Abstract

Peak oil, climate change and the achievement of energy independence have set the world into a new energy transition seeking to decarbonize both the power generation and transportation sectors. The convergence and synergy between both sectors, an electrified transportation powered by renewable energy, holds true potential to significantly reduce the world’s dependence on fossil fuels and the consequent emission of greenhouse gases. Nonetheless the integration of electric vehicles on the power system is not a minor issue and its associated impacts need to be carefully analyzed and addressed. In this context the main objective of this thesis is to develop a smart charging solution to safely integrate Plug-in Electric Vehicles into low voltage distribution networks while mitigating their corresponding impacts. This is done by designing a control algorithm capable to simultaneously meet both voltage and thermal network constrains by managing the vehicle’s charging process in real-time, while at the same time being respectful to current charging standards, computationally light and implementable in any current radial distribution grid. The proposed charging algorithm is built under a “Multi-Agent System” architecture combining a local decentralized voltage management with a centralized thermal control conceived to minimize user impact under three alternative optimization techniques. The architecture is fully implemented and tested on a realistic environment using Simulink by modeling key elements such as the charging stations, the vehicles themselves, and the different dwellings. An extensive analysis of the algorithm’s performance is completed testing it under multiple relevant scenarios. Finally the control algorithm is transferred to a real-time simulator (dSPACE MicroLabBox) to be validated and further evaluate its behavior through hardware-in-the-loop (HIL) simulations using both real charging stations and Plug-in Electric Vehicles available in the laboratory A satisfactory validation of the algorithm’s execution under and compatibility with real hardware is revealed by the HIL tests. At the same time a successful management of the considered network voltage and thermal constrains is obtained under all implementations, causing a minimal impact over the participating users and effectively peak shaving their total aggregated demand. For a full vehicle penetration scenario, the proposed control successfully prevents over 200 voltage limit violations and achieves so while significantly reducing the total transformer loading deviation, almost halving it when compared to an equivalent unrestricted charging case, and ensuring a net zero impact to 95% of participating users under its most effective thermal implementation. The study also reveals that a full participation of all vehicle owners is not critical factor to ensure a proper grid operation under the designed algorithm, as satisfactory results are also obtained when only half of them are actively involved in network management. Finally an economic assessment covering the application of the designed control over conventional network reinforcements further demonstrates the advantages of such an active management approach reporting additional economic benefits to the DSO.

Full text

MSc. Thesis Master's Degree in Energy Engineering “Real Time Voltage and Thermal Management of Low Voltage Distribution Networks through Plug-in Electric Vehicles” Author: César García Veloso Directors: Dr. Kalle Rauma (ie3) Dr. Julián Alberto Fernández Orjuela (IESVic) Tutor: Dr. Roberto Villafáfila Robles Call: September 2017 Barcelona Shcool of Industrial Engineering In Partnership with: In Collaboration with: A thesis submitted in partial fulfillment of the requirements for the degrees of: • Master of Science from KTH: Royal Institute of Technology, Sweden. • Master in Energy Engineering, from UPC: Universitat Politècnica de Catalunya, Spain. • Master of Science in Smart Electrical Networks and Systems (SENSE) from EIT: European Institute of Innovation and Technology. Abstract Peak oil, climate change and the achievement of energy independence have set the world into a new energy transition seeking to decarbonize both the power generation and transportation sectors. The convergence and synergy between both sectors, an electrified transportation powered by renewable energy, holds true potential to significantly reduce the world’s dependence on fossil fuels and the consequent emission of greenhouse gases. Nonetheless the integration of electric vehicles on the power system is not a minor issue and its associated impacts need to be carefully analyzed and addressed. In this context the main objective of this thesis is to develop a smart charging solution to safely integrate Plug-in Electric Vehicles into low voltage distribution networks while mitigating their corresponding impacts. This is done by designing a control algorithm capable to simultaneously meet both voltage and thermal network constrains by managing the vehicle’s charging process in real-time, while at the same time being respectful to current charging standards, computationally light and implementable in any current radial distribution grid. The proposed charging algorithm is built under a “Multi-Agent System” architecture combining a local decentralized voltage management with a centralized thermal control conceived to minimize user impact under three alternative optimization techniques. The architecture is fully implemented and tested on a realistic environment using Simulink by modeling key elements such as the charging stations, the vehicles themselves, and the different dwellings. An extensive analysis of the algorithm’s performance is completed testing it under multiple relevant scenarios. Finally the control algorithm is transferred to a real-time simulator (dSPACE MicroLabBox) to be validated and further evaluate its behavior through hardware-in-the-loop (HIL) simulations using both real charging stations and Plug-in Electric Vehicles available in the laboratory A satisfactory validation of the algorithm’s execution under and compatibility with real hardware is revealed by the HIL tests. At the same time a successful management of the considered network voltage and thermal constrains is obtained under all implementations, causing a minimal impact over the participating users and effectively peak shaving their total aggregated demand. For a full vehicle penetration scenario, the proposed control successfully prevents over 200 voltage limit violations and achieves so while significantly reducing the total transformer loading deviation, almost halving it when compared to an equivalent unrestricted charging case, and ensuring a net zero impact to 95% of participating users under its most effective thermal implementation. The study also reveals that a full participation of all vehicle owners is not critical factor to ensure a proper grid operation under the designed algorithm, as satisfactory results are also obtained when only half of them are actively involved in network management. Finally an economic assessment covering the application of the designed control over conventional network reinforcements further demonstrates the advantages of such an active management approach reporting additional economic benefits to the DSO. Key Words: Plug-in electric vehicles, Radial low voltage networks, Real-time control, Centralized thermal management, Local voltage management, Hardware-in-the-loop (HIL), Multiagent systems, Active distribution networks, User impact minimization. Acknowledgements It is impossible to summarize just in a few words how thankful I am for all the precious moments I have come to live in the last two years when I embarked in this adventure camouflaged as a master program and that sadly must come to an end with the completion of this project. There are so many wonderful people that I have met and so many experiences I have been through that it is simply impossible to name them all. First and foremost I would like to express my full gratitude to both of my supervisors. To Dr. Kalle Rauma member of the “Institute of Energy Systems, Energy Efficiency and Energy Economics (ie3)” who provided with the opportunity to work in this magnificent project, gave me access to the laboratory and research facilities and provided me with his support during the entire time. To Dr. Julián Fernández Orjuela member of the “Institute of Integrated Energy Systems (IESVic)” for his enormous interest, despite being an entire ocean apart, and for always providing me with a helping hand whenever I ran into trouble or had any question about my research or writing. In the same line I also want to thank Dr. Roberto Villafáfila Robles for authorizing this project and providing his help and guidance during the preparation of this document. I would also like to extend my gratitude to all the members of the “Institute of Energy Systems, Energy Efficiency and Energy Economics (ie3)” in Dortmund for their welcoming and helping attitude making me feel one more of the team from day one and to those of the “Institute of Integrated Energy Systems (IESVic)” in Canada for providing their support during the project’s complete lifetime. My total and sincere gratitude to the European Institute of Innovation and Technology and to InnoEnergy for providing me the opportunity to embark in this amazing journey, making me part of their amazing ecosystem and supporting me during the complete length of my master studies. I would also like to thank everyone who is involved in the SENSE consortium, especially Prof. Hans Edin, Prod. Jordi Vinaixa and Prof. Oriol Gomis, who as the representatives of KTH, ESADE and UPC respectively, have shaped my experience in the program. How to forget all the wonderful people that I have met during these two years and of course my college friends back home, with whom I have shared innumerable precious moments all over the years. Finally, I must express my very profound gratitude my family, to both my parents and my sister, whose devotion, time and love have given me the strength and motivation to overcome all the obstacles on the way. We might be miles and miles apart but our hearts beat as one. Without them, I would not be where I am today. ~ i ~ Table of Contents 1. General Introduction & Project Definition ......................................................... 1 Introduction & Project Objectives ............................................................................. 1 1.1 Relevance of the Study ............................................................................................... 2 1.2 Document Outline ...................................................................................................... 3 1.3 2. Project Background .............................................................................................. 5 Context: Energy Transition ....................................................................................... 5 2.1 Smart Grids: Towards Active Distribution Networks .............................................. 6 2.2 2.2.1 Background: Low Voltage Networks under Stress ............................................. 6 2.2.2 Active Distribution Networks: Flexibility Markets ............................................ 8 2.2.3 Legal Framework ................................................................................................ 11 Electro-Mobility: A Smart Load ............................................................................... 13 2.3 2.3.1 Background: Electro-Mobility on the rise ......................................................... 13 2.3.2 Electric Vehicles: Types & Charging Characteristics ....................................... 14 2.3.3 Grid Integration: Impacts & Characteristics .................................................... 18 3. State of the Art ................................................................................................... 21 Charge Plans ............................................................................................................. 21 3.1 Smart Charging: Charging Strategies .................................................................... 22 3.2 Main Findings ........................................................................................................... 27 3.3 4. Proposed Algorithm ........................................................................................... 29 Overview ................................................................................................................... 29 4.1 Multi-Agent Structure .............................................................................................. 30 4.2 4.2.1 Control Communication Sequence .................................................................... 33 Unified Thermal and Voltage Control ..................................................................... 35 4.3 4.3.1 Decentralized Voltage Control ........................................................................... 36 4.3.2 Centralized Thermal Management ................................................................... 40 4.3.3 Voltage and Thermal Synergy: Flowchart ........................................................ 50 5. Case Studies and System Modeling .................................................................. 53 Offline or Computer-Based Cases ........................................................................... 53 5.1 5.1.1 Simulation Environment .................................................................................... 53 5.1.2 Case Studies ........................................................................................................ 62 Online or HIL Validation Cases .............................................................................. 63 5.2 5.2.1 Simulation Environment & Case Study ............................................................ 63 5.2.2 Experimental Setup ............................................................................................ 64 6. Results & Discussion ......................................................................................... 67 Validation of the Proposed Algorithm ..................................................................... 67 6.1 Performance of the Algorithm ................................................................................. 70 6.2 6.2.1 Performance Metrics .......................................................................................... 71 6.2.2 Assessment: Alleviation of Voltage Violations .................................................. 71 6.2.3 Assessment: Alleviation of Network Congestions ............................................. 74 6.2.4 Assessment: Overall User Impact ..................................................................... 79 7. Project Planning and Costs ............................................................................... 82 Budget ....................................................................................................................... 82 7.1 Economic Viability .................................................................................................... 83 7.2 ~ ii ~ Project Planning ...................................................................................................... 85 7.3 8. Conclusions & Future Work ............................................................................. 87 Conclusions .............................................................................................................. 87 8.1 Future Work ............................................................................................................. 88 8.2 9. References .......................................................................................................... 91 Appendices ......................................................................................................................... 1 1. Developed Simulink Simulation Interface ......................................................... 3 Main Window ............................................................................................................. 3 1.1 Left Panel Configuration Parameters ...................................................................... 4 1.2 Studied System Panel ................................................................................................ 5 1.3 PEV-Ch. Station Model ............................................................................................. 5 1.4 Transformer Agent .................................................................................................... 9 1.5 2. Complementary Modeling Details .................................................................... 11 Offline or Computer-Based Cases ........................................................................... 11 2.1 2.1.1 Household Demand Characterization .............................................................. 11 2.1.2 PEV Connection Hours ...................................................................................... 13 Online or HIL Validation Cases .............................................................................. 14 2.2 2.2.1 Voltage, Feeder and Transformer Loads .......................................................... 14 2.2.2 PEVs Connection Times .................................................................................... 14 2.2.3 Characteristics of the Employed Hardware ..................................................... 15 3. Additional Results ............................................................................................. 17 Validation of the Proposed Algorithm .................................................................... 17 3.1 Performance of the Algorithm ................................................................................. 17 3.2 3.2.1 Additional Voltage Impact Assessment Results .............................................. 17 3.2.2 Additional Thermal Impact Assessment Results ............................................. 18 ~ iii ~ List of Figures Figure 1: Multi-Agent Structure for the Proposed Control System ................................................. 31! Figure 2: UML Diagram: Interactions between Agents .................................................................... 33! Figure 3: Local Voltage Droop Control System proposed by Martinenas et al.[12] ........................ 36! Figure 4:Thermal and Voltage Management Coordinated Execution .............................................. 51! Figure 5: Proposed Algorithm Flowchart ........................................................................................... 52! Figure 6: Computer-Based Simulation Environment ....................................................................... 54! Figure 7: Total Aggregated Domestic Demand .................................................................................. 55! Figure 8: PEV & Ch. Station Charging Model on Simulink ............................................................. 60! Figure 9:Battery Model & Simulink Implementation ....................................................................... 61! Figure 10: HIL Validation Simulation Environment ........................................................................ 63! Figure 11: Experimental Setup Scheme ............................................................................................ 65! Figure 12: Real Experimental Setup .................................................................................................. 66! Figure 13: Complete Results of the HIL Case Study ........................................................................ 68! Figure 14: Number of Nodes Presenting Voltage Violations over Time. (a) Uncontrolled vs. Controlled PEV Penetration. (b) 100% vs. 50%User Participation. ................................................. 72! Figure 15: Cumulative Total Number of Voltage Violations ............................................................ 73! Figure 16: Full PEV Deployment: Impacts and Corrections on the Nodal Voltages ....................... 74! Figure 17: Time Series Evolution of the Total Transformer Loading .............................................. 75! Figure 18: Overall Transformer Loading. .......................................................................................... 77! Figure 19: Time Series Evolution of the Total Feeder 3 Loading on its Three-Phases. .................. 79! Figure 20: Total Percentage of PEV with a final SOC >= 85% for all Case Studies ....................... 80! Figure 21: Final SOC Levels for all Case Studies ............................................................................. 80! Figure 22: Proposed Algorithm Economic Viability for Different Discount and Return Rates ...... 85! Figure 23: Gantt Diagram of the Project ........................................................................................... 86 Appendices Figure 24:Left Panel: Configuration Parameters ................................................................................ 3! Figure 25: Right Panel: Studied System .............................................................................................. 4! Figure 26: PEV-Ch. Station Model ....................................................................................................... 5! Figure 27: Station and PEV Data Interpretation ................................................................................ 6! Figure 28: Charging Station Model and Agent .................................................................................... 7! Figure 29: PEV Model and Agent ......................................................................................................... 7! Figure 30: Internal Structure of the Charging Station Agent ............................................................ 8! Figure 31: Transformer Agent .............................................................................................................. 9! Figure 32: Individual Demand: Dwellings 1-12 ................................................................................. 11! Figure 33: Individual Demand: Dwellings 13-20 ............................................................................... 12! Figure 34: Time of Arrival and Departure: Probability Density and Cumulative Functions ......... 13! Figure 35: HIL Simulation Loads ....................................................................................................... 14! Figure 37: Virtual and Real Feeder Loading Comparison ................................................................ 17! Figure 38: Additional Voltage Impact Assessment Results .............................................................. 18! Figure 39: Additional Transformer Thermal Impact Assessment Results ...................................... 19! Figure 40: Additional Feeder 1 Thermal Impact Assessment Results ............................................. 19! Figure 41: Additional Feeder 2 Thermal Impact Assessment Results ............................................. 20! Figure 42: Time Series Evolution of the Total Aggregated PEV Load ............................................. 21! 