FMEA and Risks Assessment for Thermochemical Energy Storage Systems Based on Carbonates

Carro Paulete, Andrés; Chacartegui, Ricardo; Tejada, Carlos; Gravanis, Georgios; Eusha, Muhammad; Spyridon, Voutetakis; Papadopoulou, Simira; Ortiz Domínguez, Carlos

Abstract

Thermochemical energy storage systems from carbonates, mainly those based on calcium carbonate, have been gaining momentum in the last few years. However, despite the considerable interest in the process, the Technology Readiness Level (TRL) is still low. Therefore, facing the progressive development of the technology at different scales is essential to carry out a comprehensive risk assessment and a Failure Mode Effect and Analysis (FMEA) process to guarantee the safety and operation of the technology systems. In this study, the methodology was applied to a first-of-its-kind prototype, and it is a valuable tool for assessing safe design and operation and potential scaling up. The present work describes the methodology for carrying out these analyses to construct a kW-scale prototype of an energy storage system based on calcium carbonate. The main potential risks occur during the testing and operation stages (>50% of identified risks), being derived mainly from potential overheating in the reactors, failures in the control of the solar shape at the receiver, and potential failures of the control system. Through the assessment of Risk Priority Numbers (RPNs), it was identified that the issues requiring more attention are related to hot fluid path to avoid loss of heat transfer and potential damages (personal and on the facilities), mainly due to their probability to occur (>8 on a scale of 10). The results derived from the FMEA analysis show the need for specific control measures in reactors, especially in the calciner, with high operation temperatures (1000 ◦C) and potential effects of overheating and corrosion.

Full text

energies Article FMEA and Risks Assessment for Thermochemical Energy Storage Systems Based on Carbonates Andrés Carro 1, Ricardo Chacartegui 1, Carlos Tejada 2, Georgios Gravanis 3, Muhammad Eusha 4, Voutetakis Spyridon 3, Papadopoulou Simira 3and Carlos Ortiz 5,*   Citation: Carro, A.; Chacartegui, R.; Tejada, C.; Gravanis, G.; Eusha, M.; Spyridon, V.; Simira, P.; Ortiz, C. FMEA and Risks Assessment for Thermochemical Energy Storage Systems Based on Carbonates. Energies 2021,14, 6013. https:// doi.org/10.3390/en14196013 Academic Editor: Andrea Frazzica Received: 2 July 2021 Accepted: 14 September 2021 Published: 22 September 2021 Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. Copyright: © 2021 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https:// creativecommons.org/licenses/by/ 4.0/). 1Departamento de Ingeniería Energética, Universidad de Sevilla, Camino de los Descubrimientos, 41092 Seville, Spain; andrescarr[email protected] (A.C.); ricar[email protected] (R.C.) 2VirtualMechanics, S.L., c/Arquitectura 1, 41015 Seville, Spain; [email protected] 3Chemical Process & Energy Resources Institute (CPERI), Centre for Research and Technology Hellas (CERTH), P.O. Box 60361, 57001 Thessaloniki, Greece; [email protected] (G.G.); [email protected] (V.S.); [email protected] (P.S.) 4TTZ Bremerhaven Am Lunedeich 12, 27572 Bremerhaven, Germany; [email protected] 5Materials & Sustainability Group, Department of Engineering Universidad Loyola Andalucía, Avda. De las Universidades s/n, Dos Hermanas, 41704 Seville, Spain *Correspondence: [email protected]; Tel.: +34-6557-83930 Abstract: Thermochemical energy storage systems from carbonates, mainly those based on calcium carbonate, have been gaining momentum in the last few years. However, despite the considerable interest in the process, the Technology Readiness Level (TRL) is still low. Therefore, facing the progressive development of the technology at different scales is essential to carry out a comprehensive risk assessment and a Failure Mode Effect and Analysis (FMEA) process to guarantee the safety and operation of the technology systems. In this study, the methodology was applied to a first-of-its-kind prototype, and it is a valuable tool for assessing safe design and operation and potential scaling up. The present work describes the methodology for carrying out these analyses to construct a kW-scale prototype of an energy storage system based on calcium carbonate. The main potential risks occur during the testing and operation stages (>50% of identified risks), being derived mainly from potential overheating in the reactors, failures in the control of the solar shape at the receiver, and potential failures of the control system. Through the assessment of Risk Priority Numbers (RPNs), it was identified that the issues requiring more attention are related to hot fluid path to avoid loss of heat transfer and potential damages (personal and on the facilities), mainly due to their probability to occur (>8 on a scale of 10). The results derived from the FMEA analysis show the need for specific control measures in reactors, especially in the calciner, with high operation temperatures (1000 ◦ C) and potential effects of overheating and corrosion. Keywords: thermochemical energy storage; limestone; solar energy; carbonate; risk assessment; Calcium-Looping 1. Introduction Large-scale energy storage has become one of the great challenges to achieving the ambitious goals set to increase the penetration of renewables significantly. Concentrating Solar Power (CSP) plants have a great potential for energy storage integration, which gives them great dispatchability compared to other renewable technologies, such as PV or wind energy [ 1 ]. The market for energy storage in solar thermal plants is clearly led by technology based on the exchange of sensible heat from molten salts [ 2 ]. However, molten salts present a series of drawbacks, such as corrosion [ 3 ], the need to keep them at temperatures higher than ∼ 220 ◦ C to avoid their solidification (which involves an important energy consumption) [ 4 ], and the maximum temperature limitation to ∼ 550 ◦ C to avoid salt degradation [5], which limits the power block efficiency. Energies 2021,14, 6013. https://doi.org/10.3390/en14196013 https://www.mdpi.com/journal/energies Energies 2021,14, 6013 2 of 20 As a promising alternative to molten-salts-based energy storage, Thermochemical Energy Storage (TCES) has been gaining momentum in the last few years [ 6 ]. Among them, carbonates-based systems are non-corrosive, non-toxic, and cheap (raw materials) [ 7 ], with a high energy density and allowing power production at temperatures higher than 800 ◦C , which