Full text
Development and implementation of a LabVIEW based SCADA system for a meshed multi-terminal VSC-HVDC grid scaled platform Alumna Gisela Mora Comas Tutor Joan Sau Bassols Director Oriol Gomis Bellmunt 21/10/2016 ETSEIB, UPC.
Content Content .......................................................................................................................................... 2 Summary ....................................................................................................................................... 4 Glossary ......................................................................................................................................... 5 1 Introduction................................................................................................................................ 7 1.1 Initial goals .......................................................................................................................... 7 1.2 Reach ................................................................................................................................... 7 3 HVDC transmission ..................................................................................................................... 9 3.1 Long distance bulk power transmission .............................................................................. 9 3.2 Submarine transmission ...................................................................................................... 9 3.3 AC asynchronous connections and different frequency systems connections ................... 9 4 Meshed multi-terminal VSC-HVDC grid scaled platform. ........................................................ 10 5 Hardware employed to implement the SCADA system .......................................................... 12 5.1 cRIO-9113 chassis .............................................................................................................. 12 5.2 NI9146 chassis ................................................................................................................... 13 5.3 NI 9205 data acquisition module and LEM sensors .......................................................... 13 5.4 NI-cRIO9024 ...................................................................................................................... 14 5.5 Host PC .............................................................................................................................. 14 6 Logic support. ........................................................................................................................... 15 6.1 Real-Time Operating System (RTOS) ................................................................................. 15 6.1.A Determinism and jitter ............................................................................................... 15 6.2 Employed software packages ............................................................................................ 15 6.3 Programming interfaces configurations ............................................................................ 16 6.3.A Scanning mode ........................................................................................................... 16 6.3.B FPGA mode ................................................................................................................. 17 7 Scan mode DC current SCADA system for the whole grid ....................................................... 18 7.1 VSC-MHVDC interest indicators and controls ................................................................... 18 7.2 Data logging ....................................................................................................................... 18 7.3 Post processing and monitoring ........................................................................................ 19 7.3.A Shared variables with RT FIFO configuration ............................................................. 19 7.3.B Error treatment and warning system ......................................................................... 19 7.4 SCADA application structure and performing ................................................................... 20 8 FPGA mode AC current SCADA system for a converter ........................................................... 22 8.1 Interest indicators and controls ........................................................................................ 22
8.2 Sampling and minimum time between conversions ......................................................... 22 8.3 Multi-rate tasks communication ....................................................................................... 23 8.3.A FIFO configuration and management ........................................................................ 23 8.4 FPGA application scheme .................................................................................................. 24 9. Wind turbine emulator............................................................................................................ 25 9.1 Turbine model and employed parameters ....................................................................... 25 9.1.A Maximum power extraction algorithm ...................................................................... 26 10 SCADA systems testing. .......................................................................................................... 29 10.1 VSC control scheme ......................................................................................................... 29 10.2 Scan mode DC current SCADA system and turbine emulator ......................................... 29 10.3 FPGA mode AC current SCADA system ........................................................................... 34 Conclusions ................................................................................................................................. 36 Agraïments .................................................................................................................................. 38 A. Budget ..................................................................................................................................... 39 Hardware budget .................................................................................................................... 39 Software Budget ...................................................................................................................... 39 Human resources budget ........................................................................................................ 39 Total budget ............................................................................................................................ 40 B Environmental impact .............................................................................................................. 41 B.1 Environmental impact of a offshore wind farm and HVDC submarine line. ..................... 41 B.1.2 Sea bed habitat loos or disturbance .......................................................................... 41 B.1.3 Sea life disturbance .................................................................................................... 41 B.1.4 Human traffic disturbance ......................................................................................... 42 B.1.5 Carbon footprint ........................................................................................................ 42 Bibliography ................................................................................................................................ 43
Summary This project is oriented to the development of a Supervisory, Control and Data Acquisition (SCADA) software to control and supervise electrical variables from a scaled platform that represents a meshed HVDC grid employing National Instruments hardware and LabVIEW logic environment. The objective is to obtain real time visualization of DC and AC electrical variables and a lossless data stream acquisition. The acquisition system hardware elements have been configured, tested and installed on the grid platform. The system is composed of three chassis, each inside of a VSC terminal cabinet, with integrated Field-Programmable Gate Arrays (FPGAs), one of them connected via PCI bus to a local processor and the rest too via Ethernet through a switch. Analogical acquisition modules were A/D conversion takes place are inserted into the chassis. A personal computer is used as host, screen terminal and storing space. There are two main access modes to the FPGAs through the real time system. It has been implemented a Scan mode VI to monitor all the grid DC signals and a faster FPGA access mode VI to monitor one converter AC and DC values. The FPGA application consists of two tasks running at different rates and a FIFO has been implemented to communicate between them without data loss. Multiple structures have been tested on the grid platform and evaluated, ensuring the compliance of previously established specifications, such as sampling and scanning rate, screen refreshment or possible data loss. Additionally a turbine emulator was implemented and tested in Labview for further testing.