1. General Introduction & Project Definition ~ 4 ~ Conclusions & Future Work: The main conclusions of drawn from the project are summarized in this chapter, highlighting the implications of the developed study and drawing recommendations for future lines of work. Appendixes: Additional details on the developed simulation interface implemented on Simulink, supplementary modeling data concerning the designed simulation environments including the individual household demands as well as technical details of the employed hardware, together with complementary simulation results to reinforce the overall comprehension of the project are presented in this section. ~ 5 ~ 2. Project Background Context: Energy Transition 2.1 Energy is the main driver of life and one of the pillars of our society. All living organisms need to satisfy their energy needs in order to fulfill their vital functions and prosper. Humans are not an exception. However for mankind energy has come to mean so much more than simply a pure biological need. Energy has been the catalyst of prosperity and the source of progress, which have set the foundation of modern life, to such extent that it has shaped and defined our history. From the discovery of fire to the more recent developments of wind turbines and solar panels, our quest to crack the energy formula has led to many energy transitions through time, as new promising sources seemed to offer a better solution. Nowadays this quest continues and it is still far from over. In recent years peak oil, climate change and energy independence, the three major defining issues of the century and currently exacerbated by the world’s electric power generation and transportation sectors, have marked the beginning of a new energy transition. Both sectors alone, represent over 60% of the global primary energy demand and have been predominantly fueled so far by fossil fuels, by coal and oil respectively [1]. So far many efforts have been done especially to make the transition towards a renewable energy based society a reality. Recent years, driven by the 2020 goals set by the EU, have seen the expansion and increasing penetration of renewable energy sources across the different member states, as well as a significant reduction of the total carbon footprint. The development and major expansion of both solar and wind technology, the improvements in internal combustion engine vehicles as well as the emergence of hybrid technologies to cut carbon and pollutant emissions have contribute to make this possible. At the same time major progress has been made thanks to the adoption of multiple governmental sponsored renewal programs to substitute old appliances and lightning systems with more energy efficient new ones, reducing the net energy demand of public buildings and households. However, in line with the recent Paris agreement, already more ambitious goals have been set for 2030, with further reductions of CO2 emissions and increasingly demanding renewable energy and energy efficiency targets. Thus new support schemes and strategies will be as well required in order to meet the new goals [2]. It is nonetheless extremely difficult to predict what the winning recipe will be since the current energy transition has sparked major undergoing transformations in the energy field, generating a completely changing environment, attracting the interest of major industries from different fields and shaking the traditional business model of utilities [3]. The transition towards renewable energies has started to shape a more decentralized power system due to the nature of the resources themselves, as they have to be exploited wherever they are available. The continuous developments in solar technology, improving the cell’s efficiency and reducing the system’s cost, have contributed to further increase the total amount of decentralized power production. Furthermore together with the similar trends affecting battery technology, presenting increasing energy and power densities and cost reductions, has caused the emergence of the figure of the prosumer [4][5]. 2. Project Background ~ 6 ~ These improvements in battery technology have caused and reciprocally benefited from the recent expansion of electric vehicles. In 2013 electric vehicles represented 6.2% of total car sales in Norway and more than 4% in the Netherlands, while sales’ growth rates of around 50% were registered in France, Germany and the UK [6]. In 2015 market shares of 23% in Norway and almost 10% in the Netherlands were reached and the world saw, with the United States and China at the forefront, the threshold of 1 million electric cars exceeded, closing at 1.26 million and roughly doubling the previous year stock [7]. This recent expansion of electro-mobility has also been motivated as a way to gain energy independence from oil producing countries as well as to minimize carbon emissions, combating climate change and improving air quality in especially affected urban areas [8]. Thus a good recipe to meet the appointed EU targets can be found in the convergence of both the transportation and the power generation sectors working together in synergy. The electrification of transport powered by renewable energy holds the potential to significantly reduce the world’s dependence on fossil fuels and the consequent emission of greenhouse gases [1]. Nonetheless the integration of electric vehicles on the power system is not a minor issue and its impacts need to be carefully analyzed and addressed. Additionally the increasing volatility in power systems as a result of the substitution of conventional synchronous generation with renewable alternatives, producing lower system inertia and higher generation variability, together with the ongoing decentralization, already cause significant impacts and make current power grids much more difficult to control. On the other hand, the falling prices of semiconductors and the expansion of ICTs worldwide [4] are leading the way to the digitalization of the energy sector and the emergence of Smart Grids. A Smarter Grid equipped with efficient measuring and communication devices is a central piece of the energy puzzle. Not only will it guarantee a safer and technically viable system operation but it will also act as an enabler [3] supporting all the undergoing transformations such as supporting new models, allowing the emergence of possible future regional and local markets, empowering prosumers and maximizing the usage of current system assets. The combination of an expansion of renewable based generation together with the electrification of transport while enabled by a Smart Grid technical and operational framework represents a solid path to drive the current energy transition towards fruition. The European Association for Storage of Energy (EASE) has highlighted [5] how the usage of energy storage systems in a Smart Grid framework could further facilitate the operation of future power systems and has even been shown that it could contribute to maximize asset utilization and deferral of expansion investments [9]. Precisely it is through this combination of and cooperation between all available resources, covering both the generation and transportation sectors, how the energy formula could be finally solved. Smart Grids: Towards Active Distribution Networks 2.2 2.2.1 Background: Low Voltage Networks under Stress Recent years have witnessed how the 2020 goals set by the EU have led to the propagation of the energy transition spark across the continent, causing the widespread integration of iRES as well as an increasing electrification of both the transportation and 2. Project Background ~ 7 ~ heating sectors. The swelling proliferation of iRES together with the growing charging requirements of PEVs are causing and are expected to cause multiple network operational challenges due to their unpredictable and intermittent nature. System operators are gradually facing a rising number of problems in the form of violation of voltage limits, network congestion and power quality issues among others [10][11][12][13]. Under the scope of the present study both voltage limit violations and network congestions will be considered, since they represent two of the most relevant issues. According to the European standard “EN 50160:2010 - Voltage Characteristics in Public Distribution Systems”, which establishes the minimum common requirements relevant to voltage quality, the maximum allowable magnitude deviations for the supply voltage from its nominal value, in both LV and MV networks, is ±10%. These limits apply to the average RMS values estimated every 10 minutes and must be satisfied weekly during at least 95% of the time. Network congestions, also commonly referred as network thermal overloads, are produced as a result of a prolonged violation of any of the current ratings of main assets of the network, such as the transformer or the main feeders. The continuous exposure to excessive currents above the asset’s thermal ratings, results in its overheating, deterioration, triggering the associated protections and eventual risk of failure. Between both of them, network congestions represent what is generally referred to as a “hard” limit since they will lead to the eventual trigger of the system protections stopping its normal operation, while voltage limit violations constitute a “soft” limit, as the system operation will not be immediately jeopardized by their infraction [14]. Although the MV level will also be affected, LV residential networks, highly ramified, with multiple long feeders, or densely packed, with hundreds of customers, will most certainly accumulate the greatest number of problems and thus represent the first bottleneck that needs to be tackled [10][11]. Consequently the current project will focus its attention precisely on them. Network topology constitutes the main determining factor when it comes to which types of issues are more likely to affect the system. LV networks consisting on long ramified feeders such as those in Germany, Spain, Italy and Ireland are more prone to experience voltage limit violation issues, while the ones more densely clustered such as those in the Netherlands generally tend to experience congestion problems first [13][15]. On the other hand another set of decisive factors determining the nature of the impacts caused on the grid are the daily and seasonal differences in load and generation patterns. Due to their own nature some loads and generation units are subject to changes in the behavior they exhibit in accordance to weather patterns and user preferences among other factors. For instance during the summer two important factors coexist: a lower heating demand and a larger PV generation. This is a consequence of the higher temperatures and the longer number of available sunlight hours, while in the winter the opposite trend can be seen. This generally results in a net nodal injection of power that causes overvoltage violations in the summer and in a net consumption responsible for undervoltages in the winter. Both cases are also equally susceptible to possible thermal issues caused by asset congestion regardless on the direction of power flows [13][14]. 2. Project Background ~ 8 ~ The increasing electrification of the heating sector, combined with the already electric powered air conditioning systems, further strengthens the unpredictability already present on the distribution system. However it is not only phenomena restricted to the LV grid that needs to be considered, even anomalies such as line triggering on the MV level can result in both voltage and thermal violations as a result of the newly transient power flow arrangements [16]. All of these together depict a current scenario with highly stressed LV networks. 2.2.2 Active Distribution Networks: Flexibility Markets Traditionally DSOs have designed LV distribution networks under a “fit-and-forget” approach, by forecasting the expecting future power demands and accounting for the issues already present on the system, network operators will deploy the required reinforcements to the affected lines and assets, necessary to ensure a secure and viable grid operation [13][15]. Although this classic response through physical expansions does solve those network problems, they are far form being the optimal solution needed to correct the issues affecting current distribution systems. Despite the fact that the evolution of distribution networks could be more easily anticipated in the past and therefore those reinforcements could be planned with a long lifespan in mind, normally they represent an extremely economically inefficient choice since normally the problems they tackle only affect the entire system a limited number of hours per year, falling in complete underuse the remaining amount of time. This is why DSOs are constantly seeking for more active management based solutions to be applied to their distribution systems. Although congestion issues on the transmission level are usually handled by unit re-dispatching and by using control devices, these active control solutions are not yet applied on the LV level. Current distribution networks, driven by the growing unpredictability and intermittency brought by the undergoing energy transition, are moving towards more actively controlled systems, the so called active distribution networks (ADN)[13][14]. Indeed many studies [17][18] highlight the importance for DSOs to adopt a more active role and the need to perform real-time control and supervision to safely manage future systems. When it comes to adopting more real-time voltage management approach, the substitution of distribution MV/LV transformers by OLTCs (On-Load Tap Changers) and the deployment of other control mechanisms such as LVR (Line Voltage Regulators) and shunt capacitors are among some of the alternative solutions DSOs could apply. Generally OLTCs are used solely on HV/MV transformation centers, while most MV/LV substations simply rely on NLTC (No-Load Tap Changers). The difference between them is that OLTCs can automatically change their wiring relation to respond to voltage deviations while on NLTC this can only be manually changed once the system is offline. This is normally done to decouple the MV from the transmission and guarantee a fixed MV voltage level to safeguard the different equipment. Therefore to compensate the voltage drops generally occurring MV/LV transformers are fixed with a high wiring relation. This is nonetheless problematic when a high power injection from DGs occurs since the upper voltage limits are more easily violated with such a configuration. Thus an effective way to manage these limitations is to use OLTCs on the MV/LV level, effectively decoupling the LV network and allowing an active voltage management on the distribution system [13]. Certain studies even suggest a more effective solution would be to use OLTCs capable to modify the wiring relation of each phase 2. Project Background ~ 9 ~ independently in order to tackle voltage unbalances caused by the uneven distribution of some iRES and loads among end users [19]. Other solutions such as LVR and shunt capacitors also have their own flaws. Although shunt capacitors are frequently used on the transmission level to adjust voltage levels, their effects are severely diminished when they are used on distribution networks due to their predominantly resistive nature [13]. Precisely thanks to their higher effectiveness many studies are suggesting to employ voltage management techniques based on active power control [12][13]. Despite allowing a greater level of control compared to simple grid expansions, these solutions still require major investments and have elevated associated costs to their deployment. On the other hand, when it comes to thermal limitations, disregarding conventional grid reinforcements, there are not so many alternatives other than unit time relocation, power curtailment and line alleviation through strategic storage allocation. When it comes to the use of strategic storage, some studies have pointed out that although it decreases the need for grid expansions and reduces the total capital expenditure (CAPEX) cost, it is still necessary to perform power curtailment on essentially the same level as by solely using network reinforcements to safely manage the system [9] and thus not entirely solving the problem. In the case of power curtailment current legislation is not too permissive, especially in the case of iRES, establishing a set of hard conditions only under which such control can be employed and additionally, just as with unit time relocation, it requires user consent. Furthermore European legislation shares little common ground on these matters with both Germany and Belgium exhibiting the friendliest ones [17]. Nonetheless encouraging dynamic user participation and performing a real-time asset management seems the most promising and cost-effective alternative. In other words, employing what traditionally has been known as a demand response (DR) approach. Not only is it possible to solve simultaneously both voltage and thermal issues jointly but also exploits and goes in line with the current deployment of smart meters and the population increasing involvement with green energy solutions and environmental concerns. There are two main types of demand response programs (DRP): price-based programs and incentive-based programs[20]. • Price-Based DRPs: Price-based demand response programs are built on the concept that users will adjust their demand and production accordingly to market prices seeking an optimal economic exploitation of their assets. Although they rely on a simple concept, these programs can result in even higher grid impacts as lower electricity prices driven by for example large wind generation would encourage users to massively connect their loads, further stressing the system [21]. This is an important phenomenon to bear in mind even when other techniques are applied. It is essential to prevent this so-called “Rebound Effect” after the restrictions upon the generation or consumption of certain units are lifted, especially those such as PEVs and HPs (heat pumps) that seek to fulfill certain comfort or charge objectives set by the users. • Incentive-Based DRPs: Incentive-based demand response programs are generally programs sponsored by utilities and grid operators themselves. An agreement with the users is signed offering economic compensation in exchange for control over their assets in order to manage grid congestions, power quality issues and voltage limitations among others. Inside these programs, it is of especial relevance the recent 2. Project Background ~ 10 ~ demand side flexibility program (DSF). In this program users provide a service to the energy system by modifying their generation injection and/or consumption patterns in reaction to an external signal, which could be a price or activation signal [20]. The massive adoption and consolidation of demand side flexibility programs, also commonly referred to as “System Flexibility Services”[18] will eventually lead to rise of system aggregators, system service providers as well as the establishment of a market operational framework, resulting in the final birth and consolidation of Flexibility Markets. These Flexibility Markets have a similar feeling and are indeed based on a similar concept to the already existing balancing markets used in the transmission system. The concept is quite simple and it is based on the capitalization of the choice business and residential consumers have on whether or not to be flexible in terms of when to consume, produce or inject energy into the grid [22]. This financial value given to flexibility holds the potential to benefit many new markets players that would arise seeking portfolio optimization by buying or selling energy in terms of market prices, as well as offering DSOs an alternative cost effective solution to solve many of the arising network issues at once. In this sense for the DSO flexibility can be understood as the ability of the power system to respond to changes in the net load exploiting its own resources in order to maximize the security of supply and the quality of service in the most efficient way [9][17]. Precisely numerous studies, many with an important participation of DSOs and utilities, [16] [17] are highlighting all the intrinsic benefits derived from a full implementation of such flexibility markets, emphasizing and defining the future role of the different players as well as the current limitations still in place. Some initiatives such as the “USEF” project [22] (Universal Smart Energy Framework) are strongly pushing towards their implementation by completely defining an universal operational framework for such markets. In such approach the DSO during normal operation can purchase the flexibility resources required to ensure satisfactory network operation and will also have an assisting and supporting role facilitating market operations. However it is important to highlight the existence an emergency mode, referred to as the “Graceful Degradation” mode, which can be activated by the DSO when the system is at risk of failure. Under this mode the DSO can cancel all normal market transactions and fully employ all available flexibility to ensure the system reliability and restore normal operating conditions. Although promising, three main types of barriers are yet in place preventing Flexibility Markets to become a reality: communicational, computational and legal. • Communicational Barriers: They represent one of the most challenging obstacles to overcome. As it is continuously stressed the active participation and interaction between the market players, would impose heavy communicational needs for the system to properly behave [21]. Not only a quick and efficient communication is needed to avoid excessive time delays and to ensure less restrictive constrains fall over the total computational requirements but also the adoption of a standardized and widely compatible communication protocol would be highly beneficial. Although some projects exploring different ADN functionalities have managed to successfully implement communications and ensure a proper system behavior, they have mainly worked with small scale study cases [12][15]. Those using larger, real-sized systems have highlighted the need to either simplify the complexity of the computational 2. Project Background ~ 11 ~ processes and therefore have less restrictive communication needs [10][11] or opt for a more decentralized approach in order to use less congested and more agile communication links [13]. • Computational Barriers: Another cornerstone for the implementation of Flexibility Markets is the computational requirements. The correct behavior of a market of such a scale with the active participation and interactions on real-time between so many different players such as aggregators, balancing and individual providers would also result in an enormous amount of data and effectively impose a heavy computational load on such a system. Moreover light computational solutions are needed to properly resolve the different market scenarios. Otherwise too complex system would be obtained, impossible to be solved within the proper time constrains [21]. The future introduction of new enabling technologies such as Blockchain, allowing direct and secure peer-to-peer transactions could help to alleviate this congestion. • Legal Barriers: Last but not least there are still many aspects that need to be transitioned within current legislation to allow and promote a full deployment of such a market. As many studies point out [16] [17] some of the issues that need to be addressed are: the provision of legal coverage for DSOs to adopt and assume new roles and functions out of their traditional scope since they are public regulated entities, the fostering of closer collaboration and the sharing of information between DSOs and TSOs, the standardization of protocols as well as the redefinition of cost attributions (CAPEX and OPEX) of DSOs and of their financing schemes among others. Furthermore a standardization of policies among European countries would be beneficial for a quicker market development. Regardless of what scenarios the different adopted future policies might shape and although it may still take some time before flexibility markets can become a reality, it would represent an immense step forward if any control mechanism implemented by the DSO to address the many impacts affecting current distribution networks as a result of proliferation of distributed generation and consumption resources, was to be conceived in such a way that allows its ease of integration within future market-based operations. 2.2.3 Legal Framework The present project work attempts to bring active distribution networks closer to reality, by proposing a control algorithm capable of addressing on real-time both the voltage and thermal limitations of distributions grids through the usage of PEVs. In order to develop a successfully implementable system, the current project work has been conceived for its application under the German legal framework attending to multiple reasons: • Germany is one of the most representative scenarios at the European level. With a leading position in terms of both penetration of iRES on its distribution networks and a growing presence of PEVs on its roads, the country stands at the forefront in the energy revolution. • It constitutes one of the European countries with the friendliest, most advanced and permissive regulations towards the implementation of active distribution management solutions [16][17]. • It is a welcoming environment for the application of innovative solutions and large popular support exists towards green energy and the energy transition. 