Evaluation capacity building in response to the agricultural research impact agenda: Emerging insights from Ireland, Catalonia (Spain), New Zealand, and Uruguay
Abstract
Performance-based funding and calls for public-funded science to demonstrate societal impact are encouraging public research organisations to evaluate impact, the so-called impact agenda. This paper explores evaluation methods of four fully or partially public-funded agricultural research organisations and how they are building evaluative capacity to respond to the impact agenda. Drawing on cross- organisational comparison of the readiness of each organisation to implement evaluation, the implications for improving evaluative capacity building (ECB) are discussed. This study extends the current literature on ECB, as very little has focussed on research organisations in general, and particularly agricultural research.
Full text
1 Evaluation capacity building in response to the agricultural research impact agenda: Emerging 1 insights from Ireland, Catalonia (Spain), New Zealand, and Uruguay 2 Abstract 3 Performance-based funding and calls for public-funded science to demonstrate societal impact are 4 encouraging public research organisations to evaluate impact, the so-called impact agenda. This paper 5 explores evaluation methods of four fully or partially public-funded agricultural research organisations 6 and how they are building evaluative capacity to respond to the impact agenda. Drawing on cross-7 organisational comparison of the readiness of each organisation to implement evaluation, the 8 implications for improving evaluative capacity building (ECB) are discussed. This study extends the 9 current literature on ECB, as very little has focussed on research organisations in general, and 10 particularly agricultural research. 11 Driven by the impact agenda, the organisations are beginning to emphasise summative evaluation. 12 Organisational leaders valuing the demonstration of impact and commitment to building evaluation 13 capacity are important precursors to other aspects of organisational readiness to implement 14 evaluation. However, organisational emphasis remains on using evaluation for accountability and to 15 improve efficiency and allocation of funding. The organisations have yet to systematically embed 16 evaluation processes and capabilities for learning at programme and organisation-levels. There is, 17 therefore, an opportunity to develop organisation and programme-level evaluation processes that 18 inform each other and the pathways to impact from science. 19 To realise this opportunity, organisations could strengthen internal and external networks of 20 evaluation practitioners and academics to bridge the gap between the theory and practice of 21 monitoring and evaluation for learning (MEL) and to begin to reshape organisational culture by using 22 evaluation methods that are grounded in co-production and integrated scientific and societal values. 23 Keywords: agricultural research impact; monitoring and evaluation, evaluation capacity building 24
2 Introduction 25 Over the past two decades there has been an increasing call for public-funded science to deliver and 26 demonstrate impact (Penfield et al., 2014), going beyond the excellence of academic outputs to the 27 benefits these produce for society (Donovan, 2011). This is challenging the social contract with science 28 through which scientific freedom was exchanged for the expectation of socially beneficial impacts 29 (Joly et al., 2016; Owen et al., 2012). Simultaneously, the diffusion of new public management rules 30 (Gaunand et al., 2015) has encouraged performance-based funding for public-funded science (New 31 Zealand Ministry of Business, Innovation and Employment, 2015; Organisation for Economic Co-32 operation and Development, 2010). 33 Delivering and demonstrating impact is especially important for agricultural science (Midmore, 2017), 34 with agriculture at the nexus of significant societal challenges, such as food security, rural resilience, 35 and environmental sustainability (Tilman et al., 2002). Given the nature of these challenges 36 agricultural science needs to deliver social, cultural, and environmental benefits (Donovan, 2011; 37 Kelley et al., 2008), as well as economic (Joly et al., 2015). For the purposes of this study, research 38 impact is defined as: “the demonstrable contribution that research makes to the economy, society, 39 culture, national security, public policy or services, health, the environment, or quality of life, beyond 40 contributions to academia” (Australian Research Council cited in Midmore (2017)). 41 The reasons research organisations may evaluate science impact can be organised into the four “As”: 42 advocacy, accountability, allocation, and analysis (Morgan Jones, Manville, and Chataway 2017; 43 Penfield et al., 2014): 44 1. Advocacy to demonstrate the value of research to government, stakeholders, and the public 45 (Joly et al., 2015; Penfield et al., 2014). 46 2. Accountability to funders, and more broadly society, by monitoring and managing research 47 organisation performance to contribute to society (Penfield et al., 2014). 48 3. To inform funding allocation, based on the potential value of research (Penfield et al., 2014). 49