Glossary Pt Mechanical power Cp Power coefficient Pv Wind power Air density A Blades delimited area vv Average wind speed R Blades radius Air density wnom Nominal speed ϑ Pitch angle c1 Adjusting coefficient 1 c2 Adjusting coefficient 2 c3 Adjusting coefficient 3 c4 Adjusting coefficient 4 c5 Adjusting coefficient 5 c6 Adjusting coefficient 6 c7 Adjusting coefficient 7 c8 Adjusting coefficient 8 c9 Adjusting coefficient 9 PDC Active power PDC* Active power control signal Kd Droop constant EDC VSC DC voltage EDC* VSC DC voltage control signal PDCadd* Additional active power control signal λ Tip-speed-ratio λopt Optimum Tip-speed-ratio Cpopt Optimum power coefficent Iq Active power current control signal Idc Direct current from AC to DC Pdc Power transferred from AC to DC Van,bn,cn Three-phase phase to neutral voltages Ia,b,c Line currents ωt Rotor speed Acronyms AC Alternating Current DC Direct Current FPGA Field Programmable Gate Array HVAC High Voltage Alternating Current M-HVDC Multi-Terminal High Voltage Direct Current NI National Instruments PCI Peripheral Components Interconnection RSE Referenced Single-Ended SCADA Supervisory Control And Data Acquisition VI Virtual Instrument
VSC Voltage Source Converters
1 Introduction The required measurements from the scaled meshed HVDC grid are DC current and voltage of each of the converters as well as AC current and voltage. With these measures powers will also be calculated together with frequencies, averages and RMS values. The acquisition modules can be accessed through an interface Scan engine or personalized sampling system programmed with LabVIEW FPGA1. The user friendly programming interface provided on Scan mode was tested and a SCADA application for DC signals of all the grid was implemented. On second try, it was decided to tackle FPGA programming to implement a SCADA application to monitor DC and AC signals of one of the converters. With LabVIEW FPGA programming is possible to attain personalized sampling, data transfer and synchronization of the FPGA task and the real time host task. 1.1 Initial goals To learn about HVDC grid scaled platform components and its functions. To define which measures are important for VSC-HVDC grid control. To configure, test, and install the software and hardware. To implement and test a SCADA system for the whole grid DC signals monitoring in Labview. To implement and test a SCADA system for a converter DC and AC signals monitoring in Labview FPGA, attain an 700 us sampling period optimised system. To implement and test a wind turbine emulator for the platform. 1.2 Reach The designed SCADA system has been put to test with a meshed multi-terminal VSC-HVDC grid scaled platform. The program has been optimized using multiple operation rates task separation, a personalized sampling and adapting the FIFO transmission channels to the generated amount of data. A comparison of the different computational resource locations and the available communication interfaces between the PC host, FPGA and cRIO processor has been made and thus an appropriate choose amongst the available solutions for the system design. 1 http://www.ni.com/white-paper/7338/es/#toc5
Once established the optimal resource location and data communication methods, the program itself has been defined which is composed by the following parallel multi-rate tasks: data acquisition, FIFO transmission, processing of deducted measurements, logging and user interface for control and visualization. Two functional and safe applications have been developed: A Scan mode based DC signals monitoring and data logging system hosted on the PC, which due its FPGA access mode configuration time limitations cannot keep track of AC signals. A FPGA mode based AC signals monitoring hosted on the cRIO that deterministically ensures 700 us sampling to individually monitor one of the VSCs. Lastly, a wind turbine simulator has been designed to emulate the power injection into the grid by wind turbines under different wind conditions and tested with the Scan mode AC monitoring SCADA.