2. Project Background ~ 12 ~ • Current German legislation already authorizes the DSO to bilaterally establish agreements with the different users and take advantage of their consumption devices [23]. This is essential since it provides legal guarantees and coverage to the project. Among the entire list, the most relevant factor to bear in mind is the legal support since it largely determines if the project can be or not implemented. Legal coverage is provided by the German “Act on Electricity and Gas Supply EnWG § 14a” [23], which allows the DSO to manage, prior user’s consent, those controllable consumption devices avaible in the low voltage network. In principle, through grid utilization contracts distribution networks operators agree to charge a reduced tariff to those suppliers and final consumers in the LV system in return for the grid-based control of controllable consumption devices that posses a separate metering point. This definition applies, but not exclusively, to electric vehicles, heat pumps and night storage heaters among others. The joint project deveoped by Stromnetz Hamburg GmbH and LichtBlick SE, currently under development, precisely seeks to showcase how “EnWG§14a” can be conjugated with PEVs, to effectively reduce their charging costs by about 30% [24]. The project aims to prove how, through a controlled time-shifted charge (Off-Peak Charging), electric vehicles could become more affordable as well as to demonstrate the nationwide viabilty of such a project. Aside from the “EnWG§14a” act, the German legislation also allows DSOs to perform grid management through active power curtailment of iRES. This is done through the so called “Feed-in Management”[17]. This regulation is however much more restrictive and can only be summoned by the DSO as a temporary solution, while other corrective measurements such as grid reinforcements are being deployed, to prevent the system from operational failure. Under such conditions the DSO can, depending on the plant’s installed capacity, take control and curtail some of the generated power. These harder conditions should not come as a surprise. Most regulations in place tend to favor the generation from renewable energy and therefore generally ban or depict significantly complex conditions under which curtailment can occur. In any case, although the “EnWG§14a” act sets the legal basis required for the practical implementation of the current project work, still, as the joint project by Stromnetz Hamburg and LichtBlick higlisths, many legal issues need to be clarified. For instance, under the current legislation a nationwide implementation of such a project represents an enormous administrative burden. It would require making complicated agreements with every one of the almost 900 existing electricity grid operators in the country. Far more important is the need to establish a solid and complete legal framework to create legal certainty for all stakeholders. One key aspect yet unresolved is how the DSO can justify the acquisition of such flexibility services under “EnWG§14a”. Nowadays under current legislation[17][18] DSOs cannot compute this flexibility acquisition costs as operational costs (OPEX). This is a major issue since as a public entity DSOs need to legally present their expenses. Another major issue for system operators, even after that one is solved, is precisely the result of opting for these flexibility-based solutions instead of the traditional reinforcements and grid expansions to correct network issues. By doing so DSOs are shifting from a high capital expenditure (CAPEX) approach to high operational expenditure one (OPEX), and this might prove problematic at the beginning since network operators receive their finance accordingly to their CAPEX [9]. 2. Project Background ~ 13 ~ Finally the provision of a full legal coverage to all of these remaining issues will additionally motivate the convergence towards future flexibility markets themselves, with the rise of new market players such as aggregators, concentrating the flexibility offers of several individual customers, and thus providing much more consistent and solid offers, preferable for DSOs [18]. Electro-Mobility: A Smart Load 2.3 2.3.1 Background: Electro-Mobility on the rise Of the total oil consumed in the world in 2011, 62.3% was used to power the transportation sector [8]. Oil has been and continues to this day being the blood fueling global transportation. However this comes at a price. Not only its usage aggravates climate change and harms the urban population’s heath but it also causes economic and geopolitical instability by creating great dependence on oil producing countries[8]. Its finite and damaging nature is therefore triggering a change through many countries, with transportation accounting for almost a quarter of global-energy related green house gases (GHG) emissions [7]. Australia, Canada, China, the European Union, Japan, South Korea and the United States among others, have established, or are in the process of establishing, limits on pollutant emissions for light vehicles[8]. In order to meet these regulations, automobile manufacturers have improved and reduced the emissions of their internal combustion engine vehicles (ICEV) and have started developing new electric drive vehicles. Electric drive vehicles, which are able to run on fossil fuels, electricity, a combination of both or even hydrogen, are far superior in terms of energy usage in comparison to conventional vehicles [25]. While a traditional ICEV accomplishes a fuel efficiency between 15–18%, a battery electric vehicle (BEV) can register an efficiency as high as 60–70%[1]. This represents a major economic and competitive advantage. Many governments have seen in Electro-Mobility their best option to meet their GHG emission targets through a greener energy mix [8], reduce their need of foreign oil [8][25] and improve public health. Thus they have started to incentivize the purchase of electric vehicles through different actions such as: subsidies, financing plans, tax exemption, tax deductions, transit and parking facilities, as well as developing a network of charging infrastructure [6][7][8]. All these incentives driving down the costs while offering significant driving benefits, together with the public perception of supporting the environment, have made electric vehicles a really attractive option to users [6] and companies alike. All of this has set the pace for the rapid expansion of Electro-Mobility, rising from just a few hundreds cars on the road in 2010 to a 1.26 million in 2015 almost doubling the total stock in 2014[7]. Furthermore prospects depict an even more promising future. As current obstacles such as range and price continue to be eroded and as parity with ICEV is reached through major improvements in both battery technology and new materials, vehicles become lighter, with higher driving ranges and more affordable. Not in vane the Paris Declaration on Electro-Mobility and Climate Change and Call to Action sets a global deployment target of 100 million electric cars in 2030 [7]. ~ 21 ~ 3. State of the Art Charge Plans 3.1 PEVs represent both a challenge as well as an opportunity. As their penetration in the market increases, PEVs will most likely become the main controllable load available on households and thus the largest domestic source of flexibility [21]. Therefore it becomes more and more apparent the need to implement an active management of their charging process to prevent, delay or substitute investments in grid reinforcements, achieve a more efficient operation of the system and satisfy the users’ requirements [8]. Disregarding V2G (Vehicle-to-Grid), which is not expected in the short/medium term, due to the premature degradation of batteries and energy losses caused during its operation [8], three main charge plans exist under which electric vehicles can recharge their batteries from the grid: Dumb or Uncontrolled Charging, Off-Peak or Delayed Charging and Smart Charging. The difference between them can be found in the different levels of external control involved in the process [1]. • Dumb or Uncontrolled Charging: As the name suggests, dumb or uncontrolled charging essentially consists of the absence of any control or restriction over the charging process of PEVs. The vehicle starts recharging as soon as it is connected to the grid and the process is just stopped once it reaches full charge or it is manually forced to do so by the user [1]. Of course despite being an approach extremely user friendly and easy to adopt, since no corrective measures at all are applied, it does not solve any of its associated charging impacts on the network[8]. • Off-Peak or Delayed Charging: Off-Peak or Delayed Charging consists on a simple pre-established offset of the charging process by a set amount of time. Although it still remains completely uncontrolled while it is taking place, the relocation of the PEVs’ charging load to off-peak hours, especially at nighttime, allows taking advantage of a normally much less stressed network, effectively flattening the demand profile, reducing the system’s congestion in comparison to dumb charging and delaying grid reinforcements[1][8]. Although this approach might work with small penetration numbers, as they grow it becomes as inefficient as the previous approach. Furthermore many issues remain yet unresolved such as the inability to respond to unforeseen voltage, congestion and unbalancing episodes as well as not providing an optimal solution to the problem. • Smart Charging: In contrast with dumb and off-peak charging, smart charging allows both users and network operators to exert some measure of intelligent control over the charging profile of the vehicle in order to obtain technical and economic benefits. The main idea is to perform the charge when it is most beneficial based on an active control of the process that can be automated using optimization or heuristic algorithms. This allows to fulfill different objectives such as active management of system congestions and voltage limitations, reduction of system losses and economical optimization the charging process or any other parameter of interest [1][8]. Although smart charging plans are the most beneficial ones, they also are the more complex ones to implement. Not only they require the application of suitable functional algorithms, but also involve the use of information and communication technologies and above all require the user’s consent [8]. 3. State of the Art ~ 22 ~ From a network perspective PEVs are seen as a simple electrical loads for both Dumb and Off-Peak Charging while they are considered as smart and flexible loads in the case of Smart Charging [8]. Smart Charging: Charging Strategies 3.2 Due to the nature of the control algorithm that the current project work aims to develop, as well as due to their obvious benefits, the present focus will be given to further investigate the different types of smart charging approaches that have already been proposed in the literature. These will be referred further on as “Smart Charging Strategies” or simply as “charging strategies”. Although many different optimization objectives can be pursued and thus many different types of charging strategies can then also be identified; since the focus of this project is to perform an active thermal and voltage management control of LV distribution networks, the main focus of research has been given to the literature covering such implementations. Overall in accordance to their operating principle the following categories can be found: • Predictive vs Real-Time Strategies: The key differences between real-time and predictive strategies lies in whether the controlled charge of the vehicles is pre-set in advance based on consumption estimations or forecasts [21][41][42][43][44] or on the contrary it adapts and reacts based on real-time measurements and conditions [10][11][12][13][15][16]. If a real practical implementation is the end goal, predictive approaches are not the right way to approach the problem. Nonetheless the majority of the existing strategies on the literature fall under the predictive tag. Most of them, as part of their control algorithms, preform load flow calculations while assuming a complete deterministic demand curve [41][43][44]. Some, such as Clement-Nyns et al. in their study [42], assign uncertainty to the forecasted demand curve and consider it while computing the PEVs’ optimal charge profiles. Although this is acceptable to showcase the benefits and possibilities of a controlled integration of electric vehicles, it falls short if applied to a real-world system since either a complementary real-time control algorithm is then needed when the forecast does meet the real demand or then the network control needs to be provided by alternative means. Real time strategies on the other hand base their actions on real measurements of the network current state and consequently respond to them. Opposite to predictive strategies they are able to perform an efficient system management without the need of any supplementary control and are suitable to be directly implemented on real systems. Obviously, due to their reactive nature based on real measurements, the performance of these strategies is not comparable to those offered by the predictive ones, which should also be handle with certain care since they fully depend on the accuracy of the forecast they have been based on. Finally it is important to highlight that most predictive strategies could be easily modified to operate under a real-time approach, based on how they really operate on their core. In other words how they really manage the congestion and voltage limitations when they appear. • Centralized vs Decentralized vs Mixed Control Strategies: The distinction between centralized also known as direct control strategies and decentralized also referred to as indirect control strategies can be found in who holds the decisionmaking over the vehicle’s charging process. In case of decentralized or indirect 3. State of the Art ~ 23 ~ control strategies each PEV remains in full control, thus it is the vehicle itself, according to its owner’s preferences, the one who applies any alteration or modification affecting its charge. This obviously requires each PEV or its respective charging equipment to possess certain degree of intelligence. In the case of centralized or direct control each PEV bestows that right to an external entity such as the DSO or an aggregator, who is then responsible for managing directly the charge of all PEVs under its control [8][32]. It is argued [1] in this respect that indirect charging is a more promising concept since it is more likely to lead to consumer acceptance over direct external control. On the other hand mixed control strategies involve both kinds of control. In such cases normally the users bestow control under certain circumstances but perform their own when these conditions are not met; for instance when users allow DSOs to perform thermal management when the network is in need but also individually seek economic optimization of their PEVs’ charge or for example opting for a centralized thermal management and an indirect local voltage control. This latest concept was proposed and showcased by Haque et al. [13] to perform network management using both heat pumps and local PV generators with remarkable results. Generally due to their own nature, predictive strategies tend to work under a centralized scheme while any control strategy requiring individual user involvement logically would tend to operate more on real-time. No approach is really superior over the other a priori, both possessing their own pros and cons. While a direct control approach allows a more fine-tuned control, it also has greater computational and communicational needs to handle and operate with the information coming from all involved vehicles. Decentralized strategies on the other hand are generally lighter and faster but the resulting solution is generally not as well adjusted as the one offered by a centralized system [8]. Generally thermal management, as it affects the complete network, is performed under a centralized scheme while voltage management can be more easily perform with local measurements under a decentralized approach. Although decentralized approaches for congestion management also exist in the literarute, they are generally based on price signals sent by the DSO to affect the PEVs’ behavior. Nonetheless a really novelty approach is proposed by Sansawatt et al. [45], suggesting decentralized thermal management based on a sensitivity based approach. Focusing on the issue the different strategies want to correct, the following categories can be found: • Voltage Control Strategies: Voltage control strategies aim to resolve the different voltage quality issues, essentially voltage limit violations and/or unbalances, which increasingly affect distribution networks as a result of the ever-growing demand. Generally they rely on active power management to properly mitigate such distortions. This is a direct consequence of both the intrinsic characteristics of LV networks themselves, which present a high R/X ratio [8][13], as well as the fact that the internal charging control systems of PEV do not permit reactive power management [12]. 3. State of the Art ~ 24 ~ Among the different studies applying voltage control techniques, all relying on real-time and decentralized approaches, many solutions have been tested. The one conducted by Quirós-Tortós et al. in [10][11] proposes a voltage control mechanism working under different time steps that immediately triggers the vehicles disconnection (two-step control) when a voltage limit violation on its associated node is detected. Although simple and effective it also results in greater user impact. A more refined approach can be found in the analysis conducted by Martinenas et al. [12]. Employing two sets of variants for an active power droop-based control system, compliant with the existing charging standards and tested on real hardware, overall improvements of the voltage unbalances experienced by the test system were found. Also relaying on the use of real hardware through HIL simulations, the work conducted by Del-Rosario et al. [16] employs an even simpler approach disconnecting all controllable vehicles to stabilize the system after the intentional triggering of a line is caused. Finally the project carried out by Haque et al. [13] tested and compared different mechanisms of voltage control through active power management using HPs, both droop-based and step-based. It was found that the step-based offers finer control but also results in greater curtailment with both mechanisms successfully solving the system’s issues. • Thermal / Congestion Management Strategies: Thermal or congestion management strategies seek to correct and prevent the thermal overloading of the different system assets especially the distribution transformers and the head of the main feeders, which are being increasingly affected by ongoing rising consumption and generation flows. This is normally done through active power curtailment using centralized control strategies both using predictive and real-time approaches, though predictive strategies are more predominant. One of the key aspects in this kind of approaches is identifying which vehicles should be disconnected while applying the necessary corrective measures. This is normally done accordingly to different objectives pursued by the study such as minimizing the impact on users or minimizing the system losses among others. Among the different existing studies the most relevant are described below. Quirós- Tortós et al. [10][11] complementary to their voltage control mechanism also include a thermal management centralized strategy operating under the same time steps on realtime. This mechanism based on two-step control as well, calculates congestion parameters based on sensor measurements and then determines the total number of vehicles required to be disconnected accordingly to a priority system that ranks the vehicles in terms of the amount of time their charging process has lasted. This is done in an attempt to minimize the impact over the vehicles’ users. Although significantly complete, responsive, computationally light and robust, being tested on different network architectures, the system is not without its flaws since for instance it only considers the characteristics of a single commercial car model to exactly determine the number of PEVs that are required to be disconnected. Another interesting approach has been the one employed by Haque et al. [13] due to its usage of a flexibility offer centered tactic to correct network congestions. While adopting a Multi-Agent based structure, which helps to correct some of the traditional burdens of centralized approaches, and using both HPs and PV generators as the source of flexibility, the authors then formulate a centralized optimization problem to select the 3. State of the Art ~ 25 ~ most beneficial flexibility offer combination to successfully solve the problem and maximize the user comfort. On the other hand some other studies such as the one presented by Haque et al. [15] apply solutions closer to a future flexibility market scenario. By assigning a curtailment cost to each node, the selection of PEVs can be done seeking an economical optimum by the DSO. In the same line the work conducted by Esmat & Usaola [20] additionally considers the energy payback costs derived from the rebound effect and other studies such as the one completed by Verzijlbergh et al. [21] also incorporated the effects the charging of the PEV themselves will have on the retail prices. Finally the work of Spiliotis et al. [9] performing a DC power flow analysis and using battery systems to alleviate network congestions, revealed that thermal management represents an effective substitute to grid reinforcements, although still a significant contribution of iRES generation curtailment was needed. • Unified Voltage and Thermal Management Strategies: As its name suggests unified voltage and thermal management strategies intent to simultaneously target both voltage and thermal issues affecting the distribution systems. Not only are these combined approaches the most desirable ones since they ensure a compatible coordinated action to correct the two main issues affecting current distribution networks, but as pointed out by Haque et al. [13][15] they also are the ones most aligned with and recommended by future flexibility market based framework such as USEF [22]. Most studies falling under this category generally employ separate coordinated thermal and voltage controls and as both the thermal and voltage strategies employed have already been perfectly illustrated while addressing them separately within the previous sections, to avoid repetition, no further aspects will be covered here. Nonetheless the work of Pillai et al. [44] must also be highlighted since, contrary to previous works, it executes a vehicle curtailment by elaborating a combined priority list simultaneously considering both voltage and thermal problems at once. Finally another key aspect to consider is how the different charging strategies perform the car selection when performing network management. Accordingly the following types can be identified: • Economic Optimum: These charging strategies perform a selection of the vehicles trying to optimize either the user participation cost or the management costs for the system operator. One vital risk of these types of price-based approaches, as it has been pointed out in several studies [20][21], is that they tend to cause power surges if not properly handled. As users respond to the same price signals when these are low motivated for example by a spike in wind generation, if no communication or coordination between them exists, they are all driven to suddenly start or resume the charge of their vehicles at once, resulting in an enormous stress for the power system. An illustrative project within this category is the one presented by Verzijlbergh et al.