New efficient constructive heuristics for the hybrid flowshop to minimise makespan: A computational evaluation of heuristics

Fernández-Viagas Escudero, Víctor; Molina Pariente, José Manuel; Framiñán Torres, José Manuel

Abstract

This paper addresses the hybrid flow shop scheduling problem to minimise makespan, a well-known scheduling problem for which many constructive heuristics have been proposed in the literature. Nevertheless, the state of the art is not clear due to partial or non homogeneous comparisons. In this paper, we review these heuristics and perform a comprehensive computational evaluation to determine which are the most efficient ones. A total of 20 heuristics are implemented and compared in this study. In addition, we propose four new heuristics for the problem. Firstly, two memory-based constructive heuristics are proposed, where a sequence is constructed by inserting jobs one by one in a partial sequence. The most promising insertions tested are kept in a list. However, in contrast to the Tabu search, these insertions are repeated in future iterations instead of forbidding them. Secondly, we propose two constructive heuristics based on Johnson’s algorithm for the permutation flowshop scheduling problem. The computational results carried out on an extensive testbed show that the new proposals outperform the existing heuristics.

Full text

See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/326680884 New efficient constructive heuristics for the hybrid flowshop to minimise makespan: A computational evaluation of heuristics ArticleinExpert Systems with Applications · July 2018 DOI: 10.1016/j.eswa.2018.07.055 CITATIONS 4 READS 115 3 authors: Some of the authors of this publication are also working on these related projects: Collaboration strategies in de centralized supply chains with partial information sharing View project Models and algorithms for the order scheduling problems considering setup times View project Victor Fernandez-Viagas Universidad de Sevilla 34 PUBLICATIONS401 CITATIONS SEE PROFILE Jose M. Molina-Pariente Universidad de Sevilla 14 PUBLICATIONS112 CITATIONS SEE PROFILE Jose M. Framinan Universidad de Sevilla 188 PUBLICATIONS3,131 CITATIONS SEE PROFILE All content following this page was uploaded by Victor Fernandez-Viagas on 04 February 2019. The user has requested enhancement of the downloaded file. New efficient constructive heuristics for the hybrid flowshop to minimise makespan: A computational evaluation of heuristics. ∗ Victor Fernandez-Viagas1† , Jose M. Molina-Pariente1, Jose M. Framinan1 1Industrial Management, School of Engineering, University of Seville, Camino de los Descubrimientos s/n, 41092 Seville, Spain, {vfernandezviagas,jmolina1,framinan}@us.es February 4, 2019 Abstract This paper addresses the hybrid flow shop scheduling problem to minimise makespan, a well-known scheduling problem for which many constructive heuristics have been proposed in the literature. Nevertheless, the state of the art is not clear due to partial or non homogeneous comparisons. In this paper, we review these heuristics and perform a comprehensive computational evaluation to determine which are the most efficient ones. A total of 20 heuristics are implemented and compared in this study. In addition, we propose four new heuristics for the problem. Firstly, two memory-based constructive heuristics are proposed, where a sequence is constructed by inserting jobs one by one in a partial sequence. The most promising insertions tested are kept in a list. However, in contrast to the Tabu search, these insertions are repeated in future iterations instead of forbidding them. Secondly, we propose two constructive heuristics based on Johnson’s algorithm for the permutation flowshop scheduling problem. The computational results carried out on an extensive testbed show that the new proposals outperform the existing heuristics. Keywords: Scheduling, hybrid Flowshop, Heuristics, Makespan, Computational evaluation, HFS, memory-based constructive heuristics ∗Preprint submitted to Computers & Industrial Engineering. DOI:10.1016/j.eswa.2018.07.055 †Corresponding author. Email: [email protected] 1 1 Introduction The flowshop scheduling problem is one of the most active research areas within Operations Research (see e.g. Framinan et al., 2004; Ruiz and Maroto, 2005; Fernandez-Viagas et al., 2017 for reviews on the topic). In the flowshop layout, njobs have to be processed on mstages, each one composed of a single machine, following each job the same route of stages. The problem then consists in obtaining the best sequence of jobs in each machine according to a certain objective (typically