1 Environmental and Cost Optimal Design of a Biomass – Wind – PV Electricity Generation System 1 Arnau Gonzalez, Jordi-Roger Riba*, Bernat Esteban, Antoni Rius 2 Escola d’Enginyeria d’Igualada, Universitat Politècnica de Catalunya, Pla de la Massa 8, 08700 Igualada, Spain 3 *Corresponding author. Tel.: +34 938035300; fax: +34 938031589. E-mail address: jo[email protected]pc.edu 4 5 Abstract—This work describes a methodology to optimize a grid-connected hybrid renewable energy system 6 (HRES) that hybridizes photovoltaic, wind and forest biomass energy sources taking into account cost and 7 environmental impact criteria from a life-cycle perspective. The developed model has been tested in a sample 8 township in central Catalonia. The results show that life-cycle cost and life-cycle environmental impact are 9 contradicting criteria. Low environmental impact layouts highly dependent on RES have higher costs than 10 the ones more reliant on the electricity from the public grid, which present high environmental impact. A 11 sensitivity analysis has been performed to analyze the trade-offs between different energy sources of the 12 system, showing that wind power is the RE source with higher impact on the system since it presents lower 13 cost and lower environmental impact, compared with biomass and photovoltaic power. Another important 14 conclusion that can be drawn from such sensitivity analysis is that improving the rate of return on investment 15 in HRES would be a very beneficial measure to encourage the use of renewable energies for electricity 16 production, as it has significant positive outcomes in terms of both cost and environmental impact reduction. 17 18 Keywords—Grid-connected hybrid renewable energy system; multi-objective optimization; solar 19 photovoltaic power; wind power; biomass. 20 21 I. INTRODUCTION 22 Renewable energies (REs) are an appealing alternative for tackling the climate change global issue, which 23 is widely recognized as the major challenge that is going to be faced in the upcoming future due to the major 24 implications in terms of water resources stress increases [1], [2] or global air and ocean temperature increases 25 [3], among others. These major changes in climate patterns are already being observed and there is scientific 26 consensus on being particularly affected by the anthropogenic global greenhouse gases (GHG) emissions 27 increase [3], including carbon dioxide (CO2), methane (CH4) and nitrous oxide (N2O). In particular, the 28 current anthropogenic GHG emissions could already be beyond planet boundaries [4], hence being of critical 29 importance to deal with such issue in a quick and effective manner. 30 In this context, REs are an alternative worth exploring, as they are effective means for climate change 31 prevention and mitigation [5], with undeniable external benefits in terms of environment quality and 32 economic value, especially in the case of photovoltaic (PV) power, wind power and biomass power [6], which 33 are the focus of the present work. Moreover, they are indigenous energy sources [7], allowing countries that 34 position for them to reduce energy dependency whereas taking a transition path to a decentralized energy 35 generation scheme that could be the basis for smart grid implementation. This is so because RE are not only 36 a suitable alternative for microgrid implementation [8], but also efficient in transmission since energy 37 generation can be placed close to consumption nodes [9]–[11] while allowing a modular structure [12]. 38 Despite these benefits, it is noteworthy to mention that main benefits of REs are in terms of environmental 39 performance, as these sources are carbon-free (PV or wind power) or carbon-neutral (biomass), being thus a 40 viable alternative to de-carbonize the energy generation. Another remarkable benefit from REs use is the 41 revaluation of local resources currently misused as well as the creation of local job opportunities [13], 42 especially in the case of forest wood biomass resource, which requires labor force in the fields of forest 43 management, harvesting, biofuel production storage and distribution [14] and helps preventing landscape 44 quality, landslides and biodiversity [15]. 45 However, REs have an inherent stochastic nature, which is their main drawback. Whereas fossil fuel-based 46
2 energy production is predictable and fully controllable, RE-based electricity generation is highly dependent 1 on weather conditions which are not predictable with the accuracy required for electricity supply. To 2 overcome this issue, hybrid renewable energy systems (HRES) combining two or more energy sources can 3 counteract the weaknesses of one source with the strengths of another [16]. For example, wind and solar 4 irradiation daily and even seasonal patterns complement each other. In addition, they can be combined with 5 a more predictable energy source such as biomass power that can be dispatched on demand [17]–[19]. 6 The main purpose of this paper is the optimal sizing of a HRES based on both economic and environmental 7 criteria, being of interest the research field of HRES multi-objective optimization. After a thorough literature 8 review, it has been noted that most of the works focused on HRES optimization deal with stand-alone systems 9 [8], [9], [12], [13], [20]–[27] rather than focusing on grid-connected layouts as in the case of this paper. 