[21]. The authors seek to achieve the optimal tariff, which will result in a PEV cumulative charging profile that ensures grid constrains are met. For this a quadratic optimization is performed considering a net charging cost, which is the combination of a 3. State of the Art ~ 26 ~ variable grid tariff and a wholesale electricity price composed of a fixed average term and a variable one depending on the total existing PEV demand. It is found that achieving such an optimal tariff is extremely complex and approximate solutions deliver even worst results than an unconstrained charge scenario. Three alternative techniques are suggested by the authors to reach that unique optimal tariff, two of which impose enormous computational and communicational burdens and thus their application results impractical. The remaining one an auction-based allocation of the remaining estimated grid capacity seems to be the most feasible alternative. Nonetheless this arises another conflictive issue, also common for these types of solutions, which is that they tend to force the DSO to adopt roles completely out of their traditional scope, where they have absolutely no experience at all such as estimating the daily PEV load considering factors as diverse as driver behavior. This would result in a larger error margin deteriorating the quality of the final result. It is therefore advisable to simplify as much as possible the role of the DSO[20]. • Comfort Maximization / User Impact Minimization: In this case the selection criteria used to answer which vehicles should be selected is based on either minimizing the impact or equivalently maximizing a predefined comfort parameter. This is a clever and recommendable first approach for any new strategy especially involving electric vehicles, to combat the user’s anxiety over reaching a minimum charging level and allowing them to familiarized themselves with the system. For instance Quirós-Tortós et al. [10][11] employ the charging time as an indirect measure of the vehicles SOC level and then favor those with the smallest charging times to ensure all vehicles can reach an acceptable level. • Selective / Impact-Based: Other control techniques, especially decentralized based approaches generally estimate sensitivity based parameters in order to address the impact each potential node has on the system and then prioritize the usage of those that will have the higher impact. Although this could also be seen as a user impact minimization or economically optimum solution, since it could be argued that a minimum amount of elements would be utilized, this would generally involve the overuse of the exact same vehicles, which could potentially drive user discontent resulting in both a cost increase or encouraging withdrawal. Examples of this method can be found in Haque et al. [13], who propose an alternative sensitivity based voltage control for the heat pumps, as well as in Sansawatt et al. [45], using a decentralized thermal management. • At Random: Finally some studies simply do not use any objective criteria for the car selection. This is because the primary objective of the control schemes they propose is simply more focused on showcasing how a controlled integration of PEV is indeed beneficial for the system and how, under such approaches, high penetration levels of vehicles can be safely managed and connected to the system. For instance Pillai et al. [44] ,while defining their PEV priority list, utilize three different criteria while giving preference to the different PEVs. First they cover two scenarios where preference is simply giving to the cars at the end and head of the feeder respectively and one last case where the priority is randomly distributed among all available cars. Another interesting case is provided in the work of Lopes et al. [43]. This predictive-based method aims to establish the maximum share of 3. State of the Art ~ 27 ~ PEV a network can withstand. In their work the authors randomly disconnect fixed small steps of vehicles in the affected areas on a loop until the problem is solved. Nonetheless they create a priority list for their reconnection based on how long a vehicle has remained disconnected. Main Findings 3.3 After careful review of the existing literature, meaningful insights for the algorithm’s design have been obtained. First of all it is important to notice that real-time reactive algorithms are superior to their predictive counterparts when a functional and practical implementable system is the main pursued goal. In contrast to predictive algorithms, which generally need preknown network behavior and rely on continuous load flow calculations requiring a full knowledge of the network structure; simpler real-time algorithms can easily operate without being provided any of these parameters. This, as it pointed out by Quirós-Tortós et al. [10][11], makes them way lighter, both from computational and communicational perspective, as well as much easier to be adopted. In the same line, even with real-time strategies, both computational and communicational limitations might be reached when using centralized based solutions. In this respect the best approach is to opt for decentralized controls as frequently as possible, but even those can be problematic if a high degree of coordination between the different local units is required. As it is showcased by Haque et al. [13], an interesting solution to these problems is to adopt a Multi-Agent based structure. The existence of multiple level agents allows to effectively ease both constrains by distributing the computational needs between the agents and thus also reducing the amount of unprocessed data required to be shared. At the same time the adoption of such a structure also facilitates and supports the transition towards future flexibility markets since it already establishes multiple intelligent agents capable to interact with each other and later respond to different market price signals. Another important conclusion is the overall lack, in most of the reviewed studies, of any assessment of the proposed managing mechanisms on any real hardware or systems. Of the reviewed literature only the works of Del-Rosario-Calaf et al. [16], Martinenas et al.[12] and Quirós-Tortós et al. [10], [11] presented some degree of validation through practical tests. This is however a crucial step, not just to test the proposed control mechanism under the most real conditions possible, but also to ensure its compatibility and proper behavior under current communication protocols, standards and hardware. Finally as it is pointed out in the work of Verzijlbergh et al.[21], a great amount of the proposed control strategies simply try to showcase that they are indeed beneficial for grid operation. However they do not seek to fulfill any particular objective. Conversely the most interesting solutions are those that are capable of satisfying different objectives such as minimizing user impact, reducing the total charging cost or optimizing the system operation while satisfying the network operational constrains. In this respect it can be concluded that, at first, it is important to choose to minimize user impact in order to obtain a high degree of satisfaction and engagement. ~ 29 ~ 4. Proposed Algorithm In this section a detailed description of the designed control algorithm is presented. First a brief overview covering its main general features is done. This is then followed by a description of the adopted Multi-Agent structure, defining the different involved agents and their interactions. Afterwards a complete explanation of the thermal and voltage control strategies is shown, presenting the different thermal toolboxes and highlighting their main advantages and limitations. Finally the coordination and interaction between both controls and the complete algorithm’s flowchart are presented. Overview 4.1 In order to fulfill the requirements exposed in the opening chapter, fully considering the different insights obtained after performing a complete revision of the state of the art, a real-time, mixed and unified control algorithm seeking to minimize user impact is proposed. As set by the initial constrains, the envisioned system would be required to manage both network thermal and voltage constraints as they arise on real time. Furthermore crafting a real-time reactive algorithm already offers significant benefits in terms of guaranteeing its universality, ensuring the resulting system can be easily applied to any distribution system with none or simply minor modifications, as well as restraining its total associated communication and computational requirements. In order to fully achieve a proper real-time operation that effectively manages voltage and thermal issues, a mixed control strategy, involving a centralized congestion management reinforced by a local voltage control, has been found to be a feasible solution. Whereas the nodal voltage management can be more effectively performed using local measurements under an indirect control method, an efficient way to formulate an optimized thermal control that minimizes user impact while ensuring all grid constraints are respected is to use a centralized approach. Therefore the proposed control algorithm, drawing inspiration from Haque et al. [13], employs a centralized flexibility offer based thermal management implemented under a Multi-Agent structure. The adoption of such a structure allows not only to correct some of the traditional burdens of centralized approaches, such as both communication and computational constrains, but also supports the transition towards future flexibility markets and offers versatility for later expansions of its functions. This control is then reinforced and combined with a local voltage management, based on an active power sensitivity parameter estimation, which is responsible to maintain the local voltage above its minimum stipulated limit. The application of the proposed algorithm has additionally been designed to require the minimal amount of grid measurements for its operation. This has been done to ensure its application in most present distribution networks where the amount of real time data DSOs posses is very limited [14], struggling to detect the triggering of local lines and customers out of supply. Although the situation is improving with the progressive deployment of Smart Meters, it is important to guarantee a proper behavior of the designed control system while using the least amount of information, in order to minimize the total amount of additional required sensors, as well as to reduce its total implementation costs. 4. Proposed Algorithm ~ 36 ~ to satisfy two essential principles: simplicity and functionality. Namely both control schemes have been crafted trying to obtain a complete management system as simple as possible yet capable to deliver satisfactory results. This was done in order to fulfill the premises that the resulting algorithm could be easily integrated and used within any current network. 4.3.1 Decentralized Voltage Control First of all it is important to bear in mind the two main conditions under which the voltage control system will be designed: • Firstly it must be a local control system, meaning each vehicle must regulate its own node. • Secondly the control system must satisfy that the average RMS voltage estimated every 10 minutes at the node must not exceed the lower boundary defined by a -10% deviation from the nominal value established by the European standard “EN 50160:2010. Notice that only the lower limit has been considered. This assumption comes from the fact that no V2G functionalities are considered, in which case PEVs will only be responsible for voltage drops by demanding power during their charging process. It is nonetheless true that under significant unbalanced conditions in a not grounded network, single-phase charging could result in a voltage rise in the remaining phases[12], effectively reaching the upper limit. This situation however has not been considered. 4.3.1.1 Background: Droop-Based Control- Major Problems Taking these conditions into consideration and following a careful review of the existing literature, it was found that an efficient and simple voltage control approach, capable of delivering satisfactory results was precisely to employ a droop-based control [12][13]. This control is based on the same principle applied in big power plants to manage the network frequency through active power regulation. Therefore after establishing two voltage control thresholds, a pseudo-linear relation is then determined associating the maximum charging current to the upper control threshold and the minimum to the lower one. The reason behind this pseudo-linear relation is no other but the restrictions in current variation imposed by the IEC 61851-1 standard itself. A perfect example of this type of control can be found in the work of Martinenas et al.[12], whose proposed droop control scheme is presented in the graph below. Figure 3: Local Voltage Droop Control System proposed by Martinenas et al.[12] 4. Proposed Algorithm ~ 37 ~ As it can been in Figure 3, the authors propose two different droop variations, represented by the black continuous and dashed lines, depending on if the considered vehicle will be disconnected or remain charging using the minimum current (6A) once the lower threshold has been exceeded. Complementary in red the resulting ideal linear relation can be seen if the 1A step given by the standard is disregarded. The proposed droop has been designed to be applied using a Nissan Leaf, which has a maximum charging current of 16A, for which the authors have defined the following voltage control thresholds: • Upper voltage threshold (! !"!=0.95) / Lower voltage threshold (! !"!=0.90). Its behavior is easy to understand. When the nodal voltage is: • Above the upper threshold: no limitations over the charging current exist and so the vehicle can charge at full power. • Below the lower threshold: either the vehicle charge is put on hold (Real droop 2) or continues at its minimum allowable current (6A) (Real droop 1). • In between thresholds: the maximum allowable charging current is determined using the pseudo-linear relation between the limits. As a direct consequence of its apparent benefits, a droop control system, similar to the “Real droop 2” presented by Martinenas et al.[12] was first designed and implemented. Nonetheless such system was finally discontinued and replaced with a new alternative after, as major limitations and drawbacks were found after conducting various tests. Two major reasons make a droop solution undesirable: 1. The first fundamental problem that exists with a droop approach is that, although the lower control band can be easily identified using the limit established by the norm (! !"!=0.90), the upper control threshold cannot be so easily deducted as it depends entirely on the structure of the grid as well as on the effects of the car load on it. Although the droop will work by setting an arbitrary upper limit, this is completely inefficient. For instance let’s consider a particular node where due to the normal system loading, the voltage already falls below that arbitrary upper threshold even without the presence of any vehicle’s charging demand and on the top of that, that the addition of the car load does not result in any significant voltage variation since its magnitude is much smaller than the other existing loads. Therefore this particular PEV will be force to charge at a lower rate when even charging at full power will not cause any significant difference to the voltage profile and moreover there is yet no voltage violation at all since the voltage has not fallen below its lower limit. 2. The second major problem is that a drooped based system, even if an appropriate upper limit could be set using a network voltage-active power sensitivity parameter, will result in an inappropriate control system since it will exhibit an oscillatory behavior. This can be easily understood just by examining the normal behavior of a droop system. When, due to a external perturbation, the voltage falls within the control thresholds (! !"! and ! !"!) the PEV will lower proportionally its charging current. If the upper voltage limit has been properly tuned, this correction in the charging current will cause the nodal voltage to increase and correct the deviation, resulting in a new nodal voltage just above the upper voltage threshold. Therefore in 4. Proposed Algorithm ~ 38 ~ the next control step the car out of any control limits, will resume its charging at full power causing the voltage to fall again inside the control bands and repeating the cycle. 4.3.1.2 Proposed Solution: Sensitivity Based Control In order to execute a proper voltage control overcoming the most crucial uncertainties and disadvantages of the previous droop systems, a new sensitivity based approach has been designed. Inspiration for the conception of this control was derived from the work of Haque et al. [13] were also a voltage sensitivity based control is proposed as a variant to their droop based system. However the authors still envision a voltage management system relying on two voltage bands that, instead of relaying on a lineal power variance between them, employ the nodal voltage-active power sensitivity parameter !" !" ! to determine the required change in the active power. These sensitivity parameters vary with time depending on the state of the network and strongly rely on grid topology. Haque et al. [13] argue that in a radial LV distribution network, the sensitivity remains mostly of the same order and can therefore be communicated by the DSO to the local control mechanism. They can be obtained using the Jacobian matrix through an off-line power flow calculation and be later updated if any change in grid topology occurs. Although interesting, two main problems can be found within this solution. First this alternative does not seem to correct the main problems that also affect a droop based control since, by using two voltage bands, it would still present an oscillatory behavior. What is more the estimation of the nodal sensitivity parameters suggested by the authors is incompatible with the algorithm’s premises, since it would require detail knowledge of the studied network. Consequently a new control method that addresses these limitations while relying on its core on the usage of the nodal voltage-active power sensitivity parameters !" !" ! is now presented. The main idea behind this approach is to achieve a behavior similar to the one exhibited by a programmable logic controller, forcing the car to charge at the required rate in order to follow a reference voltage value of choosing (! !!). Therefore by measuring the local voltage ! ! and comparing it to the selected voltage threshold ! !!, the new control will determine, using the nodal voltage-active power sensitivity parameter !" !" !, the vehicle’s maximum permisable charging rate so that the voltage ! ! can be kept just above the threshold value (! !!). Subsequently this new structure effectively corrects the two main issues affecting a droop based approach since only one voltage boundary is now required and thus no oscillatory behavior is expected to happen as no control band in and out dynamic can now be established. Since PEV essentially just demand active power due to their OBC and the charging rate is controlled by setting their maximum charging current, it is much more practical to use instead the nodal voltage-charging current sensitivity parameters !" !!!!!. Again the crucial aspect for the correct execution of this control method relies on how to properly estimate them. To do this, in contrast to the method proposed by Haque et al. [13], a simple perturbation approach will be employed. Measuring the local changes in voltage produced by a change in the charging current these local sensitivity parameters can be estimated. 4. Proposed Algorithm ~ 39 ~ The voltage control is executed on a discrete time basis. In order to correctly satisfy the standard and reduce the computational needs, an execution time step of !!=30! has been considered appropiate. As the sensitivity parameter will change over time depending on the state of the network, every time the voltage control applies a change to the vehicle’s charging current, the sensitivity parameter is updated. The updated sensibility value will then be used for the next control cycle. Since the sensitivity parameter used to determine the required current change is the one updated in the previous control cycle, when a vehicle is first connected, an initial estimation of the sensibility value is required. Thus an initial calibration period is defined, when the vehicle for at least two voltage control cycles is not allowed to participate in the network management. During this period, in between the voltage control execution times, to avoid disturbing the sensitivity estimation of the already connected vehicles, the car intentionally modifies its charging current and determines its nodal sensitivity. Afterwards the car can be incorporated to the normal control dynamic. Furthermore to guarantee an adequate behavior the following precautions have been taken: • In order to minimize the possible interference caused by the simultaneous changes other network loads could also have undergone, whenever a new value for the sensitivity parameter is computed, the resulting value is determined as the average between the previous value and the one currently estimated. • The voltage-charging current sensitivity parameter is by nature a negative value since an increase in the charging current translates in a corresponding voltage drop. Therefore only new values are considered whenever they take admissible values and, to further avoid external interference, when the vehicle modifies its charging current. • Finally all vehicles are requested to behave in a synchronized manner by executing their voltage management at 0 and 30 seconds past every minute. This guarantees that if any cluster of vehicles exists within the same node, they will detect each other when estimating their sensitivity parameters and consequently result in a coordinated control. In order to ensure some adequate margin of error, the voltage and the current variations are measured by taking their values one-second prior and one after the voltage control is executed. The mathematical description of the control is now presented in Table 2: It is significant to notice the need of using the “floor” and “round” functions in order to deliver an integer value and be compliant with the charging standard. Moreover it can be seen that in order to compensate the uncertainty and possible errors in the estimation of the sensitivity parameters, and to attempt to guarantee no violations of the voltage threshold would happen, the reloading operation has been designed to be much more restrictive. Not only a floor approximation to the next integer is imposed but also a vehicle can only resume its charging process until no violation of the threshold would happen for a 7A charging current. Finally some last relevant aspects will be highlighted: • The voltage control only requires the usage of local voltage sensors. The current magnitude can be directly obtained from the charging station. • The voltage threshold is calculated using a small security margin given by the DSO to ensure a proper operation. In this case a ! !!=0.905 !" has been used. 4. Proposed Algorithm ~ 40 ~ • Single-phase cars use the corresponding phase voltage to apply the control, while three-phase cars use the lowest of the phase voltages at each time step. • It is entirely coordinated with the thermal control as it is later explained. • Finally one important limitation of the current system can be found in the case of a high imbalanced network with a floating neutral. In such case, the connection of single-phase vehicles will cause the voltages on the other phases to rise, leading to potential violations of the upper limit. Since the current system is designed only to account the lower voltage limit, those violations would not be corrected. ∙! Subscript referring to the station-car pair i and its corresponding node. Notation ∙ Floor Function. ∙ Round Function. !!! ! Existing charging current (A). ! ! Phase-to-ground voltage measurement (pu). ! !! Voltage control threshold determined by the DSO (pu). !!"#$%! Maximum charging current of the tandem station-vehicle (A). !!"