the minimisation of makespan, see e.g. Fernandez-Viagas and Framinan, 2014, or the total completion times, see e.g. Fernandez-Viagas and Framinan, 2017a). However, in many manufacturing scenarios several machines in parallel are used to perform an operation as it serves to increase the capacity and/or throughput; to balance the use of the stages; and to decrease the influence of the bottleneck machine (Naderi et al., 2010). This flowshop problem with parallel machines in each stage is usually denoted as the Hybrid Flowshop Scheduling (HFS) problem or flexible flowshop scheduling problem. In this paper we address the HFS with the objective of makespan minimisation which is known to aim at minimising production run and maximising machine utilisation. The problem can be denoted as HFm||Cmax or FFm||Cmax following Graham et al. (1979) and, alternatively, by FHm, ((PMk)m k=1)||Cmax following Ruiz and Vázquez-Rodríguez (2010). Since the problem under consideration is known to be NP-hard by Gupta, 1988 (for the problem even when there are two stages: one with two machines and the other one with a single machine), and by Rinnooy Kan, 1976 (for the problem with a single stage with more than two machines), many approximated algorithms have been developed in the literature (see in this regard the reviews by Ruiz and Vázquez-Rodríguez, 2010; Ribas et al., 2010 and e.g. Dios et al., 2018; Chung et al., 2017; Zhong and Shi, 2018; Ying and Lin, 2018). In these reviews, most contributions focus on the HFS with identical parallel machines and the maximum completion time or makespan (denoted as Cmax) as objective, which is also the problem under consideration here. Despite the different heuristics proposed for the problem (see Section 2), we are not aware of any computational evaluation comparing all of them under the same conditions, and only partial comparisons have been performed in the existing literature, using a small subset of heuristics 2 and/or different sets of instances for each comparison. Among the heuristics proposed for the problem, the NEH (originally proposed by Nawaz et al., 1983 for flowshop scheduling and adapted for our problem by Brah and Loo, 1999) seems to be, up to now, one of the best heuristics for the problem, due to its extensive use as initial solution of metaheuristics or as a reference procedure for other constructive heuristics. Despite the excellent performance of the NEH for a range of scheduling problems, recent research has shown different strategies to enhance it: On the one hand, the use of the original objective function of the problem to select the best partial sequence in a heuristic must not necessary imply the best decision in an iteration of the algorithm (see e.g. Dong et al., 2008; Fernandez- Viagas and Framinan, 2015b, where tie-breaking mechanisms based on idle times are included in the evaluation of partial sequences to improve the solutions in related problems); On the other hand, Fernandez-Viagas and Framinan (2017b) found that, under certain conditions, some stages could be ignored in the traditional flowshop, being approximately equivalent to a singlemachine scheduling problem. Note that both reasonings could be also applied to the problem under consideration. To tackle these challenges, our contribution to the problem is twofold: Firstly, an exhaustive computational evaluation of the heuristics available for the problem is performed. Secondly, we propose four new efficient (memory-based and Johnson-based) constructive heuristics that take into account the aforementioned ideas and that our experiments show that they outperform the existing ones. The first two heuristics construct a solution step by step in a greedy manner, but also taking into consideration the most promising partial solutions obtained in the previous iteration. The last two heuristics reduce the problem to different two-machine flowshop scheduling problems and use the Johnson’s algorithm (Johnson, 1954) to solve them exactly. The remainder of the paper is organised as follows: In Section 2, the problem under consideration is formally described and its background is discussed. The constructive heuristics proposed are described in Section 3. The computational evaluation of both existing and new heuristics is presented in Section 4. Finally, the conclusions are discussed in Section 5. 