Implementation selected tools of Lean Manufacturing
Full text
Final Project. 0 Implementation selected tools of Lean Manufacturing 2013 AUTOR:EUGENIA MORAL SANTAMARIA PROF: JOANNA KALKOWSKA
Final Project. Implementation selected tools of Lean Manufacturing 1 Content CHAPTER 1: INTRODUCTION................................................................................................4 1.1.Aim and scope of the project....................................................................................5 1.2.Substantiation of the project.....................................................................................5 CHAPTER 2: LEAN MANUFACTURING................................................................................6 2.1. Lean Manufacturing. General issue.............................................................................7 2.2. Characteristics of tools of Lean Management............................................................9 2.2.1. Empowerment..........................................................................................................9 2.2.2. The 5's.....................................................................................................................10 2.2.2.1. Seiri (Classification)...........................................................................................12 2.2.2.2. Seiton (Order).....................................................................................................14 2.2.2.3. Seiso (Cleanliness)............................................................................................15 2.2.2.4. Seiketsu (Standardize)......................................................................................16 2.2.2.5. Shitsuke (Discipline)..........................................................................................16 2.2.3. Poka Yoke..............................................................................................................17 2.2.4. Value Stream Mapping.........................................................................................20 2.2.5. Total Productive Maintenance (TPM).................................................................23 2.2.6. Single Minute Exchange of Die (SMED)............................................................25 2.2.6.1. Basic concepts of SMED..................................................................................26 2.2.6.2. Application techniques......................................................................................30 2.2.7. Supply chain management. Kanban..................................................................30 2.2.8.Overall Equipment Effectiveness...................................................................33 CHAPTER 3: CHARACTERISTICS OF THE COMPANY.................................................36 3.1. Description and location..............................................................................................37 3.2. Description of the process...........................................................................................40 3.3. Description of the problems........................................................................................44 3.4. Proposal of improvements...........................................................................................47 3.5. Implementing improvements.......................................................................................47 3.5.1. Implementing 5 S’ in Teichenné..........................................................................47 3.5.2. Implementing Poca Yoke in Teichenné.............................................................49 3.5.3. Implementing Total Productive Maintenance in Teichenné............................51 3.5.4. Implementing Kanban in Teichenné...................................................................54
Final Project. Implementation selected tools of Lean Manufacturing 2 CHAPTER 4: CONCLUSION................................................................................................56 CHAPTER 5: BIBLIOGRAPHY.............................................................................................59 CHAPTER 6: ANNEXES......................................................................................................61
Final Project. Implementation selected tools of Lean Manufacturing 3 Thumbnails Fig 1. Continuous Improvement (Kaizen) 8 Fig 2. The 5’s 12 Fig 3. SEIRI Unwrap and remove unnecessary items 13 Fig 4. SEITON Order 14 Fig 5. Typical errors 17 Fig 6. Avoiding human errors 18 Fig 7. Development of Poka Yoke 19 Fig 8. Icons of Value Stream Mapping 22 Fig 9. Phases of SMED 29 Fig 10. Types of Kanban 31 Fig 11. Overall Equipment Effectiveness34 Fig 12. Situation of the company 37 Fig 13. Diagram of the factory39 Fig 14. Diagram of the bottling process 42 Fig 15. Flowchart 43 Fig 16. Picture of the storage 44 Fig 17. Recycling bin 45 Fig 18. Capping and labeller machine 45 Fig 19. Instruction sheet 49 Fig 20. Detection sensor 50 Fig 21. Detection devide 50 Fig 22. Monitoring Worksheet of breakdowns 51 Fig 23. Preventive maintenance plan 52 Fig 24. Tracking sheet to study the quality of raw materials 53 Fig 25. Material tracking cards 54 Tab 1. Comparation between different errors 18 Tab 2. Difference between TQMTPM 24
Final Project. Implementation selected tools of Lean Manufacturing 4 CHAPTER 1: INTRODUCTION
Final Project. Implementation selected tools of Lean Manufacturing 5 1.1. Aim and scope of the project The aim of the project is the implementation of manufacturing tools to improve the quality and the productivity of a Company. The purpose of this project is to carry out a study of the current situation of a company and try to make improvements based on Lean Manufaturing. The main purpose of the project is define, develop and implement production improvements to increase productivity, flexibilizing, reduce waste, reduce inventory, reduce space, delete safety stocks... In short, implement improvements productivity to make this as efficient as possible. In order to implement these tools to improve the production is essential to define the concept of productivity. Subsequently proceed to undertake a study of enhancement tools that will be implemented as well as a brief description and the method of application of each. Finally there will be a description of the company where this tools are going to be held and which implements are necessary to improve the production of this Company. 1.2. Substantiation of the project Due to the historical moment in which we find ourselves and the world economic crisis in which we are involved, one way to deal with this is the application of these techniques in the production process. The application of Lean manufacturing is not a charge too high but still may be able to get amazing improvements economically. In today’s accelerating, expanding and frequently volatile markets, demand can be exceedingly difficult to predict. As orders are processed through digital channels, demand changes moment by moment. In order to respond to such change—and keep the costs of responding at minimum levels— companies must have the capabilities to meet demand as it occurs
