A hypothesis-driven approach to optimize field campaigns Wolfgang Nowak, 1 Yoram Rubin, 2 and Felipe P. J. de Barros 3 Received 7 June 2011; revised 27 March 2012; accepted 18 April 2012; published 8 June 2012. [1]Most field campaigns aim at helping in specified scientific or practical tasks, such as modeling, prediction, optimization, or management. Often these tasks involve binary decisions or seek answers to yes/no questions under uncertainty, e.g., Is a model adequate? Will contamination exceed a critical level? In this context, the information needs of hydro(geo)logical modeling should be satisfied with efficient and rational field campaigns, e.g., because budgets are limited. We propose a new framework to optimize field campaigns that defines the quest for defensible decisions as the ultimate goal. The key steps are to formulate yes/no questions under uncertainty as Bayesian hypothesis tests, and then use the expected failure probability of hypothesis testing as objective function. Our formalism is unique in that it optimizes field campaigns for maximum confidence in decisions on model choice, binary engineering or management decisions, or questions concerning compliance with environmental performance metrics. It is goal oriented, recognizing that different models, questions, or metrics deserve different treatment. We use a formal Bayesian scheme called PreDIA, which is free of linearization, and can handle arbitrary data types, scientific tasks, and sources of uncertainty (e.g., conceptual, physical, (geo)statistical, measurement errors). This reduces the bias due to possibly subjective assumptions prior to data collection and improves the chances of successful field campaigns even under conditions of model uncertainty. We illustrate our approach on two instructive examples from stochastic hydrogeology with increasing complexity. Citation: Nowak, W., Y. Rubin, and F. P. J. de Barros (2012), A hypothesis-driven approach to optimize field campaigns, Water Resour. Res.,48, W06509, doi:10.1029/2011WR011016. 1. Introduction [2] Uncertainty quantification and reduction are fundamental challenges in the environmental and hydrological sciences. Uncertainties arise due to data scarcity, limited observability, and our incapacity to fully resolve spatial variability and dynamics, or to define correctly all the physical, chemical, and biological processes involved with their boundary and initial conditions and forcing terms [e.g., Christakos, 1992; Rubin, 2003; Oreskes et al., 1994]. As an outcome, full validation of model concepts and perfect model calibration is an almost impossible task [Oreskes et al., 1994]. [3] In the hydro(geo)logical sciences, we often use models to predict and address scientific hypotheses or challenges in engineering and management under uncertainty: [4] Should we shut down a drinking water well before contamination arrives [e.g., Frind et al., 2006; Enzenhöfer et al., 2012]? [5] How large is the risk emanating from a contaminated site [e.g., Troldborg et al., 2010]? [6] Is natural attenuation occurring [e.g., Schwede and Cirpka, 2010; Cvetkovic, 2011]? [7] Is a proposed remediation design safe [e.g., Cirpka et al., 2004; Bolster et al., 2009]? [8] Is a high-level radioactive waste site safe [e.g., Andricevic and Cvetkovic, 1996]? [9]IsaCO 2 injection site safe [e.g., Oladyshkin et al., 2011a, 2011b]? [10] Is human health risk above a critical value or not [e.g., de Barros and Rubin, 2008; de Barros et al., 2009, 2011]? [11] Is a proposed model adequate to answer these questions [e.g., Neuman, 2003; Refsgaard et al., 2006]? [12] All of the above examples include scientific hypotheses, binary decisions, or binary questions of compliance with environmental performance metrics such as human health risk or maximum contaminant levels [see de Barros et al., 2012]. Pappenberger and Beven [2006] provide a list of more studies where binary decisions were taken under uncertainty. They also report the fact that practitioners often complain about the discrepancy between soft uncertainty bounds and the binary character of decisions. [13] One way of dealing with binary questions in the face of uncertainty is to formalize them as hypothesis tests. 1 Institute for Modelling Hydraulic and Environmental Systems (LH 2 )/ SimTech, University of Stuttgart, Stuttgart, Germany. 2 Department of Civil and Environmental Engineering, University of California, Berkeley, California, USA. 3 Department of Geotechnical Engineering and Geosciences, Technical University of Catalonia (UPC), Catalonia, Spain. Corresponding author: W. Nowak, Institute for Modelling Hydraulic, Environmental Systems (LH 2 )/SimTech, University of Stuttgart, Pfaffenwaldring 61 70569 Stuttgart, Germany. (
[email protected]) ©2012. American Geophysical Union. All Rights Reserved. 0043-1397/12/2011WR011016 W06509 1of16 WATER RESOURCES RESEARCH, VOL. 48, W06509, doi:10.1029/2011WR011016, 2012
This makes it possible to systematically and rigorously test assumptions, models, predictions, or decisions. Beven [2002] summarizes strong arguments that models and theories in the environmental sciences are nothing else but hypotheses. A prominent example is the work by Luis and McLaughlin [1992], who indeed approach model validation via formal statistical hypothesis testing. Consequently, modelers and scientists should admit the hypothesis-like character of models and their underlying theories, conceptualizations, assumptions, parameterizations, and parameter values. We propose that the same approach should be taken to support any type of decisions that modelers, engineers, scientists, and managers need to take under uncertainty. One should treat model predictions and derived conclusions and decisions as hypotheses, and one should continuously try to assess and test their validity. [14] The credibility of and confidence in any answer or decision under uncertainty increases with well-selected additional data that help to better test, support, and calibrate the involved assumptions, models, and parameters. However, data must be collected in a rational and goaloriented manner because field campaigns and laboratory analysis are expensive while budgets are limited [e.g., James and Gorelick, 1994]. [15] This is where optimal design and geostatistical optimal design [e.g., Pukelsheim, 2006; Ucinski, 2005; Christakos, 1992] come into play. Optimal design (OD) gets the maximum gain of information from limited sampling, field campaigns, or experimentation. It optimizes the projected trade-offs between the costs spent on additional data versus the higher level of information. It can be used to optimize (1) what types of data (e.g., material parameters, state variables) to collect, (2) where to sample (e.g., the spatial layout and time schedule of observation networks), and (3) how to best excite the system to observe an informative response (e.g., designing tracer injections or hydraulic tests). Many applications in groundwater hydrology can be found in the literature [e.g., James and Gorelick, 1994; Reed et al., 2000a; Herrera and Pinder, 2005; Nowak et al., 2010; Leube et al., 2012]. [16] Classical OD theory is based on utility theory [e.g., Fishburn, 1970]. It optimizes the utility of sampling [e.g., Pukelsheim, 2006], which is traditionally defined as increased information [Bernardo, 1979] or reduced uncertainty (measured by variances, covariances, or entropies [e.g., Pukelsheim, 2006; Nowak, 2010; Abellan and Noetinger, 2010]). Unfortunately, these are only surrogate (approximate) measures for the actual utility, rather than ultimate measures [e.g., Loaiciga et al., 1992]. The use of surrogates may corrupt the optimality of designs for the originally intended purpose. [17] Goal-oriented approaches define the utility of sampling via ultimate measures, i.e., measures defined in the context of a given management application [e.g., Ben-Zvi et al., 1988; James and Gorelick, 1994; Feyen and Gorelick, 2005; Bhattacharjya et al., 2010; Li, 2010]. Thus, optimal sampling and field campaign strategies can adapt to the interplay between the actual information needs of the goal at hand, the available measurement and investigation techniques, and the specific composition of uncertainty [e.g., Maxwell et al., 1999; de Barros et al., 2009; Nowak et al., 2010]. For instance, de Barros et al. [2012] showed how the utility of data depends on the considered environmental performance metric (e.g., maximum concentration levels, travel times, or human health risk). [18] Our work focuses, for now, on situations where the objective for field campaigns or experimentation is to support binary decision problems with maximum confidence in a one-time field effort. By proper formulation of corresponding hypothesis tests, we cast the binary decision problem into the context of Bayesian decision theory [e.g., Berger, 1985] and Bayesian hypothesis testing [e.g., Press, 2003]. The latter differs from classical testing in two respects: (1) it can absorb prior knowledge on the likelihood of hypotheses, and (2) it can assess the probabilities of all possible decision errors. Then, we optimize field campaigns in a goal-oriented manner such that the total probability of decision error is minimized. The outcome of our approach are data collected rationally toward the specific hypothesis, question, or decision at hand, providing the desired confidence at minimal costs. [19] There is a substantial body of work in the literature that optimizes field campaigns via Bayesian decision theory, maximizing the expected data worth [e.g., Massmann and Freeze,1987;James and Gorelick, 1994]. The data worth concept follows classical ideas from utility theory and decision theory [e.g., Fishburn,1970;Ben-Zvietal.,1988; Raiffa et al., 1995]. It assigns monetary units for utility, and then weighs up expected benefits against the costs of field campaigns. The practical difference between our suggested approach and classical data worth studies is twofold. First, our approach encompasses arbitrary hypothesis tests or binary questions, whereas data worth studies are restricted to management tasks that provide a context for monetizing data utility. Second, we do not maximize the monetary worth of data collection but use the error probability of binary decisions or conclusions derived from the data as objective function to minimize. In contrast to classical data worth analysis, this avoids commensuration, i.e., does not require to have a common (monetary) scale for different values such as sampling costs versus improved scientific confidence or reduced health risk. [20] An alternative approach to avoid commensuration is multiobjective optimization (MOO) [e.g., Sawaragi et al., 1985; Marler and Arora, 2004]. MOO provides a suite of Pareto-optimal candidate solutions, i.e., solutions that cannot improve in any aspect without degrading in at least one other aspect. The final decision is found by inspecting and discussing the trade-offs in the different aspects between the suggested Pareto optima [e.g., Reed and Minsker, 2004; Kollat and Reed, 2007]. Thus, the problem of commensuration or preference articulation is postponed to after the optimization, where more information on the trade-offs and their consequences are available. A second reason to use MOO is that there may be a multitude of competing or (seemingly) incompatible objectives by different stakeholders. Such objectives may as well evolve and change over time, especially in the design of long-term groundwater monitoring networks [e.g., Loaiciga et al., 1992; Reed and Kollat, 2012]. [21] Looking at binary decisions leads to classical singleobjective optimization, just like most of optimal design theory or data worth concepts. We restrict our current work to the single-objective context, for now looking at the case where a planned field campaign should chiefly support a W06509 NOWAK ET AL.: HYPOTHESIS-DRIVEN FIELD CAMPAIGNS W06509 2of16
single decision problem in a one-time field effort. Still, nothing restricts our approach from integration into MOO approaches in future work, e.g., if other objectives coexist, or for a detailed trade-off analysis between improved decision confidence and costs of the field campaign. [22] The hypotheses or decision problems that can be supported with our approach include, e.g., model validity, model choice for geostatistical, physical, chemical, or biological model assumptions, parameterization forms or closure assumptions, compliance with environmental performance metrics or other model predictions that are related to binary decisions, and reliability questions in optimization and management. In a synthetic test case for the sake of illustration, we feature the prediction of compliance with maximum contaminant levels as an environmental performance metric, looking at contaminant transport to an ecologically sensitive location through a two-dimensional heterogeneous aquifer with uncertain covariance function and uncertain boundary conditions. 2. General Approach and Mathematical Formulation [23] Assume that either a modeler, scientist, or a manager is asked to provide a yes/no decision on a proposed statement. Due to the inherent uncertainty of the problemat-hand, the answer can only be found at a limited confidence level. The outline of our approach for such situations is as follows: [24] 1. To cast the corresponding yes/no question or binary decision into a hypothesis test (section 2.1). [25] 2. To insert the hypothesis test into the Bayesian framework, which yields the probability of making a false decision (section 2.2). [26] 3. To analyze the expected reduction of error probability through planned field campaigns as criterion for optimal design (section 2.3). [27] 4. To minimize the error criterion by optimizing the field campaign (section 2.3 and section A3). [28] The obtained sampling schemes allow the proposed hypotheses (and the final decision) to be affirmed or refuted at the desired confidence and at minimum costs for the field campaign. In the following we use a most generic formulation. We will illustrate our methodology based on one scenario with two different levels of complexity in sections 3, 4, and 5. 