Interstitial spaces in olympic sites

Díaz Calderón, Ana Lucía

Abstract

Since the beginning of the Olympic games, the main idea is the creation of a massive event for entertainment purposes and the attraction of people to different cities. Such decision involved many changes and modifications in the host city. For example, changes in infrastructure and the incorporation of several Olympic sites into the urban fabric, embracing several lines of communication and transport. As a result of these changes and the need for big sports infrastructures such as stadiums, pools, football fields and others. There is the necessity to look for a big site around the city to place all the buildings. Therefore, those buildings could be collocated in the untouched plot, producing a change in the topography and creating platforms as a result. The idea of platforms creates a difference of level, referring to the word fissure, that remaining part between platforms that it is often left ignored or untouched. As a result of this fissure, a new concept appears in Interstitial spaces. This term relates to relate to taking advantage of this condition in the topography. To add uses and program which can be complementary to huge scale building. To apply these concepts Barcelona was selected due to its Olympic city condition. Specifically, the Olympic ring site, whose location involves the mountain Montjuic where the topography has a pronounced level difference among platforms. In conclusion, the concept of interstitial spaces can be applied in these cases to answer their topographic conditions to help the communication between the city, the mountain, and the platform. Moreover to complement and add uses to some platforms. What’s more, to generate a site full of life and activities to avoid turning those sites, in years after the games, into a white elephant pf the city, without use and people.

Full text

INTERSTITIAL SPACES IN OLYMPIC SITES MBARCH THE CONTEMPORARY PROJECT 2019/2020 TUTOR XAVI LLOBET RIBEIRO MASTER STUDENT ANA LUCIA DIAZ CALDERON INDEX ABSTRACT INTRODUCTION 1. STRATEGY OF THE OLYMPIC SITES OLYMPIC GAMES TIMELINE STRATEGY OF LOCATION PLATFORMS 2. THE FISSURE AND PLATFORMS APPEARANCE OF THE FISSURE OLYMPIAPARK BY FREI OTTO OLYMPIC PARK AND VILLAGE, LONDON UK VALLE D’HEBRON BY EDUARD BRU THE FISSURE AND PLATFORMS 3. BCN 92 THE FISSURE UNCONNECTED BARCELONA AGAINST FISSURE OLYMPIC RING PROBLEMATIC OF MONTJUÏC CONNECTING FISSURE 4. INTERSTITIAL SPACES LEÇA SWIMMING POOLS / ÁLVARO SIZA VIEIRA THE PAPIOL SPORTS CENTRE BY GRAUCASAIS OFFICE OLYMPIC ARCHERY BY MIRALLES FISSURE AS INTERSTITIAL SPACE CONCLUSIONS BIBLIOGRAPHY LIST OF FIGURES 4 ABSTRACT Since the beginning of the Olympic games, the main idea is the creation of a massive event for entertainment purposes and the attraction of people to different cities. Such decision involved many changes and modifications in the host city. For example, changes in infrastructure and the incorporation of several Olympic sites into the urban fabric, embracing several lines of communication and transport. As a result of these changes and the need for big sports infrastructures such as stadiums, pools, football fields and others. There is the necessity to look for a big site around the city to place all the buildings. Therefore, those buildings could be collocated in the untouched plot, producing a change in the topography and creating platforms as a result. The idea of platforms creates a difference of level, referring to the word fissure, that remaining part between platforms that it is often left ignored or untouched. As a result of this fissure, a new concept appears in Interstitial spaces. This term relates to relate to taking advantage of this condition in the topography. To add uses and program which can be complementary to huge scale building. To apply these concepts Barcelona was selected due to its Olympic city condition. Specifically, the Olympic ring site, whose location involves the mountain Montjuic where the topography has a pronounced level difference among platforms. In conclusion, the concept of interstitial spaces can be applied in these cases to answer their topographic conditions to help the communication between the city, the mountain, and the platform. Moreover to complement and add uses to some platforms. What’s more, to generate a site full of life and activities to avoid turning those sites, in years after the games, into a white elephant pf the city, without use and people. KEYWORDS: Olympics; Montjuic; Interstitial Spaces; Fissure; Barcelona. 5 INTRODUCTION As the recreation of the Olympic Games started, several questions regarding the response of architecture started as well. The main objective or need in terms of architecture was the addition and creation of Olympic sites and many sports buildings in the city. As a result, the configuration of these new places brought up brand new questions regarding the topography, related to the need for huge areas to hold stadiums or other buildings, of that size, which have modifications or cuts of the topography as platforms. As these platforms appeared on the site, the difference of level started to be more noticeable in many cases and their lack of connection. So in these places in between platforms, called fissures, are often left behind. To apply this idea of using these fissures to take advantage of the concept of interstitial spaces appeared as an architectural response to create those connections and complement many sports areas. To apply this concept of interstitial spaces in one Olympic site, the need to find a city that allowed the application was required. One Olympic city that matched the requirement is Barcelona. After the Olympics in 1992 in Barcelona, the city was leaving the Olympic Ring a poor connection with the city, just by only figuring out a system of roads to access this place by car or by bus. Making this difficult for people who want to do some sports in the sports areas. Consequently, the mountain Montjuic takes part as a barrier for pedestrians and athletes. Besides the connection between platforms is not well-intended. Therefore, applying this concept can prove how beneficial it can be for these types of sites when the topography and the Olympic sites create a barrier for the city. STRATEGIES FOR THE OLYMPIC SITES 8 Figure 1. Photograph of Pierre de Coubertin. Reproduced by permission of Brain news service. Figure 3. Photograph of the view of the velodrome as it looked around the turn- of-the-century of 1900 in Paris, France. By Jules Beau Figure 2. Photograph of The Stadium of Athens in 1896. Published by A&E Television Networks. 