Final Project. Implementation selected tools of Lean Manufacturing 6 CHAPTER 2: LEAN MANUFACTURING
Final Project. Implementation selected tools of Lean Manufacturing 7 2.1. Lean Manufacturing. General issue. Lean Manufacturing can be defined as an approach to the identification and elimination of waste (non-value added activities) through continuous improvement by flowing the product in a way to "pull" from the customer in pursuit of perfection. This methodology of improving manufacturing efficiency was conceived in Japan by Taiichi Ohno1. In 1937, Ohno noted that before the war, Japanese productivity was much lower than the U.S.. After the war, Ohno visited the United States, where he studied the major pioneers of productivity and waste reduction in the country as Frederick Taylor2 and Henry Ford3. Ohno was impressed by the overemphasis that Americans put into mass production of large volumes to the detriment of the variety, and the level of waste generating industries that the richest country in the war. When he visited the supermarket had an inspiring effect immediately; Ohno found in them a perfect example of his idea of managing reduced inventories, eliminate unnecessary steps and monitor activities and provide primary control that does the work (in this case the client) as support to the value chain. The Japanese word dumb means 'waste' and refers specifically to any human activity that consumes resources and creates no value. The goal is to find tools that help eliminate all waste and all operations that do not add value to the product or process, increasing the value of each action and eliminating what is not required. This manufacturing process is related to the use of activity-based costing (generation of activity-based costs') which, according to its original-looking costs relate to all the values that the customer receives the product. On the other hand, serves to establish a philosophy of continuous improvement that allows companies to reduce their costs, improve processes and eliminate waste to increase customer satisfaction and maintain profit margins. The goal of lean manufacturing is to be useful to the community, which means being in search of continuous improvement. The principles keys of lean manufacturing are: • Perfect quality to the first: quest for zero defects, detection and resolution of problems at their source. 1TaiichiOhno(1912‐1990)wastheengineerwhodesignedtheToyotaproductionsystemjustintime (JIT)withinthecarmanufacturer. 2FrederickTaylor(1856‐1915)wasamechanicalengineerandeconomist,whowasthepromoterof scientificmanagement.In1903hepublishedhisbookcalledShopManagementwhereheintroduces theconceptsofcreatingamentalrevolutionandafunctionalworker. 3HenryFord(1863‐1947)wasthefounderoftheFordMotorCompanyandfatherofmodern productionlinesusedinmassproduction.
Final Project. Implementation selected tools of Lean Manufacturing 8 • Minimizing waste: elimination of all activities that are not value-added networks and security, optimizing the use of scarce resources (capital, people and space). • Continuous improvement: reducing costs, improving quality, increasing productivity and information sharing. • Processes "pull" products are pulled (in the sense requested) by the client end, not pushed by the end of production. • Flexibility: different mixes quickly produce a variety of products, without sacrificing efficiency due to lower production volumes. • Building and maintaining a long term relationship with suppliers taking risksharing agreements, and information costs. Lean is basically everything about getting the right things in the right place, at the right time, in the right amount, minimizing waste, being flexible and open to change. One of the philosophies of Lean Manufacturing is continuous improvement (Kaizen). Assuming that the time is the best single indicator of competitiveness, acts to be able to recognize and eliminate waste in the company, either in existing production processes or in the planning stage of new products, maintenance of machines or including administrative procedures. The statement that best defines this philosophy is: "Today better than yesterday, tomorrow better than today!"4 and its meaning is that you can always do better. In Japanese culture is introduced the concept that no day should pass without some improvement. 4http://www.revistadelogistica.com/hoy‐mejor‐que‐ayer‐manana‐mejor‐que‐hoy.asp Fig 1. Continuous Improvement (Kaizen)
Final Project. Implementation selected tools of Lean Manufacturing 15 2.2.2.3. Seiso (Cleanliness) Implementing Seiso includes finding the keys to achieving and maintain cleanliness in the work area. To reach the goal requires meet some basic rules defined below: 1. No mess. Reduce or eliminate factors that could cause contamination. At any time, remove immediately any situation of dirt that has been generated. 2. Remove dirt, defects or imperfections, leaving the media work (machines, equipment, facilities, tools, furniture, etc..) clean (no grease, dust, etc.) • Working in a cluttered environment is dirty and unsafe with high risk of accidents and also directly affect the quality matched manufactured products. • The key to success in achieving and maintaining cleanliness of a company depends on the attitude of staff and participation form. 3. Procedures to conduct a cleaning operation: • Design a program for cleaning (daily newspaper) with tasks clearly defined (who, when, how, where) • Periodically check that those responsible for implementing maintain the level tasks accomplished. • Designate who is responsible for maintenance team clean and secure by checking her figure tasks performed. • Clearly define the boundary lines of areas and responsibility to ensure that no dead areas (no charge).These areas are usually covered areas or passing by its location are not clearly defined. • Ideally, responsible for cleaning up an area to assess another area outside his execution. • Difficult or hidden areas require a special assessment and if the results were not the desired one that demonstrates specific patrol intention to achieve the highest levels of safety, quality and Productivity.
