1 Ad-hoc heuristic for design of wind-photovoltaic electrification systems, including management constraints Alberto GARCÍA-VILLORIA*, Bruno DOMENECH, Laia FERRER-MARTÍ, Marc JUANPERA, Rafael PASTOR Research group on Supply Chain and Operations Research Management (SCOM) Universitat Politècnica de Catalunya – BarcelonaTech (UPC) Abstract. Isolated electrification systems based on renewable energy are a suitable option for providing many rural communities in developing countries with access to electricity. In particular, the design of wind-photovoltaic systems that combine stand-alone and micro-grid systems has proved an efficient but challenging optimization problem. Decision support tools and solution procedures have been proposed in the literature, most of them focused on techno-economic aspects. However, social aspects related to the management of the systems are a key issue for users’ satisfaction and project sustainability. Only one procedure based on mixed integer linear programming takes the management aspects into account, but excessive computing time may be required or no solutions may be found for non-small communities. Thus, a fast procedure is proposed. The validation is carried out by solving 640 instances, randomly generated from real project characteristics. Our procedure always finds a feasible solution in less than 7 seconds on average; and even for instances with hundreds of possible locations for equipment, the solutions are found in less than one minute. Moreover, it finds cheaper solutions than those in the literature. Thus, the procedure represents a very efficient process for optimizing the design of electrification projects considering the technical and management constraints. Keywords: operations research in energy; rural electrification; micro-grids; optimization; heuristic procedure 1. Introduction Electricity access is a challenge for many people in developing countries (IEA, 2017). Electrification based on renewable energy is an efficient option for rural areas (López-González et al., 2018), as it may be cheaper than grid extension and can provide high supply quality while avoiding external dependencies (Domenech et al., 2014). Indeed, the connection between renewable energy and the Sustainable Development Goals has been emphasized in the literature (Kuriqi et al., 2019a). When addressing the design of such projects, two problems are distinguished (Gamarra & Guerrero, 2015): the sizing and siting of equipment. The sizing problem involves defining the type and size of generators and the storage capacity to meet demand according to the energy resources. Micro-hydro is a well-known, cheap and high supply quality technology (Bejarano et al., 2019). However, its implementation is linked to the presence of a waterfall and can cause negative environmental impacts, especially for medium and large projects (Ali et al., 2019a). In contrast, wind and photovoltaic (PV) technologies, using a battery backup, are increasingly being used given the complementarity of energy sources (Khare et al., 2016). The siting problem focuses on the location of generation and storage equipment according to the variability of energy resources and the distribution of demand. Stand-alone systems are a very widespread and technically simple option, while micro-grids can improve supply quality and reduce costs in concentrated demand areas (Mandelli et al., 2016). Indeed, the combination of stand-alone and micro-grid systems may be advantageous, but the design becomes much more complex (Ferrer-Martí et al., 2013). Thus, both the sizing and siting are complex combinatorial optimization problems to be tackled, and project developers may require decision aid tools to obtain better designed solutions (Domenech et al., 2018). * Corresponding author: Alberto García-Villoria, Institute of Industrial and Control Engineering (IOC-UPC), Av. Diagonal 647 (Building ETSEIB), 11th floor, 08028 Barcelona, Spain; tel.: +34 93 40107024; e-mail: [email protected]
2 Regarding the sizing problem, Erdinc & Uzunoglu (2012) review approaches used to optimally size minimum cost hybrid systems according to load requirements. In contrast, Rojas-Zerpa & Yusta (2015) focus on multicriteria techniques to select from predefined electrification solutions. In any case, the sizing of technologies must be carried out cautiously, to avoid where possible any negative impacts on local ecosystems (Kuriqi et al., 2019b). Some of the most used sizing methods are based on software interfaces to be used in different contexts (Sinha & Chandel, 2014). For instance, HOMER is a well-known software that evaluates different combinations of technologies for electricity generation and storage in terms of lifecycle costs, considering the energy resources and the demand profile (Bahramara et al., 2016). iHOGA also includes the unmet demand and the emissions of greenhouse gases (Dufo-López et al., 2011). From a different perspective, instead of designing energy systems HYBRID2 provides information about their performance, which can be useful in testing several configurations for different demand profiles (Manwell et al., 2006). Ad-hoc models have also been developed according to the requirements of each case study. For instance, Moretti et al. (2019) develop a mixed integer linear programming (MILP) model to design cost-competitive microgrids in sub-Saharan Africa. Ali et al. (2019b) examine the impact of seasonality on the production of some renewable technologies. Concerning multicriteria tools, Jamal et al. (2020) propose an Analytical Hierarchy Process-based tool to prioritize criteria and electrification alternatives for off-grid projects. In terms of the siting problem, usually the distribution of electricity is directly defined as stand-alone systems for dispersed demand or a micro-grid for consumption points close to each other. Most works conceive the siting problem as determining, through mathematical models, the best location for a single system according to the load profile and energy resources (Cai et al., 2020). In contrast, the balance between micro-grid systems (to improve supply quality and