3 4. Analysis to understand how agricultural science generated contributes to changes in practices 50 and policies in the agri-food system (Joly et al., 2016; Midmore, 2017; Pollock, 2012). 51 The “impact agenda” therefore calls for both summative (advocacy and accountability) and formative 52 (allocation and analysis) functions of evaluation (Joly et al., 2015). Formative evaluation takes place 53 during the development of a programme, with the intention of improving the value or effectiveness 54 of the programme, while summative draws lessons from a completed programme (Superu, 2017a). 55 While agricultural research organisations are in the emergent stages of meeting the impact agenda, 56 other research organisations have made progress (e.g. CSIRO, 2015; Joly et al., 2016; Kelley et al., 57 2008; Maredia et al., 2014; Menon et al., 2009). The Consultative Group on International Agricultural 58 Research (CGIAR) has been undertaking ex-post Impact Assessments since the early 1970s (Watts et 59 al., 2008), including non-economic impacts (Kelley et al., 2008). Utilising a suite of evaluation methods 60 (Kelley and Gregersen, 2003), CGIAR has moved from an accountability focus to evaluation for learning 61 (like analysis) (Watts et al., 2008) and includes participation of stakeholders and organisations in 62 evaluation (Mackay and Horton, 2003; Watts et al., 2008; Mayne and Johnson, 2015). 63 Research organisations working to meet the impact agenda face several challenges including: 64 evaluation of multiple possible impact pathways (Joly et al., 2016); multiple impacts (Bozeman and 65 Sarewitz, 2011; Kelley et al., 2008) at different levels from programme to organisation; attributing 66 impacts in multi-actor innovation systems (Douthwaite and Hoffecker, 2017; Horton and Mackay, 67 2003; Joly et al., 2016); and time-lags between research outputs and impacts (Kelley et al., 2008). To 68 address these challenges agricultural research organisations have begun to invest in evaluation 69 capacity building (ECB) (Joly et al., 2016; Maredia et al., 2014; Stone-Jovicich et al., 2019), which is 70 defined as “the intentional work to continuously create and sustain overall organisational processes 71 that make quality evaluation and its use routine” (Hueftle Stockdill et al., 2002, p.14). The goals of ECB 72 include designing, undertaking, and managing evaluation projects; developing and using evaluation 73 knowledge and skills; encouraging organisational learning as an ongoing process; organisational 74
4 accountability; creating awareness and support for evaluation within the organisation (Cousins et al., 75 2014; Preskill and Boyle, 2008); and sustaining evaluation practice over time (Wade & Kallemeyn, 76 2020). 77 However, to what extent, and how, are public-funded agricultural research organisations building 78 evaluation capacity to respond to the impact agenda? To address this question our aim is to describe 79 the current evaluative capacity of four partially to fully public-funded agricultural research 80 organisations in terms of: 81 1. The evaluation methods these organisations are using; and 82 2. Their comparative evaluation capacity. 83 This article proposes to extend the current body of literature on ECB, as very little has focussed on 84 research organisations in general, and agricultural research in particular (Joly et al., 2016). As far as 85 we are aware, this is the first time that four publicly funded research organisations have documented 86 their approaches to ECB. Drawing on our cross-organisational comparison of evaluation capacity, 87 implications are discussed to improve ECB within agricultural research organisations. 88 89 90 91 92 93 Background 94 This section provides a brief background to each of the four research organisations that participated 95 in this study. The four organisations established a learning network on evaluation capacity building 96 that was operationalised with workshops in 2017 and 2019 that provided data for the analysis in this 97
5 paper (see Methodology). The network was based on the organisation’s commonalities, particularly 98 public research organisations in the agri-food sector focusing on pastoral systems. 99 Each of the organisations is described in terms of their purpose, agri-food sectors served, key research 100 and extension capabilities, major funding sources (Table 1), overarching evaluation frameworks and 101 core principles, key characteristics of their organisational impact agenda (Table 2), and timeline of 102 activities to build evaluative capacity (Figures 1 to 4). The description of the organisations is for the 103 period 2015-2018. Given the dynamic nature of each organisation the information presented here will 104 differ from the current reality. 105 Table 1. Major funding sources for each case study organisation – average for 2015-2018 106 Income Source Contribution to the total (%) AgResearch INIA IRTA Teagasc Structural1 Funds1 27.0 84.0 32.0 69.0 Competitive 2 17.6 5.0 12.0 17.0 Contracts for services and product sales3 44.1 10.0 39.0 14.0 Subsidies4 0.0 0.0 7.0 0.0 Other funds 11.2 1.0 10.0 0.0 1Funding allocated directly to the organisation to then allocate, 2 Funds that are bid to a funder for, 3 107 One off contracted projects, e.g. for an agricultural company, and 4 Funds that are received from the 108 provincial councils and for funding researchers from national and regional programs. The availability 109 of structural research funding from the state depends on the organisational and funding 110 characteristics of each country’s science system. 111 112 113 Teagasc, Ireland 114 Teagasc – the Agriculture and Food Development Authority – is the national body providing integrated 115 research, advisory and education services to the agriculture and food industry and rural communities 116 in Ireland. It is a key node in Ireland’s Agricultural Knowledge & Innovation System (AKIS) and has long-117 established and strong collaborations with many other public and private sector AKIS actors. Teagasc 118
6 has 1,260 staff based in seven research centres, 52 advisory offices and four colleges of further 119 education around the country. 120 An Evaluation Unit was established in Teagasc in 2003 in response to recommendations made by the 121 Comptroller and Auditor General (C&AG) in a 1999 report on Performance Measurement in Teagasc 122 (see Figure 4). In 2002, consultants (Capita) outlined a strategy and plan for establishing an evaluation 123 function across Teagasc, not just research evaluation. Although no formal Evaluation Unit existed in 124 the organisation before 2003, research and advisory programmes were reviewed, and other 125 organisational functions evaluated, over the years since Teagasc was established in 1988. 