3 2 Problem description and background The problem under study can be defined as follows. There is a set Nof njobs that have to be processed on a set Mof mstages. Each stage i(∀i∈ {1, . . . , m}) is composed of miidentical machines. Each job has to be processed on only one machine in each stage, all jobs following the same order of stages. The processing time of job jin stage iis denoted by pij. The problem then consists in determining, for each stage, both the machines where each job is to be processed and the order of jobs to process for each machine in order to minimise the maximum completion time or makespan (Cmax). In addition, the following hypotheses are also adopted: each machine processes at most one job at the same time, and each job is available at initial time; setup times are considered as sequence-independent and non-anticipatory, and they can hence be included in the processing times of the jobs; finally, unlimited inventory is considered between stages. Note that many approximated algorithms have been proposed to solve the problem in the existing literature, as already mentioned in Section 1 (see Ruiz and Vázquez-Rodríguez, 2010; Ribas et al., 2010 for a more detailed review and explanation of all these approaches). Approximate algorithms can be classified in heuristics and metaheuristics (Framinan et al., 2005 and Ruiz and Maroto, 2005). While heuristics (constructive and improvement) typically obtain a fast solution using a fixed number of iterations, metaheuristics are typically forced to stop after a fixed CPU time or number of iterations. In this section, we focus in studies proposing constructive or improvement heuristics for the HFm||Cmax problem. In addition, metaheuristics typically require initial solutions obtained using constructive/improvement heuristics. Therefore, we also review the existing metaheuristics for the problem in order to identify additional constructive/improvement heuristics. Lee and Vairaktarakis (1994) solve the two-stage HFS problem to minimise makespan by using a simple heuristic that assigns jobs to the first stage with the First Available Machine rule (FAM), i.e. each job in a sequence is assigned to the first machine which becomes available. In the second stage, a mirror image of the FAM rule, named Last Busy Machine rule (LBM), is developed to assign the jobs. Koulamas and Kyparisis (2000) propose three linear time heuristics to solve the two- and three-stage case. More specifically, the HLheuristic solves the two-stage 4 case and two heuristics (denoted as H0and HS) solve the three-stage case. Several heuristics are also proposed by Soewandi and Elmaghraby (2001) to solve the three-stage problem. For the m-stage case, Santos et al. (1996) adapt four heuristics by Campbell et al. (1970), Palmer (1965), Gupta (1971), and Dannenbring (1977), originally developed for the permutation flowshop to minimise makespan. In their experiments, the proposals by Campbell et al. (1970) (denoted as CDS1) and Dannenbring (1977) (denoted as DNN) outperform the heuristics by Palmer (1965), and Gupta (1971). Brah and Loo (1999) compare the CDS1 heuristic against four other heuristics originally proposed for the permutation flowshop problem by Nawaz et al. (1983), Hundal and Rajgopal (1988), Park et al. (1984), and Ho (1995). All heuristics were adapted to the hybrid flowshop to minimise makespan and other objectives. The most promising heuristic regarding the makespan are the heuristic by Nawaz et al., 1983 (denoted as NEH), the CDS1 heuristic, and the adaptation of CDS2 (originally proposed by Park et al., 1984). Acero-Dominguez and Paternina-Arboleda (2004); Paternina-Arboleda et al. (2008) propose a heuristic, denoted as BH, based in the bottleneck concept according to the theory of constraints (Goldratt and Cox (1992)). They compare their proposal against the traditional shifting bottleneck heuristic (proposed by Adams et al., 1988 to solve a job shop layout) and against the hybrid shifting bottleneck-local search (proposed by Pinedo and Chao, 1999). Regarding metaheuristics, Alaykýran et al. (2007) and Engin and Döyen (2004) propose an Artificial Immune System and an Ant Colony Optimisation, respectively. With respect to the generation of initial solutions for these algorithms, the former uses a random population based on the idle times between the jobs, while in the latter the method to obtain the initial population is not described. Their algorithms outperform a B&B by Néron et al. (2001) (using a maximum CPU time) on the set of instances proposed by Carlier and Néron (2000) (note that, although this benchmark only considers a maximum number of jobs equal to 15, it is the most used benchmark so far for the problem under consideration). Negenman (2001) adapts several local search algorithms from the flow shop and job shop literature, and compares them against a variable-depth search and a Simulated Annealing. No indication of the initial solution is detailed. Niu et