10 Moreover, it must also be noted that there are many works that use HRES optimization software packages 11 such as HOMER [12], [20], [28]–[31], unlike others that develop heuristic methodologies [8], [21], [23], 12 [24], [27], [32]–[37] such as those based on evolutionary techniques like genetic algorithms (GA). 13 The hybridized RE sources are usually PV and wind, combined with battery storage [20], [23], [29], [33], 14 [38] or pumped hydro storage (PHS) [21], [26]–[28], [39], [40] to add flexibility and reliability. Another 15 alternative is the combination of one of the aforementioned RE sources with a backup generation technology, 16 which is often a diesel engine-generator set [8], [24], [25], [30], [41], [42]. The alternative of grid-connection 17 has been observed in very few cases [43]. 18 Another differential aspect of the present work is the use of real on-site hourly data for both weather 19 variables and electricity demand. When looking at that in the literature, it has been observed that some works, 20 rather than using real hourly data, they rely on estimated weather-related variables [28], [29], [38], [41] and/or 21 electricity demand data [20], [21], [25], [27]–[29]. The present work would be included in the group of papers 22 that rely on actual data with hourly accuracy [8], [12], [23], [30], [33], [42], being able to capture both hourly 23 and seasonal weather and demand pattern changes. 24 Hence, from the literature survey, it has been noticed a scarcity of papers focused on grid-connected HRES, 25 and, aside from previous work by the authors [44], none of the accessed ones is focused on the hybridization 26 of PV, wind and biomass power sources – being the latter the one that provides backup to the formers – or 27 uses real on-time electricity sale and purchase prices according to actual market pool and hourly 28 discrimination tariff prices. This work also proposes to use the forest wood biomass in a sustainable way, i.e. 29 without surpassing the self-growth rate of local forests so the locally available resource can be used avoiding 30 resource depletion or scarcity at mid- or long-term. This is introduced in the work through the inclusion of 31 the price of sustainably-harvested forest wood biomass as well as estimating the forested area required to 32 feed the system. The novelty of this work can be, therefore, justified from these characteristics, as well as 33 from a multi-objective analysis that allows decision-makers not only to perform informed decisions but also 34 to understand the trade-offs between system cost and environmental impact. 35 II. SYSTEM DESCRIPTION 36 The proposed optimization methodology has been designed to deal with a grid-connected HRES based on 37 the hybridization of PV power, wind power and power from forest wood biomass gasification, as proposed 38 in [44] (see Fig.1). 39 40
3 1 Fig. 1. Proposed HRES layout 2 Such layout has several advantages, among which are noteworthy to mention the flexibility provided by 3 the grid connection and the forest wood biomass engine, which has a short response time so it can be used to 4 backup stochastic renewable energy sources whenever required. Thanks to the grid connection and the 5 biomass subsystem, which has a programmable supply thanks to its storability, the HRES can be designed 6 without battery banks that otherwise would be mandatory [26] to ensure system’s reliability and that would 7 increase overall system cost [20]. 8 System components include PV modules, small wind turbines and a biomass system consisting of a gasifier 9 coupled with an internal combustion engine (ICE) – generator group. For the PV subsystem, a 265 Wp and 10 1.46 m2 module UP-M265M has been selected [45]. For the wind power subsystem, the chosen SUT200 11 wind turbine has a nominal power of 200 kW [46]. These two subsystems are scalable. Scalability is 12 important because it allows changing system size easily by increasing or decreasing the number of PV 13 modules and/or wind turbines. Hence, the proposed HRES optimization model can be used in many different 14 places and at many different scales of generation by only adapting the weather, electricity demand, 15 components’ performance and cost variables to the new constraints. 16 Regarding the biomass subsystem, a different approach was taken. The selected equipment is a generic 500 17 kWe gasifier-ICE-generator. Such generation power was established to partially cover the average hourly 18 electricity demand in the sample dealt with. In biomass-based electricity generation equipment, unlike in the 19 previously mentioned PV and wind subsystems, system scale has significant impact on the efficiency, being 20 preferable to select a single ICE. The conversion technology consists on forest wood chip gasification in a 21 downdraft gasifier, with subsequent combustion of the obtained syngas in a gas engine after gas cleaning and 22 cooling. This is the most efficient conversion path at the scale of 100-1000 kW [47], [48] and it also beneficial 23 in terms of maintenance and equipment lifetime [49]. The biomass subsystem is thought to work always at 24 full load in order to maximize generator efficiency that otherwise would rapidly decay [50]. The equipment 25 do not include pre-drying, because the Mediterranean climate ensures good drying rates by atmospheric 26 drying and it do not include a biomass storage tank in the gasifier. Instead, the gasifier is cyclically fed at its 27 full capacity. The bio-fuel used are forest wood chips from pruning and forest clearing, according to the 28 environmental criteria of not using entire forest biomass, only that amount self-regenerated by the trees. 29