9 The idea of bringing back the Olympic games came from the ancient games in Greece, where they gave public performances for different sports. Creating a necessity of entertaining infrastructures and a different way to entertain civilians and generate competitiveness between cities After many attempts of bringing them back, on the 25th of November in 1892, in Paris, France. Pierre de Coubertin gave a speech where he stated a certain key-points about how this modern Olympics must be. He gave this speech again the year 1984 in the International Sports congress, where he stated these ideas: .Reintroduce the ancient games’ four-yearly cycle. .Ambulatory, to have this event in different parts of the world .Open to amateur sportsmen .Modern sports over classic sports. The first two games where selected pragmatically, the first one chose to be in Athens 1896, showing the idea to go back to where it all started, and the second one in Paris 1900 to showcase these Games during the exposition of the same year to attract people and spectators. The first Olympic Games started with a small scale due to being the first one, showed great potential and a possibility to start working on the city for it to allow great masses. OLYMPIC GAMES Figure 3. Photograph of the view of the velodrome as it looked around the turn- of-the-century of 1900 in Paris, France. By Jules Beau Figure 2. Photograph of The Stadium of Athens in 1896. Published by A&E Television Networks. “In tandem with supporting the development of the individual and the nation-state, the Olympics aimed to reconcile warring nations. The modern Olympics were both a stimulant and a pacifier, a means of international reconciliation but also of rivalry” (Gold and Gold, 2011, 16 OLYMPIAPARK OLYMPIC PARK PLATFORMS As a requirement of these Olympic areas, the need for big infrastructures is a must to hold different sports and masses. Therefore, these platforms as cuts of the topography are a necessity and highly required. So in every project, there has to be a decision and an idea of how to place those platforms and their connections with the city. As seen in these projects, these platforms have an intricate design in base of what was the previous use of the land before it. And how these brand new patches connected by paths that coincidentally they are located into some fissures. In particular, the project in Valle D’hebron whose location is the limit of the city and the mountain which determined those platforms. As a matter of fact, many differences of level in this project are of great significance and can show the idea of the platform Figure 8, 9 y 10 Image of Platforms of Olympiapark, Olympic Park and Valle Hebron. By Google Earth, modified by author 17 OLYMPIC PARK VALLE D’HEBRON and the division of them. The project of Olimpiapark in Munich works with the natural topography and an artificial one, jut because of the need for big areas they had to modify the site. So it can be seen how they tried to be somehow truthful with the natural topography, but in some cases, the platform shows how the artificial topography is affecting it. And the last project, the interesting fact is that those platforms work concerning the river Lea, so every path and shape of those green areas are modified by water. So the idea of working with either the topography or creating a new one is a key decision. And also how these platforms work with the city and overall design is something to take into account. Figure 8, 9 y 10 Image of Platforms of Olympiapark, Olympic Park and Valle Hebron. By Google Earth, modified by author THE FISSURE AND PLATFORMS 20 OLYMPIAPARK OLYMPIC PARK VALLE D’HEBRON Figure 11, 12 y 13 Image of fissure of Olympiapark, Olympic Park and Valle Hebron. By Google Earth, modified by author 21 Normally this Olympic Games requires many big locations to create several centralities in the city called Olympic sites. These new centralities are most of the time located on the periphery of the city to give value and more movement to these parts of the city. Giving a different shape to certain parts of the city where the creation of new sports hub consolidate the activities in the area. As a result the area selected must be almost untouched, therefore there is a need to place sport infrastructure in land. These infrastructure cuts the topography and creates differences of level. The fissure appears as the need of huge platforms creates differences of level. These fissures conforms, and, in some sort of way, unify the site to allow a connection between the sport infrastructure and other uses. However in some cases this fissure cuts the connection of the platforms. APPEARANCE OF THE FISSURE VALLE D’HEBRON Figure 11, 12 y 13 Image of fissure of Olympiapark, Olympic Park and Valle Hebron. By Google Earth, modified by author 22 OLYMPIAPARK BY FREI OTTO AND BEHNISCH & PARTNER 1972 Figure 14. Image of the Olympic Site in Munich, Germany. By Google Earth. Modified by author. Figure 15. Photography of the Olympiapark in Munich, Germany. By. Behnisch & Partner Figure 16. Photography of the Olympiapark in Munich, Germany. By. Behnisch & Partner Figure 17. Model of Olympiapark