126 After 2003, a regular cycle of peer assessments of research centres, then research programmes 127 (established in 2008) and advisory regions (established in 2013) began. Organisational functions were 128 evaluated on a non-cyclical basis. In 2014, Teagasc approached the Department of Education & Skills 129 to develop an evaluation framework for its colleges. Externally, in 2016, the Code of Practice for the 130 Governance of State Bodies issued by the Department of Public Expenditure and Reform led to the 131 Oversight and Performance Delivery Agreement (2017 – 2020) with the Department of Agriculture, 132 Food and the Marine (DAFM). This Agreement formalises the arrangements between DAFM and 133 Teagasc for oversight and reporting on performance. Internally, a series of revisions of evaluation 134 protocols, framework, methodologies and networks has shaped the evaluation function from 2017 to 135 2021. 136 Teagasc uses agricultural innovation systems as an overarching framework for understanding the 137 organisation’s contribution to the transformation of Ireland’s AKIS. To evaluate its research 138 programmes and advisory service Teagasc uses ex-post outcome assessment and peer assessments 139 (Table 2, Figure 1). Key principles that guide evaluation activities in Teagasc are: 140 1. Using M&E for accountability and learning. 141 2. Incorporating stakeholder participation. 142 3. Undertaking M&E of economic, social, and environmental impacts. 143
7 4. A focus on improvement of service design and delivery. 144 5. Strengthening organisational governance. 145 146 Figure 1: Timeline of key external and organisational events in building evaluation capacity in Teagasc. 147 148 149 150 AgResearch Ltd., New Zealand 151 AgResearch is one of seven Crown Research Institutes (CRI), Government-owned organisations tasked 152 with providing research and technologies to deliver outcomes for New Zealand. AgResearch focuses 153 on the pastoral and agri-food sectors, “to enhance the value, productivity and profitability of New 154
8 Zealand’s pastoral, agri-food and agri-technology sector value chains to contribute to economic 155 growth and beneficial environmental and social outcomes for New Zealand.” (AgResearch, 2018). 156 AgResearch achieves this by providing research and the transfer of knowledge and technologies in 157 partnership with key Māori (the indigenous peoples of New Zealand), industry and Government 158 partners (AgResearch, 2020). AgResearch has 286 scientists and 178 technicians (2020), but does not 159 have staff dedicated to technology transfer. Instead, AgResearch partners with stakeholders with 160 these capabilities. . 161 In 2010 the CRI Taskforce Review (Crown Research Institute Taskforce, 2010) (Figure 2), recommended 162 changes to encourage realising impact from science. Recommendations included, improve 163 partnerships between research organisations and industry, increase internal funding managed by each 164 CRI to align with sector needs, and increase each CRI’s accountability for impact (Turner et al., 2013). 165 To encourage the last each CRI reports on the percentage of relevant end-users who have adopted 166 their knowledge and technology and provides annual impact case-studies (AgResearch, 2020) (Table 167 2). 168
9 169 Figure 2: Timeline of key external and organisational events in building evaluation capacity in 170 AgResearch. 171 In response to the CRI Taskforce Review recommendations the AgResearch Adoption and Practice 172 Change Roadmap (2012-13) developed organisational recommendations to increase science impact, 173 including: 174 1. Partnering with stakeholders to deliver research outcomes. 175 3. Planning science programmes with stakeholders to identify issues, outcomes and get a clear 176 understanding of who the stakeholders will be and their roles in achieving impact (Impact 177 Planning Tool). 178 4. Monitoring and evaluating progress towards outcomes and impact within research 179 programmes (Percy et al., 2015) for accountability to funders and to support learning and 180
16 Table 2: Characteristics of the agricultural research impact agenda in each organisation – definition, weighting and incentives for an impact focus 254 Characteristics AgResearch INIA IRTA Teagasc Definition of impact Improved productivity, profitability and value from pasture-based production while reducing environmental footprint. Contribute to the sustainable development of Uruguay and the agricultural sector considering State policies, social inclusion, and market and consumer demands, strengthening the linkages between research and the productive sector. Modernisation, improvement, and promotion of competitiveness and sustainable development in the agriculture, food and aquatic sectors. Underpin profitability, competitiveness and sustainability of agrifood sector and bioeconomy. Weighting of impact in research assessment 50% in ex-ante assessment of public research funding to show potential benefits to New Zealand (economic, environmental and social). Almost all efforts are oriented to research monitoring. Ex-ante evaluation and impact are not yet established practices at INIA. Depends on the type of project. High weights attributed to research related to business activities. 50% in ex-post outcome assessment. Funder mechanisms for encouraging an impact focus Ministry of Business, Innovation and Employment.(MBIE) competitive funds require ex-ante estimate of impact and credible impact pathway in funding proposals. Funding contracts with MBIE competitive funds include an outcome statement against which projects are annually assessed. Impact case studies (ex-post) are required as part of annual reporting on all AgResearch science to MBIE. AgResearch provides a selection of annual case-studies as examples of economic, social, and environmental impact. INIA’s last institutional impact evaluation carried out in 2010, through IICA and a multidisciplinary team. In 2015 INIA’s Fund for the Promotion of Agricultural Technology (FPTA) had an impact evaluation process with institutional funding. Evaluation against outcomes (indicators): adopted 10 years ago, though it is no longer used. Annual reporting to Department of Agriculture, Food and the Marine on Teagasc’s performance in delivering on its goals/objectives as set out in its multi-annual Statement of Strategy and the associated annual High Level Business Plan. Focus on outcome evaluation. Ex-ante impact pathway.