4 Another important aspect of the system layout is how to establish the priorities of using one source of 1 another whenever there are one or more available, and the design condition of supply-demand match. For 2 environmental reasons, this work proposes prioritizing PV and wind power usage ahead of biomass power 3 generation, which is used to backup PV and wind whenever they are not available. When the total PV, wind 4 and biomass power generation is not enough to match the overall demand, the HRES will consume electricity 5 from the public grid. Conversely, if PV and wind power are enough to match the existent demand, the biomass 6 engine will be off. An intermediate situation occurs when PV and wind power exceed the existent demand, 7 or when they are not enough to supply the demand but turning on the biomass subsystem at full load generates 8 electricity surplus. In those situations, the excess electricity produced is sold to the grid at market price. 9 III. METHODOLOGY DESCRIPTION 10 In the following subsections the proposed methodology is detailed. First, a sample location is selected. 11 Then, the data required for the model to find the optimum trade-off between cost and environmental impact 12 in terms of CO2 emissions is presented for such sample location. Finally, the optimization algorithm is 13 explained. 14 A. Sample selection 15 The sample location is a rural township in central Catalonia, a region with high availability of forest wood 16 biomass, a moderate solar irradiation averaging around 1650 kWh/(m2year) [51], and with a low average 17 wind speed of 3.7 m/s at 35 m above ground level [51]. The sample township has 2931 inhabitants and a 18 population density of 86.6 inhabitants/km2, thus meeting the criteria for rural population [52] since it is below 19 150 inhabitants/km2. The hourly electricity load averages approximately 1 MWh. The hourly peak demand 20 is 2127 kWh. This sample is also representative of Mediterranean climate electricity consumption, hence the 21 results can be extrapolated to similar climatic regions, such as Southern France, Italy or Greece, among 22 others. The electricity price in Spain is similar to the average in the Euro area [53], so the results in terms of 23 cost and return of investment would be comparable, and the model can be applied in these other contexts 24 with slight changes in weather-related variables and demand. 25 26 B. Input data 27 Four groups of input variables are described in the following subsections: stochastic variables, including 28 weather-related and demand data, cost and financial variables, equipment efficiency and performance 29 variables and environmental impact variables. Data come from trustworthy sources which are indicted. 30 31 1) Stochastic variables 32 In this group are found those variables with a certain degree of randomness. In this work, data series of 33 8760 points, corresponding to 24 hours – 365 days a year, have been used. Such data series allow capturing 34 daily and seasonal patterns. They are summarized in Table I. 35 36 TABLE I H OURLY S ERIES OF S TOCHASTIC V ARIABLES Data Value Source Solar irradiation (W/m2) Vector of 8760 points (365 days x 24 hours) [51] Wind speed at 6m above ground (m/s) Vector of 8760 points (365 days x 24 hours) [51] Electricity demand profile (kWh) Vector of 8760 points (365 days x 24 hours) [54] The solar irradiation data series provided by [51] is measured on a horizontal surface, so a horizontal-to-37 tilted plane conversion (eq. 1-3) was performed to obtain the solar irradiation SI on a plane tilted 37º, which 38 is the optimum angle for the latitude of the sample. This can be done as follows [55]: 39
5 𝑆𝑆𝐼𝐼𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡=𝑆𝑆𝐼𝐼ℎ𝑜𝑜𝑜𝑜𝑡𝑡𝑜𝑜𝑜𝑜𝑜𝑜𝑡𝑡𝑜𝑜𝑡𝑡·sin(𝛼𝛼+𝛽𝛽) sin(𝛼𝛼) (1) 1 where 𝛼𝛼 is the elevation angle and 𝛽𝛽 is the tilt angle measured from the horizontal, in the sample selected 2 𝛽𝛽 = 37º. The elevation angle can be calculated as follows: 3 𝛼𝛼=90 −𝜙𝜙+𝛿𝛿 (2) 4 𝛿𝛿=23.45 · sin �360 365·(284 +𝑑𝑑)� (3) 5 𝜙𝜙 being the latitude and 𝑑𝑑 ∈(1, 365) the day of the year. 6 The wind speed must be transformed to account for the boundary layer effect that reduces the wind speed 7 close to the ground. According to [56], the measured wind speed at an altitude of 6 m [51] can be converted 8 to the wind speed at hub height of 35 m as: 9 𝑉𝑉𝐻𝐻=𝑉𝑉𝐻𝐻0(𝐻𝐻 𝐻𝐻0 ⁄)1/7 (4) 10 where 𝑉𝑉𝐻𝐻 and 𝑉𝑉𝐻𝐻0 are, respectively, the estimated wind speed at height 𝐻𝐻 and the measured one at height 11 𝐻𝐻0= 6 𝑚𝑚. 12 13 2) Cost and financial variables 14 The cost variables category include the purchasing cost of PV modules, wind turbines, biomass gasifier 15 and gas cleaning and cooling systems and the ICE-generator equipment. The operation and maintenance 16 costs, as well as financial variables such as interest and inflation rates as well as lifetime of equipment – for 17 return on investment and end of life value calculation – are also included. All of them are summarized in 18 Table II. 19 The selected PV power costs account not only for the PV panels but also for all other elements of the 20 installation, i.e. wiring, converter, installation materials, labor costs and land acquisition and taxes. The 21 chosen value is $3.8 per Watt-peak, representative of utility-scale installations according to [57]. 22 In the case of wind power costs, the entire cost of the project is also considered, according to [58]. 