scieee AI-readable full text Open interactive document viewer

Optimal sizing and operation of hybrid renewable power plants participating in coupled power markets with different execution times

García Santacruz, Carlos; Alcántara de las Heras, Andrés; Carrasco Solís, Juan Manuel; Galván Díez, Eduardo

Abstract

The increasing limitations in the use of fossil fuels due to their limited availability and pollution have increased the use of renewable energies and storage systems for electricity generation. To achieve the goals of the integration of renewable energy, sizing and management methods for hybrid plants are needed to make investments profitable and attractive in these resources. This work presents an optimization method for the sizing and operation of hybrid plants with storage, choosing the best combination of technologies based on resource availability, installation costs and market prices, maximizing an economic index such as the net present value. One of the main contributions of this work is to reduce the oversizing that occurs in traditional methods through a penalty term for lost energy, encouraging investment in batteries to store excess energy above the point of interconnection (POI). In addition, it is intended to cover gaps such as the operation in coupled markets with different execution periods to maximize the benefits of the investment made and to contemplate different generation alternatives together with storage. The presented method is tested through sizing and operation simulations to demonstrate its potential. The presented method is tested through sizing and operation simulations to demonstrate its potential. In scenario A, the best combination of solar energy, photovoltaic energy and storage, is chosen. In scenario B, it is shown how the curtailment of the oversizing is reduced in some months by more than 5%. In scenario C, for daily operation in coupled markets, it is possible to improve the benefits from 0.7% to 37.04% in the days of the year.

Full text

Citation: García-Santacruz, C.; Alcántara, A.; Carrasco, J.M.; Galván, E. Optimal Sizing and Operation of Hybrid Renewable Power Plants Participating in Coupled Power Markets with Different Execution Times. Energies 2023,16, 3432. https://doi.org/10.3390/en16083432 Academic Editors: Alexander Micallef and Zhaoxia Xiao Received: 29 March 2023 Revised: 10 April 2023 Accepted: 12 April 2023 Published: 13 April 2023 Copyright: © 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https:// creativecommons.org/licenses/by/ 4.0/). energies Article Optimal Sizing and Operation of Hybrid Renewable Power Plants Participating in Coupled Power Markets with Different Execution Times Carlos García-Santacruz * , Andrés Alcántara , Juan M. Carrasco * and Eduardo Galván Electronical Engineering Department, University of Seville, 41092 Seville, Spain *Correspondence: [email protected] (C.G.-S.); [email protected] (J.M.C.) Abstract: The increasing limitations in the use of fossil fuels due to their limited availability and pollution have increased the use of renewable energies and storage systems for electricity generation. To achieve the goals of the integration of renewable energy, sizing and management methods for hybrid plants are needed to make investments profitable and attractive in these resources. This work presents an optimization method for the sizing and operation of hybrid plants with storage, choosing the best combination of technologies based on resource availability, installation costs and market prices, maximizing an economic index such as the net present value. One of the main contributions of this work is to reduce the oversizing that occurs in traditional methods through a penalty term for lost energy, encouraging investment in batteries to store excess energy above the point of interconnection (POI). In addition, it is intended to cover gaps such as the operation in coupled markets with different execution periods to maximize the benefits of the investment made and to contemplate different generation alternatives together with storage. The presented method is tested through sizing and operation simulations to demonstrate its potential. The presented method is tested through sizing and operation simulations to demonstrate its potential. In scenario A, the best