scieee AI-readable full text Open interactive document viewer

Component sizing of an isolated networked hybrid microgrid based on operating reserve analysis

Salehi, Navid,Martínez García, Herminio,Velasco Quesada, Guillermo

Abstract

The power-sharing possibility amongst microgrids (MGs) in networked microgrids (NMGs) offers multiple profits to the NMG by employing an applicable energy management system. An efficient energy management system can provide an adequate compromise in terms of the component sizing of NMGs through MG collaboration. This paper proposes a procedure to size the component for an isolated networked hybrid microgrid. The proposed design procedure relies on the optimum operation of individual MGs. The defined Reduced Factor (RF) identifies the possible size reduction for the dispatchable components, such as diesel generators and the energy storage system of each MG. The introduced RF is based on the operating reserve evaluation obtained from the optimal operation of individual MGs and the correlation between load profiles. Eventually, the simulation and practical results of a networked hybrid MG consisting of three MGs are presented to verify the proposed component sizing procedure. The practical results verify the theoretical expectations. The results show that NPC and capital costs are reduced up to 13% and 17%, respectively.

Full text

Citation: Salehi, N.; Martínez-García, H.; Velasco-Quesada, G. Component Sizing of an Isolated Networked Hybrid Microgrid Based on Operating Reserve Analysis. Energies 2022,15, 6259. https://doi.org/ 10.3390/en15176259 Academic Editor: Dimitrios Katsaprakakis Received: 14 July 2022 Accepted: 15 August 2022 Published: 27 August 2022 Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. Copyright: © 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https:// creativecommons.org/licenses/by/ 4.0/). energies Article Component Sizing of an Isolated Networked Hybrid Microgrid Based on Operating Reserve Analysis Navid Salehi , Herminio Martínez-García * and Guillermo Velasco-Quesada Electronic Engineering Department, Universitat Politècnica de Catalunya–BarcelonaTech (UPC), 08019 Barcelona, Spain *Correspondence: [email protected] Abstract: The power-sharing possibility amongst microgrids (MGs) in networked microgrids (NMGs) offers multiple profits to the NMG by employing an applicable energy management system. An efficient energy management system can provide an adequate compromise in terms of the component sizing of NMGs through MG collaboration. This paper proposes a procedure to size the component for an isolated networked hybrid microgrid. The proposed design procedure relies on the optimum operation of individual MGs. The defined Reduced Factor (RF) identifies the possible size reduction for the dispatchable components, such as diesel generators and the energy storage system of each MG. The introduced RF is based on the operating reserve evaluation obtained from the optimal operation of individual MGs and the correlation between load profiles. Eventually, the simulation and practical results of a networked hybrid MG consisting of three MGs are presented to verify the proposed component sizing procedure. The practical results verify the theoretical expectations. The results show that NPC and capital costs are reduced up to 13% and 17%, respectively. Keywords: networked hybrid microgrid; operating reserve; peak load; component sizing; optimization 1. Introduction Conventional power systems have adopted microgrids (MGs) to address concerns about fossil fuel source depletion, environmental pollution, and climate change. Distributed energy resources (DERs) in an MG can consist of conventional power generators, such as diesel generators (DGs), or they can be integrated with renewable energy sources (RESs), such as photovoltaic (PV) and wind turbine (WT), as a hybrid MG (HMG). MGs propose valuable features to the power system, such as improving the operation and stability of the distributed system, reducing transmission line losses, and efficient harvesting of REs. These features can be obtained in both grid-connected and stand-alone MGs. However, the stand-alone operation mode in MGs is more delicate to provide the system’s power balance due to the intermittency and uncertainty of RE sources (RESs). To this end, energy storage systems (ESSs), such as batteries and fuel cells, are inevitably utilized in the MGs. The ESS makes the system controllable to effectively manage the energy to supply the demand load. Therefore, the energy management system (EMS) is the other vital part of MGs, not only to provide the stability of the system but also to optimize the operation of the MG [1]. Accordingly, the configuration and the size of the components of the power generation units in an MG have attracted the attention of researchers in this industry to propose effective solutions for MGs. In [ 2 ], a multi-objective optimization problem was defined for an HMG to obtain the optimum size of the components. The net present cost (NPC), emission penalty cost, and CO2 released quantity are three objective functions