generation costs) and stand-alone systems (to avoid high line extension costs) is, despite its benefits, a less studied problem (Domenech et al., 2018). Exceptionally, ViPOR enables the design of a limited number of micro-grids, considering resource spatial variations for micro-grid generation, together with stand-alone systems for scattered points (Lambert & Hittle, 2000). A comprehensive method simultaneously addressing the sizing and siting problems can be obtained by combining HOMER and ViPOR, both developed by the NREL, although their integration is not straightforward. As observed, several optimization techniques have been developed to address the sizing and sitting problems, although separately (Kola, 2018); but little research has addressed both problems simultaneously. Ferrer-Martí et al. (2013) propose a mixed integer linear programming (MILP) model to optimize the design of wind-PV projects, combining micro-grids and stand-alone systems. Heuristics can accelerate (or make viable) the solution of large instances, while achieving results fairly close to optimal values (Gendreau & Potvin, 2005). Triadó-Aymerich et al. (2016) work on the same problem, developing MILP-based heuristics inspired by Relax & Fix, Corridor Method and ad-hoc techniques. Ranaboldo et al. (2014) include the possibility of generating not only at consumption points, but also at locations with significant energy potential, such as mountain peaks. The problem is solved through an ad hoc heuristic which achieves good results in a short computation time. Then, Ranaboldo et al. (2015) propose a meta-heuristic improving the results of the previous paper. Most reviewed works focus on the techno-economic perspective (Kumar et al., 2019). In contrast, social issues have been less considered, despite being a key point for project sustainability (Baldwin et al., 2015). In particular, the management model, i.e. the way that users are organized around the electrification systems, is fundamental for users’ satisfaction and commitment (Peters et al., 2019). In this regard, Domenech et al. (2015b) identify constraints that facilitate the management model (from now on called management constraints) and include them in the design of rural electrification projects. In particular, the benefits of micro-grids as opposed to stand-alone systems are reported (flexibility in consumption, equity between users, etc.) as well as possible limitations to be aware of (coordination between users with conflicting interests, etc.). Hence, Domenech et al. (2015b) aim to extend micro-grids but ensuring the easy management of the system. To do so, a methodology is developed, which allows the sizing and siting problems to be solved, including the technical and management constraints, while considering consumption points as possible locations for generators. The design of the electrification system is addressed in an interactive decision framework, minimizing project costs while combining wind-PV technologies, battery storage as well as micro-grids and stand-alone systems. Initially, the data from the target community is compiled, including demand requirements, user locations, energy resources and equipment available. This information is used in the design, progressively analyzing three levels of the problem: the demand supplied, the electricity distribution and the equipment used. Each level is studied in two steps: first, different options are generated with a mathematical model (Domenech et al. 2015b); then the best is
3 selected by means of a multicriteria process based on compromise programming (Domenech et al. 2019). The methodology is conceived for iterative use; hence many design options are tested at each level to adapt the final result to the requirements of each case study. However, solving the mathematical model for medium and large instances is challenging in terms of computation time, which is an enormous handicap because of the interactive nature of the methodology. It must be emphasized that finding the best solution under the above two-step (optimization-multicriteria) approach implies calculating non-dominated solutions from different input data and constraints. This whole process may become hard to use in real projects if the design of each solution is time consuming. In this regard, project promoters in developing countries usually have limited resources, which favors the use of easy and fast tools such as heuristic algorithms to support decision-making (Garfí et al., 2011). However, no heuristic has yet been developed to design electrification projects that combine stand-alone and micro-grid systems, considering technical and management constraints. In this context, the purpose of this paper is to develop a design process for wind-PV electrification projects for rural communities, considering points far from demand as possible locations for generators while combining stand-alone and micro-grid systems. Regarding the specific state-of-the-art of the problem, the main contributions of this paper are: The design process is based on a heuristic procedure able to optimize the design in a very short computing time, even for large instances. The procedure considers common techno-economic issues, and also includes management constraints to ease the long-term sustainability of the projects. The procedure includes the possibility of generating at both non-consumption and consumption points. The procedure always obtains a feasible solution and its solutions are cheaper than those in the literature. As a result, the location and size of the equipment to be installed are obtained, including the micro-grid structure and stand-alone systems. This novel solution procedure consists of two heuristics starting from opposite and extreme solutions. The first heuristic starts from a single micro-grid for all points. The second is a more complex heuristic that constructs a solution starting with all points as stand-alone systems. Later, an improvement algorithm is applied to both solutions. An extensive computational experiment, based on real case studies, is carried out to validate and test the solution procedure. The