combination of solar energy, photovoltaic energy and storage, is chosen. In scenario B, it is shown how the curtailment of the oversizing is reduced in some months by more than 5%. In scenario C, for daily operation in coupled markets, it is possible to improve the benefits from 0.7% to 37.04% in the days of the year. Keywords: batteries; energy storage; optimal sizing; power system management; electricity markets 1. Introduction Renewable energy resources are clean and increasingly competitive energy sources, so their growth seems to have no limit. According to the latest projections of the International Energy Agency (IEA), the contribution of renewable energies to the global electricity supply will increase from 26% in 2018 to 44% in 2040. These sources will provide enough energy to power two thirds of the increase in electricity demand, mainly through wind and photovoltaic energy technologies [ 1 ]. This, together with various directives such as [ 2 , 3 ] at the European level, which set targets for clean energy, makes it essential to consider investing in renewable energies. The International Renewable Energy Agency (IRENA), in [ 4 ], has pointed out how investments in renewable energy have grown from USD 50 to USD 300 billion in the last two decades. Together with renewable energy generation, energy storage systems (ESS) should be considered [ 5 ], especially batteries, as cost-effective and beneficial investment options, since it is a critical element in the transition to a sustainable electricity system, able to provide a wide range of services. In addition, ref. [ 6 ] noted that clean hydrogen currently has unprecedented political and business momentum, encouraging hydrogen to be widely used. There are works that analyze investments in renewable energies, such as [ 7 ], where the financing, risk and environmental and financial connection of these investments in Energies 2023,16, 3432. https://doi.org/10.3390/en16083432 https://www.mdpi.com/journal/energies Energies 2023,16, 3432 2 of 16 renewable technologies were analyzed. Similarly, in [ 8 ], investments in renewable energy projects were analyzed, pointing out the importance of technological innovation and R&D investments, which also includes sizing and management methods. The development of projects with renewable technologies and the improvement of the efficiency of their use is key [9]. This highlights the need for research in the study and analysis of investments in renewable energies, trying to obtain the maximum economic return from the renewable energy and storage mix, considering all possible markets, in order to make these investments attractive and their development even faster. The use of storage is crucial, obtaining benefits by arbitraging or reducing the possible curtailment of the plants [ 10 ], for the subsequent sale of energy in markets. For this, it is essential to consider the correct sizing and operation of the assets [ 11 ]. It is important to base the sizing methods on obtaining benefits for the investor, since, as indicated in [ 12 ], only taking into account the technology and installation cost criteria does not provide an optimal result from a cost-effectiveness perspective. In [ 13 ], mixed integer non-linear programming (MINLP) optimization models are used to compare the economic performance of hybrid systems with PV generation as the only alternative of energy source together with batteries. In [ 14 ], a multi-objective optimization method is used to size a storage system to maximize revenue and minimize the daily cost, in order to adjust to realistic sizes, but without taking into account investment costs or measuring profit with an economic index. In [ 15 ], an MILP problem is proposed for the sizing of storage systems participating in the frequency reserve market, without considering the installation costs to be incurred by the investor. In the work developed in [ 16 ], an optimization method for the sizing and operation of photovoltaic energy generation and storage system based on price control is proposed, with the disadvantage of oversizing the hybrid plant in some cases to make it profitable. In [ 17 ], particle swarm optimization (PSO) is used to size hybrid energy sources with the objective of minimizing the levelized cost of energy (LCOE). Minimizing