Final Project. Implementation selected tools of Lean Manufacturing 16 2.2.2.4. Seiketsu (Standardize) The objective is to develop clear rules to ensure the maintenance of the results obtained implement the S's previous. As in Seiso there are a number of standards note: 1. To maintain and continuously improve procedures and standards used in implementing 5S Plan is necessary to collect written those elements that have facilitated progress in the first three S's. By therefore it is recording all actions that have been carried out with the result. 2. Depending on the areas (manufacturing, administrative, etc.) will develop a 5S implementation manual. This manual should contain at least: • Initial conditions prior corresponding workspace (Area occupied in plan distribution) • General Layout areas, furniture and equipment that form (Include area and is responsible for the contact). • The plan standardizes documentation must be available to Plant anyone. Progress must be visible through informative illustrations and information of the panels has to be updated periodically. • After obtaining the desired results define and procedures for cleaning. These procedures will be reviewed periodically. Management must design systems and procedures to ensure continuity of seiri, seiton and seiso, which is the other meaning of seiketsu (systematic).9 2.2.2.5. Shitsuke (Discipline) This S is the most weight in the implementation and consolidation of results since without it the goals achieved with the implementation of the rest of S's was dissipate over time. Shitsuke therefore has to ensure the creation and maintaining good safety and efficiency in the field of housekeeping items, people and places of employment. In summary has to be the philosophy that prevails within the company. Because habits generated by the practice of these activities are to be derive advantages: • Greater freedom of personal performance in the workplace without rigorous oversight. 9http://www.tuobra.unam.mx/publicadas/040119152742‐6_.html
Final Project. Implementation selected tools of Lean Manufacturing 17 • Less stress on repetitive practice of program activities. • Increased efficiency and job satisfaction. • More careful management and conservation of the features individual and collective production. To achieve higher levels required by competition Company staff discipline and commitment using standards established and cooperating on practical application and improvement of procedures. 2.2.3. Poka Yoke A poka-yoke is a device designed carefully to avoid errors in the operation of a system. Some authors handle the poka-yoke as an anti-stupid, which guarantees the safety of machinery and processes to users. Thus, they prevent any accidents. These devices were introduced at Toyota in the 1960s, by engineer Shigeo Shingo10 within what is known as the Toyota Production System. Although prior poka-yokes existed, it was not until his introduction when Toyota became a technique, common today, quality. The table below demonstrate the different errors that can occur during a process, this information is taken from the book Human Errors11 10ShigeoShingo(1909‐1990)Japaneseindustrialengineerwhowashiredin1955asaconsultantat ToyotaMotorCompany 11JamesReason,1990CambridgeUniv.Press Fig 5. Typical errors
Final Project. Implementation selected tools of Lean Manufacturing 18 Moreover, Shingo stated, in his book12, that the cause of the error was in labor of the workers and defects in manufactured parts were produced by themselves. Consequently fit two possibilities or objectives to achieve with poka-yoke: • Somehow preclude human error, putting obstacles to disallow these errors, such as making some cables for recharging mobile phone batteries and DC devices which can only be connected with the correct polarity, it is impossible to reverse, since the connector pins are of different size or shape. • Highlight the error that is so obvious to him that he has committed. Shingo cites the following example: a worker has to assemble two buttons on a device by placing them under a pier, to prevent the failure of the latter on one of the buttons the worker must take before assembly, two pier from the box where all stored and would deposit on a tray or dish, once completing the assembly, the worker could tell immediately of forgetfulness with a glance at the tray, something impossible to do by looking at the box piled high with lots of springs. Currently the poka-yokes usually consist of: • Detection system, which depends on the feature type to control and in terms of which are usually classified • Alarm system (visual and audible commonly) that alerts the worker of the error to remedy the same. TechniquesPokaYoke‐Safe Whenwefinderrors? Beforetheyoccur:PredictionandPrevention Aftertheyoccur:Detection TechniquePredictionDetection Terminationorsuspensionof activities Whenanerrorisaboutto happen Whenanerrorordefect alreadyoccurred ControlTheerrorsareimpossibleDefectiveitemscannotbe movedtothenextoperation WarningWhensomethingisaboutto fail Immediatelywhen somethingfails 12 Zero Quality Control: Source Inspection and the Poka-Yoke System by Shigeo Shingo (Apr 1, 1986) Fig 6. Avoiding human errors Tab1.Comparationbetweendifferenterrors
Final Project. Implementation selected tools of Lean Manufacturing 19 Makeamanufacturing process Identifyallpotential errors Identifydesign featuresthatcan eliminatetheerror Redesignedto eliminatethe possibilityoferror Redesignedtomakeit obviousthatanerror willhappen Reviewthedesignto detectpotentialerrors inManufacturingand Assembly Redesignforobvious erroroccurred The best way to develop the Poka Yoke process is to follow the methodology set out below. Development of Poka Yoke Fig 7. Development of Poka Yoke