in Munich, Germany. By Behnisch & Partner 23 Figure 14. Image of the Olympic Site in Munich, Germany. By Google Earth. Modified by author. Figure 17. Model of Olympiapark in Munich, Germany. By Behnisch & Partner In the next examples, in three different projects in Olympic sites that have worked on the fissure and how they solve it. This project is located in Germany, Munich. To host the Olympic Games in 1972. The late 60s were a period of enthusiasm and brand new ideas were architects and engineers were called to build many important facilities. As a first point, this location is placed in the outskirts of the city in a previous dump. However, this project is somewhat a unique type, because it is located now in the centre of Munich due to the development of this city. As said before, it is not common to place these types of cites in the middle of the city due to different factors. The Olympic Park is made up of an indoor swimming pool, an ice rink, the residential area, lakes, bike paths, concert halls, restaurants and the Olympic Stadium. They designed the Olympiapark to welcome the people to the sports infrastructure to make it feel like one piece of land that could have several uses and gather big masses of people. Recreational purposes and sport purposes. They designed this park with organic shapes to create paths that are more adapted to the slopes and the topography of the site. This sort of connection with the city makes it easier to access and to allow people to use these spaces even when there is no competition in the buildings. In this model, the paths of the project are shown as a landscaping matter that flows with the topography as if they were a water stream that falls from them, these paths communicate and allows a more organic relationship with the site. “Olympic Games in the green” and the sense of boldness and optimism reflected on the original vision of Günter Behnisch and Frei Otto, And the fact that the whole layout goes smoothly for visitors. Extending the original purpose of the Olympia park the pro- 24 ject adds new contemporary indoor and outdoor sports facilities for the visitors of the park. In terms of paths and connections, this project works the ground and sculpt its way to several spaces and areas. It shows a way to design forms and shapes following the topography and some other lines in the plot. The intention mainly is to have access to every part of the complex or zone in the project through different connections working with the fissure made by those platforms. He connects with several paths controlling the unevenness of the ground and giving new uses to them and inviting new places. This project seems to have applied some system of layers to differentiate uses and flows of users. In these terms, we can see a layer of paths, platforms, overpasses and the layout of the lake. Those layers being emphasized by the landscape and difference of level. As a different matter, these paths are connecting different platforms following the shape of the topography and creating some natural or organic shapes, as a result, these paths are taking into consideration the natural shapes to make the project as truthful with the context as possible. To conclude the project can provide and allow continuity to every part of Figure 18 Plan of Olympiapark in Munich, Germany. By Behnisch & Partner Figure 20. Section of Olympiapark in Munich, Germany. By Behnisch & Partner. Edited by author. 25 Figure 18 Plan of Olympiapark in Munich, Germany. By Behnisch & Partner Figure 20. Section of Olympiapark in Munich, Germany. By Behnisch & Partner. Edited by author. the site. Giving a new experience in the middle of the city, through a big recreational green area for people to use after the games. This type of ground design helps the feeling of open space and the feeling of a park to invite people to go and enjoy this place. Sinking the playing field below ground level and or surrounding the stadium with planted mounds to reduce the apparent height are useful devices, and enables the stadium and the landscape to melt. In terms of the section the intention is to work with the topography to create spaces and add program to the site, For example, in the case of the Olympic Stadium, the topography allows to create a platform where the intended sport will be performing and add the bleachers to take advantage of the level difference without leaving not intended spaces that are not useful for this purpose. With this in mind, the whole project works respecting specific parameters of taking advantage of the fissure. Overall this intention of creating several spaces in this topography cut, the section can show and portray a difference of level of different platforms though-out the site. Figure 19. Section of Stadium in Olympiapark in Munich, Germany. By Behnisch & Partner. Edited by author. 32 In this project, there are two main aspects that Eduard Bru had taken into account that is going to be analysed. In such a manner, this project works the ground floor and the differences in the level. This place has specific characteristics, and due to its northern location, this site has a considerable difference of level. Focusing on the intensity and the placement of enormous platforms, sports areas, and placing particular paths to connect them. The plan considers anew the possibilities of order and rationality potentially offered by a layout organised here by three geometrical forms, a common dimensional unit and a variety of auxiliary formations.” (Bru, 2011, 47) Another aspect that was taken into consideration was the idea of following certain topographic lines to work with, in terms to get some starting points to shape the platforms and other buildings in this site. The path is a layer that works with the idea of removing the orthogonal shapes of the platforms with the intention to create a transition between nature and artificial