#$!! ! Maximum permissible charging current by the voltage control (A). ∆!!!!! Current variation determined by the voltage control (A). !" !!!!! Voltage-charging current sensitivity parameter. ∆!!!!!=(! !−! !!)!" !!!!! !!"#$!! !=max(!!! ! ,min(!!! !+∆!!!!!,!!"#$% !)) !" !!! !<6A & !!"#$!! !<7A→!!"#$!! !=0 !" !!! !<6A & !!"#$!! !=7A→!!"#$!! !=6A !"#! → !!"#$!! !=!!"#$!! ! !" ! !≥! !! Reloading ∆!!!!!=(! !!−! !)!" !!!!! !!"#$!! !=max(6A ,min(!!! !−∆!!!!!,!!! !)) !" !!! !−∆!!!!!<6A →!!"#$!! !=0 !"#! →!!"#$!! !=!!"#$!! ! !" ! !<! !! Curtailment Table 2: Proposed sensitivity-based local voltage control. 4.3.2 Centralized Thermal Management Following a careful review of the existing literature an optimized, centralized and discrete time based thermal management control that ensures all grid constraints are respected and minimizes user impact is proposed. The designed control employs a flexibility offer tactic under a multi-agent based approach motivated by the work of Haque et al.[13]. and draws inspirations from the cumulative charging time centered ranking used by Quirós-Tortós et al. [10][11] to deliver, through three alternative optimization toolboxes, with their respective target functions, a minimal impact upon the user. To ensure a proper understanding of its functionality, its execution will be now explained following a sequential basis. In the same way as the voltage control was configured, the thermal management is also executed on a discrete time basis. As it is pointed out by Quirós-Tortós et al. [10][11] a good indicator to measure the assets’ overloading, considering their thermal time constant, is to look at their hourly loading. Thus taking this into consideration and seeking a compromise trying to reduce the total computational and communication needs, as well as obtaining an adequate thermal control, an execution time step of !!=300! has been considered appropriate. Additionally looking to deliver a coordinated action with the voltage control system, the thermal management is executed every 5 min just prior to the 10th voltage control action in a row. This is later clarified in the following section, when the complementary action of both systems is presented. 4. Proposed Algorithm ~ 41 ~ Every execution time, the transformer agent receives the power and current measurements from the transformer and the head feeders and estimates the assets’ utilization factors. These utilization factors are used as a metric to quantify the loading of the assets and determine the necessary course of action. A single one is defined in terms of power for the transformer (!) and three for every feeder “i” defined in terms of current to account for each individual phase “j” (! !"). They are all calculated as the present loading of the asset (!!,!!!") minus its rated capacity (!!"#$%,!!"#$!!" ) times a security factor specified by the DSO (!). This security factor is introduced to further guarantee the integrity of the network and, as it will later become clear, because of the operational constrains of some of the optimization toolboxes. Although this factor can be tuned and optimized for each particular network by trial and error, a value of !=95% has been considered motivated by the findings of Quirós-Tortós et al. [10][11]. In other words a total executional error margin of 5% is assumed for the thermal control system. Assuming a total “n” number of feeders, with phases a-b-c, connected to the distribution transformer, the utilization factor vector (! ! ) is defined as: ! !(!!!!,!)=! ! !! ! !! ! !!…! !" ! !" ! !" ! != !!−!!"#$% ! ! !" =!!!" −!!"#$!!" ! ∀ !=1,..!; ∀ !=!,!,! Utilization Factor Vector Once the utilization factor vector has been determined, according to its values, a reloading, curtailment, or none flexibility request will be issued. It is important to bear in mind that the thermal control is designed to operate in terms of the asset’s maximum admissible limits, given by their rated capacity and the security factor !. It is the violation or not of these limits, or equivalently, the sign of the utilization factors, the criteria that determines the undergone control actions: !" !"# ! !" <0 & !<0 ∀ !=1,..!; ∀ !=!,!,! Issue a Reloading Request !"#!$% !<0 & ! !" ≥0 !" {!>0 } ∀ !=1,..!; ∀ !=!,!,! Issue a Curtailment Request else No Actions Taken As it can be appreciated in the expressions above, a reloading flexibility request can only be sent to the charging station agents when the transformer limit has not been exceeded and there is still margin in any of the feeder’s phases. Else a curtailment flexibility request will be issued whenever the transformer limit is surpassed, no matter the state of the feeders connected to it, or even if some room exists within the distribution transformer, when no margin is available at any of the connected feeders. Finally in the exceptional case that either the distribution transformer or all the feeders are operating precisely at their maximum admissible limit, not corrective action is required. It is important to highlight before moving any further that, in case a first reloading command has been issued, after that optimization has concluded and within the same control cycle, a second curtailment optimization is launched, if any of the assets so requires, to properly ensure no thermal violations occur. This is done using the computed changes in the vehicles’ charging currents to estimate a new utilization factor vector. Once a reloading or a curtailment flexibility request reaches the charging station agent, providing that the tandem vehicle-station is “enabled” to participate in network management, a flexibility offer is issued back to the transformer agent. These flexibility offers, either for curtailment or reloading, contain the following information: 4. Proposed Algorithm ~ 42 ~ ∙! Subscript referring to the station-vehicle tandem i. Notation ∆! Current flexibility bid (A). !"#$% Minimum current step of the bid (A). ! !! Cumulative time of charge of the vehicle (s). !"!!" Resulting connection of the station-car pair (1-Phase / 3-Phase AC). !"#!! (!) (!,!) Reloading offer. !"#!! (!) (!,!) Curtailment offer. !"#!! (! !" !) (!,!)=∆!,!"#$%,! !!,!"!!" ! ! Flexibility Offer Before detailing the construction of both curtailment and reloading offers, it is important to clarify some of the parameters (the cumulative charging time of the vehicle is disregarded as it is considered to be self-explanatory): i. The current flexibility bid (∆!) represents the maximum change in the charging current offered by the station-vehicle tandem. ii. The minimum current step of the bid (!"#$%) denotes the minimum unitary division the current bid consists of. iii. Finally the resulting connection of the station-car pair (!"!!") is used to fully characterize the duo’s connection to the network. This parameter is of extreme relevance since it represents how each vehicle-station tandem directly affects the different network assets. For instance a single-phase car connected to phase “b” cannot alleviate feeder congestion in phases “a” or “c”. Thus in order to complete describe such connection, this parameter is modeled to take an integer numerical value ranging from one to four accounting the four possible considered combinations. Therefore the first three values are assigned to single-phase AC connections to phases “a”, “b” and “c”, while number four corresponds to three-phase AC connections. Now the construction of both curtailment and reloading offers is fully explained: • Reloading Offers: Fist of all it is important to notice that, once a PEV is plugged to a charging station, both its cumulative charging time (!!!), which starts increasing with every passing second, and its resulting connection parameter (!"!!"), which becomes completely fixed, will not reset until the vehicle is unplugged and a new car is connected once again. Thus, as these values are simply read directly from the charging controller, when elaborating a flexibility offer, what the charging station agent must really determine are both the current flexibility bid (∆!) and the minimum step for the bid !"#$% . The same applies for the curtailment offers. In order to properly define them the following additional information is required: i The existing charging current of the station (!!! !). ii The maximum permissible charging current by the voltage control (!!"#$!! !). Then according to their values two subtypes of reloading offers can be issued: charge resume offers or charging rate increase offers. Their definition and the conditions under which each one is issued are detailed in the table below: ∆!!=6A; !"#$!!=6A !" !!"#$!! !≥6 A & !!! !<0.1 A Charge Resume Offer ∆!!=!!"#$ !! !−!!! ! ;!"#$!!=!"#$%&'!! !"#!$% !!"#$ !! !≥!!! ! & !!! !≥6A Charging Rate Increase Offer ∆!!=0A; !"#$!!=!"#$%&'!! else Table 3: Flexibility Reloading Offers: Definition and Issuing Conditions. 4. Proposed Algorithm ~ 43 ~ As it can be appreciated a charge resume offer is issued whenever the vehicle’s charge is on hold and the maximum allowable charging current given by the voltage control system is equal to or above the minimum current value of 6A given by the standard IEC 61851-1. Under such conditions a current bid of 6A, representing the car’s charge restart, is sent to the transformer agent. It is important to notice that this bid is given with a minimum current step of 6A, which means that, if selected, the current bid must be taken using 6A steps, in other words in its full integrity. This is necessary to guarantee a fulfillment of the standard and as it is later covered when describing the optimization processes, correctly operate with both charging rate increase and charge resume offers. If the vehicle’s charging process in currently undergoing a current bid is issued as the difference between the car’s actual current and the maximum allowable one given by the voltage control system. In this case the minimum current step is the one applicable by the charge controller itself, which if compliant with the standard corresponds to 1A. This is precisely what is intended to be stated under the notation !"#$!!=!"#$%&'!!. Where !"#$%&'!! represents the minimum current step applicable by the controller. Finally it is important to clarify even though “else” conditions can never occur under a normal operation, it is required to include them in the code to account for any possible anomaly. • Curtailment Offers: Opposite to the reloading case, to properly define the curtailment offers, only one additional parameter is required: the existing charging current of the station (!!! !). Nonetheless, once again, according to its value two subtypes of curtailment offers can be issued: charge stop offers or charging rate decrease offers. Their definition and the conditions under which each one is issued are detailed in the table below: ∆!!=!!! !−6A ;!"#$!!=!"#$%&'!! !" !!! !>6 A Charging Rate Decrease Offer ∆!!=6A; !"#$!!=6A !"#!$% !!! !=6 A Charge Stop Offer ∆!!=0A; !"#$!!=!"#$%&'!! else Table 4: Flexibility Curtailment Offers: Definition and Issuing Conditions. As it can be seen once again in the case of curtailment the same structure exists. If a vehicle is charging above the minimum current, a maximum bid to lower the current until its minimum value is issued, otherwise if it is already charging at the minimum rate, a charge stop offer, presenting the same characteristics as the previously described charge resume offers, is sent to the transformer agent. Finally also another technical “else” condition is added to properly cover all possible combinations of values within the code, although this can never happen under normal system operation. 4.3.2.1 Thermal Optimization: As the different flexibility offers are received by the transformer agent, they are categorized according to their feeder of origin and listed in an ordered manner. This initial order is of extreme importance since it will be later used to correctly reroute the obtained solutions and send them back to their corresponding nodes. At the same time and as a structural consequence of this routing mechanism to properly ensure a correct signal allocation, the charging station agents are forced, both under curtailment and reloading cases, to issue an empty flexibility offer back to the transformer agent in case the tandem vehicle-station is not enabled to participate in network management. One 4. Proposed Algorithm ~ 44 ~ aspect intentionally left unresolved is how to properly categorize the offers by feeder, which, for the present study cases, has simply been done manually. The reason behind this is that it was considered that such information could be already inferred through the communication process between the agents. Nonetheless, if this would not be the case, an automated sorting mechanism can be easily built on top of the present system by adding an extra parameter to the offers indicating feeder of origin. Once all the offers have been received and properly categorized by the transformer agent, accordingly to the optimization toolbox selected by the DSO, the thermal optimization is executed. Three alternative optimization toolboxes have been used, together with their respective target functions, to properly manage the network constrains while inflicting a minimum impact upon the PEV users. In other words trying to ensure the maximum amount of vehicles can reach an acceptable final charge level at departure time. This minimal impact is ensured by delivering target functions and car ranking systems prioritizing the curtailment of those vehicles presenting the higher cumulative charging times. As it is pointed out by Quirós-Tortós et al. [10][11], the higher the cumulative charging time a vehicle has, the longer the car has been plugged to the network and thus the closer to a full charge state its battery must be. The three used optimization toolboxes are: “Intlinprog”, “Fmincon” and “DynTable”. Two of them,“Intlinprog” and “Fmincon”, are included in Simulink and are thus property of “The MathWorks, Inc.”. The proposed problem formulation, together with their respective target functions and solutions, using both “Intlinprog” and “Fmincon” are presented in Table 5. • “Inlinprog” & “Fmincon” Formulation: In order to add some additional clarity, some crucial structural aspects common to both optimizations are now highlighted. First of all it is important to notice that the curtailment process is executed in two steps. During the first optimization a network alleviation considering only the system feeders is covered, followed by, if the congestion of the distribution transformer has not yet been resolved, a second optimization simply focused on the transformer itself. This is done to ensure an intelligent and efficient car selection during the thermal optimization process. Since the vehicles’ cumulative charging time is used as the main decisive parameter in the selection, by first correcting the congestion on each individual feeder while disregarding the transformer, a better network synergy, avoiding duplicities, is achieved. For instance let’s consider a sample network consisting of two feeders and one transformer, with its first feeder and the transformer requiring both a curtailment of 10A. Obviously the preferred solution would be to curtail those 10A using the vehicles from the first feeder, effectively correcting both issues. However if just a single optimization including the transformer is done and the cumulative charging times from the vehicles in the second feeder is higher than those from the first one, the cars from the second feeder could be used to alleviate the transformer congestion and then additionally those from the first feeder would correct their own feeder overloading, resulting in an inefficient solution with excessive curtailment and a higher impact on the users. This phenomenon is not present in the case of reloading, since, in that case, each car is analyzed considering the limitations of the feeder it is plugged to and using the transformer as the higher limit that stops any vehicle anywhere in the network from increasing its charging rate. 4. Proposed Algorithm ~ 45 ~ “Intlinprog”: max (!"#$!! !! ℵ !!!!!!!) “Fmincon”: max (!"#$!! !! ℵ !!!!!!!) !!ℵ,! Target Function Constrains: !+(!"#$!! !! ℵ !!!!!) ! !"# ≤0 ! !" +(!"#$!! !! ℵ !!!!!) ≤0; !" ! !" <0; 0+(!"#$!! !! ℵ !!!!!) ≤0; !" ! !" ≥0; ∀!=1,..!; ∀!=!,!,!; where: !!=1 3 !" !"!!" !=1;2 !" 3 (!"#$% !ℎ!"# !"#) !" !"!!" !=4 (!ℎ!"" !ℎ!"# !"#) !!=1 0 !" !ℎ! !"ℎ!"#$ !""#$%& !ℎ!" !ℎ!"# !"# !""#"$ !"ℎ!"#$%! Variable Boundaries: !!!≤!!≤!!! !!!=0;!!!=∆!! !"#$!! ; Solution Vector: Reloading “Intlinprog”: !(ℵ,!)=!!,!!,…,!ℵ !; “Fmincon”: !(ℵ,!)=!!,!!,…,!ℵ ! ; Constrains: ! !" −(!"#$!! !! ℵ !!!!!)≥0; !" ! !" ≥0; 0+(!"#$!! !! ℵ !!!!!)≥0; !" ! !" <0; ∀!=1,..!; ∀ !=!,!,! where: !!=1 3 !" !"!!" !=1;2 !" 3 (!"#$% !ℎ!"# !"#) !" !"!!" !=4 (!ℎ!"" !ℎ!"# !"#) !!=1 0 !" !ℎ! !"ℎ!"#$ !""#$%& !ℎ!" !ℎ!"# !"# !""#"$ !"ℎ!"#$%! Variable Boundaries: !!!≤!!≤!!! !!!=0;!!!=∆!! !"#$!! ; Solution Vector: Curtailment 1st Optimization “Intlinprog”: !!!" (ℵ,!)=!!,!!,…,!ℵ !; “Fmincon”: !!!" (ℵ,!)=!!,!!,…,!ℵ !; Executed only if: !−(!"#$!! !! ℵ !!!!!) ! !"# >0; ∀ !!∈!!!" (ℵ,!) New Utilization Factor: !!"# =!−(!"#$!! !! ℵ !!!!!) ! !"# ; ∀ !!∈!!!" (ℵ,!) Constrains: !!"# −(!"#$!! !! ℵ !!!!!) ! !"# ≥0; where: !!=1 3 !" !"!!" !=1;2 !" 3 (!"#$% !ℎ!"# !"#) !" !"!!" !=4 (!ℎ!"" !ℎ!"# !"#) Variable Boundaries: !!!≤!!≤!!! !!!=0;!!!=∆!! !"#$!! −!!!" (!,1)(ℵ,!); Solution Vector: Curtailment 2nd Optimization “Intlinprog”: !!!" (ℵ,!)=!!,!!,…,!ℵ !; “Fmincon”: !!!" (ℵ,!)=!!,!!,…,!ℵ !; Final Solution: “Intlinprog”: !(ℵ,!) !=!!!" (ℵ,!)+!!!" (ℵ,!); “Fmincon”: !(ℵ,!) !=!!!" (ℵ,!)+!!!" (ℵ,!); ! !"# Nominal Voltage at the transformer and Head Feeders (V). ! !" Utilization Factor for Feeder “i”, phase “j” (A). Notation ℵ Total number of participating cars. !! Participation Factor. ∙! Subscript referring to each participating vehicle. !!!; !!! Lower and Upper limits of the Participation Factor. ! Total number of feeders !ℵ,! Participation Factor Vector. ! Transformer Utilization Factor (VA) !!; !! Auxiliary variables. Table 5: Thermal Optimization: Problem Formulation and Resolution: “Intlinprog” & “Fmincon”. 4. Proposed Algorithm ~ 52 ~ properly shaped electrical waveforms in the simulated network environment. Nonetheless under a real implementation on an existing network, control time steps of several seconds should be feasible. Figure 5: Proposed Algorithm Flowchart ~ 53 ~ 5. Case Studies and System Modeling In this section the different covered case studies to validate and test the algorithm’s performance will be presented, accompanied by a detailed description of their designed simulation environments, covering the modeling of the most relevant network elements. As two main objectives are pursued when assessing the algorithm’s behavior, two sets of case studies have accordingly been defined for the present work. On one hand several offline or computer-based cases, conceived to allow a through assessment of the algorithm’s performance on a representative distribution network environment, have been considered. These are then reinforced by the execution of a single online or HIL validation case crafted to verify the algorithm’s compatibility with and proper execution under real hardware. In order to perform a HIL validation using the hardware available in the laboratory, the usage of a real-time simulator is required. MicroLabBox by dSPACE Ltd. [46], from now on simply referred to as “dSPACE”, was chosen for the present study over other available alternatives such as “OPAL-RT” for its excellent compatibility with Simulink and its Simscape Power Systems Library [47]. This is why the proposed control algorithm and the simulation environments for the different case studies have been implemented and tested using Simulink. Additional information regarding the structure and characteristics of the created simulation interface under Simulink can be found in the appendices. Since both cases share the modeling and characteristics of the most relevant elements, these will only be only assessed when describing the computer-based simulations, as they represent the most complex case. Afterwards, when covering the online case, only its main differences between will be highlighted and justified. The different case studies and their respective simulation environments are now detailed. Offline or Computer-Based Cases 5.1 5.1.1 Simulation Environment As it was already mentioned the offline cases are designed to properly evaluate the algorithm’s performance, executing a deeper and more complete review of its characteristics. In order to properly present and define the selected study cases, first of all a comprehensive introduction of the created simulation environment covering the definition of its main elements is done. A complete summary of its characteristics can be found in Figure 6. 5.1.1.1 Test Network To properly create a suitable simulation environment, a modified network topology inspired by a typical Dutch residential LV network used by Haque et al. [13] in their work is employed. While structurally almost all characteristics have been preserved, such as the allocation of the domestic loads and the properties of the distribution transformer itself, some minor downgrades have been introduced to the head sections of the feeders. This has been done in order to make the network more sensitive to experience both thermal congestions and voltage problems, but essentially to lower the otherwise extremely high ampacity of the main distribution feeders. 5. Case Studies and System Modeling ~ 54 ~ Figure 6: Computer-Based Simulation Environment Consequently a downgrade of the previously existing aluminum cable sections of 150mm2 and 95mm2 within the distribution feeders was executed. These were then substituted by equally long underground aluminum replacements of 50mm2. The resulting network consists of a total of 20 households, fed by power underground cables and distributed among three main feeders supplied by a 10/0.4 kV, 100kVA MV/LV transformer. The allocation of the existing dwellings as well as the location of the different cable sections within the network can be found in Figure 6. Their main electrical characteristics are summarized in Table 6. Underground Cables Cable type R (Ω/km)1 X (Ω/km)1 R/X 1 C(µF/km)2 R0/R1; X0/X13 C0/C14 Ampacity (A)5 A 150 mm2 Al 0.206 0.079 2.61 0.723 4 0.6084 - C 50 mm2 Al 0.641 0.085 7.54 0.553 4 0.6084 116 D 16 mm2 Al 1.91 0.096 19.9 0.404 4 0.6084 - E 10 mm2 Cu 1.837 0.088 20.88 0.404 4 0.6084 - F 6 mm2 Cu 3.061 0.1 30.61 0.325 4 0.6084 - Transformer Rating (kVA) 100 R; Z (Ω)1 0.0072; 0.0246 Table 6: Network electrical characteristics The network underground cables have been modeled using the “pi” line models available in Simulink, which also require the specifications of the zero sequence to take into 1 [13]. 2 [62]. 3 [63], [64]. 4 Default relation given by the Simulink “pi” line model. 5 Value corresponding to 3-4 core XLPE aluminum cables laying in ducts (more restrictive). 5. Case Studies and System Modeling ~ 55 ~ account possible unbalanced operation. All network components have been implemented using the Simscape Power Systems Library [47]. 