the LCOE is interesting from an investor’s point of view, but it is also essential to consider market prices to determine the benefit. In [ 18 ], different methods are presented for sizing batteries only in photovoltaic energy plants to maximize the total annual revenue and try to find cost-effective storage sizes. In [ 19 ], the maximization of economic indexes are evaluated to obtain a hybrid plant, but with PV generation and storage, which is the only asset to be sized. In [ 20 ], the problem of optimal storage operation together with wind generation to maximize profit is investigated. It can be observed that it is usual to consider a unique generation source together with storage. This is an important gap, since there are not several generation sources from which to choose the best option together with storage. In [ 21 ], a sizing is proposed through a multi-objective optimization, reducing the cost of the system but also seeking to minimize the emissions of the generation, nor considering different generation sources. The stochastic formulations [ 22 ] are also applied to the problem of sizing and profit maximization for the owner participating in the daily and real-time markets, but without specifying different periods as in this paper and not contemplating investment costs. The problem of sizing is also approached from a technical point of view. In [ 23 ], it is presented how to determine the optimal size of wind-solar photovoltaic hybrid energy plant (without storage and its management) using heuristic optimization, with an iterative algorithm to minimize fluctuating production. Studies such as [ 24 ] evaluate the sizing of storage systems to compensate for fluctuating wind and solar power generation through optimal economic dispatch. Another approach for sizing can be to determine the optimal generation mix, as in [ 25 ], where a flexible fuzzy programming approach is proposed for it. In [ 26 ], a storage system sizing technique is proposed, taking into account the possible errors made in the temporal prediction. The impact of hybrid power plants, with photovoltaic energy and solar thermal energy, from a technical point of view, is analyzed in [ 27 ]. Following this point of view, in [ 28 ], a sizing of distributed generation and storage Energies 2023,16, 3432 3 of 16 is proposed for the improvement of the system and maximizing benefits from a company’s point of view, but not measuring with any economic index the investment over the years. The work developed in [ 29 ] focuses on solving the problem of grid inertia, without considering investment costs, through frequency control as well as a focus on the use of storage systems. A method for optimal sizing of a BESS, not a full hybrid plant, to provide different services to the power system is included in the work developed in [ 30 ]. In [ 31 ], the focus is on reducing system losses and voltage unbalance, leaving the economic criterion as an added benefit, not as the focus of the solution. In addition, only one type of generation is considered, without considering if there are more beneficial options. The sizing problem has also been studied for island systems. In [ 32 ], the optimization of the size of an existing plant is studied. There are also studies for isolated networks, as can be seen in [ 33 ]. With regards to other, less common technologies, we refer to a review covering all types of CHP optimization problems using meta-heuristic algorithms, including operation and sizing [34]. Most methods in the literature focus on sizing with a single source of generation and storage. For a correct evaluation and maximization of the investment, it is necessary to evaluate all options with predictions of generation and installation costs. Issues of interest to investors, such as economic performance and installation costs must be evaluated in the method, to obtain real and feasible sizing in its application. Another gap in the existing methods is to perform the operation of the plant considering only one market, or several in some works, but which are executed in the same time intervals. Thus, this article presents an optimal sizing and operation method that attempts to integrate the various renewable resources together with storage. Thanks to the model presented, it is possible to participate