results show that the proposed procedure obtains a feasible solution for all instances, whereas the existing mathematical model does not (Domenech et al. 2015b), thus validating its effectiveness. Moreover, all the test instances are solved in just a few seconds, so the process is significantly accelerated, and cheaper solutions are obtained than with the MILP model. In conclusion, the proposed procedure is proved to be very fast and obtains even better solutions than exact procedures (when the computing time is limited), so it represents a very efficient optimizing method of designing electrification projects that allows technical and management constraints to be considered. The remainder of the paper is organized as follows. In Section 2, the studied problem is described in detail. In Section 3, the solution procedure is developed and the pseudo-code formulation is presented. In Section 4, the performance of the procedure is analyzed through two computational experiments: comparing the results to those obtained with the existing mathematical model and examining the influence of non-consumption points. Finally, the main conclusions are summarized in Section 5. 2. Definition of the problem In this section the electrification problem to be solved is explained and its formulation is presented. 2.1. Problem description This paper aims to develop a fast and efficient solution procedure to design minimum cost wind-PV electrification projects combining stand-alone and micro-grid systems, while considering the technical and management constraints. In addition, points far from demand with high energy potential (from now on nonconsumption points) are considered as possible locations for generators (together with consumption points).
4 The elements included in these projects are: generators, controllers, batteries, inverters, meters and low voltage (LV) lines (Figure 1). Generators, either wind turbines or PV panels, produce electricity in alternating current (AC) or direct current (DC). The wind and solar controllers ensure the appropriate charge and discharge of batteries, working in DC. Batteries store electricity during high production and low demand periods, in order to supply it in the opposite situation. Inverters transform DC into AC, better suited for most electrical appliances. Electricity is distributed to consumption points (houses, schools, etc.), either as a stand-alone system or as a radial micro-grid (Mandelli et al., 2016), in which case LV lines are used. Finally, meters measure the electricity consumption of micro-grid users. Figure 1. Scheme of elements of a wind-PV electrification system (Domenech et al., 2015a) Complementarily, Domenech et al. (2015b) identified some management constraints to be addressed when designing electrification projects, to facilitate users’ organization around electrification systems. In this regard, benefits are reported from micro-grid systems when compared to stand-alone systems: users’ consumption is not limited by the resources available at their location and higher flexibility in consumption and equity between users is favored as the micro-grid grows and includes more users. However, micro-grids require coordination between users who might have conflicting interests. So, management constraints aim to promote the use of micro-grids, avoiding excessively small micro-grids, to ensure the easy management of the system. 2.2. Problem formulation Next, the input data, constraints and solution of the problem are explained. Note that the management constraints are explained in detail as they are the main contribution to be included in the procedure developed in Section 3. Input data o Communities. Consumption points (location, energy and power demands) and non-consumption points (possible locations for additional generators). o Electric generation. Wind turbines and PV panels (energy at each point, cost and nominal power), wind controllers (internally included) and solar controllers (cost and nominal power). o Electric equipment. Days of autonomy required, batteries (cost, capacity, efficiency and depth of discharge), inverters (cost, nominal power and efficiency) and meters (cost). o Electric distribution. Grid (nominal voltage and maximum voltage drop) and lines (cost, resistance, maximum intensity and efficiency). Technical constraints o Electric generation and storage. Energy and power are balanced at each consumption point to satisfy demand, either through generators and inverters as a stand-alone system or through input lines from a micro-grid system. System autonomy considers the battery characteristics and energy demand. Power of solar controllers according to PV panels. Note that in rural areas of developing countries aiming to
5 access electricity for the first time, the main concern is to implement an adequate system from tight techno-economic resources; supply quality remains a lower priority. Consequently, a daily solution is commonly considered when examining the balance between generation and demand (Odou et al., 2020). o Electric distribution. Energy and power flow through lines. Radial structure of micro-grids (at most, one input line). Electrical requirements of LV lines between connected points. Management constraints o Maximum number of micro-grids. Micro-grids entail the management and coordination of users, so this constraint seeks to avoid implementing too many micro-grids. Managing such a solution could be a dramatic challenge, particularly when differences appear in the performance of each micro-grid; these could cause disagreements between users and, consequently, social conflicts. o Minimum number of users per micro-grid. Micro-grids require efforts in coordinating people for the proper usage of electricity and the organization of operation and maintenance activities, so this constraint aims to avoid small micro-grids where the number of beneficiaries does not compensate the management efforts invested. o Maximum number of stand-alone systems. Micro-grids have significant advantages over stand-alone systems, so this constraint aims to extend micro-grids. As the cost is minimized in the objective function, the farthest consumption points from satisfying the constraint may remain as individuals, since the cost of extending a micro-grid to them will, logically, be higher. Solution o Minimum investment cost of all the equipment to be installed. o Number, size and location of equipment to be installed. o Structure of stand-alone and micro-grid systems to be implemented. o Electrical characteristics such as energy and power flows, voltage at each point. 