Final Thesis developed by: Miquel Roger De La Torre Directed by: Francesc Robusté Bachelor in: Civil Engineering Barcelona, January 2024 Department of Civil and Environmental Engineering Transportation Infrastructure and Territory TREBALL FINAL DE GRAU PUBLIC BICYCLE SHARING SYSTEM IMPLEMENTATION IN MATARÓ
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 1 Abstract Bike sharing systems have been growing exponentially in our cities to help the urban micro mobility and encourage people towards greener ways of transportation, a more sustainable city, and an overall increase in the quality of life of the inhabitants that live there. This study focuses on the implementation of a bike sharing system in Mataró, a city where private vehicle usage (33.6%) dominates over the public transportation users (11.4 %) and bike (0.6%) users (Diputació de Barcelona, 2019). This situation must be reversed, as it is one of the biggest cities in Catalonia and should be an example of mobility transition. To dimension the system, different examples around the world have been analyzed and correlated, from which a demand of 2824 trips/day is estimated. By using this prediction, it is possible to determine the fleet size and number of stations, once again considering the systems studied, leading to a proposal of 79 stations and 948 bikes. In addition to this dimensioning, the study delves into the financial feasibility of the proposed system. A total cost around 6.5M€ in a five-year contract seems a reasonable scenario to be assumed by the municipality, but other alternative financial plans must be explored. In addition to this the decision of the correct operations management and infrastructure will be considered to ensure the user satisfaction. Furthermore, the study carries out an environmental evaluation, to ensure the desired sustainability parameters. This study reveals a potential reduction of the CO2 emissions by 61000 kg a year, considering the dimension made. Even though it seems like a small change, it is important to remember that is the sum of all action what make the change and leads towards the cities of tomorrow.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 2 Resum Els sistemes de bicicletes compartides han anat creixent exponencialment a les nostres ciutats per ajudar a la micromobilitat urbana i encoratjar les persones cap a maneres de transport més ecològiques, una ciutat més sostenible i en general una millora de la qualitat de vida de les persones que hi viuen. Aquest estudi es centra en la implementació d'un sistema de bicicletes compartides a Mataró, ciutat on l'ús del vehicle privat (33,6%) domina sobre els usuaris del transport públic (11.4 %) i de bicicleta (0,6%) (Diputació de Barcelona, 2019). Aquesta situació s'ha d'invertir, ja que és una de les ciutats més grans de Catalunya i ha de ser un exemple de transició de mobilitat. Per dimensionar el sistema s'han analitzat i correlacionat diferents exemples arreu del món, dels quals s'estima una demanda de 2824 viatges/dia. Amb aquesta predicció, es pot determinar la mida de la flota i el nombre d'estacions, tenint en compte de nou els sistemes estudiats, donant lloc a una proposta de 79 estacions i 948 bicicletes. A més d'aquest dimensionament, l'estudi aprofundeix en la viabilitat financera del sistema proposat. Un cost total d'uns 6,5M€ en un contracte de 5 anys, sembla ser un escenari raonable per ser assumit pel municipi, tot i així s'han d'explorar plans financers alternatius. A més d'això es important considerar la decisió de la correcta gestió d'operacions i infraestructura per garantir la satisfacció de l'usuari. A més, l'estudi realitza una avaluació ambiental, per garantir els paràmetres de sostenibilitat desitjats. Aquest revela una possible reducció de les emissions de CO2 en 61000kg anuals, tenint en compte la dimensió realitzada. Encara que sembli un petit canvi, és important recordar que és la suma de totes les accions les que fan el canvi i ens condueixen cap a les ciutats del demà.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 3 Resumen Los sistemas de bicicletas compartidas han crecido exponencialmente en nuestras ciudades para ayudar a la micro movilidad urbana y animar a la gente hacia formas más ecológicas de transporte, una ciudad más sostenible, y un aumento en general de la calidad de vida de las personas que viven en ella. Este estudio se centra en la implementación de un sistema de bicicletas compartidas en Mataró, una ciudad donde el uso del vehículo privado (33,6%) domina sobre los usuarios del transporte público (11,4%) y de bicicleta (0,6%) (Diputació de Barcelona, 2019). Esta situación debe revertirse, ya que es una de las ciudades más grandes de Cataluña y debería ser un ejemplo de transición de movilidad. Para dimensionar el sistema, se han analizado y correlacionado diferentes ejemplos alrededor del mundo, a partir de los cuales se estima una demanda de 2824 viajes/día. A partir de esta predicción es posible determinar el tamaño de la flota y el número de estaciones, considerando de nuevo los sistemas estudiados, obteniendo una propuesta de 79 estaciones y 948 bicicletas. Además de este dimensionamiento, el estudio profundiza en la viabilidad financiera del sistema propuesto. Un coste total en torno a los 6,5M€ en un contrato de cinco años parece un escenario razonable a asumir por el ayuntamiento, aun así, deben explorarse planes financieros alternativos. Además de esto, se considerará la decisión de la correcta gestión de las operaciones y la infraestructura para garantizar la satisfacción del usuario. Además, el estudio realiza una evaluación medioambiental, para garantizar los parámetros de sostenibilidad deseados. Este revela una reducción potencial de las emisiones de CO2 entorno a 61000kg al año, teniendo en cuenta la dimensión realizada. Aunque parezca un pequeño cambio, hay que recordar que es la suma de todas las acciones lo que hace el cambio y nos conduce hacia las ciudades del mañana.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 4 Acknowledgements This work is the result of all the people that have supported me during all these years and encouraged not settling for nothing and trying to always become better than yesterday. This journey has not been easy, lots of challenges have appeared and I have been able to solve them thanks to my friends and my family, the ones that have always been there. That is why I would like to thank you all. First, my family, for educating me and showing me that if I want I can, for being there when I thought something was impossible, for the patience during the ups and downs in this academic venture, and the most important for making me who I am. My friends from school that are still there when I come back home, they have showed my what friendship is and why it is important to overcome the difficulties in the path. I am grateful to my friends from university which all together we have created a group that will last a lifetime, we have shared our knowledge and experience and we have been able to overcome this journey together. Finally, I would like to thank my supervisor in this thesis, Francesc Robusté, who has helped me when I was not sure how to proceed and when I had doubts, sharing his knowledge with me. This thesis is part of all of you.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 5 Index 1.Introduction and objectives ...................................................................................... 7 1.1Goal definition and Introduction, why does Mataró need a BSS? .................... 7 1.2 Objectives ............................................................................................................. 8 2.Overview public bike sharing systems. .................................................................... 9 2.1. Bike sharing systems schemes and history categorization. ......................... 9 2.2. Components and influencing factors. ........................................................... 13 2.3. Investment, management, and financial methods ...................................... 17 2.4. Intermodality with public transport .............................................................. 19 2.5. Benefits, impacts and challenges of implementing a BSS. ......................... 20 3.Methodology, system dimensioning ...................................................................... 22 3.1 Demand prediction ........................................................................................... 23 3.2 Estimation of the number of stations and bikes ........................................... 24 3.3.1 Priority zones identification ..................................................................... 25 3.3.2 Exact location definition ........................................................................... 27 3.4 Business model and viability ........................................................................... 28 CASE STUDY: MATARÓ ............................................................................................ 29 4. City and influencing factors analysis .................................................................... 29 4.1 City overview ...................................................................................................... 29 4.2 Exogenous factors analysis .............................................................................. 29 4.2.1 Population density ..................................................................................... 29 4.2.2 Bike Lane density ....................................................................................... 31 4.2.3 Weather ....................................................................................................... 33 4.2.4 Terrain inclination ..................................................................................... 35 4.2.5 Points of interest ........................................................................................ 37 4.2.6 Job density .................................................................................................. 38 4.2.7 Intermodality, public transport density ................................................. 39 4.3 First approach: Exclusion areas of the system .............................................. 44 5. Demand prediction .................................................................................................. 46 5.1 Observed systems. ............................................................................................. 46 5.2 Number of Stations and Bikes estimation ..................................................... 50 5.3 Other KPI’s analysis .......................................................................................... 51 6.Planning of the system ............................................................................................. 54 7. Decision on the type of Infrastructure used ........................................................ 61 7.1 Stations ............................................................................................................... 61 7.2 Bikes .................................................................................................................... 63
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 6 7.3 Warehouse, Workshop, and call center ......................................................... 66 7.4 Software .............................................................................................................. 66 7.5 Vehicles ............................................................................................................... 68 7.6 Spare parts ......................................................................................................... 70 7.7Branding .............................................................................................................. 71 8. Operations ................................................................................................................ 72 8.1Maintenance........................................................................................................ 72 8.2Rebalancing ......................................................................................................... 74 9. Business model ........................................................................................................ 77 9.1 Capital costs ....................................................................................................... 77 9.2 Operational costs ............................................................................................... 78 9.3 Total costs ........................................................................................................... 79 9.4. Pricing (fee) ....................................................................................................... 82 9.5 Possible case: City below the budget estimated. ........................................... 84 10. Sustainability ......................................................................................................... 86 10.1 Waste management ........................................................................................ 86 10.2 System operations ..................................................................................... 88 10.3 Greenhouse emission reduction ................................................................... 88 11. Conclusions and future research ......................................................................... 91 11.1Future research ................................................................................................ 94 12.References ............................................................................................................... 96 APPENDIX.................................................................................................................... 99 A.1. Tables for demand prediction and system dimensioning ............................ 100 A.1.1 Tables for demand prediction .................................................................... 100 A.1.2 Tables for stations and bikes dimensioning ............................................ 101 A.1.3 Demand prediction code ............................................................................ 102 A.1.4 Code to estimate number of stations ........................................................ 103 A.2 Tables for stations and bikes dimensioning .................................................... 104 A.2.1 9 factors for each district ............................................................................ 104 A.2.2 Homogenization of the data using normalization .................................. 104 A.2.3 Homogenization of the data using standarization .................................. 105 A.3 Technical files for exact station location ......................................................... 106
