. 6.2.2. Run-time For the experiments of the run-time phase, the constraint-based search algorithm is run until a 5-second CPU time limit is reached. Figs. 9 and 10 show the average quality of solutions which is found when compared with the best known solution for each problem, after 0%, 25%, 50%, and 75% of the BP optimized enactment plan is executed because users, for example, deviated Table 7 ID for each instantiation of the generic relationships (i.e., relations and negations) of the generic models (cf. Tables 2, 7) which is considered for the experiments. ID Relation –Negation 1 Response –Negation response 2 Response –Negation alternate response 3 Response –Negation chain succession 4 Alternate Response –Negation response 5 Alternate Response –Negation alternate response 6 Alternate Response –Negation chain succession (a) (c) (b) Fig. 8. Experimental results regarding build-time. (response variables %Q 0 ,%Q 25 ,%Q 50 ,%Q 75 ,%Q ANY ) versus the problem to be solved. When comparing the different search techniques, similar results compared to the build-time evaluation are obtained due to the previously explained reasons. Moreover, for all search algorithms, it is possible to see that for the same model the quality decreases as the complexity of the filtering rules increases, obtaining the lowest values for relationships 5 and 6 in most cases. Furthermore, for the same filtering rules the quality decreases as the complexity of the models increases, obtaining the lowest values for models M20B and M20C. It should be emphasized that, as stated, in general replanning is less time consuming than initial planning, since CSP variable values become known as execution proceeds. Therefore, the quality of the solutions increases as BP execution proceeds (cf. Fig. 10). In general, the quality of the solutions which is obtained applying each technique individually is quite good (greater than 86% for all cases). However, the use of all techniques in a coordinated way increases the quality of the solutions even further (greater than 92% for all cases), especially for complex problems (cf. Fig. 10). (a) (c) (d) (b) Fig. 9. Experimental results regarding run-time: average quality of solutions which are found after 0%, 25%, 50%, and 75% of the BP enactment. Table 8 Average percentage of optimal solutions found in 5-minute time limit when considering all techniques. Relation –Negation M10A M10B M10C M20A M20B M20C 1 Resp. –Neg. resp. 84 95.33 88.66 99.33 87.33 78.66 2 Resp. –Neg. alt. resp. 84 23.33 93.33 98 62 67.33 3 Resp. –Neg. chain succ. 84 86 83.33 99.33 93.33 87.33 4 Alt. Resp. –Neg. resp. 89.33 100 80 41.33 50.66 58.66 5 Alt. Resp. –Neg. alt. resp. 89.33 92.66 77.33 43.33 30 32 6 Alt. Resp. –Neg. chain succ. 88.66 76.66 80.66 44 30 26.66 7. Discussion One advantage of our proposal is that the recommendation service is based on optimized enactment plans which are generated by P&S all BP activities, hence it allows for a global optimization of the performance goal. Moreover, the generation of the optimized plans is carried out through a constraint-based approach, which is suitable for modeling and solving P&S problems [40]. In addition, this approach allows modeling the considered problems in an easy way, since the considered declarative specifications are based on high-level constraints. Furthermore, BPs are specified in a declarative way, which is an important step towards the flexible management of PAISs. Moreover, our approach, as an extension of other similar works [41,20], considers the resource perspective besides the control-flow perspective, hence greater optimization can be obtained. Additionally, in order to consider deviations in the estimates, the optimized plans can be updated if necessary, allowing reaction to changes in a quick and flexible way. The generated optimized execution plans can be used for further purposes besides giving recommendations to users of flexible PAISs, e.g., model verification, simulation or time prediction in BP management (i.e., BPM) systems. Moreover, a similar approach can be proposed for imperative models. In that case, the focus would be on recommendations related to resource allocation only (i.e., which activity is using which resource and when, hence influencing the ordering