in different markets at the same time, including the hydrogen market, in order to make investments attractive. As the main contributions of this work, the following are highlighted: • Optimization model to size resources, maximizing the net present value and adjusting to the maximum investment as a constraint (even not spending the entire budget in some cases), to find highly attractive and realistic investments; • Reduction of curtailment that occurs due to oversizing with a penalty term for lost energy, encouraging investment in storage; • Evaluate all resources at the same level to maximize the benefit, considering availability, market prices and installation costs, choosing the best option based on the input parameters; • Modeling and integration of participation in different time-coupled markets (hourly and fifteen minutes), with the possibility of incorporating ancillary services market; • Consideration of the number of daily charge and discharge cycles of storage in the optimization model, taking care of the valuable life for real results. 2. Method This section presents the proposed method for sizing and optimal operation of hybrid plants in coupled markets. It is an MINLP optimization model, with three technologies (extendable to more) as alternatives: wind energy, photovoltaic energy and storage systems. The plant can operate in two coupled markets, M1, with hourly execution, and M2, every 15 min. An overview of the proposed method is shown in Figure 1, indicating the inputs and outputs to the system. The aim is to evaluate which is the best investment to size a hybrid plant and manage it, participating in several markets coupled at the same time, with the objective of maximizing profits. The inputs of the algorithm are the annual (or years of analysis) unit profile of wind and PV generation, installation costs of all technologies, characteristics of the assets and annual price profiles (or years of analysis) of the M1 and M2 markets. As outputs, we obtain the size of the generation and storage, the scheduling of charge and discharge and the participation in each moment on the markets. Energies 2023,16, 3432 4 of 16 OPTIMAL SIZING AND OPERATION - Tecnology costs - Generation profiles - Markets data - Market prices - Investment budget - Sizing plant - Market participation - Management ESS Investor criteria NPV, IRR, payback inputs outputs Figure 1. Flowchart of the proposed sizing and operation method. As a result of the conceptualization and model presented, it is possible to extend it to more markets and generation sources. Table 1shows the parameters and variables used to model the optimization problem for daily operation and the optimal sizing problem. To simplify the nomenclature, the model is presented for a single year, which can be extrapolated to as many years as desired for the analysis of optimal sizing. Table 1. Nomenclature. Sets πM1 d,h Selling price on the market hourly market M1 (EUR/MWh). DSet of D days of a year, d∈D.πM2 d,h,tSelling price on the 15-min market M2 (EUR/MWh). HSet of H hours of a day, h∈H.αWeight factor related to the to penalization of curtailment. TSet of T intervals of an hour, t∈T.EPOI Limit of the point of connection (MWh). Parameters Variables CPV Installation cost for photovoltaic energy generation (EUR/MW). PVsize Maximum installed capacity for photovoltaic energy resource (MW). CWind Installation cost for wind generation (EUR/MW). Windsize Maximum installed capacity for wind resource (MW). CESS Installation cost for ESS generation (EUR/MWh). ESSsize Maximum installed capacity for ESS (MWh). Eload d,h,tInternal load in day d, hour h and period t (MW). EPV d,h,t Power injection by photovoltaic energy generation in interval t of hour h and day d (MWh). MPV d,h,t Generation profile for photovoltaic energy in day d, hour h and period t (pu). EWind d,h,t Power injection by wind generation in interval t of hour h and day d (MWh). MWind d,h,t Generation profile for wind in day d, hour h and period t (pu). EM1 d,h,t Energy sold on market M1 in the interval t of hour h and day d (MWh). NNumber of charge and discharge cycles. EM2 d,h,t Energy sold on market M2 in the interval t of hour h and day d (MWh). Emax,ch d,h,t Maximum energy charged by battery in interval t of hour h and day d (MWh). Ech d,h,t