2 HVDC transmission In the twentieth century, HIgh Voltage Direct Current (HVDC) was demonstrated to be the best solution for many specific application areas and the rise of the number of installations per year has been rising at the beginning of the twenty-first century [1]. 2.1 Long distance bulk power transmission Power transmission from point to point through large distances employing requires less cable laying (two instead of the three necessary lines for three-phase system ). Furthermore, in DC current transmission, the cable inductance and capacitance only affects during the transient state, but not during the permanent regime. When considering to choose between HVDC or High Voltage Alternating Current (HVAC) it is important to consider the break-even distance concept. It is the transmission distance from which HVDC becomes economically preferable over HVAC. This distance takes place when the AC transmission power loss costs become superior to the installation of the HVDC converters. For terrestrial transfer this distance is typically over 500 km. The NordNed submarine HVDC between Norway and the Netherlands, for example, reaches a 580 km distance [1]. 2.2 Submarine transmission Break-even distance for submarine transmission is considerably lower than the terrestrial, from over 50 km, since the existence of parasitical capacitances forces to charge and discharge the capacitors periodically which derives in the augment of reactive power and power loss. 2.3 AC asynchronous connections and different frequency systems connections HVDC can be employed to connect AC asynchronous systems and act as electrical insulation to prevent grid perturbation propagation, such as the 150 MW, ±42 kW McNeill back to back HVDC link between Alberta and Saskatchewan [1]. An example of different frequency systems connection is the Melo HVDC between Uruguay and Brazil, which run at 50 and 60 Hz respectively [1].
The CompactRIO has been configured with software modules for correct communication, synchronous time management and common network resources. The Measurement & Automation Explorer de National Instruments (NI MAX) machinery management platform was uses was used. The following list contains a description of the drivers installed on the CompactRIO. LabVIEW 2015 Base software. LabVIEW FPGA Provides the tools to program on FPGA targets and communicate with them from host. API VISA Automatically selects the adequate drivers for a resource, for a variety of instrument kinds: GPIB, serial, USB, Ethernet, PXI, or VXI or Ethernet. Labview Real Time Configuration management and synchronization with the RT target (the cRIO) Scanning Engine Provides access to the I/O with LabVIEW real-time an host applications without FPGA programming. Provides a coherent access to the I/O variables, which are stored in a global memory and are synchronously actualized with the configurable Scanning Period. Network Variable Engine Negotiates between different data structure protocols employed by different system applications or networked elements and provides the Networked variables, which are common to every system element, configurable and easily accessible. 5.3 Programming interfaces configurations To adjust to the requirements and complexity of a project and available development time, LabVIEW offers two main different access modes and programming configurations. 5.3.A Scanning mode Te Scanning mode allows the acquisition of calibrated data without employing FPGA programming. It is assisted by LabVIEW Real-Time environment and composed of two