2.1. Classical Hypothesis Testing [29] This section summarizes the key steps of classical hypothesis testing and introduces the notation, before we move on to Bayesian hypothesis testing and optimal design. The well-known individual steps of hypothesis testing are [e.g., Stone, 1996; Casella and Berger, 2002]: [30] 1. Identify the null hypothesis H 0 and the alternative hypothesis H 1 . [31] Null hypothesis H 0 : A fallback assumption H 0 on some target variable qholds. [32] Alternative hypothesis H 1 : A (desirable) assumption H 1 on qis true. [33]H 0 is the hypothesis that is accepted for the time being, while the burden of proof is on H 1 , which is the hypothesis one desires to prove [e.g., Shi and Tao, 2008]. Per definition, falsely accepting H 1 is the more critical type of error. This calls for sufficient evidence (i.e., statistically significant data) before accepting H 1 over H 0 , and coincides well with the precautionary principle in policy, environmental sciences, and the public health sector [e.g., Kriebel et al., 2001]. [34] 2. Choose a level of significance 2½0%;100%. Typically, should be small (e.g., 10%). It is the probability of falsely accepting H 1 although H 0 is in fact true, and so controls the worse type of test failure. The quantity ¼1is often called the power of the test. [35] 3. Decide what type of data are appropriate to judge H 0 and H 1 , and define the relevant test statistic Tthat can be computed from the data. [36] 4. Derive the distribution pðTÞof the test statistic, while considering all statistical assumptions (independence, distribution, etc.) of the data. More accurately, pðTÞshould be denoted as pðTjH0Þbecause it is the distribution of T that can be observed if H 0 was in fact true. Since Tis a sample statistic, pðTjH0Þwill depend, among other things, on the sample size N. [37] 5. The significance level and the character of the test (one-sided, two-sided) partitions the distribution pðTjH0Þinto the critical or rejection region (reject H 0 ), and the acceptance region (accept H 0 due to lacking statistical evidence against it). [38] 6. Evaluate the observed value T obs of the test statistic from the data. [39] 7. Depending on the value of T obs , decide on the two hypotheses: [40] Decision D 0 : Accept H 0 if T obs is outside the critical region of pðTjH0Þ. [41] Decision D 1 : Else, reject H 0 in favor of H 1 . [42] Either of the decisions D 0 and D 1 could be false, leading to the corresponding error events: [43]error E: Decision D 1 was taken (H 1 accepted) although hypothesis H 0 is in fact true (called false positive of H 1 ). [44]error E: Decision D 0 was taken (H 0 accepted) although hypothesis H 1 is in fact true (called false negative of H 1 ). [45] Within classical hypothesis tests, these errors can only be quantified via their conditional probabilities: Pr½D1jH0P; Pr½D0jH1P: (1) The significance level is the maximum acceptable conditional probability Pfor the error. A total (unconditional) error probability cannot be specified for two reasons. First, Pcan only be assessed if the alternative hypothesis H 1 is sufficient to infer a sampling distribution pðTjH1Þ. For example, using an inequality in H 1 would be insufficient. Second, one would need prior probabilities Pr½H0and Pr½H1of H 0 or H 1 being true to remove the conditions on H 0 and H 1 in equation (1). 2.2. Bayesian Hypothesis Testing [46] With Bayesian hypothesis testing [e.g., Press, 2003], one can assess, for all possible hypotheses and the resulting decisions, the probability of being false both W06509 NOWAK ET AL.: HYPOTHESIS-DRIVEN FIELD CAMPAIGNS W06509 3of16
before and after considering the data. If desired, one could even test more than two competing hypotheses at once. [47] Given the prior probabilities Pr½H0and Pr½H1of H 0 or H 1 being true, respectively, and a formulation of the hypotheses that defines the sampling distribution of any data vector yunder each hypothesis, Bayes rule yields for the conditional probabilities of the hypotheses: Pi¼Pr½Hijy¼pðyjHiÞPr½Hi=pðyÞ;i¼f0;1g:(2) [48] Then, one can use a Bayesian decision rule [e.g., Berger, 1985] and infer the total probability of committing any of the two errors: [49] Decision D 0 : Accept H 0 if Pr½H0jy. [50] Decision D 1 : Else, reject H 0 in favor of H 1 . [51] Individual risks: The overall risks Rand Rto commit an or error ðE;EÞare R¼Pr½Ejy¼Pr½D1jH0;yPr½H0jyPjyP0jy; R¼Pr½Ejy¼Pr½D0jH1;yPr½H1jyPjyP1jy: (3) [52] Total risk R: the total risk Rof committing any of the errors (sometimes called the Bayes risk) is R¼RþR¼PP0þPP1; RðyÞ¼RðyÞþRðyÞ¼PjyP0jyþPjyP1jy; (4) where the first and second lines are the prior and conditional versions, respectively. A weighted version is given by R¼wRþwR;(5) where the weights wand wreflect the severeness of the error versus the error. The link to utility theory [e.g., Fishburn, 1970] would be to assign weights that quantify the respective losses, e.g., in monetary units. The limiting cases for different weighting are R¼Rand R¼R, reflecting the preference to never falsely assume safety, or to never sound a wrong alarm. [53] In Bayesian hypothesis testing, the significance level is derived from different considerations than in classical tests. Typically, Bayesian decision rules [e.g., Berger, 1985] find a significance level such that, for the given weighting or loss functions in equation (5), the total Bayes risk according to equation (5) is minimal. This decision rule is called the Bayes decision criterion by Jaynes [2003]. In the simple case that no weighting is applied, a significance level of ¼50% is optimal. Thus, in absence of recommendations through regulations or legislation, ¼50% is the value we recommend, because it encodes an unbiased search for ‘‘the truth,’’ without articulating any specific preferences between the alpha or beta error. 2.3. Hypothesis-Driven Optimal Design [54] We will now derive the framework that optimizes field campaigns to support Bayesian decision (hypothesis testing) problems with data for maximum confidence. To this end we minimize the total risk Rof false decision (see equation (5)). We assume that the decision rule (here the value of ) is fixed a priori. Therefore we consider the impact of additional planned data on the total risk Rby taking the difference between the first and the second line of equation (4). [55] Assume that the initial Bayesian risk R 0 of false decision (prior to additional sampling) is too large for the task or purpose of the modeler, scientist, or manager. The maximum acceptable risk shall be R max . In such cases it is only natural to try and improve one’s knowledge by collecting data. Additional data will have the power to narrow down all relevant distributions of parameters, predictions, and of the relevant sampling distributions upon which the decision between H 0 and H 1 is based. This can make the final decision between H 0 and H 1 more defensible, as illustrated schematically in Figure 1, up to the point where RRmax. [56] In classical univariate hypothesis testing, the sampling distribution pðTjH0Þof the test statistic Tdepends on sample size. In the (geo)statistical inverse context, distributions and distribution shapes also depend on many other factors [e.g., Rubin, 2003]. These include sampling locations, data types, the nonlinearity of governing equations Figure 1. The objective of hypothesis-driven field campaigns. W06509 NOWAK ET AL.: HYPOTHESIS-DRIVEN FIELD CAMPAIGNS W06509 4of16