3. Solution procedure Next, a fast and efficient solution procedure (from now on F-PROC) is proposed, including the technical and management constraints described in Section 2. From this point, a solution to the problem is defined as a set of systems, which can be stand-alone (1 user) or micro-grid (2 or more users) systems. Figure 2 shows a community with 12 users and a possible solution with 5 systems: 3 stand-alone (SA1, SA2 and SA3) and 2 micro-grids (M1 and M2). The generation point of a system can be a consumption point (SA1, SA2 and M1) or a non-consumption point (SA3 and M2). Figure 2. Example of a solution with 5 systems: 3 stand-alone and 2 micro-grids
6 Figure 3 illustrates F-PROC. The solution procedure consists of two heuristic processes that generate two solutions (Solution I and II), starting from different bases: a single micro-grid for all consumption points, which is improved by removing connections; or a purely stand-alone systems solution, which is improved by creating and expanding micro-grids until the management constraints have been satisfied. Then, the best (cheapest) solution is returned. In the case of Solution I, an initial solution consisting of a single micro-grid with all consumption points (constructive stage) is calculated. This solution will always satisfy the management constraints, so only the technical constraints have to be explicitly considered in the design process. Then, a cheaper solution is sought (improvement stage), not allowing the loss of feasibility. On the other hand, the calculation of Solution II consists of 3 stages. The first stage (constructive stage) initially assumes that all users are stand-alone systems and merges them iteratively into micro-grids. Throughout this stage, only technical constraints are considered and management constraints may be not satisfied. Then, a second stage (repair stage) is applied in which the previous solution is iteratively modified in order to match the management constraints. In the last stage, the solution is improved (improvement stage, the same as in Solution I). Finally, F-PROC returns the cheapest of the two solutions obtained. Figure 3. Flowchart of the proposed procedure F-PROC The terminology used to define F-PROC is shown in Section 3.1. The stages to calculate Solutions I and II are explained in Sections 3.2 and 3.3, respectively. Finally, given its complexity (see Section 3.1 for a short description), function 𝑆𝐺𝑅(𝑝,𝑃) is detailed in Section 3.4. Start Solution II: Constructive stage An initial solution is generated starting with all users as stand-alone systems (only technical constraints are satisfied) Cost of Solution I ≤ cost of Solution II? Stop Return Solution I True False Solution II: Repair stage The initial solution is modified so the management constraints are also satisfied Solution II: Improvement stage The repaired solution is improved (in terms of cost) while keeping its feasibility Return Solution II Solution I: Constructive stage An initial solution is generated, consisting of one micro-grid that includes all users (both technical and management constraints are satisfied) Solution I: Improvement stage The initial solution is improved (in terms of cost) while keeping its feasibility
7 3.1. Terminology Next the terminology (data, variables and functions) needed to explain the heuristic are listed and defined alphabetically: Data 𝐴𝑃 Set of all points, at which generators can be placed: 𝐴𝑃 =𝐶𝑃∪𝑁𝐶𝑃. 𝐶𝑃 Set of consumption points (users). 𝐸𝐷𝑝 Energy demand [Wh/day] at point 𝑝∈𝐶𝑃. 𝐿𝑝𝑞 Distance [m] between points 𝑝 and 𝑞 (𝑝∈𝐴𝑃; 𝑞 ∈ 𝐴𝑃). 𝑁𝐶𝑃 Set of non-consumption points at which generators can be placed. 𝑁𝑆𝐴𝑆𝑚𝑎𝑥 Maximum number of stand-alone systems. 𝑁𝑀𝐺𝑚𝑎𝑥 Maximum number of micro-grids. 𝑁𝑈𝑀𝑚𝑖𝑛 Minimum number of consumption points (users) per micro-grid. Variables and functions 𝐶𝑂𝑁(𝑠𝑦𝑠): Set of connections (pair of points connected by a line) of system 𝑠𝑦𝑠. 𝐶𝑃𝑆(𝑠𝑦𝑠): Set of consumption points of system 𝑠𝑦𝑠. 𝐺𝐸𝑁(𝑠𝑦𝑠): Generation point of system 𝑠𝑦𝑠. 𝐺𝐺𝑆(𝑝): Grid generation score (GGS) of point 𝑝∈𝐴𝑃. GGS estimates a priori the goodness of 𝑝 as a micro-grid generation point, considering the surrounding demand and resources (see Ranaboldo et al. 2013 for more details). 𝐼𝐺𝐶(𝑠𝑜𝑙): Function that returns a solution in which the generation point of each system is shifted to the best (lowest cost) point. Its algorithm is shown in Figure 4: 1. 𝑁𝐶𝑃′=𝑁𝐶𝑃\⋃{𝐺𝐸𝑁(𝑠𝑦𝑠)} 𝑠𝑦𝑠∈𝑠𝑜𝑙 2. 𝑆′=𝑠𝑜𝑙 3. 𝑏𝑒𝑠𝑡_𝑠𝑜𝑙 = 𝑠𝑜𝑙 4. While 𝑆′≠∅ do: 5. 𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑦𝑠 =𝑎𝑟𝑔𝑚𝑎𝑥𝑠𝑦𝑠∈𝑆′(𝐾𝑆(𝑠𝑦𝑠) ∑𝐸𝐷𝑝𝑝∈𝐶𝑃𝑆(𝑠𝑦𝑠) ); 𝑆′=𝑆′\{𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑦𝑠} 6. 𝑔=𝑎𝑟𝑔𝑚𝑖𝑛𝑝∈𝑁𝐶𝑃′∪𝐶𝑃𝑆(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑦𝑠)𝐾𝑆(𝑆𝐺𝑅(𝑝,𝐶𝑃𝑆(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑦𝑠))) 7. 𝑛𝑒𝑤_𝑠𝑦𝑠 =𝑆𝐺𝑅(𝑔,𝐶𝑃𝑆(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑦𝑠)) 8. If 𝐾𝑆(𝑛𝑒𝑤_𝑠𝑦𝑠)<𝐾𝑆(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑦𝑠) then 9. 𝑏𝑒𝑠𝑡_𝑠𝑜𝑙 =(𝑏𝑒𝑠𝑡_𝑠𝑜𝑙\{𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑦𝑠})∪{𝑛𝑒𝑤_𝑠𝑦𝑠}; 𝑁𝐶𝑃′=𝑁𝐶𝑃′\{𝑔} 10. If 𝐺𝐸𝑁(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑦𝑠)∈𝑁𝐶𝑃 then 𝑁𝐶𝑃′=𝑁𝐶𝑃′∪{𝐺𝐸𝑁(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑦𝑠)} End if 11. End if 12. End for 13. Return 𝑏𝑒𝑠𝑡_𝑠𝑜𝑙 Figure 4. Algorithm of function 𝐼𝐺𝐶(𝑠𝑜𝑙) 𝐾𝑆(𝑠𝑦𝑠): Cost [US$] of system 𝑠𝑦𝑠. 𝐿𝑆(𝑠𝑦𝑠1,𝑠𝑦𝑠2): Lowest distance [m] between systems 𝑠𝑦𝑠1 and 𝑠𝑦𝑠2: 𝐿𝑆(𝑠𝑦𝑠1,𝑠𝑦𝑠2)=𝑚𝑖𝑛𝑝∈𝐶𝑃𝑆(𝑠𝑦𝑠1)∪{𝐺𝐸𝑁(𝑠𝑦𝑠1)}, 𝑞∈𝐶𝑃𝑆(𝑠𝑦𝑠2)∪{𝐺𝐸𝑁(𝑠𝑦𝑠2)}(𝐿𝑝𝑞). 𝑀𝐺(𝑠𝑜𝑙): Set of micro-grids of solution 𝑠𝑜𝑙. 𝑃𝐴𝑅𝑇(𝑠𝑦𝑠,𝑐): Function that returns a partition of set 𝐶𝑃𝑆(𝑠𝑦𝑠) into two subsets (𝑃1,𝑃2), where 𝑃1 is the subset that includes 𝐺𝐸𝑁(𝑠𝑦𝑠) if 𝐺𝐸𝑁(𝑠𝑦𝑠)∈𝐶𝑃. The partition is obtained by removing connection 𝑐.