23 Biomass power generation equipment costs are taken from [59], [60], which were validated through a 24 personal communication with an expert [61]. In this case, the cost of bio-fuel must also be added. According 25 to [15], forest wood chips obtained through sustainable management practices based on cow grazing cost 26 12.8 €/GJ, which in terms of tons of wood chips with a moisture content of 30% equals to 173 €𝑡𝑡𝑡𝑡30% �: 27 This cost clearly exceeds the current market prices of forest wood chips, ranging between 56 and 136 €/tn 28 in European countries [62], since sustainable management and harvesting practices have been assumed. 29 Finally, it is also important to highlight that the electricity sale and purchase is taken into account 30 considering that electricity is purchased at current retail prices with hourly discrimination tariff [63] and sold 31 at the clearing prices established in the market pool with hourly auctions [64]. It is important to remark that 32 the electricity market in Spain, unlike in the 2000s, currently do not have price incentives for the production 33 of renewable energy, so the surplus of energy generated is sold competing with all other sources of energy, 34 regardless of their origin or environmental impact. Both prices are considered to suffer an annual inflation of 35 3%, a consistent value considering the rates experienced throughout the last five years [65]. 36 37 38 39 40 41 42 TABLE II COST AND FINANCIAL VARIABLES Data Variable name Value Source 1. Lifetime
6 1.1. System lifetime 𝑁𝑁 25 years [66]–[68] 1.2. PV modules lifetime 𝑌𝑌𝑃𝑃𝑃𝑃 25 years [69] 1.3. Biomass equipment (gasifier – ICE) lifetime 𝑌𝑌𝑏𝑏𝑡𝑡𝑜𝑜 25 years [61] 1.4. Wind turbine lifetime 𝑌𝑌𝑤𝑤𝑡𝑡 20 years [68] 1.5. Solar PV DC – DC converter lifetime 𝑌𝑌𝑡𝑡𝑜𝑜𝑖𝑖 15 years [33], [68] 2. Financial data 2.1. Interest rate 𝐼𝐼𝐼𝐼 3.5% [70] 2.2. Spain’s Value Added Tax (VAT) rate 𝑇𝑇𝐼𝐼 21% [71] 2.3. General inflation rate 𝑔𝑔 3% [68] 2.4. Electricity selling price inflation rate 𝑔𝑔𝑒𝑒𝑡𝑡𝑒𝑒𝑒𝑒𝑡𝑡𝑜𝑜𝑡𝑡𝑒𝑒𝑡𝑡𝑡𝑡𝑒𝑒 3% [68] 2.5. Wind turbines selling price inflation rate 𝑔𝑔𝑤𝑤𝑡𝑡 -5% [68] 2.6. Converter selling price inflation rate 𝑔𝑔𝑡𝑡𝑜𝑜𝑖𝑖 -5% [68] 2.7. Cost reduction limit due to technological maturity for wind turbines 𝐿𝐿𝑔𝑔_𝑤𝑤𝑡𝑡 -25% [68] 2.8. Cost reduction limit due to technological maturity for converters 𝐿𝐿𝑔𝑔_𝑡𝑡𝑜𝑜𝑖𝑖 -25% [68] 3. Capital costs 3.1. PV capital cost 𝐶𝐶𝑃𝑃𝑃𝑃 3800 $/kW [57] 3.2. Wind capital cost 𝐶𝐶𝑊𝑊𝑊𝑊 2700 $/kW [58] 3.3. Converter capital cost 𝐶𝐶𝐼𝐼𝐼𝐼𝑃𝑃 250 $/kWPV [68] 3.4. Biomass equipment capital cost 𝐶𝐶𝐵𝐵𝐼𝐼𝐵𝐵 4000 $/kW [59]–[61] 4. Fixed O&M costs 4.1. PV fixed O&M costs 𝐶𝐶𝑃𝑃𝑃𝑃𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝐵𝐵&𝑀𝑀 32.64 $/kW [72] 4.2. Wind fixed O&M costs 𝐶𝐶𝑊𝑊𝑊𝑊𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝐵𝐵&𝑀𝑀 32.15 $/kW [72] 5. Variable O&M costs 5.1. PV variable O&M costs 𝐶𝐶𝑃𝑃𝑃𝑃𝑣𝑣𝑣𝑣𝑣𝑣𝐵𝐵&𝑀𝑀 0 $/kW [72] 5.2. Wind variable O&M costs 𝐶𝐶𝑊𝑊𝑊𝑊𝑣𝑣𝑣𝑣𝑣𝑣𝐵𝐵&𝑀𝑀 0.01475 $/kW [72] 6. Bio-fuel (wood chips) cost 𝐶𝐶𝑊𝑊𝑜𝑜𝑜𝑜𝑊𝑊 173 €/tn [15] 7. Electricity cost and tariff 7.1. Electricity market price 𝐶𝐶𝑝𝑝𝑜𝑜𝑜𝑜𝑡𝑡 Vector of 8760 points; 24 hours per 365 days [64] 7.2. Electricity retail price 𝐶𝐶𝑒𝑒𝑡𝑡𝑒𝑒𝑒𝑒𝑡𝑡𝑜𝑜 Peak – 0.101406 €/kWh Flat – 0.078289 €/kWh Off-peak – 0.052683 €/kWh [54] 7.3. Time periods Peak: 17-23 winter/10-16 summer Flat: 8-17, 23-24 winter /8-10,16-24 summer Off-peak: 0-8 winter time / summer time [63] It has been assumed an exchange rate of 1 € = 1.1292$ 1 Values are presented in € or $ according to the original sources 2 3 3) Efficiency and performance variables 4 In this category of variables, there are included the efficiencies of PV modules, other PV ancillary 5 equipment and biomass gasification – ICE system, as summarized in Table III. 6 TABLE III EFFICIENCY AND PERFORMANCE VARIABLES Data Value Source PV module reference efficiency 15.0% [69] PV module nameplate derating 95.0% [73] PV inverter efficiency 92.0% [73] PV module mismatch factor 98.0% [73] PV connections efficiency 99.5% [73] PV DC wiring losses factor 98.0% [73] PV AC wiring losses factor 99.0% [73] PV soiling derating factor 95.0% [73] PV system availability O&M 98.0% [73] Biomass gasifier ideal efficiency 71% [59] Biomass gasifier operation efficiency 95% [61] Biomass syngas-fired ICE efficiency 37% [47], [61] Biomass lower heating value (LHV) 15.5 GJ/tn [61], [74] PV global efficiency is obtained by multiplying all system efficiencies, and introducing the efficiency 7 decay due to aging, data provided by the manufacturer [45]. 8 The characteristic curve is used to calculated the power output of the wind turbine for a given wind speed 9
7 (see Fig. 2), as well as the PV warranted efficiency curve, which is used to estimate the PV power output 1 decrease over modules lifetime due to aging (see Fig. 3). 2 3 Fig. 2. 200 kW wind turbine characteristic curve, representing output power (kW) over wind speed (m/s) [46]. 4 5 6 Fig. 3. Warranted power (%) over lifetime of selected monocrystalline PV module [45]. 7 8 For the biomass subsystem, the global biomass-to-electricity conversion efficiency is calculated by 9 multiplying all the gasifier ideal and operation efficiencies and the engine – generator group efficiency (see 10 Table III), getting a 25% of global efficiency as a result. 11 Another important aspect for the biomass system performance is the heating value of the bio-fuel. It can 12 be calculated as follows [74]: 13 𝐿𝐿𝐻𝐻𝑉𝑉𝑤𝑤=�𝐻𝐻𝐻𝐻𝑉𝑉𝑊𝑊𝑜𝑜𝑑𝑑−20.3 · 𝐻𝐻𝑊𝑊𝑜𝑜𝑑𝑑�·(1−𝐴𝐴𝐶𝐶𝑤𝑤−𝑀𝑀𝐶𝐶𝑤𝑤),𝑤𝑤ℎ𝑒𝑒𝑒𝑒𝑒𝑒 �𝐴𝐴𝐶𝐶𝑤𝑤:𝑎𝑎𝑎𝑎ℎ % 𝑀𝑀𝐶𝐶𝑤𝑤:𝑚𝑚𝑚𝑚𝑚𝑚𝑎𝑎𝑡𝑡𝑚𝑚𝑒𝑒𝑒𝑒 % 𝐻𝐻𝑊𝑊𝑜𝑜𝑑𝑑:ℎ𝑦𝑦𝑑𝑑𝑒𝑒𝑚𝑚𝑔𝑔𝑒𝑒𝑡𝑡% (5) 14 where HHV, hydrogen content and ash content are taken, respectively, as 20.4 GJ/tn, 6.2% and 3%, 15 according to [75]. 