Earned schedule management as a complement for earned value management
Abstract
Earned Value Management is a well-known technique within project management, which allows to control and forecast the project based on your budget and its degree of execution. However, the behavior of this tool has a more significant significance from 20% of the project's progress. Many of their indicators are calculated in terms of cost and have been shown to perform poorly in the final stages of the project, showing a correct behavior when the project is delayed. Earned Schedule Management is an "evolution" of Earned Value Management that solves this deficiency.
Full text
©2018 by he au ho s. Licensee AEIPRO, Spain. This a icle is licensed unde a
C ea i e Commons A ibu ion-NonComme cial-NoDe i a i es 4.0 In e na ional
License (h ps://c ea i ecommons.o g/licenses/by-nc-nd/4.0/).
01-006
EARNED SCHEDULE MANAGEMENT AS A COMPLEMENT FOR EARNED VALUE MANAGEMENT
Mon e o Fe nández - Vi ancos, Guille mo
Uni e sidad de Se illa
Ea ned Value Managemen is a well-known echnique wi hin p ojec managemen , which allows
o con ol and o ecas he p ojec based on you budge and i s deg ee o execu ion. Howe e ,
he beha io o his ool has a mo e signi ican signi icance om 20% o he p ojec 's p og ess.
Many o hei indica o s a e calcula ed in e ms o cos and ha e been shown o pe o m poo ly
in he inal s ages o he p ojec , showing a co ec beha io when he p ojec is delayed. Ea ned
Schedule Managemen is an "e olu ion" o Ea ned Value Managemen ha sol es his
de iciency.
Keywo ds: Ea ned Value Managemen ; EVM; Ea ned Schedule Managemen ; ESM; moni o ing and
con ollingl; o ecas ing
GESTIÓN DE LA PROGRAMACIÓN GANADA COMO COMPLEMENTO A LA GESTIÓN DEL VALOR
GANADO
La Ges ión del Valo Ganado es una écnica ampliamen e conocida den o de la ges ión de
p oyec os, que pe mi e con ola y p onos ica el p oyec o a pa i de su p esupues o y su g ado
de ejecución. Sin emba go, el compo amien o de es a he amien a iene una signi icancia más
conside able a pa i del 20% de a ance del p oyec o.
Muchos de sus indicado es se calculan en é minos de cos e y se ha demos ado que se
desempeñan mal en las e apas inales del p oyec o, mos ando un compo amien o co ec o,
cuando el p oyec o es á e asado. La Ges ión de la P og amación Ganada es una “e olución”
de la Ges ión del Valo Ganado que sol en a es a de iciencia.
Palab as cla e: Ges ión del Valo Ganado; EVM; Ges ión de la P og amación Ganada; ESM; seguimien o
y con ol; p onós ico
Co espondencia: Guille mo Mon e o; [email p o ec ed]
22nd In e na ional Cong ess on P ojec Managemen and Enginee ing
Mad id, 11 h – 13 h July 2018
41
1. In oduc ion
In Decembe 1967, he Uni ed S a es Depa men o De ence (DoD) issued a di ec i e o
p i a e indus ies who wan ed o apply in i s majo p ocu emen p og ammes o incen i es wi h
35 Cos /Schedule Con ol Sys ems C i e ia, C/SCSC, ha means s anda ds o compliance.
O he go e nmen agencies in he Uni ed S a es, as well in o he na ions such as Aus alia,
Canada, Sweden, e c. adop ed simila ea ned- alue c i e ia in he managemen o hei majo
sys em acquisi ions (Fleming and Koppelman 2010, 1998).
The concep appea s in ea ly 1900s and came om indus ial enginee s in ac o ies who o
yea s ha e employed a h ee-dimensional app oach o assess ue “cos -pe o mance”
e iciencies (Fleming and Koppelman 1998). These dimensions consis s in:
1. Compa ison be ween ea ned s anda ds o ac o y ou pu s and incu ed cos s.
2. Compa ison be ween ea ned s anda ds and o iginal planed ones, o assess he schedule
esul s.
3. Cos a iance as he di e ence be ween he ac ual cos s spen and he ea ned s anda ds
in he ac o y.
Ea ned Value Managemen (EVM) is a p ojec managemen echnique ha allows you o
con ol he execu ion o a p ojec h ough i s budge and i s execu ion schedule and ela es he
esou ce planning, use o schedule and echnical pe o mance equi emen s (Abba 1997).