boost the power cycle efficiency [ 8 ]. The most studied system is the one based on calcium carbonate in the so-called Calcium-Looping (CaL) process [ 9 ], which is also being developed as a potential CO 2 capture system in plants based on fossil fuels [ 10 ]. Many studies are being published, mainly investigating the performance of the reaction on a laboratory scale and by the simulation of different processes schemes to evaluate the efficiency of their integration in large-scale CSP plants. However, their Technology Readiness Level (TRL) continues to be low (TRL4, technology demonstrated on a laboratory scale). The successful scaling of the process, first at kW scale in a relevant environment (TRL5) and later at a larger scale, is essential for developing this promising technology. However, due to the novelty of the process regarding the management of gas and solids at high temperature (even higher than 1000 ◦C), there is important challenges and risks. To reach a successful prototype development on a relevant scale, an exhaustive risk assessment that encompasses the different stages of the process is essential [ 11 ], as well as a Failure Mode Effect and Analysis (FMEA) that allows us to improve designs and identify potential failures and their probability of occurring, to reach a successful and safe operation. A correct evaluation of potential failures is essential for the development of mitigation measures that prevent problems if these failures occur [ 12 ]. These analyses are complementary to those linked to technical/scientific approaches, and they are fundamental for safe design, operation and scaling-up, when prototypes are under design, and operation. However, there is a reduced number of publications under this approach. In FMEA analysis, decisions on the present work are based on Risk Priority Numbers (RPN) [ 13 ]. In the last years, several FMEA papers have been published directly related to the energy sector, such as for sensible energy storage systems [ 14 ], Lithium-ion batteries management [ 15 , 16 ], hydrogen refueling station [ 17 ], liquefied natural gas sector [ 18 ], or municipal solid-waste management [19]. This work shows the methodology followed for these analyses in a real case: the construction of the first prototype at a relevant scale (TRL5) of an energy storage system, a CaL-based TCES in CSP plants, through the SOCRATCES project [ 20 , 21 ], in Seville. This is the first work related to risk assessment and FMEA related to promising thermochemical systems for energy storage. It aims to bridge the gap between the laboratory and prototype scales from a risk-analysis point of view, providing a valuable methodology for application in other prototypes. It is valuable information for engineers and scientists involved in prototypes development and scaling up within the energy sector. 2. A Real Case of Study: Developing a KW-Scale CSP–CaL Prototype SOCRATCES project aims to develop novel thermochemical energy storage based on the the CaL process for its integration in CSP plants [ 22 ]. In SOCRATCES, a kW-scale prototype, the first of its type, is under design, construction, and testing. Moreover, several components have specifically been developed for advancing the knowledge of the processes and the requisites for technology for scaling up. The CSP–CaL process consists of using the heat provided for a CSP receiver to carry out the endothermic decomposition of CaCO 3 (calcination) in CO 2 and CaO, which are stored separately. Calcination occurs in a solid–gas reactor (calciner), which typically has been proposed as a Fluidized Bed (FB) [ 23 ]. However, Entrained Flow (EF) reactors are gaining impetus in the last years due to their potential to operate with fine particles [ 24 ]. Once energy is demanded, the stored products are sent to another solid–gas reactor (carbonator), where energy is recovered by the reverse reaction (carbonation), which releases the energy previously stored to a power cycle by its exothermic nature. Figure 1shows a conceptual scheme for the CSP–CaL integration. Energies 2021,14, 6013 3 of 20 Energies 2021, 14, x FOR PEER REVIEW 3 of 19 the energy previously stored to a power cycle by its exothermic nature. Figure 1 shows a conceptual scheme for the CSP–CaL integration. Figure 1. CSP–Calcium Looping conceptual scheme. Adapted from Reference [8]. The equipment represented in Figure 1 is included in the SOCRATCES prototype. The calciner is an EF reactor in which a stream composed of CaCO3 particles and CO2 enters through a pneumatic conveying system. A 40 m2 solar field provides the required energy to carry out the endothermic calcination. Another EF reactor is constructed for the carbonation reaction, which is coupled with a Stirling engine to produce electricity from the stored materials. The power output constrains the selection of the power block. At an industrial scale, more efficient power cycles would be considered at [25]. The reactors include several heaters to guarantee isothermal operation at a prototype scale and emulate different operating conditions. A schematic of the pilot plant configuration of the SOCRATCES project is shown in Figure 2. Figure 2. SOCRATCES pilot plant scheme. The SOCRATCES technological concept and reaction have been proven successful at the laboratory scale [26]. However, the scale-up of the processes at the prototype level and Figure 1. CSP–Calcium Looping conceptual scheme. Adapted from Reference [8]. The equipment represented in Figure 1is included in the SOCRATCES prototype. The calciner is an EF reactor in which a stream composed of CaCO 3 particles and CO 2 enters through a pneumatic conveying system. A 40 m 2 solar field provides the required energy to carry out the endothermic calcination. Another EF reactor is constructed for the carbonation reaction, which is coupled with a Stirling engine to produce electricity from the stored materials. The power output constrains the selection of the power block. At an industrial scale, more efficient power cycles would be considered at [ 25 ]. The reactors include several heaters to guarantee isothermal operation at a prototype scale and emulate different operating conditions. A schematic of the pilot plant configuration of the SOCRATCES project is shown in Figure 2. Energies 2021, 14, x FOR PEER REVIEW 3 of 19 the energy previously stored to a power cycle by its exothermic nature. Figure 1 shows a conceptual scheme for the CSP–CaL integration. Figure 1. CSP–Calcium Looping conceptual scheme. Adapted from Reference [8]. The equipment represented in Figure 1 is included in the SOCRATCES