17 Sources (AgResearch, 2020; Ministry of Business, 2015, 2017) www.inia.org.uy/online/site/967882I1.php www.iica.int/es/prensa/noticias/iicaevalua-20-anos-de-investigacion-de-inia- uruguay (IRTA, 2017) Teagasc (2017) 255
18 The next section presents the study methodology, defining evaluative capacity building and the 1 analytical framework for comparing the types and uses of evaluation, and evaluative capacities. The 2 results of the comparative analysis are then presented and discussed. The paper finishes with key 3 conclusions regarding how public-funded agricultural research organisations can build evaluation 4 capacity. 5 Methodology 6 The Evaluation Capacity Building (ECB) literature points to the need to increase the capacity within the 7 individual, organisation, and wider science system to do and use evaluation (Bourgeois & Cousins, 8 2013; Chaplowe & Cousins, 2016). However, as every organisation works and operates within different 9 contexts there is no single approach to building evaluative capacity (Bourgeois et al., 2015). White, 10 Percy & Small (2018) suggest using a hybrid model of ECB based on the multi-disciplinary model of 11 Preskill & Boyle (2008) and Cousins, Goh, Elliott & Bourgeois (2014) as a useful foundation for science 12 organisations building an ECB culture. This aligns an evaluative culture of “doing” that includes such 13 things as organisational support systems, structure, and leadership; capacity to do evaluation within 14 the organisation; and capacity to do evaluation within programmes, with a culture of “using and 15 valuing” that involves organisational learning capacity; programme and individual learning capacity; 16 and capacity to use the evaluation by the organisation and within programmes. This hybrid model 17 formed the basis of the analytical framework described below. 18 Analytical framework 19 For the purposes of this study, evaluation is defined as the structured interpretation of predicted or 20 actual impacts of proposals, organisations, programmes, projects, or individuals (Taylor-Powell & 21 Henert 2008). It looks at original objectives, and at what is either predicted, or what was accomplished 22 and how it was accomplished. To understand the types of evaluation in each organisation, we 23 estimated the allocation of funding to internal and external evaluations, and the proportion of 24 evaluation undertaken as (Taylor-Powell & Henert 2008; Superu, 2017b): 25
19 1. Needs – Characterisation of the needs and priorities of the population targeted by a 1 programme, as well as the potential barriers and enablers to the programme meeting these. 2 2. Audit – Evaluation of a programme for the purpose of verifying adherence to a set of pre-3 defined processes. 4 3. Formative (Process) – Method of assessing how a programme is being implemented. Process 5 evaluation focuses on the programme’s operations, implementation, and service delivery. 6 4. Outcome – Focuses on the effectiveness of the programme and its outcomes. Outcomes can 7 be produced in the short or long term. 8 5. Impact – Assesses programme effectiveness in achieving its ultimate goals. This is done several 9 years after the programme is implemented. 10 Figure 5: Types of evaluation. 11 12 Source: Taylor-Powell & Henert (2008) 13 To understand why each organisation undertakes evaluation, the frequency of evaluation for each of 14 the four “As” was estimated using a four-point Likert scale (never/occasionally/frequently/always): 15 • Allocation – Evaluation is used to instigate changes within a project or programme. 16 • Advocacy – Evaluation is used to support a position or to justify action or inaction. 17 • Analysis – Evaluation is used to learn about the programme, its staff, its operation, or 18 outcome. 19
20 • Accountability – The process of evaluation is used to support programme management and 1 engagement (e.g. use of programme logics, Theory of Change, Evaluation Plans etc.). 2 To consider the readiness of each organisation to implement evaluation, questions adapted from the 3 Checklist for Organisational Readiness for Evaluation (Superu, 2017b) were used (Table 3). For each of 4 the questions in Table 3 readiness was assessed as: 5 • Emerging: There is very little or no evidence of this in the organisation. 6 • Developing: there is some evidence of this in the organisation – it happens sometimes but is 7 not embedded in routines. 8 • Consolidating: This is seen occurring regularly in the organisation, however, not everyone is 9 on board. 10 • Highly developed: This is evident at all levels of the organisation and appears strongly 11 embedded in the organisation’s governance, leadership, system, structures, and practices. 12 Table 3: Questions used to consider organisational readiness for evaluation. 13 Our organisation uses evaluation to be accountable to our funders and/or internal and external stakeholders Our organisation uses evaluation for learning and reviewing to improve the ways our organisation delivers impact from science and/or investments in science Our organisation understands the value of demonstrating the difference we have made from science for our stakeholders Leaders and/or managers are committed to developing evaluation capacity Systematic M&E occurs at all levels of our organisation (if not at all levels, specify which, e.g. projectlevel, organisation-level) Our organisation has the systems and processes in place to collect data for evaluation Our organisation has the skills and knowledge to collect data for evaluation In our organisation, we have the skills and knowledge we need to understand and use data required for evaluation In our organisation, staff have time, funds and/or resources to collect and use data required for evaluation In our organisation we (decision-makers and staff) have opportunities to involve a wide range of people (internal and external to our organisation) in evaluation In our organisation, we participate in external networks of learning to increase our knowledge of evaluation Source: Superu (2017b) 14