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 7 1.Introduction and objectives 1.1Goal definition and Introduction, why does Mataró need a BSS? Mataró with approximately 130000 inhabitants, is the 8th biggest city in population in Catalonia. In similar manner to most cities around the globe in the last century, this area has experienced an exponential growth in vehicle usage to move around, leading in a global problem related to greenhouse emissions, which footprint is chasing our generation. In the last years, this tendency has started to change, and cities are beginning to evelope towards a more sustainable mobility, which goal is to reduce the gas emissions, by diminishing the car use in it, and creating efficient public transport systems, where the bicycle has gained an important weight. That is why Mataró, like almost every city has started to take some measures to tackle those problems and grow towards a sustainable mobility. Between those measures, according to the municipality of Mataró (Ajuntament de Mataró, 2019) it is important to mention the creation of “Mataró Bus” that is composed by 8 lines with 148 stops and 79 km, operated by some hybrid buses that also help in the reduction of those emissions. In relation to bicycle usage, new bike lines, known under the name “cyclist ring” have been built in the recent years to facilitate and encourage the use of the bike and the change from private vehicles. The extension with these new project increases the 6.5 km of bike lane to 15 km and connect them to other municipalities around. To help achieve this transition towards a greener mobility and bike use, the road speed in the city center has been reduced to a maximum of 30 km/h. As it can be seen the city of Mataró is pushing for a change to become a more sustainable city, they are in the correct path and that is where the possibility of implementing a Public Bike Sharing System appears. Now with the new bike lanes and the possibility to build more in a near future, there exists the need to promote the bike use and fill those lanes with live begins to appear, and here is where BSS takes the lead to motivate the inhabitants of Mataró to use those by creating an inclusive, efficient, safe, and sustainable system. With the optimal solution, that
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 8 can be obtained with the appropriate study (goal of these project) the BSS would be the step that the city needs to impulse what they have just started. It has been now considered that a Public Bike Sharing System could be part of the solution of Mataró’s mobility, so throughout this document, it will be proved if these are a real solution, and which is the system and disposition that adapt better to the city. This is the goal, to develop a case study to check the viability of BSS in this city, starting with a proper city analysis and study, followed by the development of a mathematical model to simulate what its effects could be. Once the analysis is done, planning of the system will begin, along with the decision of a suitable technology based on the city necessities. In the end, the main operations related to its implementation must be discussed, and a financial plan will be carried out to evaluate if Mataró can deal with it in economic terms. 1.2 Objectives Furthermore, with the purpose of implementing and checking the viability of a BSS in the city of Mataró the goals of this projects are the following: • Predict the demand and based on it determine an appropriate dimension for the system, the number of stations and the bike fleet size. • Understand the city by studying its main influencing factors and related with the future system. • Identification of the priority districts where a higher demand is expected and plan the possible locations of the stations based on the study made. • Be able to identify the infrastructure need it based on the city necessities and influencing factors. • Study the feasibility of implementing a system of the dimensions that have been predicted, based in economic terms, and so on the need to study the costs of it. • Analyze the sustainability effects of implementing a Bike sharing system.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 15 use the system frequently, such as tourists. In the stations the user can register in the special enabled machines or also trough the mobile phone app, as it is commonly done nowadays. There exist different rates depending on the user needs from a day pass to an annual. 4) System status information systems. Thanks to many sensors it is possible to provide real time data that can be seen by the user in the mobile app. This data helps to identify the availability of bikes in each of the stations, the conditions of the bikes, and many relevant information from the safety and efficiency of the system, such as the position of the closest stations from where the user is at real time and where its trip finishes. In this mobile app, the users can also check their account status and the money that has been spent on their last trip. In case of any incidence, there is also access to contact with the technical services, and some options to report it. 5) Maintenance programs: Daily issue reports are very frequent in this type of systems, especially in big cities, where the fleet is huge. That is why every day there is the need to inflate tires or repair the fragile parts of some bikes. For example, in Copenhagen, Denmark it has been calculated that every year the 10 to 15% of the bikes must be replaced, this means an additional cost that must be considered always. To solve these problems rapidly, as it has been mentioned, users can report the issues through the mobile app, but at the same time, the support center check constantly the condition of the different components. If some bike needs a repair, special vehicles destinated to the collection of damaged bikes, pick them and take those to a facility outside the city destinated to these operations. 6) Bicycle redistribution mechanisms: a phenomenon that has been observed through the different systems around the world is the asymmetric travel demands in large cities, which need an anticipated optimized network to minimize it. Most of the time this is related to the difference in slope in a city, it can be easily observed that at the top of hills, stations tend to be empty, as users use the bike to go down to their destination, but when they must come back, they think on other transport systems. This phenomenon is also remarkable in city centers, where people tend to finish their trips and they stay there for a long time.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 16 To solve this problem, there is a need for a rebalance system equipped with vehicles that collect the bikes in the downhills and take them back to the hills where there are no bikes. To facilitate this work some other incentives have been included in these systems by giving points to the users that use bikes from plane areas to high slope are, which later could be used as a discount for example. Influencing factors According to the analyses performed by (OBIS, 2011) there exist 3 categories of influencing factors on the outcomes of BSS, that at the same time can be divided in “endogenous” and exogenous” factors. The first refers to the ones that are policy sensitive design, they are subdivided into institutional and physical design factors. On the other hand, exogenous factors are city dependent and specific of each one. In the Table 3 below, the most common influencing factors of the different 3 categories can be found: BSS influencing factors Endogenous factors Exogenous factors Physical design City size Hardware and technology Weather Service design Mobility behavior Institution design Population density Type of operator Demographic factors Contracts and ownership Economic factors Financing sources Geographic factors and topology Employment opportunities Existing infrastructure Financial situation Political situation Job density Some of these factors have already been introduced in the components, and some of them will be explained in more detail along this document and more specifically in the case study, which will help in the determination of the station location and the demand when defining the model for the BSS implementation. Table 2: BSS influencing factors. Source: OBIS optimizing Bike sharing system in European cities (2011)
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 17 2.3. Investment, management, and financial methods In this part the economic aspects of BSS will be treated, as it is a fundamental part for the systems to work properly. The ones that must be considered are the capital and operating costs, the users fees, and the business model. Capital and operating costs The capital costs (Intuit quickbooks, 2022) are the ones that include the purchase of some of the different components that have been introduced, the so-called onetime expenses. Those are (Midgley, 2011) the bike purchase, the docking station, and the necessary construction related to its mounting. The license or purchase of the back-end necessary to operate the equipment, the member access card and the vehicles necessary for the maintenance and the redistribution process which can be purchased or rented. For some of the different systems that exist it was estimated, by the New York City Department of City Planning in 2009, that these costs range between 3000 to 4500$/bicycles in the system. In the other hand the operating cost as the name indicates, correspond to those costs, and include the expenses of the system for day-to-day transactions. In this case, this operating cost includes the maintenance, staff, distribution, office space, insurance, storage facilities, membership cards and warehouse fees. The same study for those cities was considered, and it was calculated that this total operating cost ranges between 1200 and 1700 $/bicycle in the system. User Fees As it has been remarked along this document, (Midgley, 2011),the fees in BSS are always kept low, to encourage people to use it, as the main objective is obtaining a sustainable mobility system in cities. To do so, the industry must adapt their subscription and their rental fees to the mentioned necessities. They must be accessible for the maximum possible number of inhabitants, as the objective of a public system is to make the maximum number of trips to achieve this greener mobility and not the aim to earn the maximum money possible. In most of the cases the user must pay the subscription and then the next 30 minutes are free, after this time the user must pay an extra amount of money, that also varies from one city to another.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 18 It is important to mention that the subsidizing of BSS it is done with the shortfall between user fees and total cost related to the business models, which normally use general revenues, advertising revenues, parking revenues, government grants or sponsorships. Business model (Midgley, 2011)Along the history of BSS, different model proposals have been used and evolved to operate, develop, and fund them. There exist different operators, public transport agencies, local governments, advertising companies, for-profit companies, and non-profit groups. In the other hand, funding mechanism include municipal budgets, user fees and resources public-private partnership agreements. The above-mentioned operators follow different business models, as it is seen here below: • Public transport operators: their business model consists of them providing and operating the system to enhance public transport services. • Local authorities: there exist 2 types of business models when the operator is the local authorities. In the first one they are the ones that design, own, and operate the system. In the other hand it consists in contracts with the provider to install and operate the system for a fee. • Advertising company: Provide and operate the system in exchange of advertising rights. • For-Profit: They provide and operate the system aiming to obtain a profit, in this case the involvement of the government is minimal. • Non-Profit: In this case the local authorities and involved in order to provide and operate the system. It is commonly seen BSS being operated as public private partnerships (PPPs) with an advertising company. The procedure is the following, the city provides spaces for the company to advertise and in exchange the company must provide and operate an off-the-self BSS. By using this model, the municipality takes the advantage of no need for direct public funding or just little. As it has been introduced there exist different operating and financing structures which have advantages and disadvantages as it can be seen in Figure 2.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 19 Comparison of operating and financing structures Type Advantages Disadvantages Public private Partnership (PPPs). Design, Built, Operate, Maintain Finance All logistics done by private sector. - Partial control in some phases of the project, by the public sector. -Relieved of operating detail and performance risk. -loss in advertising revenues. -Risk of public backlash to increased levels of outdoor advertising. -Difficult to enforce performance standards Design, Built, Operate, Maintain - Partial control in some phases of the project, by the public sector. -Retain control of public spaces Relieved of operating retail -Difficult to enforce performance standards -Competition for public founds Design, Built, -Complete control in all phases of the project. -Retain control of public spaces Complete control over network configuration performance, pricing and marketing details. -Competition for public founds -Assume all operating risks 2.4. Intermodality with public transport The objective of implementing a BSS in a city is to finally achieve an efficient system, accessible, safe, and sustainable that encourages people to use it. But this system does not only have to be functional by itself, but it is also essential that it works with its medium, ensuring the intermodality with the public transport for a greener mobility in the whole city and at the same time creating a more attractive system fighting against the private vehicles. To ensure this, cities should adopt measures parallel and directly related to the BSS implementation, such as a safe and well-marked bikeway network that converges with bus, tram, train stations and other available public transport systems, these proposals are all related to the bike and stations linkage (FAL Bulletin, 2013). Also included in this proposal, hard bus/bike lanes are becoming an important advantage to the intermodality, accompanied with the right signage Table 3: Comparison of operating and financing structures Source: TransLink Public Bike System Feasibility Study, Quasy Communications Inc in 2008.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 20 to avoid accidents. Then inside these parallel actions that the municipality can take, the possibility to carry the bike inside other transport methods can be an option, facilitating the accessibility and adopting the necessary safety measures. But to avoid this it is a better option to have docking stations near to all the important public transport stations (train, bus, …) with preference to the ones that are more frequently used to reduce the traffic flow, these actions are the ones directly related to the operator of the system. In this way, the following case is solved. If some of this intermodality needs are implemented BSS is an excellent solution to the first and last mile problem, as in this way, an extension service is provided, so this distance that is considered to be too far to walk between the initial point and public transport or from public transport to destination can be done by using the bike if the stations are placed in the right way. As it is seen in Figure 2 above, if the space between the docking station and the other transport station was too big, another additional length should be added reducing the efficiency of the intermodality, so in this case less users would use the BSS, as the final time of the trip would be too much, and not worth it compared to walking. So, thanks to a previous study of the city this can be solved in most of the cases by placing docking stations next to other public transport systems and efficiently covering the city (about 300m away from each other = 5min walking), so first and last mile problems can be solved. 2.5. Benefits, impacts and challenges of implementing a BSS. It is important to consider that, as it has been mentioned throughout this document, there are numerous positive effects due to public bike sharing systems implementations. The first direct impact is the increment in bike use in the city and the substitution of private vehicle use by bikes, a study done in different systems around the world in 2010 concluded that between 2 and 10% of the users used the bike instead of their car since the system implementation (Midgley, 2011). This has a real environmental effect, as it implies a reduction in toxins Figure 2: First and last mile representation