elements: firstly, the Scanning Engine, which actualizes the I/O variables value at a specified rate, including the analogical lecture modules and abstract user defined variables. Secondly, the Scanning Interface, a set of software packages responsible of the I/O modules detection, temporization, synchronization and communication. Said interface is executed in a hardware temporized scan cycle actualizing the physical I/O values. There a local and networked defined variables and their maximum refreshment rate is limited to 1KHz and 100 Hz respectively. Using the Scanning mode it is not necessary to employ LabVIEW FPGA or define the communications between the FPGA and the host vi. Neither there is need to compile the program before deploying it and running it. On Scanning mode, LabVIEW programs the FPGA on the CompactRIO to work with the scanning variables. 5.3.B FPGA mode LabVIEW FPGA mode allows to access the C Series modules, in our case analogical modules, from the FPGA target VI's. The modules appear under the FPGA target on the exploration windows and the I/O channels can be accessed. FPGA mode allows FPGA programming and therefore more flexibility, personalization and determinist synchronization of the tasks. There is a 8 us minimum time between conversions from Analogical to Digital (A/D) signal. The minimum time can be reduced affecting, though, conversion quality. FPGA programs require to be compiled before execution and the program developing time becomes much more slow. Figure 5. Labvies Scan mode and FPGA mode communication methods.4 4 NI tutorial image; http://www.ni.com/white-paper/7338/es/#toc5
6 Scan mode DC current SCADA system for the whole grid 6.1 VSC-MHVDC interest indicators and controls The following tables show the control and indicators implemented on The Scan mode an FPGA mode application. The figure below portraits the DC grid and VSC terminal nodes and shows the measured signals. Figure 6. Meshed HVDC grid and its measurements. Indicator Glossary Units Indicator type Figure 5 legend VSC DC voltage Edc1, Edc2, Edc3 V Waveform graph Blue arrows VSC DC current Idc1, Idc2, Idc3 A Waveform graph Red arrows VSC DC Power Pdc1, Pdc2, Pdc3 W Waveform graph - DC Line current Idc21, Idc13, Idc32 A Waveform graph Green arrows Number of iterations Iteration [u] Single value - Recording state Recording - Boolean - Control Glossary Units Control type Stop application Stop - Boolean - Start/Stop recording Recording - Boolean - Table 2. Scan mode DC current SCADA system indicators and controls 6.2 Data logging
The data logging application must ensure to attain a lossless, uninterrupted, and accurately timed data stream from the grids electrical signals and the signals generated by the wind turbine emulator. 6.3 Post processing and monitoring The screen must show a stable image of the waveform that can be attained by performing periodical sweeping, and refresh fast enough to be able to monitor the signal changes without lag. There is a minimum scan period restricted to 20ms by the loop execution and the network variables maximum actualization rate of 100 Hz. Led indicators must respond fast enough to allow a control response on time. 6.3.A Shared variables with RT FIFO configuration The Scan mode application shares information between parallel loops and tasks to optimise the execution rate. The data communication is preformed through the scan engine and scan interface, the variables are defined The Scan mode allows to implement applications that require synchronous actualizations of I/O and internal communication variables at a maximum rate of 1 kHz. It does not perform with the most optimum resource use, such as FPGA programming would allow, but the interface is intuitive and facilitates a lot the access to the I/O ports and its treatment avoiding the kind of errors derived of bad synchronization between applications tasks, as seen further on when programming the FPGA. On the other hand, it is quiet restricted compared to FPGA programming. 6.3.B Error treatment and warning system The application must stop in case of an error sprouting in any of the involved tasks, since the data stream must be ensured to be uninterrupted. The employed tool blocks generate error information which must be transmitted between blocks and iterations following the established data flow, at the end of every important subset the Boolean error status is read and its logic transmitted to the stop function that will halt the application if necessary.