defined as a minimization problem. Moreover, the results from three multi-objective optimization— MOPSO, PESA-II, and SPEA-II—were analyzed to achieve the best solution to fulfill the objectives. A similar study was conducted in [ 3 ] to optimize the size of HMG components. The multi-objective self-adaptive differential evolution (MOSaDE) was assigned to the Energies 2022,15, 6259. https://doi.org/10.3390/en15176259 https://www.mdpi.com/journal/energies Energies 2022,15, 6259 2 of 17 optimization approach to propose the optimal HMG configuration. The loss-of-power supply probability (LPSP), the cost of electricity (COE), and the renewable factor are the three objective functions of the optimization problem that are restricted with HMG cost and reliability. The paper presented the optimally sized HMG components considering the load supply with a minimum energy cost and high reliability. Additionally, an optimal sizing methodology for an MG consists of a stand-alone photovoltaic system (SAPV), and the battery were studied in [ 4 ]. A mutation adaptive differential evolution (MADE) optimization algorithm was performed to optimize the configuration of the off-grid MG. The loss-of-load probability (LLP), levelized cost of energy (LCE), and life-cycle cost (LCC) are three objective functions that are normalized, weighted, and aggregated as a single objective for the optimization algorithm. In [ 5 ], the other HMG consists of renewable energies, and conventional energy sources were studied by considering the load uncertainty. To obtain the optimal configuration for the HMG, a decomposition-based multi-objective evolutionary algorithm (MOEA/D) was applied to minimize the LPSP and COE as the objective functions. In [ 6 ], the inconstancy and unpredictability of solar radiation were considered in the proposed hybrid optimization method of a SAPV/battery MG to optimize the configuration and size of the system. Furthermore, some software tools have been introduced by several companies to plan the MG optimally. HOMER, RETScreen, H2RES, DER-CAM, and MARKAL/TIMES are several practical applications in MG design planning [ 7 , 8 ]. HOMER is widely used in MG applications to design the optimal MG consisting of renewable and non-renewable energy sources with different storage systems in grid-connected and isolation operation modes. In HOMER, the optimization procedure evaluates all possible configurations of energy generator units to meet the load. The simulation in HOMER carries out for a long time according to the cost function of the MG components. The results in HOMER present the most economic configurations with the lowest net total cost (NTC). In [ 9 ], HOMER develops an optimized grid-connected MG with PV and battery configuration. This study investigates the effect of the upsurge of grid failure frequency, and grid mean repair on the power price. Additionally, other studies have been conducted using HOMER to design HMG in remote areas, select and size power generators in rural MGs, and plan the microsource generators to accommodate the high demand of RESs and environment policy [ 10 , 11 ]. RETScreen is more used to analyze the MG economically rather than operationally. The RETScreen can also be applicable for on-grid and off-grid MGs. The changes in parameters in RETScreen can provide a comparative analysis for the system under study considering the climate condition, RES availability, and load requirements [ 12 ]. The H2RES is also a balancing simulation tool that can effectively be used to design an MG integrated with RE. This tool checks the energy balance of the system hourly, considering the economic restriction [ 13 ]. The DER-CAM optimization is a customer-based model tool that monitors demand-side management and time-of-use under control by scheduling the DERs [ 14 , 15 ]. The MARKEL/TIMES energy system model can be applied to analyze the MG system as an energy sector. This tool evaluates the energy system in various time slices by considering the energy markets with a different objective function to obtain the least cost production units [16]. Recently, the concept of networked MG (NMG) has emerged to enhance the successful achievements of IMG. In NMGs, several MGs coordinate cooperatively to achieve the following goals: - Increasing the reliability of the system due to increasing the possibility of power sharing and avoiding imbalanced power situation; - Increasing the penetration ratio of REs into the MGs; - Suppressing the uncertainties related to the RES employing the energy management system (EMS); - Energy trading and ancillary service management. On the other hand, the control strategies in NMGs are more complicated than in IMGs. In recent years, several control strategies have been introduced by researchers to control the Energies 2022,15, 6259 3 of 17 NMG effectively. Centralized, decentralized, hybrid, and distributed are some of the most prominent control strategies in NMGs. Each control strategy has its pros and cons, which, in several studies, are comprehensively surveyed [ 17 , 18 ]. However, briefly explained, in a centralized control