21 Data collection and analysis 1 Two workshops were held on November 2017 and February 2019 at Teagasc (Carlow, Ireland) and 2 IRTA-CREDA (Barcelona, Spain), respectively. At the first workshop there were three participants from 3 Teagasc, two from CREDA-UPC (who provided information on IRTA), one from INIA, and two from 4 AgResearch. At the second workshop there was one participant from Teagasc, three from CREDA-UPC 5 (who again provided information on IRTA), one from AgResearch, one from Scotland, and one from 6 Udelar (University of the Republic) (who participated virtually and provided information on INIA). In 7 the second workshop participants reviewed and updated data collected in the first workshop. All the 8 workshop participants are tasked with undertaking evaluation within their organisations, as well as 9 one participant each from Teagasc, INIA and AgResearch being tasked with building evaluation 10 capacity in their organisations. 11 At the 2017 workshop the participants mapped the reasons evaluation is undertaken, the types of 12 evaluation, approaches and activities, and actions to build evaluation capacity (see Analytical 13 Framework). The selection of questions (Table 3) were circulated prior to the workshop so that 14 workshop participants could consult within their organisation to provide an assessment of 15 organisational readiness. 16 At the workshop each organisation used a colour-coded dot to show where they were positioned 17 (Table 6) and then a facilitated discussion was held around the gaps and trends emerging. After the 18 workshop the participants undertook verification with key staff in their respective organisations. 19 Having identified the types of evaluation and evaluative capacities, workshop participants then 20 identified the initiatives, strategies, actions, and key resources each organisation engaged in to 21 support evaluation at the stages of planning, monitoring and communication. 22 Findings and Discussion 23 Purposes for evaluating research 24
22 The four organisations undertook evaluation for all four purposes, though with different frequency 1 (Table 4). Evaluation for allocation purposes ranged from always in Teagasc, to frequently in INIA, to 2 occasionally in the other organisations. Teagasc has more initiatives in place to assist with being able 3 to make changes within a project or programme, including a formal cyclical peer review system of 4 research programme objectives and evaluation of knowledge transfer services. AgResearch uses its 5 annual programme reporting and funding processes to reflect on programme contributions to the 6 Science Plan and identify changes to allocation of funding to different research areas. IRTA also use 7 evaluation to allocate resources to different research programmes based on ex-ante estimation of the 8 potential impact of research. INIA are looking to increase the use of evaluation for informing funding 9 allocation at the programme-level. 10 Accountability is traditionally a strong driver for undertaking evaluation (Midmore 2017; Penfield et 11 al., 2014), and agricultural research organisations are no different. INIA, Teagasc and Agresearch had 12 strong accountability drivers. In contrast, the remaining organisation identified that while evaluation 13 for accountability was occurring, it was not well embedded throughout the organisation. For example, 14 through its Annual Reports to the New Zealand Government, AgResearch reports on organisational 15 performance against Key Performance Indicators (KPIs), such as commercial revenue, science 16 publications per scientist, and understanding of stakeholder strategies. Another example is INIA which 17 intends to hold a workshop with producer associations and the government, at the end of its five-year 18 strategic plan, to evaluate performance in seven production systems against the objectives and goals 19 proposed at the beginning of the plan. In the case of Teagasc, through its oversight agreement with 20 DAFM, it provides an evaluation of its performance in delivering on its goals/objectives as set out in 21 its multi-annual Statement of Strategy and the associated annual High Level Business Plan for the 22 period under review. 23 Another significant driver for evaluation is learning (or analysis) (Midmore 2017; Pollock 2012; Wade 24 & Kallemeyn, 2020). While this driver was evident within Teagasc, AgResearch, and INIA, IRTA is at the 25
23 very early stages of realising organisationally the potential for evaluation to improve their science 1 programmes through evaluation for analysis (Table 4). To support this use of evaluation AgResearch 2 is building evaluation into all major research programmes; though this is at an early stage (Table 8). 3 Table 4: Frequency with which evaluation is used in each research organisation for the four purposes. 4 Purposes for evaluating research Never Occasionally Frequently Always Allocation AgResearch IRTA INIA Teagasc Advocacy Teagasc IRTA AgResearch INIA Analysis IRTA INIA AgResearch Teagasc Accountability IRTA AgResearch Teagasc INIA 5 Since this research was undertaken the four “As” have been extended by Parks et al. (2019) to include 6 acclaim (comparing and recognising the value of higher education institutions and the research 7 conducted within them) and adaptation (to steer change in organisational structures, behaviours and 8 cultures, and research activities and priorities). Future research should consider the evaluative 9 capacities needed to support evaluation for acclaim and adaptation. 10 Internal and external evaluation 11 The four organisations have different balances of evaluation undertaken by internal and external 12 parties (Table 5). For IRTA and AgResearch, evaluation is predominantly undertaken internally. In 13 contrast, evaluation is equally split between external and internal in Teagasc, and in the case of INIA 14 is predominantly undertaken externally. 15
24 Table 5: Estimated proportion of internal and external evaluation undertaken within each organisation 1 Organisation % undertaken internally % undertaken externally AgResearch ~ 85 ~ 15 INIA 40 60 IRTA 90 10 Teagasc 50 50 2 Teagasc and INIA evaluations always involve an external provider in collaboration with internal staff. 3 These organisations also use external peer review panels chosen to represent the different areas of 4 the programme being evaluated. Using external providers and review panels enables evaluations to 5 be completed more rapidly and the evaluation is considered more impartial. This emphasis on external 6 evaluation may be related to Teagasc and INIA both emphasising the use of evaluation for 7 accountability purposes (Table 4). 8 Types of evaluation 9 For most of the organisations, evaluation is concentrated on internal research performance: needs, 10 auditing, and formative evaluation (Table 6 and Figure 5). INIA, IRTA, and AgResearch are all 11 undertaking similar proportions of evaluation in these areas. For example, AgResearch reports on 12 milestones, deliverables, and case studies of research programmes in its Annual Reporting. The 13 emphasis on formative (or process) evaluation, relative to summative (or outcome) evaluation, may 14 be due to impacts occurring post-programme and the difficulty of allowing for the time lag to when 15 impacts occur, and lack of investment in evaluation of impacts post-project. 16 There appears to be less analysis of changes in the social, economic and production context of 17 stakeholders to analyse research effectiveness and changes beyond the research organisations. 18 Evaluation of impact is, therefore, limited in all organisations. However, the organisations are 19 beginning to increase their emphasis on summative evaluation. Teagasc is strategically moving into 20