I he li e a u e is e iewed you can be seen some con o e sy. On he one hand au ho s who
ind he me hodology e y use ul (Kim, Wells, and Du ey 2003; Fleming and Koppelman 1998),
while on he o he hand o he s ind de iciencies (A hu 1983; Lukas 2008; Paja es Gu ié ez
and López Pa edes 2007). On a mo e gene ic le el, some o hese a e: quali y is ne e
conside ed, planned alue is he baseline and is calcula ed om unce ain p edic ions, high
implemen a ion cos s o high e o o cap u e cu en cos da a, especially in la ge p ojec s.
Ea ned Value Analysis loses p edic i e capaci y a he end o he p ojec . This happens
because as he p ojec p og esses, he ea ned alue ends o he planned alue. In ac , when
he p ojec ends, bo h alues mus ma ch. To o e come his de iciency, Lipke p oposes in 2003
he concep o "ea ned schedule" (Lipke 2003). O he issue o no ice is he lea ning e ec ha
akes place h oughou he li e cycle o he p ojec (Paja es Gu ié ez and López Pa edes
2007). O he poin o conside is he mo phology o he ne wo k. The p edic i e capaci y o he
ea ned alue, as well as he ea ned scheduled, in s ongly in luenced by his mo phology
(Vanhoucke and Vande oo de 2005, 2006).
In he planning phase, cos s o ime es ima ions a e s a ic, and a e wo d in he execu ing
phase he managemen need a lexible pe spec i e. Applying simula ions by inco po a ing he
a o emen ioned lexibili y in o he models, cos and ime es ima es a e ob ained ha a e
signi ican ly di e en om hose p o ided by he s a ic models (Jø gensen and Wallace 2000).
Also, he me hodology needs o in eg a e ac i i y sensi i i y in o ma ion o ime o ecas ing
(Elshae 2013).
An al e na i e o he model in oduces ea ned du a ion managemen , whe e schedule
pe o mance is calcula ed om me ics exp essed in ime uni s, and no in cos uni s
(Khamooshi and Gola shani 2014).
The Ea ned Value Managemen is de eloped unde condi ions wi hou unce ain y and ha by
in oducing a iabili y in he model, he p ojec manage can know i he de ia ions o he
planned alues a e in acco dance wi h he s a is ical a iabili y (Acebes, Paja es, and López-
Pa edes 2011; Acebes 2015; Acebes e al. 2014; Williams 1992, 1993).
22nd In e na ional Cong ess on P ojec Managemen and Enginee ing
Mad id, 11 h – 13 h July 2018
42
2. O e iew o he Concep s o Ea ned Schedule
The concep o he ea ned schedule is analogous o he ea ned alue. Howe e , ins ead o
using cos o measu e he pe o mance o he schedule, i would use ime. The nex poin s
desc ibe he basic glossa y1.
The Ea ned Value Managemen (EVM) is based on ou key a iables:
Planned Value (PV): The au ho ized budge assigned o scheduled wo k as o a gi en
epo ing da e.
Ac ual Cos (AC): The ealized cos incu ed o he wo k pe o med on an ac i i y du ing a
speci ic ime pe iod.
Ea ned Value (EV): The measu e o he wo k pe o med, exp essed in e ms o he budge
au ho ized o ha wo k.
Budge a Comple ion (BAC): The sum o all he budge s es ablished o he wo k o be
pe o med on a p ojec , wo k b eakdown s uc u e componen , con ol accoun , o wo k
package.
Conside ing hem, he Ea ned Value Managemen allows analyse he p ojec pe o mance in
he wo le els, cos and schedule:
Cos Va iance (CV): The amoun o budge de ici o su plus a a gi en poin in ime.
Schedule Va iance (SV): A measu e o schedule pe o mance on a p ojec . I is he
di e ence be ween he ea ned alue and he planned alue.
Fo hese bo h indica o s a alue equal o o g ea e han ze o indica es a a ou able
condi ion and a alue o less han ze o indica es an un a ou able condi ion.
Cos Pe o mance Index (CPI): A measu e o he cos e iciency o budge ed esou ces
exp essed as he a io o ea ned alue o ac ual cos .
Schedule Pe o mance Index (SPI): A measu e o schedule e iciency on a p ojec . I is he
a io o ea ned alue o planned alue.