8 𝑆𝐺𝑅(𝑝,𝑃): Function that returns a system composed of point 𝑝∈𝐴𝑃 and the consumption points of set 𝑝⊆𝐶𝑃. The returned system generates at point 𝑝. If the technical constraints cannot be satisfied with the available equipment, then a void system is returned with an infinite cost. This function is explained in detail in Section 3.4. 𝑆𝑃𝐿𝐼𝑇(𝑠𝑦𝑠,𝑐): Function that returns a pair of systems by removing connection 𝑐 in system 𝑠𝑦𝑠. Its algorithm is shown in Figure 5: 1. (𝑃1,𝑃2)=𝑃𝐴𝑅𝑇(𝑠𝑦𝑠,𝑐) 2. 𝑠𝑦𝑠1=𝑆𝐺𝑅(𝐺𝐸𝑁(𝑠𝑦𝑠),𝑃1) 3. 𝑔=𝑎𝑟𝑔𝑚𝑖𝑛𝑝∈𝑃2𝐾𝑆(𝑆𝐺𝑅(𝑝,𝑃2)) 4. 𝑠𝑦𝑠2=𝑆𝐺𝑅(𝑔,𝑃2) 5. Return (𝑠𝑦𝑠1,𝑠𝑦𝑠2) Figure 5. Algorithm of function 𝑆𝑃𝐿𝐼𝑇(𝑠𝑦𝑠,𝑐) 𝑆𝐴𝑆(𝑠𝑜𝑙): Set of stand-alone systems of solution 𝑠𝑜𝑙. Note that 𝑠𝑜𝑙 =𝑆𝐴𝑆(𝑠𝑜𝑙)∪𝑀𝐺(𝑠𝑜𝑙). 𝑈𝑆(𝑠𝑦𝑠1,𝑠𝑦𝑠2): Function that returns a system with the consumption points of 𝑠𝑦𝑠1 and 𝑠𝑦𝑠2. The generation point is the best one among those from 𝑠𝑦𝑠1 and 𝑠𝑦𝑠2. Its algorithm is shown in Figure 6: 1. 𝑠𝑦𝑠_𝑎=𝑆𝐺𝑅(𝐺𝐸𝑁(𝑠𝑦𝑠1),𝐶𝑃𝑆(𝑠𝑦𝑠1)∪𝐶𝑃𝑆(𝑠𝑦𝑠2)) 2. 𝑠𝑦𝑠_𝑏=𝑆𝐺𝑅(𝐺𝐸𝑁(𝑠𝑦𝑠2),𝐶𝑃𝑆(𝑠𝑦𝑠1)∪𝐶𝑃𝑆(𝑠𝑦𝑠2)) 3. If 𝐾𝑆(𝑠𝑦𝑠_𝑎)≤𝐾𝑆(𝑠𝑦𝑠_𝑏) then (𝑠𝑦𝑠_𝑢)=𝑠𝑦𝑠_𝑎 else 𝑠𝑦𝑠_𝑢 =𝑠𝑦𝑠_𝑏 End if 4. Return 𝑠𝑦𝑠_𝑢 Figure 6. Algorithm of function 𝑈𝑆(𝑠𝑦𝑠1,𝑠𝑦𝑠2) 3.2. Calculation of Solution I Solution I is obtained in two stages: first an initial solution supplying all users through a single micro-grid is constructed, then it is improved. 3.2.1. Constructive stage The solution calculated through the constructive stage consists of a micro-grid including all consumption points. Its generation point is selected from all the consumption and non-consumption points, so as to reduce the overall cost of the solution. This solution has the advantage of always being feasible, but it may be expensive. Therefore, the cost is reduced in the improvement stage (Section 3.2.2). Figure 7 formalizes the algorithm of the constructive stage. 1. 𝑏𝑒𝑠𝑡_𝑐𝑜𝑠𝑡 =∞ 2. For 𝑝∈𝐴𝑃 do: 3. 𝑠𝑦𝑠=𝑆𝐺𝑅(𝑝,𝐶𝑃\{𝑝}) 4. If 𝐾𝑆(𝑠𝑦𝑠)<𝑏𝑒𝑠𝑡_𝑐𝑜𝑠𝑡 then 𝑏𝑒𝑠𝑡_𝑠𝑦𝑠=𝑠𝑦𝑠; 𝑏𝑒𝑠𝑡_𝑐𝑜𝑠𝑡=𝐾𝑆(𝑠𝑦𝑠) End if 5. End for 6. Return {𝑏𝑒𝑠𝑡_𝑠𝑦𝑠} Figure 7. Algorithm of the constructive stage of Solution I
9 3.2.2. Improvement stage The solution is improved monotonically in the improvement stage (in terms of cost), without any loss of (technical and management) feasibility, by applying four different strategies: 1) divide micro-grids into two smaller systems by eliminating one connection (function 𝑑𝑖𝑣𝑖𝑑𝑒𝑀𝑖𝑐𝑟𝑜𝑔𝑟𝑖𝑑𝑠); 2) eliminate micro-grids and leave their points as stand-alone systems (function 𝑒𝑙𝑖𝑚𝑖𝑛𝑎𝑡𝑒𝑀𝑖𝑐𝑟𝑜𝑔𝑟𝑖𝑑𝑠); 3) merge micro-grids with other systems (function 𝑚𝑒𝑟𝑔𝑒𝑆𝑦𝑠𝑡𝑒𝑚𝑠); 4) move generation points to better locations (function 𝐼𝐺𝐶, explained in Section 3.1). For instance, a better solution can be achieved when dividing a micro-grid into two smaller ones by eliminating one of them or, vice versa, the four functions are applied iteratively. The algorithm of the improvement stage stops when the solution has not been modified (improved) in two successive iterations. Figure 8 shows the algorithm, where 𝑠𝑜𝑙 is the solution obtained in the previous stage. 1. 𝑖𝑚𝑝𝑟𝑜𝑣𝑒𝑑_𝑠𝑜𝑙 =𝑠𝑜𝑙 2. 𝑐𝑜𝑛𝑡𝑖𝑛𝑢𝑒=true 3. While 𝑐𝑜𝑛𝑡𝑖𝑛𝑢𝑒 do: 4. 𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙 =𝑑𝑖𝑣𝑖𝑑𝑒𝑀𝑖𝑐𝑟𝑜𝑔𝑟𝑖𝑑𝑠(𝑖𝑚𝑝𝑟𝑜𝑣𝑒𝑑_𝑠𝑜𝑙) 5. 𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙 =𝑒𝑙𝑖𝑚𝑖𝑛𝑎𝑡𝑒𝑀𝑖𝑐𝑟𝑜𝑔𝑟𝑖𝑑𝑠(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙) 6. 𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙 =𝑚𝑒𝑟𝑔𝑒𝑆𝑦𝑠𝑡𝑒𝑚𝑠(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙) 7. 𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙 =𝐼𝐺𝐶(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙) 8. 𝑐𝑜𝑛𝑡𝑖𝑛𝑢𝑒=(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙 ≠𝑖𝑚𝑝𝑟𝑜𝑣𝑒𝑑_𝑠𝑜𝑙) 9. If 𝑐𝑜𝑛𝑡𝑖𝑛𝑢𝑒 then 𝑖𝑚𝑝𝑟𝑜𝑣𝑒𝑑_𝑠𝑜𝑙 =𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙 End if 10. End while 11. Return 𝑖𝑚𝑝𝑟𝑜𝑣𝑒𝑑_𝑠𝑜𝑙 Figure 8. Algorithm of the improvement stage Function 𝑑𝑖𝑣𝑖𝑑𝑒𝑀𝑖𝑐𝑟𝑜𝑔𝑟𝑖𝑑𝑠 (see Figure 9) iteratively divides micro-grids as long as there are feasible divisions that reduce the cost. The division is done by removing one connection (LV line), prioritizing according to the greater length. 1. 𝑖𝑚𝑝𝑟𝑜𝑣𝑒𝑑_𝑠𝑜𝑙 =𝑠𝑜𝑙 2. 𝑀=𝑀𝐺(𝑖𝑚𝑝𝑟𝑜𝑣𝑒𝑑_𝑠𝑜𝑙) 3. While 𝑀 ≠∅ do: 4. 𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑_𝑠𝑦𝑠 =first element of 𝑀; 𝑀 =𝑀\{𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑_𝑠𝑦𝑠} 5. 𝐶 =𝐶𝑂𝑁(𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑_𝑠𝑦𝑠); 𝑓𝑜𝑢𝑛𝑑 =false 6. While (𝐶 ≠∅)∧(¬𝑓𝑜𝑢𝑛𝑑) do: 7. 𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑_𝑐 =𝑎𝑟𝑔𝑚𝑎𝑥(𝑝,𝑞)∈𝐶𝐿𝑝𝑞 8. (𝑠𝑦𝑠1,𝑠𝑦𝑠2)=𝑆𝑃𝐿𝐼𝑇(𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑_𝑠𝑦𝑠,𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑_𝑐) 9. 𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙=(𝑖𝑚𝑝𝑟𝑜𝑣𝑒𝑑_𝑠𝑜𝑙\{𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑_𝑠𝑦𝑠})∪{𝑠𝑦𝑠1,𝑠𝑦𝑠2} 10. 𝑓𝑜𝑢𝑛𝑑 =(∀𝑠𝑦𝑠∈𝑀𝐺(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙)|𝐶𝑃𝑆(𝑠𝑦𝑠)|≥𝑁𝑈𝑀𝑚𝑖𝑛)∧(|𝑀𝐺(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙)|≤ 𝑁𝑀𝐺𝑚𝑎𝑥)∧(|𝑆𝐴𝑆(𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙)|≤𝑁𝑆𝐴𝑆𝑚𝑎𝑥)∧(𝐾𝑆(𝑠𝑦𝑠1)+𝐾𝑆(𝑠𝑦𝑠2)< 𝐾𝑆(𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑_𝑠𝑦𝑠)) 11. If 𝑓𝑜𝑢𝑛𝑑 then 𝑖𝑚𝑝𝑟𝑜𝑣𝑒𝑑_𝑠𝑜𝑙 =𝑐𝑢𝑟𝑟𝑒𝑛𝑡_𝑠𝑜𝑙; 𝑀 =𝑀∪{𝑠𝑦𝑠1,𝑠𝑦𝑠2} else 𝐶 =𝐶\{𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑_𝑐} End if
16 RH can locate generators only at consumption points. So, to compare the performance of the F-PROC procedure fairly, a first computational experiment is carried out removing non-consumption points from the test instances. Both procedures are compared in terms of the computing time and cost of the obtained solutions. F-PROC is implemented in Java and the MILP model is solved with CPLEX 12.6. Parameter Δ of F-PROC (see Section 3.3.1) is set to 50, which is a big enough value. All calculations are carried out on a PC with 3.2 GHz Intel Core 2 i5 with 3.87 GB RAM. Since RH is based on mathematical programming, even the solution of small instances may require a huge computation time, so 3600s are allowed for solving each instance. 