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 21 release and burning fuel, improving in this way the air quality in cities, and a reduction in traffic congestion as less cars are being used. (PBSC Urban Solutions, 2021) These effects are directly related to citizens health, it has been estimated in a recent study by Colorado State University in the U.S, that the implementation of bike share systems reduced 4.7 premature deaths, 737 DALYS (disabilityadjusted life years) and 36 million dollars (USD) in health economic impacts each year. Another positive effect is the increment of physical activity also related to health, as cycling has incredible cardiovascular benefits, and it is known that helps stave off the effects of anxiety and depression. When deciding which transport to use in the micro mobility in cities, bikes will be chosen before walking as it is faster, before an Uber or a Taxi because it’s cheaper, before a private car due to the flexibility, before bus, metro..., due to the easy accessibility. In the other hand it is important to remark that nowadays there still some problems that public bike sharing systems need to solve. One of the most relevant, is that due to the rapidly increase in free-float systems, an urban clutter effect has appeared (Mobix, 2021), as this growth has been faster than the regulations. This problem has led to bicycles cluttering the streets and sidewalks, blocking the pedestrian and motor traffic on some occasions, and degrading the urban aesthetic environment. That is why new laws have been implemented in some of the cities to reduce this effect. In more general way, other negative effects and so on challenges for the future industry can be found. For example, the lack of helmet usage (Kass, 2020), as nowadays just 20% of the users use them. Empty docking stations in heavy traffic hours, and during non-typical hours, full stations that become a problem when trying to store the bike. Moreover, the topography and climate (high slopes, ice and snow…) of some cities can become a problem, an each of them has to be studied in a different way in order to find the most efficient solution to be adopted. Finally, the inexperienced cyclists due to their lack of contact with bikes or their unfamiliarity with the city, such as tourist, can cause some accident and some measures should be taken.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 22 3.Methodology, system dimensioning Different scenarios are contemplated when designing a bike sharing system and deciding the number of stations and bikes that will be necessary to satisfy the city demand. The following scenarios could be summarized in these 3: • Demand, where the estimation of the required number of stations and bikes is based on an analysis of predicted demand in the city where the system is planned to be implemented. To do so, different factors affecting the demand must be analyzed. In this study case this is will be done using historical data from other cities with BSS. With this data it is possible to forecast the demand in the city where the new system is wanted to be implemented by adapting the study to its own characteristics. The result is an ideal scenario of the system adapted to the possible demand without considering the budget and so on the costs as factor of dimensioning. Nevertheless, this can be considered in the end and re-dimension if necessary. • Budget, in this case another situation is planned where the designers of the system have beforehand the maximum budget that city council can spend in a BSS implementation. Now the number of bikes and stations is estimated by computing the costs and with this, one knows which is the maximum number that can be used for a specific scenario. • Points of interest and accessibility, from theory it is known that in terms of accessibility in an ideal situation there should be between 8 and 14 stations/km2, (Mariano Pérez Miñano, 2014), or what is also the same a maximum distance of 300 m from stations for the user not to walk more than 5 minutes to get to the station to take a bike. When planning where to place them is important to check the points of interest (POI’s) of the system and place them near them, so they would be the main attractors of the demand, which in this case has not been computed. This type of planning does not consider the possible demand in each district or city and could lead to an excess of stations and bikes and so on in budget as the costs are again not considered. After exposing these 3 scenarios, it has been decided that for the case study, the number of stations needed will be estimated based on a demand prediction. In
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 23 this case as it has been mentioned before, an ideal situation is created. Since the costs are computed based on the number of bikes and stations predicted, in some cases, this ideal situation overpasses the budget that the city council has. Nevertheless, based on the budget, the number of stations can be reduced from the ideal scenario according to the demand. This is not bad, because some cities sometimes implement their systems by phases as their budget is limited and a future a second’s phase can be later performed to achieve the ideal estimated situation in terms of demand. 3.1 Demand prediction When a new system is planned to be designed, it is necessary to estimate which could be the demand associated to it. To do so, a demand prediction model is commonly used, this prediction of the system future use, is essential to plan an optimal and efficient BSS. Currently, after the last decade of exponential sector growth, many models have been implemented, using different parameters related to demographics, environment and bike sharing ridership, each with different or variations in the equations, methods, and variables. From all these different methodologies, the one that is going to be used and explained along this project is the trip generation from observed demand, used to determine the frequency of origins or destinations of trips by some of the different factors that will be later introduced. In this case it has been decided to use the multiple linear regression model where the trips generated are a linear function of the mentioned factors. The assumptions made are the independence between the factors, meaning that if one changes it does not imply a change in the others. The linearity is also assumed by the model, as it has been said, there exists a linear relationship between the independent variables (factors) and the number of trips. Finally, the last assumption is referred to the normality as the errors are normally distributed and the homoscedasticity refers to the constant variance across different levels of independent variables.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 24 To proceed, the model is calibrated by using OLS linear regression techniques to the database that has been obtained by observing existing systems in other cities. The expression used is the following (Hampshire, 2011): 𝐺𝑖= 𝛼𝑖+ 𝛽𝑖𝑋𝑖+ 𝜀 Where 𝐺𝑖 is the trip generation and 𝛼𝑖 𝑎𝑛𝑑 𝛽𝑖 are the vector of parameters to be estimated with the different factors expressed in the vector 𝑋𝑖, and so on refereing to the vector of explanatory variables, finally the last term 𝜀 refers to the errors. To estimate the parameters 𝛼𝑖 𝑎𝑛𝑑 𝛽𝑖 the linear regression model must be performed based on the factors observed in the different cities where a system is working correctly. As it has been said, the factors chosen, depend on the different studies done, the most common, are the ones that have been introduced in section 3.2. Depending on the characteristics of the city and the study, the factors that fit better are chosen. In the equation before, the demand is calculated as the demand at the end of the day, in other words, the total demand. The problem would become more complex if the time is considered, in this way the result would be a graph with the estimated demand according to the time of the day. Once these parameters have been estimated, those are used to predict the demand in the city where the system is planned to be built. When doing this, the same factors must be used by using the estimated coefficients. The result of this operation is the predicted number of trips. 3.2 Estimation of the number of stations and bikes Once the demand has been estimated following the previous steps it is time to do the same with the number of stations and bikes. To do so, the computations used are based in the result obtained from the predicted number of trips. Again, a multiple linear regression must be performed, but this time being the number of stations the dependent variable which it is wanted to be estimated. Once this procedure finishes, based on the ratio bikes/stations from the different cities observation, the fleet size of the system is predicted.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 31 very high and more stations or capacity in the station will be need it. The mean population density of the districts has also been computed and it is equivalent to 16938.77Inhab/km2. This value is bigger than the total density which is less representative for this study as the value decreases to 5732.02 Inhab/km2. Resulting from QGIS processes, the map in Figure 4 represents graphically the extension of each district in different colors associated to its range of population density as the legend indicates. This representation later will be used to help in the identification of the priority zones when locating the bike stations. From all this information it is also important to classify the city by its number of inhabitants. The cities between 100.000 and 300.000 inhabitants are considered medium cities which could help when taking some decisions later, as the behavior of the systems change from small to large (OBIS, 2011). 4.2.2 Bike Lane density Depending on the quality and amount of bike infrastructure, people take the decision of using BSS or not. When cities have a great bike lane mesh, well separated from road and distinct from it, the number of bike users increase. That is why this is an important factor when designing the system. First, the bike lanes have been drawn in QGIS separating the new ones from the old ones and the ones that have been built on the pavement. The official documents say that around 15 Figure 4: Population density (inhab/Km2) map
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 32 km will be available when all the works finish, counting all the two-way lanes that have also been drawn separately the total amount exceeds up to 18.5 km. Then for the later study of the future system and demand, the final data has been expressed in Km of bike lane/Km2 to have a standardized value. To do so, the tool to sum the lines has been used and the result was the total length inside each district that then has been divided by its area resulting in the density of lanes per region. In Figure 5 and 6, the representation of this bike lanes and the density is shown. As it can be seen in Figure 5, nowadays the infrastructure is covering more space than before, yet is not sufficient, there are many streets where bike lanes should Figure 6: Bike lane density map Figure 5: Bike lanes in Mataró map
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 33 be built up to facilitate the bike usage. Nevertheless, is a great step forward and with this it can be seen the aim of the city towards a change and the use of public bike sharing system. In Figure 6, the density of bike lanes per district is shown, the districts where there are more bikes per Km2 are the ones in Table 5: Districts with higher bike lane density District Lane length (Km) Bike lane density (Km Lane/Km2) Peramás 871.8800497 4.152 Pla d'en Boet 7499.5354 3.762 Eixample 4538.699387 2.44 In the other hand the districts that have the less density are the ones in Table 6, from this information it is seen that Centre does not have any bike lanes, and it is the only one, after searching the reason why it has been concluded that there exists a restriction in the city center related with the use of bikes and other centers, this is because is it an historical center and streets are narrow and destined to pedestrians. This is an important information because now it has been determined that it won’t be possible to install stations in some parts of this district, so other solutions will be studied. Districts with lower bike lane density District Lane length (Km) Bike lane density (Km Lane/Km2) Centre 0 0 Vista Alegre 24.12 0.003 Palau-Escorxador 856.92 0.161 4.2.3 Weather The weather is one of the most influential factors (OBIS, 2011) as the demand not also changes from one city to another due to its location and associate weather, it also changes for different months in the same city, due to the cycle usage in different seasons. People tend to use more or less the bikes depending on the weather, if it rains or snows, people use other transportation methods, also if outside the temperature is too high the same situation can occur. Cities are divided first into ‘cold cities’ if temperatures are <11ºC and ‘Warm cities’ if >11ºC. Table 5: Districts with higher Bike Lane density Table 6: Districts with lower Bike Lane density
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 34 In cold cities the tendency has shown that in the coldest months the demand in the system is very low or in some cases the system is out of service, due to snow, ice or other extreme conditions. In the other hand, warm cities demand is more uniform, in most of the situations the peak demands are found during spring and autumn, where the weather is not extremely cold or warm. Knowing all this, it is important to analyze the average weather per months in the city of Mataró which it has been determined as ‘Warm city’ and see what is the trend that is following to later use it for the demand. As it is seen in Figure 8 above, the cool season lasts about 4 months from November to March with an average temperature of 16ºC, the coldest moth is January where the average minimum temperature is 4ºC and the maximum around 13ºC. In the other hand, the warm season starts in June and ends in September, around 3 months with a daily average temperature above 26ºC, the warmest month is August with minimum average temperatures of 20ºC and maximum of 28ºC. Knowing this information and assuming that is a ‘Warm city’, it can be predicted that, as it normally happens in this kind of cities, the peak demand would be between April and May and between October and November. This will be determined more accurately after the studies that will later be performed. So probably 2 peaks will be visible in comparison of cold cities where there is just one peak during summer. When planning the system is important to ensure that Figure 8: Average temperature in Mataró. Source: Weather spark