Energy charged by battery in interval t of hour h and day d (MWh). Emax,ch d,h,t Maximum energy discharged by battery in interval t of hour h and day d (MWh). Edis d,h,t Energy discharged by battery in interval t of hour h and day d (MWh). SOCmin , SOCmax Minimum and maximum state of charge of storage. EBat d,h,t Energy stored in the battery in interval t of hour h and day d (MWh). ηch Battery charge efficiency. Binary ηdis Battery discharge efficiency. BMs d,h,t Binary variable to indicate the sale of energy on markets M1 and M2. Inv Total investment in assets in millions of euros (MEUR). BGridBuy d,h,tBinary variable to indicate the purchase of energy. Bch d,h,tBinary variable to indicate the charge of battery. Bdis d,h,tBinary variable to indicate the discharge of battery. 2.1. Objective Functions The two objective functions proposed in this work are presented below. The first function is utilized for the daily operation of the hybrid plant, with the goal of maximizing profits through participation in different markets. In this case, the operation is performed for a specific size of the hybrid plant. The second objective function is used for sizing the resources of the hybrid plant, seeking the maximum benefit for the investor based on Energies 2023,16, 3432 5 of 16 an economic index. In this case, the sizes of the generation and storage components are variables to be calculated in the optimization. 2.1.1. Operation In the daily operation of the power plant, the maximum economic benefit is sought from the sale of energy to the market. To achieve this, it is necessary to consider the largest possible number of market types, whether they have a short execution interval (minutes) or an hourly one, in order to have more alternatives. Thus, the objective function of the optimal operation, which takes into account all types of assets, as well as two markets with different execution times, is defined as follows: max z1= h=H ∑ h=1 EM1 d,h,1 ·πM1 d,h | {z } Market M1 + h=H ∑ h=1 t=T ∑ t=1 EM2 d,h,t·πM2 d,h,t | {z } Market M2 + h=H ∑ h=1"t=T ∑ t=1Ech d,h,t+Eload d,h,t#·πM1 d,h | {z } Operation cost (1) where the profit is determined by participating simultaneously in the M1 and M2 markets, with different execution intervals. As the operation of the power plant is limited to a short horizon of hours or days, the value of D is set to 1 and the set of hours in the desired horizon, such as H= 24, is defined. Additionally, the cost of providing power to internal loads and charging the battery from the grid is taken into consideration. The MINLP optimization model for the operation is composed of the objective function (1) and the associated constraints (6)–(13), (15)–(20) defined in Section 2.2. 2.1.2. Sizing To achieve optimal sizing of the hybrid plant, it is necessary to consider the objective of daily operation, which is to maximize daily profit through participation in various markets and to calculate cash flows accordingly. Since the sizing is done based on a given investment budget, it is important to use an economic index to evaluate the investment. Typically, sizing algorithms based solely on investment costs and operating benefits tend to oversize the plants. This is because, numerically, it is often more profitable to install excess generation capacity and curtail the excess energy produced. To avoid this, a penalty term is proposed to be included in the objective function. This term penalizes the oversizing of the plant and seeks to produce realistic and practical results in a real-world environment. This work proposes maximizing the net present value (NPV) to determine if asset selection and management, participation in various markets and discounting the investment result in benefits. The objective function for sizing is defined as follows: max NPV →max −I0+ y=Y ∑ y=1 CFy (1+k)y | {z } Profit markets − y=Y ∑ y=1 NCFGy (1+k)y | {z } Penalty curtailments (2) where I0 represents the total investment made in the generation and energy storage system (ESS), k is the discount rate, Y denotes the number of years of analysis or project and, finally, CF refers to the annual cash flow generated by participating in all markets. This annual cash flow is defined as: CFd= d=D ∑ d=1 h=H ∑ h=1EM1 d,h,1 ·πM1 d,h+ d=D ∑ d=1 h=H ∑ h=1 t=T ∑ t=1EM2 d,h,t·πM2 d,h,t+ d=D ∑ d=1 h=H ∑ h=1"t=T ∑ t=1Ech d,h,t+Eload d,h,t#·πM1 d,h (3) The penalty term, referred to as non-cash flow generated (NCFG), is introduced to penalize excessive oversizing of the generation resources of the hybrid plant. Depending Energies 2023,16, 3432 6 of 16 on the generation costs, resource availability and price forecasts, it is possible for the plant to be oversized beyond the point of connection (POI). The NCFG is defined as: NCFGd=α· d=D ∑ d=1 h=H ∑ h=1 t=T ∑ t=1h(EPV,max d,h,t−EPV d,h,t)·πM1 d,h+ (EWind,max d,h,t−Ewind d,h,t)·πM1 d,hi(4) The NCFG penalizes the excessive oversizing of the generation resources of the hybrid plant. It is calculated as the energy not served due to curtailment in each type of generation. This is determined as the difference between the maximum possible injection according to the sizing, EPV,max d,h,t and EWind,max d,h,t , and the actual energy injected, EPV d,h,t and Ewind d,h,t , during each interval t. The unserved energy is then economically valued by multiplying it with the market price. It is further weighted by the coefficient α to determine the amount of penalty. This penalty term is intended to promote the investment and use of storage together with the generation source. The α value can be tuned from 0 to a saturation value specific to each case (from which it does not penalize more). Depending on the value it takes, it will penalize to a different degree and affect the sizing. A small α will allow a lot of curtailment, while a big value will decrease curtailment and will further adjust the sizing of the resources. Although initially a higher NPV or other index may be obtained, oversizing the plant excessively over the connection point, a large curtailment makes that energy unusable, not allowing it to be stored and used in other markets or ancillary services. This can even be very detrimental to the investment if the prices for which the plant was sized change a lot, not having the flexibility of storage to minimize the negative effects of this change. The MINLP optimization model for the sizing of the investment in resources is composed of the objective function (2) and constraints (5)–(13), (15)–(20), presented below. 2.2. Problem Constraints All constraints associated with the operation and size problems are defined in this section. First, the maximum investment that can be made in assets is limited in Equation (5) , where the investment is divided between the installed power of the generation sources as well as the storage systems. This constraint allows optimal sizing according to the maximum investment that can be realized. Inv ≥CPV ·PVsize +CWind ·Windsize +CESS ·ESSsize (5) In Equation (6) , the balance to be met at the POI of the hybrid plant to the grid is represented. EPV d,h,t+Ewind d,h,t+Edis d,h,t+EGridBuy d,h,t=Eload d,h,t+Ech d,h,t+EM1 d,h,t+EM2 d,h,t, ∀d∈D,∀h∈H,∀t∈T,(6) where this balance is applied for each period t for the entire horizon of days (in operation case) or years (in sizing) analyzed. It must be fulfilled that the available photovoltaic energy ( EPV d,h,t ), wind ( Ewind d,h,t ) or discharge of the storage systems ( Edis d,h,t ) is equal to the load of the plant, sold energy in the different markets ( EM1 d,h,t , EM2 d,h,t ) or the charge of the storage ( Ech d,h,t ). Equation (7) represents the maximum energy that can be injected into the grid at the connection point. This is determined by the net available energy of the hybrid plant. EPOI ≥EM1 d,h,t+EM2 d,h,t,∀d∈D,∀h∈H,∀t∈T. (7) Energies 2023,16, 3432 7 of 16 In order to avoid simultaneous participation in the energy purchase and sale market, it is necessary to define the restrictions (8) – (10) , also limiting the maximum amount of energy to be injected or consumed: BMs d,h,t+BGridBuy d,h,t≤1, ∀d∈D,∀h∈H,∀t∈T. (8) EM1 d,h,t+EM2 d,h,t≤BMs d,h,t·EPOI,∀d∈D,∀h∈H,∀t∈T. (9) Eload d,h,t+Ech d,h,t≤BGridBuy d,h,t·EPOI,∀d∈D,∀h∈H,∀t∈T. (10) Equations (11) and (12) limit the maximum PV and wind generation injections as a function of the total available energy: EPV d,h,t≤MPV d,h,t·PVsize,∀d∈D,∀h∈H,∀t∈T. (11) Ewind d,h,t≤Mwind d,h,t·Windsize,∀d∈D,∀h∈H,∀t∈T. (12) Another contribution of this work is the possibility of participating in two coupled markets simultaneously, M 1 and M 2, with different execution times. This could be