4.2.1 Results First of all, the results of the computational experiment show F-PROC is able to calculate a feasible solution for the 640 instances, whereas RH finds a solution for 616 instances (i.e., it cannot find a solution for 24 instances within the time limit). Note that our procedure always guarantees a feasible solution. The results of these 616 instances are compared next (Table 1). Specifically, the number of instances (percentage in parentheses) for which RH obtains a feasible solution (nº of solved instances, column 3), the computation time (Cpu time [s], F-PROC column 4 and RH column 5) and the mean cost of the obtained solutions (Cost [$], F-PROC column 6 and RH column 7) are shown. First, the total aggregated results of all the instances are presented in the first row. Next, in order to provide a sensitivity analysis of the results and to analyze how variations of each parameter influence them, the instances are grouped regarding the input characteristics studied (number of users, user concentration, energy and power demands and wind resource) and the management constraints imposed (minimum number of users per micro-grid (𝑁𝑈𝑀𝑚𝑖𝑛), maximum number of micro-grids (𝑁𝑀𝐺𝑚𝑎𝑥) and maximum number of stand-alone systems (𝑁𝑆𝐴𝑆𝑚𝑎𝑥)). Nº of solved instances by RH CPU time [s] Cost [$] F-PROC RH F-PROC RH Total 616 (96.3%) 6.57 3244.71 82561.0 84378.8 Input characteristics Nº of users 10-40 256 (100%) 0.48 2745.1 44304.3 43215.7 50-70 192 (100%) 6.58 3600 92798.9 92661.2 80-100 168 (87.5%) 15.83 3600 129156.4 137638.1 User concentration Low 305(95.3%) 3.56 3239.55 82811.5 84069.8 High 311 (97.2%) 9.52 3249.77 82315.2 84682.0 Demand Low 313 (97.8%) 10.22 3245.49 74609.7 76269.48 High 303 (94.7%) 2.79 3243.90 90774.6 92755.8 Wind resource Low 309 (96.6%) 9.75 3246.70 82746.0 85068.7 High 307 (95.9%) 3.37 3242.71 82374.7 83684.5 Management constraints 𝑵𝑼𝑴𝒎𝒊𝒏 Not limited 316 (98.8%) 8.18 3262.4 82460.5 82871.8 Limited 300 (93.8%) 4.87 3226.1 82666.8 85966.2 𝑵𝑴𝑮𝒎𝒂𝒙 Not limited 310 (96.9%) 7.48 3257.8 81394.7 82861.8 Limited 306 (95.6%) 5.64 3231.4 83742.5 85915.7 𝑵𝑺𝑨𝑺𝒎𝒂𝒙 Not limited 319 (99.7%) 6.23 3251.6 82525.3 85253.9 Limited 297 (92.8%) 6.93 3237.3 82599.3 83439.0 Table 1. Results without non-consumption points according to the instance characteristics and management constraints
17 4.2.2 Discussion The results show that F-PROC is very fast: on average, needing 6.57s to find the solution whereas RH needs 3244,71s. Thus, F-PROC only uses 0.2% of the time needed by RH. Moreover, F-PROC is clearly more efficient than RH regardless of the instance characteristics: F-PROC finds the solutions of any of the groups in less than 16s on average, whereas RH needs more than 2745s for any of them. In particular, as the size (number of users) of the instance increases (over 50 users) RH consumes all the computing time for all the instances. As expected, solving RH for large instances proves challenging as the number of possible micro-grid connections dramatically increases and the model fails to guarantee even one feasible solution. Indeed, RH obtains the lowest percentage of feasible solutions (87.5%) in the group of 80-100 users, whereas F-PROC is always able to find a feasible solution in a short period of time. Regarding the quality of solutions, F-PROC is also better than RH: on average, the cost of the solutions obtained by F-PROC is 2.2% lower than the solutions with RH ($82561.0 vs. $84378.8). Although RH obtains slightly better solutions than F-PROC in the groups of smaller instances ($43215.7 vs. $44304.3 for 10-40 users, $92661.2 vs. $92798.9 for 50-70 users), F-PROC becomes significantly better (6,2%) when the size of the instance increases ($129156.4 vs. $137638.1 for 80-100 users). In addition, F-PROC obtains better solutions than RH for any group of instances regarding user concentration, demand or wind resource. Similar conclusions are reached when analyzing the performance for the management constraints. First, the results confirm that F-PROC is very quick and obtains better results than RH regardless of the management constraints imposed: on average, a 2.5% reduction in the overall cost is achieved when imposing a maximum number of micro-grids ($83742.5 vs. $85915.7), while the cost is 1.0 % better when limiting the number of stand-alone systems ($82599.3 vs. $83439.0). This superiority particularly stands out when the minimum number of users per micro-grid is imposed, as it increases to 3.8% ($82666.8 vs $85966.2). Thus, the results show the preferable use of F-PROC in designing electrification systems with management constraints, since it obtains, on average, better solutions and needs much less time than previous methods. Moreover, the quality of the solutions obtained and the extremely short time needed allow F-PROC to be used perfectly in multicriteria design-aid processes that involve solving several design options: for instance, in only 5 minutes it may calculate almost 50 alternatives of feasible designs. 4.3. Inclusion of non-consumption points F-PROC allows generating also at non-consumption points, which may have a high energy potential (for instance, mountain peaks). Thus, cheaper solutions are expected to be found. To validate this idea, a second computational experiment is carried out, including non-consumption points. 4.3.1 Results As in the first experiment, Table 2 shows the new results grouped according to the characteristics of the instances and the management constraints. Note that results with RH do not vary since it does not include non-consumption points. 4.3.2 Discussion The results confirm that F-PROC is very fast even with the inclusion of non-consumption points: on average, it needs 54.3s to find a solution whereas the time needed by RH without non-consumption points is 3244.71s. Although the computation time increases when compared to F-PROC without non-consumption points (54,35s on average) it is still only 1.7% of the time needed by RH. Moreover, F-PROC is still more efficient than RH regardless of the instance characteristics: F-PROC finds the solution for any group in less than 125s on average, while RH needs more than 2745s for any of them. The F-PROC computing time increases significantly with the number of users, but even with the larger instances (80-100) it finds the solutions in a practical time (123,01s).