scheme, all the MGs are controlled by a central controller; therefore, knowing the status of all MGs to analyze the system is mandatory. This control method is efficient and accurate. However, the enormous computing burden and dependency of the system on the central controller are the disadvantages of this method. In a decentralized control strategy, each MG controls separately to overcome the afore-mentioned drawbacks in the centralized method. However, optimizing the system without knowing other MGs’ information reduces the system’s efficiency. Therefore, in a hybrid strategy, the advantages of both centralized and decentralized methods are exploited. However, this method still suffers from the dependency on the central controller and the possibility of global failure in the system by any probable fault in the central controller. Finally, distributed control strategies have recently drawn more attention to increase the speed of analysis; meanwhile, the system’s reliability increased as well. In NHM, due to the possibility of power sharing amongst MGs, it is expected that the size of the components can be reduced effectively without significantly affecting the system’s reliability. In [ 19 ], a three-level planning model for optimal sizing of NMG considering resilience and cost was proposed. An adaptive genetic algorithm was utilized for the normal sizing problem in the first level. However, load profile uncertainty and contingency for load shedding and a trade-off between cost and resilience were evaluated in the second and third levels, respectively. In [ 20 ], an optimal design of a hybrid distributed generation system to enhance the load and system reliability is conducted. The optimal sizing of the RE system considering electricity market interaction and reliability is presented in [21]. High renewables penetration considering demand response is investigated in [22] by proposing an optimal sizing and siting of smart MG components. This paper proposes an optimal sizing components methodology for an isolated networked hybrid MG. The design procedure is based on IMG optimization. Consequently, according to the optimized operation of each IMG, a reduced factor (RF) identifies the possible component size reduction of each MG. This paper is organized as follows: In Section 2, the proposed NHMG configuration with RE and non-RE sources and load profiles are presented. Then, the optimal sizing of HIMG is investigated. To this end, HOMER is used to obtain the most economical configuration and component size for each IMG according to the energy sources and practical restrictions of the energy generator units. To evaluate the operation of the MGs, the optimal operation of each IMG is calculated for 24 h by considering the defined energy management algorithm. The RF calculation is conducted at the end of this section. In Section 3, the proposed sizing component algorithm is evaluated, and the simulation results will be presented in order to calculate the RF for each IMG. In Section 4, the verification of the proposed algorithm for an NHMG is analyzed according to the simulation and practical results. Finally, in Section 5, the conclusion of the paper is presented. 2. Proposed Optimal Sizing Procedure of an NHMG The networked hybrid microgrid (NHMG), consisting of PV and WT with battery storage and DG, is investigated in this section. Figure 1shows an HNMG of three MGs involving two residential and one industrial consumer. The MGs can exchange energy to provide a reliable operation to meet the loads according to the defined strategy. The load profiles are shown in Figure 4. As can be seen, the load profile of two residential consumers have the same pattern but with a different scale, and the load profile of industrial consumer has a different pattern. In this paper, to optimize the size of the components in HNMG, an algorithm is proposed. In this algorithm, the optimal design of the HNMG is based on the optimal design of each IMG. Figure 2represents the proposed algorithm. Energies 2022,15, 6259 4 of 17 Energies 2022, 15, x FOR PEER REVIEW 4 of 18 Figure 1. NMG consists of three residential MG and one industrial MG. Figure 2. Proposed algorithm of NMG optimal sizing. The optimal component size for each MG was obtained by HOMER Pro to evaluate the most economical configuration of potential candidate energy resources. According to the optimal sizing of each MG, power management was applied to the MGs to control the power production of dispatchable units, i.e., battery and DG. Moreover, the practical constraints and renewable energy intermittency were taken into consideration. Accordingly, the operating capacity (OC) and operating reserve (OR) of the individual MGs can be obtained. The calculation of OC and OR are essential due to the dependency of the optimization algorithm on these values. The OC and OR are defined as follows: - Operating capacity (OC): the maximum amount of electrical generation capacity that is operating or is able to be produced at a moment’s notice. - Operating reserve (OR): the surplus operating capacity that can instantly respond to a sudden