16 Through a personal communication with an expert [61], biomass is usually sold at 30% of moisture content, 17 but with atmospheric pre-drying it can easily reach 15% moisture content which is better as it supplies more 18 energy per kilogram. Therefore, the LHV of biomass is calculated for this moisture content: 19 𝐿𝐿𝐻𝐻𝑉𝑉15%=(20.4 −20.3 · 0.062)·(1−0.03 −0.15)=15.70 𝐺𝐺𝐺𝐺/𝑡𝑡𝑡𝑡 (6) 20 To be conservative a value of 15.5 GJ/tn is selected, corresponding to a moisture content of 16%. 21 22 4) Environmental impact variables 23 The last group of input variables includes the life-cycle CO2 emissions for all electricity supply alternatives, 24 that is PV modules, wind turbines, forest wood biomass gasification and the Spanish electricity grid. The 25 values are presented in Table IV. 26 27
8 TABLE IV LIFE-CYCLE CO2 EMISSIONS VALUES Data Value Source PV life-cycle CO2 emissions (kgCO2/kWp) 439.9 [76] Wind turbine life-cycle CO2 emissions (gCO2/kWh) 30 [77] Forest wood biomass-based life-cycle CO2 emissions (gCO2/kWh) 60 [78] Spanish grid electricity supply CO2 emissions (gCO2/kWh) 428.6 [79] In the case of PV system life-cycle CO2 emissions, it has been chosen as representative the impact of a 1 system by UPSolar with 439.9 kgCO2/kWp [76]. This datum corresponds to about 48 gCO2/kWh in a region 2 with an average solar irradiation of 1650 kWh/(m2·year) as the one under study, a figure in accordance with 3 other accessed sources, such as 40-45 gCO2/kWh reported by the NREL [80] and 46 gCO2/kWh reported as 4 median value by the IPCC and Eurelectric [81], [82]. 5 For wind power, the value of 30 gCO2/kWh for an average 300 kW wind turbine [77] was used as 6 representative of life-cycle CO2 emissions. 7 With biomass gasification and combustion in a gas engine – generator group, the chosen value is 60 8 gCO2/kWh, obtained from [78], a value in accordance with the range of 40-60 gCO2/kWh given by NREL 9 [83]. In this case, the value accounts for the logging, chipping, transport and other processes associated with 10 biomass gathering and preparation. The emissions from syngas combustion are not accounted since biomass 11 has a carbon neutral balance due to its carbon capture throughout lifetime before logging. It is claimed that 12 this neutral balance is not accurate because the logging of forest wood biomass means a decrease in carbon 13 stock that is equivalent to carbon emissions [84]. However, in this study this effect can be dodged because 14 its impact is small compared with the environmental impact from logging, chipping and transport of forest 15 wood biomass [85]. 16 17 C. Algorithm description 18 This paper deals with weather-related variables (wind speed and solar irradiation) and hourly fluctuations 19 in electricity and thermal demand, which are non-predictable and non-homogeneous, thus making the 20 problem complex to deal with since they induce variability in the relationship between the decision variables 21 and the objective function. Different heuristic optimization methods have been proposed to deal with 22 optimization problems that otherwise would be difficult to solve [86]. These methods usually generate a 23 random initial solution, and generate and evaluate new solutions iteratively based on a determined generation 24 rule and finally select the best solution [87]. The iterations are often paused when the error is below a 25 threshold value, when there is no evident improvement of the solution after a determined number of iterations 26 or when the calculation time surpasses an imposed limit value. Among them different methods highlight, 27 such as particle swarm, evolutionary computation, ant colony systems, simulated annealing, or memetic 28 algorithms among others [86]–[88]. They have several advantages compared to traditional methods, 29 including shorter development time, or robustness since they are quite insensitive to missing data and noise. 30 Genetic algorithms have been widely applied to solve multi-objective problems in hybrid renewable energy 31 systems because of the fast convergence and uniform distribution of the Pareto frontier [89]. According to 32 [90], 63% of the optimization papers related to optimization works of renewable energy systems in the period 33 2013–2015 are based on GA, whereas 33% are based on PSO. It is a recognized fact that GA-based 34 optimization approaches allow increasing the optimum performance and efficiency of HRES and reducing 35 environmental impact and cost [91]. 36 The optimization algorithm is the core of the proposed optimization methodology. For the case under study 37 the wisest choice according to the accessed literature is a genetic algorithm (GA) [21], [32], [92], due to its 38 ability to tackle complex constrained or unconstrained problems with non-linarites [93] as HRES multi-39 objective optimizations are [94], [95] and can be applied when dealing with input variables that contain noise 40 or are stochastic. When a GA is used in multi-objective problems, instead of obtaining a single optimum, the 41