al. (2009) propose a quantum algorithm using an initial population randomly generated (see e.g. Norman and Bean, 1999; Kurz and Askin, 2004). Liao et al. (2012) propose a hybrid Particle 5 Swarm Optimization (PSO) using the BH heuristic to obtain the initial solution. Their results have been compared using the benchmark from Carlier and Néron (2000) against some existing metaheuristics (Carlier and Néron, 2000; Néron et al., 2001; Engin and Döyen, 2004; Niu et al., 2009; Alaykýran et al., 2007). A simple iterated greedy algorithm and two different constructive heuristics, denoted as WT1(x) and WT2(x), are proposed by Kizilay et al. (2015). Regarding WT1(x) and WT2(x), they found that both outperform NEH. However, the comparison is carried out using different computational CPU times. An Estimation of Distribution Algorithm using a random population is proposed by Wang et al. (2013). This algorithm outperforms the proposals by Liao et al. (2012), and Engin and Döyen (2004). Pan et al. (2014) develop a Discrete Artificial Bee Colony Algorithm (DABC). In addition, they propose several dispatching rules and NEH-based heuristics to solve the problem. These heuristics reduce the number of positions where each job has to be inserted. Among them, the best results are found by the dispatching rules SPTB (jobs ordered according to non-decreasing processing times till bottleneck stage) and bLPTB (jobs ordered in a backward manner according to non-decreasing processing times till bottleneck stage), and by the NEH-based heuristics NEHLPT(λ), and bNEHSPT(λ). Regarding contributions in related (more constrained) problems, Barman (1997) proposes several dispatching rules for the three-stage problem considering release dates, and minimising total flow time, total tardiness or number of tardy jobs. Each rule uses a different method to construct the sequence in each stage. The best result is found for the total flow time by chosing the jobs in the queue between stages according to the SPT rule, denoted as FIFO(SPT). Jayamohan and Rajendran (2000) extend the experimentation performed by Barman (1997) to other objectives (maximum flowtime, variance of flowtime, maximum tardiness and variance of tardiness) and considering new dispatching rules. The PT+WINQ+AT rule (Holthaus and Rajendran, 1997), denoted as FIFO(PT+WINQ+AT), obtains the best result for the maximum flowtime minimisation. To summarise, different heuristics have been proposed to solve the problem under study during the last twenty years. Nevertheless, the state-of-the art regarding heuristic methods is nowadays unclear due to the following issues: 1. Despite the good results obtained by Santos et al. (1996), and Brah and Loo (1999), to 6 the best of our knowledge, their heuristics have not been used and/or compared against new proposals, so their actual performance remains unclear. 2. Several heuristics have been proposed in the literature during the last years (see e.g. Acero- Dominguez and Paternina-Arboleda, 2004; Paternina-Arboleda et al., 2008; Pan et al., 2014) to solve the problem either to obtain fast solutions or to be used as seed sequences of more complex algorithms. However, to the best of our knowledge, a direct comparison between them does not exist. 3. In most of the existing heuristics, jobs are sequenced between stages according to simple rules, such as the FIFO rule (jobs ordered according to non decreasing completion times in the previous stage). However, the results by Barman (1997), Holthaus and Rajendran (1997) and Jayamohan and Rajendran (2000) suggest that other rules could provide good solutions for the problem. Despite their potential, such rules have not been incorporated so far in the existing algorithms. 4. Recent advances in constructive greedy heuristics have shown the potential of using tailored indicators to improve the myopic nature of these heuristics (Fernandez-Viagas et al., 2017). 5. Finally, it can be seen that additional heuristics could be developed by further exploring the division of the original problem in subsets. Particularly, the use of heuristics for the 2-machine flowshop (i.e. Johnson) has not been sufficiently analysed: despite being a straightforward adaptation from the flowshop layout, the CDS2 heuristic provides very good results, and it could be further refined by considering the number of machines on each stage. As a result, both a computational evaluation of heuristics and new efficient approaches are pertinent. In Section 3 we propose several heuristics based in the aforementioned considerations, while in Section 4 the computational evaluation is carried out. 7 3 Proposed constructive heuristics In this