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 35 this demand in the peaks can be covered with the dimensioned infrastructure and take the necessary measures to overcome this possible situation. 4.2.4 Terrain inclination It is known that slopes and public bike sharing systems do not get along, and all the people that have used a bike coincide with this statement. Pedaling uphill is not an easy work, that is why the cities that present high slopes in some of its districts normally have some problems related to the demand. As it has been said riding uphill is a hard work and in the other hand pedaling downhill can sometimes be dangerous. This takes part in a diminution of the bike usage. Another problem demand-related problem is the bike rebalancing, as in these cases people tend to ride downhill as it is easy, but they do not come back pedaling uphill, the final situation ends up with full station in plain areas and no bikes in uphill areas, so the rebalancing cost needed in these cases is higher. Also related to costs, maintenance increases as bikes in high slopes present more wear and tear. It is convenient to mention that in this situation users prefer power battery bikes, encouraging the system use. Having said that, it is time to analyze the terrain in Mataró, to do so the software QGIS has been used. To determine the slope, it is important to download a Digital Elevation Model (DEM) of the area, where the terrain is represented digitally, containing information of the elevation in each pixel. The DEM downloaded from ICGC (Institud Cartogàfic i Geològic de Catalunya) inside the software, has been cut to the part where the study is performed, and later by using the tool slope, converted to a map that shows the slope in angles of each point, as it can be seen in Figure 7. The pixels represented in yellow are the ones with the highest slope and the blue ones are the ones with lowest slope. With these two regions are clearly differentiated, the uphill area in the north and the downhill area in the south closer to the beach. So previously to any planning or study it can be said Figure 7: Slope (º) map
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 36 that in the upper part there will be more empty stations and in the other more occupied stations, affecting in this way the demand. For the future identification of the priority zones, the mean slope has been computed for each of the districts by using the tool statistics by zones and the result obtained is the one observed in Figure 8. In this case the 11 districts are painted with different colors from less mean slope, in yellow, to the highest mean slope in dark red. The districts that correspond to the maximum mean slope are Vista Alegre with 13.83º and La Llàntia with 9.44º, both corresponding to the uphill part mentioned before in Figure 7. The district with the minimum mean slope corresponds to Pla d’en Boet, as it names indicates in Catalan; plain, equal to 2.27º. From the mobility plan of Mataró, the following Figure 9 has been extracted, showing the inclination of the streets, which counteract the graphical information previously exposed. Figure 8: Mean slope (º) map by districts
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 37 4.2.5 Points of interest When analyzing the city, it is very important to determine which are the possible origin or destination points, which in this case have been named as interest points. There exist different motivations when initiating a trip, such as work, study or simply leisure, so different categories of interest point are associated to those. In this case, in the city of Mataró the points that will be analyzed are the following ones: • Universities and high schools • Tourist attractions • Job • Others When locating the stations of the system, universities, and high schools play an important role, as young people tend to use more the bike and a great demand is generated in these trips (as origin and destination). In this case schools are not considered in the study as the system can just be used if the user is 16 years old or older. In the case of Mataró, it has been determined that there is just one University, as it is seen in Figure 10, the green point, TecnoCampus in which around 4000 students are matriculated. For the future study it is important to remark that students come, not just from Mataró as most of them arrive by train, bus and some other by car, which probably will not use the system if they have parking Figure 9: Slope in Mataró streets in % , Source: Mataró 2050
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 38 slots nearby the faculty. So, it can be said, that the majority of university trip origin or destination will be residential areas from the inhabitants of Mataró and the train station and bus station. In the other hand, it has been determined that the number of high schools rise to 8, in red in Figure 10. In this case not all the students will be able to use the system so the demand will be nothing compared to the one generated by TecnoCampus, that is the point that has more weight when designing the system. 4.2.6 Job density Mentioned before as points of interest, it is necessary to determine the areas with higher rate of employment. In this case two things should be analyzed; the amount of people that have a job in each of the districts and in the other hand their destiny, in other words in which district there are more places where people go to work, identifying where are the business, and so on the possible origins and destinations of the bike trips. Analyzing the first mentioned point, in Mataró during 2023, according to (IDESCAT, 2023), 51801 people had a job, out of a total labor force sector of 61659 people. This information has also been analyzed in more detail considering Figure 10: Universities and High schools location in Mataró.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 39 which is the percentage of occupied people in each of the districts, from the following map in Figure 11. From the map it is seen that the areas where more people work correspond to the ones close to the city center such as Centre and Eixample, then the ones where there are less people working are Rocafonda, Palau-Escorxador, and Peramas. 4.2.7 Intermodality, public transport density Finally, it is fundamental to analyze the existing public transport infrastructure, this helps identifying the areas where there are missing transportation needs and BSS could help on getting there. Also, as it has been introduced in the theory the study is also necessary to complement the bike sharing system with the public transport, facilitating in this way the intermodality and creating an efficient global public transport system, able to solve some of the problems related with the first and last mile. Nowadays the city of Mataró uses the bus as its main public transport method for people to move around the city. This system has 8 different bus lines, which in total sum up to 79 km, 148 bus stops and 27 operating vehicles. This service works the 24 hours during all the year. Depending on the day the frequency changes, as during workdays 374 expeditions are carried, value that decreases to 241 on Saturdays and 114 on Sundays and holidays (Ajuntament de Mataró, 2019). Figure 11: Map of the percentage of people working in Matró by districts. Source: El confidential, 2021
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 40 From OpenData Mataró it has been possible to download an excel file with all the stations that later have been open in QGIS. The map seen in Figure 12 is the result, showing in different colors the 8 lines that compose the hole system. Again, the same operation performed with universities is repeated and the number of stops is determined for each district, from where it is possible to compute the density of stops in all of them, showing the coverage area of the system. Figure 12: Bus stops map Figure 13: Bus stops map
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 47 Barcelona and Montreal, Milan and the other have been chosen, considering the proximity to Mataró and so on the possibility of the users to have a similar behavior as they come from the same country. Some of those are smaller systems that help to calibrate the linear regression, considering that the coverage area in Mataró is about 9.3 km2, so it is not a big system. All the data that has been compiled for each of the cities is found in the Appendix A.1.1. The cities are Barcelona, Paris, Montreal, Milan, Madrid, Girona, A Coruña, Valladolid and Sevilla. Before performing any linear regression, it is seen that the Population density has a great effect in the demand as in higher populated cities the demand increases. The same phenomena are observed with the other 2 densities, public transport, and bike lane. But this is just something a grosso modo, now it must be proved by using the linear regression. First, it has been decided to perform a linear regression comparing each of the factors individually to the demand. To study this, it is important to focus not only on the equation in which by substituting with Mataró factor the demand can be predicted, but also in the R2. This parameter is a statistical measure that refers to the goodness of the linear regression by determining the proportion of variance in the dependent variable that can be explained in the independent variable. In other words, when R2 is closer to 1 the data fits well in the regression model. If it tends to 0 the data in not good for the model. This operation has been done for each of the factors and the results are observed in Table 8 below.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 48 Individual linear regression of each of the factor’s vs the demand R2 𝜷 𝜶𝟎 Population Density (𝒊𝒏𝒉𝒂𝒃/𝒌𝒎𝟐) 0.6891 0.0255 14.258 PIB per capita (€/𝒊𝒏𝒉𝒂𝒃) 0.2131 0.0072 -80.895 Employed population density (𝑰𝒏𝒉𝒂𝒃/𝒌𝒎𝟐) 0.5743 0.0321 59.433 Bike lane density (𝒌𝒎 𝒍𝒂𝒏𝒆 /𝒌𝒎𝟐) 0.3234 60.683 99.261 PT stops density (𝑺𝒕𝒐𝒑𝒔/𝒌𝒎𝟐) 0.4929 14.408 -20.926 Slope (%) 0.427 144.65 23.598 Temperature (𝑪º) 0.043 13.262 36.119 Year rain accumulation (𝒎𝒎/𝒚𝒆𝒂𝒓) 0.0443 -0.1302 319.53 In this case it is seen that not all the factors are well suited for this study, this is probably due to the number of observations made, as it is just 9 and if the sample was bigger the goodness would increase. This situation is found for example in Temperature and Year rain accumulation, both factors related to the weather, and as previously seen those are one of the factors that affects bike sharing system demand the most. Due to the low number of observations the relation between these variables and the demand is not good, so none of the weather factors will be considered in the multiple linear regression as their R squared values are very low, close to 0. The other factor that will be also excluded from the multiple regression is the slope as in this case, again due to the sample size, the effect generated is not the one expected. The slope should affect the demand by lowering it, but in this study Barcelona data generates the contrary effect to the regression as due to its high population and great use of the system the demand Table 8: Individual linear regression of the different factors respect to the demand (R2, 𝜷,𝜶𝟎)
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 49 stills the biggest, even though the slope is the highest. From the data it is also necessary to mention that the coverage area factor has not been included as this value has been considered in the demand, expressed in this case as 𝑇𝑟𝑖𝑝 𝐷𝑎𝑦·𝑘𝑚2, so it is already taken it into account there. Once these observations have been performed individually, it is time to start with the multiple linear regression between the factors that affect the demand. In this case MATLAB software is used to perform the necessary operations. The function fitlm. was used to perform the linear regression once the data was separated in Y being the demand (dependent variable) and X the different factors representing each of the independent variables. The results from the linear regression are the ones in Table 9. MATLAB script is available in Appendix A.1.3. R2 𝜷𝒑𝒐𝒑 𝜷𝒑𝒊𝒃 𝜷𝒋𝒐𝒃 𝜷𝒍𝒂𝒏𝒆𝒔 𝜷𝑷𝑻 𝜶𝟎 0.9485 0.1747 0.0017 -0.2088 60.6461 -14.0632 -77.0738 From the equation obtained, it can be determined a high goodness as R2 is close to 1. The other coefficients in the Table 9 are the weights associated to each of the factor. Then predict. function was used to estimate the demand in Mataró. To do so the data obtained from the previous study of the city referring to the previous 5 factors was used and when substituting these values in the equation, the result obtained has been: 𝐸𝑠𝑡𝑖𝑚𝑎𝑡𝑒𝑑 𝐷𝑎𝑖𝑙𝑦 𝐷𝑒𝑚𝑎𝑛𝑑 = 303.6263 𝑇𝑟𝑖𝑝 𝐷𝑎𝑦 · 𝑘𝑚2 This value can be then transformed into overall daily demand, by assuming a coverage area of 9.3 km2 resulting from the first approach. 𝐸𝑠𝑡𝑖𝑚𝑎𝑡𝑒𝑑 𝑜𝑣𝑒𝑟𝑎𝑙𝑙 𝐷𝑎𝑖𝑙𝑦 𝐷𝑒𝑚𝑎𝑛𝑑 = 303.6263 𝑇𝑟𝑖𝑝 𝐷𝑎𝑦 · 𝐾𝑚2· 9.3𝑘𝑚2 =2823.7345 𝑇𝑟𝑖𝑝 𝐷𝑎𝑦 Table 9: R2, 𝜷 and 𝜶𝟎 resulting from multiple linear regression.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 50 5.2 Number of Stations and Bikes estimation After predicting the demand in Mataró, it is possible to estimate the number of stations that are need it based in the demand that has already been calculated. To do so, a multiple linear regression is used, considering the data from the analyzed cities, but this time being the stations the dependent variable Y and using as factors and so on independent variables, the demand, the population density, and the coverage area. As the other data has already been considered in the demand prediction. It must be considered that in this case the demand has been expressed as trip/day as the coverage area is already one of the factors in this case. This data is available in Appendix A.1.2 and MATLAB scrip in Appendix A.1.4. After repeating the same procedure but with this new disposition of the data, the results obtained are the ones seen in Table 10. R2 𝜷𝒂𝒓𝒆𝒂 𝜷𝒑𝒐𝒑 𝜷𝒋𝒐𝒃 𝜶𝟎 0.9850 3.3853 0.0146 0.016 -40.2971 The goodness of the multiple linear regression is high, even more than in the other case. Again, the same procedure is repeated, and the number of stations is estimated. The result obtained is the following: 𝑁º 𝑜𝑓 𝐷𝑜𝑐𝑘𝑖𝑛𝑔 𝑆𝑡𝑎𝑡𝑖𝑜𝑛𝑠 = 79.40 This result means that the density of stations for the coverage area determined in the first approach, would be: 𝐷𝑒𝑛𝑠𝑖𝑡𝑦 𝑜𝑓 𝑑𝑜𝑐𝑘𝑖𝑛𝑔 𝑠𝑡𝑎𝑡𝑖𝑜𝑛𝑠 = 8.53 𝑠𝑡𝑎𝑡𝑖𝑜𝑛𝑠/𝑘𝑚2 If this value is compared to other cities station density, it can be accepted as good value, as for example Barcelona station density which is one of the highest in the world is close to 8. Also, as the guides indicate the ideal value for an efficient coverage ranges between 8 and 14 Stations/ km2. From this data it is also computed the mean coverage area of each station, following this procedure: 𝑀𝑒𝑎𝑛 𝑐𝑜𝑣𝑒𝑟𝑎𝑔𝑒 𝑎𝑟𝑒𝑎 𝑜𝑓 𝑠𝑡𝑎𝑡𝑖𝑜𝑛 = 9.3𝑘𝑚2 79 𝑠𝑡𝑎𝑡𝑖𝑜𝑛𝑠 = 0.11772𝑘𝑚2 Considering the coverage area as a hexagon as it is seen in Figure 16, it has been determined that the radius of the hexagon and the side are, r=0.194 and c=0.234. Table 10: R2, 𝜷 and 𝜶𝟎 resulting from multiple linear regression of number of stations estimation.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 51 As it is known that 𝑟 = √𝐴/𝜋, from this information it is determined that the distance between two stations will be in average equal to 2𝑟 depending on if it is considered a circle or square as coverage area. This results that the distance between those should be around 0.388 m. Theoretically it is normally used the distance of 300 m to obtain a good coverage of the BSS area, that is why it can be concluded that the estimation has been accurate. Then the ratio of Bikes/Stations has been computed for each of the observed cities and the mean of those has been computed, it is equal to: 𝑀𝑒𝑎𝑛 𝐵𝑖𝑘𝑒𝑠 𝑆𝑡𝑎𝑡𝑖𝑜𝑛𝑠 𝑟𝑎𝑡𝑖𝑜 = 12.099 𝑏𝑖𝑘𝑒𝑠/𝑠𝑡𝑎𝑡𝑖𝑜𝑛𝑠 This value has been used to estimate the number of bikes need it in the system, the result obtained is then: 𝑁º 𝑜𝑓 𝑏𝑖𝑘𝑒𝑠 = 12 ·79 =948 𝑏𝑖𝑘𝑒𝑠 Then the capacity of the different station, the so-called racks will be determined when locating the stations depending on the possible demand observed in each of the possible station locations, but normally for each bike correspond 2 racks, to ensure sufficient capacity for the station, this means that the number of racks is: 𝑁º 𝑜𝑓 𝑟𝑎𝑐𝑘𝑠 = 2 · 948 =1896 Representing a mean of 24 racks per station. 5.3 Other KPI’s analysis Once the bike number has been estimated other KPI’s (Key performance indicators) have been analyzed to ensure the performance of the future system implementation. Figure 16: coverage area of each station