Final Project. 20 2.2.4. Value Stream Mapping The Value stream mapping or mapping the value chain is a visual tool that allows Lean Manufacturing to identify all activities in the planning and production of a product, in order to find opportunities for improvement that have an impact on the entire chain and not in separate processes. This tool is based on the layout of two maps of the value chain, one present and one future, that will make it possible to document and display the current status and actual process to be improved, and the subsequent state, ideal or that want to achieve once they have made improvement activities. The VSM is a graph consisting of icons and symbols that describe simple and mainly two types of flow: The flow of information (planning), which covers the activities from which the customer makes the order until a work order or production is generated. The other is the flow of materials (manufacturing), which takes into account all the processes needed to produce the good, until it is delivered to the customer. Each of the operations or processes assigned performance indicators or measures that reveal and display the current status of the process and usually include cycle time, setup time and baseline shift, number of players per team, percentage rejections, equipment availability, downtime, efficiency, among others. Once indicators have been allocated and drawn to the VSM (Value Stream Map), identify improvement opportunities and prioritized according to the impact they have on reducing cost, increasing flexibility and improving productivity and quality. Finally we draw the future map which will help us visualize the state of the process after the execution of the opportunities found. Below it is show the icons and the definition of each.
Final Project. Implementation selected tools of Lean Manufacturing 21
Final Project. Implementation selected tools of Lean Manufacturing 22 Fig 8. Icons of Value Stream Mapping
Final Project. Implementation selected tools of Lean Manufacturing 23 2.2.5. Total Productive Maintenance (TPM) TPM13 is an innovative Japanese concept. The origin of TPM can be traced back to 1951 when preventive maintenance was introduced in Japan. However the concept of preventive maintenance was taken from USA. Nippondenso was the first company to introduce plant wide preventive maintenance in 1960. Preventive maintenance is the concept wherein, operators produced goods using machines and the maintenance group was dedicated with work of maintaining those machines, however with the automation of Nippondenso, maintenance became a problem as more maintenance personnel were required. So the management decided that the routine maintenance of equipment would be carried out by the operators, so maintenance group took up only essential maintenance works. The aim of productive maintenance was to maximize plant and equipment effectiveness to achieve optimum life cycle cost of production equipment. TPM was introduced to achieve the following objectives. The important ones are listed below. • Avoid wastage in a quickly changing economic environment. • Producing goods without reducing product quality. • Reduce cost. • Produce a low batch quantity at the earliest possible time. • Goods send to the customers must be non defective The TPM program closely resembles the popular Total Quality Management (TQM) program. Many of the tools such as employee empowerment, benchmarking, documentation, etc. used in TQM are used to implement and optimize TPM. Following are the similarities between the two. 1. Total commitment to the program by upper level management is required in both programmes 2. Employees must be empowered to initiate corrective action 3. A long range outlook must be accepted as TPM may take a year or more to implement and is an on-going process. Changes in employee mind-set toward their job responsibilities must take place as well. 1313http://www.elprisma.com/apuntes/ingenieria_industrial/tpmmantenimientoproductivototal/
Final Project. Implementation selected tools of Lean Manufacturing 24 There are also differences between TQM and TPM which are summarized below. There are different kinds of maintenance as we can see afterwards: 1. Breakdown maintenance: It means that people waits until equipment fails and repair it. Such a thing could be used when the equipment failure does not significantly affect the operation or production or generate any significant loss other than repair cost. 2. Preventive maintenance (1951): It is a daily maintenance (cleaning, inspection, oiling and re-tightening), design to retain the healthy condition of equipment and prevent failure through the prevention of deterioration, periodic inspection or equipment condition diagnosis, to measure deterioration. It is further divided into periodic maintenance and predictive maintenance. Just like human life is extended by preventive medicine, the equipment service life can be prolonged by doing preventive maintenance. • Periodic maintenance (Time based maintenance - TBM): Time based maintenance consists of periodically inspecting, servicing and cleaning equipment and replacing parts to prevent sudden failure and process problems. • Predictive maintenance: This is a method in which the service life of important part is predicted based on inspection or diagnosis, in order to use the parts to the limit of their service life. Compared to periodic maintenance, predictive maintenance is condition based maintenance. It manages trend values, by measuring and analyzing data about deterioration and employs a surveillance system, designed to monitor conditions through an on-line system. Tab2.DifferencebetweenTQM‐TPM
Final Project. Implementation selected tools of Lean Manufacturing 31 be understood as a system of production that determines the flow of materials through signals that indicate when a product must be produced and when we need to replenish raw materials between two workplaces that are consecutive. A kanban is characterized for having associated a set of a particular type of products and is defined as text, image, barcode, etc..Each lot must have assigned a specific amount and may add other useful information, such as the identification of related processes, source-end, type of product packaging where the material should be placed in the area of storage. Ultimately Kanban label contains information that serves as an order of work, this is their primary function. In other words, is an automatic direction device that gives us information about what to produce, in what quantity, by what means, and how to transport it. Typically there are two main kinds of Kanban: 1. Production Kanban: A signal from the internal customer to the internal supplier that something is required from the internal supplier. 2. Withdrawal Kanban: A signal from the internal supplier to the internal customer that the supplier has produced something which is available to be withdrawn by the internal customer. In such case the internal supplier doesn’t produce more until the withdrawal is made by the internal customer. In the diagram below we can see the two types of kanban specified above. To ensure the smooth operation of the system is necessary to have clear two fundamental principles: 1. The production control: Production control means the integration of the different processes and developing a JIT system in which materials arrive in time and amount required in the different stages of manufacture. In the field of operating, small and frequently deliveries are the key to the system. The proximity Fig 10 Types of Kanban