As in he p e ious indica o s, a a io equal o o g ea e han one indica es a a ou able
condi ion and a alue o less han one indica es an un a ou able condi ion.
In pa allel, he Ea ned Schedule Managemen (ESM) s a s om wo a iables:
Ac ual Time (AT): The numbe o ime pe iods om he s a o he p ojec o he p ojec
s a us da e.
Ea ned Schedule (ES): I measu es he scheduled wo k accomplished, exp essed in he
ime based uni o measu e being u ilized.
Planned Du a ion (PD): The planned du a ion o he p ojec .
The equa ion (1) ep esen s he way o calcula e he ea ned alue, whe e n is he longes
pe iod which PVn ≤ EV.
𝐸𝑆
=
𝑛
+
𝐸𝑉
−
𝑃𝑉
𝑃𝑉
−
𝑃𝑉
(1)
The Figu e 1 shows hese a iables. The ea ned alue (EV) o he assessmen da e, which
ep esen he ac ual ime (AT), p ojec ed in he planed alue cu e p o ides he measu e o
he ea ned schedule.
1 The shown de ini ions come om he P ac ice S anda d o Ea ned Value Managemen (PMI 2005)
22nd In e na ional Cong ess on P ojec Managemen and Enginee ing
Mad id, 11 h – 13 h July 2018
43
Figu e 1: Main a iables o he ea ned alue and ea ned schedule o an assessmen da e.
Wi h hese, he me hod analyses also he p ojec pe o mance wi h he nex indica o s:
Schedule Va iance ( ime) (SV ): A measu e o schedule pe o mance on a p ojec
calcula ed using ea ned schedule.
A alue equal o o g ea e han ze o indica es a a ou able condi ion and a alue o less
han ze o indica es an un a ou able condi ion and will only e e o ze o a p ojec
comple ion i on- ime comple ion has been achie ed.
Schedule Pe o mance Index ( ime) (SPI ): A. measu e o ime-based schedule e iciency
on a p ojec calcula ed using ea ned schedule. I is he a io o ea ned schedule o ac ual
ime.
A SPI equal o o g ea e han one indica es a a ou able condi ion and a alue o less
han one indica es an un a ou able condi ion. The SPI will only e e o one a p ojec
comple ion i on ime comple ion has been achie ed.
Table 1. Pa allelism o he calcula ion o SV and SPI in he EVM and ESM pe spec i es.
EVM ESM
Schedule Va iance
𝑆𝑉
=
𝐸𝑉
−
𝑃𝑉
𝑆𝑉
=
𝐸𝑆
−
𝐴𝑇
Schedule Pe o mance Index
𝑆𝑃𝐼
=
𝐸𝑉
𝑃𝑉
𝑆𝑃𝐼
=
𝐸𝑆
𝐴𝑇
The Table 1 shows he pa allelism in he calcula ion o he schedule a iance and schedule
pe o mance index in he bo h pe spec i es. Bea ing in mind, ha in case o he schedule
a iance he uni o measu e o he Ea ned Value Managemen is mone a y, while o Ea ned
Schedule Managemen is ime.
As he p ojec p og esses, o ecas s can be de eloped o cos and schedule pe o mance.
Common o ecas ing i ems in Ea ned Value Managemen includes:
Es ima e a Comple ion (EAC): The expec ed o al cos o comple ing all wo k exp essed
as he sum o he ac ual cos o da e (AC) and he es ima e o comple e (ETC).
Es ima e o Comple e (ETC): The es ima ed cos o comple ing he emaining wo k.
22nd In e na ional Cong ess on P ojec Managemen and Enginee ing
Mad id, 11 h – 13 h July 2018
44
Va iance a Comple ion (VAC): A p ojec ion o he amoun o budge de ici o su plus,
exp essed as he di e ence be ween he budge a comple ion (BAC) and he es ima e a
comple ion (EAC).
To-Comple e Pe o mance Index (TCPI): A measu e o he cos pe o mance ha mus be
achie ed wi h he emaining esou ces in o de o mee a speci ied managemen goal, such
as he EAC o he BAC.
In his case, a alue g ea e han one indica es an un a ou able condi ion and a alue
equal o o less han ze o indica es a a ou able condi ion.