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 52 After analyzing the factors indicating the performance in terms of accessibility from all the parts of the coverage area, it is a priority to estimate the indicators related to the trips and so on the use of the system. The first parameter is the number of bikes per 1000 inhabitants. This parameter helps in determine the goodness of the system. This value should range between 10 to 30, but when the reality comes, this is difficult to maintain, so just 2 cities (Mexico City and Dublin) are between these parameters (ITDP, 2018). Most of the important cities move around 2 to 10, such as Barcelona that has a value close to 4.4 or Paris around 7.6, in this case the city of Mataró based on the previous estimated parameters: 𝑁º 𝑜𝑓 𝑏𝑖𝑘𝑒𝑠 1000 𝑖𝑛ℎ𝑎𝑏 = 7.442 𝑏𝑖𝑘𝑒𝑠 1000 𝑖𝑛ℎ𝑎𝑏 This value is above the mean, and so on it can be said that indicates a high probability of covering the demand of the city. In the same line, the number of trips per 1000 inhabitants is another KPI that has to be analyzed, in the case of Mataró its estimated value is: 𝑇𝑟𝑖𝑝𝑠 𝑎 𝑑𝑎𝑦 1000 𝑖𝑛ℎ𝑎𝑏 =21.89 𝑡𝑟𝑖𝑝𝑠 1000 𝑖𝑛ℎ𝑎𝑏 This value is again above the mean, but it could be higher as normally it is just considered the inhabitants living in the coverage area of the system. This value measures the penetration in the market. After this, it is also relevant to consider the bike uses per day, the manual establish that the objective should be between 4 and 8, in this case as it is seen below: 𝑇𝑟𝑖𝑝𝑠 𝑝𝑒𝑟 𝑏𝑖𝑘𝑒 𝑑𝑎𝑦 = 2.94 𝑢𝑠𝑒𝑠 𝑎 𝑑𝑎𝑦 𝑏𝑖𝑘𝑒 Again, this value is below the range but above the mean compared to the main systems in the world, so it is accepted. And it is also important to recall that this computation comes from an estimated value and, the mean value of the demand can be higher and so on this ratio higher. Once the system has been implemented it is very important to monitor all the data to check if the assumptions were correct and the system is working properly.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 53 To do so, those KPI’s and even more should be analyzed with the real data and compare the real performance with the estimate it one.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 54 6.Planning of the system Once the demand, number of docking stations and fleet size has been estimated it is time to plan the disposition of the stations, based on the predictions made. To do so the procedure followed will be the one introduced in Section 3.3. Where the factors that have been analyzed in the study of the city will be considered to determine which of the 11 districts has a higher attraction of bike trips and so on needs a higher density of stations to cover the demand. To proceed, we consider the factors, stated in the beginning of Section 3.3 and then the different variables will be homogenized. To do so, the procedure differs a bit from the original explained in theory as it has been decided to use a standardization and normalization of the data to homogenize it. In this case the equation used to standardize is the following (Statistics How To, 2014): 𝑌 = 𝑥 − 𝑋 𝜎 Where Y represents the standardized value, 𝑥 is the value that is wanted to be standardized, X represents the mean of all the values from the same factor corresponding to each of the districts and finally 𝜎 represents the standard deviation of each of the factors. In the other hand, data has also been normalized and the results obtained were very similar. Standardization a priory is much less affected by the outliers and not bounded between 0 and 1, such as it happens when using normalization. The equation used to normalize the data is the one below (Alam, 2020): 𝑌 = 𝑥 − 𝑥𝑚𝑖𝑛 𝑥𝑚𝑎𝑥 − 𝑥𝑚𝑖𝑛 In this case x represents a value from the sample and 𝑥𝑚𝑖𝑛 𝑎𝑛𝑑 𝑥𝑚𝑎𝑥 are the minimum and maximum value from the sample respectively. In the end both methods will be compared, and the mean of the results will be used. The factors that have been analyzed are the following: • Population density (Inhabitants/km2) • Employment percentage (Occupied people (%)) • Business density (Licenses/km2) • Industrial areas (Industrial areas/ km2) • Bus network (Bus stops/km2)
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 55 • Cycling lanes (km cycling lanes/km2) • Universities proximity (Universities/km2) • High school proximity (High schools/km2) • RENFE station proximity (RENFE/km2) • Average slope (º) Some of the factors from the original study have been taken out. One of those is the tourism, as Mataró is not a Touristic city and so on this factor does not affect much. Others have been added up due to the specific necessities of Mataró such as the Industrial areas that are in certain areas of the city and a great amount of people moves there to work every day. It is also seen that there has been added up a factor just considering RENFE station as it is one of the main generators and attractors of Mataro’s demand, as it has been seen in the city study in section 4. Also, it is seen that Universities and High schools have been separated as they do not have the same weight in terms of demand, being the Universities a higher attraction of it.. All this data is available in the appendix in Table A.2, where the data corresponding to each of the factors and districts is found. Once all the variables have been collected the following step is using the standardization and normalization equations to homogenize the results. Once this is done, the assignment of weights is performed. To do so, different studies have been considered such as (Sadegh, 2022) which uses AHP done by experts in BSS to assign the weights to the factors. From these studies and our criterion, it has been determined that the most influencing factors are the Population density and the Mean slope. It is seen that when those change the demand is seriously affected. Those are followed by proximity to current transportation systems and bike infrastructure as it was seen along the document. After trying different combinations, it has been decided that the weights assigned will be the following in Table 11.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 56 Weights for the different factors Factors Weight Weight normalized Population density 0.3 0.1875 Employment 0.2 0.125 Business density 0.15 0.09375 Industrial areas 0.05 0.03125 Bus network 0.15 0.09375 Cycling lanes 0.15 0.09375 Universities proximity 0.1 0.0625 High school proximity 0.05 0.03125 RENFE station 0.15 0.09375 Average slope 0.3 0.1875 Summatory 1.6 1 The weights are the result of the research mentioned, my experience and expert consultation. It is known that the sum of all the weights must be 1, so what has been done is apply reasonable punctuation to each factor based on the mentioned criterion and later apply a normalization to the values so that they sum 1, as it is seen in the third column of the table. It has been seen that this model is robust, and it is true that if the weights change the results change but the tendency is very similar, what means that there are no big changes, In other words, the highest rated district would never be the last one if the weights are changed. In the table it is also notable the high weight applied to the employment, as a great number of trips are dedicated to work and so on it is an important factor. Also RENFE station has one of the greatest weights in terms of attraction and generation of trips, and the same happens with bike and bus infrastructure to encourage the intermodality and the use of the bike respectively. When those are close, users tend to use more the system due to first and last mile trip. The result after multiplying these weights to each of the value of each factor for every district is in Table 12 and Table 13, that are seen below. The ones with higher value are the ones that need more stations due to a higher possible demand. The tables to get to these results are shown in the Appendix A.2. Table 11: Weights associated to the 11 factors affecting the BSS.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 63 • Totem: In this case its maximum power has capacity to supply 64 racks, more than the mean in Mataró that will be around 20. It has also a lot of flexibility when installing it as it can be placed on top of the platform and in the pavement next to the station. 79 totems are needed for the city of Mataró, one for each station. All these justifies why this station has been decided to be used for the system implementation. Also, another important reason is the quality price that guarantees a high degree of reliability and lower future maintenance cost. The prices of each rack are 450 €. 7.2 Bikes BSS bikes are not common bikes, like the ones that everyone can buy in the store. There are specific companies that design and distribute them. Those are made with patented components that can only be used for the bikes and mounted and demounted with specific instruments. This guarantee the durability and security as pieces are more difficult to be stolen. The minimum (ITDP, 2018), that these bikes include is a standardized size in order to ensure the highest accessibility as possible, robust design as it has a higher use than a conventional bikes and they should guarantee a lifespan from 3 to 5 years, also it is important to find the equilibrium between the bike parts of low maintenance and quality of the ride, Figure 21: Station blueprint, Source: Inurba Mobility (2022) in Servicios de implantación, mantenimiento y gestión del servivio de bicileta pública
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 64 also has to maintain a certain degree of safety in terms of possible theft or vandalism, and also in terms of the user safety and health when driving with all the necessary equipment (lights, breaks, bells, wheels,..). It is also necessary that the bike is easy identifiable and has a nice visual aspect. There is the need to include storage so that’s why a frontal basket is installed. According to all this requirement it has been necessary to search for a company that distributed a bike of this characteristics, and it has been decided that Mataró will use the model V3 by Fifteen, as it also the same company of the docking stations. The first that has been considered was if the bikes should be electrical and as the result of the study made, it has been determined that this is a must. Mataró is very inclined and using electric bikes will encourage users to use the system for this extra cost to be worth it and reduce the cost of the rebalancing operations. This is another reason why the V3 model has been the choice, its main characteristics are the following: • Lightweight • Weatherproof and vandalism resistant • Eco-friendly • Easy to use to ensure continuity of service in the field The key aspect on why this bike has been chosen are the following, in terms of maneuverability and control (Inurba Mobility, 2022): Its weight is 26 kg making it the lightest electric bike on the market, it has robust frame with a low bar (46 cm high), comfortable, ergonomic and with suitable dimensions for all types of audiences and morphologies, guarantying a great accessibility for a big range of people. It has an ergonomic handlebar for a comfortable posture that permits and easy use. The optimum visibility is a key factor, thanks to the headlights and taillights that stay on for more than 3 minutes when the bike stops. It incorporates a front basket independent of the handlebars that is resistant to safely transport a load of 10 kg and has large capacity.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 65 When it comes to the battery that is one of the principal worries if we want them to be light but with high range. V3 model has Integrated battery under the saddle, in the center of gravity of the bike, which provides a lightweight feeling when maneuvering, it has an effort sensor for electric assistance to facilitate the ride in high slopes as it happens in Mataró. The engine has 250W of power and the range of the bike is 60 km. The bike has LEDs that let you know the status of the battery. The mobile app also shows the charge level of the bicycle batteries at the station. In terms of safety, it is important to mention the breaks that are connected to a system that stop the electrical assistance when the breaks are pressed to prevent an accident, the disks also have an element equipped which dissipated the heat of it when breaking. As it has been mentioned, the design of the bike has a great impact in its use, that is why it is necessary to choose the proper colors and design. It has been decided that color used will be the corporative one that Mataró uses in all its website, blue. The design of the bike and the station after applying this distinction from other bikes is the one that is seen in the following Figure 22, later the branding will be reasoned. Figure 22: Fifteen V3 bike with BikeMat BSS branding