18 Nº of solved instances by RH CPU time [s] Cost [$] F- PROC RH F-PROC RH Total 616 (96.3%) 54.35 3244.71 81663.2 84378.8 Input characteristics Nº of users 10-40 256 (100%) 9.00 2745.1 44023.8 43215.7 50-70 192 (100%) 54.72 3600 91918.6 92661.2 80-100 168 (87.5%) 123.01 3600 127298.1 137638.1 User concentration Low 305(95.3%) 52.00 3239.55 82332.0 84069.8 High 311 (97.2%) 56.65 3249.77 81007.3 84682.0 Demand Low 313 (97.8%) 56.63 3245.49 73924.1 76269.48 High 303 (94.7%) 51.99 3243.90 89657.8 92755.8 Wind resource Low 309 (96.6%) 60.23 3246.70 81195.1 85068.7 High 307 (95.9%) 48.43 3242.71 82134.4 83684.5 Management constraints 𝑵𝑼𝑴𝒎𝒊𝒏 Not limited 316 (98.8%) 51.59 3262.4 81618.13 82871.8 Limited 300 (93.8%) 57.13 3226.1 81706.01 85966.2 𝑵𝑴𝑮𝒎𝒂𝒙 Not limited 310 (96.9%) 56.69 3257.8 80524.9 82861.8 Limited 306 (95.6%) 51.88 3231.4 82816.4 85915.7 𝑵𝑺𝑨𝑺𝒎𝒂𝒙 Not limited 319 (99.7%) 54.02 3251.6 81536.3 85253.9 Limited 297 (92.8%) 54.70 3237.3 81781.4 83439.0 Table 2. Results with non-consumption points according to the instance characteristics and management constraints Regarding the quality of solutions, the results confirm that F-PROC with non-consumption points is better than RH: the average cost of the solutions obtained with F-PROC is 3.2% lower than for RH ($81663.2 vs. $84378.8). Although F-PROC may potentially find better solutions taking advantage of non-consumption points, considering hundreds of extra points also adds complexity to the search process, so real improvements and cost reductions in the solutions obtained a priori could not be assumed. Indeed, although RH obtains slightly better solutions than F-PROC in the smallest instances ($43215.7 vs. $44023.8 for 10-40 users), F-PROC performs significantly better for instances of more than 40 users and for any other characteristic. F-PROC is also very quick and achieves better results regardless of the management constraints imposed, even with the added solving complexity of extra points. Compared with RH, the cost reductions obtained are greater than those achieved by F-PROC without non-consumption points. In particular, the cost reduction reaches 2.0% when limiting the number of stand-alone systems ($81781.4 vs. $83439.0); this reduction rises to 3.6% when imposing a maximum number of micro-grids ($82816.4 vs. $85915.7). Finally, a maximum difference of 5.0% is obtained in the quality of the solutions when the minimum number of users per micro-grid is imposed ($81706.01 vs $85966.2). Overall, the results confirm the preferable use of F-PROC, instead of previous procedures, in designing electrification systems with management constraints. Indeed, the consideration of non-consumption points improves the cost reduction of the solutions and has an affordable impact in terms of computing time. Therefore, F-PROC may be used in multicriteria design-aid processes which involve solving several design options, even when considering extra non-consumption points, allowing even better solutions to be obtained. 5. Conclusions A very complex problem emerges when designing hybrid wind-photovoltaic electrification systems, combining stand-alone and micro-grid systems. Management constraints have rarely been considered in the literature,
19 despite their importance in facilitating users’ organization and enhancing project sustainability. In the literature, only one mixed integer linear programming model simultaneously deals with economic, technical and management issues for the design of wind-photovoltaic projects combining micro-grid and stand-alone systems. However, the benchmark for this procedure, determined through a computational experiment, shows 3.75% of the test instances cannot be solved and most test instances do not reach optimality within 1 hour. In order to overcome these limitations, a novel solution procedure is proposed in this paper. In particular, two heuristics are calculated starting from opposite and extreme solutions: a single micro-grid connecting all points and a solution with all stand-alone systems. Then these solutions are enhanced through repair and/or improvement algorithms. Two computational experiments, based on real case studies, are carried out in order to validate the solution procedure: the first without non-consumption points as possible locations of generators, to compare with the existing mixed integer linear programming procedure; the second including non-consumption points to test the full potential of our procedure. Analysis of the results highlights: First, our procedure finds a feasible solution for all the test instances and at a lower cost (on average, 2.15%), whereas the existing procedure does not. In addition, the computation time is very short (on average, less than 7 seconds), regardless of the characteristics of the instances or management constraints imposed. This is especially suitable when the problem has to be solved several times with an iterative methodology, which is the case of multicriteria-based design-aid procedures. When non-consumption points are included, the procedure is able to design more efficient solutions by taking advantage of high wind potential locations. Although the complexity of the problem increases significantly, the heuristic is able to take advantage of the additional locations, so cheaper solutions are achieved with regard to the existing procedure (on average, 3.22%). In particular, the cost reduction reaches up to 5% when imposing a maximum number of users per micro-grid as a management constraint. Moreover, the computing time is still short (on average, less than one minute). Therefore, the efficiency and effectiveness of the proposed solution procedure is validated. As future research, the proposed approach could be the basis of a metaheuristic procedure (for instance, simulated annealing) to further improve the results. Additionally, other social aspects beyond management constraints (for instance, security of supply) could be considered for better adapting the results to the project beneficiaries in different contexts. Acknowledgement This research was funded by the Spanish Ministry of Science and Innovation (RTI2018-097962-B-I00) and the Centre for Cooperation Development (CCD) of the Universitat Politècnica de Catalunya-Barcelona TECH (UPC). The authors wish to express their gratitude to the anonymous reviewers for their valuable comments, which have helped to improve the quality of this paper. References Ali, R., Kuriqi, A., Abubaker, S., Kisi, O. (2019a). Hydrologic alteration at the upper and middle part of the Yangtze river, China: towards sustainable water resource management under increasing water exploitation. Sustainability, 11(19), 5176. Ali, R., Kuriqi, A., Abubaker, S., Kisi, O. (2019b). Long-term trends and seasonality detection of the observed flow in Yangtze river using Mann-Kendall and Sen’s innovative trend method. Water, 11, 1855. Bahramara, S., Moghaddam, M. P., Haghifam, M. R. (2016). Optimal planning of hybrid renewable energy systems using HOMER: A review. Renewable and Sustainable Energy Reviews, 62, 609-20. Baldwin, E., Brass, J. N., Carley, S., Maclean, L. M. (2015). Electrification and rural development: Issues of scale in distributed generation. WIREs Energy and Environment, 4, 196-211. Bejarano, M. D., Sordo-Ward, A., Gabriel-Martin, I., Garrote L. (2019). Tradeoff between economic and environmental costs and benefits of hydropower production at run-of-river-diversion schemes under different environmental flow scenarios. Journal of Hydrology, 572, 790-804.