section, two memory-based constructive heuristics (see Subsection 3.1) and two Johnsonbased constructive heuristics (see Subsection 3.2) are proposed to find fast solutions for the problem. All these heuristics use a unique sequence to represent a solution for the problem. This sequence indicates the order in which the jobs are processed in the first stage. The FIFO rule is used to extend the solution to other stages, i.e. the sequence of jobs in stage i(with i > 1) is obtained by ordering the jobs according to non-decreasing completion times in stage i−1. Furthermore, within each stage, jobs are processed in the machines according to the FAM rule, i.e. the first job of the sequence in a stage is assigned to the first machine that becomes available and so forth. 3.1 Memory-based constructive heuristics Two memory-based constructive heuristics are proposed in this section: a Fast Memory-based Constructive Heuristic (denoted as FMCH), and a Memory-based Constructive Heuristic (denoted as MCH). Both heuristics construct a complete sequence by inserting, one by one, a job in the best position of a partial sequence, following a mechanism similar to that in the NEH heuristic. However, these heuristics use an objective function that combines the minimisation of makespan and idle time to evaluate the partial sequences. As explained in Section 1, the evaluation of these partial sequences substantially influences the efficiency of this type of heuristics. Although the final objective is minimising the makespan, using solely the minimisation of this criterion to select the best partial sequence may result in a wrong choice in the first iterations of the algorithm when the partial sequences are composed of very few jobs. In addition, a memory mechanism is incorporated in our proposals. This mechanism works exactly in the opposite way than the tabu list in the tabu search. Thus, the idea behind this mechanism is to keep the most promising moves to test them in future iterations. Regarding FMCH, in the related permutation flowshop scheduling problem (Fm|prmu|Cmax), Kalczynski and Kamburowski (2007, 2008, 2009) obtained very good results by inserting each job in the position with the lowest makespan, and in case of ties, in 8 To normalize the processing times in a machine i, they are multiplied at most by max{m0;m00 } (to have the same maximum reference in both artificial machines). In addition, the processing times which form the first reduced machine are normalised by m00 /m0if m00 6=m0(this weight is introduced to balance the case where the number of machines considered in the second artificial machine is either lower or greater than in the first one). cand dare again parameters of the algorithm which are introduced to balance the expressions. Procedure JbH2 for k1= 1 to mdo for k2=k1to mdo m0=k1; m00 =m−k2+ 1; max=max{m0;m00 } for j= 1 to ndo p0 1j=Pk1 i=1 (max{m0;m00 }−i+1)·m00 /m0+m·a mi+b·pij; p0 2j=Pm i=k2 max{m0;m00 }−m+i+m·a mi+b·pij; end Π := permutation obtained by Johnson’s algorithm in the reduced two-machine flowshop problem using p0 ij (with i∈ {1,2}) as the processing times. Let OF denote the value of the objective function of such sequence; if k1= 1&k2= 1 then OFb:= OF; else if OF < OFbthen OFb:= OF; end end end end Figure 4: Pseudocode of JbH2 15 4 Computational evaluation In this section, a computational evaluation is carried out to compare the different heuristics. Subsection 4.1 explains the sets of instances generated for the comparisons. The indicators to assess the algorithms are detailed in Subsection 4.2. In Subsection 4.3, an experimental parameter tuning is performed to find the best values of the parameters for JbH1 and JbH2. The heuristics implemented are listed in Subsection 4.4. Finally, the results of the computational evaluation are presented in Subsections 4.5. 4.1 Testbeds In the problem under study, the parameters n,m,mi, and pij must be completely defined for each instance. Several approaches and instances have been employed in the literature to test approximate algorithms. However, most of them use small instances (see e.g. Carlier and Néron, 2000; Liao et al., 2012) and/or very different values for the parameters. In this paper, a common set of big instances (denoted as β1) is generated as follows: •Number of jobs, n:n∈ {20,50,100,150}(see e.g. Naderi et al., 2009; Pan et al., 2014 for similar ranges). •Number of stages, m:m∈ {5,10,20}(taken from Taillard, 1993). •Number of machines per stage, mi: three different procedures have been applied to generate the set of instances using parameter s∈ {0,1,2}.s= 0 generates instances with 2 machines in a unique stage (randomly generated) and 3 machines in the rest (see e.g. Carlier and Néron, 2000; Kouvelis and Vairaktarakis, 1998 for similar approaches); s= 1 generates instances with the same number of machines, mi= 3 ∀i, in each stage (see e.g. Naderi et al., 2009); finally, s= 2 generates machines using a uniform distribution [1,3]. Note that the use of uniform distribution is the most common approach to generate the machines, see e.g. Liao et al., 2012; Pan et al., 2014; Dios et al., 2018). •Processing times, pij: all instances are generated using a uniform distribution [1,99] (see e.g. Naderi et al., 2009; Pan et al., 2014). 