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 66 7.3 Warehouse, Workshop, and call center Every bike sharing system needs a place to store spare parts, bikes, and vehicles (warehouse) another to repair the bikes that come from the street (workshop), and a call center from which the operations are managed. Sometimes it is difficult to decide if these places must be rented or simply bought, in this case a unique building will be bought, an industrial one with enough place to store, and smaller place in the same floor to repair the bikes. On the second floor, there is place for a small office from which the daily operations are managed. As it has been studied, Mataró has one big industrial area in Pla del Boet, there are big buildings which match with the mentioned necessities, the prices range 400000€ to 500000€. This location is also good as it is easy for the vehicles to maneuver, it is not far from the center and prices per meter square are lower than in any place in the city according to Idealista. 7.4 Software In a BSS there is the need to use different software’s for the correct functioning of the system, as there is one associated to each of the operations. The street operations of rebalancing and collecting the bikes that must be fixed in the workshop, need a specific program to monitor the operations using predictive routes to fasten the work. For the workshop repairs, it is necessary to have a register of the bikes that are broken and the bikes that have been repaired. Also, an exploitation platform is necessary, able to consult the condition of the bikes and manage from the call center the necessary operations without moving. As it has been said, for the rebalancing and the collection of inoperative bikes on street, a software to create higher efficient routes, showing when a station needs rebalance, or a bike needs to be fixed is fundamental in a bike sharing system. In this case one of the most used softwares in the industry is QUCIT. The field workers use a mobile app, which shows the stations that need rebalancing and optimize the routes. When the worker gets to the station, must scan the QR in the bike and store it in the van, the app shows the route to the next station, where this bike must be relocated. It is important to mention the necessity of continuously using the app not only to monitor the operations but as it includes AI, patrons and algorithms are generated, helping in the optimization of the activities.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 67 When a bike is inoperative and needs to be repaired, an alert is created if the system incorporates this software. UrbanSharing provides this service, when a bike is reported as damaged by a user, a message gets to the workers and depending on the priority of the incidence they can decide to pick up the bike to be transported to the workshop where it will be repaired. Also, this software includes the option that when a bike is not reported broken by any user but is returned to the station before 60 seconds more than one time in a short period of time, its condition changes to inoperative and a worker must go there to check it. UrbanSharing is also a real time platform, where every bike can be controlled, the system can be stopped and is a basic need when analyzing the KPI’s of the system. The repairs performed in the workshop must coincide with the bike getting in an out of the street. To control this, and the time that it takes for a repair to be finished a software as GMAO is commonly used. When a bike gets in the workshop the mechanic should scan the bike, automatically a working order is associated to this bike and is pending for a mechanic to fix it. Once someone starts with the reparation of the bike the QR is scanned and the reparation time starts, when the operation is finished this must be notified. By doing this the control center can monitor the time it takes for each type of reparation and the spare parts that are more likely to brake and so on prepare for this problem by buying more parts to not run out. After fixing the bike the mechanic must test that the it has been correctly fix and if this is done correctly it is assigned to be relocated again into the system. Finally, the users need a platform, from which they can unlock and lock the bike, check in real time the condition of the bikes, stations, and the system in general. Each user must be registered before using a bike and the fee must be paid, everything through this interface.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 68 7.5 Vehicles Vehicles necessary for the maintenance and rebalancing operations, adapted to each of the operations to transport the optimum number of bikes. It is essential to adapt to the vehicle to the necessities, as accurate as possible, to adjust costs. As the vehicles will be used in a BSS, those should be electric, as one of the main purposes of bike use is the reduction of greenhouse gases into the environment. The operations vehicles must also consider this as one of the main purposes of the system. For the rebalance a Van is need it, apart from being electric, it is also important that no special driving license is need it to drive that, as it would be in long term more expensive. The idea is to adapt a normal van for the rebalancing, so the operation has higher efficiency. In this case this is done by using wood in the interior to avoid superficial damage on the bike, and the use of racks inside the van walls to fix correctly and easy the bikes that must be moved. Nowadays in the market there exist many vehicles brands that have van with these characteristics. The model that has been used in many cities and has been proved to have a great capacity and correct range for the city operations is the Volkswagen e-crafter 35 L3H2 (Inurba Mobility, 2022). The specifications can be seen in the following Table 14: Volkswagen e-crafter 35 L3H2 Length Power Range Charging time (S/F) Max bike capacity Price Max load 5.99 m 136 CV 173km 5:20 h/0:45 h 16 81905€ 1700kg Table 14: Rebalancing van, technical aspects. Source: Inurba Mobility Figure 23: Volkswagen e-crafter 35 L2H2. Source: Volkswagen webpage
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 69 For the maintenance operations, there is also the need for using vehicles. The activity of taking the damaged bikes from the street to the workshop will be done combining the use of an e-crafter and smaller Van for the operations that require a smaller vehicle in terms of faster parking and less intrusion when moving bikes or fixing problems in the station. A vehicle that is electric and has reduced dimensions but adapts to the mention necessities is the Cenntro Logistar 200, this vehicle has been designed especially for this type of operations. Its technical aspects are remarked in the following Table 15: Cenntro Logistar 200 Length Power Range Charging time (S/F) Max bike capacity Price Max Load 4.7 m 41.86CV 264km 12h/1:30h 8 30990€ 1120kg For preventive maintenance and small repairs on the stations, e-motorbikes are going the correct option, as they are agile and fast vehicle, they can park mostly everywhere and the necessary tools for these reparations on field can be carried inside the cases. A good option considering the necessary characteristics that the motorbike should have is the Seat MO 125, as it is 125 cc, which does not require a special license and meets the mentioned requirements The technical aspects appear in the following Table 16: Table 15: Cenntro Logistar 200, technical aspects. Source: invicta electric Figure 24: Cenntro Logistar 200. Source: Rentiner
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 70 Seat MO 125 CC Range Charging time Price weight 125cc 137km 8h 6250€ 111 kg 7.6 Spare parts In a system of this characteristics, it is always important to have in storage the spare parts of the bikes and stations to guarantee the repair and the fleet functioning at its highest level. If there are no substitution parts in the warehouse the bikes that need to be repaired, probably cannot, and in this way the system is below the demand and could lead to serious problems if this happens to a great percentage of them. That is why it has been decided to always have in storage spare parts for the 10% of the total float. If this level goes below this value or it is seen that will go below in a short period of time, more parts must be ordered. This procedure is guaranteed thanks to the continuous monitoring with GMAO software. For the stations the same percentage (10%) will be considered from the total racks, platforms, and totems. Also, to always guarantee the total fleet functioning, an extra 5% of the 948 bikes, so on 48 extra bikes will be stored in the warehouse, as vandalism or the impossibility of repairing a bike are normal situations in BSS (Inurba Mobility, 2022). Table 16: Seat Mo technical aspects. Source: Seat webpage Figure 25: Seat Mo 125. Source: Seat webpage
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 71 7.7Branding As it has been stated, it is important that all the components of the system have their own colors and design, to help being easily identified by the users and reduce the vandalism, as it is clearly seen that the parts are from the BSS. As it happens with all the bike sharing systems, a name is need it, so users associate this to the BSS. This name will be the title of the marketing, web and other sources. In this case it has been decided to be called BikeMat. The municipality normally uses a specific type of blue as corporative color, as it is seen in their web page. That is why it has been decided to use the same color. The logo has been designed and it is the following in Figure 26: For the bikes and stations, the color used will be the same, and for the bikes it has been decided to use a background that can be associated with Mataró, in this case, this is the sea, so a wave texture have been used in the bikes as it is seen in Figure 22 in Section 7.2, following the corporative color. An attractive design is always an option for attracting new users, and so on these proposal gives a modern look to the bike and opens this possibility. Figure 26: BikeMat logo
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 72 8. Operations There are different operations in a bike sharing system that are fundamental for the correct functioning of the system, if those are not planned before the system launch the consequences can be catastrophic. Those main operations are the rebalancing, the maintenance, and the user support (ITDP, 2018). In this case the operations that are going to be treated are just the first 2. 8.1Maintenance Maintenance operations comprise several processes from which the followings are the most important: • Corrective and preventive maintenance of the bikes and the stations on field. • Corrective and preventive maintenance in the workshop. • Bike and stations cleaning. The purpose of all of them is to maintain the system in the optimal conditions for the user’s comfort and safety and to keep operative the greater number of bikes as possible. To carry out these operations there is the need to have different teams for each of the activities and so on the necessary material to do so. This also considers a fleet of vehicles enabled to perform the different operations, including vans to transport the unusable bikes to the workshop and vehicles with the necessary material to perform the maintenance on field and the cleaning if necessary. Based on the experience of business such as Inurba Mobility (Inurba Mobility, 2022), the number of damaged bikes per day should not be higher than the 2% of the fleet. Based on this reference value, it is estimated the number of workers need it to perform bike repairing operations. As it has been said the number of bikes estimated for the city of Mataró is 948, knowing this value and that the bikes damaged per day is no more than 2%, the worst scenario case is evaluated where: 𝐷𝑎𝑚𝑎𝑔𝑒𝑑 𝑏𝑖𝑘𝑒𝑠 𝑝𝑒𝑟 𝑑𝑎𝑦 = 0.02 ·948 =18.96𝑏𝑖𝑘𝑒𝑠 𝑑𝑎𝑦
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 79 The call center includes just the salaries of the workers performing these operations and the office material used. 9.3 Total costs The operational costs have been computed in this Table 18: Capital costs Quantity Unit cost (€) Total cost (€) Stations and bikes Bikes 948 2230 2114040 Racks 1896 450 853200 Electrified platform 474 450 213300 Electric totems 79 3600 284400 Total 3397 3464940 Vehicles E-crafter 3 81905 245715 Van 1 30990 30990 Seat Mo 2 6250 12500 Total 6 289205 Workshop/warehouse Building 1 500000 500000 Total 1 500000 Software UrbanSharing 1 2000 2000 Qucit 1 1500 1500 Gmao 1 1000 1000 web/app 1 3000 3000 Total 3 5500 Spare parts Bike parts (10% of fleet) 94.8 2230 211404 Racks 189.6 450 85320 Electrified platform 47.4 450 21330 Electric totems 8 3600 28800 Extra bikes 48 2230 107040 Total 293 453894 TOTAL 4713539 The capital cost finally is estimated to be 4713539 €. As it is seen all the parts that have been introduced have been computed considering the quantities dimensioned and the price for each of them. The operational costs have also been estimated and the results can be seen in the following Tables divided in worker salaries, vehicle consume, bike consume and the operational costs of the software for the maintenance, rebalance and the global functioning of the system. Table 18: Capital cost
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 80 In this first Table 19 the results show the total spend in salaries per year, considering the predictions made in workers need it in the previous sections. Operational costs People Salary month(€) Total month (€) Total Year (€) Workers Workshop 2 1500 3000 36000 On street repair 2 1500 3000 36000 Preventive Maintenance and cleaning 3 1500 4500 54000 Rebalance 7 1500 10500 126000 Callcenter 2 1500 3000 36000 Total 288000 In this second table, it has been estimated the vehicle consumption in a hole year, knowing the consumptions per 100 km. As it is not known the number of kilometers that those will perform every day, it is assumed a charge of 100km range for each vehicle. Operational costs Quantity Power consumed KWh/100Km Range (km) €/KWh 1 charge (€) A year (€) Vehicle Consume E-crafter 3 35.8 173 0.1629 5.83182 6385.84 Van 1 23.2 264 0.1629 3.77928 1379.44 SeatMO 2 3.15 137 0.1629 0.51314 374.58855 Total 8139.87 Table 19: Operational cost 1 Table 20: Operational cost 2
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 81 To estimate the total fleet energy consumption, it is known that the power subminiature by each rack is 84 watts, and the charging time is 6 hours so, we can estimate a consumption per bike per charge of: 𝐶ℎ𝑎𝑟𝑔𝑖𝑛𝑔 𝑐𝑜𝑛𝑠𝑢𝑝𝑡𝑖𝑜𝑛 = 84𝑊 · 6ℎ 1000 = 0.504𝐾ℎ Recalling the estimation made in the KPI’s that the bike usage rate will be of 2.94 uses per bike per day, it can be estimated that a bike would need a full charge every 6.66 days, as it is known that the bike has 60 km range and assuming a mean trip of 3km, as it is seen in the following computation: 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑝𝑒𝑟 𝑏𝑖𝑘𝑒 𝑑𝑎𝑦 = 2.94 · 3 = 9𝑘𝑚 · 𝑏𝑖𝑘𝑒 𝑑𝑎𝑦 𝐷𝑎𝑦𝑠 𝑓𝑜𝑟 𝑎 𝑓𝑢𝑙𝑙 𝑐ℎ𝑎𝑟𝑔𝑒 = 60 9= 6.66 𝑑𝑎𝑦𝑠 Knowing this it can be determined that every year the full charges need it per bike would be 54.75: 𝐹𝑢𝑙𝑙 𝑐ℎ𝑎𝑟𝑔𝑒𝑠 𝑥 𝑏𝑖𝑘𝑒 𝑥 𝑦𝑒𝑎𝑟 = 365 6.66 =54.75 𝐹𝑢𝑙𝑙 𝑐ℎ𝑎𝑟𝑔𝑒𝑠 𝑝𝑒𝑟 𝑦𝑒𝑎𝑟 Finally multiplying, the number of bikes per power per full charge per the full charge bike x bike every year by the cost of the KWh it is obtained the approximate value in the Table 21 below. Operational costs Cost (€) per bike/month Bikes A year (€) Software UrbanSharing 2 948 22752 Qucit 1 948 11376 Gmao 0.75 948 8532 web/app 1 948 11376 Total 54036 Operational costs Rack with bike Power for full charge (Kwh) Charge x bike (year) €/KWh A year (€) Bike Consume Stations 948 0.504 54.75 0.1629 4261.32 Table 21: Operational cost 3 Table 22: Operational cost 4