25 formative and summative evaluation and INIA recently incorporated the evaluation of outcomes and 1 the goal is to strengthen the evaluation of impact in the future. 2
32 evaluation at all levels of the organisation, including processes for collecting data. Teagasc’s 28 recognition of the value of demonstrating impact is also reflected in the organisation being at the 29 consolidating stage of skills, knowledge, and resourcing to collect and use evaluation data. The other 30 organisations are emerging or developing the skills, knowledge, and resources to collect and use 31 evaluation data. 32 Perhaps reflecting that leadership commitment to building evaluation capacity is still developing in 33 AgResearch, and INIA, these organisations are at the stage of developing processes for the systematic 34 use of evaluation but are still emerging in having processes to collect evaluation data. For example, all 35 AgResearch competitively funded programmes are required to develop a programme logic. However, 36 in most cases this has yet to be translated into evaluation plans and collection of evaluation data for 37 funded programmes. Leadership and valuing the demonstration of impact, therefore appear to be 38 important precursors to other aspects of organisational readiness to implement evaluation as well as 39 sustaining evaluative capacity, as has previously been observed by Stone-Jovicich et al. (2019), Wade 40 & Kallemeyn (2020), and White et al. (2018). This is not surprising given the importance of these 41 factors in the success of organisational change initiatives, as highlighted by research on successful 42 organisational change (e.g. Kotter (2012) and Brinkerhoff and Morgan (2010)). 43 44
33 Table 8: Degree of organisational readiness to implement evaluation capacities as of 2018. 45 Evaluation capacities Emerging Developing Consolidating Highly developed Organisation values demonstrating impact IRTA INIA AgResearch Teagasc Leadership committed to building evaluation capacity IRTA AgResearch INIA Teagasc Systematic M&E occurs at all levels of organisation IRTA AgResearch INIA Teagasc Systems and processes to collect M&E data AgResearch IRTA Teagasc INIA (in projects) Skills and knowledge to collect M&E data AgResearch IRTA Teagasc INIA Skills and knowledge to use M&E data AgResearch IRTA INIA Teagasc Sufficient resourcing to collect M&E data AgResearch IRTA INIA Teagasc Opportunities to involve stakeholders in M&E AgResearch INIA IRTA Teagasc 46 Internal and external support networks to build evaluative capacity 47 All four organisations have benefited from having both internal and external support for M&E 48 activities (Table 7 and Figures 1 to 4). Internal support included senior management resourcing and 49 championing the inclusion of M&E in organisational processes. External support included bringing in 50 M&E experts to facilitate evaluation or train social scientists in evaluation best practice, particularly 51 through “train the trainers” and “learning by doing”. For example, IRTA has worked closely with a team 52 of social researchers at CREDA who are experts in research impact assessment. 53 Also beneficial was growing internal and external networks of M&E champions to build legitimacy for 54 M&E and share good practices. The latter has previously been recommended by Joly et al. (2016) and 55 our findings highlight the benefits of this for creating an enabling environment for M&E. Internally, 56 science staff leading large research programmes or with experience in evaluation can be influential 57 champions. For example, Teagasc has supported evaluators to move into other roles in the 58
34 organisation to embed evaluative thinking. Three of the organisations (INIA, IRTA and AgResearch) 59 have benefited from joining a network of other research organisations and agencies implementing 60 M&E. This includes bringing in external experts to participate in seminars and workshops on 61 evaluation methodologies to build awareness and evaluation capacity, an approach also used by 62 Teagasc. 63 Build evaluation practices into existing planning and review processes 64 Each organisation had unique reasons for the effectiveness of activities to build evaluative capacity. 65 These reflect the specific characteristics of existing evaluation and science impact activities. Teagasc 66 has embedded evaluation activities into the cyclical reviews of research programmes and knowledge 67 transfer activities that it conducts. These reviews provide an opportunity for staff and stakeholders to 68 reflect on and learn from programmes outside of the annual business planning process. IRTA has been 69 effective in embedding evaluation of impact by having a dedicated knowledge transfer unit that is 70 assessed on its knowledge transfer activities through end-user assessment, technology transfer 71 measures and use of this to inform further improvement. This has included increased resourcing and 72 staff to undertake M&E of knowledge transfer activities. In contrast AgResearch did not have staff 73 dedicated to knowledge transfer nor conducts cyclical reviews. In this context embedding M&E into 74 organisational planning and funding processes, including making M&E tools easily available, has been 75 most effective for increasing M&E activities. These differences in programme and project-level 76 evaluation are like the differences observed in the five agricultural research organisations studied by 77 Joly et al. (2016). 78 A common theme across the organisations though is that M&E activities were built into existing 79 organisational processes (cyclical reviews, knowledge transfer, project planning) and incentivised 80 (KPIs, funding). The value of cyclical reviews by IRTA and Teagasc for incentivising M&E of impact and 81 reflection and learning suggests this could be an opportunity for other research organisations to 82 encourage on-going M&E. Teagasc is seeking to deepen the integration of M&E with regular business 83