16 •Number of replications. 10 instances have been generated for each combination of n,m, and s, which results in a total of 360 instances. In addition, a different testbed of 360 instances, denoted by β2, is generated following the same procedure as above and is used to obtain the best values for the parameters of the algorithms JbH1 and JbH2, in order to avoid an overcalibration of these algorithms. 4.2 Performance indicators In this paper, a total of 20 heuristics are compared under the same conditions. Since each algorithm obtains a value of the objective function typically requiring a different CPU time in each instance, in order to have a fair comparison, the Average Relative Percentage Deviation (ARPD), and Average Computational CPU Times (ACT) have been computed: ARPDh= I X i=1 RPDih I,∀h= 1, . . . , H ACTh= I X i=1 Tih I,∀h= 1, . . . , H where His the number of algorithms under comparison (h∈ {1, . . . , H}), and Iis the number of instances (i∈ {1, . . . , I}). RP Dih is defined by: RPDih =OFih −Besti Besti ·100,∀h= 1, . . . , H where OFih is the Cmax obtained by algorithm hin instance i, and Bestiis the best value found in instance i, i.e. min∀hOFih. In addition, according to Fernandez-Viagas and Framinan (2015a); Fernandez-Viagas et al. (2017), the computational effort of heuristics should also be evaluated by means of ARPThto avoid an over-representation of the largest instances of the indicators. ARPThis defined as: ARPTh= 1 + I X i=1 RPTih I,∀h= 1, . . . , H 17 where RPT is the relative percentage computation time, defined by: RPTih =Tih −ACTi ACTi ,∀h= 1, . . . , H with ACTi= H X h=1 Tih I,∀i= 1, . . . , I and where Tih is the CPU time (in seconds) of algorithm hfor instance i. Finally, for the calibration of the Johnson-based heuristics, a slightly different measure of the quality of the solution is used, denoted as ARPD0(see e.g. Fernandez-Viagas et al., 2016): ARPD0= I X i=1 (OFi−Basei/Basei I where Baseiis the solution obtained in instance iby a reference algorithm (NEH). 4.3 Experimental parameter tuning Two full factorial designs of experiments are performed to find the best values of the parameters aand bfor JbH1, and cand dfor JbH2. The following range of values for the parameters have been chosen in the experimentation: a={0.00,0.05,0.10,0.15,0.20,0.25,0.30} b={0.50,0.75,1.00,1.25,1.50,1.75} c={0.00,0.05,0.10,0.15,0.20,0.25,0.30} d={0.50,0.75,1.00,1.25,1.50,1.75} Non parametric Kruskal-Wallis tests are carried out using the ARPD0indicator, and the corresponding p-values obtained are 0.975, 0.846, 0.892, and 0.989 for the a,b,c, and dparameters, respectively. No statistical significant difference between the values of the parameters has been found, which show the robustness of the proposals against them. ARPD0values obtained for 18 the different levels are shown in Table 1. Results show that although there is no statistical different between the level, the average values between some levels are quite different. The best combination of the parameters is found for a= 0.1,b= 1.25,c= 0.1, and b= 1.50. Parameter JbH1 Parameter JbH2 a=0 -0.08 c=0 -0.71 a=0.05 -0.10 c=0.05 -0.78 a=0.1 -0.12 c=0.1 -0.81 a=0.15 -0.12 c=0.15 -0.79 a=0.2 -0.12 c=0.2 -0.76 a=0.25 -0.10 c=0.25 -0.72 a=0.3 -0.04 c=0.3 -0.69 b=0.5 -0.06 d=0.5 -0.73 b=0.75 -0.10 d=0.75 -0.73 b=1 -0.10 d=1 -0.74 b=1.25 -0.11 d=1.25 -0.76 b=1.5 -0.11 d=1.5 -0.76 b=1.75 -0.10 d=1.75 -0.76 Table 1: Experimental parameter tuning 4.4 Implemented heuristics Following the conclusions obtained in Section 2, the new heuristics proposed (FMCH, MCH, JbH1, and JbH2) are compared against the most promising heuristics for the problem under consideration (results are shown in Subsection 4.5), which are enumerated next: •CDS1 adapted for the problem by Santos et al. (1996). •DNN adapted for the problem by Santos et al. (1996). •CDS2 adapted for the problem by Brah and Loo (1999). •NEH adapted for the problem by Brah and Loo (1999). •BH proposed by Acero-Dominguez and Paternina-Arboleda (2004); Paternina-Arboleda et al. (2008). •SPTB proposed by Pan et al. (2014). 