Final Project. Implementation selected tools of Lean Manufacturing 32 between centres is, therefore, a very important element, as improves control, communication, cost and timeliness of transactions, thereby maintaining minimum input inventories. The requirements terms of quality and timeliness come to the fore due to the short range of overproduction. 2. Continuous improvement: Function improvement of processes means improving the different activities of the company by using Kanban (done by engineering techniques). These techniques were looking to achieve the following results: • Elimination of overproduction and waste. • Power starting any standard at any time. • Give instructions based on the current conditions of the work area. • Prevent unnecessary work being added to those orders and started and prevent excessive unnecessary paperwork. • It facilitates control of the material. • Organization of the work area. • Reduced set-up (model change). • Reduced WIP (Work in Process). • Management multiprocessing. • Error-proof mechanisms. • Preventive maintenance. • Reduced inventory levels. It should take into account the following considerations before implement Kanban: • Determine a production scheduling system for developing mixed production system and labeled before implantation Kanban full to smooth the current flow of materials. • Establish a route Kanban which reflects the flow of materials, this implies designate places to avoid confusion in handling materials. It should be obvious when the material is out of place. • The use of Kanban systems is linked to small batch production. • It should be noted that those items of special value should be treated different. • You must train all personnel to be able to operate with Kanban system. This point is vital for the future of the new system.
Final Project. Implementation selected tools of Lean Manufacturing 33 Using a Kanban system promotes improvements in two aspects: 1. The Kanban exposes abnormal situations that are caused by breakdowns of machines and product defects. 2. A gradual reduction in the number of Kanbanes leads to reductions in stock, which ends with the role of stock as buffer against production instabilities. This reveals the processes that generate anomalies and simplifies the points for improvement. The overall efficiency is increased by concentrating in weak elements. One role of Kanban is to transmit the information to the process previous to know which the needs of the current process are. If there are many Kanbanes, the information is no longer as effective, because you don’t know which parts are really needed. 2.2.8. Overall Equipment Effectiveness The machines are designed in order to be able to fulfil a certain production capacity. In reality, and for different reasons, the production always lags behind the capacity for which it was designed. Furthermore, it seems that the implanted improvements have little effect on productivity. The higher the production speed is, more products are rejected, and when we focus more on quality, the machine does not work as expected. The OEE provides insight about the losses that occur during the manufacturing process If the production of approved products lags behind installed capacity, we talk about hidden production capacity (this capacity is not being used for the production of good). OEE allows us to identify the losses by comparing the performance of different machines with an ideal machine (a machine that works as long as we want, at top speed and producing only good to the first). These losses can be divided into the following factors: • Availability: How long has been running the machine or equipment versus time that should have been operating (removing unplanned time)
Final Project. Implementation selected tools of Lean Manufacturing 34 • Performance: During the time it has been running, how much you have produced (good and bad) regarding what had to be made to the ideal cycle time. • Quality: The indicator known by everyone. How much I have made good on the first of the total production performed (good and bad). The OEE indicates how effectively the machines are being used compared to the ideal machine (OEE = 100%). The figure below illustrates how to determine the OEE. Actually the OEE value is much lower than expected. The difference between the ideal and the reality is equal to the sum of the losses and, consequently, shows exactly where we should implement the improvement. You can’t improve what you can’t measure, that is why the improvement process always starts with measuring OEE since the OEE is a very powerful tool to find where the losses are. When analyzing OEE, many companies may be surprised to find that there is significant room to increase the output of certain pieces of equipment. For example, they may be able to minimize: • Unnecessary equipment breakdowns. • Downtime due to set-up and adjustment. B/A=Availability •A=TimeAvailable •B=OperatingTime D/C=Performance •C=ProductionPreview •D=Realproduction F/E=Quality •E=Realproduction •F=Goodpieces OEE=B/A*D/C*F/E Fig 11. Overall Equipment Effectiveness
Final Project. Implementation selected tools of Lean Manufacturing 35 • Idling and minor stoppages due to lack of raw materials to process due to bottlenecks or poor production planning. • Operation below maximum designed speed due to poor operator efficiency, maintenance constraints or other factors. • Defects that require re-processing. Tracking OEE is helpful for identifying the sources of bottlenecks, for making capital spending decisions and for monitoring the effectiveness of programs to increase machine productivity.