5.1.1.2 Dwellings: Domestic Load Profiles The characterization of all domestic loads has been done using the CREST tool [48]. This tool, developed by the Centre of Renewable Energy Systems Technology (CREST) of Loughborough University in the UK, allows to randomly generate the time-series behavior, with 1-min resolution data, of domestic loads taking into consideration the number of people at home, the use of the existing appliances (lightning, heating, local generation, etc.), the type of day (weekday or weekend), the month of the year, and the weather conditions of the selected location among others. The tool has been designed considering the domestic behavior of British customers. Thus, using the tool, 20 random domestic load profiles have been generated. These profiles have been crafted considering the geographical location of Dortmund (51.5ºN 7.5ºE) and correspond to a typical weekday during winter (15th of January) to account for the case of maximum domestic demand and therefore the hardest base load conditions for the studied network. This is done in order to showcase the effectiveness of the algorithm under the most severe possible conditions. The individual generated profiles, indicating the net active power demand of each household in kW, are then assigned, to make them more realistic, a random inductive power factor between 0.9 and 0.95. Finally the resulting PQ loads are allocated to their respective nodes and modeled using the Three-Phase Dynamic Load block available in Simulink. The combined net active power aggregated demand of the 20 households is presented in the figure below. Figure 7: Total Aggregated Domestic Demand It is important to remark that this individual characterization of the different domestic loads has been considered preferable over the usage of an average aggregated profile scaled and assigned to each individual dwelling. Such alternative would result in a much smaller total maximum demand. The reason is highlighted by Jenkins et al. [49] in their study, where the they analyzed the mitigation effect over the individual maximum 5. Case Studies and System Modeling ~ 56 ~ demands when multiple dwellings are aggregated. Nonetheless, those smoothing effects over the individual demand spikes are much more significant as the number of considered customers increase. For a small number of households, as it is the current case, the authors point out that those mitigation effects are still much smaller than the ones reflected in a aggregated profile generated with the data of thousands of individual costumers. Consequently an individual characterization was considered much more realistic and adequate over a scaled smoothed profile, resulting in a more spiky behavior to test the proposed control algorithm. Further details on the characteristics and consumption of each individual dwelling, as well as their associated power factors can be found under appendices. 5.1.1.3 PEV and Charging Stations • Considered Vehicles and Stations Models: For the present study, two PEV models have been considered corresponding with two of the available vehicles present in the laboratory: a Nissan Leaf and a BMWi3. Their characteristics are summarized in the table below: Version 2014/2015 BMWi3 (94 Ah) Battery Capacity [Ah] 67 1 94 2 Battery Rated Voltage [V] 360 1 353 2 On-Board Charger efficiency [%] 0.89 3 0.925 4 Connector IEC 62196 Type 1 1 IEC 62196 Type 2 2 Maximum Charging Current [A] 16 1 32 2 DC Charging Supported 1 Supported 2 Table 7: Studied PEV Characteristics5 Since the present project work, does not account for DC charging, only the AC charging capabilities of both cars are of interest. As it can be seen in Table 7 the Nissan Leaf represents a single-phase AC vehicle with a maximum permissible charging current of 16A given by its OBC. On the other hand the BMWi3 with its type two connector supports three-phase AC charging and its OBC allows charging currents up to 32A. As only domestic charging will be considered in the present analysis, two commercial charging stations models sold by Schneider Electric SE have consequently been considered, capable of supporting respectively single-phase AC and three-phase AC charging. Their main characteristics are summarized in Table 8. Finally it is important to highlight that the efficiency of the OBCs for each vehicle has been estimated in accordance to their maximum charging current, once plugged to their corresponding charging stations, based on the experimental results of the studies conducted by Genovese et al. [50] and Scoffield [51]. 1 [65]; 2 [66]; 3 [50], [51]; 4 [51] 5 The attached images of the commercial vehicles have been extracted from the following sources [67], [68]. 5. Case Studies and System Modeling ~ 57 ~ Model EVH2S3P0AK ! EVH2S11P02K Charging Mode 3 3 Connector IEC 62196 Type 1 IEC 62196 Type 2 IEC 61851-1 Standard Supported Supported Maximum Supported Current [A] 16 16 Table 8: Charging Station Characteristics1 [52], [53] • Allocation, Penetration Levels & Participation in Network Management A maximum of 20 vehicles, one per each individual household, have been considered for the present study. Taking into account the rated power of the distribution transformer, as well as the maximum charging rate of both single-phase and three-phase vehicles once coupled to their corresponding charging stations, 3.7kW and 11KW respectively, a total amount of 15 Nissan Leaf and 5 BMWi3 will be scattered throughout the network. Together they represent a total charging demand of approximately 110kW, surpassing already, without considering the domestic load, the transformer rating and ensuring the need for curtailment. At the same time, as the DSO must safeguard the system from the introduction of great sources of unbalance, the single-phase charging stations of those households assigned one Nissan Leaf, will be distributed among the three different phases, resulting in a total of 5 stations per phase. Seeking not to influence in any way the final shape of the network in order to work with a case as realistic as possible, a random allocation of the different vehicles among the existing dwellings has been done. To do so a column vector containing a random sample of 20 unique integer elements, ranging from one to twenty, was generated. Each row represents each individual household and its assigned value determines the type of vehicle and charging station it has been assigned, with values 1-5 representing a singlephase car-station tandem connected to phase “a”, 6-10 to phase “b”, 11-15 to phase “c” and 16-20 being a three-phase vehicle-station pair. The results of the distribution are shown in Table 9. On the other hand, in order to assess their potential impacts as well as to test the performance of the developed control system, a progressive penetration in the network of the aforementioned PEVs is considered. This progressive increment of the amount of vehicles in the network allows to analyze the inherit allocation capacity of the current network, revealing the critical number of PEVs above which corrective measures over their uncontrolled charging process become necessary. At the same time the effectiveness of the proposed algorithm correcting them can be evaluated. In the current study the PEV penetration level will be defined as the % of the total existing households possessing at least one electric vehicle. Five different progressive 1 The attached image of the commercial charging station has been extracted from the following source [69] 5. Case Studies and System Modeling ~ 58 ~ penetration levels have been considered: 20%, 40%, 60%, 80% and 100%. Each one representing the total amount of PEVs considered that will be considered to be connected to the network: 4,8,12,16 and 20 respectively. The main idea is that as the penetration level increases, progressively the different households would have acquired the assigned PEVs and charging stations, thus for instance a penetration level of 20% indicates that only four dwellings have acquired and will therefore charge their corresponding PEVs. When a penetration level of 40% is reached four additional households would join the previous ones until all 20 will have their vehicles and station for the 100% scenario. Once again, seeking not to influence in any way the final shape of the network and to work with a case as realistic as possible a random assignation of this minimum penetration level, above which the existing dwellings would have acquired their corresponding vehicle-station tandem, has been done. The same exact strategy is used defining a column vector containing a random sample of 20 unique integer elements, ranging from one to twenty with every four values (1-4, 5-8, etc.) representing each minimum penetration level (20%,40%, etc,). The obtained results are shown in Table 9. Lastly, as it will later be explained while defining the considered case studies, a final round of simulations designed to test whether the proposed control system would require the active participation of all users as a critical factor to ensure a proper network behavior are considered. This is done by assuming only half of the vehicles will actively participate in network management for each penetration level, while the remaining ones will charge unconstrained. Thus a final factor is assigned to each household indicating whether that particular dwelling will actively contribute or not. Once more a random selection is performed by simply arranging the households according to their penetration level and then considering that the odd dwellings will actively participate and the even ones will not. This ensures that for each particular penetration level exactly only half of the available vehicles will be controlled. Again the obtained results are presented in Table 9. Household Vehicle-Station Tandem Penetration Level Part of 50% Control? 1 Single-Phase “c” 40 Yes 2 Single-Phase “a” 80 Yes 3 Single-Phase “a” 80 No 4 Single-Phase “c” 80 Yes 5 Single-Phase “b” 100 Yes 6 Three-Phase 40 No 7 Single-Phase “a” 20 Yes 8 Single-Phase “c” 20 No 9 Three-Phase 60 Yes 10 Three-Phase 40 Yes 11 Single-Phase “a” 60 No 12 Single-Phase “c” 100 No 13 Single-Phase “b” 20 Yes 14 Single-Phase “a” 80 No 15 Single-Phase “c” 60 Yes 16 Single-Phase “b” 20 No 17 Three-Phase 100 Yes 18 Single-Phase “b” 100 No 19 Single-Phase “b” 40 No 20 Three-Phase 60 No Table 9: PEV-Charging Stations Distribution, Penetration Level and Participation in Network Management This same information can also be found more visually presented within Figure 6. 5. Case Studies and System Modeling ~ 59 ~ • Connection Hours Another essential aspect to correctly model the charging patterns of the PEVs is to determine the time at which each vehicle arrives home and thus is initially plugged to the network as well as when it is later disconnected when the car is once again needed. For the current study only domestic charging has been considered and at the same time only the main charging event at night will be analyzed. This can easily be justified since it is precisely at night when PEVs spend the longest time connected to the network since the majority will have to refill most of their batteries and it is thus the period when their potential aggregated impacts can potentially be more damaging. Consequently drawing inspiration from the work developed by Fernández-Orjuela [54] and using the data published by Alonso et al. [55], whose study presented, for every hour in the morning, the percentage of PEVs initiating their daily trip as well as the cumulative share of vehicles already parked back home during the evening, an estimation of the probability density functions reflecting the time of arrival and departure of the vehicles have been defined. Following the example of Fernández- Orjuela [54], the density functions are designed on a hourly basis and then redefined to account every 10 min interval distributing the hourly probability using a binomial permutation. Finally by taking a random sample of both functions the time of arrival and departure of the different vehicles was estimated. The obtained results are presented in Figure 12. Further additional details regarding the calculation of the connection hours can be found under appendices. Household Time of Arrival (Day x) Time of Departure (Day x+1) 1 19:30:00 7:20:00 2 21:00:00 8:10:00 3 21:10:00 8:20:00 4 18:50:00 8:40:00 5 20:10:00 9:20:00 6 20:00:00 8:10:00 7 20:20:00 7:10:00 8 20:30:00 7:10:00 9 20:40:00 7:20:00 10 19:10:00 8:30:00 11 20:30:00 7:20:00 12 20:20:00 8:30:00 13 18:30:00 7:20:00 14 18:20:00 9:10:00 15 20:10:00 7:30:00 16 0:10:00 (Day x+1) 7:10:00 17 19:20:00 7:20:00 18 20:20:00 8:10:00 19 19:10:00 8:00:00 20 20:40:00 7:30:00 Table 10: Time of Arrival and time of Departure of the different PEVs Although it was already stated, it will be again clarified that it is considered that each vehicle is continuously plugged to the network while it remains parked at home. Lastly it will also be highlighted that the total simulation time has obviously been adjusted, for mere practical reasons, solely to the interval where at least a PEV is connected to the network. Thus the simulations begin a couple of minutes prior to the connection of the first vehicle and end a couple of minutes after the last vehicle has been unplugged. 5. Case Studies and System Modeling ~ 60 ~ • Electrical Behavior Modeling Once all details concerning the characteristics, distribution and connection of the vehicles have been detailed, the modeling of the two main aspects of their electrical behavior, their charging process and their battery, will be now addressed. i Charging Process First of all it is important to clarify once again, that for the scope of this project, only single-phase and three-phase mode 3 charging compliant with the IEC 61851-1 and relaying respectively on connectors IEC 62196 types 1 and 2 are considered. Under such circumstances, the charging process of every vehicle-station tandem is then governed by the restrictions imposed by their combined ratings and by the behavior of the vehicles’ OBC. As it was previously explained in page 17 while describing the characteristics of the charging process, the car’s OBC is the one responsible to convert the network AC power into the DC power required to charge the battery. The most important aspect to bear in mind is that the OBC is equipped with a PFC, which controls the charging process correcting the power factor in order to achieve a sole active power demand and reducing the harmonic injection into the network. A complete and detailed modeling of the PEV’s OBC is not the purpose of this work, since the objective is to study the vehicle’s charging impact on the network. Therefore a simplified a qualitative model considering the key features of the OBC is more than enough to achieve that goal. Thus the charging process is modeled using controlled current sources, one per phase, fed with sinusoidal signals generated using a set of unitary sinusoidal waves and the charging current maximum permissible value, given by the vehicle-station tandem characteristics and the limitations set by the proposed algorithm in case such condition applies. To properly reflect the features given by the vehicle’s OBC, the set of unitary sinusoidal waves is calculated using a PLL (Phase-Locked Loop) control system fed with the corresponding nodal voltages. The PLL allows to generate an output signal in phase with the nodal voltage and thus effectively mimicking the car’s OBC. This guarantees the resulting charging current will be in phase with the voltage, solely demanding active power and thus also reducing the harmonic injection into the network. Such implementation in Simulink is shown in Figure 8. Figure 8: PEV & Ch. Station Charging Model on Simulink Two important considerations regarding Figure 8 can be made. First of all is the need of a parallel resistance when a current source is connected in series with inductive elements such as the network lines in Simulink. Assigning it a huge value it effectively becomes an open branch. Secondly it is important to highlight, in the case of a singlephase vehicle, the two non-participating phases current sources are then fed with a 0 value signal. Finally it will also be remarked that the complete modeling of the charging 5. Case Studies and System Modeling ~ 61 ~ process in more complex since it also considers the connection and disconnection of the vehicle as well a stop command once the battery is refilled. Nonetheless these are the most relevant aspects. ii Battery !"# !=!"# !−∆!+ 1 ! ! ! !! ∆!; ! !!=! ! !!"# !!"##; ! !=!!! !"#!! 3600; ! ! PEV Charging Power (Network Side) (W) ∆! Simulation Time Step. (s) !!"# OBC efficiency !!"## Battery Re/Discharge Efficiency ! !! Useful Battery Charging Power (W) !! Battery Capacity (Ah) ! !"#!! Battery Rated Voltage (V) Figure 9:Battery Model & Simulink Implementation As it was previously explained in page 17 while describing the characteristics of the charging process, the charging of a battery is an extremely complex process defined by cycles of constant-current and constant-voltage. While it would be beneficial and advisable to attempt to take this distinctive behavior under consideration, this has been disregarded under the scope of the current project for three main reasons: - First of all due to the lack of time and data to do a better system modeling. - Secondly, even though a better model would depict more accurate network impacts, the objective of the project is to assess the resulting improvements by using the developed algorithm. Thus since in both cases the studied network is subjected to the same battery model, it should not interfere while addressing the quality of the developed control. - Finally most studies in the field so far have not taken this into account. When it comes to model the battery’s behavior essentially two main approaches exist, as pointed by Young et al.[56]: electrochemical and equivalent electrical circuit models. Electrical circuit models are preferable for grid integration studies, as they can be easily coupled with other circuit devices. Among them, multiple categories can be defined according to their levels of complexity. Nonetheless for the present study an alternative battery model based on the estimation of its SOC as a function of the charging rate will be used. This model is based on the one employed by Fernández-Orjuela [54] in his work, where it is shown to present a total deviation inferior to 1% when compared to a classical simplified equivalent circuit model, while, at the same time, offering faster computational times and compatibility with multiple battery technologies. The model has been further expanded to also account for the efficiency of the vehicle’s OBC as well as a charge and discharge efficiency for Lithium-Ion batteries of 97%. This estimate is based on the experimental findings of Genovese et al. [50]. A mathematical description of the model as well as part of its implementation on Simulink can be found in Figure 9. 6. Results & Discussion ~ 68 ~ (a) (b) (c) (d) (e) (f) Figure 13: Complete Results of the HIL Case Study 6. Results & Discussion ~ 69 ~ This is particularly noticeable during the voltage control cycles as shown in Figure 13- (a),(c),(e) and (f), especially during the second one. It can be seen how the charging rate of the vehicles is progressively reduced and latter increased as a response to the limit violations introduced by the external voltage load. These modifications seek to adjust the voltage as much as possible to the control threshold satisfactorily holding it above the lower limit. One noticeable aspect is that during the second cycle, when both vehicles are plugged and participating, the system exhibits what seems like a more precise control. This higher degree of control is simply caused because in this case, with both vehicles charging, the magnitude of the external load has been lowered. Consequently the vehicles alone represent a higher share of the total net demand and have a greater effect over the overall loading. Nonetheless the same correct execution of the control can be seen for both cycles. In the same way it is also demonstrated how the sensitivity-based voltage control allows a good coordinated control when several vehicles are connected into the same electrical node. Additionally, during both cycles, the control is performed in response to the most stressed phase, phase “a”, which is additionally loaded with the charge of the single-phase vehicle. In fact it can be precisely highlighted how all phases converge when the charge of the single-phase vehicle is stopped. Moreover the same corrective control can be seen during the thermal violations stage shown in Figure 13-(b),(d),(e) and (f). One important aspect to bear in mind when judging both controls is that the algorithm can only correct such violations up to the maximum control capacity of the vehicles. For instance if an asset is already overloaded due to an additional external load, the control system will prevent any vehicle connection to further stress it but cannot alleviate its existing congestion. This explains why even when both vehicles disconnected the feeder loading at 2500s is still above the thermal limit. Nonetheless it can be seen how the curtailment and latter reloading of the vehicles is correctly caused as a response to the thermal loading of the assets attempting to safeguard their control limits. Once again matching the nodal voltage behavior it can be appreciated how the feeder loading for phase “a” is higher due to the single-phase vehicle. On the other it can also be established, giving the obtained results, that the algorithm has been proven to be fully compatible with and validated under real hardware. This is most noticeable by the overall quality of the matching behavior between the charging rates of both real and virtual vehicles with only some minor differences that will now be covered. It is important to remark that the focus is only given to the charging rates as structurally both feeders are identical and thus the any difference in any remaining parameter such as the nodal voltages and the total feeder loading is simply a direct consequence of the charging rates, which ultimately depend on the designed control. First of, disregarding the measurement noise of approximately 2% of the measured current introduced by the instrumentation as well as the wrong 2A range measurements generated by the RTS whenever the charge of a real vehicle was stopped and its virtual partner charging and corresponding to a real null current, it can be seen how consistently the real BMWi3 presents a lower charging rate than its virtual counterpart even when no limitations are in place. This is simply because the three-phase socket of the charging station in the laboratory, in practice, never delivers a full charging rate of 16A when both terminals are under used, consistently offering 1A less than its giving reference. This explains why it always presents a lower rate than the virtual one and thus also allows, most noticeably during the voltage control, the real Nissan to sustain a 6. Results & Discussion ~ 70 ~ higher charging current compared to the virtual one, as the BMWi3 is causing a smaller voltage drop. Moreover it can also be seen how during the voltage control the imposed current limitations differ for instance at 500s and while managing the vehicles’ reconnection, when only the Nissans are connected. This can be explained by two complementary reasons. The first one is related to how the response times of the real vehicles affect the sensitivity parameter estimation. This parameter is estimated every voltage control cycle and relies on employing the voltage and current changes by measuring them 1s prior to the execution of the control and 3s afterwards. Since the change in the charging rate of the real vehicles is not as fast as that of the virtual ones some differences in the estimation of the parameter could lead to different end set points. Complementarily the second one is related to the noise introduced by the instrumentation. Not only has it the potential to also disturb the sensitivity parameter estimation, but also to slightly alter the voltage signal used for the calculation of the new current set point. This is in fact reinforced by the perfect match existing during the thermal control stages, where no dependence at all with the instantaneous voltage measurements or the sensitivity parameter exist. Finally it is important to remark that while a perfect match does exist in the feeder thermal congestion phase some differences appear during the second thermal cycle. These differences, corresponding to the transformer congestion phase, are simply the result of the normal operation of the developed algorithm. This is because, although when the transformer is affected all vehicles downstream can actively contribute to its management, only those necessary to cover the required amount of curtailment or reloading capacity will be selected according to the optimization toolbox criteria. This is the reason why the first thermal congestion the management, done under the exact same conditions (relying on the same two vehicles with equal cumulative charging times), results in the same exact behavior while in the transformer case, where all four vehicles participate, the curtailment and reloading actions do not have to be equally match between both feeders as they depend on the magnitude of the control need. Consequently this can be used to explain the recorded differences in the measured currents, for example by examining the curtailment and reloading commands of both three-phase vehicles. It can be seen as the virtual vehicle was first disconnected, it later possesses a smaller cumulative charging time and this results on its preferable reloading over the real BMW around 3500s. Performance of the Algorithm 6.2 After illustrating the correct execution of the designed control system, the focus will be now given, within this segment, to complete a more detailed examination of its performance and effectiveness when applied on a more realistic and representative residential LV network. This will be done by first presenting the considered performance metrics to address the algorithm’s execution, followed by an individual examination of how its application alleviates respectively both network voltage and thermal violations. Finally the main underlying objective of the optimization, minimizing the impact over the participating users, is covered. Before moving any further it is important to highlight that while the improvements over the voltage and thermal violations are presented separately, they both are the result of the application of the complete algorithm and thus 6. Results & Discussion ~ 71 ~ consisting on the simultaneous coordinated operation of both thermal and voltage control systems. 