prototype. The calciner is an EF reactor in which a stream composed of CaCO3 particles and CO2 enters through a pneumatic conveying system. A 40 m2 solar field provides the required energy to carry out the endothermic calcination. Another EF reactor is constructed for the carbonation reaction, which is coupled with a Stirling engine to produce electricity from the stored materials. The power output constrains the selection of the power block. At an industrial scale, more efficient power cycles would be considered at [25]. The reactors include several heaters to guarantee isothermal operation at a prototype scale and emulate different operating conditions. A schematic of the pilot plant configuration of the SOCRATCES project is shown in Figure 2. Figure 2. SOCRATCES pilot plant scheme. The SOCRATCES technological concept and reaction have been proven successful at the laboratory scale [26]. However, the scale-up of the processes at the prototype level and Figure 2. SOCRATCES pilot plant scheme. Energies 2021,14, 6013 4 of 20 The SOCRATCES technological concept and reaction have been proven successful at the laboratory scale [ 26 ]. However, the scale-up of the processes at the prototype level and higher scales will show new challenges regarding materials behavior and components performance, including additional issues on the operation and efficiency effects. One of the SOCRATCES project objectives is to learn about the performance of solid materials at high temperatures in terms of their transport, storage, and cyclability. It involves a series of kW-prototype scale challenges that must be assessed based on a detailed risk assessment. 3. CSP–CaL Prototype Risk Assessment The risk assessment aims to reduce the risks in prototype design, construction, and scaling up, identifying risks early on and planning how to manage them. According to ISO 31010, the risk is a combination of the consequences of an event (hazard) and the associated likelihood/probability of its occurrence. The following factors should be considered: •Nature and types of risks assessed. •Definition of likelihood (Table A1 in Appendix A). • Definition of consequences of the risk. The consequences will be described quantitatively as a function of its impact on the project’s objectives (Table A2 in Appendix A). • Definition of the risk level. It is the magnitude of risk or combination of risks, expressed in terms of probability and consequence combination. Depending on the level of the risk, it is classified as low, medium, moderate, high, very high, or extreme risk. The risks identified within the CSP–CaL prototype construction were consolidated and grouped by the different parts of the project life cycle (Figure 3), with the full description of each of the project’s risks and their corresponding mitigation actions. The first group includes those general transversal risks identified as those that affect the entire project life cycle. The second group comprises those that affect specific parts and components. The third group includes all those linked to testing and operation, and finally, the fourth group includes those identified as affecting the scalability and pathway to commercialization. Energies 2021, 14, x FOR PEER REVIEW 4 of 19 higher scales will show new challenges regarding materials behavior and components performance, including additional issues on the operation and efficiency effects. One of the SOCRATCES project objectives is to learn about the performance of solid materials at high temperatures in terms of their transport, storage, and cyclability. It involves a series of kW-prototype scale challenges that must be assessed based on a detailed risk assessment. 3. CSP–CaL Prototype Risk Assessment The risk assessment aims to reduce the risks in prototype design, construction, and scaling up, identifying risks early on and planning how to manage them. According to ISO 31010, the risk is a combination of the consequences of an event (hazard) and the associated likelihood/probability of its occurrence. The following factors should be considered:  Nature and types of risks assessed.  Definition of likelihood (Table A1 in Appendix A).  Definition of consequences of the risk. The consequences will be described quantitatively as a function of its impact on the project’s objectives (Table A2 in Appendix A).  Definition of the risk level. It is the magnitude of risk or combination of risks, expressed in terms of probability and consequence combination. Depending on the level of the risk, it is classified as low, medium, moderate, high, very high, or extreme risk. The risks identified within the CSP–CaL prototype construction were consolidated and grouped by the different parts of the project life cycle (Figure 3), with the full description of each of the project’s risks and their corresponding mitigation actions. The first group includes those general transversal risks identified as those that affect the entire project life cycle. The second group comprises those that affect specific parts and components. The third group includes all those linked to testing and operation, and finally, the fourth group includes those identified as affecting the scalability and pathway to commercialization. Figure 3. Project lifecycle stages. Risk Assessment Development This section collects the main risks of the scaling-up process divided into categories according to Figure 3. The present work is mainly focused on prototype construction and testing, these being the categories in which we go into more detail along this section. Firstly, the main risks affecting the construction of the prototype are assessed (Table 1). They appear as a potential gap between design and on-site installation work. Special attention requires equipment manufacturing (when they are not commercially available) and plant integration work: foundations, piping, instrumentation, mechanical supports, and others. An action plant with a clear definition of tasks and responsibilities, as well as a daily evaluation, is fundamental to the success of the construction. Figure 3. Project lifecycle stages. Risk Assessment Development This section collects the main risks of the scaling-up process divided into categories according to Figure 3. The present work is mainly focused on prototype construction and testing, these being the categories in which we go into more detail along this section. Firstly, the main risks affecting the construction of the prototype are assessed ( Table 1 ). They appear as a potential gap between design and on-site installation work. Special attention requires equipment manufacturing (when they are not commercially available) and plant integration work: foundations, piping, instrumentation, mechanical supports, and others. An action plant with a clear definition of tasks and responsibilities, as well as a daily evaluation, is fundamental to the success of the construction. Energies 2021,14, 6013 5 of 20 Table 1. Definition of main risks affecting the construction of the prototype. Risk ID Description and Consequences Source of Risk Mitigation Action R1 Delays in transferring information/ components/ modules between partners suppliers and EPC companies for prototype integration (includes material exchange) Modules design and construction Management board controls. Clear definition of responsibilities Consider alternative pathways to advance in construction activities until the reception of information to avoid accumulated delays Identification of alternative systems for temporal substitution of modules or components with delays/failures R2 Non-adequate correspondence of plans and components Modules design and construction Clear definition in the action plan of the responsibility for information transmission. R3 Differences in modules information availability and accuracy. Results integration Following of results and data quality R4 Issues in modules construction, transport, or erection Modules construction Clear definition in the action plan of the responsibilities for task implementation and times R5 Problems with prototypes location (legal constraints, delays in permits, etc.) Prototype construction Participation of specialized technicians for legal framework and documents R6 Appear unexpected new results and technological challenges, critical component breakdown, unexpected low performance Technology watch Technologies evaluated at different levels of integration, in a sequential process, from laboratory to demonstrators, to identify separate effectsRedesign of alternatives R7 The appearance of new requisites of technologies, new regulations or changes in costs or materials availability Technology watch Project’s technology watch must deliver information periodically to maintain a continuous flow of information R8 Non-unexpected availability (or delays) for implementing in demonstrator location Prototype construction Flexibility for readapting modules. Periodical meetings to identify alternative solutions Table 4classified the items shown in Table 1according to the risk level. Note that classification is made based on the combination of likelihood and consequence of each risk following (Appendix Asection). Thus, very high risks are related to issues on modules construction, transport, or erection and issues with licenses or permits on-site, a situation that could lead to delays in the tests planned to validate the technology. Energies 2021,14, 6013 6 of 20 Table 2. Evaluation of main risks affecting the CSP–CaL prototype construction. Risk Level Prototype Construction Consequence Insignificant Minor Moderate Major Severe Low Rare Medium Unlikely R3-R6-R7 R2 High Possible R1 R5-R8 Very high Likely R4 Extreme Likehood Almost Certain Following is described the most prominent risks in each part and system of the pilot plant and their evaluation associated with the plant’s operation and the testing campaign. This phase of the project is where the most significant risks were identified. Because of this, this stage of pilot plant testing and operation is also studied in the Product Failure Mode Analysis (FMEA) developed in the next section. Table 4summarizes the main risks associated with this stage from a general perspective, whilst specific issues with each main system of the prototype are analysed under the FMEA assessment in Section 4. Table 3and ?? evaluates the risk level of each item affecting the testing and operation of the prototype. Higher risks are associated with loss of remote control and potential inadequate operation of systems because of issues in the signal tracing, which can cause materials failures and compromise the safe operation of the plant. Table 3. Definition of main risks affecting the testing and operation of the pilot plant. Risk ID Description and Consequences Source of Risk Mitigation Action R9 Delays in laboratory facilities startup. Non-availability for testing equipment Planning Laboratory facilities startup with adequate time before starting main activities. R10 Inconsistent measures from different sources Measurement equipment and protocols Setting of templates and standards for data collecting and information presentation at the beginning of the tasks. R11 Incorrect records keeping Data management Clear definition in the Action plan of the responsibilities for information keeping at each subsequent step. R12 Low availability of demonstration cases/modules testing Modules construction Definition in the action plan of strategies for validation of modules. R13 Excessive fatigue of materials of construction due to cyclic operation Materials failure The materials of construction must be chosen for their ability to withstand high temperature and still perform mechanically. Regular programmed materials inspection will be performed to avoid catastrophic failures. The reactors should be designed to be extracted and replaced (if needed) for mechanical and material analyses after operation time. Energies 2021,14, 6013 7 of 20 Table 3. Cont. Risk ID Description and Consequences Source of Risk Mitigation Action R14 Disfigurement of units due to differential thermal expansion at high temperatures (calciner and carbonator operation up to 1000 ◦C) Magnitudes resizing with operation and heating Lateral fixations should be included to allow displacements. System includes monitoring of displacement. Need for a control system actuation to avoid disfigurement or structural damages. R15 High emissivity losses leading to unexpected results Heat losses at solar receiver The receiver’s cavity design should be selected based on its better ability to retain radiation than others (e.g., a bare tube). At prototype; Integration of measures to control surface absorptivity and beam down (low emissivity losses design). Absorptivity losses evaluated and included in calculations R16 Errors in programming the control software cause malfunctions, e.g., an incomplete reaction in the carbonization process Incomplete tested control software for the carbonator Simulating the control software as far as possible; foreseen remote access to fix errors remotely. R17 Bad data acquisition and observation An incomplete programmed master control unit (MCU) Remote access to the MCU to fix any errors quickly. R18 