Final Project. Implementation selected tools of Lean Manufacturing 36 CHAPTER 3: CHARACTERISTICS OF THE COMPANY
Final Project. Implementation selected tools of Lean Manufacturing 37 3.1. Description and location In order to implement the above techniques I decided to select a bottling of alcoholic beverages called Teichenné. Here below is detailed some of the history of this company and its evolution during his lifetime. TEICHENNÉ , Inc. is a family business dedicated to the production of liquors and derivatives . It was founded in 1956 by the father of the current manager and company president, John Teichenné. At that time the production was entirely handmade and very limited, sales were confined to regions closer. It was not until the '70s, when Teichenné, SA expanded, coinciding with the moment when John Teichenné replaced his father. The challenge was to create a wide range of products, taking into account the presentations and offering the best quality. Thus began the position in the Spanish market and there was a " Boom " when where introduced into the market the Teichenné acquaintances " Schnapps ", sweet liqueurs flavored with Fruit of medium graduation that represented a novelty in the late 80s. These new liqueurs opened the door to new exports, which has grown since then arithmetically. This constant growth in production made Factory L 'Arboç , the family's hometown, too small to be able to satisfied all the necessities and was in 1993 when new facilities were built in Bellvei Penedes . Between these two factories nowadays Teichenné have a catalog of over 200 products and is exporting to more than 25 countries. In this project we focus only on the plant in the Arboç, specifically Km.1194 Crta N-340, 8 Bellvei del Penedès. Below is an image where point A is the factory Fig 12. Situation of the company
Final Project. Implementation selected tools of Lean Manufacturing 38 The company cares for spreading their organizational principles, its mission, vision and objectives are described below: Mission: To be one of the first consumer products companies worldwide. Provide opportunities for growth and enrichment to employees, business partners and communities in which the company operates. And throughout, cultivate honesty, fairness and integrity. Vision: The liability of the company is to continually improve all the appearance, environmental, social and economic world in which it operates, creating a better tomorrow than today. The vision springs into action with programs focusing on environmental stewardship, activities to benefit society, forming a truly sustainable company. Objectives: • Obtain customer satisfaction through the quality of service and compliance calendars and schedules at the beginning of each cycle. • Achieve staff ownership and commitment to the company likewise, promote respect between employees and customers (Promoting human resource development). • Develop action plans related to Quality services and continuous improvement of processes. • Raising levels of efficiency and productivity with responsibility and fulfillment of obligations. • Establish security policies for the benefit of workers. • Get the best value in the operations of the best manner.
Final Project. Implementation selected tools of Lean Manufacturing 39 Below is a map of the factory. As we can see it has two floors, on the ground floor is produced the process of filling the bottled and on the first floor it is produced the mixture. On the front of the factory are located the offices and on the back is the area of production and storage. Fig 13. Diagram of the factory
Final Project. 40 3.2. Description of the process To be able to find the weaknesses of our production line, those points where there are problems that can be solved by any of the techniques discussed above I must first explain the operation of the factory. The factory receives eight types of raw materials: alcohol, sugar, flavorings, empty bottles, boxes, seals, labels and caps. Using a mixture of alcohol, sugar and flavorings, we obtain the desired type of liquor by the formula used. Alcohol is received by truck and discharged by pumps up the four tanks at the ship dock. Moreover, both sugar and flavorings come in vans that are downloaded manually and using a forklift it is transported to the first floor where is performed the mixture to obtain liquor. The other five types of raw materials arrive by truck and unloaded by lifting bulls to the store entrance. The factory produce two different types of liquor, the manufacturing process is the same for both lines. Each line has a conveyor belt that moves the empty bottles and passed through the different machines as explained below. The process has several entry points of raw materials. On one hand, the cardboard caps, seals, labels and plastic packaging arrive to the dock and are downloaded in the store. Empty bottles come in by trucks, packed properly to avoid damage during the transport, and are stored in the warehouse entrance. Thus, the process begins with manual unpacking bottles. Once this process finish, using a forklift truck one operator takes the empty bottles to the initial part of the