artefacts. Figure 30. Perspective of Valle d’Hebron. Barcelona, Spain. By Eduard Bru. 33 Figure 29. Ground Floor Plan of Valle d’Hebron. Barcelona, Spain. By Eduard Bru. 34 Figure 33. Section of Olympiapark in Munich, Germany. By Behnisch & Partner. Edited by author. Figure 32. Elevation of Valle d’Hebron, Swimming pool complex. Barcelona, Spain. By Eduard Bru. Edited by author. Figure 31. Elevation of Valle d’Hebron, Swimming pool complex. Barcelona, Spain. By Eduard Bru. Edited by author. FISSURES RESOLVED 35 So as can be seen in these projects it is essential how they design and carve the topography and the natural context. On the other hand, it is also important to decide how these platforms are going to be unified and consolidated for them to be accessible and pedestrian-friendly. Another essential point to emphasize is how the design could help to create public spaces with activities after the Olympic Games finale. So the way of taking advantage of the topography to place stadiums and other buildings could give a natural feeling and an idea that everything is blending into nature. THE FISSURE UNCONNECTED BCN 92’ 38 1 1 2 2 3 4 Figure 34. Image of Olympic sites. Barcelona, Spain. By Google Earth. Edited by Author. Figure 35. Olympic Ring. Barcelona, Spain. Figure 36. Valle d’hebron. Barcelona, Spain. 39 BARCELONA AGAINST FISSURE In 1986 Barcelona won, against six other cities, in the competition to host the 1992 Summer Olympic Games. After the dictatorship of Francisco Franco Spain went through a period of democracy were the economy was starting to bloom and, due to this event, the economy changed from being focused on the imanufacturing industry to an economy mostly based on services. The same year the Special Urban Planning Plan developed by Josep Martorell, Oriol Bohigas, David Mackay y Albert Puigdomènech was approved to show the placing and development of several sports areas. These four main Olympic areas were located in strategic points, edges of the consolidated city and first periphery. The main venue was planned in the Montjuïc mountain. In 1929 a park with cultural and sporting facilities had been planned there. Valle d’Hebron which was planned in a semi developed area of the first periphery surrounded by many amenities. The Diagonal, taking advantage of previous installations. Olympic Village, located in the waterfront, due to the objective to open the city to the sea. These areas were located in those sites to avoid gathering all the facilities in one place, thinking about the use of these areas after the games. 3 4 Figure 37. Olympic Village. Barcelona, Spain. Figure 38. The Diagonal. Barcelona, Spain. 40 BARCELONA - OLYMPIC RING The “Olympic Ring” is one of the Olympic sites in Barcelona for the Olympic Games in 1992. After two massive events such as the International Exhibition in 1929 and the “Olimpiadas populares” in 1936, the idea of taking advantage of these previous infrastructures and placing the most valuable sport buildings in this area was clever and useful to get this new centrality, at the periphery of the city, as other sites where considering to attract more people to this side of the city. Also, the idea of creating a new statement or landmark in the city was important in terms of reactivating the city after Franco’s dictatorship. This Olympic area has many important sport facilities, another types of cultural buildings and few buildings regarding educational purposes. As it can be seen in the following pictures: Figure 39. Image of Olympic site “Olympic Ring” in the mountain Montjuïc. Barcelona, Spain. By Google Earth. Edited by Author. 41 Figure 40, 41, 42 y 43. Photographies of the Olympic Ring infrastructures. “There are several international events that have had Barcelona as its epicenter, such as the 1888 International Exposition that promoted the conversion of the military installations of the current Ciutadella into a park; or the 1929 International Exposition, which promotes the urban reform of the surroundings of Montjüic as a fairground; both were the initiative of the great merchants and the Catalan bourgeoisie (Navas, 2016, 14) 48 PROBLEMATIC OF MONTJUÏC Since the conception to host the international exposition, the idea of connection for pedestrians was not proposed, even then after this event, the popular Olympics didn’t consider this aspect at all. When Barcelona won to be the host for the Olympic Games, they wanted to create a more cohesive area; nevertheless, the current connection is insufficient. As a consequence, people are not interested to get there by walking. So they opt to access by car or by bus or another kind of transportation. Even though this place is conceived to gather great masses of people to do sports and do recreational activities, lately people tend not to get to these areas to do exercises due to its inaccessibility. Which is something to take into consideration due to the great infrastructure it has in terms of sports facilities and other special buildings, for this Olympic ring to have activity and not turn into a white elephant in the city. FIRA SPORT FACILITIES ROAD Figure 50. Existing road connection and landmark fira I and II, Montjuïc. Barcelona, Spain. By author. 49 After analysing the Olympic Ring, this site has many problems regarding the difference of level and inaccessibility to the sports area. Having this problematic allows an architectural response in how, in this specific case, the fissure can be modified. In order to respond and connect this site with the city the project is situated in the border and the barrier itself to connect in specific points to communicate it better. Creating a path for pedestrians and complementary buildings along. The first proposed strategy is to locate those specific areas in the border of Montjuïc, that includes four main characteristics: The first one is having space in the lower part of Montjuïc to start the path. Secondly, it has to connect directly to a sports area. Thirdly, is to allow a space in the upper part to receive the people. And the last point is that all the links have to connect the upper and lower part with a sports infrastructure. PROJECT FIRA SPORT FACILITIES ROAD CONNECTING FISSURE Figure 51. Existing connection lines in the mountain Montjuïc and project in red. Barcelona, Spain. By author. PEDESTRIAN PATHS 50 Figure 52. Location of paths and buildings. By author. 