increase in the electric load or a sudden decrease in the renewable power output. Peak load (PL) is an important factor with a significant impact on the component sizing in MGs. Demand-side management (DSM), integration of ESSs, and integration of electric vehicles (EVs) to the grid are considered as three methods in recent research as a solution for peak load shaving [23]. However, power sharing amongst MGs in NMGs results in the possibility of providing PL demand with the OR of adjacent MGs. The PLs and ORs are considered two main factors of MGs to define a reduced factor (RF) by the pro- Figure 1. NMG consists of three residential MG and one industrial MG. Energies 2022, 15, x FOR PEER REVIEW 4 of 18 Figure 1. NMG consists of three residential MG and one industrial MG. Figure 2. Proposed algorithm of NMG optimal sizing. The optimal component size for each MG was obtained by HOMER Pro to evaluate the most economical configuration of potential candidate energy resources. According to the optimal sizing of each MG, power management was applied to the MGs to control the power production of dispatchable units, i.e., battery and DG. Moreover, the practical constraints and renewable energy intermittency were taken into consideration. Accordingly, the operating capacity (OC) and operating reserve (OR) of the individual MGs can be obtained. The calculation of OC and OR are essential due to the dependency of the optimization algorithm on these values. The OC and OR are defined as follows: - Operating capacity (OC): the maximum amount of electrical generation capacity that is operating or is able to be produced at a moment’s notice. - Operating reserve (OR): the surplus operating capacity that can instantly respond to a sudden increase in the electric load or a sudden decrease in the renewable power output. Peak load (PL) is an important factor with a significant impact on the component sizing in MGs. Demand-side management (DSM), integration of ESSs, and integration of electric vehicles (EVs) to the grid are considered as three methods in recent research as a solution for peak load shaving [23]. However, power sharing amongst MGs in NMGs results in the possibility of providing PL demand with the OR of adjacent MGs. The PLs and ORs are considered two main factors of MGs to define a reduced factor (RF) by the pro- Figure 2. Proposed algorithm of NMG optimal sizing. The optimal component size for each MG was obtained by HOMER Pro to evaluate the most economical configuration of potential candidate energy resources. According to the optimal sizing of each MG, power management was applied to the MGs to control the power production of dispatchable units, i.e., battery and DG. Moreover, the practical constraints and renewable energy intermittency were taken into consideration. Accordingly, the operating capacity (OC) and operating reserve (OR) of the individual MGs can be obtained. The calculation of OC and OR are essential due to the dependency of the optimization algorithm on these values. The OC and OR are defined as follows: - Operating capacity (OC): the maximum amount of electrical generation capacity that is operating or is able to be produced at a moment’s notice. - Operating reserve (OR): the surplus operating capacity that can instantly respond to a sudden increase in the electric load or a sudden decrease in the renewable power output. Peak load (PL) is an important factor with a significant impact on the component sizing in MGs. Demand-side management (DSM), integration of ESSs, and integration of electric vehicles (EVs) to the grid are considered as three methods in recent research as a solution for peak load shaving [ 23 ]. However, power sharing amongst MGs in NMGs results in the possibility of providing PL demand with the OR of adjacent MGs. The PLs and ORs are considered two main factors of MGs to define a reduced factor (RF) by the proposed algorithm in this paper. The RF represents the amount of energy that can be reduced when the MGs collaborate as an NMG. Consequently, the RFs assess the size of Energies 2022,15, 6259 5 of 17 dispatchable components while avoiding the reliability compromise due to OR reduction. Renewable energies exploit their maximum power due to utilizing maximum power point tracking (MPPT) to optimize the harvested energy. 2.1. Optimal Sizing of Hybrid Individual MGs In order to obtain the optimal size of HIMGs, the power output and the cost function of power generator units have to be considered for each time step to supply the load in the most economical manner. The more precise power output model and cost function equations result in more accurate calculations. Tables 1and 2present the most well-known equations for power generation units and their cost functions. By considering the power output in Table 1, the optimization problem can be defined as: min CF ={CF(PV) + CF(WT) + CF(DG) + CF(BAT)}(1) Subject to: PPV(t) + PWT(t) + PDG(t) + PBAT(t) = PLaod(t)(2) Equations (1) and (2) expressed that the total cost functions of generation units must be minimized considering the power balance of the system in each time step. Although only the power balance is stated as a constraint in this optimization problem, practically more constraints such as upper and lower limits for power generation units or battery SoC can be defined for this problem. Table 1. Power output and cost function of power generation units in a HIMG. Gen Unit Ref. Power Output Cost Function PV [3,24]Ppv(t) = PN−pv ×G(t) Gre f ×1+Kt(Tamb +(0.0256 ×G)) −Tre f  CPV =αIP pv PN−pv +GE pv PN−pv WT [5,24] Pwt(t) =        0V<Vcut−in,V>Vcut−in V3(t)Pr V3 r−V3 cut−in −PrV3 cut−in V3 r−V3 cut−in Vcut−in ≤V<Vrated PrVrated ≤V≤Vcut−out CWT =αIP pv PN−r+GE wt PN−r DG [3]PDG(t) = q(t)−bPr aCDG =A+B×PDG +C×P2 DG BAT [2]PBATT(T) = v T EL.AD DOD.