19 •bLPTB proposed by Pan et al. (2014). •NEHLPT(λ)proposed by Pan et al. (2014). •bNEH proposed by Pan et al. (2014). •bNEHSPT(λ)proposed by Pan et al. (2014). •WT1(x)∀x∈ {1,5, n/m, n}proposed by Kizilay et al. (2015). •WT2(x)∀x∈ {1,5, n/m, n}proposed by Kizilay et al. (2015). We also incorporate in the comparison other heuristics by changing the traditional rule (FIFO rule) to sequence the jobs between the stages in the NEH heuristic: •NEHSPT: NEH heuristic using the SPT rule when there are more than one job in the queue, as proposed by Barman (1997), i.e. when a machine becomes free, it take the next job according to the SPT rule. •NEHLPT: NEH heuristic using the LPT rule to determine the next job to be taken in the queue. •NEHPT+WINQ+AT: NEH heuristic using the PT+WINQ+AT, proposed by Holthaus and Rajendran (1997). •NEHrand: NEH heuristic taking the job to be sequenced randomly from the queue. All these heuristics have been fully coded in C# using Visual Studio in an Intel Core i7-3770 with 3.4 GHz, 16 GB RAM, and with Microsoft Windows 8.1 64 bit, using the same common functions and libraries. 4.5 Comparison of heuristics The 20 heuristics presented in Subsection 4.4 have been run on Benchmark β1. The computational results with respect to the quality of the solutions (ARPD) are shown in Table 2, grouped by parameters n,m, and s, and the detailed results of ARPD in terms of n×min Table 3. The 20 average results in terms of ARPD, ACT, and ARPT are shown in Table 4 and graphically in Figure 5. In view of the results, a number of conclusions can be noted: 1. The JbH1 and JbH2 heuristics show the best solution quality among the fast heuristics in the literature (as e.g. CDS2, BH, SPTB, and NEHLPT(λ)). To support this conclusion, the following hypotheses have to be checked, hypotheses H1: JbH1=CDS2, H2: JbH2=CDS2 (see Table 5). 2. The JbH2 heuristic proposed (ARPDJbH2= 2.19 and ARPTJbH2= 0.04) improves the quality of the solutions obtained by the NEH heuristic (ARP DNEH = 3.02 and ARPTNEH = 0.12) using less computational effort (hypothesis H3: JbH2=NEH). 3. In addition, the FMCH heuristic proposed (ARPDFMCH = 2.78 and ARPTF MCH = 0.12) also outperforms the NEH heuristic by using a similar computational effort (hypothesis H4: FMCH=NEH). 4. Among all implemented heuristics, the best results in terms of quality of the solutions have been obtained by the proposed MCH heuristic, ARPDMCH(12) = 0.67 (hypothesis H5: MCH(12)=WT1(n)). 5. To summarise, the efficient heuristics for the problem are: JbH1, JbH2, MCH(1), MCH(2), MCH(4), MCH(6), MCH(8), MCH(10), and MCH(12) (the following hypotheses should be added to the previous ones: hypothesis H6: MCH(4)=WT1(5); H7: MCH(4)=WT2(5); H8: JbH2=WT1(1)). To justify the hypotheses, a Holm’s procedure (Holm, 1979) is performed (see results in Table 5). In this test, the hypotheses are sorted in non-descending order of p-values, denoted by βi(i∈}1, . . . , k}, with kthe number of hypotheses). p-values are obtained following a non-parametric Wilcoxon signed-rank test (see e.g. Fernandez-Viagas et al., 2018 for similar studies) assuming a 0.95 confidence level, i.e. α= 0.05. Then, each hypothesis iis rejected if p > α/(k−βi+ 1). As it can be seen from Table 5, each hypothesis is rejected with the exception of hypotheses H5(i.e. no statistical evidence has been found between ARPDMCH(12) and ARPDW T1(n)) and H1(ARPDJbH1=ARPDCDS2). In the former, although no differences 21 has been found in the ARPD, ARPT and ACT of the heuristics proposed is 1.95, and 5.61 as compared to 9.19 and 57.99 of the WT1(n) heuristic. In the latter, H1has been rejected according to the non-parametric Wilcoxon signed-rank test but not using Holm’s procedure. Heuristic n= 20 n= 50 n= 100 n= 150 m= 5 m= 10 m= 20 s= 0 s= 1 s= 2 All NEH 4.58 3.68 2.20 1.61 1.71 3.25 4.09 3.18 4.27 1.60 3.02 NEHSPT 6.08 4.80 3.10 2.53 3.04 4.42 4.93 4.77 4.29 3.33 4.13 NEHLPT 8.74 9.25 9.16 8.47 4.93 9.51 12.28 8.30 7.97 10.44 8.90 NEHPT+WINQ+AT 4.92 3.76 2.07 1.59 1.83 3.27 4.16 3.27 4.08 1.92 3.09 NEHrand 6.31 5.68 3.86 3.15 2.84 4.95 6.46 4.52 6.32 3.42 4.75 Palmer 10.35 8.17 5.07 3.78 5.53 7.08 7.91 7.03 7.53 5.96 6.84 BH 17.72 15.17 11.21 9.62 9.00 12.39 18.90 10.07 19.27 10.96 13.43 NEHLPT(λ)7.00 5.54 3.35 2.42 2.61 4.70 6.41 4.66 6.55 2.52 4.58 bNEH 6.31 3.89 2.36 1.95 3.05 3.62 4.22 3.41 4.97 2.51 3.63 bNEHSPT(λ)8.58 6.46 4.72 3.87 5.29 5.98 6.45 5.55 7.59 4.58 5.91 SPTB 15.75 12.80 8.88 8.07 10.40 11.42 12.31 9.60 14.97 9.56 11.38 bLPTB 25.68 22.77 18.88 16.21 20.00 21.92 20.74 19.28 25.06 18.32 20.88 FMCH 3.96 3.31 2.27 1.57 1.44 2.79 4.11 2.93 3.97 1.44 2.78 MCH(1) 3.37 2.63 1.34 1.03 1.23 2.13 