and of the inversion, and the circumstances of data collection, e.g., the design of tracer chemistry and injection setup, or the strength and type of any other system excitation versus passive system observation. [57] The entire strategy, layout, and schedule of the field campaign is typically termed an experimental design. All corresponding design parameters are lumped together in a formal vector d. This vector contains, e.g., a list of sampling locations and data types to be collected, as well as parameters that control the circumstances of data acquisition. [58] When collecting data according to some design d, one obtains a data vector y d. The planning phase prior to sampling is often called the preposterior stage [e.g., Ben- Zvi et al., 1988; James and Gorelick, 1994; Raiffa et al., 1995]. During that phase the yet unmeasured data values are conceptualized as random values drawn from a distribution pðydÞ. Knowing pðydÞrequires an underlying model with statistical prediction capability for potential data, e.g., based solely on prior statistics, or on conditional statistics that honor all data already available. [59] Given a specific data vector y d, one could condition all involved distributions on y d: the distribution pðqÞfor the target quantity could be updated to pðqjy dÞ, and the probabilities P 0 and P 1 (of H 0 and H 1 being true, respectively) would also change. Thus, following equations (3) and (4), the total risk Rbecomes a function of y d: Rðy dÞ¼Pjy dP0jy dþPjy dP1jy d;(6) where PðÞjy dis the conditional version of probability PðÞ. Following decision-theoretic ideas, we define the decision utility of the data set y das the reduction of total risk: ðy dÞ¼R0Rjy d;(7) where R 0 is the initial decision risk in absence of additional data evaluated according to the first line of equation (4). The data set y dis informative if the conditional risk is smaller than the initial risk R 0 , and it is sufficient if Rjy dRmax. [60] Unfortunately, for nonlinear statistical inference, the shape of conditional distributions (including their critical tails) depends on the actual values of data, which are yet unknown at the stage of planning the design. For each possible data set y dfrom pðydÞfor a given design d, a different risk reduction ðy dÞmay result, yielding an entire distribution pðjdÞfor the design’s utility. We therefore invoke the concept of expected utility [Schoemaker, 1982; Raiffa et al., 1995] by marginalizing equation (7) over all possible data values ydpðydÞ, and obtain ðdÞ¼Zyd ðydÞpðydÞdyd;(8) where ðdÞis the expected utility of the design. The conditional expected risk is then E½Rjd¼R0ðdÞ:(9) Evaluating equation (9) requires estimation of the possible conditional distributions of the target quantity qfor all possible data sets y d , and evaluation of the decision risk in each case. This task calls for nonlinear Bayesian inference schemes such as PreDIA [Leube et al., 2012] (see also sections 4.3 and Ax). [61] When using equation (8) as objective function for optimizing the design d, the resulting design will be optimal (in the expected value sense) in supporting a most confident decision on the proposed hypotheses. The reliability of a design to actually deliver the promised (expected) utility and related possible modifications of equation (8) for improved robustness as well as the relation between and the possible posterior risk values are discussed in section 5.3. [62] Optimal design theory and its geostatistical branch know an entire list of optimality criteria that mostly work on the conditional covariance matrix of model parameters [e.g., Pukelsheim,2006;Müller,2007;Nowak, 2010], often called the optimality alphabet [e.g., Box, 1982]. To distinguish our criterion from the existing ones, we call it the Rcriterion. We denote the extreme end-members that consider only R or R(see equation (5)) as Roptimality and Roptimality, and the case without weighting as R; optimality. [63] The formal optimization task is dðRÞ opt ¼arg max d2d ðdÞ;(10) with the space of allowable designs d. The superscript ðRÞ in the expression above can be either R,R,orR;.For any fixed cost of the design, the choice of data types and configurations can be optimized. Alternatively, for fixed R max , the cheapest sufficient design can be found. Several possible optimization algorithms are provided in section A3. [64] In the presence of an already existing data set y0, all prior probabilities are simply exchanged for probabilities conditional on y0, without otherwise changing our proposed framework. 2.4. Bayesian (Geo)statistics and Model Averaging [65] The resulting design will be optimal, conditional on all prior probabilities and assumptions that enter equations (3)–(5). The challenge is to provide a sufficient envelope for the uncertainties and errors that plague real field campaigns and hydro(geo)logical modeling efforts. This is a substantial challenge, especially if complex statistical assumptions in combination with hydro(geo)logical simulation models serve to provide the priors. In such situations it is advisable to explicitly account for uncertainties in model choice and parameters since this will provide designs that are robust to variations in the prior assumptions. This calls for approaches such as Bayesian model averaging [e.g., Hoeting et al., 1999; Neuman, 2003] or Bayesian geostatistics [e.g., Kitanidis, 1986]. [66] The importance of considering parametric uncertainty and uncertain model choice in the context of geostatistical optimal design has recently been pointed out by Nowak et al. [2010] for geostatistical inverse problems, while Diggle and Lophaven [2006] and Neuman et al. [2012] performed similar studies restricted to the kriginglike context. If desired, our hypothesis-driven framework can also help selecting between different mathematical or conceptual model structures. This can be achieved by formulating the model choice in terms of hypotheses. W06509 NOWAK ET AL.: HYPOTHESIS-DRIVEN FIELD CAMPAIGNS W06509 5of16