extrapolated to more than two markets due to the modeling of the problem. The market with the shorter execution time ( M 2) will be the one that determines into how many intervals, t, an hour, h, should be split. Instead of dividing the whole year directly into the total number of intervals, we work on the hours of the day, and these are divided into intervals determined by the market with the shortest execution time. This allows to establish a better relationship between markets and execution times. This is shown in Figure 2. Hourly market Energy time 15-min market Figure 2. Diagram of coupled markets. To relate the two markets, a set must be defined that relates the execution intervals of the smaller market to the other market. Thus, for example, if market M 2 is executed every 15 min and market M 1 is executed every hour, the values to be taken by t must be in the set {1, 2, 3, 4}. The value in hourly market M1 must be maintained during the four intervals that define an hour. That is, for each period t, the value in the first period must be maintained to complete the hour with the same energy value. The equation which models the coupled simultaneity of participation is defined as: EM1 d,h,1 =EM1 d,h,t∀d∈D,∀h∈H,∀t∈T. (13) Energies 2023,16, 3432 8 of 16 This modeling of the problem allows adding additional markets at different times. For example, to add another market M 3 that closes every half hour, it is sufficient to define a set m∈ {1, 3}, and include the following constraint equation: EM3 d,h,1 =EM3 d,h,m+1, , ∀y∈Y,∀d∈D,∀h∈H,∀m∈M, (14) where with this set, it is possible to relate t1 , the first fifteen minutes, with t2 , which is the second fifteen minutes, making the half-hour constant. This would be the same in the second half hour. These markets can represent the case of a main market and other markets for ancillary services or other markets. Considering participation in deviation or short-time markets is interesting, due to the variability of generation, with storage offering flexibility to the system. This can result in economic benefits, the greater possibility of renewable energy integration and greater system reliability. Storage system is modeled by the following set of equations. Equation (15) represents the update of the stored energy in each period. In (16) – (18) , simultaneous charging and discharging of the battery is constrained. Finally, the maximum and minimum energy stored in each interval is defined in (19): EBat d,h,t=EBat d,h,t−1+Ech d,h,t·ηch −Edis d,h,t·1 ηdis ,∀d∈D,∀h∈H,∀t∈T. (15) Bch d,h,t+Bdis d,h,t≤1, ∀d∈D,∀h∈H,∀t∈T. (16) Ech d,h,t≤Emax,ch d,h,t·Bch d,h,t,∀d∈D,∀h∈H,∀t∈T. (17) Edis d,h,t≤Emax,dis d,h,t·Bdis d,h,t,∀d∈D,∀h∈H,∀t∈T. (18) Batsize ·SOCmin ≤Ebat d,h,t≤Batsize ·SOCmax,∀d∈D,∀h∈H,∀t∈T. (19) Finally, the daily energy that can be charged or discharged by the battery is defined in (20) . This is essential to protect the battery and maintain its lifetime throughout the project, and to provide realism to the solution of the problem. h=H ∑ h=1 t=T ∑ t=1hEdis d,h,t+Ech d,h,ti≤N·Batsize,∀d∈D. (20) 3. Test Case To test the presented method, two different generation scenarios will be used for the analysis. For simplicity and to observe the differences, the same energy prices will be used for both cases. In Figure 3, the prices used for the analysis are shown, with the main market data, M1, with a resolution of one hour, and the secondary market data, M2, with a resolution of 15 min. Table 2shows the investment data, with generation and storage costs used in the scenarios. The cost of land or areas to place the generation is not taken into account. Table 2. Resource costs. Cost Value PV energy generation costs 550,000 EUR/MW Wind energy generation costs 1,200,000 EUR/MW Battery cost 300,000 EUR/MWh Energies 2023,16, 3432 9 of 16 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec (a) 0 50 100 150 200 Price ( /MWh) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec (b) 0 50 100 150 200 Price ( /MWh) Figure 3. Day-ahead market price (a) and 15-min market price (b). 