9 algorithm provides a set of possible solutions called Pareto front [66], [92], [95], [96]. 1 Once introduced all input variables and the objective functions defined, the optimization process can be 2 applied. Among several possibilities, this paper proposes a GA-based optimization due to its ability to deal 3 with problems allowing multiple solutions using a random initial population of prospective solutions and an 4 evolutionary strategy to restrict the possible solutions according to a fitness value until the optimum solution 5 is found. From the random initial population, the individuals producing the best solutions are ranked and the 6 first ones are selected according to the fitness function to be optimized. Once the most adapted individuals 7 are selected, the crossover operation is applied to produce a new generation of offspring individuals. The 8 offspring individuals are generated from two existent specimens or parents. The mutation operation can also 9 be applied although in this problem it is not applied since it deals with integer variables (wtNumber). The 10 least-fit individuals are rejected and substituted by the new offspring individuals’ generation. This process is 11 iterated until the minimum value of the fitness function to fulfill a stopping criterion. 12 The algorithm described in subsections below has been implemented using the MATLAB R2014a 13 Optimization Toolbox. 14 15 1) Variables 16 The optimization procedure is based on the optimization of one or more “fitness” functions, which are the 17 objective functions of the problem. These functions are dependent on several independent variables that, in 18 this case, are related to system sizing. The choice made are 𝑝𝑝𝑝𝑝𝐴𝐴𝑒𝑒𝑒𝑒𝑎𝑎, a representation of the area covered by 19 the PV installation, and 𝑤𝑤𝑡𝑡𝑁𝑁𝑚𝑚𝑚𝑚𝑤𝑤𝑒𝑒𝑒𝑒, a representation of the number of turbines to be installed. 20 21 2) Fitness functions 22 The present work is aimed to optimize the proposed HRES system size according to both economic and 23 environmental criteria. Therefore, two fitness functions have been defined, that is the Net Present Value 24 (NPV), a cost metric obtained by adding and subtracting the discounted present values of all lifetime incomes 25 and expenses (see Eq. 7), respectively; and the life-cycle system CO2 emissions, an environmental impact 26 metric that accounts for all life-cycle greenhouse gas (see Eq. 8). 27 The NPV accounts for all future cash-flows but converting them to their present value. This is useful 28 because it allows analyzing the system cost without external variables such as inflation or currency value 29 volatility affecting the metric. The system life-cycle costs accounted are the initial investment 𝐶𝐶𝑡𝑡𝑜𝑜𝑖𝑖𝑒𝑒𝑖𝑖𝑡𝑡𝑖𝑖𝑒𝑒𝑜𝑜𝑡𝑡, 30 operation and maintenance costs 𝑁𝑁𝑁𝑁𝑉𝑉𝐵𝐵&𝑀𝑀, end of life residual value of components 𝑁𝑁𝑁𝑁𝑉𝑉𝑒𝑒𝑜𝑜𝑊𝑊𝑒𝑒𝑡𝑡𝑑𝑑𝑒𝑒, equipment 31 replacement costs 𝑁𝑁𝑁𝑁𝑉𝑉𝑜𝑜𝑒𝑒𝑝𝑝𝑡𝑡 – wherever required – and electricity purchase and sale cash flows 𝑁𝑁𝑁𝑁𝑉𝑉𝑒𝑒𝑡𝑡𝑒𝑒𝑒𝑒𝑡𝑡𝑜𝑜𝑡𝑡𝑒𝑒𝑡𝑡𝑡𝑡𝑒𝑒: 32 𝑁𝑁𝑁𝑁𝑉𝑉=𝐶𝐶𝑡𝑡𝑜𝑜𝑖𝑖𝑒𝑒𝑖𝑖𝑡𝑡𝑖𝑖𝑒𝑒𝑜𝑜𝑡𝑡+𝑁𝑁𝑁𝑁𝑉𝑉𝐵𝐵&𝑀𝑀+𝑁𝑁𝑁𝑁𝑉𝑉𝑜𝑜𝑒𝑒𝑝𝑝𝑡𝑡−𝑁𝑁𝑁𝑁𝑉𝑉𝑒𝑒𝑡𝑡𝑒𝑒𝑒𝑒𝑡𝑡𝑜𝑜𝑡𝑡𝑒𝑒𝑡𝑡𝑡𝑡𝑒𝑒−𝑁𝑁𝑁𝑁𝑉𝑉𝑒𝑒𝑜𝑜𝑊𝑊𝑒𝑒𝑡𝑡𝑑𝑑𝑒𝑒=𝑓𝑓(𝑝𝑝𝑝𝑝𝐴𝐴𝑒𝑒𝑒𝑒𝑎𝑎,𝑤𝑤𝑡𝑡𝑁𝑁𝑚𝑚𝑚𝑚𝑤𝑤𝑒𝑒𝑒𝑒) (7) 33 The different terms of (7) are explained in detail in [44], [97]. 34 Regarding the measure of environmental impact, the life-cycle CO2 emissions have been selected as a 35 representative metric. It is important to highlight the relevance of the life-cycle perspective, accounting the 36 entire life-cycle emissions rather than the use-phase emissions alone. It is calculated as follows: 37 𝐸𝐸𝐼𝐼=𝐸𝐸𝐼𝐼𝑃𝑃𝑃𝑃+𝐸𝐸𝐼𝐼𝑊𝑊+𝐸𝐸𝐼𝐼𝐵𝐵𝑡𝑡𝑜𝑜+𝐸𝐸𝐼𝐼𝐺𝐺𝑜𝑜𝑡𝑡𝑊𝑊=𝑓𝑓(𝑝𝑝𝑝𝑝𝐴𝐴𝑒𝑒𝑒𝑒𝑎𝑎,𝑤𝑤𝑡𝑡𝑁𝑁𝑚𝑚𝑚𝑚𝑤𝑤𝑒𝑒𝑒𝑒) (8) 38 where 𝐸𝐸𝐼𝐼𝑃𝑃𝑃𝑃, 𝐸𝐸𝐼𝐼𝑃𝑃𝑃𝑃 and 𝐸𝐸𝐼𝐼𝐵𝐵𝑡𝑡𝑜𝑜 are the environmental impact of the electricity produced by the PV, wind and 39 biomass subsystems, respectively; and 𝐸𝐸𝐼𝐼𝐺𝐺𝑜𝑜𝑡𝑡𝑊𝑊 is the environmental impact of the electricity purchased to the 40 electricity grid, calculated with the actual grid emissions. 41 The environmental impact of the PV subsystem is proportional to the size of the installation, as given in 42 [76], whereas the impact of wind and biomass subsystems are proportional to the amount of electricity 43 generated with these technologies [77], [78], similarly as calculated for the grid using the data in [79]. 44 45
16 system,” Appl. Energy, Dec. 2014. 1 [28] G. Bekele and G. Tadesse, “Feasibility study of small Hydro/PV/Wind hybrid system for off-grid rural electrification in 2 Ethiopia,” Appl. Energy, vol. 97, no. 0, pp. 5–15, 2012. 3 [29] G. Bekele and B. Palm, “Feasibility study for a standalone solar–wind-based hybrid energy system for application in 4 Ethiopia,” Appl. Energy, vol. 87, no. 2, pp. 487–495, 2010. 5 [30] S. Rehman, M. Mahbub Alam, J. P. Meyer, and L. M. Al-Hadhrami, “Feasibility study of a wind–pv–diesel hybrid 6 power system for a village,” Renew. Energy, vol. 38, no. 1, pp. 258–268, 2012. 7 [31] Y. V. P. Kumar and R. Bhimasingu, “Optimal sizing of microgrid for an urban community building in south India using 8 HOMER,” in 2014 IEEE International Conference on Power Electronics, Drives and Energy Systems (PEDES), 2014, 9 pp. 1–6. 10 [32] M. Fadaee and M. A. M. Radzi, “Multi-objective optimization of a stand-alone hybrid renewable energy system by using 11 evolutionary algorithms: A review,” Renew. Sustain. Energy Rev., vol. 16, no. 5, pp. 3364–3369, 2012. 12 [33] D. Abbes, A. Martinez, and G. Champenois, “Life cycle cost, embodied energy and loss of power supply probability for 13 the optimal design of hybrid power systems,” Math. Comput. Simul., vol. 98, pp. 46–62, Apr. 2014. 14 [34] L. Ngoc An, T. Quoc-Tuan, B. Seddik, and N. Van-Linh, “Optimal sizing of a grid-connected microgrid,” in 2015 IEEE 15 International Conference on Industrial Technology (ICIT), 2015, pp. 2869–2874. 