3. Simplistic Illustration: Contaminant Arrival Times [67] In the following we will first illustrate our concept of R-optimal designs on a simplistic version of a synthetic case in order to discuss the principles without complication. A more complex version of this test case will follow in sections 4 and 5. 3.1. Simplistic Setup [68] Consider a contaminant source within a 2-D homogeneous aquifer. We assume that the effective porosity n e and the regional hydraulic gradient Jare known and uniform, whereas the spatially constant value of log-transmis- sivity Y¼log Kis unknown. Authorities are concerned that the contaminant arrives at some sensitive location at a distance Ldownstream within the aquifer faster than a specified arrival time 0, and demand 95% confidence for rejecting their concern. Under the given circumstances, the arrival time is a so-called environmental performance metric (see section 3.2 of de Barros et al. [2012]) of interest and is given by ¼Lne KJ ;(11) where K¼exp ðYÞ[e.g., Rubin, 2003]. We can rearrange this for the limiting value Y¼Y0which leads to ¼0. Using the data shown in Table 1, we obtain Y0¼0:9 (with Kin units of m d 1 ). [69] Next, a site investigator is entrusted with the task to provide a suitable data acquisition strategy, such that one can determine with sufficient confidence (here 95%), whether or not the arrival time is smaller than 0. For simplicity we limit this example to collecting aquifer cores, assuming that they can provide conductivity data with uncorrelated Gaussian measurement error of variance 2 ". 3.2. Application of Hypothesis-Driven Design [70] First, we set up a hypothesis test and perform all steps as outlined in sections 2.1 and 2.2: Null hypothesis H 0 :YY0: unsafe situation with 0. Alternative hypothesis H 1 :Y<Y0: safe situation with > 0. [71] Since human health is at risk, the challenge is to prove the safe situation ðH1Þ, whereas the null hypothesis H 0 represents the more conservative choice. In accordance with the requested confidence of 95% typical for regulations by the US EPA [e.g., USEPA, 1989, 1991, 2001], we choose a significance level of ¼5%. [72] When taking n s samples of Y¼log Kwe can use the sample mean m Y as an estimate of Yand as the test statistic T. Because we face independent and normally distributed samples with known variance 2 ", the distribution pðTjH0Þof the test statistic T¼mYunder H 0 is normal with mean Y 0 and sample variance n1 s2 "[e.g., Stone, 1996]. Under these conditions we can simplify the procedure outlined in section A2 by analytical means. [73] In order to drive the hypothesis test in a Bayesian manner, we need prior probabilities for H 0 and H 1 .Thiscan be achieved by assuming a distribution for Y,forexample from world-wide data bases, expert elicitation or minimum relative entropy considerations [e.g., Woodbury and Ulrych, 1993; Woodbury and Rubin, 2000; Hou and Rubin, 2005]. Here we assume that pðYÞis Gaussian with prior mean Y and variance 2 Y. In our case, 2 Ydenotes uncertainty in the constant mean value of Y¼log K, not spatial variability. The data to be collected will have independent zero-mean Gaussian measurement errors "Nð0; 2 "Þ.ThevaluesforY, 2 Y,and2 "and several scenario variations for discussion are provided in Table 2. The data from Tables 1 and 2 yield prior probabilities of Pr½H0¼Pr½YY034% and Pr½H1¼ Pr½Y<Y066%. For the base case with ¼5%, we decide a priori in favor of H 0 , because Pr½H0>5%. This immediately yields that the initial risk of wrong decision according to equations (3) and (4) is R0¼P¼66%. [74] Under the conditions adopted for this example, optimal design amounts to finding the minimal number n s of core samples that need to be collected in order to achieve the requested confidence. Thus, the design vector dsimplifies to d¼½ns[e.g., Raiffa et al., 1995; Rasch et al., 2011]. Next, we will use the algorithm explained in section A2 with different sample sizes (n s ¼1, ... , 50) to assess the dependence of Ron n s , and perform this for all scenario variations listed in Table 2. Results are provided in section 3.3. 3.3. Results [75] Figure 2 looks at the resulting expected reduction of total risk R¼RþRas a function of sample size n s . It indicates what n s is necessary such that we can expect to support or refute the hypotheses with an error probability of RRmax, e.g., ns¼10 for Rmax ¼5% when 2 "¼1=16, 2 Y¼1, Y¼0:5, and ¼5% (see darkest line in Figure 2(a)). Seen from the viewpoint of multiobjective optimization, all plots in Figure 2 resemble Pareto fronts. They visualize the trade-off between the costs and benefits of sampling, i.e., between n s and the reduced risk R0RðnsÞ. [76] In general, the initial risk R 0 and RðnsÞdepend nonlinearly on the distance between the sampling statistic T and its critical value T crit . This distance results from the relations between prior mean, prior variance, measurement precision, limiting value Y 0 and significance level , as discussed in the following. [77] 1. Measurement error: Figure 2(a) shows that, quite intuitively, more precise measurements satisfy the information needs faster. For accurate samples, a smaller number suffices to acquire the desired confidence. Table 1. Data Used for Hypothesis Testing Example in Section 3 Name Symbol Value Units Gradient J0.04 – Porosity n e 0.2 – Error 2 "1/4 – Travel distance L500 m Critical arrival time 01000 day Table 2. Scenario Variations for the Simplistic Example Used in Section 3 a Name Symbol Values Units Prior mean of YY0.5, 0, 0.5, 1, 1.5 – Prior variance of Y2 Y1/4, 1/2, 1,2,4 – Measurement error 2 "1/16, 1/8, 1/4, 1/2, 1 – Significance level 1, 5, 50, 95, 99 % a Bold numbers refer to the base case scenario. W06509 NOWAK ET AL.: HYPOTHESIS-DRIVEN FIELD CAMPAIGNS W06509 6of16
[78] 2. Prior uncertainty: Figure 2(b) may be surprising at first sight. A smaller prior variance 2 Yleads to an increased risk of wrong decision for any given n s . The reason is that Ylies within the region of H 1 . Thus, decreasing 2 Yincreases the prior probability of H 1 as we concentrate p(Y) more and more within the region of H 1 . Since H 1 is initially being rejected over the entire explored range of scenario conditions in Figure 2(b), this leads to an increase of decision risk. [79] 3. Prior mean: Figure 2(c) shows that the initial risk R 0 is larger for smaller Y. This is because smaller values of Ymove p(Y) more into the region of H 1 , with the same arguments following as above. For increasing n s and different values of Yin Figure 2(c), the different curves for RðnsÞcross each other. The reason can be seen from Figure 3, which shows the dependence of decision risk on a standardized normal test statistic z: at the transition from some acceptance region of H 0 (z<zcrit) to some rejection region (zzcrit), the decision risk jumps from R¼1to R¼, i.e., from 95% to 5% in the shown example. The closer the limiting value z 0 is to z crit (but still below), the easier it is for additional data to move the observed value of zinto the rejection region with R5%. Thus, R decreases faster with n s when the prior expected value Y is just below the limiting value Y 0 . This behavior is a direct outcome of the binary character of decisions in conjunction with the strong jump of error risk at the critical value z¼zcrit. The jump that causes this effect disappears when choosing ¼50%, i.e., when