ηinv.ηbCBAT =γ+ξ×PN−BAT Table 2. Parameter definitions in Table 1. Parameter Description Parameter Description Ppv output power of PV a,bfuel consumption coefficients (L/kW) [3] PN-pv rated power under reference conditions ELload power Gsolar radiation (W/m2)AD autonomy days (typically 3–5 days) Gref reference solar radiation (W/m2)DOD depth of discharge Tref 25 ◦Cηinv inverter efficiencies Kt−3.7 ×10−3(1/◦C) ηbbattery efficiencies Pwt output power of WT A=r/[1 −(1 + r)−N]investment annuitization coefficient Prrated power rinterest rate Vrrated wind speed Ninvestment lifetime Vcut-in cut-in wind speed IPinvestment costs Vcut-out cut-out wind speed GEO&M cost for solar and wind generation [24] q(t) fuel consumption (L/h) A, B, C generator coefficients P(t) generated power (kW) γ,ξcoefficients to linearize the cost function of batteries according to the capital cost and operation cost of batteries Energies 2022,15, 6259 6 of 17 HOMER Pro can effectively size the MG components consisting of the conventional power generation such as DGs, REs such as solar and wind energy, and energy storage systems (ESSs) such as batteries and fuel cells both in the grid-connected and stand-alone modes. HOMER analyzes all feasible solutions to meet the load and sorts them from the most economical configuration to the least one. To this end, the potential candidates for power generation have to be defined, and the cost of each unit must be determined. The cost in HOMER consists of capital cost, replacement cost, and operation and maintenance (O&M) cost. The capital cost is the initial investment to provide the power generation units. The replacement cost is the cost of replacing the units at the end of their lifetime. Additionally, the O&M cost is referred to as annual operation and maintenance cost. Moreover, cycling charging (CC) and load following (LF) are the two most common strategies in HOMER to control the power dispatch in the MG. The CC dispatch strategy is more economical when the RE generation consists of a lower portion of the total required energy. In this case, the dispatchable generators, such as DG, operate at full output power, and surplus energy charges the storage systems, such as batteries. On the other hand, in the LF strategy, the dispatchable units only produce the required power to supply the unmet load by REs, and REs can charge the storage systems if extra power is produced. The practical constraints for each power generation unit, operating reserve, and emission and environmental effects can be defined in HOMER effectively. Table 3represents the optimum design of the three MGs considering the load profiles in Figure 2by HOMER Pro. The considered MGs are situated in the geographical coordinates of 41 ◦ 23 0 04 00 N, 02 ◦ 10 0 27 00 E (Barcelona City). The solar, wind, and temperature resources were loaded from NASA Prediction of Worldwide Energy Resources, and Table 4presents the relevant costs. In order to increase the reliability of the MGs, the operating reserve for solar and wind power output and load in each current time step was considered and presented as the constraints in Table 4. Because forecasting solar radiation is more reliable than wind profile, the operating reserve for WT is usually greater than PV. Table 3. HIMG optimal design by HOMER. PV (kW) WT (kW) DG (kW) BAT (kWh) Converter (kW) Dispatch NPC ($) Unmet Electric Load Capacity Shortage MG1 6.5 2 6.8 29 2.95 LF 80,980 0 0 MG2 8.31 3 9.1 38 4.03 LF 107,774 0 0 MG3 16.8 4 15 57 9.71 CC 234,924 0 0 Table 4. Economical and constraints parameters. Gen Unit Parameter Value Unit Gen Unit Parameter Value Unit PV Capital 2500 USD/kW WT Capital 3000 USD/kW Replacement 2500 USD/kW Replacement 3000 USD/kW O&M 10 USD/kW/year O&M 30 USD/kW/year Derating Factor 80 % Hub Height 17 m Lifetime 25 year Lifetime 20 year DG Capital 500 USD/kW BAT Capital 300 USD/kW Replacement 500 USD/kW Replacement 300 USD/kW O&M 0.03 USD/kW/year O&M 10 USD/kW/year Fuel Price 1 USD/L Min SOC 40 - Lifetime 15 k hour Lifetime 10 year CONVERTER Capital 300 USD/kW CONSTRAINTS Load in current time step 10% Replacement 300 USD/kW Annual peak load 0 O&M 0 USD/kW/year Solar power output 20% Lifetime 15 year Wind power output 50% Energies 2022,15, 6259 7 of 17 2.2. Optimal Operation of HIMGs According to the obtained optimal size of HIMG, the optimal operation of the MGs over 24 h was performed to calculate the produced energy (PE) and OR of each power