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 82 Total operatinal cost Operational costs 354437.19 €/year The operational costs are expressed by year, in this case the 354437.19 €/year is the amount spend in operations as it seen in Table 23. It is assumed then, that the contract between the private company and the municipality has been agreed for 5 years, so the total cost of maintenance at the end of the contract will be approximately 1772185.94€. This means that in the end of the contract the total spend by the municipality will be the sum of the capital and operational cost in these 5 years what gives a total of 6485725€. Considering all these costs the approximate amount spends every year by the municipality, again assuming a 5- year contract, should be around 1297145 € if the municipality was able to pay the total amount in the same fraction each year. 9.4. Pricing (fee) It has been stated along this document that the first objective of a BSS is not earning money as it is a public system. The key is finding the right balance. A scheme that is too cheap for users will cost the city significantly in maintenance. Conversely, prices that are too high will result in poor adoption and usage (Fifteen, 2021). What this company recommends is that the system is inclusive, as it is vital that the inhabitants adopt the scheme early, if the system is early regarded as too expensive it is not a good start because it is fundamental to have enough resource to ensure the fleet correct functioning and so on the satisfaction of the users. To achieve that, 2 methods will be available, a year subscription and a pay as you go subscription. According to the first statement in this section, the aim is that the system is inclusive, and if we want so, the yearly subscription should range between 40€ and 60€ and the pay as you go method, about 2€ every 45 minutes or between 0.10 € and 0.15€ per minute (Fifteen, 2021). For example, Barcelona model is 50 € nowadays, so in terms of proximity and being inside the mentioned range, the same pricing will be adopted. Also if the price in Mataró is higher than Table 23: Total operational costs
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 83 in the biggest city in Catalonia, this could lead to less people using it. In the following Table 24, the different methods that will be adopted are summarized. Pricing in Mataró BSS Year subscription Pay as you go 50€/year 2€/ hour According to Barcelona, nowadays there are around 40000 trips per day and the users rise to 148000. This gives us a ratio of 3.7 users/trips/day. This value for proximity and similarities in pricing used, will be adopted to estimate the number of users that the system could have in Mataró. Recalling that the estimated demand in Mataró is 2824 trips/day, if this ratio is multiplied by the demand, it gives that the number of users approximately will be around 10449. For this calculation it will be considered that all these users refer to the annual pass so then it is estimated that the revenue due to the annual subscription arise up to: 𝐹𝑒𝑒′𝑠𝑟𝑒𝑣𝑒𝑛𝑢𝑒 = 10449 ·50 =522450 If this is multiplied by the 5 years, the total revenue would be: 5 𝑦𝑒𝑎𝑟 𝑐𝑜𝑛𝑡𝑟𝑎𝑐𝑡 𝑟𝑒𝑣𝑒𝑛𝑢𝑒 = 522450 · 5 = 2612250 This means that the operations could be paid, and the possibility of daily unexpected risk could be managed also the future extra need for spare parts. Again, recalling the sentence that have been repeated, the system is in the right side, is obvious that as it is a public system there are no benefits for the municipality, but the inflow is enough to ensure the correct functioning and the most important the satisfaction of the users and the transition towards a greener and healthier mobility. Table 24: Pricing in Mataró
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 84 9.5 Possible case: City below the budget estimated. As it has been stated in Section 3, there are different ways in how the BSS can be dimensioned. In this case it has been decided to do it by first modelling the possible demand based on previous systems all over the world and then estimating the infrastructure needed according to the dimensioning performed. This approximation should be the best one in terms of efficiency and user satisfaction, but sometimes can lead to an overbudget according to the maximum that the city can spend. It is very difficult to estimate which could be the maximum budget that the city of Mataró can spend in a system of this characteristics, as nowadays European founds are available to subsidize this type of projects which facilitates the transition towards a greener mobility. So according to the facilities that are available when implementing a sustainable transportations system and the characteristics of Mataró being one of the biggest cities in Catalonia. The most probable situation is that the municipality can spend this amount of money in the BSS that has been now designed. Considering a situation where the assumptions made are not correct and the municipality can spend just the 50% of the cost per year that have been now planned, different scenarios are considered. Some people would say that it is as easy as just reducing the number of stations and the fleet in the same proportion as the budget reduction, but there are many different scenarios that can be considered instead. One possible direct solution is searching for external financing such as advertising companies, where the municipality loans the available spaces in the bikes and stations to places advertisement of the interested company. It is possible that the amount of money received in this situation is not enough to achieve the other 50 % of the budget but is still a valid option and can be combined with others that are going to be presented now.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 85 In the same path line as the solution that was first presented as a basic solution that some people could thing, it is possible to still use some part of the idea. What is proposed here is to extend the contract reducing in this case the total cost spend by year, but in some cases the capital cost would still increase the cost for the first year being higher than the others. To help this solution what can be done parallel to the contract extension is implementing the project by phases, so the first year just a percentage of the stations is implemented and year by year the other stations are constructed, obviously maintaining the same bike/station ratio so in the beginning there would be less bikes too. Also, we could thing on reducing the capital cost by using cheaper infrastructure, but most of the times this is not a good idea as the less quality of the products will be translated in higher maintenance cost in the future and the possibility of having to spend more money in new bikes as they brake before the others, leading into an over budget situation in the near future. With an overview on the different options that have been presented, one of the main options is working by phases and if it is possible extending the contract, also always having in mind the possibility of using the spaces for advertising. In the case that it is decided to implement the system by phases, it is fundamental to plan how this operation would proceed, and which are the stations that should be first constructed. Those should be placed with higher density in the districts that have been defined with higher priority in the previous sections and leaving the ones that are crucial points of interest such as universities, high schools, libraries, intercity buses and urban buses, train stations, commercial areas, squares, sports centers, and hospitals. The implementation process will be determined by the budget and so on can be finished earlier depending on the possibility of combining this solution with the others that have been mentioned.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 86 10. Sustainability Building a bike sharing system is not just an improvement in terms of mobility but also a step forward to the sustainability and the reduction of the city carbon footprint. Bike sharing systems appear in the right moment, nevertheless, is a small action, the sum of those makes a huge contribution to become the city of tomorrow, free of greenhouse gases. Each bike trip is probably someone that has changed its mobility from a car vehicle or public transport vehicle to a clean energy transportation system, at the same time eliminating one car from the streets and reducing the traffic problems. These benefits related with the reduction of greenhouse emissions and private vehicles generating traffic on street are not the only ones. The other goal of implementing a public bike sharing system in Mataró is to foment the physical activity of the inhabitants and so on create the habit of practicing some sport everyday just by moving by bike. Referring to the mentioned in the initial part of this document, all these has the same end, the increase in health as practicing sports reduce lots of diseases and the same thing happens with the reduction of greenhouse emissions. The goal of implementing this system related to a positive impact on the society and benefits over inhabitants’ health are clear, but it is also very important to consider what must be done with the residues coming from it. What should we do when a bike cannot be used? What should we do with some of parts that can still be used but are outdated? How can we recycle the batteries when their lifetime has come to an end? These are questions that one can think, and they must be solved also focusing on the sustainability as the goal of the system. It cannot happen that what people see is great, the system works perfectly but through the back door, the waste is not properly managed. 10.1 Waste management First of all as it has been mentioned in the decision of the infrastructure used, it is important to consider a balance between the price and the quality of the product, if our product is cheap, the capital cost are lower but it can happened that in less time they have to be changed, generating more waste, so a higher
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 87 environmental impact and also higher long term cost impact. Fifteen bikes and stations parts have been decided to be used ensuring an easy recyclable material and long term service life, trying to make this time as long as possible and when it is over managed in the correct way. That is what is known as circular economy, is a model of production and consumption which involves sharing, leasing, reusing, repairing, refurbishing, and recycling existing materials and products as long as possible (European Parliament, 2023). In this way, the life cycle of products is extended, with the goal of reducing our wastes. To achieve these correct waste management, it is commonly used the term 4 R’s (ILACSD, 2021) which accounts for reduce, reuse, recycle sometimes between reuse and recycle another term is added, repair. These terms must be really applied in the bike sharing system in Mataró. Reduce, referring to the first action that must be taken, not over producing, just use what it is need it and no more. Then reuse comes for example for the spare parts that have been substitute and a second life can be given to them. The repair, if that part can be repaired and it is safe for the user it is better to do so than substituting in term of waste generation, finally if nothing can be done with a part of the bike, the station, they must be recycled, that is why it is important what was mentioned before, that the products used in the system have to be easy recyclable and they are. If we consider the first action of reduce, the bike and the stations chosen are robust with a high service life, they have a higher cost than others in the market but this increment in quality helps in reducing, by changing more frequently the bike and so on generating more waste. As it was mentioned Fifteen bikes are made of aluminum which is 100% recyclable, there are other parts made of plastic and other materials, in general the 95% of the bike can be easily recyclable. In this part it is also important to consider not ordering to much substitution spare parts (just 10%) as the plan is trying to reuse as much as possible the part until they are not safe for the user. According to the action of reusing, as it has been said first it is important to repair the part before directly substituting, it is known that is easily and less time consuming, but it generates more waste and pollution, also higher costs. So, it has
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 88 to be stated in the operations of the system that always try to fix over substituting, As the bikes are electric one factor that has to be really taken into account are the batteries, as they have to be properly recycled and if possible reused in other activities as there are companies that do that, so this is what is going to be done with the batteries that cannot longer be used in the BSS in Mataró (Inurba Mobility, 2022). Once the previous actions have been tried but is not possible to apply them, the last option is to recycle the unusable parts, they should be donated to companies that fix them and mount other bikes for people with less resources or managed by a specific company that recycles the materials to produce new parts. 10.2 System operations As it has been stated, to reduce the greenhouse emissions, the operations are performed by using electrical vehicles, which are in terms of capital cost, more expensive but in long term there is huge reduction in oil consumption and greenhouse emission. As we are implementing a system for people to change their way of mobility it does not make sense if the operations are performed by using gas or other pollution vehicles. Also, the operations that do not require capacity of carrying bikes, are performed with motorbikes to consume less power and reduce the traffic in the city. In the rebalance, as it has been mentioned, a system that gives points to users to perform certain trips when those help the rebalance is planned to be implemented, reducing the number trips that are made by car in the city due to this operation. To conclude as it has been seen not only the mobility by implementing a bike sharing system reduces the greenhouse emissions, also the company that implement it, must consider the sustainability in their daily operations and in the future life of the products that are generated from it. 10.3 Greenhouse emission reduction Nowadays according to Mobility Plan of Mataró (Diputació de Barcelona, 2019) around 450000 trips per day are generated being Mataró the origin and destination or the origin or the destination. In this official document the number