16 [35] I. Sansa, R. Villafafila, and N. M. Bellaaj, “Optimal sizing design of an isolated microgrid using loss of power supply 17 probability,” in IREC2015 The Sixth International Renewable Energy Congress, 2015, pp. 1–7. 18 [36] T. Logenthiran, D. Srinivasan, A. M. Khambadkone, and T. Sundar Raj, “Optimal sizing of an islanded microgrid using 19 Evolutionary Strategy,” in 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power 20 Systems, 2010, pp. 12–17. 21 [37] A. Yazdani, F. A. Bhuiyan, and S. L. Primak, “Optimal sizing approach for islanded microgrids,” IET Renew. Power 22 Gener., vol. 9, no. 2, pp. 166–175, Mar. 2015. 23 [38] M. Ranaboldo, B. D. Lega, D. V. Ferrenbach, L. Ferrer-Martí, R. P. Moreno, and A. García-Villoria, “Renewable energy 24 projects to electrify rural communities in Cape Verde,” Appl. Energy, vol. 118, pp. 280–291, Apr. 2014. 25 [39] T. Ma, H. Yang, L. Lu, and J. Peng, “Technical feasibility study on a standalone hybrid solar-wind system with pumped 26 hydro storage for a remote island in Hong Kong,” Renew. Energy, vol. 69, pp. 7–15, Sep. 2014. 27 [40] M. Kapsali, J. S. Anagnostopoulos, and J. K. Kaldellis, “Wind powered pumped-hydro storage systems for remote 28 islands: A complete sensitivity analysis based on economic perspectives,” Appl. Energy, vol. 99, pp. 430–444, Nov. 29 2012. 30 [41] Y. Hu and P. Solana, “Optimization of a hybrid diesel-wind generation plant with operational options,” Renew. Energy, 31 vol. 51, pp. 364–372, Mar. 2013. 32 [42] S. Rehman and L. M. Al-Hadhrami, “Study of a solar PV–diesel–battery hybrid power system for a remotely located 33 population near Rafha, Saudi Arabia,” Energy, vol. 35, no. 12, pp. 4986–4995, 2010. 34 [43] M. Alsayed, M. Cacciato, G. Scarcella, and G. Scelba, “Multicriteria Optimal Sizing of Photovoltaic-Wind Turbine Grid 35 Connected Systems,” IEEE Trans. Energy Convers., vol. 28, no. 2, pp. 370–379, Jun. 2013. 36 [44] A. González, J.-R. Riba, and A. Rius, “Optimal Sizing of a Hybrid Grid-Connected Photovoltaic–Wind–Biomass Power 37 System,” Sustainability, vol. 7, no. 9, pp. 12787–12806, 2015. 38 [45] Upsolar, “Upsolar 6’’ Monocrystalline cells.” 2015. 39 [46] Generation Wind Ltd, “SUT200 wind turbine,” 2014. [Online]. Available: 40 http://www.generationwindturbines.com/en/our-turbines/product-range/sut-200. 41 [47] A. González, J.-R. Riba, R. Puig, and P. Navarro, “Review of micro- and small-scale technologies to produce electricity 42 and heat from Mediterranean forests׳ wood chips,” Renew. Sustain. Energy Rev., vol. 43, pp. 143–155, Mar. 2015. 43 [48] J. Ahrenfeldt, U. Henriksen, T. K. Jensen, B. Gøbel, L. Wiese, A. Kather, and H. Egsgaard, “Validation of a Continuous 44 Combined Heat and Power (CHP) Operation of a Two-Stage Biomass Gasifier,” Energy & Fuels, vol. 20, no. 6, pp. 45 2672–2680, 2006. 46 [49] U. Arena, F. Di Gregorio, and M. Santonastasi, “A techno-economic comparison between two design configurations for 47 a small scale, biomass-to-energy gasification based system,” Chem. Eng. J., vol. 162, no. 2, pp. 580–590, Aug. 2010. 48
17 [50] K. Alanne and A. Saari, “Sustainable small-scale CHP technologies for buildings: the basis for multi-perspective 1 decision-making,” Renew. Sustain. Energy Rev., vol. 8, no. 5, pp. 401–431, Oct. 2004. 2 [51] Meteorological Service of Catalonia (Meteocat), “Hourly data of UJ automatic weather station.” Generalitat de 3 Catalunya, Barcelona, Spain, 2012. 4 [52] Organisation for Economic Co-operation and Development (OECD), “Defining regions and functional urban areas,” in 5 OECD Regions at a Glance, Paris, France: OECD Publishing, 2013. 6 [53] Eurostat, “Electricity and Natural Gas price statistics,” 2014. [Online]. Available: 7 http://epp.eurostat.ec.europa.eu/statistics_explained/index.php/electricity_and_natural_gas_price_statistics. 8 [54] Elèctrica de Santa Coloma, “High voltage price 3.0 fare.” 2014. 9 [55] M. Kacira, M. Simsek, Y. Babur, and S. Demirkol, “Determining optimum tilt angles and orientations of photovoltaic 10 panels in Sanliurfa, Turkey,” Renew. Energy, vol. 29, no. 8, pp. 1265–1275, 2004. 11 [56] S. Blumsack and K. Richardson, “Cost and emissions implications of coupling wind and solar power,” Smart Grid 12 Renew. Energy, vol. 3, no. 4, pp. 308–315, 2012. 13 [57] A. Goodrich, T. James, and M. Woodhouse, “Residential, Commercial, and Utility-Scale Photovoltaic (PV) System 14 Prices in the United States: Current Drivers and Cost-Reduction Opportunities,” Golden, CO, USA, 2012. 15 [58] R. Wiser and M. Bolinger, “2012 Wind technologies market report,” 2013. 16 [59] S. Wickwire, “Biomass Combined Heat and Power catalog of technologies,” Washington, DC, 2007. 17 [60] J. Brandin, M. Tunér, and I. Odenbrand, “Small Scale Gasification: Gas Engine CHP for Biofuels,” Växjö, Sweden, 18 2011. 19 [61] J. Riba, “Personal communication,” 2015. 20 [62] P. Prislan, K. Nike, T. Jemec, and M. Piskur, “Wood fuel prices - Report no.6,” Ljubljana, Slovenia, 2014. 21 [63] Endesa, “High voltage time periods,” 2014. [Online]. Available: 22 https://www.endesaonline.com/ES/empresas/luz/tarifas_electricas_empresas_alta_tension/optima/horas/index.asp. 23 [64] OMIE, “Resultados del mercado diario,” 2011. [Online]. Available: http://www.omie.es/inicio. 24 [65] OMIE, “Precio final anual de demanda nacional,” 2014. [Online]. Available: 25 http://www.omie.es/files/flash/ResultadosMercado.swf. 26 [66] R. Dufo-López and J. L. Bernal-Agustín, “Design and control strategies of PV-Diesel systems using genetic algorithms,” 27 Sol. Energy, vol. 79, no. 1, pp. 33–46, 2005. 