of activity execution). Therefore, the complexity of the constraint-based approach would considerably decrease since the activities to be executed do not need to be stated, i.e., the planning part of the problem would be removed, resulting in a scheduling problem. Note that the complexity of this problem is still very high since the related scheduling problem is NP complete [17]. On the other hand, the proposed approach presents some drawbacks. First, the business analysts must deal with a non-standard language for the declarative specification of BPs, therefore a period of training is required to let the business analysts become familiar with ConDec specifications. Secondly, the optimized plans are generated by considering estimated values for activity durations and resource availabilities, hence our proposal is only appropriate for processes for which the duration of the activities and resource availabilities can be estimated. However, as stated earlier, in the enactment phase, the replanning module can update the current plan by considering the current values of the estimates. Moreover, the considered constraint-based specifications deal with both control-flow and resource perspectives, but do not consider the data perspective. It is intended to consider this aspect in our future work. Furthermore, in this work, only the basic ConDec templates introduced in [46] are considered. ConDec templates can be easily extended so that the specification of more complex and flexible problems can be stated. As future work, some extensions are intended to be considered in the proposed constraint-based approach, e.g., branched templates (i.e., high-level relationships given between more than two activities). Moreover, additional evaluations of our proposal in the context of real process executions are planned as future work. In our proposal we focus on the minimization of overall completion time. However, it can be easily extended in order to consider further objectives, such as cost or other temporal measures. 8. Related work Several research groups have integrated AI P&S techniques with BPM systems. Most of the related work integrates scheduling tools into the BPM systems in the enactment phase, in order to make dispatching decisions as to which activity should be executed using a resource when it becomes free (dynamic scheduling) [56,42,19,34,44].Moreover,[21,4] support resource allocation in business process execution when considering performance optimization. Other authors use AI for exception handling during run-time [37,15]; we, in turn, use a constraint-based modeling approach and make suggestions to users. Furthermore, unlike our work, the related proposals rely on imperative specifications. Notice that integrating AI and BPM is not new. However, the use of AI P&S techniques for giving user recommendations is a new application area. Related to decision support systems, [28] develops a knowledge-based decision support system (KBDSS) for short-term scheduling in flexible manufacturing systems (FMS). Unlike our proposal, [28] considers the optimization of the efficient use of the machining cells by using a knowledge-based expert system to support the decision making process. Moreover, [7] manages multiple objectives in a hierarchical way. In a related way, [43] addresses the scheduling of a group of employees with different productivity Fig. 10. Average quality of solutions which are found by any technique after 0%, 25%, 50% and 75% of the BP enactment. considering the stochastic nature of customer arrivals. Furthermore, [36,24] propose business process simulation for operational decision support through process mining. While all approaches [28,7,36,24] are based on the knowledge which has been learnt in prior executions, our approach is based on a constraint-based approach for the generation of optimized plans by considering estimated values. Furthermore, [28,7,43,36,24] do not consider declarative process specifications. Related to user recommendations, [51] generates recommendations to select the next step to optimize some objective functions. While [51] is based on a product data model for generating the recommendations, our approach is based on optimized enactment plans. In addition, [41,20] support users during