51 The proposal consists in locating three connections to link the urban area to the Olympic site. On top of that to add an architectural program as complementary uses to these new public spaces and the sports facility, for them to be more accessible. As a consequence of these interventions, this area can have a way more accessible site for pedestrians and the Olympic area. In the figure, we can see the location of each link, and the buildings that work with them. The program regarding the buildings is, as said before, complementary to each platform.The use itself is not sports-related but more commercial and service-related. To create attraction points besides the sports facility. Mainly those buildings correspond to changing rooms, restaurants, bars and green areas. So the first link is from a residential area to the tennis zone. The second link is related to a connection with the park “la Florida” to the stadium “Serrahima”. And the last link is from another residential area to several sports points, such as the golf court and the swimming pool area. 52 Figure 53. Location of paths and buildings with topography and platforms. In black and white. By author. 53 54 This area connects a residential area to the main upper road to place the pedestrian to the most important part of montjuïc where the stadium is located. Also, in this area there is located a building that works as public space and connects with the first part of the path. At the end of this path, a big area is located that allows peopl to appreciate a view of the city and over seas. TENNIS’ CONNECTION Figure 54. Tennis’ connection floor plan, location of building and shape of the path. By author. 55 56 In this section there are several spaces to create and carve into the mountain. The idea mainly is to carve the mountain in a way that was almost natural, for it not to be or feel artificial. And of course having the decision to place some drain points in the path. Figure 57. Tennis’ connection section. By author. Figure 55. Tennis’ connection section. Zoom path area By author. Figure 56. Tennis’ connection section. Zoom upper platform area. By author. 57 Figure 56. Tennis’ connection section. Zoom upper platform area. By author. 64 Figure 66. Swimming pool’s connection section. By author. Figure 63. Swimming pool’s connection section close up of lower part. By author. In this specific case, the section works to see how the path connects two platforms and the golf court. In which the upper platform welcomes the project and arrives at the swimming pool. In this project, there’s a difference in terms of topography. Even though, the difference of level is not that high the slope is developed in a larger section. So the idea of applying the same concepts as the other two projects to establish similar characteristics, such as the drainage control and the way of carving the topography to take advantage of it. 65 Figure 63. Swimming pool’s connection section close up of lower part. By author. Figure 64. Swimming pool’s connection section close up of the middle part. By author. Figure 65. Swimming pool’s connection section close up of the upper part. By author. 66 To compare each section, of these three interventions, each one has a considerable difference in level. In which there is a path or a space that occurs to create accessibility and connection. In the first project, the difference of level is considerable, so the fissure is more noticeable and can be used in many ways, but in this case, in specific the path is considered to follow the shape of the topography and to make a more amicable for the pedestrians. In the second case is more about creating public spaces and different platforms for people to enjoy and have recreational activities. As for the last project, the difference in level was not that high. However, it was high enough for the pedestrians not being able to cross it. So in terms of section, it was mostly to create flat platforms and some friendly areas. Consequently, all these strategies mentioned before were applied to create these paths and allow a more cohesive site with the city. Figure 69. Swimming pool’s connection section. By author. Figure 68. Serrahima’s connection section. By author. Figure 67. Tennis’ connection section. By author. 67 Figure 69. Swimming pool’s connection section. By author. Figure 68. Serrahima’s connection section. By author. Figure 67. Tennis’ connection section. By author. INTERSTITIAL SPACES 70 Figure 70. Tennis’ connection section concept interstitial space. By author. 71 INTERSTITIAL SPACES These fractures or Interstitial spaces appear due to the cut of the topography where the sports areas are placed, due to the space they need they create some sort of big platform that cuts the topography and those spaces in between those infrastructures. So taking advantage of the shape, the height and also the space in between platforms, where the interstitial spaces appear, there can be placed buildings that work to create new opportunities for designing in a slope or these cases in particular. This way of design can improve and take in advantage of specific parts, and also could connect to different levels. Accordingly, this design method can have different ways to be represented. .To be a containing wall for the topography. .To place program, uses, inside the topography. .To connect two platforms. 