the hypothesis test setup does not put the burden of proof on either H 0 or H 1 . [80] 4. Significance level: Figure 2(d) shows how RðnsÞ changes with the significance level . The levels of ¼1%;5%;50% yield a common initial risk of R0¼46:67% for the given example. For all three cases, R 0 is comprised solely from R. The prior decision is D 0 (that H 0 should be true), and R0¼46:67% is the probability P 1 that, in reality, H 1 is true. For ¼95% and ¼99%, the decision in absence of data flips to D 1 (that H 1 should be true), and the common value R0¼53:33% is the probability P0¼1P1that H 0 is the actual truth. After several samples collected (in fact, already after the first), the risks in the different scenarios change their rank: the values Rðns1Þfor ¼1% and ¼99% are now the largest ones, the values for ¼50% are the lowest, and the values for ¼5% and ¼95% fall in between. The reason is that ¼1% and ¼99% represent the most demanding decision rules, requiring very strong statistical evidence for H 0 or H1;respectively. Contrary to that, the other values of require only weaker statistical evidence. Therefore, the Figure 2. Probability Rof wrong decision (both and error, equation (4)) versus the number n s of measurements for the scenario defined in section 3.2 with data from Tables 1 and 2. Plot (a) represents different measurement precision; plot (b) describes the dependency on different prior variances; plot (c) illustrates the behavior for different prior mean values, and (d) shows variations with the significance level . Figure 3. The initial decision risk Rdepends very nonlinearly on z(a generic standardized normal test statistic). Red shaded area: rejection region of H 0 for ¼5%. Green shaded area: acceptance region of H 0 . W06509 NOWAK ET AL.: HYPOTHESIS-DRIVEN FIELD CAMPAIGNS W06509 7of16
decision rule behind ¼50% triggers information needs that are easiest to satisfy. [81] Altogether, this example demonstrates that hypothesis-driven design can optimize field campaigns (here: simply find the number of samples to collect) to maximize the probability of finding the correct answer for a specified hypothesis. It does so by combining all aspects of proper hypothesis testing with Bayesian updating and Bayesian decision theory. 4. Test Case [82] Now we illustrate the methodology on a more complex version of the example, featuring a significant amount of uncertain parameters. Again, the goal is to support predictions of arrival time with data in order to come below a maximum allowable risk of wrong decision. For the current scenario we use numerical simulations of contaminant arrival time (details given in section 4.1) within a Monte Carlo framework, and consider an extensive list of sources for uncertainty (details again in section 4.1), in accordance with the discussion in section 2.4. In section 4.2 we will describe how we applied our hypothesis-driven framework to this situation. We present and discuss the results in section 5. 4.1. Physical Formulation and Setup [83] Consider a steady state, 2-D depth-averaged flow in a heterogeneous aquifer with locally isotropic transmissivity K[L 2 /t]. We assume a scenario free of sinks and sources. Under these conditions, the flow equation is given by r½KðxÞrhðxÞ ¼ 0;(12) with h[L] denoting hydraulic head and x¼ðx1;x2Þ. The domain is rectangular with L1L2¼200 m 200 m. Boundary conditions for flow will be discussed below. We wish to predict the bulk arrival time (t 50 ) from a continuous-release line source along the upstream domain boundary ðx1¼0Þto a sensitive location at xS¼ðL; 100 mÞ. Top this end, we use the groundwater age equation described by Goode [1996]: vr¼r½Ddrþ1; v¼q=ne; (13) subject to ¼0 on the upstream boundary and zero-gradient boundaries everywhere else. Here ðxÞ½tis the arrival time at any point xwithin the domain, v[L/t] is the effective transport velocity, q[L/t] is the specific discharge given by Darcy’s law, n e [–] is the effective porosity, and Dd[L 2 /t]is the local porescale dispersion tensor [Scheidegger, 1954]. [84] Following our arguments from section 2.4, we choose the Mate´rn covariance function [Mate ´rn, 1986; Handcock and Stein, 1993] with uncertain covariance parameters to model the heterogeneity of log-transmissivity Y¼ln K. The advantage of the Mate´rn covariance is that it encompasses a family of covariance functions within a single expression that depends on its shape parameter . For specific values of , the Mate´rn function recovers the exponential, Whittle, and Gaussian covariance as special cases [e.g., Handcock and Stein, 1993]. This maps structural model uncertainty onto a set of uncertain parameters, which is called continuous Bayesian model averaging [Nowak et al., 2010]. [85] We superimpose a trend model with uncertain linear trend components along the directions of the x 1 and x 2 coordinates. We also admit uncertainty in flow boundary conditions via a regional gradient with uncertain slope J and rotation angle hrelative to the x 1 axis, and assign corresponding fixed-head conditions to all four boundaries. All relevant parameter values and their uncertainty are listed in Table 3. 4.2. Hypothesis-Driven Design [86] Following the approach described in section 2 and illustrated in section 3, we will now formulate the hypotheses directly in terms of the target quantity qfor decision, i.e., in terms of arrival time q: [87] Null hypothesis H 0 :< 0. [88] Alternative hypothesis H 1 :0. [89] In the current example arrival time is our test statistic T. In the previous case (see section 3.2), we featured a globally constant value of Y¼ln Kas test statistic and as the only unknown and observable quantity. All data were repeated measurements of the very same quantity, and the test statistic was a simple arithmetic average of the collected data. In the current example we consider hydraulic heads hðxÞand log-transmissivities YðxÞ¼ln KðxÞas possible data types. Arrival time and our two data types are three different physical quantities, and the latter vary in space due to heterogeneity and boundary conditions. [90] Now, the distribution pðÞand the related sampling distributions pðjH0Þand pðjH1Þhave to be constructed from prior assumptions and auxiliary models. The conditional distributions pðjyÞfor possible data values yreflect the entire uncertainty involved in inferring the true value of from prior assumptions and from scarce, erroneous additional data. In section 3.2 the main uncertainty originated from measurement errors. In the current example we additionally feature overall system uncertainty and a target Table 3. Parameter Values Used for the Synthetic Test Case a Numerical Domain Domain size ½L1;L2m½200;200 Grid spacing ½1;2m½0:4;0:8 Transport Parameters Head gradient J–Uð0:005;0:015Þ Head angle h%Nð0;5Þ Effective porosity n e – 0.35 Local dispersivities ½‘; tm½1;0:1 Diffusion coefficient D m m 2 s 1 109 Geostatistical Model Parameters Global mean Y¼ln Kgln(m 2 s 1 )Nð7:2;1Þ Trend in x 1 1ln(m 2 s 1 )Nð0;0:5Þ Trend in x 2 2ln(m 2 s 1 )Nð0;0:5Þ Variance 2 Yln 2 (m 2 s 1 )Nð2;0:5Þ Integral scales ½1; 2m½N ð20;5Þ;Nð20;5Þ Mate´rn’s shape parameter –Nð3;0:75Þ Measurement Error Standard Deviations ln Tr;T– 0.5 Head r; m 0.05 a Uis uniform distribution with lower and upper bound provided. Nis normal distribution with mean and SD provided, truncated at zero for 2 Y; 1,2, and (according to minimum relative entropy considerations). W06509 NOWAK ET AL.: HYPOTHESIS-DRIVEN FIELD CAMPAIGNS W06509 8of16