the execution of declarative process models by selecting among enabled activities. Unlike our work, the recommendations are based on similar past process executions, instead of optimized plans which are generated through a constraint-based approach. Moreover, while our approach allows for a global optimization of the performance goal, the recommendations described in [41,20] bear the risk of creating local optimums. Furthermore, [51,41,20] only consider the control-flow perspective, while our approach also deals with the resource perspective. All of the previously mentioned approaches optimize the execution of single process instances. Our approach, in turn, provides recommendations for optimizing the execution of several instances. Additionally, there exist some proposals which could be used to generate optimized enactment plans for BPs from declarative process specifications. Specifically, [29] proposes the generation of a non-deterministic finite state automaton from declarative specifications based on linear temporal logic (LTL) which represents exactly all traces that satisfy the LTL formulas. This approach could then be extended, by including estimates, and the overall completion time of all the traces can then in turn be calculated (e.g., [48]). In this approach, the big disadvantage is that the process of generatingtheautomaton from thedeclarative specifications is NP complete, and, unlike ourapproach,any heuristic has been used. In a similar way,CLIMB [26] can be used to generate quality traces from declarativespecifications, and calculate its completion time. Then, the best traces can be selected. Unlike our approach, [26] does not consider neither optimality nor resource perspective. 9. Conclusion and future work We propose a recommendation system for giving users assistance during process execution in flexible PAISs to optimize performance goals of the processes (i.e., minimization of overall completion time). The recommendations are generated considering the partial trace of the process execution, the constraint-based process model and resource availabilities. The recommendation system is based on a constraint-based approach, which is used for P&S the activities such that the process goal is optimized. In the proposed approach, both control-flow and resources are considered. Furthermore, the optimized enactment plans are updated by replanning techniques when necessary. Different constraint-based algorithms are applied to a range of test models of varying complexity, including an actual example, so that the suitability of our approach is tested regarding both build-time and run-time phases. The results indicate that the proposed approach produces a satisfactory number of suitable solutions, i.e., solutions which are optimal in most cases and quite good in other cases. As for future work, it is intended to integrate the proposed recommendation system with a framework for evaluating algorithms for operational support [27]. In addition,theproposed approach is intended to be extended byconsideringfurther objective functions. Moreover, we will explore various constraint-based solving techniques and analyze their suitability for the generation of optimized plans to assist users through recommendations. Furthermore, some extensions of ConDec templates are intended to be considered, e.g., branched templates (i.e., high-level relationships given between more than two activities). Additionally, we intend to consider further resource patterns. Acronyms AI artificial intelligence BP business process BPM business process management CJSSP cumulative job shop scheduling problem COP constraint optimization problem CP constraint programming CSP constraint satisfaction problem GRASP greedy randomized adaptive search procedure IBG iterative bounded greedy LNS large neighborhood search OCT overall completion time PAISs process-aware information systems P&S planning and scheduling Acknowledgements This work has been partially funded by the Spanish Ministerio de Ciencia e Innovación (TIN2009-13714) and the European Regional Development Fund (ERDF/FEDER). References [1] P. Baptiste, C. Le Pape, W. Nuijten, Satisfiability tests and time-bound adjustments for cumulative scheduling problems, Annals of Operations Research 92 (1999) 305–333. [2] I. Barba, C. Del Valle, A constraint-based approach for planning and scheduling repeated activities, Proc. Coplas, 2011, pp. 55–62. [3] I. Barba, C. Del Valle, Filtering rules for ConDec templates —pseudocode and complexity. Online http://regula.lsi.us.es/MOPlanner/FilteringRules.pdf 2011, (accessed 08-January-2013). [4] I. Barba, C. Del Valle, Planning and scheduling of business processes in run-time: a repair planning example, Information Systems Development (2011) 75–87. [5] I. Barba, B. Weber, C. Del Valle, Supporting the optimized execution of business processes through recommendations, Proc. BPI, vol. 99, 2012, pp. 135–140. [6] P. Brucker, S. Knust, Complex Scheduling (GOR-Publications), Springer-Verlag New York, Inc., 2006. [7] A.R. Chaturvedi, G.K. Hutchinson, D.L. Nazareth, Supporting complex real-time decision making through machine learning, Decision Support Systems 10 (2) (1993) 213–233. [8] P. Dourish, J. Holmes, A. MacLean, P. Marqvardsen, A. Zbyslaw, Freeflow: mediating between representation and action in workflow systems, Proc. CSCW, 1996, pp. 190–198. [9] In: M. Dumas, W.M.P. van der Aalst, A.H. ter Hofstede (Eds.), Process-aware Information Systems: Bridging People and Software Through Process Technology, Wiley-Interscience, 2005. [10] Dynadec, Comet downloads. Online http://dynadec.com/support/downloads/ 2010, (accessed 08-January-2013). [11] D. Fahland, D. Lübke, J. Mendling, H. Reijers, B. Weber, M. Weidlich, S. Zugal, Declarative versus imperative process modeling languages: the issue of understandability, Proc. BPMDS 2009 and EMMSAD 2009, 2009, pp. 353–366. [12] D. Fahland, J. Mendling, H.A. Reijers, B. Weber, M. Weidlich, S. Zugal, Declarative versus imperative process modeling languages: the issue of maintainability, Proc. BPM Workshops, 2010, pp. 477–488. [13] T.A. Feo, M.G.C. Resende, A probabilistic heuristic for a computationally difficult set covering problem, Operations Research Letters 8 (1989)67–71. [14] T.A. Feo, M.G.C. Resende, Greedy randomized adaptive search procedures, Journal of Global Optimization 6 (1995) 109–133. [15] G. Friedrich, M. Fugini, E. Mussi, B. Pernici, G. Tagni, Exception handling for repair in service-based processes, IEEE Transactions on Software Engineering 36 (2) (2010) 198–215. [16] H.L. Gantt, Work, Wages, and Profits, Engineering Magazine Co., 1913 [17] M.R. Garey, D.S. Johnson, Computers and Intractability: A Guide to the Theory of NP-completeness, W. H. Freeman & Co., New York, NY, USA, 1979. [18] M. Ghallab, D. Nau, P. Traverso, Automated Planning: Theory and Practice, Morgan Kaufmann, 2004. [19] B. Ha, J. Bae, Y. Park, S. Kang, Development of process execution rules for workload balancing on agents, Data & Knowledge Engineering 56 (1) (2006) 64–84. [20] C. Haisjackl, B. Weber, User assistance during process execution —an experimental evaluation of recommendation strategies, Proc. BPI, vol. 66, 2011, pp. 134–145. [21] Z. Huang, W.M.P. van der Aalst, X. Lu, H. Duan, Reinforcement learning based resource allocation in business process management, Data & Knowledge Engineering 70 (1) (2011) 127–145. [22] C. Le Pape, P. Couronne, D. Vergamini, V. Gosselin, Time-versus-capacity compromises in project scheduling, Proc. PlanSIG, 1994, pp. 498–502. [23] C. Li, M. Reichert, A. Wombacher, Mining business process variants: challenges, scenarios, algorithms, Data & Knowledge Engineering 70 (5) (2011) 409–434. [24] Y. Liu, H. Zhang, C. Li, R.J. Jiao, Workflow simulation for operational decision support using event graph through process mining, Decision Support Systems 52 (3) (2012) 685–697. [25] R. Lu, S. Sadiq, V. Padmanabhan, G. Governatori, Using a temporal constraint network for business process execution, Proc. ADC, 2006, pp. 157–166. [26] M. Montali, Specification and verification of declarative open interaction models: a logic-based approach. PhD thesis, Department of Electronics, Computer Science and Telecommunications Engineering, University of Bologna, 2009. [27] J. Nakatumba, M. Westergaard, W.M.P. van der Aalst, An infrastructure for cost-effective testing of operational support algorithms based on colored Petri nets, Proc. PETRI NETS, 2012, pp. 308–327. [28] M. Özbayrak, R. Bell, A knowledge-based decision support system for the