35 planning activities. There is a risk, however, that as was experienced by AgResearch, operationalising 84 M&E means that it can become a ‘tick box’ activity for compliance. Overall however, evaluative 85 capacity building will benefit from having organisational processes for planning and review, as well as 86 incentives for delivering impact, already in place into which M&E activities can then be embedded. 87 Different drivers of organisation- and programme-level evaluation 88 Given different organisational emphasis on evaluation for accountability, advocacy, allocation, or 89 analysis (Table 4), and how these may drive a focus on organisation or programme-level evaluation, 90 none of the organisations would consider themselves highly developed in systematically embedding 91 evaluation at all levels from programme to whole of organisation (Table 8). Out of the four 92 organisations in this study, INIA, and IRTA appear to emphasise accountability and advocacy, which 93 focuses evaluation on organisation-level processes and reporting. For example, strategic plans inform 94 KPIs used in reporting on organisational performance to funders (Table 6). AgResearch appears to 95 emphasise allocation purposes, and a focus on programme-level evaluation, through cyclical peer 96 reviews of individual programmes or areas of research by advisory boards. Teagasc appears to be the 97 most advanced in undertaking evaluation at organisation and programme-levels for accountability, 98 advocacy, allocation, and analysis. 99 This suggests there is an opportunity to develop organisation and programme-level evaluation 100 processes that inform each other. Organisation-level evaluation sets longer-term outcomes 101 (accountability and advocacy) to which multiple programmes deliver, and then supports reporting on 102 the contribution of a suite of programmes to these outcomes. Programme-level evaluation therefore 103 assists with the allocation of funds to the mix of programmes to realise outcomes. 104 There is less use of evaluation for analysis (or learning) to better understand the processes that could 105 lead to greater impact from research. However, since this research was undertaken, Teagasc has 106 begun to address this gap by incorporating a theory-led approach into its research evaluations. This 107 role of evaluation in supporting increased research impact has recently been emphasised in other 108
36 agricultural research organisations such as CIRAD (Blundo-Canto et al., 2019), the International 109 Livestock Research Institute (Kristjanson et al., 2009), Wageningen University, and the Dutch 110 Agricultural Research Institutes (Spiertz & Kopff, 2011). In the case of the four research organisations 111 studied here, the emphasis remained on using evaluation for improving the efficiency and allocation 112 of funding within the organisations and with sporadic participation of stakeholders (Table 8). 113 Evaluation provides the potential for organisations to work differently with stakeholders to realise 114 impact by keeping them more engaged in programmes, their progress, and impact (Blundo-Canto et 115 al., 2019; Percy et al., 2015; Stone-Jovicich et al. 2019). This practice ranges from emerging (INIA) 116 through to highly developed (Teagasc). For example, Teagasc uses stakeholder engagement both in 117 programme development and evaluation. These programme logics and evaluation plans can then be 118 used to assess how a project is progressing toward desired outcomes, provide accountability for public 119 investment in research, and produce evidence of the benefits of this investment. 120 Evaluation capacities for learning remain limited compared with capacities for accountability 121 M&E for learning remains under-resourced relative to evaluation for accountability and the 122 organisations lack the necessary structures to embed M&E for learning (see also Joly et al. (2016)). 123 The four organisations have therefore found it challenging to implement M&E to understand and learn 124 from the pathways by which science contributes to wider societal impact. This challenge has 125 previously been highlighted by Joly et al. (2016) in a review of M&E practices in five agricultural 126 research organisations. In the current study, two reasons for this challenge were identified. 127 Firstly, M&E for learning is more complex as it needs to reflect the multitude of contexts, actors, 128 interactions, impact pathways and outcomes of individual projects. This places greater demands on 129 organisational resources and capacities, for example to undertake case studies, support the 130 information systems to collect and track a wider variety of data at programme, project, and individual 131 levels, and to standardise findings across case studies to report on organisational-level impact (see 132
37 also Joly et al. (2016)). It also makes analysis of attribution of individual organisations challenging, if 133 not impossible. 134 Secondly, it was highlighted that strong cultural obstacles to embedding learning from M&E remain. 135 For example, a senior manager in one of the organisations highlighted that “one of the major 136 difficulties is … still deeply rooted belief that science already fulfils its objectives by generating 137 knowledge and that impact is not a priority or even it is assumed that it will happen if the science is 138 good, a fact that rarely happens.” This may reflect a deeply rooted belief in the separation of scientific 139 and societal values and linear model of knowledge production (Smit & Hessels, 2021). That is, that 140 science is focused on knowledge generation and therefore is not immediately about impact or that 141 impact is something that will automatically happen if research meets science excellence criteria. This 142 culture is emphasised by the tendency for the organisations to focus on traditional measures of 143 scientific excellence (e.g. h-index, citations), stakeholder satisfaction surveys, economic impacts 144 evaluated at the end of a project, or include evaluation only at the planning stage. Thus, there has 145 been limited on-going monitoring and use of that data for reflection and learning, with these activities 146 seen as a “nice to do” that compete with science activities and funding. As Smit and Hessels (2021) 147 highlight in a review of ten evaluation methodologies, the culture influences the types of evaluation 148 methods prioritised by research organisations. 149 There is an opportunity to build capacity amongst in-house M&E teams to conduct M&E for learning 150 by deeper engagement with the academic research and researchers on this type of evaluation. To 151 then begin to reshape organisational culture, evaluation methods that are grounded in co-production 152 and integrated scientific and societal values should be emphasised, e.g. contribution mapping and 153 evaluative inquiry (Smit & Hessels, 2021). Teagasc has begun to address on-going evaluation for 154 learning by introducing three high-level impact pathways to describe the ways Teagasc contributes to 155 change in the agri-food sector. AgResearch also identified the need for clear narratives of the 156