20 Cai, W., Li, X., Maleki, A., Pourfayaz, F., Rosen, M. A., Nazari, M. A., Bui, D. T. (2020). Optimal sizing and location based on economic parameters for an off-grid application of a hybrid system with photovoltaic, battery and diesel technology. Energy, 201, 117480. Domenech, B., Ferrer-Martí, L., Lillo, P., Pastor, R., Chiroque, J. (2014). A community electrification project: Combination of microgrids and household systems fed by wind, PV or micro-hydro energies according to micro-scale resource evaluation and social constraints. Energy for Sustainable Development, 23, 275-85. Domenech, B., Ferrer-Martí, L., Pastor, R. (2015a). Hierarchical methodology to optimize the design of standalone electrification systems for rural communities considering technical and social criteria. Renewable and Sustainable Energy Reviews, 51, 182-96. Domenech, B., Ferrer-Martí, L., Pastor, R. (2015b). Including management and security of supply constraints for designing stand-alone electrification systems in developing countries. Renewable Energy, 80, 359-69. Domenech, B., Ferrer-Martí, L., Pastor, R. (2018). Comparison of various approaches to design wind-PV rural electrification projects in remote areas of developing countries. WIREs Energy and Environment, e332. Domenech, B., Ferrer-Martí, L., Pastor, R. (2019). Multicriteria analysis of renewable‑based electrification projects in developing countries. Annals of Operations Research, https://doi.org/10.1007/s10479-019-03195- 1. Dufo-López, R., Bernal-Agustín, J. L., Yusta-Loyo, J. M., Domínguez-Navarro, J. A., Ramírez-Rosado, I. J., Lujano, J., Aso, I. (2011). Multi-objective optimization minimizing cost and life cycle emissions of standalone PV–wind–diesel systems with batteries storage. Applied Energy, 88, 4033-41. Erdinc, O., Uzunoglu, M. (2012). Optimum design of hybrid renewable energy systems: Overview of different approaches. Renewable and Sustainable Energy Reviews, 16, 1412-25. Ferrer-Martí, L., Domenech, B., García-Villoria, A., Pastor, R. (2013). A MILP model to design hybrid windphotovoltaic isolated rural electrification projects in developing countries. European Journal of Operational Research, 226, 293-300. Gamarra, C., Guerrero, J. M. (2015). Computational optimisation techniques applied to microgrids planning: a review. Renewable and Sustainable Energy Reviews, 48, 413-24. Garfí, A., Ferrer-Martí, L., Bonoli, A., Tondelli, S. (2011). Multicriteria analysis for improving strategic environmental assessment of water programs. A case study in semi-arid region of Brazil. Journal of Environmental Management, 92, 665-75. Gendreau, M., Potvin, J. Y. (2005). Metaheuristics in combinatorial optimization. Annals of Operations Research, 140, 189-213. IEA. (2017). World energy outlook. Paris, France: International Energy Agency. Jamal, T., Urmee, T, Shafiullah, G. M. (2020). Planning of off-grid power supply systems in remote areas using multi-criteria decision analysis. Energy, 201, 117580. Khare, V., Nema, S., Baredar, P. (2016). Solar-wind hybrid renewable energy systems: A review. Renewable and Sustainable Energy Reviews, 58, 23-33. Kola, S. S. (2018). A review on optimal allocation and sizing techniques for DG in distribution systems. International Journal of Renewable Energy Research, 8, 1236-56. Kruskal, J.B. (1956). On the shortest spanning subtree of a graph and the traveling salesman problem. Proceedings of the American Mathematical Society, 7, 48-50. Kumar J., Suryakiran, B. V., Verma, A., Bhatti, T. S. (2019). Analysis of techno-economic viability with demand response strategy of a grid-connected microgrid model for enhanced rural electrification in Uttar Pradesh state, India. Energy, 178, 176-85. Kuriqi, A., Pinheiro, A. N., Sordo-Ward, A., Garrote, L. (2019a). Influence of hydrologically based environmental flow methods on flow alteration and energy production in a run-of-river hydropower plant. Journal of Cleaner Production, 232, 1028-42. Kuriqi, A., Pinheiro, A. N., Sordo-Ward, A., Garrote, L. (2019b). Flow regime aspects in determining environmental flows and maximizing. Applied Energy, 256, 113980. Lambert, T. W., Hittle, D. C. (2000). Optimization of autonomous village electrification systems by simulated annealing. Solar Energy, 68, 121-32. López-González, A., Domenech, B., Ferrer-Martí, L. (2018). Sustainability and design assessment of rural hybrid microgrids in Venezuela. Energy, 159, 229-42. Mandelli, S., Barbieri, J., Mereu, R., Colombo, E. (2016). Off-grid systems for rural electrification in developing countries: Definitions, classification and a comprehensive literature review. Renewable and Sustainable Energy Reviews, 58, 1621-46.
21 Manwell, J. F., Rogers, A., Hayman, G., Avelar, C. T., McGowan, J. G., Abdulwahid, U., Wu, K. (2006). HYBRID2 – A HYBRID system simulation model. Theory manual. Amherst, MA: Renewable Energy Research Laboratory. Moretti, L. Astolfi, M., Vergara, C., Macchia, E., Pérez-Arriaga, J. I., Manzolinia, G. (2019). A design and dispatch optimization algorithm based on mixed integer linear programming for rural electrification. Applied Energy, 233-234, 1104-21. Odou, O. D. T., Bhandari, R., Adamou, R. (2020). Hybrid off-grid renewable power system for sustainable rural electrification in Benin. Renewable Energy, 145, 1266-79. Peters, J., Sieverta, M., Toman, M. A. (2019). Rural electrification through mini-grids: challenges ahead. Energy Policy, 132, 27-31. Ranaboldo, M., Ferrer-Martí, L., García-Villoria, A., Pastor, R. (2013). Heuristic indicators for the design of community off-grid electrification systems based on multiple renewable energies. Energy, 50, 501-12. Ranaboldo, M., García-Villoria, A., Ferrer-Martí, L., Pastor, R. (2014). A heuristic method to design autonomous village electrification projects with renewable energies. Energy, 73, 96-109. Ranaboldo, M., García-Villoria, A., Ferrer-Martí, L., Pastor, R. (2015). A meta-heuristic method to design offgrid community electrification projects with renewable energies. Energy, 93, 2467-82. Rojas-Zerpa, J. C., Yusta, J. M. (2015). Application of multicriteria decision methods for electric supply planning in rural and remote areas. Renewable and Sustainable Energy Reviews, 52, 557-71. Sinha, S., Chandel, S. S. (2014). Review of software tools for hybrid renewable energy systems. Renewable and Sustainable Energy Reviews, 32, 192-205. Triadó-Aymerich, J., Ferrer-Martí, L., García-Villoria, A., Pastor, R. (2016). MILP-based heuristics for the design of rural community electrification projects. Computers & Operations Research, 71, 90-9.