72 LEÇA SWIMMING POOLS BY ÁLVARO SIZA VIEIRA 1966 As a first approach to this first project, Siza’s intentions are to look for a certain atmosphere, in which the context and landscape takes part into the decisions to place the project and its shape. Therefore, the design follows a certain analysis of the context and its natural shape, adapting and giving character to the site. Collocating and placing the program as a spatial composition. This project deals with a very specific context, being placed where the water and the mountain meet. Accordingly to those facts, the project allows a better understanding of what it means to have a connection with an upper part and a natural context as the sea. Figure 71. Leça Swimming Pools Floor Plan By Álvaro Siza Vieira Figure 72. Leça Swimming Pools Section. By Álvaro Siza Vieira. Edited by author Figure 71. Leça Swimming Pools Floor Plan By Álvaro Siza Vieira 73 The plan explains how the intention of the shapes comes from the topography and other senses, to place and locate the uses. On the other hand these sense of Interstitial Spaces can be seen in how the project is placed in the topography between two kinds of platform, one being the sea and the other one being the plateau. This intention of creating this building inserted and make it correspond to the form and clefts of the site, to allow the program to give a new shape in between. So as seen in this intention the building places itself to create an idea of placing itself on top of the topography as a way to connect. Figure 73. Photography of Leça Swimming Pools. By Álvaro Siza Vieira. 80 “The building is formed on the basis of the repetition of changing-room/shower unit, forming blocks which the concrete screens enclose. A surface of translucent glass separates the roof slab from these prefabricated elements. The earthworks between the rear of the building and the street form the access ramps to the competition area. The main ramp is covered with a pergola of galvanised plates. The light passing through these traces curves on the floor that follow those of the earthworks. The asphalt of the interior paving penetrates the interior of the ramps.” (Bru, 2011 ,62) This project is conceived in the Olympic Games period for it to complement an area with a particular program as a service building for the amount of people who wanted to attend. This project in specific has a different approach to the topography, carving it with unusual shapes to create spaces inside the fissure as a way to answer the necessity of a platform in this specific site. This intention is more of a containing wall. COMPETITION FACILITIES FOR THE ARCHERY RANGE By miralles and carme pinos 1992 Figure 84. Floor plan and facade of competition facilities for the archery range. By Miralles and Carme Pinos. Edited by Author 81 Figure 84. Floor plan and facade of competition facilities for the archery range. By Miralles and Carme Pinos. Edited by Author Figure 85. Photography of competition facilities for the archery range. By Miralles and Carme Pinos. 82 Figure 86. Collage of photographies of the competition facilities for the archery range. By Miralles and Carme Pinos 83 The exterior of the project has a prefabricated concrete wall which adapts to the topography and creates different accesses throughout the project. The interior of the project has an effect of working with natural lights and shadows to create an atmosphere inside. Also, the textures take an honest approach with different materials reflecting in the shadows. Another characteristic is the intention of connecting two platforms with fields as a path and axis covered with a canopy. In this sense, the project takes advantage of the topography to complement this area. Figure 87. Collage of photographies of the competition facilities for the archery range. By Miralles and Carme Pinos Figure 78. Photography of the competition facilities for the archery range. By Miralles. 84 In the three projects, it can be seen how the interstitial space works, and how their conditions differ but the same characteristics are applied. These three projects have a thematic of sport-related infrastructures and are placed into a fissure of the topography between two platforms. As such it can be said that these spaces have three main qualities or characteristics. The first characteristic is working as a containing wall in the fissure, as can be seen in the project in Papiol and the Miralles Competition facilities, both of them rest their backs into the topography containing earth. The second characteristic is how they carve into the topography, As the Alvaro Siza’s pools where the building carves into the topography and places itself on top, creating spaces where the topography is more carved. The third characteristic is the idea of connecting two platforms at different levels with a path, as the Papiol project. Figure 88. Section of the competition facilities for the archery range. By Miralles and Carme Pinos. Edited by author Figure 90. Section of the papiol sports centre by graucasais office. Edited by author Figure 91. Leça Swimming Pools Section. By Álvaro Siza Vieira. Edited by author 85 Figure 88. Section of the competition facilities for the archery range. By Miralles and Carme Pinos. Edited by author Figure 89. Section of the competition facilities for the archery range. By Miralles and Carme Pinos. Edited by author Figure 90. Section of the papiol sports centre by graucasais office. Edited by author 86 TENNIS’ CONNECTION PLOT PLAN At first, this project looks to receive people with an open space, complimenting this with a Bar/Restaurant. This figure show how connection has, as a starting point, a building that works as a ramp that allows to introduce the path in a different way. This ramp works as a possibility to introduce a different sensation through it, a different experience in the city to be surrounded by green areas and trees. The materials applied are