6.4 SCADA application structure and performing The data visualization interface consists on a tab structure to easily access the measurements at the different VSC and a start and stop control Figure 7. DC SCADA system user interface. This SCADA system is composed of a PC VI where logging takes places and a cRIO VI where acquisition and electrical measurements and display take place in two independent loops Amongst the different structures that could be implemented with graphical code it has been chosen a flat structure, which sequentially runs the program initializations, executing and closing frames. In the execution frame two parallel loops run with different priorities to optimise the execution time. The first loop rate is synchronized with the data acquisition rate and is the highest priority loop. It only includes the calculation of the necessary deducted measures for control and supervision. This way it is ensured that the acquired and calculated data and control response is the most recent and faster to obtain. The second loop includes the post processing, such as visualization and logging of the different acquired and calculated data, it is a lower priority loop with lower execution rate. The communication between loops and tasks is performed through network or local variables, whose refreshing time is configured to be the same and has a predefined maximum (10 ms and 1 ms respectively). They can be associated to physical I/O and employ FIFOs which store elements in arrival order and then provides access to them using the first-in, first-out protocol.
The correct operation of the acquisition system has been tested on the VSC-MHVDC grid platform. There was no problem when applying low frequency voltages, but at the desired 50 Hz frequency, the amplitude and frequency variations on the visualization screen were lagged due to an insufficient refreshment rate. In conclusion, it can be used to track DC signals but not AC ones. Additionally, since the acquisition module has to be configured on either the real-time scan mode system or the FPGA target, it cannot be used simultaneously with the later on developed FPGA acquisition VI, that solves the AC monitoring problem.
7 FPGA mode AC current SCADA system for a converter 7.1 Interest indicators and controls Grid indicator Glossary Units Indicator type VSC DC voltage Edc1, Edc2, Edc3 V Waveform graph VSC DC current Idc1, Idc2, Idc3 A Waveform graph VSC three-phase phase to neutral voltages Van, Vbn, Vcn V Waveform graph VSC three-phase currents Ia, Ib, Ic A Waveform graph VSC AC power PAC W Waveform graph Edc average Edc average V Single value Idc average Idc average A Single value Pdc average Pdc average W Single value IAC signals RMS Ia RMS, Ib RMS, Ic RMS A Single value VAC signals RMS Van RMS, Vbn RMS, Vcn RMS V Single value IAC and VAC signals frequency f Ia, f Ib, f Ic, f Van, f Vbn, f Vcn Hz Single value Application indicator Glossary Units Indicator type Host scan period Tloop ms Chart graph Sampling rate Ts us Chart graph Scanned samples array size Size(s) Single value Error error out - Boolean status Error code Description text FIFO indicator Glossary Units Indicator type Buffer overflow Buffer overflow - Boolean Timed out Timed out - Boolean Underflow Underflow - Boolean Elements remaining to be read Elements remaining [u] Single value Number of elements to write Number of elements to write [u] Single Value Table 3. FPGA mode DC and AC current SCADA system indicators and controls 7.2 Sampling and minimum time between conversions For the sampling to be valid it must, according to Shannon theorem, the sampling rate must be at less the double of the oscillation period. [1]
In this case the system is designed to sample a 50 Hz grid, thus the minimum sampling rate is of 100 Hz (Ts=0.01s). The sampling period has been decided to be of 700 us. Thanks to the deterministic FPGA clock, we can ensure that all Every chassis reads six signal measurements, samples and stores them in a FIFO from the FPGA side, so the PC host or controller host program can request and read the data arrays to processes higher amounts of data at a lower rate without data loss and ensuring a deterministic timing of the data sampling. 7.3 Multi-rate tasks communication 7.3.A FIFO configuration and management Steps to set the right buffer size: Configure FIFO data structure with just the necessary precision bits. Set right size buffer depth: too small overflow, too large waste of resources Scanning rate underflow and timeout if attempting to read more values than available Prevent stale data from accumulating. There are two methods to calculate the number of elements requested by the host each iteration: Constant value Requested elements= Elements remaining -Remainder Non constant value More robust The second method was chosen since it can respond better to possible host lags and easily attains FPGA and host coordination 7.3.A1Data interleaving and array decimation It must be considered that in this application there is data interleaving to transfer six signals through a single FIFO. Since the data arrays read from the host will be decimated it is important that every iteration the host request a number of samples multiple of the decimating factor (which is six in this case)
7.3.A2Timing and synchronization The synchronisation is correct and the host can be requested to access more or less samples per host scan iteration, whilst the number of samples is not bigger that the buffer size. The host cannot scan a single oscillation, it requires a minimum of 40 ms (two oscillations) to execute. 7.4 FPGA application scheme This SCADA applications is composed of the PC visualization terminal, a FPGA acquisition VI and a cRIO processing VI. Figure 8. cRIO host VI. Figure 9. FPGA acquisition VI.