Loss of remote control and loss of data acquisition Control Duplicate control system in the equipment for automatic stop procedure and position of components. R19 Potential inadequate operation on systems Control Commissioning procedure for labeling. Periodic revision status. Table 4. Evaluation of main risks affecting the CSP–CaL prototype construction. Risk Level Prototype Construction Consequence Insignificant Minor Moderate Major Severe Low Rare Medium Unlikely R-12 R16 R13-R14 High Possible R-10-R-11-R-17 R9-R15 R18-R19 Very high Likely Extreme Almost Certain Finally, risks affecting the CSP–CaL prototype scalability and commercialization must be considered. They are related to (i) the appearance of unexpected performance in the testing stage, compromising the technology deployment; (ii) ownership’s conflict for novel technology developments; (iii) difficulties in commercializing products and services; and (iv) higher investment costs of the technologies than expected before the testing stage. None of these items should fall into the classification of very high or severe risks. However, they do expose the need to include mitigation actions such as: (i) evaluation of technologies at different levels of integration, in a sequential process, from laboratory to demonstrators, to identify separate effects related to the unexpected performance of the facility; (ii) design of the warning and control systems to detect abnormalities in the performance; (iii) redesign of alternatives as soon as problems appear; (iv) identification of suitable applications and Energies 2021,14, 6013 8 of 20 synergies to boost the technology through the learning curve until a mature status; and (v) consider potential alternative markets if the commercialization stagnates. 4. Product and Process Failure-Mode Effect and Analysis (FMEA) FMEA is an essential reliability analysis technique that evaluates designs and identifies potential failures and their probability of occurring. Generally, FMEA is a proactive method for evaluating a process to identify the need for and the effects of design changes [ 27 ]. It departs from the risk analysis and complements it with additional information for implementing monitoring actions and control actions to reduce potential failures in the system, components, and processes. Due to the nature of the analyses, FMEA is focused on this work in the CSP–CaL prototype operation and testing, as an engineering tool whose objective is to increase the technology reliability. CSP plants, in general, experience different issues resulting from failures of different impacts, reducing efficiency, and increasing downtime and maintenance costs. Besides, in developing novel prototypes, unexpected performances are probable due to the lack of previous experiences. Therefore, in order to minimize them and reduce the involved risks, it is critical to identify the critical failure modes in the facilities. The FMEA aims to eliminate potential failures or reduce their impacts. The tool provides the structure for a cross-functional critique of a design or a process. This analysis is built around three elements: the effect, the cause, and the detection. The effect is the result of what potential failure can cause to the project; the cause will indicate the reasons why this problem has appeared; finally, detection is the selected way of controlling the process to avoid possible failures. For the analysis, the CSP–CaL integration is divided into subsections: solar side (receiver and heliostats field), materials storage, solid–gas reactors (calciner and carbonator), and power block. 4.1. Evaluation Method and Risk Criteria The generic form of an FMEA is designed relatively simple and straightforward for worthy data acquisition and classification. Figure 4presents a basic form that identifies all essential information to reduce or eliminate a root cause from either a design and/or a process. The rankings or criteria, as they are commonly known, are not globally standardised. There are no global criteria that everyone is using for all FMEAs and industries. The criteria must be based on logic, knowledge, and experience about the process at hand. In the present work, these criteria are based on the expertise of the authors in the study of the CaL process [26], as well as the experience in prototypes construction. Energies 2021, 14, x FOR PEER REVIEW 8 of 19 process. The rankings or criteria, as they are commonly known, are not globally standardised. There are no global criteria that everyone is using for all FMEAs and industries. The criteria must be based on logic, knowledge, and experience about the process at hand. In the present work, these criteria are based on the expertise of the authors in the study of the CaL process [26], as well as the experience in prototypes construction. Figure 4. Typical FMEA pathway. The evaluation includes the Severity (S), Probability (P), and Detection (D) of the risks [28]. Severity is a relative measure of the importance of the effect. When the severity changes depending on the point in time, we consider the worst-case scenario. Reducing the severity are necessary changes in the design, construction or operation and focus on reducing the standards, procedures, and instructions. Probability is the estimated number of failures, based on experience, that may occur for a given cause during the design life. Finally, the detection rate is a numerical rating of the probability that a given set of control measures or examinations will uncover a failure mode. Risks inevitably exist in any system, design, or manufacturing process. The FMEA process aids in the identification of main risks then provides help to reduce its impact. It was carried out using Risk Priority Numbers or the RPN index. The RPN for each potential failure detected is calculated by multiplying the three scores, such as Severity (SEV), Probability (PRO), and Detectability (DET). These RPNs are considered for prioritising the risks with a potential failure mode [29]. Criteria for S, P and D are shown in Tables A1– A3 (Appendix A section). 𝑅𝑃𝑁 = 𝑆𝐸𝑉 × 𝑃𝑅𝑂 × 𝐷𝐸𝑇 (1) The primary focus will be on the failures detected with a high number of RPN. For obtaining the RPN number of a potential failure mode, the three factors were introduced using an evaluation scale of 10 points (Tables A1–A3). The higher the RPN of a failure mode, the greater the risk for the CSP–CaL prototype reliability. As design criteria, RPN values higher than 100 are considered critical and need to be evaluated carefully. Regarding the scores of RPNs, the failure mode assessed them and considering the results, and the proper actions were taken on the high-risk failure types. 