generator unit in the MGs. To this end, the cost functions in Table 1were used. However, to achieve the maximum power from REs, it was supposed that a maximum power point tracking (MPPT) was applied to the PV and WT. Therefore, the DG and battery power as the decision variables and battery SoC as the state variable were defined for the optimizer in order to determine the most economical operation for MGs. Consequently, the optimization problem can be defined as cost function (CF) minimization of the total sum of DG and BAT: min{CF(DG) + CF(BAT)}(3) Subject to: PDG(t) + PBAT(t) = PLoad(t)−PPV(t)−PWT(t)(4) PDGmin ≤PDG ≤PDGmax (5) 0≤PBAT ≤PBATmax (6) So Cmin ≤So C(t)≤So Cmax (7) where the SoC of the battery can calculated by: So C(t+∆t) = So C(t) + ∆t CBAT P(t)(8) In (8), the power P(t) can be positive or negative regarding the discharging or charging state of the battery. To obtain the optimal operation for each MG, a power management unit has to be applied to the system. Figure 3represents the power management in this paper. Energies 2022, 15, x FOR PEER REVIEW 8 of 18 Figure 3. Power management algorithm for the HIMG. As it can be seen from Figure 4, according to the power amounts of PV, WT, and Load at each time step, a single-objective optimization was employed to obtain the optimal values for DG and BAT considering the constraints in (4)–(7). If the REs meet the load, this difference power (PD) can charge the battery if the battery is not fully charged. On the contrary, if the battery is fully charged (SoCmax), then PD identifies as extra power. In this case, DG is not necessary to produce power to provide the power balance. On the other hand, if the REs are insufficient to supply the load, the DG and BAT participate economically to provide the required power for the load. In this case, the battery discharges if a portion of load demand is supplied by battery power. Supplementary battery management is also provided to check the SoC battery in each iteration. By evaluating the possibility of DG generation, the battery can be charged at least at the level of 50%. Figure 4. Load profile for each MG of the NMG. Figure 3. Power management algorithm for the HIMG. Energies 2022,15, 6259 8 of 17 As it can be seen from Figure 4, according to the power amounts of PV, WT, and Load at each time step, a single-objective optimization was employed to obtain the optimal values for DG and BAT considering the constraints in (4)–(7). If the REs meet the load, this difference power (PD) can charge the battery if the battery is not fully charged. On the contrary, if the battery is fully charged (SoCmax), then PD identifies as extra power. In this case, DG is not necessary to produce power to provide the power balance. On the other hand, if the REs are insufficient to supply the load, the DG and BAT participate economically to provide the required power for the load. In this case, the battery discharges if a portion of load demand is supplied by battery power. Supplementary battery management is also provided to check the SoC battery in each iteration. By evaluating the possibility of DG generation, the battery can be charged at least at the level of 50%. Energies 2022, 15, x FOR PEER REVIEW 8 of 18 Figure 3. Power management algorithm for the HIMG. As it can be seen from Figure 4, according to the power amounts of PV, WT, and Load at each time step, a single-objective optimization was employed to obtain the optimal values for DG and BAT considering the constraints in (4)–(7). If the REs meet the load, this difference power (PD) can charge the battery if the battery is not fully charged. On the contrary, if the battery is fully charged (SoCmax), then PD identifies as extra power. In this case, DG is not necessary to produce power to provide the power balance. On the other hand, if the REs are insufficient to supply the load, the DG and BAT participate economically to provide the required power for the load. In this case, the battery discharges if a portion of load demand is supplied by battery power. Supplementary battery management is also provided to check the SoC battery in each iteration. By evaluating the possibility of DG generation, the battery can be charged at least at the level of 50%. Figure 4. Load profile for each MG of the NMG. Figure 4. Load profile for each MG of the NMG. Particle swarm optimization (PSO) was utilized in this paper as a single-objective optimization. However, other algorithms, such as differential evolution (DE), genetic algorithm (GA), and imperialist competitive algorithm (ICA), are also able to deal with this problem. PSO represents a robust, rapid, and reliable performance among different optimization algorithms. In the PSO algorithm, the particles are identified by position and velocity. At the initial phase, the particles position and particle best position are initialized. Then, over the iterations, the particles’ position and velocity are updated to propel the particles toward the global best [25]. 