8 Wind turbine emulator This emulator was designed on first term as a complement to get acquainted with the program. It allows to recreate and visualize a step or ramp wind signal, define its maximum speed and duration and choose de turbine parameters. Running the simulation, it returns the mechanical power obtained at the engine shaft and, disregarding the transmission gears and converter losses, it provides the electrical power a wind turbine would provide to the grid under different wind conditions. Thus, the VSC can be used to emulate dc power injection by a wind turbine, this signal is sent to an analogical output module which generates a ±10 V signal taht is sent to the VSC control board. There is no implemented pitch control and the pitch angle ϑpitch is maintained at zero. 8.1 Turbine model and employed parameters The mechanical power collected by the turbine Pt can be expressed as the wind power flowing through the blades area Pv multiplied to an dimensionless coefficient called power coefficient Cp. Obtaining the following expression: (2) air densisty A blades delimited area average wind speed The Cp can be interpreted as the turbine aerodynamic efficiency. It depends on turbine characteristics, wind velocity, rotation speed and pitch angle. The 0.593 maximum value is H V D C g r i d Turbine ϑpitch=0 Transmission Permanent magnets generator VSC Vw Paero Pm Pe Pdc Simplification; Pdc=Paero Figure 10. Wind turbine model
Power injection from DC to AC side. Line currents. [A]/[s] Figure 19. DC system response measurements to a wind speed ramp control signal. System response to a wind speed step signal (Figure 20) is shown in Figure 22. Wind speed step signal and rotor speed. time scale axis in seconds. Figure 20. Wind speed step control signal. -2800 -2300 -1800 -1300 -800 -300 200 700 1200 1700 0 5 10 15 20 25 30 35 [W] [s] Pdc2 Pdc1 Pdc3 -4 -3 -2 -1 0 1 2 0 5 10 15 20 25 30 35 [A] [s] Idc21 Idc13 Idc32 0 5 10 15 35 40 45 50 55 60 65 [m/s ] [s] Wind speed Wind speed
Figure 21. Wind turbine emulator response. Edc voltage averaged every 30 samples Current injected from DC to AC side. Power injection from DC to AC side. 0 0,5 1 1,5 2 35 40 45 50 55 60 65 [rad/s] [s] Rotational speed wt Rotational speed wt 480 490 500 510 520 530 35 40 45 50 55 60 65 [V] [s] Edc2 Edc1 Edc3 -6 -4 -2 0 2 4 35 40 45 50 55 60 65 [A] [s] Idc2 Idc1 Idc3
Line currents. Figure 22. DC system response to a wind speed step control signal. 9.3 FPGA mode AC current SCADA system In this case the whole grid is in operation but only the second cabinet VSC response has been monitored, directly requesting to its control to inject three different active power values: 2000, 350 and 5000 W. The screen visualization is uninterrupted and without noticeable lags. The FIFO indicators stay off, there is no overflow of data, thus the acquired data stream is continuous and could be transferred to a logging task. Figure 23. User control (left) and error interface (right) -2800 -1800 -800 200 1200 35 40 45 50 55 60 65 [W] [s] Pdc2 Pdc1 Pdc3 -4 -3 -2 -1 0 1 2 35 40 45 50 55 60 65 [A] [s] Idc21 Idc13 Idc32
Figure 24. Monitoring screen response to a 2000, 3500 and 5000 W power injection request from the 2nd VSC. Conclusions In this project, two SCADA applications have implemented in LabVIEW and tested in a meshed multi-terminal VSC-HVDC grid scaled platform. One of them, employing LabVIEW Scan engine and Interface to access the FPGA, monitor and log data from the whole grid DC signals and the other, employing LabVIEW FPGA programming access to monitor one of the converters DC and AC signals when the whole grid is also operating. A wind turbine emulator was also implemented and tested on one of the converters whilst evaluating the Scan mode SCADA application. The applications behaviour was as expected the sampling correctly timed ensuring a lossless data stream acquisition. Further work would be directed to the whole grid AC signals monitoring. Since the access mode is different hey cannot function together. With further work time, to solve the FPGA reference conflict an application that executed the host scanning loop access to the FPGA targets sequentially instead of parallel access could be tested. Once solved the conflict, the DC
monitoring could be merged and function together. Secondly, additional FIFO communication would have been implemented between the cRIO hosted FPGA application to with the PC host, which would allow AC data logging.