two, concrete and glass. The predominant material is concrete to give a strong presence, adding glass to give lightness to it. Figure 92. Plot plan of the Tennis’ connection. By author 87 Figure 92. Plot plan of the Tennis’ connection. By author 88 TENNIS’ CONNECTION FLOOR PLAN In this particular case in terms of floor plan. In the figure, the project is carving into the mountain to determinate some artificial borders, to develop a more substantial start of the path. So in the case of the Bar building consists in a reception which you can access through the separation between two walls. This building also involves a table area and a kitchen area. The other building responds to the idea of having only a ramp as a way to communicate lower and upper part. As a result this specific building has inside a ramp that communicates with the top of the bar building. Figure 93. Floor plan of the Tennis’ connection. BY author 89 Figure 93. Floor plan of the Tennis’ connection. BY author 96 SERRAHIMA’S CONNECTION PLOT PLAN This connection, as can be seen in the plot plan, is different from the others regarding in the continuation of the path, so in this case the intention is to work as an easier way to connect to an upper part of the road. There are two buildings in this site connected by a roof that acts as a path. The project collects a green area with trees and bushes which leaves a more open space between the green area and building. This new space will receive gatherings of people after a competition or even after training. The materials selected are concrete and glass, following the same idea as the last project, to make it look as a strong building and to give it lightness. Figure 97. Plot plan Serrahima’s connection. By author 97 Figure 97. Plot plan Serrahima’s connection. By author 98 SERRAHIMA’S CONNECTION FLOOR PLAN In this case, it can be seen in this floor plan, that part of the building is located in a slope and the other part is not. In the right side there are the changing rooms + the bathrooms distributed by a hall. In the left side there is a cafeteria that works for the stadium when the latter is being used. As such those two buildings create a more cohesive side to receive and create an area that allows people to gather and be there for a while. Figure 98. Floor plan Serrahima’s connection. By author 99 Figure 98. Floor plan Serrahima’s connection. By author 100 SERRAHIMA’S CONNECTION SECTION In this section the intention was to show how the building adapts to the fissure and allow to connect the path to a more controlled space that complements the stadium nearby. Figure 99. Section Serrahima’s connection. By author 101 Figure 99. Section Serrahima’s connection. By author 102 Figure 100. Isometric view Serrahima’s connection. By author 103 Figure 100. Isometric view Serrahima’s connection. By author 104 Figure 101. Perspective. Human view of Serrahima’s connection. By author 105 112 Figure 105. Isometric view of swimming pool’s connection. By author 113 Figure 105. Isometric view of swimming pool’s connection. By author 114 Figure 106. Perspective. Human view. Of swimming pool’s connection. By author 115 Figure 106. Perspective. Human view. Of swimming pool’s connection. By author 116 FISSURE AS INTERSTITIAL SPACE Figure 107. Location of paths and buildings with topography and platforms. In black and white. By author. 117 As said before, these locations for these three projects are based on the fissure and the platforms that are connecting them. So in these cases, as can be seen in their floors plans individually, they are transforming the topography adding program and making connections with a different floor level. In the first project, the idea is locating a bar on the lower part but also placing a building that works as a public space to connect to the path. The second project modifies the topography to add program and modify the public space in this site in specific. However, there’s a building that it is not located in the topography though this building allows a connection with the upper part. On the other hand, the third project is working inside the topography. In few words, every project has this idea of behaving as a containing wall, connecting two platforms and working carving the mountain. Figure 110. Floor plan of swimming pool’s connection. By author Figure 109. Floor plan Serrahima’s connection. By author Figure 108. Floor plan of the Tennis’ connection. By author 118 In this research, there are several ideas of what Olympic sites could be or have. These sites are full of complexity and require several ways to intervene in them, even to locate them is a struggle for the host. This intention is mainly a way to regenerate the city, to improve and give civilians new areas for recreational purposes and, why not, green landscapes. However, in many other cases of Olympic sites, the lack of use after the event provokes isolation of the site with the context turning them into white elephants in the city. On the other hand, these sites, as a regeneration tool, work in many areas that involve several aspects of the city. Namely, working with transport infrastructure, new residential buildings, and urban frames. Moreover, they deal with natural topography (mostly in the peripheries), and with the size of the buildings. This necessity to place and locate these platforms for many sports, reveals itself as cuts of the topography. When this happens, without intention, they create some considerable difference in level. Additionally, when this difference of level appears, it comes in the shape of a fissure that breaks the continuity and the sequence of spaces in these type of Olympic sites, as seen in the previous case studies. The use of interstitial spaces is a way of taking advantage of this situation. The concept of interstitial space defines a place in the topography between two platforms, with the possibility