28 [67] J. Hernández-Moro and J. M. Martínez-Duart, “Analytical model for solar PV and CSP electricity costs: Present LCOE 29 values and their future evolution,” Renew. Sustain. Energy Rev., vol. 20, pp. 119–132, 2013. 30 [68] R. Dufo-López, J. L. Bernal-Agustín, and F. Mendoza, “Design and economical analysis of hybrid PV–wind systems 31 connected to the grid for the intermittent production of hydrogen,” Energy Policy, vol. 37, no. 8, pp. 3082–3095, Aug. 32 2009. 33 [69] Amerisolar, “AmeriSolar AS-5M,” 2013. [Online]. Available: http://www.weamerisolar.com/. 34 [70] INE, “Spain: Economic and financial data,” 2014. [Online]. Available: http://www.ine.es/dynt3/FMI/en/. 35 [71] Agencia Tributaria, “Impuesto Sobre el Valor Añadido,” 2014. [Online]. Available: 36 http://www.agenciatributaria.es/AEAT.internet/Inicio_es_ES/La_Agencia_Tributaria/Normativa/Normativa_tributaria_y37 _aduanera/Impuestos/Impuesto_sobre_el_valor_anadido__IVA_/Impuesto_sobre_el_valor_anadido__IVA_.shtml. 38 [72] OpenEI, “Transparent cost database,” 2012. [Online]. Available: http://en.openei.org/apps/TCDB/. 39 [73] Alliance for Sustainable Energy, “PV Watts calculator.” National Renewable Energy Laboratory (NREL), Golden, CO, 40 USA, 2013. 41 [74] P. Quaak, H. Knoef, and H. E. Stassen, Energy from Biomass: A Review of Combustion and Gasification Technologies, 42 Volums 23-422. 1999. 43 [75] Energy Research Centre of the Netherlands (ECN), “Phyllis, data base for biomass and waste,” 2009. [Online]. 44 Available: https://www.ecn.nl/phyllis2/. [Accessed: 01-Jun-2015]. 45 [76] UPSolar, “Carbon footprint analysis,” Paris, France, 2014. 46
18 [77] H. Hondo, “Life cycle GHG emission analysis of power generation systems: Japanese case,” Energy, vol. 30, no. 11–12 1 SPEC. ISS., pp. 2042–2056, 2005. 2 [78] T. Yoshioka, K. Aruga, T. Nitami, H. Kobayashi, and H. Sakai, “Energy and carbon dioxide (CO2) balance of logging 3 residues as alternative energy resources: System analysis based on the method of a life cycle inventory (LCI) analysis,” 4 J. For. Res., vol. 10, no. 2, pp. 125–134, 2005. 5 [79] Thinkstep, “GaBi software database.” Leinfelden, Germany, 2011. 6 [80] NREL, “Life Cycle Greenhouse Gas Emissions from Solar Photovoltaics,” J. Ind. Ecol., 2012. 7 [81] W. Moomaw, P. Burgherr, G. Heath, M. Lenzen, J. Nyboer, and A. Verbruggen, “Annex II: Methodology,” IPCC Spec. 8 Rep. Renew. Energy Sources Clim. Chang. Mitig., vol. 16, no. 10, p. NP, 2014. 9 [82] Eurelectric, “Life Cycle Assessment of Electricity Generation,” no. November, 2011. 10 [83] E. Warner, G. Heath, and M. Mann, “Biopower Life Cycle Assessment (LCA) Harmonization,” 2010. 11 [84] E. Johnson, “Goodbye to carbon neutral: Getting biomass footprints right,” Environ. Impact Assess. Rev., vol. 29, no. 3, 12 pp. 165–168, 2009. 13 [85] B. Esteban, J.-R. Riba, G. Baquero, R. Puig, and A. Rius, “Environmental assessment of small-scale production of wood 14 chips as a fuel for residential heating boilers,” Renew. Energy, vol. 62, pp. 106–115, Feb. 2014. 15 [86] M. E. El-Hawary, Modern heuristic optimization techniques, theory and applications to power systems. Wiley, 2008. 16 [87] D. Maringer, Portfolio management with heuristic optimization. Springer, 2005. 17 [88] Z. Abdmouleh, A. Gastli, L. Ben-Brahim, M. Haouari, and N. A. Al-Emadi, “Review of optimization techniques applied 18 for the integration of distributed generation from renewable energy sources,” Renew. Energy, vol. 113, pp. 266–280, 19 2017. 20 [89] X. Wang, Y. Mei, Y. Kong, Y. Lin, and H. Wang, “Improved multi-objective model and analysis of the coordinated 21 operation of a hydro-wind-photovoltaic system,” Energy, vol. 134, pp. 813–839, 2017. 22 [90] E. L. V. Eriksson and E. M. Gray, “Optimization and integration of hybrid renewable energy hydrogen fuel cell energy 23 systems – A critical review,” Appl. Energy, vol. 202, pp. 348–364, 2017. 24 [91] F. Ahmadi Boyaghchi and S. Nazer, “Assessment and optimization of a new sextuple energy system incorporated with 25 concentrated photovoltaic thermal - Geothermal using exergy, economic and environmental concepts,” J. Clean. Prod., 26 vol. 164, pp. 70–84, 2017. 27 [92] J. L. Bernal-Agustín and R. Dufo-López, “Efficient design of hybrid renewable energy systems using evolutionary 28 algorithms,” Energy Convers. Manag., vol. 50, no. 3, pp. 479–489, 2009. 29 [93] H. Saavedra, J. R. Riba, and L. Romeral, “Multi-objective optimal design of a five-phase fault-tolerant axial flux PM 30 motor,” Adv. Electr. Comput. Eng., vol. 15, no. 1, pp. 69–76, 2015. 31 [94] R. Luna-Rubio, M. Trejo-Perea, D. Vargas-Vázquez, and G. J. Ríos-Moreno, “Optimal sizing of renewable hybrids 32 energy systems: A review of methodologies,” Sol. Energy, vol. 86, no. 4, pp. 1077–1088, 2012. 33 [95] E. Koutroulis, D. Kolokotsa, A. Potirakis, and K. Kalaitzakis, “Methodology for optimal sizing of stand-alone 34 photovoltaic/wind-generator systems using genetic algorithms,” Sol. Energy, vol. 80, no. 9, pp. 1072–1088, 2006. 35 [96] R. Baños, F. Manzano-Agugliaro, F. G. Montoya, C. Gil, A. Alcayde, and J. Gómez, “Optimization methods applied to 36 renewable and sustainable energy: A review,” Renew. Sustain. Energy Rev., vol. 15, no. 4, pp. 1753–1766, 2011. 37 [97] A. González, J.-R. Riba, A. Rius, and R. Puig, “Optimal sizing of a hybrid grid-connected photovoltaic and wind power 38 system,” Appl. Energy, vol. 154, pp. 752–762, Sep. 2015. 39 [98] B. Worley and R. Powers, “Multivariate Analysis in Metabolomics,” Curr. Metabolomics, vol. 1, no. 1, pp. 92–107, 40 2012. 41 42