Agraïments Per tota la paciència i alegria, gràcies. A la meva família, amics i al Joan i la resta de companys d'equip.
A. Budget For the budget three main budget lines have been considered: the hardware, software and human resources budgets. The necessary items cost to develop the project has been accounted. The project has had an approximate duration of six month, so the amortization has been considered during this period for the human resources, on the other hand, the hardware and software amortization time is considered of five years. The interest rates considered are 4% annual rate and 2% monthly rate. NI academic price discounts are applied on the unit cost. Hardware budget Concept Unit cost [€] Units Amortized cost [€] NI cRIO-9113 651.9 1 583.46 NI 9205 738.90 3 1 983.97 cRIO-9204 1 325.10 1 1 185.98 NI 9146 638.10 2 1 142.21 Total cost [€] 4 895.62 € Table 6. Hardware budget Software Budget Concept Unit cost [€] Units Amortized cost [€] NI LabVIEW Professional 1 423 1 1 273.6 Total cost [€] 1 273.6 € Table 7. Software budget Human resources budget Concept Monthly cost [€] Time weighing 6 months cost [€] Study and design 1 800 0.4 4 320 Programming and installation setting 1 800 0.4 4 320 Testing 1 700 0.15 1 530 Drafting 1 500 0.05 450 Total cost [€] 10 620 € Table 8. Human resources budget
Total budget In Table 9 all the lines budgets are added and the corresponding IVA is applied. Concept Cost [€] Hardware 4 895.62 Software 1 273.6 Human resources 10 620 TOTAL 16 789.22 IVA (21%) TOTAL 20 314.9562 € Table 9. Total budget with IVA
B Environmental impact In this section the environmental impact of different elements related to a possible M-HVDC grid, an offshore wind farm and a HVDC submarine line, are analyzed. The analysis exposes the main problems aroused in the project development and precaution measurements to take into account [8]. B.1 Environmental impact of a offshore wind farm and HVDC submarine line. B.1.2 Sea bed habitat loos or disturbance On first term, The wind farm sea bed foundation for the wind turbine and platforms installation greatly affect the soil and the life in it. Secondly, To install submarine HVDC lines, ditches must be dug in the sea bed. A boat with a towing a hook like tool used to withdraw the soil. Then, the cable is installed and the ditch covered with the same extracted soil. Precaution measurements for Sea bed habitat loos or disturbance Analyse soil composition and present life and make an estimation of the damages in order to trace new distributions if there is risk of endangering local life. B.1.3 Sea life disturbance Mammals The primary risk to marine mammals arises from underwater noise arising from construction activities, most notably pile-driving. The magnitude of such noise is likely to be great enough to cause disturbance, and in close proximity to the works even injury or death to individuals or populations of marine mammals. Fish Fish are especially vulnerable to loud noises. Risking deafnes or even death caused by ruptures of their swim bladers Birds The main risks for birds to be considered are: direct loss of habitat, displacement, collision risk or avoidance behaviour due to the wind farm installation. Precaution measurementsfor sea life disturbance Assessment of use of the site and regional populations.