2.3. Evaluation of the HIMG Operation (RF Calculation) According to the optimal operation of the HIMG, the optimal produced energy of the energy generator units and consequently the OR of MGs can be calculated over a specific interval. Interactive transfer or receiving energy in the MG community results in higher OR in MGs. Therefore, optimal component sizing in the NMG can effectively reduce MGs’ capital, replacement, and M&O cost. The reduced factor proposed in this section was based on two main factors, the PL and correlation of load profile. Due to the dependency of the proposed RF to the OR of MGs, the RF affects the dispatchable components of the MGs. The RF is expressed in (9): RFMGi=hORMGi×OCMGi−PL OCMGiikδ− i−δ+ ik MGi × 2−N ∏ j=1 corr(MGi,MGj)! hORMGi×OCMGi−PL OCMGiikδ− i−δ+ ik MGi +1 N−1 N ∑ j=1 j6=i ORMGj×OCMGj−Lmax OCMGjkδ− i−δ+ ik MGj (9) Energies 2022,15, 6259 9 of 17 In (9), || δ+−δ− || represents the interval at which PL occurs, at ( δ+ + δ− )/2, and the OR of other MGs are also calculated in this interval; therefore, only PL and the maximum load profile (L max ) are identical if the load patterns are similar. For instant, when the MG 1 and MG 2 are at PL, the MG 3 is not in its PL. In addition, Nis the number of MGs that existed in the NHMG, and corr represents the correlation of the load pattern among MGs. The Pearson’s linear correlation coefficient was utilized to evaluate the correlation of the Load profile: corr(MGi,MGj) = n ∑ k=1 (MGi,k−MGi)(MGj,k−MGj) n ∑ k=1 (MGi,k−MGi)2n ∑ l=1 (MGj,k−MGj)1 2 (10) where MG is the mean value of ndata of MG’s load profile. This correlation coefficient returns a value between − 1 and 1, if a perfect negative correlation and perfect positive correlation exists among the data, respectively. To obtain the δ for MGs, a Gaussian curve with a mean ( µ ) of PL ( µ =PL) was fitted to the load profile. The standard deviation of the fitted curve was considered as δ . Figure 4demonstrates the Gaussian fitted curve to the MG load profiles. The following results can be deduced from (9): - The calculations were based on the OR of a specific MG during the PL in the interval || δ+−δ− ||. This time interval is considered for the other MGs that exist in the NHMG. The ORs were calculated based on the optimal operation of HIMGs. - The ORs are given importance by the factor of PL and OC difference. Therefore, the higher PL led to reducing lower OR in the NMG in order to increase the MG reliability. - The correlation represents the PL coincidence of MGs. Therefore, the correlation with a value that is lower than the unity resulted in a higher RF due to the possibility of sharing OR of adjacent MGs. 3. Evaluation and Simulation Results According to the optimal design of the HIMG with HOMER and the discussed power management algorithm in Figure 4, the ORs of HIMGs were calculated. To this end, the simulation was conducted in MATLAB. Eventually, according to Equation (9), the RFs were calculated in order to obtain the optimal design in the NHMG. Figure 5shows the optimal operation of the HIMGs. The SoC of the batteries and extra and shortage power are also presented in Figure 5. The initial SoC of the batteries was set to 50%, and as can be observed, the extra power leads to charging the batteries completely. The simulation was performed for 24 h, and the time step was set to 15 min to reduce the large quantity of data produced. The ORs were calculated for two different intervals || δ+−δ− ||. The PL of MG 1 and MG 2 is a coincidence at the same time, and the OR for MG 3 was also calculated during the PL of two other MGs. Furthermore, the OR during the PL of MG 3 was calculated for MG 1 and MG 2 to obtain the RF of MG 3 . To evaluate the battery power, the C-rate was considered as 5C. The correlation was calculated by using the “corr” function in MATLAB. The load profile of MG 1 and MG 2 are similar with different scales. Therefore, the correlation for these two MGs is unity. However, the correlation between MG 1 and MG 3 was obtained as 0.8727. Table 5presents the HIMG specifications and RFs for the HIMGs. The RF represents the OR reduction percentage in each HIMG when the MGs are in collaborative operation as the NHMG. Therefore, in order to evaluate the optimal component size for the HNMG, the reduced power generation units were obtained as follows: min{α×CF(DG) + β×CF(BAT)}(11) Subject to: PDG MGi+PBAT MGi=RFMGi×ORMGi kδ− i−δ+ ik(12) Energies 2022,15, 6259 16 of 17 MG Microgrid MOEA/D Multi-Objective Evolutionary Algorithm Based on Decomposition MOSaDE Multi-Objective Self-Adaptive Differential Evolution MOPSO Multi-Objective Particle Swarm Optimization MPPT Maximum Power Point Tracking NHMG Networked Hybrid Microgrid NMG Networked Microgrid NPC Net Present Cost NTC Net Total Cost OC Operating Capacity OR Operating Reserve PE Produced Energy PESA-II Pareto Envelop-based Selection Algorithm II PL Peak Load PV Photovoltaic RE Renewable Energy RES Renewable Energy Source RF Reduced Factor SAS Solar Array Simulator SoC State of Charge SPEA-II Strength Pareto Evolutionary Algorithm II SAPV Stand-Alone PV WT Wind Turbine References 1. Kumar, P.S.; Chandrasena, R.P.S.; Ramu, V.; Srinivas, G.N.; Babu, K.V.S.M. Energy Management System for Small Scale Hybrid Wind Solar Battery Based Microgrid. IEEE Access 2020,8, 8336–8345. [CrossRef] 2. Mohammed, K.; Mohammed, O.H.; Alshammari, N.; Akherraz, M. Multi-objective optimization and the effect of the economic factors on the design of the microgrid hybrid system. Sustain. Cities Soc. 2021,65, 102646. 