4.2. FMEA Analysis for the CSP–CaL Prototype Operation and Testing In this section, a detailed review of the potential issues derived from the operation of a prototype of a CSP–CaL plant at kW-scale is carried out. Potential failures are divided into (i) supplies and control system, (ii) solar side and power block, and (iii) reactors. Table 5 shows those potential failures related to supplies and control systems. Figure 4. Typical FMEA pathway. The evaluation includes the Severity (S), Probability (P), and Detection (D) of the risks [ 28 ]. Severity is a relative measure of the importance of the effect. When the severity Energies 2021,14, 6013 9 of 20 changes depending on the point in time, we consider the worst-case scenario. Reducing the severity are necessary changes in the design, construction or operation and focus on reducing the standards, procedures, and instructions. Probability is the estimated number of failures, based on experience, that may occur for a given cause during the design life. Finally, the detection rate is a numerical rating of the probability that a given set of control measures or examinations will uncover a failure mode. Risks inevitably exist in any system, design, or manufacturing process. The FMEA process aids in the identification of main risks then provides help to reduce its impact. It was carried out using Risk Priority Numbers or the RPN index. The RPN for each potential failure detected is calculated by multiplying the three scores, such as Severity (SEV), Probability (PRO), and Detectability (DET). These RPNs are considered for prioritising the risks with a potential failure mode [ 29 ]. Criteria for S, P and D are shown in Tables A1–A3 (Appendix Asection). RPN =SEV ×PRO ×DET (1) The primary focus will be on the failures detected with a high number of RPN. For obtaining the RPN number of a potential failure mode, the three factors were introduced using an evaluation scale of 10 points (Tables A1–A3). The higher the RPN of a failure mode, the greater the risk for the CSP–CaL prototype reliability. As design criteria, RPN values higher than 100 are considered critical and need to be evaluated carefully. Regarding the scores of RPNs, the failure mode assessed them and considering the results, and the proper actions were taken on the high-risk failure types. 4.2. FMEA Analysis for the CSP–CaL Prototype Operation and Testing In this section, a detailed review of the potential issues derived from the operation of a prototype of a CSP–CaL plant at kW-scale is carried out. Potential failures are divided into (i) supplies and control system, (ii) solar side and power block, and (iii) reactors. Table 5 shows those potential failures related to supplies and control systems. Table 5. Data collection and risk assessment of the FMEA analysis of the supplies and CO2compression system. Item System Devices, Component Failure Modes, and Potential Effects SEV PRO DET RPN S1 Electrical supply Supplies. Electrical circuit breaker triggering Installation without power supply. Elements position fixed—regulation capacity loss. 4 4 2 32 S2 Compressed gas supply Supplies. Compressed gas pressure loss Installation without compressed gas supply. Pneumatic valves blocked. Effects on the reactors control system. 6 5 2 60 S3 Compressed gas supply Supplies. Compressed gas regulator valve failure Installation without compressed gas supply. Regulation capacity lost. Overpressure in the system. 6 5 2 60 CD1 CO2 compression and storage system Communication loss with PLC Loss of remote control. Loss of data acquisition. 3 3 2 18 CD2 CO2 compression and storage system Pressure transmitter failure Overpressure on the tank. 6 3 2 36 CD3 CO2 compression and storage system Local electrical system failure System out of operation. Loss of CO2 pressure and mass flow capacity reposition. 4 3 2 24 Energies 2021,14, 6013 16 of 20 probability of failure, but they have a high probability of being detected, so actions are foreseen to minimize the severity and/or probability of failure. The risks that fall into the “Control and Supervision” quadrant do not have very high levels of severity or probability of failure, but they were classified as having a low probability of being detected, and therefore periodic reviews of the condition of the equipment are established to increase the probability of detecting failures. The risks that fall into the “Action Control” quadrant have both high levels of severity or probability of failure and a high level of probability of not being detected, so it is necessary both to minimize the severity and/or probability of failure and to control them and periodically supervise that they are under control. All failure modes detected in the analysis that require severity reduction measures or control and monitoring pertain to the reactors: calciner and carbonator. They correspond to failures in the seals or in the heat-transfer structure. In the heat-transfer structure, very different failure modes are assessed, such as a stress crack due to cooling losses, leakage due to corrosion, perforation or breakage, and plugging. Once severity or probability of failure mitigation and/or control and monitoring measures are applied, all detected failures fall within the “no action required” zone. In addition to being fundamental to avoid accidents in the plant, applying these measures would be key to increase the useful life of the different equipment in the plant. This methodology of risk assessment and failure mode analysis described and applied in this work is of great interest and can provide clear benefits in the process of prototypes design and construction, especially for low TRL prototypes, and also contributes to scaling up. Specifically, it is identified that it can be directly extrapolated to thermal energy systems prototypes, including energy storage systems. The SOCRATCES research project, on which this work is based, develops the first prototype of new technology, a thermochemical energy storage plant based on Calcium-Looping on this scale (TRL 5). The methodology applied to its novel components and integration, which are the first of their kinds, is of high interest for successful development and scaling up of low TRL prototypes and their scaling up. 6. Conclusions This paper shows the methodology followed for a comprehensive risk assessment and Failure Mode and Effects Analysis (FMEA) in a real case: the construction of the first full-scale prototype (TRL5) to assess CaL-based TCES in solar thermal