38 pathways to impact from its research (Hall, 2018), and has found that the process of project teams 157 developing programme logics raised awareness of the existence of different impact pathways. 158 Evaluation capacity building increases the frequency of evaluation in agricultural research 159 organisations 160 For evaluation to thrive within an organisation, it must be valued (Stone-Jovicich et al., 2019) and 161 enabled (Preskill and Boyle, 2008; Wade & Kallemeyn, 2020; White et al., 2018). Figure 6 shows some 162 consistent trends regarding the four organisations’ positioning in this regard. At the time of the study, 163 IRTA was in an emerging space whereby the skills, knowledge, resources, and opportunities were yet 164 to be developed; however, it is developing this area. Teagasc had some of the key enablers to collect 165 evaluation data (systems, processes, skills, knowledge) within the organisation, but not yet 166 systemically distributed from the programme to organisation-levels. AgResearch and INIA were 167 positioned in between, considering themselves to be in an emerging to developing position. 168 Organisational evaluation capacity readiness is also reflected in the commitment of leadership. Within 169 AgResearch, INIA and Teagasc, organisational leaders and managers have shown commitment to 170 developing evaluation capacity. Leadership within IRTA has yet to mandate further internal 171 development of systems and processes in place to collect evaluation data and capacity for 172 evaluation.Figure 6: Organisations’ positioning towards Evaluation Capacity Building. 173
39 174 While the four organisations included M&E for learning in guiding principles, all were predominantly 175 focused on M&E for accountability and advocacy. This was reflected in a disconnect between 176 evaluation at the programme- and organisational-level, with an emphasis on evaluation of 177 organisational KPIs. For example, IRTA has focused on embedding research impact assessment. This 178 was prioritised for accountability and reporting at specified periods. M&E for learning at the 179 programme-level appeared to be left to individual programmes and received less resourcing and 180 capacity within the organisations, and where it did occur was a point in time event, rather than a 181 continuous activity. The experience of Teagasc in embedding M&E as part of cyclical programme 182 reviews could be an opportunity to address the programme- and organisation-level disconnect by 183 evaluating suites of programmes and projects delivering to a common objective (e.g. Sustainability 184 Development Goals) and involving project and programme teams in reflecting on these evaluations. 185 Conclusion 186 To the best of our knowledge, the present study is one of the first attempts to provide empirical 187 evidence of how publicly funded agricultural research organisations put research evaluation principles 188
40 into practice. Drawing on our analysis, accountability and allocation are strong drivers of evaluation 189 in the four agricultural research organisations studied. For most of the organisations, evaluation is 190 concentrated on internal research performance, with less focus on evaluation of societal, 191 environmental, and economic impacts. However, perhaps reflecting the influence of the impact 192 agenda, the organisations are beginning to increase their emphasis on summative evaluation. This is 193 reflected in organisational leaders valuing the demonstration of impact and commitment to building 194 evaluation capacity. These appear to be important precursors to other aspects of organisational 195 readiness to implement evaluation. 196 Given different organisational emphasis on evaluation for accountability, advocacy, allocation, or 197 analysis, and how these may drive a focus on organisation or programme-level evaluation, none of 198 the organisations would consider themselves highly developed in systematically embedding 199 evaluation processes and capabilities at all levels of the organisation from programme to whole of 200 organisation. This suggests there is an opportunity to simultaneously develop organisation- and 201 programme-level evaluation processes that inform each other. There is also less use of evaluation by 202 the organisations to better understand the processes that could lead to greater impact from research. 203 The four organisations have demonstrated their ability to develop evaluation capacities and to 204 establish cycles of periodical impact assessment within their organisations. Given the difference in 205 development across organisations, we believe that more on-going collaboration between the four 206 organisations would provide the opportunity to learn constantly through exchanging information and 207 insights of ‘what works’ in other research organisations and create a network to improve the 208 evaluation capacity, which in turn helps sustain future science impact. Finally, our empirical findings 209 reveal that the research organisations’ challenge is mainly to adapt evaluation practices in terms of 210 skills, knowledge, time, data, resourcing, and supportive structure to build an ECB culture within their 211 own context. 212 Acknowledgements 213
41 Thank you to Teagasc and IRTA for hosting the workshops, and to Penny Payne and Roxanne Henwood 214 for reviewing an early draft of the manuscript. 215 Funding: This work was supported by the Strategic Partnership; Strategic Science Investment Fund, 216 New Zealand; Scottish Government; Teagasc; Instituto Nacional de Investigación Agropecuaria (INIA) 217 in Uruguay; and the Societal Impact of R&D Investments [IRTA project-61095]. 218 219