conveyor where two operators are in charge to position the empty bottles in the conveyor as it advances. When the pallet is empty it is carried to the end of the conveyor to be able to reuse it placing there the full bottles. Moreover, an operator is responsible for carrying each material to the different machines and put them in a correct way to be able to perform correctly the bottling fill. Parallel to this process, in the laboratory there is make the production of the desired liquor. The sugar and flavorings are downloaded manually and using a forklift are transported to the first floor. Alcohol is discharged, through a pipe, from the truck to the four storage tanks, and then transported by pumps to the tanks at the first floor. It is at this point where following the formulas derived in the laboratory, mixing alcohol, sugar and flavorings it is produced the desired liquor. Below the mixture there is extract a sample to make the quality control. If the mixture is satisfactory by some pipes located on the floor of the first floor, thanks to gravity, the liquor descends reaching the bottling
Final Project. Implementation selected tools of Lean Manufacturing 47 3.4. Proposal of improvements The company's goal is to improve every day to get a better quality for the product to satisfy customers. To achieve this improvement will follow kaizen philosophy. The measures to be taken to be able to improve the problems outlined above will be: • 5S’: It allows us to create a formation of habits of cleanliness and order that will be passed on process improvement. • Poca Yoke:Different device designed carefully in order to avoid errors in the operation of a system. • TPM: The aim is to reduce both the cost and waste, using preventive and corrective maintenance. • Kanban: A system of cards that are stick in the containers that detach when these containers are used to ensure the replenishment of such materials. The cards act as witness the production process. 3.5. Implementing improvements This chapter details how will be implemented the different tools to achieve the desired goals. 3.5.1. Implementing 5 S’ in Teichenné The Workspace organization or 5S methodology is a technique that seeks to achieve a working environment clean and stable. The steps to follow are: 1. Seire → Sort: Remove what is unnecessary, reorder needed most to least important and prevent disordered again. 2. Seiton → Order: Everything has a place and needs to be in place. 3. Seiso → Cleanliness: Identify and remove dirt. 4. Seiketsu → Standardize: Setting methods for planning maintenance cleaning. 5. Shitsuke → Discipline: Getting the improvements made through the 5 s are a habit and used established methods. Here we present the improvements implemented in the company Teichenné: • Seire As stated above one of the problems that has our company is the great disorder of storage as shown in Fig 16.
Final Project. Implementation selected tools of Lean Manufacturing 48 To achieve a better distribution is necessary to make a thorough examination and find those materials are stored to be used not more either because they are outdated or no longer manufactured because such bottles. We also need you establish an order in both stores placing the materials most used in the closest points, thus reducing production time and placing less used materials in the top shelves. Later in the implementation of kanban process should contain a methodology for achieving this purpose. You also need to clean the area of production and because if there are things that are not worth the ground can cause injury to operator, pollution, reduces the accuracy and quality of the process and it can even prevent access to certain machines that can lead to production delays. • Seiton One of the main problems found daily by the operators is that they produce a large amount of plastic and cardboard waste during the process of unpacking raw materials as these are contained in boxes. Also as discussed above there are many materials that are in bad condition, broken or defective. As discussed in the description of problems that has Teichenné, recycle containers are placed outside the factory (Fig 17) and this causes a great waste of time since the operators, to maintain a clean working environment, every time that unpacks something have to travel around the installations until arrive to the container to throw it. This problem is easily solved by placing the container area, for plastic and cardboard, inside the factory near the place where operators make the unpacking. • Seiso To achieve a good final product quality is necessary that the work environment is clean. Thus it is very important as we have said previously that all the wasted materials must be thrown in the containers. It is also necessary that the machines are clean, every time you change batch, in other words when you change the liquor, employees must be sure that the filling machine is cleaned to ensure that the flavors not to be mixed. To make this process must follow the instructions detailed in the sheets that are posted in each of the machines. And above all, be sure when performing these tasks that the machines are unplugged.