3. Ramli Makbul, A.M.; Bouchekara, H.R.E.H.; Alghamdi, A.S. Optimal sizing of PV/wind/diesel hybrid microgrid system using multi-objective self-adaptive differential evolution algorithm. Renew. Energy 2018,121, 400–411. [CrossRef] 4. Mohammed, R.H.; Gomes, C.; Hazim, H.; Ahmadipour, M. Sizing and implementing off-grid stand-alone photovoltaic/battery systems based on multi-objective optimization and techno-economic (MADE) analysis. Energy 2020,207, 118163. 5. Bouchekara, H.R.E.-H.; Javaid, M.S.; Shaaban, Y.A.; Shahriar, M.S.; Ramli, M.A.M.; Latreche, Y. Decomposition based multiobjective evolutionary algorithm for PV/Wind/Diesel Hybrid Microgrid System design considering load uncertainty. Energy Rep. 2020,7, 52–69. [CrossRef] 6. Ridha, H.M.; Gomes, C.; Hizam, H.; Ahmadipour, M.; Muhsen, D.H.; Ethaib, S. Optimum Design of a Standalone Solar Photovoltaic System Based on Novel Integration of Iterative-PESA-II and AHP-VIKOR Methods. Processes 2020 ,8, 367. [CrossRef] 7. Anderson Alexander, A.; Suryanarayanan, S. Review of energy management and planning of islanded microgrids. CSEE J. Power Energy Syst. 2019,6, 329–343. 8. Wei, F.; Jin, M.; Liu, X.; Bao, Y.; Marnay, C.; Yao, C.; Yu, J. A review of microgrid development in the United States—A decade of progress on policies, demonstrations, controls, and software tools. Appl. Energy 2018,228, 1656–1668. 9. Vinny, M.; Adetunji, K.E.; Joseph, M.K. Planning of a sustainable microgrid system using HOMER software. In Proceedings of the 2020 Conference on Information Communications Technology and Society (ICTAS), Durban, South Africa, 11–12 March 2020; pp. 1–5. 10. Zahid, J.; Li, K.; Hassan, R.U.; Chen, J. Hybrid-microgrid planning, sizing and optimization for an industrial demand in Pakistan. Teh. Vjesn. 2020,27, 781–792. 11. Wencong, S.; Yuan, Z.; Chow, M. Microgrid planning and operation: Solar energy and wind energy. In Proceedings of the IEEE PES General Meeting, Providence, RI, USA, 25–29 July 2010; pp. 1–7. 12. Yu, P.; Liu, L.; Zhu, T.; Zhang, T.; Zhang, J. Feasibility analysis on distributed energy system of Chongming County based on RETScreen software. Energy 2017,130, 298–306. 13. Gasparovic, G.; Krajaˇci´c, G.; Dui´c, N.; Baoti´c, M. New Energy Planning Software for Analysis of Island Energy Systems and Microgrid Operations – H2RES Software as a Tool to 100% Renewable Energy System. Comput. Aid. Chem. Eng. 2014 ,33, 855–1860. 14. Michalitsakos, P.; Mihet-Popa, L.; Xydis, G. A Hybrid RES Distributed Generation System for Autonomous Islands: A DER-CAM and Storage-Based Economic and Optimal Dispatch Analysis. Sustainability 2017,9, 2010. [CrossRef] 15. Essiet, I.O.; Sun, Y.; Wang, Z. Analysis of the Effect of Parameter Variation on a Dynamic Cost Function for Distributed Energy Resources: A DER-CAM Case Study. Appl. Sci. 2018,8, 884. [CrossRef] Energies 2022,15, 6259 17 of 17 16. Comodi, G.; Cioccolanti, L.; Gargiulo, M. Municipal scale scenario: Analysis of an Italian seaside town with MarkAL-TIMES. Energy Policy 2012,41, 303–315. [CrossRef] 17. Zia Muhammad, F.; Benbouzid, M.; Elbouchikhi, E.; Muyeen, S.M.; Techato, K.; Guerrero, J.M. Microgrid transactive energy: Review, architectures, distributed ledger technologies, and market analysis. IEEE Access 2020,8, 19410–19432. 18. Islam, M.; Yang, F.; Amin, M. Control and optimisation of networked microgrids: A review. IET Renew. Power Gener. 2021 ,15, 1133–1148. [CrossRef] 19. Yi, W.; Rousis, A.O.; Strbac, G. A Three-Level Planning Model for Optimal Sizing of Networked Microgrids Considering a Trade-Off Between Resilience and Cost. IEEE Trans. Power Syst. 2021,36, 5657–5669. 20. Afolabi, Y.A.; AlMuhaini, M.; Heydt, G.T. Optimal design of hybrid DG systems for microgrid reliability enhancement. IET Gener. Transm. Distrib. 2020,14, 815–823. 21. Hakimi, S.M.; Hasankhani, A.; Shafie-Khah, M.; Lotfi, M.; Catalão, J.P. Optimal sizing of renewable energy systems in a Microgrid considering electricity market interaction and reliability analysis. Electr. Power Syst. Res. 2021,203, 107678. [CrossRef] 22. Hakimi, S.M.; Hasankhani, A.; Shafie-Khah, M.; Catalão, J.P. Optimal sizing and siting of smart microgrid components under high renewables penetration considering demand response. IET Renew. Power Gener. 2019,13, 1809–1822. [CrossRef] 23. Moslem, U.; Romlie, M.F.; Abdullah, M.F.; Halim, S.A.; Kwang, T.C. A review on peak load shaving strategies. Renew. Sustain. Energy Rev. 2018,82, 3323–3332. 24. Norberto, F.; Sanz, Y.; Rodrigues, M.; Montañés, C.; Dopazo, C. The use of cost-generation curves for the analysis of wind electricity costs in Spain. Appl. Energy 2011,88, 733–740. 25. Navid, S.; Martinez-Garcia, H.; Velasco-Quesada, G.; Guerrero, J.M. A Comprehensive Review of Control Strategies and Optimization Methods for Individual and Community Microgrids. IEEE Access 2022,10, 15935–15955.