to be held in different cases. Nevertheless, in Olympic sites, this concept particularly fits better because it can be in a fissure of a considerable height. For this reason, this concept is analysed under two different scales. The first scale is dedicated to three Olympic areas, in order to understand how this term’s application regarding connections. The second scale focuses on three different buildings that modify the fissure to assess their approach towards the topography. In the first scale, these areas developed two different layers, the paths and platforms. These two ideas are acknowledging the context, shape-wise and their connection with the city. In the second scale, the three buildings share specific characteristics, which are how they can work as a path, link, or containing wall, and create spaces that take advantage of the fissure. CONCLUSIONS 119 Aside from this, this type of interventions has no defined program, as seen in the case studies. The concept of interstitial space is mostly a form matter, which can allow from stadiums to buildings of service. With this idea in mind, the proposal works in these two scales to show to what level the situation on the Olympic Ring can be modified. Accordingly, these three interventions solve the problematic of Montjuic and the Olympic area. They contribute to bond the city and said sites with pedestrian paths to make it more pedestrian-friendly. What is more, they complement different areas with buildings of service and public spaces. Regarding the situation in several Olympic areas, it can be concluded that an important aspect to focus on is regarding connections and the development of these fissures in different ways to allow a better understanding between platforms. Finally, this concept of interstitial spaces solves this problem that tends to occur in these types of sites, improving the Olympic areas’ relationship with the city and people. The contemplation of what can be done with this concept is limitless, this can be used in other contexts that could benefit from a more natural way to approach natural surroundings. For this reason, the development and deep understanding of these concepts, such as interstitial spaces, is key for architecture to keep thinking in disruptive ways to approach projects. 120 BIBLIOGRAPHY Aldrete-Haas, José Antonio, and Álvaro Siza. 1999. “Álvaro Siza.” BOMB, no. 68 (May): 46–51. http:// www.jstor.org/stable/40426186. Bru Bistuer, Eduard. El suelo como noche de la arquitectura. “DPA: Documents de Projectes d’Arquitectura”, 2005, núm. 21, p. 76-79. Bru, Eduard. 2011. “Vall d’Hebron : Nou Paisatge = a New Landscape.” Quaderns d’arquitectura i Urbanisme, no. 193 SE-Articles (March). https://www.raco.cat/index.php/QuadernsArquitecturaUrbanisme/ article/view/231880. Chalkley, Brian, and Stephen Essex. “Learning from the Olympic Games.” Teaching Geography 25, no. 3 (2000): 112-18. Accessed March 24, 2020. www.jstor.org/stable/23756000. Davidson, Mark, and Donald McNeill. “The Redevelopment of Olympic Sites: Examining the Legacy of Sydney Olympic Park.” Urban Studies 49, no. 8 (2012): 1625-641. Accessed March 24, 2020. www.jstor. org/stable/26150950..0 Davis, Juliet. 2019. “Avoiding White Elephants? The Planning and Design of London’s 2012 Olympic and Paralympic Venues, 2002–2018.” Planning Perspectives. https://doi.org/10.1080/02665433.2019.1633948. EVERETT, JON. “Olympic Design Games.” Landscape Architecture Australia, no. 119 (2008): 81. Accessed May 17, 2020. www.jstor.org/stable/45124481. Gold, John R., and Margaret M. Gold. 2011. Olympic Cities : City Agendas, Planning and the World’s Games, 1896-2016. New York : Routledge. https://discovery.upc.edu/iii/encore/record/C__Rb1379927__ Solympic__Orightresult__X6?lang=cat. Kennett, Christopher, and Miquel De Moragas. “From Athens to Beijing: The Closing Ceremony and Olympic Television Broadcast Narratives.” In Owning the Olympics: Narratives of the New China, edited by Price Monroe E. and Dayan Daniel, 260-83. Ann Arbor: University of Michigan Press, 2008. Accessed March 24, 2020. www.jstor.org/stable/j.ctv65sw9q.13. Kennelly, Jacqueline, and Paul Watt. 2011. “Sanitizing Public Space in Olympic Host Cities: The Spatial Experiences of Marginalized Youth in 2010 Vancouver and 2012 London.” Sociology 45 (5): 765–81. http://www.jstor.org/stable/42857456. Lerner, Jonathan. “OLYMPIC HOPEFUL.” Landscape Architecture 94, no. 8 (2004): 26-35. Accessed March 24, 2020. www.jstor.org/stable/44675165. BIBLIOGRAPHY 121 Martínez Garcia, N. (2012) Espais Metropolitans, 2008/20124 : Projectes i Obres Àrea Metropolitana de Barcelona. Barcelona : Àrea Metropolitana de Barcelona,. Available at: https://discovery.upc.edu/ iii/encore/record/C__Rb1429727__Sespais metropolitans__Orightresult__U__X7;jsessionid=644BF- 1B23AAFE56BEB4E18FBF4CAB053?lang=cat (Accessed: 24 March 2020). McAllister, M. (1997). Chapter 3: Sponsorship, Globalization, and the Summer Olympics. Counterpoints, 54, 35-63. Retrieved March 24, 2020, from www.jstor.org/stable/42975203 SCHILLER, KAY, and CHRISTOPHER YOUNG. “Motion and Landscape: Otl Aicher, Günther Grzimek and the Graphic and Garden Designs of the 1972 Munich Olympics.” Urban History 37, no. 2 (2010): 272-88. Accessed March 24, 2020. www.jstor.org/stable/44614275. Smith, Andrew. 2014. “From Green Park to Theme Park? Evolving Legacy Visions for London’s Olympic Park.” Architectural Research Quarterly 18 (4): 315–23. https://doi.org/10.1017/S1359135515000056. Steiner, Frederick R. 2008. “OLYMPIC HOPEFUL.” Landscape Architecture 98 (3): 90–97. http://www. jstor.org/stable/44791633. “GRZIMEK FROM MUNICH: 350 Acres of Excitement Modeled from the Flats.” 1972. Landscape Architecture 62 (2): 128–32. http://www.jstor.org/stable/44665577. Traganou, Jilly. 2012. “Foreword: Design Histories of the Olympic Games.” Journal of Design History 25 (3): 245–51. http://www.jstor.org/stable/41687776.