quantity that is not observable, but needs to be inferred via Bayesian updating. [91]H 1 will be rejected in favor of H 0 if the critical value 0¼50 d lies outside the acceptance region of pðÞ(or of pðjyÞ, if additional data are available). The acceptance region for H 1 is again defined by the significance level (taken again as ¼5%). The possible decision errors in the current situation are: [92]error E: Accepting that > 0according to H 1 , although 0(falsely assuming a safe situation). [93]error E: Accepting that 0according to H 0 , although > 0(falsely issuing an alert). [94] Following our hypothesis-driven framework, the objective function for optimizing the design is the total risk R¼RþRof committing any of the two decision errors (see equation (10)), again using a maximum acceptable risk of decision error Rmax ¼5%. For the sake of later discussion, we produce R-optimal sampling patterns for different travel distances L¼100, 120, 140, and 160 m between the upstream boundary and the sensitive location xS¼ ðL;100 mÞ, and for different maximum numbers of samples (ns¼2;4;6;8;9;10) that may be placed within the aquifer. 4.3. Implementation [95] The flow and travel time equations from section 4.1 are solved numerically using the code described by Nowak et al. [2008] and Nowak et al. [2010]. We obtain the prior arrival time probability distribution pðÞvia Monte Carlo simulation with nr¼40;000 realizations, based on the parameter values listed in Table 3. To evaluate all the possible conditional distributions of travel time pðjyÞfor any possible data set y, the required test statistics and the objective function (equation (10)) according to the scheme outlined in sections A2 and A1, we use the PreDIA framework by Leube et al. [2012]. [96] For optimizing the design we chose a simulated annealing (SA) algorithm [e.g., Laarhoven and Aarts, 1992] from the possible algorithms listed in section A3. The design parameters to be optimized were the number of samples, their data types, and their spatial coordinates. Because the optimization carried out here mainly serves to illustrate our hypothesis-driven approach with results, we leave out all further details on setup and implementation. 5. Results and Discussion 5.1. Optimal Measurement Locations [97] Now we will discuss what design patterns are optimal to feed the information needs of the hypothesis test by relating the resulting patterns to the underlying flow and transport statistics. Figure 4 shows the resulting sampling pattern for the sensitive location placed at xS¼ð140 m; 100 mÞand with ns¼10 and R¼5:00%. [98] For this scenario variant, ns¼10 is merely sufficient to achieve the desired maximum probability of wrong decision Rmax ¼5%. This can be seen in Figure 5, and will be discussed in more detail in section 5.2. When gradually stepping up from ns¼1tons¼10 samples, our framework first places six transmissivity samples, and then four head measurements. How these 10 measurements helped to reduce parametric uncertainty (for parameter definitions, see Table 3) is shown in Figure 6. Here uncertainty reduction is expressed as expected entropy of parameter groups relative to their prior entropy [cf. Nowak et al., 2010], see also the information yield curves by de Barros and Rubin [2008] and de Barros et al. [2009]. [99] The six transmissivity samples are located between the upstream boundary and the sensitive location, helping to condition the transmissivity field locally. They are transversely more scattered near the upstream boundary, because the origin of solutes arriving at the sensitive location is uncertain. Both heterogeneity and the uncertain angle hof the regional gradient contribute to this effect. These six samples also help to identify the structural parameters of log-transmissivity (the mean Y, the trend parameters 1and 2, and the covariance parameters 2 Y,1, 2, and , see Table 3). Due to their wide spacing, at typical lag distances of more than 30 m, they are practically uncorrelated. This is powerful for inferring the mean and the trend coefficients, as can be seen in Figure 6. They are also somewhat useful to infer the variance 2 Y. Due to the large lags, this design will not be very helpful to reliably infer values of the integral scales 1and 2, but it will help to detect whether there is long-distance correlation or not. Certainly the design shown here does not support inference of the covariance shape parameter . This is consistent with the fact that Yand 2 Yare the dominant parameters in arrival time uncertainty [Rubin and Dagan, 1992a]. As a result, one can see in Figure 6 that the covariance parameter group is addressed less by this design. [100] A total of four out of the ten locations are designated for measurements of hydraulic heads. These locations mainly address the uncertainty caused by the regional head gradient J. They are placed at maximum mutual distance in the respective corners of the domain, for two reasons: First, this arrangement forms a duplicated measurement of a longitudinal head gradient. Duplication helps to suppress measurement error. Second, their wide spacing protects the inference of the global head gradient Jfrom the impact of mesoscale head fluctuations caused by heterogeneity in Y¼ln K. By matter of chance, this arrangement is also helpful to infer the angle hof the head gradient, although hhas almost no impact on arrival times in our scenario. Overall, this leads to the quick reduction of uncertainty in the boundary condition (BC) parameter group visible in Figure 6 for the last samples placed. 5.2. Information Needs Change With Distance [101] Figure 7 shows how the unconditional PDF (probability density function) of arrival time changes with distance to the inflow boundary. This PDF has been evaluated numerically from a Monte Carlo analysis using equations (12) and (13) with nr¼40;000 realizations and the parameter values provided in Table 3. Our numerical results shown in Figure 7 indicate a PDF very close to a lognormal one. This is in agreement with results from the literature [e.g., Rubin, 2003; Gotovac et al., 2010], although we consider an extended list of parametric uncertainty in boundary conditions and within the geostatistical model. [102] Two properties of our test case setup modify the magnitude and character of information needs with travel distance to a sensitive location: [103] 1. The variance of the arrival time PDF depends on travel distance [cf. Rubin and Dagan, 1992b; Rubin, 2003]. W06509 NOWAK ET AL.: HYPOTHESIS-DRIVEN FIELD CAMPAIGNS W06509 9of16