plants, through the SOCRATCES project, in Seville, with a planned completion date of 2021. The risk assessment aims to maximize the chances of successful prototype design and construction by identifying risks from the outset and planning how to manage, reduce, and/or control them. The risks identified in the construction of the CSP–CaL prototype were consolidated and grouped by the different parts of the project life cycle. Focusing on the construction of the prototype, the highest risks are related to problems in the construction, transport, or assembly of the modules and to licensing or permitting issues on site, which could lead to delays in the planned tests to validate the technology. For pilot plant testing, the highest risks are associated with loss of remote control and possible malfunctioning of the systems due to signal routing problems, which can lead to material failures and compromise the safe operation of the plant. FMEA is an essential reliability analysis technique that evaluates designs and identifies potential failures and their probability of occurrence. The FMEA assessment aims to eliminate potential failures or reduce their impact. The tool provides the structure for a cross-functional critique of a design or process. This analysis is built around three elements: effect, cause, and detection. These three elements allow risks to be classified into four quadrants. These analyses show that the main potential risks for the case analyzed in this work occur during the test and operation stages, deriving mainly from potential overheating in the reactors, from failures in the control of the solar part in the receiver, and from potential failures in the control system. The results warn of the need to increase control measures in the reactors, especially in the case of the calciner, given the high temperatures (1000 ◦ C) that Energies 2021,14, 6013 17 of 20 can be reached, with potential overheating and corrosion effects. The methodology shown is of high value for the design and construction of novel experimental prototypes, with high uncertainties. It entirely complements and supports the technical design approaches. The methodology here presented and applied can be directly extrapolated to the analysis of other thermal systems. Author Contributions: Conceptualization, C.O. and A.C.; methodology, R.C., C.T., G.G., M.E., A.C.; software, C.O., A.C.; validation, V.S., P.S., R.C. and C.T.; formal analysis, C.O., A.C., R.C.; investigation, R.C., C.T., A.C.; resources, R.C., V.S.; data curation, R.C., A.C.; writing—original draft preparation, C.O., A.C.; writing—review and editing, R.C., V.S., G.G., M.E., P.S.; funding acquisition, R.C., V.S. All authors have read and agreed to the published version of the manuscript. Funding: This research was funded by European Union’s Horizon 2020 Research and Innovation Programme, grant number 727348 (SOCRATCES project). Institutional Review Board Statement: Not applicable. Informed Consent Statement: Not applicable. Conflicts of Interest: The authors declare no conflict of interest. Appendix A Table A1. Likelihood criteria. Likelihood E Almost certain The event is expected to occur on a regular basis. The probability of occurring is greater than 90%. D Likely The event is expected to occur from time to time. The probability of occurring is between 60 and 90%. C Possible The event could occur at the same time. The probability of occurring is between 40 and 60%. B Unlikely Event not expected, but it is possible that one could occur. The probability of occurring is between 10 and 40%. A Rare The event will only occur in exceptional circumstances. The probability of occurring is less than 10%. Table A2. Consequence criteria. Consequence 5 Severe If it occurs, a risk event will have a severe impact on achieving desired results, to the extent that one or more of its critical outcome objectives will not be achieved. 4 Major If it occurs, a risk event will have a significant impact on achieving desired results, to the extent that one or more stated outcome objectives would fall below acceptable levels. 3 Moderate If it occurs, a risk event will have a major impact on achieving desired results, to the extent that one or more stated outcome objectives would fall below goals but above minimum acceptable levels. 2 Minor If it occurs, a risk event will have a minor impact on achieving desired results, to the extent that one or more stated outcome objectives will fall below goals but well above minimum acceptable levels. 1 Insignificant If it occurs, a risk event will have little or no impact on achieving outcome objectives. Energies 2021,14, 6013 18 of 20 Table A3. Severity criteria. Effect Severity Ranking Hazardous without warning Very high severity ranking when a potential failure mode effects safe system operation without warning. 10 Hazardous with warning Very high severity ranking when a potential failure mode affects safe system operation with warning. 9 Very high The system is inoperable with destructive failure without compromising safety. 8 High The system is inoperable with equipment damage. 7 Moderate The system is inoperable with minor damage. 6 Low The system is inoperable without damage. 5 Very low The system is operable with significant degradation of performance. 4 Minor The system is operable with some degradation of performance. 3 Very Minor The system is operable with minimal interference. 2 None No effect. 1 Table A4. Probability criteria. Probability Ranking Very High: failure is almost inevitable >1 in 2 10 Hazardous with warning 1 in 3 9 High: repeated failures 1 in 8 8 High 1 in 20 7 Moderate: occasional failures 1 in 80 6 Low 1 in 400 5 Very low 1 in 2000 4 Low: relatively few failures 1 in 15,000 3 Very Minor 1 in 150,000 2 Remote: failure is unlikely <1 in 1,500,000 1 Table A5. Detectability criteria. Detection Likelihood of Detection by Design Control Ranking Absolute uncertainty Design control cannot detect potential cause/mechanism and subsequent failure mode. 10 Very remote Very remote chance the design control will detect potential cause/mechanism and subsequent failure mode. 9 Energies 2021,14, 6013 19 of 20 Table A5. Cont. Detection Likelihood of Detection by Design Control Ranking Remote Remote chance the design control will detect potential cause/mechanism and subsequent failure mode. 8 Very low Very low chance the design control will detect potential cause/mechanism and subsequent failure mode. 7 Low Low chance the design control will detect potential cause/mechanism and subsequent failure mode. 6 Moderate Moderate chance the design control will detect potential cause/mechanism and subsequent failure mode. 5 Moderately high Moderately high chance the design control will detect potential cause/mechanism and subsequent failure mode. 4 High High chance the design control will detect potential cause/mechanism and subsequent failure mode. 3 Very high Very high chance the design control will detect potential cause/mechanism and subsequent failure mode. 2 Almost certain Design control will detect potential cause/mechanism and subsequent failure mode. 1 References 1. Kiefer, C.P.; Caldés, N.; Del Río, P. Will dispatchability be a main driver to the European Union cooperation mechanisms for concentrated solar power? Energy Sources Part B Econ. Plan. Policy 2021,16, 42–54. [CrossRef] 2. National Renewable Energy Laboratory (NREL) Concentrating Solar Power Projects. Available online: https://www.nrel.gov/ csp/solarpaces/index.cfm (accessed on 1 July 2018). 