management of parts and tools in FMS, Decision Support Systems 35 (4) (2003) 487–515. [29] M. Pesic, Constraint-based workflow management systems: shifting control to users. PhD thesis, Technische Universiteit Eindhoven, Eindhoven, 2008. [30] M. Pesic, M.H. Schonenberg, N. Sidorova, W.M.P. van der Aalst, Constraint-based workflow models: change made easy, OTM Conferences (1), 2007, pp. 77–94. [31] D. Pisinger, S. Ropke, Large neighborhood search, International Series in Operations Research & Management Science 146 (13) (2010) 399–420. [32] M. Reichert, J. Kolb, R. Bobrik, T. Bauer, Enabling personalized visualization of large business processes through parameterizable views, Proc. SAC, 2012, pp. 1653–1660. [33] M. Reichert, B. Weber, Enabling Flexibility in Process-aware Information Systems, Springer, 2012. [34] S. Rhee, N.W. Cho, H. Bae, Increasing the efficiency of business processes using a theory of constraints, Information Systems Frontiers 12 (4) (2010) 443–455. [35] F. Rossi, P. van Beek, T. Walsh, Handbook of Constraint Programming, Elsevier, 2006. [36] A. Rozinat, M.T. Wynn, W.M.P. van der Aalst, A.H.M. ter Hofstede, C.J. Fidge, Workflow simulation for operational decision support, Data & Knowledge Engineering 68 (9) (2009) 834–850. [37] N. Russell, W.M.P. van der Aalst, A.H.M. ter Hofstede, Workflow exception patterns, Proc. Caise, 2006, pp. 288–302. [38] N. Russell, W.M.P. van der Aalst, A.H.M. ter Hofstede, D. Edmond, Workflow resource patterns: identification, representation and tool support, Proc. Caise, 2005, pp. 216–232. [39] I. Rychkova, G. Regev, A. Wegmann, High-level design and analysis of business processes: the advantages of declarative specifications, Proc. RCIS, 2008, pp. 99–110. [40] M.A. Salido, Introduction to planning, scheduling and constraint satisfaction, Journal of Intelligent Manufacturing 21 (1) (2010) 1–4. [41] H. Schonenberg, B. Weber, B.F. van Dongen, W.M.P. van der Aalst, Supporting flexible processes through recommendations based on history, Proc. BPM, 2008, pp. 51–66. [42] J.H. Son, M.H. Kim, Improving the performance of time-constrained workflow processing, Journal of Systems and Software 58 (3) (2001) 211–219. [43] G.M. Thompson, J.C. Goodale, Variable employee productivity in workforce scheduling, European Journal of Operational Research 170 (2) (2006) 376–390. [44] C. Tsai, K. Huang, F. Wang, C. Chen, A distributed server architecture supporting dynamic resource provisioning for BPM-oriented workflow management systems, Journal of Systems and Software 83 (8) (2010) 1538–1552. [45] W.M.P. van der Aalst, S. Jablonski, Dealing with workflow change: identification of issues and solutions, International Journal of Computer Systems Science and Engineering 15 (5) (2000) 267–276. [46] W.M.P. van der Aalst, M. Pesic, DecSerFlow: towards a truly declarative service flow language, LNCS 4184, 2006, pp. 1–23. [47] W.M.P. van der Aalst, M. Pesic, H. Schonenberg, Declarative workflows: balancing between flexibility and support, Computer Science —Research and Development 23 (2) (2009) 99–113. [48] W.M.P. van der Aalst, M.H. Schonenberg, M. Song, Time prediction based on process mining, Information Systems 36 (2) (2011) 450–475. [49] B.F. van Dongen, W.M.P. van der Aalst, A meta model for process mining data, Proc. Caise, 2005, pp. 309–320. [50] P. van Hentenryck, The OPL Optimization Programming Language, MIT Press, 1999. [51] I. Vanderfeesten, H.A. Reijers, W.M.P. van der Aalst, Product based workflow support: a recommendation service for dynamic workflow execution, Technical Report BPM-08-03, BPMcenter.org, 2008. [52] J. Wainer, F. Bezerra, P. Barthelmess, Tucupi: a flexible workflow system based on overridable constraints, Proc. SAC, 2004, pp. 498–502. [53] J. Wainer, F. De Lima Bezerra, Constraint-based flexible workflows, LNCS 2806, 2003, pp. 151–158. [54] B. Weber, M. Reichert, S. Rinderle-Ma, Change patterns and change support features —enhancing flexibility in process-aware information systems, Data & Knowledge Engineering 66 (3) (2008) 438–466. [55] M. Weske, Business Process Management: Concepts, Methods, Technology, Springer, 2007. [56] J.L. Zhao, E.A. Stohr, Temporal workflow management in a claim handling system, SIGSOFT: Software Engineering Notes 24 (2) (1999) 187–195.