Nowak, W., and O. A. Cirpka (2004), A modified Levenberg-Marquardt algorithm for quasi-linear geostatistical inversing, Adv. Water Resour., 27(7), 737–750. Nowak, W., R. L. Schwede, O. A. Cirpka, and I. Neuweiler (2008), Probability density functions of hydraulic head and velocity in three-dimensional heterogeneous porous media, Water Resour. Res.,44, W08452, doi:10.1029/2007WR006383. Nowak, W., F. P. J. de Barros, and Y. Rubin (2010), Bayesian geostatistical design: Task-driven optimal site investigation when geostatistical model is uncertain, Water Resour. Res,46, W03535. Oladyshkin, S., H. Class, R. Helmig, and W. Nowak (2011a), An integrative approach to robust design and probabilistic risk assessment for CO 2 storage in geological formations, Comput. Geosc.,15(3), 565–577, doi:10.1007/s10596-011-9224-8. Oladyshkin, S., H. Class, R. Helmig, and W. Nowak (2011b), A concept for data-driven probabilistic risk assessment and application to carbon dioxide storage in geological formations, Adv. Water Res.,34, 1508–1518, doi:10.1016/j.advwatres.2011.08.005. Oreskes, N., K. Shrader-Frechette, and K. Belitz (1994), Verification, validation, and confirmation of numerical models in the earth sciences, Science,263(5147), 641. Pappenberger, F., and K. J. Beven (2006), Ignorance is bliss: Or seven reasons not to use uncertainty analysis, Water Resour. Res.,42, W05302, doi:10.1029/2005WR004820. Press, S. J. (2003), Subjective and Objective Bayesian Statistics: Principles, Models, and Applications, Wiley Series in Probability and Statistics, 2nd ed., pp. 217–232, John Wiley, New York. Pukelsheim, F. (2006), Optimal Design of Experiments, pp. 61–113, 135– 157, Classics in Applied Mathematics, SIAM, Philadelphia. Raiffa, H., R. Shlaifer, and J. Pratt (1995), Introduction to Statistical Decision Theory, MIT Press, Cambridge, Mass. Rasch, D., J. Pilz, , and V. R. A. Gebhardt (2011), Optimal Experimental Design With R, Chapman and Hall, Englewood Cliffs, N. J. Reed, P., B. Minsker, and A. J. Valocchi (2000a), Cost-effective long-term groundwater monitoring design using a genetic algorithm and global mass interpolation, Water Resour. Res.,36(12), 3731–3741. Reed, P., B. Minsker, and D. E. Goldberg (2000b), Designing a competent simple genetic algorithm for search and optimization, Water Resour. Res.,36(12), 3757–3761. Reed, P. M., and J. B. Kollat (2012), Save now, pay later? Multi-period many-objective groundwater monitoring design given systematic model errors and uncertainty, Adv. Water Res.,35, 55–68, doi:10.1016/ j.advwatres.2011.10.011. Reed, P. M., and B. S. Minsker (2004), Striking the balance: Long-term groundwater monitoring design for conflicting objectives, J. Water Resour. Plann. Manage.,130(2), 140–149, doi:10.1061(ASCE)0733- 9496(2004)130:2(140). Refsgaard, J. C., J. P. van der Sluijs, J. Brown, and P. van der Keur (2006), A framework for dealing with uncertainty due to model structure error, Adv. Water Resour.,29(11), 1586–1597. Rubin, Y. (2003), Applied Stochastic Hydrogeology, Oxford University Press, Oxford. Rubin, Y., and G. Dagan (1992a), Conditional estimates of solute travel time in heterogenous formations: Impact of transmissivity measurements, Water Resour. Res.,28(4), 1033–1040. Rubin, Y., and G. Dagan (1992b), A note on head an velocity covariances in three-dimensional flow through heterogeneous anisotropic porous media, Water Resour. Res.,28(5), 1463–1470. Rubin, Y., X. Chen, H. Murakami, and M. Hahn (2010), A Bayesian approach for inverse modeling, data assimilation and conditional simulation of spatial random fields, Water Resour. Res.,46, W10523, doi:10.1029/2009WR008799. Sawaragi, Y., H. Nakayama, and T. Tanino (1985), Theory of Multiobjective Optimization, Mathematics in Science and Engineering, Vol. 176, Academic, New York. Scheidegger, A. E. (1954), Statistical hydrodynamics in porous media, J. Appl. Phys.,25, 994–1001. Schoemaker, P. J. H. (1982), The expected utility model: its variants, purposes, evidence and limitations, J. Econ. Lit.,20(2), 529–563. Schwede, R. L., and O. A. Cirpka (2010), Stochastic evaluation of mass discharge from pointlike concentration measurements, J. Contam. Hydrol., 111(1–4), 36–47,doi:10.1016/j.jconhyd.2009.10.011. Shah, R., and P. M. Reed (2011), Comparative analysis of multiobjective evolutionary algorithms for random and correlated instances of multiobjective d-dimensional knapsack problems, Eur. J. Oper. Res.,211(3), 466–479, doi:10.1016/j.ejor.2011.01.030. Shi, N.-Z., and J. Tao (2008), Statistical Hypothesis Testing: Theory and Methods, World Scientific, Singapore. Smith, A. F. M., and A. E. Gelfand (1992), Bayesian statistics without tears: A sampling-resampling perspective, Am. Stat.,46(2), 84–88. Stone, J. C. (1996), A Course in Probability and Statistics, Duxbury, Pacific Grove, Calif. Trainor-Guitton, W. J., J. K. Caers, and T. Mukerji (2011), A methodology for establishing a data reliability measure for value of spatial information problems, Math. Geosci.,43, 929–949, doi:10.1007/s11,004-011-9367-0. Troldborg, M., W. Nowak, N. Tuxen, P. L. Bjerg, R. Helmig, and P. Binning (2010), Uncertainty evaluation of mass discharge estimates from a contaminated site using a fully Bayesian framework, Water Resour. Res., 46, W12552, doi:10.1029/2010WR009227. Ucnski, D. (2005), Optimal Measurement Methods for Distributed Parameters System Identification, CRC, Boca Raton, Fla. USEPA (1989), Risk Assessment Guidance for Superfund Vol. 1: Human Health Manual (Part A), Tech. Rep. Rep. EPA/540/1-89/002, Off. Emerg. and Remedial Response, U.S. Environmental Protection Agency, Washington, D. C. USEPA (1991), Risk Assessment Guidance for Superfund Vol. 1: Human Health Evaluation (Part B), Tech. Rep. Rep. EPA/540/R-92/003, Off. Emerg. and Remedial Response, U.S. Environmental Protection Agency, Washington, D. C. USEPA (2001), Risk Assessment Guidance for Superfund: Vol. III—Part A, Process for Conducting Probabilistic Risk Assessment, Tech. Rep. Rep. EPA 540/R-02/002, Off. Emerg. and Remedial Response, U.S. Environmental Protection Agency, Washington, D. C. Vrugt, J. A., B. A. Robinson, and J. M. Hyman (2009), Self-adaptive multimethod search for global optimization in real-parameter spaces, IEEE Trans. Evol. Comput.,13(2), 243–259, doi:10.1109/TEVC.2008.924428. Wilks, D. S. (1995), Statistical Methods in the Atmospheric Sciences: An Introduction, Academic, San Diego. Woodbury, A. D., and Y. Rubin (2000), A full-Bayesian approach to parameter inference from tracer travel time moments and investigation of scale effects at the Cape Cod experimental site, Water Resour. Res.,36(1), 159–171. Woodbury, A. D., and T. J. Ulrych (1993), Minimum relative entropy: Forward probabilistic modeling, Water Resour. Res.,29(8), 2847–2860. Zhang, Y., G. F. Pinder, and G. S. Herrera (2005), Least cost design of groundwater quality monitoring networks, Water Resour. Res.,41, W08412, doi:10.1029/2005WR003936. W06509 NOWAK ET AL.: HYPOTHESIS-DRIVEN FIELD CAMPAIGNS W06509 16 of 16