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 95 is not charging, a bike that is broken and must be repeated, the low demand in some stations or overdemand. And based on these, faster measures can be considered. During this operational phase it will be also important to check the viability of the implementation, check if the costs are close to the estimation made, or if the externalities have increased them. It is necessary to keep in touch with all the project stakeholders and provide a good communication to ensure that all the parts of the system are well coordinated and work as a team, avoiding taking actions that are not planned or decided by the responsible. As it has been mentioned throughout this project, the BSS world is still a premature transportation system compared to conventional ones but is evolving fast and so on its technology along with it. So, in this case, it is important to be aware of the new market technology and evaluate incorporating it, if the costs permit so, and if these advances are crucial for the user experience and the improvement of the system as a whole. Continuous development is an important aspect to consider improving the safety, the sustainability, the better usage, the operations efficiency, … Based in the continuous monitoring of the demand and the operations (bikes that are repaired every day, rebalance,) it is important to future-plan, and take a step towards the expansion of the system in terms of everything that has been now said. In summary, it is crucial to accurately assess the efficiency to prevent problems and keep pace with the evolving technology. Therefore, continuous planning, monitoring and improvement should never cease.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 96 12.References Ajuntament de Mataro. (2018). Una pinzelada sobre Mataró. Retrieved 08 03, 2023, from Ajuntament de Mataro: https://www.mataro.cat/es/laciudad/sobre-mataro Ajuntament de Mataró. (2019). Ajuntament de Mataró. Retrieved 08 06, 2023, from Mobilitat i transport : https://www.mataro.cat/ca/temes/mobilitat- i-transports/transport-public Ajuntament de Mataró. (2022). Estudi de la Població. Retrieved 08 07, 2023, from Ajuntament de Mataró: https://www.mataro.cat/ca/laciutat/observatori-de-ciutat/demografia/estudi-de-la-poblacio-a- mataro-1-de-gener-de-2022/estudi-poblacio-de-mataro-1-de-gener-de- 2022.pdf Alam, R. (2020). Normalization vs Standardization Explained. Retrieved 10 03, 2023, from Towards data science : https://towardsdatascience.com/normalization-vs-standardization- explained-209e84d0f81e DeMaio, P. (2009). Bike-sharing: History, Impacts, Models of Provision and Future. Retrieved 08 07, 2023, from MetroBike : https://www.metrobike.net/wp-content/uploads/2013/10/Bikesharing-Models-of-Provision.pdf Diputació de Barcelona. (2019). Pla de mobilitat urbana sostenible de Mataró. Retrieved 09 05, 2023, from Mataró.cat: https://www.mataro.cat/ca/temes/urbanisme/imatges-i- documents/cap_4_5_memoria_pmus_mataro_demanda_volum_3_de _5_19oct2018.pdf European Cyclists' Federation. (2020). Bike Share Schemes. Retrieved 08 06, 2023, from European Cyclists' Federation: https://ecf.com/what-we- do/urban-mobility/bike-share-schemes-bss European Parliament. (2023). Circular economy: definition, importance and benefits . Retrieved 12 20, 2023, from European Parliament news: https://www.europarl.europa.eu/news/en/headlines/economy/2015120 1STO05603/circular-economy-definition-importance-and-benefits FAL Bulletin. (2013). Bikeways and intermodality between bycicles and public transport . Retrieved 08 10, 2023, from Comisión Económica para América Latina y el Caribe: https://repositorio.cepal.org/server/api/core/bitstreams/70de7b5d- 8531-469d-9d77-db1be967d266/content
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 97 Fifteen. (2021). How to choose a pricing structure for your bike-sharing project. Retrieved 1 22, 2024, from Fifteen: https://fifteen.eu/en/resources/blog/how-to-choose-a-pricing- structure-for-your-bike-sharing-project Hampshire, R. C. (2011). Analysis of Bike Sharing Usage: Explaining Trip Generation. Retrieved from Nacto: https://nacto.org/wpcontent/uploads/2012/02/An-Analysis-of-Bike-Sharing-Usage- Explaining-Trip-Generation-and-Attraction-from-Observed-Demand- Hampshire-et-al-12-2099.pdf IDESCAT. (2023). El municipio en cifras (Mataró). Retrieved 5 9, 2023, from Idescat: https://www.idescat.cat/emex/?id=081213&lang=es ILACSD. (2021). Waste Hierarchy: What are the 4 Rs? Retrieved 12 22, 2023, from Cleansd : https://cleansd.org/2021/02/26/waste-hierarchy-what- are-the-4-rs/ Intuit quickbooks. (2022). What is a capital cost? Retrieved 08 09, 2023, from Intuit quickbooks : https://quickbooks.intuit.com/global/glossary/capital-cost/ Inurba Mobility. (2022). Servicios de implantación, mantenimiento y getión del servivio de bicileta pública. ITDP. (2018). Guía de planeación del sistema de bicicletas compartidas. Retrieved 08 11, 2023, from ITDP : https://www.itdp.org/wpcontent/uploads/2021/05/BSPG_espanol20.01.pdf Kass, A. (2020). Bike Sharing Benefits and Disadvantages. Retrieved 08 10, 2023, from Kass and Mosses: https://kassandmoses.com/blog/bikesharing-benefits-and-disadvantages/ Midgley, P. (2011). Bicycle-sharing schemes: enhancing sustainable mobility in urban areas. Retrieved 08 07, 2023, from United Nations : https://www.un.org/esa/dsd/resources/res_pdfs/csd-19/Background- Paper8-P.Midgley-Bicycle.pdf Miñano, M. P. (2014). A complete methodology for designing and dimensioning bike-sharing. Retrieved 08 18, 2023, from Serttel Ltda : https://civitas.eu/sites/default/files/documents/session_2_easy_shared _cycling_mariano_perez_minano.pdf Miñano, M. P. (2016). Economic and Financial Study of the Contribution of Public . Retrieved 09 10, 2023, from European Cyclists' Federation: https://ecf.com/sites/ecf.com/files/68_29AM2-1-Mariano%20Perez.pdf Mobix. (2021). Micromobility, Urban Clutter & Industry Solutions . Retrieved 08 12, 2023, from MOBI: https://mobix.ai/2021/08/19/micromobilityurban-clutter-industry-solutions/
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 98 OBIS. (2011). Optimizing Bike Sharing in European cities, handbook. Retrieved 08 09, 2023, from OBIS : http://mobility-workspace.eu/wpcontent/uploads/OBIS_Handbook_EN.pdf Orsini, F. (2022). Local authorities: 2 steps to help you choose where your bike sharing stations should be located. Retrieved 08 19, 2023, from Fifteen : https://fifteen.eu/en/resources/blog/local-authorities-2-steps-to-help- you-choose-where-your-bike-sharing-stations-should-be-located PBSC Urban Solutions. (2021). The 3 Health Impacts of a Bike Share Systems for cities . Retrieved 08 12, 2023, from The 3 Health Impacts of a Bike Share Systems for cities PBSC: https://www.pbsc.com/blog/2021/08/the-3-health-impacts-of-a-bike- share-system-for-cities Sadegh, M. (2022). A GIS-MCDM Method for Ranking Potential Station Locations in the Expansion of Bike-Sharing Systems. Retrieved 10 21, 2023, from MDPI . Statistics How To. (2014). Standardized Values. Retrieved 10 03, 2023, from Statistics How To : https://www.statisticshowto.com/standardizedvalues-examples/ The Meddin Bike-sharing World Map. (2022). The Meddin Bike-sharing World Map Report (2022 edition). Retrieved 08 09, 2023, from The Meddin Bike-sharing World Map: https://bikesharingworldmap.com/reports/bswm_mid2022report.pdf
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 99 APPENDIX
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 100 A.1. Tables for demand prediction and system dimensioning 1 A.1.1 Tables for demand prediction Dependent variable for demand prediction CITY Demand (trip/day·km2) Barcelona 666.473 Paris 428.9962 Montreal 112.0797 Sevilla 182.9707 Milano 116.5005 Girona 174.4942 Valladolid 40.625 Madrid 93.95156 Coruña 117.6471 1 The data used for this analysis has been found in the different cities open data, in their respective bike sharing data, in CityTransitData, in weatherspark.com, google earth and Datosmacro.com. Data used for demand prediction (MLR) CITY Population density (inhab/km2) PIB per capita (€/year) Job density (job/km2) Bike lane density (km lane/km2) Public transport (stops/km2) Barcelona 16144 46000 9169.792 2.368032 28.56438 Paris 21423 65200 15853.02 6.666667 31.8 Montreal 4828.3 45967 2858.354 2.088065 20.57706 Sevilla 4875 20647 2885.513 1.315417 7.236003 Milano 7500 49500 4462.5 1.430143 18.70737 Girona 2624 40700 1464.192 0.707311 5.725971 Valladolid 1514 29490 757 0.916332 3.968422 Madrid 5418 41042 3050.334 0.330961 18.00662 Coruña 6452 31391 3073.733 1.321702 12.69841 Data discarded for the demand analysis CITY Slope(%) Precipitation (mm) Temperature (ºC) Barcelona 3.2 614 15.5 Paris 1.1 720 11.7 Montreal 1 1159 7.1 Sevilla 0.5 483 18.8 Milano 0.3 1162 13 Girona 2 963 14.7 Valladolid 0.9 490 12.5 Madrid 2 416 14.5 Coruña 0.9 1228 13.5 Table A.1: Data used for demand prediction. Table A.2: Dependent variable for demand prediction Table A.3: Data discarded for demand analysis.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 101 A.1.2 Tables for stations and bikes dimensioning Data used for stations dimensioning CITY Demand (trip/day) Nº Stations NºBikes Coverage area(km2) Barcelona 44653.69 514 7000 67 Paris 120547.9 1400 19000 281 Montreal 24657.53 865 10079 220 Sevilla 9331.507 260 2600 51 Milano 7572.534 325 6000 65 Girona 1395.953 26 300 8 Valladolid 1300 97 856 32 Madrid 9395.156 264 2964 100 Coruña 2000 50 500 17 Dependent variable for station dimensioning CITY Nº stations Barcelona 514 Paris 1400 Montreal 865 Sevilla 260 Milano 325 Girona 26 Valladolid 97 Madrid 264 Coruña 50 CITY Nº stations NºBikes Bike/Station ratio Station density (station/km2) Barcelona 514 7000 13.61867704 7.671641791 Paris 1400 19000 13.57142857 4.982206406 Montreal 865 10079 11.65202312 3.931818182 Sevilla 260 2600 10 5.098039216 Milano 325 6000 18.46153846 5 Girona 26 300 11.53846154 3.25 Valladolid 97 856 8.824742268 3.03125 Madrid 264 2964 11.22727273 2.64 Coruña 50 500 10 2.941176471 Table A.4: Data used for stations dimensioning. Table A.5: Dependent variable for station dimensioning Table A.6: Data used for bike fleet estimation.
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 102 A.1.3 Demand prediction code %%%DEMAND PREDICTION % Create a dataset with data for all cities (A, B, C, D, E) and MATARÓ cities = {'BCN', 'PA', 'MT', 'SV', 'ML','GN','VL','MD','AC'}; population_density = [16144,21423, 4828.3, 4875, 7500, 2624.38,1514.4,5418,6452]; % people/km2 pib= [46000,65200,45967.02,20647,49500, 40700, 29490, 41042, 31391]; %€ job_density= [9169.792, 15853.02, 2858.3536, 2885.5125, 4462.5, 1464.40404, 757.2, 3050.334, 3073.7328]; %hab/km2 bike_lane_density = [2.368031574,6.666666667,2.08806489,1.315417256,1.430143014, 0.707310838, 0.916331853, 0.330961443, 1.321702353]; % km bike lane/km2 public_transport_density = [28.56438086, 31.8, 20.57705678, 7.236002835, 18.70737074, 5.72597137, 3.968421795, 18.00662252, 12.6984127]; % stops/km2 bike_sharing_demand = [666.4729503, 428.9962463, 112.0797011, 182.9707225, 116.5005269, 174.4941781, 40.625, 93.95156164, 117.6470588]; % trips/km2*day for MATARÓ (to be predicted) % Create a table to store the data T = table(cities', population_density', pib', job_density', bike_lane_density', public_transport_density', bike_sharing_demand', ... 'VariableNames', {'City', 'PopulationDensity', 'pib', 'JobDensity', 'BikeLaneDensity', 'PublicTransportDensity', 'BikeSharingDemand'}); % Display the table disp(T); % Train a linear regression model X = T{1:end-1, { 'PopulationDensity', 'pib','JobDensity', 'BikeLaneDensity', 'PublicTransportDensity'}}; y = T{1:end-1, 'BikeSharingDemand'}; %linear model for multiple linear regresion lm= fitlm(X, y); %The coefficient are the folllowing: coeff = lm.Coefficients.Estimate; disp(coeff); intercept = coeff(1); disp(intercept) r_squared = lm.Rsquared.Ordinary; disp(r_squared) % Predict bike sharing demand for MATARÓ mataro_features = [5725, 28145.02, 2748.3792, 0.69,9.675]; mataro_prediction = predict(lm, mataro_features); % Display the prediction for MATARÓ disp(['Predicted Bike Sharing Demand for MATARÓ: ', num2str(mataro_prediction)]);
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 103 A.1.4 Code to estimate number of stations %PREDICT Nº OF STATIONS % Create a dataset with data for all cities (A, B, C, D, E) and MATARÓ cities = {'BCN', 'PA', 'MT', 'SV', 'ML','GN','VL','MD','AC'}; area=[67, 281,220, 51, 65, 8, 32, 100, 17];%km2 population_density = [16144,21423, 4828.3, 4875, 7500, 2624.38,1514.4,5418,6452]; % people/km2 bike_sharing_demand = [44653.68767, 120547.9452, 24657.53425, 9331.506849, 7572.534247, 1395.953425, 1300, 9395.156164, 2000]; % trips x day for MATARÓ (to be predicted) n_stations=[514,1400, 865, 260, 325, 26, 97, 264,50]; % Create a table to store the data T = table(cities', area', population_density', bike_sharing_demand',n_stations', ... 'VariableNames', {'City','Area', 'PopulationDensity', 'BikeSharingDemand','NStations'}); % Display the table disp(T); % Train a linear regression model X = T{1:end-1, { 'Area', 'PopulationDensity', 'BikeSharingDemand'}}; y = T{1:end-1, 'NStations'}; lm= fitlm(X, y); %The coefficient are the folllowing: coeff = lm.Coefficients.Estimate; disp(coeff); intercept = coeff(1); disp(intercept) r_squared = lm.Rsquared.Ordinary; disp(r_squared) % Predict bike sharing demand for MATARÓ mataro_features = [9.3, 5725, 2824]; mataro_prediction = predict(lm, mataro_features); % Display the prediction for MATARÓ disp(['Predicted Nº of stations for MATARÓ: ', num2str(mataro_prediction)]);
Miquel Roger De La Torre Public Bicycle Sharing System implementation in Mataró 104 A.2 Tables for stations and bikes dimensioning A.2.1 9 factors for each district 2 9 factors for priority zone definition District Name Population density (inhab/km2) Bike lane density (km lanes/km2) Mean Slope (º) Bus stop density (stops/km2) Bussiness Densty (Buss./km2) Industrial areas density (inds./km2) Number of Highschools Job (%) RENFE Eixample 17548.77 2440.36 -2.5213 32.26075 434.9825 26.884 0 54.5 1 Els Molins 15374.37 340.14 -6.1442 55.19947 249.711 0 3 47.72 0 Palau- Escorxador 1376.702 5082.55 -3.9597 29.65599 367.734 0 0 44.73 0 Rocafonda 46359.18 5489.90 - 4.23622 64.69663 558.008 0 0 40.12 0 Centre 16555.28 0 - 3.53374 20.5358 862.503 0 1 55 0 Peramas 36952.92 4152.40 - 3.33709 42.86329 661.999 0 0 44.14 0 Cerdanyola 21658.42 650.801 -6.9921 27.67673 249.090 0 2 42.52 0 La Llàntia 18326.5 353.233 - 9.44038 59.6805 142.315 0 0 52.25 0 Cirera 8471.604 1770.56 - 6.82776 23.29129 94.7714 0 0 58 0 Pla d'en Boet 2893.567 3762.20 - 2.27741 4.013269 335.108 252.836 1 43.8 0 Vista Alegre 809.2366 20.0695 -6.9796 11.64725 138.103 178.036 1 53.6 0 Mean 16938.78 2187.47 -5.113 33.7746 372.211 41.614 0.7272 48.761 0.0909 Minimum 809.2366 0 -9.440 4.0132 94.7714 0 0 40.12 0 Maximum 46359.18 5489.89 -2.2774 64.696 862.503 252.835 3 58 1 Standard deviation 14368.7 2109.19 2.285 19.712 240.627 87.918 6.080 0.3015 Variance 2.06E+08 444871 5.224 388.587 57901.7 7729.661 0 36.972 0.0909 A.2.2 Homogenization of the data using normalization Results obtained after normalization District Name Pop density Bike lane Mean slope Bus density Business Industrial higschool Job RENFE UNI Eixample 0.3675 0.44452 0.96595 0.46549 0.44314 0.10633 0 0.80425 1 0 Els Molins 0.31976 0.06196 0.46017 0.8435 0.20182 0 1 0.42506 0 0 El Palau- Escorxador 0.01246 0.9258 0.76514 0.42257 0.35554 0 0 0.25783 0 0 Rocafonda 1 1 0.72654 1 0.60338 0 0 0 0 0 Centre 0.34569 0 0.82461 0.27227 1 0 0.33333 0.83221 0 0 Peramas 0.7935 0.75637 0.85206 0.64021 0.73884 0 0 0.22483 0 0 Cerdanyola 0.45772 0.11855 0.3418 0.38995 0.20101 0 0.66667 0.13423 0 0 La Llàntia 0.38457 0.06434 0 0.91734 0.06193 0 0 0.67841 0 0 Cirera 0.16822 0.32251 0.36474 0.31768 0 0 0 1 0 0 Pla d'en Boet 0.04576 0.6853 1 0 0.31305 1 0.33333 0.20582 0 1 Vista Alegre 0 0.00366 0.34354 0.1258 0.05644 0.70416 0.33333 0.75391 0 0 2 The data used has been found in: Portal OpenData Ajuntament de Mataró, estudi de la población 2022, Polígons industrials i d’activitat económica de Matarò and treated using QGIS Software in some cases. Table A.7: 9 factors used for priority zone definition. Table A.8: Homogenization of the data, using normalization.