Final Project. Implementation selected tools of Lean Manufacturing 49 The following image shows the instruction sheet for a correct cleaning. You have to scrub the floor as often poured liquid and may be dangerous for operators as they may slip and hurt. • Seiktsu This step is one of the most difficult because once you have managed to put everything in order, it is difficult to maintain. One way to achieve this is to talk with employees and accustom them to carry out all operations properly complying with the policies outlined in the previous sections. It is very important that they get used to doing things right, listing everything that they think is not right or that could be improved • Shitsuke To conclude, we should monitor employees to ensure compliance with these new changes, to finally get them to be their own supervisors. This we achieve by tracking weekly to each of the operators which will explain the problems that have arisen during the week.In these interviews will also be assessed progression of operators. 3.5.2. Implementing Poca Yoke in Teichenné After visiting the factory we focus how to improve the production process. The bottle filling process is a very compact since no operator is required to take care of moving the bottles. There is a conveyor belt that transports them from one machine to another. The problem arises if there is some unexpected damage in a bottle. For example we see that a point that could be improved would be the implementation of a sensor that would measure the filling of the bottle to make sure that everyone gets Fig 19. Instruction sheet
Final Project. Implementation selected tools of Lean Manufacturing 50 the same amount of liquid. This sensor would be place on the conveyor belt and through a beam function would measure the amount of liquid that the bottle has. It consists of two devices, a sender and a receiver. The transmitter will send a beam of light, if the receiver receives it means that the bottle is properly filled, if the receiver doesn’t receives anything an alarm turn on indicating that the bottle is too full. At that time the conveyor belt is stopped and an operator takes care of removing the bottle. The sensor that has been chosen is shown in the picture. Another detection device that can be placed which is very visual detection is a traffic light. The function of this would alert the operator if a problem exists in one machine. The traffic light will have three positions, if the process is in operation the green light will be on, if there is any problem with one machine the traffic light is red and if the machine is not in operation will both leds off.The device that is selected is as follows. Fi g 20. Detection sensor Fig 21. Detection devide
Final Project. Implementation selected tools of Lean Manufacturing 51 3.5.3. Implementing Total Productive Maintenance in Teichenné Whereas in most production settings the operator is not viewed as a member of the maintenance team, in TPM the machine operator is trained to perform many of the day- to-day tasks of simple maintenance and fault-finding. Teams are created that include a technical expert (often an engineer or maintenance technician) as well as operators. In this setting the operators are enabled to understand the machinery and identify potential problems, righting them before they can impact production and by so doing, decrease downtime and reduce costs of production. Note that the 5S tool 'is closely linked to TPM as largely helps to observe anomalies because after cleaning the machine is much easier to perform a visual inspection of the machine and discover possible errors. Maintenance is a concept closely aligned with the quality. Must be at the origin, in other words in the machine, where achieves a zero breakdowns and not through some maintenance activities that use the system to putting out fires. For a company to survive, in an increasingly intense competition, maintenance activities should be incorporated wing definitely achieving manufacturing excellence. Teichenné currently don’t have preventive maintenance culture. Normally maintaining the machines is performed corrective type. It is at this point that we want to improve the process by creating a habit of preventive maintenance which helps detect problems. First of all there will be a study of the operation of the machines and the damage they have. In the picture is shown below where the blade will describe the problems encountered. Fig 22. Monitoring Worksheet of breakdowns
Final Project. Implementation selected tools of Lean Manufacturing 52 Once monitoring for a month, we will know which machines are those that break down more often and from there create a preventive maintenance plan to try to avoid these breakdowns. Monitoring will continue doing from now on as because new errors may arise to be modified.Below is shown a possible preventive maintenance plan. Fig 23. Preventive maintenance plan
Final Project. Implementation selected tools of Lean Manufacturing 53 As we can see the maintenance plan shall include a schedule when each action should be performed at each machine component that must be done, what is the goal you want to achieve with this measure and ultimately who should carry it out. We also believe it is appropriate to make a study of the quality of raw materials as visited the factory when we realized that many are in bad condition. So also will create a tracking sheet from defects in materials where operators will mark the number of defective parts. When we get the results we can consider whether you need to change supplier. The following image shows a possible tracking sheet. Fig 24. Tracking sheet to study the quality of raw materials
Final Project. 54 3.5.4. Implementing Kanban in Teichenné Kanban is a system that controls the flow of process resources production through cards, which are used to indicate material supply or production of parts. The first thing we will implement is the use of some adhesives that will be glued to the boxes of raw materials. The operator which is responsible for downloading the raw materials will become the responsible for completing these cards and paste it correctly. The cards that will be used will look like that one shown below. Thanks to the date of bottling the operator will be able to place these boxes in the storage in order to make it easier to locate later and therefore not lost much time when going to look for them. At the moment the box is used, the raw materials are placed in their respective machine, the cards are carried off to the end of the process. This is where the workers in charge of putting the bottles in their respective containers realize what kind of box and packaging needs and are going to pick them up. Every time that one material is used an email is sent by internal mail to a database. The commercial will use this information to talk with materials suppliers to ask them for materials needed and in what quantities. This is a Pull phase, because when we spend a box we expect that another part will come for not running out. Once the bottling process is finished and the workers have already put all the bottles in the boxes and that boxes on pallets, these are carried to be packaged. All this is done without losing the card that was placed at the beginning as this takes all the data from each type of bottle. Once packed the card is reattached and thanks to a reader all the Fig 25. Material tracking cards
Final Project. Implementation selected tools of Lean Manufacturing 55 information is sent to the same database information mentioned above sending the information that the lot is already finished and can therefore come to be collected. This database is very important because if at some point for some reason we had any delay in production we would be able to advise customers that have not yet delivery list and so would save a trip in vain. Such actions favor us because if a client is expected to deliver a package and without warning is not given might decide to break the link between companies and obviously not interested in losing customers.
Final Project. Implementation selected tools of Lean Manufacturing 56 CHAPTER 4: CONCLUSION
Final Project. 63
Final Project. Implementation selected tools of Lean Manufacturing 64