6.2.1 Performance Metrics To properly assess the effectiveness of its executions and quantify the different network impacts the proposed system attempts to correct, the following performance metrics have been defined and considered for the current study: 1. Voltage Impact Metric: According to the European standard “EN 50160:2010” and in order to assess the resulting impact over the network nodal voltages, an impact metric based on the total number of nodes experiencing voltage violations, registering a 10-min average RMS value below the 0.9 minimum band, is considered. Thus a proper execution of the control algorithm would be measured by a decrease in the total number of affected nodes compared to an equivalent non-control scenario. 2. Thermal Impact Metric: Similarly, a thermal impact metric based on the total number of overloading operation hours, determined by existence of an average hourly loading above the assets’ ratings, was first considered to measure the thermal impact. The selection of such a time frame was based on the work of Quirós-Tortós et al. [10][11] who, taken into consideration the assets’ thermal time constant, considered their hourly loading as a sutiable indicator to measure their congestion. Nonetheless after examining the first set of results it became clear that, even for the non-control scenarios, the overall thermal stress of the assets was not high enough for such a metric to be representative on its own. It was then decided to complement it with a more generic analysis of the continuous loading of the assets. Thus a proper execution of the control algorithm would be thermally measured by both a decrease in the total number of overloading operating hours and by an adaptation of the total aggregated PEV load, being curtailed when the assets’ thermal control boundaries are exceeded and increased whenever there is enough margin for it. 3. User Impact Metric: Finally in order to examine whether the satisfaction of grid constrains is achieved while causing a minimum impact over the participating users, the following global user impact metric is defined. As it was previously explained, it will be considered any vehicle that after an overnight charge has reached a final SOC beyond an 85% level is impact free. Thus the overall user impact metric is defined as the percentage of total users whose PEVs have reached a final SOC beyond such level. Consequently the algorithm will be considered to correctly minimize user impact if a high share of the participating users can remain impact free. 6.2.2 Assessment: Alleviation of Voltage Violations The main results used to address the effectiveness of the algorithm to correct the different nodal voltage violations for the different considered case studies are presented and commented in this segment. For further additional complementary results the reader is referred to the corresponding appendix. 6. Results & Discussion ~ 72 ~ First of all Figure 14-(a) and (b) depict, for the complete simulation time frame, a 10-min time series representation of the complete number of nodes within the network experiencing any voltage limit violations. Figure 14-(a) draws a comparison between the impacts of the progressive uncontrolled penetration of PEVs and those once all vehicles’ charging needs are regulated by the proposed algorithm. Complementarily to assess how critical a 100% user participation would be required Figure 14-(b) compares such a case to that when only half the existing vehicles would participate in network management. In both cases only the scenarios above a 60% PEV penetration level are shown. This is because for the lower penetration levels no significant voltage impacts have been registered, with only four aggregated violations during the entire simulation for the 40% case. The reader can consult the additional plots covering these cases in the corresponding appendix. Moreover this fact is also reflected in Figure 15. Additionally, in both Figure 14-(a) and (b), the controlled penetration cases only correspond to the use of “DynTable” as the thermal optimization toolbox. The reason behind this is that regardless of the selected thermal toolbox no difference at all was found in the system’s ability to correct voltage problems. This can also be appreciated in in Figure 15. (a) (b) Figure 14: Number of Nodes Presenting Voltage Violations over Time. (a) Uncontrolled vs. Controlled PEV Penetration. (b) 100% vs. 50%User Participation. As both plots depict, for those cases where not all the vehicles actively participate in network management, with a higher PEV penetration level a logically higher number of nodes experiencing voltage limit violations is registered. This is because, for such cases, the network is subjected to a greater overall uncontrolled load, resulting in higher and more severe voltage drops. In fact the higher number of violations is shown to occur 6. Results & Discussion ~ 73 ~ between 9 and 10 PM, coinciding with the greatest daily domestic demand and the moment where most vehicles have already been plugged into the network. As both graphs show the proposed algorithm satisfactorily corrects all voltage violations for all penetration levels when all vehicles are actively involved in network management. Notice how all round markers depicting the controlled cases are constantly concentrated on the x-axis meaning no nodes experience any voltage violations. A comparison between Figure 14-(a) and (b), also reveals that whether a full involvement of all users is preferable even with just an active involvement of half of them, a significant reduction of the complete number of violations is registered. Figure 15: Cumulative Total Number of Voltage Violations A more complete outlook of the global results regarding voltage management is presented in Figure 15, where the outcomes of all case studies are summarized. The bar graph shows the total cumulative number of nodes experiencing voltage violation episodes across the different 10-min intervals over the entire simulation time frame and for each corresponding penetration level. As it was previously mentioned, it can be appreciated how, from a network perspective, a critical PEV penetration level is only reached, in terms of voltage constrains, beyond a 40% level. Once again it can be seen how even with just an active involvement of half of all users, the application of the algorithm still manages to significantly reduce the total number of total registered violations, lowering them in more than half compared to a no control case for penetrations above 60%. At the same time as it was also previously highlighted, it can be seen that, regardless of the selected thermal toolbox, a full correction of all voltage violations is achieved. This is no surprise as both controls complement each other, meaning that the thermal commands can only impose additional more restrictive conditions over the existing voltage control, not compromising in any case its correct execution. At the same time, as it will be later highlighted during the congestion assessment, the present network was found to more prone to suffer voltage violation episodes first, with a critical PEV penetration level of 100% required to start registering overloading episodes, meaning that all corrective measures below that level are solely driven by the voltage control system. Finally to conclude this analysis Figure 16, compiling the effects over the nodal voltages of a full PEV deployment for the different case studies as well as for the initial vehicle free grid, is presented. The error bar graph shows the overall mean voltage per node, based on the 10-min average values registered, together with their standard deviation over the complete simulation time frame. Before further commenting its implications, is 6. Results & Discussion ~ 74 ~ important to remark that only the corresponding phase voltage in the case of singlephase vehicles and the average and deviations based on the most conflictive phase in the case of three-phase vehicles have been considered. Focusing on the results, first of all it can be seen the considerable change on the average nodal voltages a 100% PEV deployment brings to the network by comparing those scenarios with the voltage levels corresponding to the initial case. Aside from revealing those nodes more prone to experience limit violations, the graph also proves the correct operation of the voltage management system which, based on its design, maintains the nodal voltages as close as possible to their lower operational limit. This can be proven as for all control cases the voltage averages are not distant from those corresponding to the no control case, and, on the other hand, it is shown how the dispersion of the voltage values becomes lower for the control scenarios and even further with the higher the user participation is (“DynTable 50%” vs. “DynTable 100%”). Lastly it is significant to remark how indeed it also allows spotting some practical differences in the operation of the thermal toolboxes, particularly with “Fmincon” resulting the most restrictive one generating the higher averages and lower deviations overall. This is nonetheless perfectly coherent since ceiling and round approximations had to be applied to it in order to deliver integer-based solutions, resulting in the most restrictive approach of the three. Figure 16: Full PEV Deployment: Impacts and Corrections on the Nodal Voltages 6.2.3 Assessment: Alleviation of Network Congestions An exposition and discussion of the main obtained results will be now covered in this segment to assess the effectiveness of the algorithm to manage the congestion of the network’s assets. The discussion will be carried out in an orderly manner and will be mainly focused on the impact and correction assessment regarding the distribution transformer since, as it will later be proven, the loading of the network feeders remains significantly below their maximum rating and thus none of them impose any restriction over the vehicles’ charging process. For further additional complementary results the reader is referred once again to the corresponding appendix. 6. Results & Discussion ~ 75 ~ (a) (b) (c) (d) Figure 17: Time Series Evolution of the Total Transformer Loading 6. Results & Discussion ~ 76 ~ Consequently, first of all, a complete evolution of the loading of the distribution transformer is presented within Figure 17-(a),(b),(c) and (d). All of them depict, for the complete simulation time frame, a 5-min time series representation of the transformer loading covering different case studies. Figure 17-(a) represents both the initial network scenario and the loading of the no control cases for all PEV penetration levels. Figure 17- (b) draws a comparison between the resulting loading of the uncontrolled PEV penetration scenarios and that of the active management of all vehicles using “DynTable” for the higher PEV penetration levels. Complementarily to assess how critical a 100% user participation would be, Figure 17-(c) shows the resulting transformer loading, for those same penetration levels, of a full user participation in network management and that of just a 50% one. Finally Figure 17-(d) parallels, for the two higher PEV penetration levels, the total resulting loading of the transformer when the different thermal implementations are used. To facilitate their interpretation all graphs additionally incorporate the transformer rated power. It is important for the reader to bear in mind, as it was previously explained during the description of the algorithm, that the thermal control is tuned to operate with a 5% security margin. Thus all control actions will be executed based on whether the total is above or below 95kVA. As it can be seen in Figure 17-(a) the increasing penetration of PEVs results in a progressive higher loading of the distribution transformer. Nonetheless, as it can be seen and as it was previously alerted in the voltage assessment, the studied network is more prone to experience voltage limit violations rather than thermal overloading of its assets. While beyond a 40% penetration level the network already experiences voltage limit violations, according to the thermal metrics, the critical PEV penetration level required to cause any asset congestion is no other but a 100%. Although during the most demanding time frame, between nine and ten o’clock in the evening, for a 60 and 80% uncontrolled PEV penetration some minor violations of the thermal rating can already be seen, it is only for the 100% case when the limit is significantly exceeded, operating two hours with a 16% average net overload. In any case the application of the developed algorithm successfully manages to completely extinguish any sign of congestion as it can be seen in Figure 17-(b). The active management of the available PEVs effectively peak shaves the total demand curve curtailing the vehicle’s charging rates during the most conflictive time period, between nine and ten o’clock in the evening, and allowing them to resume their rated charge once the network is less stressed during the early morning hours. It is important to highlight the relevance of this finding because, although it was the rational outcome of the control implementation, it further demonstrates the system’s correct operation and also reinforces how a real-time based control, without relying on any historical network loading data, can effectively result in a satisfactory peak shaving operation. Complementarily multiple plots just containing the aggregated PEV load can be found in the corresponding appendix to showcase in more detailed this effect. Another crucial aspect to emphasize is that below for all penetration levels except a 100%, the resulting modified loading curves are solely the result of the voltage control management. This should not be surprising since the network has been already shown to be more sensible to voltage violations rather than to thermal congestions. It can be easily proven by simply looking at Figure 17-(d) where the performance of the three thermal implementations is compared. While for a 100% penetration the resulting peak shaved curves delivered by the different implementations differ, they all coincide for an 80% 6. Results & Discussion ~ 77 ~ penetration. This demonstrates that, although for uncontrolled 60% and 80% penetrations, the thermal limit was exceeded, this is no longer the case once the voltage management begins to act, resulting in an equal control by all toolboxes. While Figure 17-(d) shows how all implementations effectively peak the demand and correct the thermal overloading, a direct comparison solely based on these curves is complicated. Thus a better comparison is later established based on the overall loading data presented in Figure 18. The obtained results also reveal that while even with a 50% user control, all transformer congestion can be corrected, the resulting demand curve is not as finely tuned as that obtained with a full user involvement. Nonetheless this was to be expected since a smaller degree of control exists in such case, and can be perfectly appreciated by looking at the 100% penetration curves in Figure 17-(c). There it is shown how for a full user participation results in a softer and better-distributed loading. Moreover this is further reinforced by the results presented in Figure 18. Figure 18 depicts, considering the complete simulation time frame, the overall transformer loading by showing its average loading values, expressed as percentage of the rated value, together with their standard deviations for the different case studies. Figure 18-(a) covers all PEV penetration levels while Figure 18-(b) portraits in more detailed the 100% penetration case where already the different thermal implementations influence the final outcome. (a) (b) Figure 18: Overall Transformer Loading. 7. Project Planning and Costs ~ 84 ~ each individual user, only the additional current and power meters for thermal management are considered as a capital expenditure for the DSO. Despite searching for more representative data for advanced substation monitoring, this information was found to be confidential and only available through a purchase order. Thus an estimated cost based on the price of available commercial are presented in Table 13. Current Clamps Unit Cost (€) Nº Units Total Cost (€) 240 9 2160 Power Meter Unit Cost (€) Nº Units Total Cost (€) 1460 1 1460 Total Cost (€) 4000 Net Present Value (€) 858.19 Table 13: Total CAPEX cost proposed algorithm A total of 9 current clamps necessary to monitor the respective phases of each one of the three available feeders as well as an additional power meter used to measure the loading of the distribution transformer are needed. The total costs are round up to 4000€ to additionally consider their installation costs accounting for their deployment and communication needs. Afterwards, once again, their total net present value is calculated based a return rate of 8% and considering their deployment would only be needed once thermal management is required in 20 years time. According to the EnWG § 14 act, the DSO can manage, prior user’s consent, those controllable consumption devices available in the low voltage network through grid utilization contracts, where, in return for the grid-based control of their devices, DSOs agree to charge those respective users a reduced tariff. Since no further details regarding the nature of such agreements is given, two alternatives are hereby considered: 1. A 24h reduced energy price per day user flexibility is requested applicable to the remaining domestic load. (The remaining non-controllable load) 2. A discounted energy price in the PEV charging tariff. To simplify the economic calculations a total yearly average household demand was considered instead of a differentiated individual demand. The same was done to the 20 PEV battery capacities, while were their charging needs were kept under simulation conditions, with an 80% depth of discharge. Considering an domestic average electricity price of 0.211 €/kWh [59] the resulting economic balances for both proposed agreements are presented in Figure 22, where the additional cost of using the algorithm based active management solution over the total network expansion expenditure for the 30-year period is plotted against the different discount rates in energy prices offered by the DSO. At the same time three different return rates of 8, 10 and 12% have also been considered. As it can be appreciated by the obtained results, discounts rates in the energy prices below 24% for the remaining household demand and around 12% for PEV charging ensures a profitable application of the algorithm over network expansions for any return rate. The higher discounts rates in the case of the remaining household demand correspond to its smaller magnitude compared to the aggregated PEV load. To minimize the dependence of the total benefit on the return rate, energy discount rates of 17% and 9% respectively are recommended, generating savings of approximately 4000€ over the studied period per each similar LV network were the control is implemented. At the same time it is important to notice that the adoption of an active management approach would not only report these direct savings but would also reduce the total expansion 7. Project Planning and Costs ~ 85 ~ needs to be required in the future. Although a fixed energy discount rate was here used, the DSO would obtain greater benefits and control if such rate could be yearly adjusted. (a) Energy Price Discount for the Remaining Domestic Load (b)Energy Price Discount for the PEV charging tariff Figure 22: Proposed Algorithm Economic Viability for Different Discount and Return Rates Finally it is crucial to remark that the current economic study was performed considering an active participation of all available vehicles, which further reinforces the viability of the proposed control since, as depicted in the results section, even with a 50% user participation an effective control could be performed considering the 5% weekly margin for voltage violations. Project Planning 7.3 To successfully execute this project multiple tasks and subtasks were defined and progressively executed. The most important ones and their distribution within the project’s lifespan are depicted in the Gantt diagram presented below. 