As be o e, by ans e ing hese a ios o Ea ned Value Managemen , he o ecas ing indica o s
a e:
Es ima e a Comple ion ( ime) (EAC ): The expec ed o al ime o comple ing p ojec wo k.
I is equal o he ac ual ime plus he es ima e o comple e ( ime) o he emaining wo k.
Es ima e o Comple e ( ime) (ETC ): The es ima ed du a ion o comple ing he emaining
wo k.
Va iance a Comple ion ( ime) (VAC ): The di e ence be ween he planned du a ion
assigned o a p ojec .
To-Comple e Schedule Pe o mance Index (TSPI): The calcula ed p ojec ion o schedule
pe o mance ha mus be achie ed on emaining wo k o mee a speci ied goal, such as
he EAC o he planed du a ion calcula ed using ea ned schedule.
3. Applica ion o Real P ojec s
As p e iously men ioned, he schedule a ia ion (SV) and he schedule pe o mance index
(SPI) beha e e oneously in he inal s age o a p ojec , and his is e en wo se when we know
ha he p ojec has inished mo e la e han expec ed, since hese indica o s indica e ha he
p ojec has been comple ed as planned when in eali y i is no so.
Lipke (2003) conside s wo special cases: Ea ly Finish P ojec and La e Finish P ojec , in o de
o in oduce he Schedule Value Managemen . La e on, Vande oo de and Vanhoucke (2006)
in hei conduc ed analysis abou his me hodology di e en ia e also when p ojec s unde - un
and o e - un cos .
Following his classi ica ion, he Figu e 2 shows he di e en si ua ions, conside ing i he ac ual
ime a he end (ATend) o he p ojec exceeds o no he planed du a ion (PD) and i he ac ual
cos a he end (ACend) exceeds o no he budge a comple ion (BAC).
22nd In e na ional Cong ess on P ojec Managemen and Enginee ing
Mad id, 11 h – 13 h July 2018
45
Figu e 2: Classi ica ion o p ojec s acco ding o cos and ime si ua ion.
The Ea ned Value Managemen was applied in h ee di e en p ojec s ela ed o ae onau ical
indus y, as shown in he Table 2. These can be loca ed in he uppe igh a ea o he Figu e
2.
Table 2. P ojec po olio.
Cos (€)
Time (mon hs)
P ojec Classi ica ion
BAC ACend
PD ATend
Implemen a ion o p ocu emen p ocedu e
La e Finish
O e -Run
Cos
650,000 697,125
12 13
S anda diza ion o KPIs and epo s
La e Finish
O e -Run
Cos
1,150,000
1,497,990
12 16
Implemen a ion o imp o emen o inal
assembly line (FAL) o a comme cial plane
La e Finish
O e -Run
Cos
2,250,000
2,742,425
12 18
The h ee p ojec s a e o la e comple ion. As men ioned p e iously, he accu acy and eliabili y
o he ea ned schedule me ics can be clea ly seen when he p ojec has inished la e han
expec ed, since in his case he schedule pe o mance indica o s o he Ea ned Value
Managemen show inco ec ly ha he p ojec has been comple ed on ime when in eali y i is
no ue. This does no mean ha Ea ned Schedule Managemen canno be applied o p ojec s
o ea ly comple ion, since as we ha e seen p e iously, i can be applied o any ype o p ojec
as wi h Ea ned Value Managemen .
I can also be obse ed ha he h ee p ojec s end wi h an o e - un cos , al hough in his case
i is i ele an o he pu pose o his esea ch, since we a e only analysing he pe o mance o
he schedule indica o s. The ea ned alue me ics a e only applicable o he ime a iable, so
i is i ele an ha he p ojec has inished wi h a low budge , as planned o wi h an excess o
budge .
The i s p ojec co esponds o he implemen a ion o p ocu emen p ocedu e, he second one
o he s anda diza ion o KPIs and epo s in he p ojec managemen o ice and he hi d one
o he implemen a ion o imp o emen o inal assembly line (FAL) o a comme cial ai c a .
22nd In e na ional Cong ess on P ojec Managemen and Enginee ing
Mad id, 11 h – 13 h July 2018
46
The Table 3 shows he calcula ed da a o he schedule pe o mance indica o s o he Ea ned
Value Managemen , as well as o Ea ned Value Managemen , which a e he mos in e es ed
o e i y he eliabili y o his las me hodology.
Table 3. Schedule indica o s o he i s p ojec .