3. Goods, S.H.; Bradshaw, R.W. Corrosion of Stainless Steels and Carbon Steel by Molten Mixtures of Commercial Nitrate Salts. J. Mater. Eng. Perform. 2004,13, 78–87. [CrossRef] 4. Vignarooban, K.; Xu, X.; Arvay, A.; Hsu, K.; Kannan, A.M. Heat transfer fluids for concentrating solar power systems—A review. Appl. Energy 2015,146, 383–396. [CrossRef] 5. Kearney, D.; Kelly, B.; Herrmann, U.; Cable, R.; Pacheco, J.; Mahoney, R.; Price, H.; Blake, D.; Nava, P.; Potrovitza, N. Engineering aspects of a molten salt heat transfer fluid in a trough solar field. Energy 2004,29, 861–870. [CrossRef] 6. André, L.; Abanades, S.; Flamant, G. Screening of thermochemical systems based on solid-gas reversible reactions for high temperature solar thermal energy storage. Renew. Sustain. Energy Rev. 2016,64, 703–715. [CrossRef] 7. Sunku Prasad, J.; Muthukumar, P.; Desai, F.; Basu, D.N.; Rahman, M.M. A critical review of high-temperature reversible thermochemical energy storage systems. Appl. Energy 2019,254, 113733. [CrossRef] 8. Alovisio, A.; Chacartegui, R.; Ortiz, C.; Valverde, J.M.; Verda, V. Optimising the CSP-Calcium Looping integration for Thermochemical Energy Storage. Energy Convers. Manag. 2017,136, 85–98. [CrossRef] 9. Chacartegui, R.; Alovisio, A.; Ortiz, C.; Valverde, J.M.M.; Verda, V.; Becerra, J.A.A. Thermochemical energy storage of concentrated solar power by integration of the calcium looping process and a CO2 power cycle. Appl. Energy 2016,173, 589–605. [CrossRef] 10. Hanak, D.P.; Michalski, S.; Manovic, V. From post-combustion carbon capture to sorption-enhanced hydrogen production: A state-of-the-art review of carbonate looping process feasibility. Energy Convers. Manag. 2018,177, 428–452. [CrossRef] 11. Zimon, D.; Madzík, P. Standardized management systems and risk management in the supply chain. Int. J. Qual. Reliab. Manag. 2019,37, 305–327. [CrossRef] 12. Khan, A.S.; Salah, B.; Zimon, D.; Ikram, M.; Khan, R.; Pruncu, C.I. A Sustainable Distribution Design for Multi-Quality Multiple-Cold-Chain Products: An Integrated Inspection Strategies Approach. Energies 2020,13, 6612. [CrossRef] 13. Xiao, N.; Huang, H.Z.; Li, Y.; He, L.; Jin, T. Multiple failure modes analysis and weighted risk priority number evaluation in FMEA. Eng. Fail. Anal. 2011,18, 1162–1170. [CrossRef] Energies 2021,14, 6013 20 of 20 14. Krüger, M.; Haunstetter, J.; Knödler, P.; Zunft, S. Slag as an inventory material for heat storage in a concentrated solar tower power plant: Design studies and systematic comparative assessment. Appl. Sci. 2019,9, 1833. [CrossRef] 15. Bubbico, R.; Greco, V.; Menale, C. Hazardous scenarios identification for Li-ion secondary batteries. Saf. Sci. 2018 ,108, 72–88. [CrossRef] 16. Purushothaman, S. Prioritizing Battery Management System Functionalities for Risk Mitigation. In Proceedings of the 2019 IEEE Industry Applications Society Annual Meeting, Baltimore, MD, USA, 29 September–3 October 2019; pp. 1–5. [CrossRef] 17. Casamirra, M.; Castiglia, F.; Giardina, M.; Lombardo, C. Safety studies of a hydrogen refuelling station: Determination of the occurrence frequency of the accidental scenarios. Int. J. Hydrogen Energy 2009,34, 5846–5854. [CrossRef] 18. Animah, I.; Shafiee, M. Application of risk analysis in the liquefied natural gas (LNG) sector: An overview. J. Loss Prev. Process Ind. 2020,63, 103980. [CrossRef] 19. Chen, Y.C.; Wu, W.F. Constructing an effective prevention mechanism for MSW lifecycle using failure mode and effects analysis. Waste Manag. 2015,46, 646–652. [CrossRef] 20. Socratces Project—Competitive & Sustainable Concentrated Solar Plants. Available online: https://socratces.eu/public-library/ (accessed on 1 April 2021). 21. Chacartegui, R.; Ortiz, C.; Pérez-maqueda, L.A.; Hills, T.; Romeo, L.M.; Schories, G.; Lorenzo, A.; Grippa, M.; Lemonidou, A.; Valverde, J.M. Solar Calcium-Looping Integration for Thermochemical Energy Storage: SOCRATCES Project. Available online: https://cordis.europa.eu/project/id/727348 (accessed on 1 April 2021). 22. SOCRATCES Project Consortium Socratces Project. Available online: https://socratces.eu/ (accessed on 1 April 2021). 23. Shimizu, T.; Hirama, T.; Hosoda, H.; Kitano, K.; Inagaki, M.; Tejima, K. A twin fluid-bed reactor for removal of CO 2 from combustion processes. Chem. Eng. Res. Des. 1999,77, 62–68. [CrossRef] 24. Ortiz, C.; Valverde, J.M.; Chacartegui, R.; Pérez-Maqueda, L.A.; Gimenez-Gavarrell, P. Scaling-up the Calcium-Looping Process for CO2Capture and Energy Storage. KONA Powder Part. J. 2021,38, 189–208. [CrossRef] 25. Ortiz, C.; Chacartegui, R.; Valverde, J.M.M.; Alovisio, A.; Becerra, J.A.A. Power cycles integration in concentrated solar power plants with energy storage based on calcium looping. Energy Convers. Manag. 2017,149, 815–829. [CrossRef] 26. Ortiz, C.; Valverde, J.M.; Chacartegui, R.; Perez-Maqueda, L.A.; Giménez, P. The Calcium-Looping (CaCO 3 /CaO) process for thermochemical energy storage in Concentrating Solar Power plants. Renew. Sustain. Energy Rev. 2019,113, 109252. [CrossRef] 27. Albliwi, S.A.; Antony, J.; Arshed, N.; Ghadge, A. International Journal of Quality & Reliability Management. Int. J. Qual. Reliab. Manag. 2017,34, 508–529. 28. Stamatis, D.H. Risk Management Using Failure Mode and Effect Analysis (FMEA); ASQ Quality Press: Milwaukee, WI, USA, 2019; ISBN 9780873899789. 29. Chen, J.K. Utility Priority Number Evaluation for FMEA. J. Fail. Anal. Prev. 2007,7, 321–328. [CrossRef] 30. Constantin, A.; National, M.; Stefan, H.; Independent, M. Risk assessment of thermal power plant. Rev. Energ. 2009 ,57, 627–630. 31. Shrivastava, R.; Patel, P. Hazards Identification and Risk Assessment in Thermal Power Plant. Int. J. Eng. Res. Technol. 2014 ,3, 463–466.