7. Project Planning and Costs ~ 86 ~ Figure 23: Gantt Diagram of the Project ~ 87 ~ 8. Conclusions & Future Work Conclusions 8.1 The current project has reached its main objectives successfully designing a smart charging algorithm which simultaneously addresses and corrects two of the main network impacts caused by the progressive penetration of PEVs, voltage limit violations and network congestions. The system offers DSOs a viable and competitive technical alternative over conventional network reinforcements to mitigate the impacts of uncontrolled domestic Mode 3 AC charging. The proposed control algorithm, built using a “Multi-Agent System” architecture achieved a correct and effective real-time operation and coordination between the decentralized sensitivity-based voltage management and the centralized thermal control, under its three alternative formulations, relying on minimal external grid measurements solely required in their respectively 30s and 300s control time steps. This, combined with its generic formulation, allows the system to directly operate under radial distribution networks and, potentially, overcome the main traditional limitations found in other alternatives in the literature. The suggested method also provides the DSO with a versatile tool, whose structure allows the future incorporation of market based operations and ensures its compatibility with other existing control strategies. The analysis of the algorithm’s performance, satisfactorily demonstrated the effectiveness of both controls to remove all generated impacts. The analysis has been conducted using a realistic simulation environment, defining characteristic PEVs connection and departure times as well as individual household demands, under severe demanding conditions, given by peak winter domestic demands and a low initial SOC for all vehicles. Under all thermal variants, all network violations were successfully attenuated by effectively peak shaving the total aggregated demand, ensuring a correct system operation for all PEV penetration scenarios while causing a minimal impact over the participating users. The newly designed toolbox,“DynTable”, based on a dynamic ranking system based on the vehicles’’ cumulative charging times, was proven to be the most effective thermal alternative delivering the best performance in terms of peak shaving and user impacts, closely followed by “Intlinprog”. Moreover, being the only one directly compatible with standalone code generation, “DynTable” allowed to validate the algorithm’s behavior using real hardware through the HIL tests. These not only further shown the correct execution of the proposed system but also proved its design compatibility with current communication and charging standards. The system, conceived to operate under the legal coverage provided by the German EnWG § 14a act, offers DSOs the chance to actively engage user participation through bilateral agreements compensating them through reduced tariff fees, while guaranteeing them a minimal impact will be infringed upon their vehicle’s charging needs. Furthermore, the conducted economic assessment covering the application of the designed control over conventional network reinforcements, illustrated the profitability benefits of such an active management approach, considering multiple return and energy discount rates, not only reporting economic benefits to the DSO but also reducing the need of future reinforcements and upgrades. Finally, an active engagement of all 8. Conclusions & Future Work ~ 88 ~ network users appears not to be a critical factor to perform a successful network management, further assuring the DSO of the economic and technical viability of such a solution. Future Work 8.2 Although the present project represents an ample and comprehensive study considering its scope, offering a detailed state of the art review, proposing an innovative control algorithm to manage the charging process of PEVs, fully addressing its performance using a realistic test network, as well as, testing its compatibility and proper execution through HIL; still there is plenty of room for improvements as well as many relevant aspects to further pursue. One relevant issue that has not been yet addressed is whether the proposed sensitivity based voltage control could derive in any grid stability issues. Thus, a corresponding transient analysis should be undertaken. At the same time as it was highlighted, the voltage control system has only been designed to properly manage lower voltage limit violations, presumably struggling in the case of highly unbalanced networks with floating neutral conductors, where the charging of single-phase PEVs could potentially cause violations of the upper voltage limit. Consequently an additional mechanism should be included to tackle this problem, as well as to further reduce voltage unbalances between the different phases or other power quality issues (e.g. Total harmonic Distortion, Flickering, etc.). Complementarily the thermal control architecture should be reinforced adding supplementary coordination criteria for the treatment of potential network layouts consisting of shared feeders among different individual transformers (Low Voltage meshed networks). Of course this does not include the simple case of various parallel transformers supplying the exact same feeders. On the other hand, a procedure to make both “Intlinprog” and “Fmincon” compatible with real hardware could be potentially interesting. Further research efforts should be dedicated to find an alternative toolbox to “Fmincon”, capable of supporting the same target convex function as well as operating with integer values. Moreover the system’s functionality can be further expanded by: - Allowing users to independently participate in either thermal or voltage management. - Incorporating market-based operation including: o New flexibility buyers besides the DSO. o New optimization objectives such as maximizing the economic benefits. (Price-based operation) - Incorporating and making the current control compatible with new smart loads such as heat pumps. - Defining new user participation criteria such as a minimum charging time. - Expanding the control to support DC charging. Further testing improving the current simulation environment is also recommended. Significant improvements could be obtained by employing larger and more realistic distribution networks, incorporating distributed generation as well as generalizing the obtained results by launching multiple variant cases changing the location and 8. Conclusions & Future Work ~ 89 ~ magnitude of the loads using stochastic modeling. More significant network impacts could also be potentially obtained using a more realistic and complex battery model, as well as by considering public and DC charging, or simulating more genuine driving patterns through fleet simulation software. Finally more extensive testing with real-time equipment should also be performed, for example, through pilot projects implementing the designed control to update commercial charging equipment. ~ 91 ~ 9. References [1] D. B. Richardson, “Electric vehicles and the electric grid: A review of modeling approaches, Impacts, and renewable energy integration,” Renew. Sustain. Energy Rev., vol. 19, pp. 247– 254, 2013. [2] C. Franco and E. Pignoloni, “Changing targets, changing support structures: the move to post 2020 EU-wide targets and standardized auctions for new renewables.” European Power Generation Week 2017, Brussels, 2017. [3] M. Prass, “Decentralization of generation and the rise of the prosumer: The scale of distributed energy resources: shaking the traditional utility business model.” European Power Generation Week 2017, Brussels, 2017. [4] G. Reid, “Examining the amalgamation of mechanical , electrical and digital technology for today ’ s power markets We deliver leading corporate finance solutions for the new energy markets.” European Power Generation Week 2017, Brussels, 2017. [5] A. Price and P. Clerens, “Electricity storage : a disruptive influence ?” European Power Generation Week 2017, Brussels, 2017. [6] McKinsey, “EVolution. Electric vehicles in Europe: gearing up for a new phase?,” 2014. [7] International Energy Agency, “Global EV Outlook 2016 Electric Vehicles Initiative,” 2016. [8] J. García-Villalobos, I. Zamora, J. I. San Martín, F. J. Asensio, and V. Aperribay, “Plug-in electric vehicles in electric distribution networks: A review of smart charging approaches,” Renew. Sustain. Energy Rev., vol. 38, pp. 717–731, 2014. [9] K. Spiliotis, S. Claeys, A. R. Gutierrez, and J. Driesen, “Utilizing local energy storage for congestion management and investment deferral in distribution networks,” Int. Conf. Eur. Energy Mark. EEM, vol. 2016–July, pp. 0–4, 2016. [10] J. Quirós-Tortós, L. F. Ochoa, S. W. Alnaser, and T. Butler, “Control of EV Charging Points for Thermal and Voltage Management of LV Networks,” IEEE Trans. Power Syst., vol. 31, no. 4, pp. 3028–3039, 2016. [11] K. Petrou, J. Quirós-Tortós, and L. F. Ochoa, “Controlling electric vehicle charging points for congestion management of UK LV networks,” 2015 IEEE Power Energy Soc. Innov. Smart Grid Technol. Conf., no. February, pp. 1–5, 2015. [12] S. Martinenas, K. Knezovic, and M. Marinelli, “Management of Power Quality Issues in Low Voltage Networks using Electric Vehicles: Experimental Validation,” IEEE Trans. Power Deliv., vol. 8977, no. c, pp. 1–9, 2016. [13] A. N. M. M. Haque, P. H. Nguyen, T. H. Vo, and F. W. Bliek, “Agent-based unified approach for thermal and voltage constraint management in LV distribution network,” Electr. Power Syst. Res., vol. 143, pp. 462–473, 2017. [14] K. Rauma, “Industrial aspects of voltage management and hosting capacity of photovoltaic power generation in low voltage networks.,” Université Grenoble Alpes, 2016. [15] A. N. M. M. Haque, M. T. Rahman, and P. H. Nguyen, “Smart Curtailment for Congestion Management in LV Distribution Network,” pp. 8–12, 2016. [16] G. Del-Rosario-Calaf, M. Cruz-Zambrano, C. Corchero, and R. Gumara-Ferret, “Distribution Network Congestion Management by means of Electric Vehicle Smart Charging within a Multi-microgrid Environment,” IEEE Int. Electr. Veh. Conf., pp. 1–8, 2014. [17] E. Rivero, D. Six, and A. Ramos, “‘Preliminary assessment of the future roles of DSOs , future market architectures and regulatory frameworks for network integration of DRES,’” 9. References ~ 92 ~ 2014. [18] European Distribution System Operators for Smart Grids, “Flexibility : The role of DSOs in tomorrow ’ s electricity market,” pp. 1–16. [19] M. Coppo, R. Turri, M. Marinelli, and X. Han, “Voltage management in unbalanced low voltage networks using a decoupled phase-tap-changer transformer,” Proc. Univ. Power Eng. Conf., no. September 2014, 2014. [20] J. Usaola and A. Esmat, “DSO Congestion Management Using Demand Side Flexibility,” in CIRED Workshop - Helsinki, 2016, no. Paper 0343, pp. 15–18. [21] R. A. Verzijlbergh, L. J. De Vries, and Z. Lukszo, “Renewable Energy Sources and Responsive Demand. Do We Need Congestion Management in the Distribution Grid?,” Power Syst. IEEE Trans., vol. 29, no. 5, pp. 2119–2128, 2014. [22] USEF Foundation, USEF: The Framework Explained. 2015. [23] Federal Ministry of Justice and for Consumer Protection, “Act on Electricity and Gas Supply (Energiewirtschaftsgesetz - EnWG) § 14a Controllable consumption devices in low voltage; Authorization.” [Online]. Available: https://www.gesetze-im- internet.de/enwg_2005/__14a.html. [Accessed: 29-May-2017]. [24] Stromnetz Hamburg GmbH and LichtBlick SE, “Stromnetz Hamburg GmbH und LichtBlick machen E-Mobilität attraktiver,” 2016. [Online]. Available: https://www.lichtblick.de/unternehmen/presse/news/2016/02/04/stromnetz-hamburg-gmbh- und-lichtblick-machen-e-mobilität-attraktiver/. [Accessed: 29-May-2017]. [25] R. C. Green, L. Wang, and M. Alam, “The impact of plug-in hybrid electric vehicles on distribution networks: A review and outlook,” Renew. Sustain. Energy Rev., vol. 15, no. 1, pp. 544–553, 2011. [26] U.S. Department of Energy, “Alternative Fuels Data Center.” [Online]. Available: http://www.afdc.energy.gov/. [Accessed: 17-May-2017]. [27] M. Alaküla, K. Jonasson, C. Andersson, and B. Simonsson, “Hybrid Drive Systems for Vehicles System Design and Traction Concepts,” 2006. [28] U.S. Department of Energy, “Plug-In Electric Vehicle (PEV) Definition.” [Online]. Available: http://www.afdc.energy.gov/laws/9355. [Accessed: 12-May-2017]. [29] International Electrotechnical Commission, “International Standard IEC 61851-1,” Time. 2017. [30] A. Di Giorgio, F. Liberati, and S. Canale, “IEC 61851 compliant electric vehicle charging control in smartgrids,” 2013 21st Mediterr. Conf. Control Autom. MED 2013 - Conf. Proc., pp. 1329–1335, 2013. [31] ev.lk, “Types of Electric Vehicle Chargers.” [Online]. Available: http://ev.lk/typesofchargers/. [Accessed: 18-May-2017]. [32] Electric Vehicle Institute, “Common Connector Types.” [Online]. Available: http://www.evinstitute.com. [Accessed: 26-May-2017]. [33] M. D. Galus, M. González Vayá, T. Krause, and G. Andersson, “The role of electric vehicles in smart grids,” Wiley Interdiscip. Rev. Energy Environ., vol. 2, no. 4, pp. 384–400, 2013. [34] Carcharger.ie, “How fast charging works,” 2017. [Online]. Available: http://carcharger.ie/fast-charging-works/. [Accessed: 26-May-2017]. [35] MIT Electric Vehilce Team, “A Guide to Understanding Battery Specifications,” 2008. [36] H. Turker, S. Bacha, D. Chatroux, and A. Hably, “Modelling of System Components for Vehicle-to-Grid Plug-in Hybrid Electric Vehicles ( PHEVs ),” 2012 IEEE PES Innov. Smart 9. References ~ 93 ~ Grid Technol. ISGT, pp. 1–8, 2011. [37] Phoenix Contact, “EV Charge Control: Standard-compliant control of the Control Pilot and Proximity Plug interfaces between the electric vehicle and charging station. (User manual),” 2015. [38] G. Mathieu, “Design of an on-board charger for plug-in hybrid electrical vehicle ( PHEV ),” Chalmers University of Technology, 2009. [39] S. Habib, M. Kamran, and U. Rashid, “Impact analysis of vehicle-to-grid technology and charging strategies of electric vehicles on distribution networks - A review,” J. Power Sources, vol. 277, pp. 205–214, 2015. [40] Vicor Corporation, “Active PFC for Electronic Power Supplies,” no. 2, pp. 2–3. [41] V. Tikka, J. Lassila, J. Haakana, and J. Partanen, “Case study of the effects of electric vehicle charging on grid loads in an urban area,” 2011 2nd IEEE PES Int. Conf. Exhib. Innov. Smart Grid Technol., pp. 1–7, 2011. [42] K. Clement-Nyns, E. Haesen, and J. Driesen, “The impact of charging plug in hybrid electric vehicles on a residential distribution grid,” IEEE Trans. Power Syst., vol. 25, no. 1, pp. 371–380, 2010. [43] J. Lopes, F. Soares, and P. Almeida, “Integration of electric vehicles in the electric power system,” Proc. IEEE, vol. 99, no. 1, 2011. [44] J. R. Pillai, P. Thogersen, J. Moller, and B. Bak-Jensen, “Integration of Electric Vehicles in low voltage Danish distribution grids,” IEEE Power Energy Soc. Gen. Meet., pp. 1–8, 2012. [45] T. Sansawatt, L. F. Ochoa, and G. P. Harrison, “Smart decentralized control of DG for voltage and thermal constraint management,” IEEE Trans. Power Syst., vol. 27, no. 3, pp. 1637–1645, 2012. [46] dSPACE Ltd., “MicroLabBox,” 2017. [Online]. Available: https://www.dspace.com/en/ltd/home/products/hw/microlabbox.cfm. [47] The MathWorks Inc., “Simscape Power Systems.” [Online]. Available: https://es.mathworks.com/products/simpower.html. [48] I. Richardson and M. Thomson, “Integrated simulation of photovoltaic micro-generation and domestic electricity demand: a one-minute resolution open-source model,” Proc. Inst. Mech. Eng. Part A J. Power Energy, vol. 227, no. 1, pp. 73–81, 2012. [49] D. P. Jenkins, S. Patidar, and S. A. Simpson, “Synthesising electrical demand profiles for UK dwellings,” Energy Build., vol. 76, pp. 605–614, 2014. [50] A. Genovese, F. Ortenzi, and C. Villante, “On the energy efficiency of quick DC vehicle battery charging,” EVS28 Int. Electr. Veh. Symp. Exhib., pp. 1–7, 2015. [51] D. Scoffield, “Power Quality Benchmarking and Evaluation of Vehicle On-Board Chargers,” 2015. [52] Schneider Electric SE, “EVlink Wallbox EVH2S11P02K.” [Online]. Available: http://www.schneider-electric.com/en/product/EVH2S11P02K/evlink-wallbox---11-kw--- socket-outlet-t2---charging-station/. [Accessed: 29-Aug-2017]. [53] Schneider Electric SE, “EVlink Wallbox EVH2S3P0AK.” [Online]. Available: http://www.schneider-electric.co.uk/en/product/EVH2S3P0AK/evlink-wallbox---3.7-kw--- attached-cable-t1---charging-station/. [Accessed: 29-Aug-2017]. [54] J. A. Fernandez Orjuela, “Intégration des Véhicules Electriques dans le réseau électrique résidentiel : impact sur le déséquilibre et stratégies V2G innovantes.,” Université Grenoble Alpes, 2014. Appendices ~ 6 ~ presented in Figure 27, the “Charging Station Model and Agent” one depicted in Figure 28 and the “PEV Model and Agent” shown in Figure 29. Figure 27: Station and PEV Data Interpretation The “Station and PEV Data Interpretation” section is responsible, as previously highlighted, to collect both all the data from the available car and charging station characteristics from the defined pools as well as the assigned preferences to that particular node and then cross them to determine the particular characteristics that apply to this particular household. Additionally the assigned control preferences and user behavior, obviously in a real case determined by each individual, are also properly interpreted. Moreover the general data signal also incorporates the selected simulation parameters such as the current PEV penetration level, the overall user participation and the current time which are once again crossed to correctly determine when each vehicle must start interacting, participate in the network management and be connected and unplugged from the network. Appendices ~ 7 ~ Figure 28: Charging Station Model and Agent Figure 29: PEV Model and Agent Once all this information is decoded, it is then used by the generic PEV and Ch. Station models presented in Figure 28 and Figure 29. Since the core working principle behind the electrical implementation was already described in the modeling section, no further comments on that will be now given. Instead some interesting additional details will be covered. First of all, as it can be appreciated, the system internally relies on memory and locally scooped goto and from blocks to properly operate the different internal signals as well as to mimic the real communication between the different elements such as the vehicle and the station as well as their respective agents and also that between the station and transformer agents. Secondly additional important aspects such as the cumulative charging time as well as a charge stop command, once the battery maximum Appendices ~ 8 ~ capacity is reached, and the selection of the assigned charging phase in the case of single phase vehicles were also added to the basic system to properly reflect the behavior of a real charging station. Thirdly a separate definition of the agents and the basic electrical structural elements was done to facilitate the system implementation when using real hardware, thus requiring minimal structural changes. Finally it is important to notice that due to the basic functions performed by the Car Agent, its implementation on the simulation environment is completely covered by the data established within the simulation preferences. This will nonetheless change for a real application of the system. Lastly the internal structure of the Ch. Station agent is presented in Figure 30. Figure 30: Internal Structure of the Charging Station Agent As it can be appreciated three main sections have been defined for the three main core functions executed by the agent: the voltage management control, the issue and application of the thermal flexibility offers and command requests as well as determining whether the connected vehicle is or not enabled to participate in the network management. No further comments regarding its operating principle will be given. The reader is referred back to the main report where they are extensively covered. Appendices ~ 9 ~ Transformer Agent 1.5 To conclude this appendix the internal implementation of the transformer agent, responsible for executing the thermal optimizations, is presented in Figure 31. The agent operation is once again structured in a first section responsible for calculating the utilization factors based on the system measurements and the DSO established limits and then two consecutive ones responsible for the reloading and curtailment optimizations respectively. Figure 31: Transformer Agent Aside from the routing of the received signals once again through goto and from blocks mimicking the real communication links between the agents, only the fact that triggered based subsystems are used will be highlighted. The same can also be appreciated in Figure 30 for the Ch. Station agent. This is done to ensure the thermal and voltage controls will only be executed in their respective designated times. Once again the reader is referred back to the main report where the operation of the thermal control is fully detailed. ~ 11 ~ 2. Complementary Modeling Details Offline or Computer-Based Cases 2.1 2.1.1 Household Demand Characterization Additional details regarding the definition of the domestic loads are provided in this appendix. The individual household active power demands are represented in the figures below. Moreover the different assigned inductive !"#(!) to each individual home are provided together with their main characteristics, result of their random generation, in Table 14. Figure 32: Individual Demand: Dwellings 1-12 Appendices ~ 12 ~ Figure 33: Individual Demand: Dwellings 13-20 Dwelling nº Nº of Residents Building index1 Primary heating system !"#(!) ind 1 1 6 Gas 0.9328 2 1 1 Gas 0.9018 3 2 3 Gas 0.9425 4 2 6 Gas 0.9467 5 4 4 Gas 0.9339 6 2 3 Gas 0.9379 7 1 4 Gas 0.9372 8 2 1 Gas 0.9196 9 1 2 Gas 0.9328 10 2 6 Gas 0.9086 11 2 4 Gas 0.9353 12 2 3 Gas 0.9016 13 3 3 Gas 0.9138 14 2 6 Gas 0.9023 15 3 4 Gas 0.9049 16 4 1 Gas 0.9412 17 2 5 Gas 0.9347 18 2 4 Gas 0.9159 19 2 2 Gas 0.9475 20 2 4 Gas 0.9017 Table 14: Dwelling’s Characteristics 1 The building index is used for its thermal characterization. For further details please refer to the CREST tool. [48] Appendices ~ 13 ~ 2.1.2 PEV Connection Hours A more detailed explanation of the estimation of the connection hours is here presented. First of all using the available data published by Alonso et al. [55] the following hourly probabilities for the arrival and departure of the different PEVs were estimated: Time of Arrival Probability Time of Departure Probability 18:00 18% 5:00 4.5% 19:00 24% 6:00 3.5% 20:00 34% 7:00 33.5% 21:00 9% 8:00 48.5% 22:00 6% 9:00 10% 23:00 4% 0:00 5% Table 15: Arrival and Departure Hourly Estimated Probabilities These reflect the probability of any vehicle to arrive or leave within that complete hour. The definition of this probability density functions is done motivated by the work of Fernández-Orjuela [54]. The main idea is to correctly select two random samples that determine the time of arrival and departure of the different vehicles and properly follow the defined probability density functions. First of all to achieve a more complete resolution within the hour, once again following the example set by Fernández-Orjuela [54] in his work, these initial hourly probability density functions were redefined to account every 10 min interval. This was done distributing the hourly probability using a binomial permutation. Once recalculated, the cumulative probability functions can be easily determined. The obtained results are presented in the histograms below. Figure 34: Time of Arrival and Departure: Probability Density and Cumulative Functions Appendices ~ 14 ~ Using the newly estimated cumulative functions, the selection of any random sample that follows those probability density functions can be easily done. By selecting two random samples of 20 elements ranging from 0 to 1, the position of each value determining the household it is assigned to, and then comparing them with the cumulative functions, the time of arrival and departure of each vehicle can be determined as the first time value for which the cumulative probability is equal or higher than the considered sample. In such a way the obtained values can be shown to completely follow the calculated density functions. Selecting two different samples, one for arrival and another for departure, and applying the aforementioned strategy, the departure and arrival times are determined. Online or HIL Validation Cases 2.2 2.2.1 Voltage, Feeder and Transformer Loads The profiles corresponding to the voltage, feeder and transformer loads used in the HIL validation case are presented in the figure below. It is important to highlight that these loads have been defined with a unitary power factor, in other words purely as active power loads. At the same as it was already mentioned, both voltage and feeder loads, are designed to act simultaneously on both feeders. Figure 35: HIL Simulation Loads 2.2.2 PEVs Connection Times The time of connection to the network of the two types of PEVs for the HIL validation case are presented in the table below: Vehicle Connection Time (s) Single-Phase AC (Nissan Leaf) 20 Three-Phase AC (BMWi3) 1000 Table 16: PEVs HIL Connection Time Appendices ~ 15 ~ 2.2.3 Characteristics of the Employed Hardware Here the main characteristics of the hardware utilized for the HIL validation case are presented. Charging Station: Electrical Characteristics Model RWE eSTATION Charging Mode 3 Number of available Sockets 2 Connector IEC 62196 Type 2 IEC 61851-1 Standard Supported Theoretical Maximum Output Performance 2 x 22kW @ 400V AC Default External Control Not Supported Protective technology Included Table 17: Electrical Characteristics of the Charging Station 1 It is important to highlight that although the charging station, natively supports charging rates up to 22kW for each socket, in other words, maximum charging currents of 32A, these levels cannot be accomplished in the laboratory. The reason is that the cable connecting the station to the network has a maximum current limit of 32A and consequently lowers its total admissible charging power to only 11kW for each individual socket. Model Phoenix Contac EV Charge Control Advanced Charging Mode 3 IEC 61851-1 Standard Supported External Control Supported via Modbus Table 18:Characteristics of the employed Charge Controller [60] The newly installed charge controllers support external control using Modbus TCP IP. Model Fluke i400s AC Current Clamp Nominal current range: 40 A Range: 0.5 A to 40 A Basic accuracy: 40 A Range: 2% + 0.015 A (45-400 Hz) Phase Shift: 5 A to 20 A: 3” Typical Bandwidth: 40 A Range: 5 Hz - 10 kHz Output level: 40 A Range: 10 mV/A Crest Factor 40 A Range: ≤ 3 Table 19: Specifications of the used Current Clamp Model [61] The most relevant parameters to bear in mind when using the selected current clamp and analyzing and treating the obtained measurements are both its accuracy and output level. The clamp’s accuracy is of approximately 2% of the measured current value. Thus for measuring charging currents up to 16A, a maximum error of 0.32A should be expected. Moreover to properly retrieve the real current value, the measurement, once 1 The attached image of the commercial charging station has been extracted from the following source [70].