Pe iod SV SPI n ES SV SPI
1 -975 0.93 0 0.93 -0.08 0.93
2 -10,010 0.85 1 1.81 -0.19 0.90
3 -17,875 0.88 2 2.77 -0.23 0.92
4 -18,850 0.90 3 3.64 -0.36 0.91
5 -52,065 0.83 4 4.53 -0.47 0.91
6 -85,020 0.76 5 4.64 -1.36 0.77
7 13,780 1.04 6 7.27 0.27 1.04
8 21,645 1.05 7 8.56 0.56 1.07
9 38,220 1.08 8 9.37 0.37 1.04
10 -23,985 0.96 9 9.77 -0.23 0.98
11 -35,425 0.94 10 9.97 -1.03 0.91
12 -31,655 0.95 11 11.03 -0.97 0.92
13 0 1.00 12 12.00 -1.00 0.92
As can be seen, he same hing happens as p e iously men ioned o la e inish p ojec s. The
indica o s o Ea ned Value Managemen , SV and SPI, show he alues 0 and 1, espec i ely,
indica ing a pe ec comple ion, when we know ha his is no he case, while he indica o s o
he Ea ned Schedule Managemen , SV and SPI , indica e he alues -1 and 0.92, espec i ely,
ha i hey show eally wha is happening, since p ojec has inished a mon h la e han
planned.
In he same way, he Table 4 and Table 5 show he da a o he second and hi d p ojec . As
in he case o he i s p ojec , he indica o s SV and SPI indica e he alues 0 and 1,
espec i ely, while he indica o s SV and SPI show he alues -4 and 0.75 in he second
p ojec (Table 4) and -6 y 0.67 o he las one (Table 5), as we al eady in ui ed a he
beginning. The e o e, ea ned schedule indica o s show wha is eally happening, ha is why
hey ha e g ea e eliabili y, in addi ion o gi ing esul s in uni s o ime and no in mone a y
uni s as i happens wi h he schedule indica o s o he Ea ned Value Managemen .
22nd In e na ional Cong ess on P ojec Managemen and Enginee ing
Mad id, 11 h – 13 h July 2018
47
Table 4. Schedule indica o s o he second p ojec .
Pe iod SV SPI n ES SV SPI
1 2,415 1.04 1 1.02 0.02 1.02
2 -8,855 0.95 1 1.91 -0.09 0.96
3 -61,755 0.79 2 2.51 -0.49 0.84
4 -112,585 0.73 3 3.02 -0.98 0.76
5 -133,515 0.74 3 3.74 -1.26 0.75
6 -161,920 0.74 4 4.55 -1.45 0.76
7 -125,465 0.82 5 5.61 -1.39 0.80
8 -158,010 0.80 5 5.93 -2.07 0.74
9 -234,600 0.74 6 6.51 -2.49 0.72
10 -255,875 0.74 7 7.13 -2.88 0.71
11 -269,215 0.75 8 8.05 -2.95 0.73
12 -291,870 0.75 8 8.60 -3.40 0.72
13 -238,855 0.79 9 9.04 -3.96 0.70
14 -170,085 0.85 10 10.03 -3.97 0.72
15 -77,510 0.93 11 11.16 -3.84 0.74
16 0 1.00 12 12.00 -4.00 0.75
Table 5. Schedule indica o s o he hi d p ojec .
Pe iod SV SPI n ES SV SPI
1 22,470 1.19 1 1.17 0.17 1.17
2 44,965 1.18 2 2.23 0.23 1.11
3 -40,774 0.91 2 2.79 -0.21 0.93
4 -307,800 0.62 3 3.14 -0.86 0.78
5 -315,031 0.68 3 3.58 -1.42 0.72
6 -247,623 0.77 4 4.18 -1.82 0.70
7 -337,572 0.74 4 5.00 -2.00 0.71
8 -468,274 0.69 5 5.60 -2.40 0.70
9 -521,360 0.69 6 6.38 -2.62 0.71
10 -517,310 0.72 7 7.11 -2.89 0.71
11 -644,754 0.69 7 7.71 -3.29 0.70
12 -684,900 0.70 8 8.30 -3.70 0.69
13 -532,575 0.76 9 9.14 -3.86 0.70
14 -406,125 0.82 9 9.95 -4.05 0.71
15 -284,400 0.87 10 10.46 -4.54 0.70
16 -176,625 0.92 10 10.90 -5.10 0.68
17 -72,900 0.97 11 11.52 -5.48 0.68
18 0 1.00 12 12.00 -6.00 0.67
22nd In e na ional Cong ess on P ojec Managemen and Enginee ing
Mad id, 11 h – 13 h July 2018
48
4. Conclusions
Wi h he de elopmen o he Ea ned Value Managemen , di e en au ho s indica e ha he
schedule indica o s beha e e oneously, especially in he inal s age o a p ojec . Fo his
eason, p ojec manage s conside ha cos indica o s a e mo e eliable han schedule ones.