2.91 2.30 2.82 1.16 2.09 MCH(2) 2.45 1.80 1.13 0.87 0.94 1.50 2.25 1.74 1.82 1.11 1.56 MCH(4) 1.05 1.11 0.90 0.54 0.54 0.91 1.25 1.07 0.99 0.64 0.90 MCH(6) 1.02 0.81 0.61 0.53 0.43 0.88 0.92 0.81 0.87 0.56 0.75 MCH(8) 1.05 0.75 0.60 0.51 0.53 0.76 0.90 0.83 0.89 0.47 0.73 MCH(10) 1.03 0.73 0.59 0.45 0.44 0.83 0.83 0.81 0.76 0.53 0.70 MCH(12) 1.07 0.77 0.47 0.37 0.45 0.72 0.85 0.81 0.69 0.51 0.67 WT1(1) 4.50 3.61 2.12 1.81 1.60 2.92 4.51 3.14 4.19 1.70 3.01 WT1(5) 2.31 2.06 1.18 1.10 0.74 1.61 2.64 1.66 2.42 0.91 1.66 WT1(n/m) 3.48 2.33 1.07 0.85 0.64 1.70 3.46 1.97 2.66 1.17 1.93 WT1(n) 1.23 1.07 0.54 0.39 0.30 0.82 1.29 0.74 1.34 0.34 0.81 WT2(1) 4.85 4.12 2.40 1.74 1.65 3.63 4.55 3.43 4.36 2.04 3.28 WT2(5) 2.42 2.38 1.46 1.06 0.81 1.84 2.84 1.83 2.79 0.87 1.83 WT2(n/m) 3.69 2.64 1.30 0.89 0.72 2.06 3.61 2.24 2.90 1.25 2.13 WT2(n) 1.24 1.06 0.58 0.39 0.28 0.77 1.40 0.72 1.37 0.36 0.82 CDS1 5.36 4.10 2.79 2.56 2.76 3.99 4.36 2.87 5.10 3.14 3.70 CDS2 4.58 3.45 2.34 2.04 2.04 3.42 3.84 2.45 3.76 3.09 3.10 DNN 7.51 5.28 3.68 3.10 2.64 5.15 6.88 4.25 5.60 4.83 4.89 JbH1 4.43 3.29 2.11 1.86 2.07 3.18 3.52 2.64 3.25 2.89 2.92 JbH2 2.93 2.67 1.71 1.45 1.82 2.29 2.45 1.77 2.75 2.04 2.19 Table 2: Detailed values of ARPD grouped by n,m, and s 22 Heuristic 20x5 20x10 20x20 50x5 50x10 50x20 100x5 100x10 100x20 150x5 150x10 150x20 All NEH 3.77 5.25 4.71 1.76 3.88 5.39 0.92 2.09 3.60 0.38 1.76 2.69 3.02 NEHSPT 6.30 6.39 5.55 3.08 5.13 6.19 1.50 3.58 4.22 1.27 2.57 3.76 4.13 NEHLPT 7.94 9.22 9.06 4.60 10.10 13.05 4.20 9.88 13.40 2.96 8.83 13.62 8.90 NEHPT+WINQ+AT 3.96 5.30 5.51 1.94 4.03 5.30 0.91 2.22 3.09 0.51 1.52 2.75 3.09 NEHrand 5.73 6.99 6.20 2.93 5.79 8.32 1.68 3.76 6.15 1.01 3.26 5.16 4.75 Palmer 10.35 10.60 10.11 6.36 8.46 9.68 3.13 5.13 6.95 2.31 4.11 4.91 6.84 BH 17.71 16.26 19.20 8.30 13.65 23.56 5.43 10.51 17.70 4.58 9.16 15.13 13.43 NEHLPT(λ)6.41 7.44 7.15 2.46 5.44 8.71 1.14 3.49 5.43 0.44 2.44 4.36 4.58 bNEH 7.37 5.85 5.71 2.68 4.01 4.98 1.26 2.70 3.12 0.90 1.90 3.06 3.63 bNEHSPT(λ)10.27 8.62 6.85 5.62 6.43 7.34 3.10 4.71 6.33 2.17 4.16 5.27 5.91 SPTB 18.67 14.82 13.76 10.93 12.38 15.09 6.64 9.47 10.54 5.36 9.01 9.85 11.38 bLPTB 30.14 26.67 20.22 21.13 24.01 23.17 16.04 19.25 21.33 12.69 17.73 18.22 20.88 FMCH 3.06 4.31 4.52 1.53 3.14 5.25 0.72 2.25 3.85 0.43 1.47 2.81 2.78 MCH(1) 2.77 3.46 3.90 1.26 2.80 3.83 0.60 1.19 2.22 0.29 1.09 1.70 2.09 MCH(2) 1.99 2.68 2.67 0.97 1.54 2.90 0.44 0.93 2.01 0.34 0.85 1.40 1.56 MCH(4) 0.98 1.06 1.11 0.52 1.17 1.63 0.42 0.80 1.48 0.23 0.61 0.79 0.90 MCH(6) 0.87 1.11 1.08 0.41 1.13 0.89 0.24 0.74 0.86 0.19 0.54 0.87 0.75 MCH(8) 0.95 1.27 0.94 0.50 0.76 0.99 0.46 0.40 0.94 0.21 0.61 0.72 0.73 MCH(10) 0.94 1.21 0.95 0.30 0.95 0.94 0.37 0.61 0.80 0.16 0.54 0.65 0.70 MCH(12) 0.99 1.20 1.01 0.35 0.89 1.08 0.31 0.39 0.72 0.15 0.39 0.58 0.67 WT1(1) 3.57 4.73 5.19 1.67 3.63 5.52 0.79 1.78 3.79 0.39 1.52 3.53 3.01 WT1(5) 1.66 2.69 2.59 0.81 1.88 3.50 0.26 1.00 2.28 0.21 0.86 2.21 1.66 WT1(n/m) 1.74 3.52 5.19 0.61 1.88 4.50 0.15 0.79 2.28 0.08 0.60 1.86 1.93 WT1(n) 0.82 1.40 1.47 0.29 1.00 1.91 0.07 0.50 1.03 0.03 0.38 0.76 0.81 WT2(1) 4.01 5.46 5.08 1.56 4.97 5.84 0.65 2.28 4.25 0.40 1.80 3.03 3.28 WT2(5) 1.94 2.58 2.73 0.72 2.47 3.96 0.38 1.27 2.73 0.19 1.04 1.95 1.83 WT2(n/m) 2.04 3.96 5.08 0.62 2.47 4.83 0.14 1.02 2.73 0.10 0.80 1.79 2.13 WT2(n) 0.78 1.41 1.52 0.26 0.91 2.01 0.06 0.43 1.26 0.03 0.33 0.81 0.82 CDS1 5.51 5.73 4.84 2.54 4.60 5.17 1.69 2.66 4.01 1.31 2.99 3.40 3.70 CDS2 4.36 5.03 4.33 1.99 3.82 4.56 1.00 2.51 3.50 0.80 2.32 2.99 3.10 DNN 5.69 8.07 8.75 2.38 5.55 7.91 1.43 3.80 5.80 1.07 3.16 5.07 4.89 JbH1 4.40 4.74 4.15 2.13 3.59 4.16 0.96 2.34 3.03 0.80 2.05 2.73 2.92 JbH2 3.67 2.76 2.34 1.96 2.85 3.20 0.92 1.82 2.38 0.74 1.75 1.86 2.19 Table 3: Detailed values of ARPD grouped by nxm 23 Heuristic ARPD ACT ARPT Heuristic ARPD ACT ARPT MCH(12) 0.67 5.61 2.09 NEH 3.02 0.29 0.13 MCH(10) 0.70 4.44 1.79 NEHPT+WINQ+AT 3.09 0.72 0.22 MCH(8) 0.73 3.46 1.46 CDS2 3.10 0.00 0.00 MCH(6) 0.75 2.51 1.07 WT2(1) 3.28 0.42 0.16 WT1(n) 0.81 57.99 9.77 bNEH 3.63 0.32 0.11 WT2(n) 0.82 58.00 9.78 CDS1 3.70 0.00 0.00 MCH(4) 0.90 1.68 0.71 NEHSPT 4.13 0.75 0.22 MCH(2) 1.56 0.94 0.39 NEHLPT(λ)4.58 0.25 0.08 WT1(5) 1.66 2.13 0.91 NEHrand 4.75 0.51 0.18 WT2(5) 1.83 2.13 0.87 DNN 4.89 0.00 0.00 WT1(n/m) 1.93 4.90 1.07 bNEHSPT(λ)5.91 0.28 0.09 MCH(1) 2.09 0.61 0.24 Palmer 6.84 0.00 0.00 WT2(n/m) 2.13 4.89 1.01 NEHLPT 8.90 0.90 0.25 JbH2 2.19 0.01 0.04 SPTB 11.38 0.00 0.00 FMCH 2.78 0.30 0.13 BH 13.43 0.00 0.00 JbH1 2.92 0.00 0.00 bLPTB 20.88 0.00 0.00 WT1(1) 3.01 0.43 0.18 Table 4: Summary of computational results. In bold type the efficient heuristics for the problem are shown 24