3.1. Scenario A This scenario will use data collected in [ 35 ], specifically from Great Britain. Unit profiles of wind energy and PV energy generation, shown in Figure 4, will be used. For this scenario, the plant has installation limitations of 60 MW of wind energy generation and 170 MW of photovoltaic energy, with no restrictions on the use of batteries, while the limit of the connection point is 100 MW. The limit for purchase at the connection point is 30 MW. A 15-year period is analyzed, with a discount rate of 2% and a maximum investment of EUR 100 million. A 1-year simulation is performed, and its result is considered approximately constant for the entire 15-year period. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec (a) 0.0 0.2 0.4 0.6 0.8 1.0 Power (pu) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec (b) 0.2 0.4 0.6 0.8 1.0 Power (pu) Figure 4. Photovoltaic energy (a) and wind energy (b) generation in Great Britain. Energies 2023,16, 3432 16 of 16 21. Parashar, S.; Swarnkar, A.; Niazi, K.R.; Gupta, N. Multiobjective optimal sizing of battery energy storage in grid-connected microgrid. J. Eng. 2019,2019, 5280–5283. [CrossRef] 22. Krishnamurthy, D.; Uckun, C.; Zhou, Z.; Thimmapuram, P.R.; Botterud, A. Energy Storage Arbitrage Under Day-Ahead and Real-Time Price Uncertainty. IEEE Trans. Power Syst. 2018,33, 84–93. [CrossRef] 23. Al-Shereiqi, A.; Al-Hinai, A.; Albadi, M.; Al-Abri, R. Optimal Sizing of Hybrid Wind-Solar Power Systems to Suppress Output Fluctuation. Energies 2021,14, 5377. [CrossRef] 24. Klansupar, C.; Chaitusaney, S. Optimal Sizing of Utility-scaled Battery with Consideration of Battery Installtion Cost and System Power Generation Cost. In Proceedings of the 2020 17th International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON), Phuket, Thailand, 24–27 June 2020; pp. 498–501. [CrossRef] 25. Khan, M.F.; Pervez, A.; Modibbo, U.M.; Chauhan, J.; Ali, I. Flexible Fuzzy Goal Programming Approach in Optimal Mix of Power Generation for Socio-Economic Sustainability: A Case Study. Sustainability 2021,13, 8256. [CrossRef] 26. Zhao, L.; Zhang, T.; Peng, X.; Zhang, X. A novel long-term power forecasting based smart grid hybrid energy storage system optimal sizing method considering uncertainties. Inf. Sci. 2022,610, 326–344. [CrossRef] 27. Remon, D.; Cantarellas, A.M.; Martinez-Garcia, J.; Escano, J.M.; Rodriguez, P. Hybrid solar plant with synchronous power controllers contribution to power system stability. In Proceedings of the 2017 IEEE Energy Conversion Congress and Exposition (ECCE), Cincinnati, OH, USA, 1–5 October 2017; pp. 4069–4076. [CrossRef] 28. Abdeltawab, H.; Mohamed, Y.A.-R.I. Energy Storage Planning for Profitability Maximization by Power Trading and Ancillary Services Participation. IEEE Syst. J. 2021,16, 1909–1920. [CrossRef] 29. Bera, A.; Chalamala, B.R.; Byrne, R.H.; Mitra, J. Sizing of Energy Storage for Grid Inertial Support in Presence of Renewable Energy. IEEE Trans. Power Syst. 2021,37, 3769–3778. [CrossRef] 30. Siface, D. Optimal Economical and Technical Sizing Tool for Battery Energy Storage Systems Supplying Simultaneous Services to the Power System. In Proceedings of the 2019 16th International Conference on the European Energy Market (EEM), Ljubljana, Slovenia, 18–20 September 2019; pp. 1–6. [CrossRef] 31. Chiang, M.-Y.; Huang, S.-C.; Hsiao, T.-C.; Zhan, T.-S.; Hou, J.-C. Optimal Sizing and Location of Photovoltaic Generation and Energy Storage Systems in an Unbalanced Distribution System. Energies 2022,15, 6682. [CrossRef] 32. Chowdhury, T.; Hasan, S.; Chowdhury, H.; Hasnat, A.; Rashedi, A.; Asyraf, M.R.M.; Hassan, M.Z.; Sait, S.M. Sizing of an Island Standalone Hybrid System Considering Economic and Environmental Parameters: A Case Study. Energies 2022 ,15, 5940. [CrossRef] 33. Li, X.; Jones, G. Optimal Sizing, Location, and Assignment of Photovoltaic Distributed Generators with an Energy Storage System for Islanded Microgrids. Energies 2022,15, 6630. [CrossRef] 34. Alsagri, A.S.; Alrobaian, A.A. Optimization of Combined Heat and Power Systems by Meta-Heuristic Algorithms: An Overview. Energies 2022,15, 5977. [CrossRef] 35. Open Power System Data. A Free Open Data Platform for Power System Modeling. Available online: https://data.open-power- system-data.org/ (accessed on 20 January 2023). 36. The European Commission’s Science and Knowledge Service. Photovoltaic Geographical Information System (PVGIS). Available online: ec.europa.eu/jrc/en/pvgis (accessed on 20 January 2023). Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.