As a esul o his p oblem, in 2003 Lipke p oposed a new me hod o calcula ing he schedule
indica o s, called "Ea ned Schedule". As I ha e shown h oughou he documen , hese ea ned
schedule indica o s a e mo e eliable and accu a e han he co esponden s in he Ea ned
Value Managemen .
So much has been he impac o he Ea ned Schedule Managemen ha he P ojec
Managemen Ins i u e (PMI) has included i in i s book "P ac ice S anda d o Ea ned Value
Managemen ", explaining he concep o ea ned schedule and how o calcula e i .
Th oughou hese almos i een yea s, since he concep ion o he ea ned schedule concep ,
nume ous esea che s ha e been ca ied ou o e i y he accu acy and applicabili y o his
new me hod.
I is no in ended ha his new me hod, Ea ned Schedule Managemen , eplaces Ea ned Value
Managemen , bu ha bo h me hods a e used oge he .
5. Re e ences
Abba, W. 1997. “Ea ned Value Managemen -Reconciling Go e nmen and Comme cial
P ac ices.” P og am Manage 26 (1): 58–63.
Acebes, Fe nando. 2015. “In eg ación de La Ince idumb e Y Riesgos En La Ges ión Y
Con ol de P oyec os.” Uni e sidad de Valladolid.
Acebes, Fe nando, Ja ie Paja es, José Manuel Galán, and Adol o López-Pa edes. 2014. “A
New App oach o P ojec Con ol unde Unce ain y. Going back o he Basics.”
In e na ional Jou nal o P ojec Managemen 32: 423–34.
Acebes, Fe nando, Ja ie Paja es, and Adol o López-Pa edes. 2011. “In luencia Del Riesgo
Es acional En La Línea Base de Riesgos Del P oyec o.” XV In e na ional Con e ence on
Indus ial Enginee ing and Indus ial Managemen , no. Janua y 2015.
A hu , D. 1983. “Su ey Rela ing o he Implemen a ion o Cos /Schedule Con ol Sys em
C i e ia Wi hin he Depa men o De ense and Indus y, Phase I and II: A Repo o he
Assis an Sec e a y o De ense.”
Elshae , Raa a . 2013. “Impac o Sensi i i y In o ma ion on he P edic ion o P ojec ’s
Du a ion Using Ea ned Schedule Me hod.” In e na ional Jou nal o P ojec Managemen
31 (4). Else ie L d and IPMA: 579–88. h ps://doi.o g/10.1016/j.ijp oman.2012.10.006.
Fleming, Quen in W., and Joel M Koppelman. 1998. “Ea ned Value P ojec Managemen . A
Powe ul Tool o So wa e P ojec s.” C oss alk The Jou nal o De ense So wa e
Enginee ing 11 (6): 19–23.
h p://s a ic1.1.sqspcdn.com/s a ic/ /702523/9173170/1288308420137/199807-
Fleming.pd ? oken=E6iNhDP7 0RFZXy sUbG jqOiJ8%3D.
Fleming, Quen in W, and Joel M Koppelman. 2010. Ea ned Value P ojec Managemen .
Edi ed by P ojec Managemen Ins i u e. P ojec Managemen Ins i u e. 4 hed.
Pennsyl ania: P ojec Managemen Ins i u e. h ps://doi.o g/10.1016/S0263-
7863(97)83206-1.
Jø gensen, T ond, and S ein W. Wallace. 2000. “Imp o ing P ojec Cos Es ima ion by
Taking in o Accoun Manage ial Flexibili y.” Eu opean Jou nal o Ope a ional Resea ch
22nd In e na ional Cong ess on P ojec Managemen and Enginee ing
Mad id, 11 h – 13 h July 2018