The project Testing Platform for Tidal Turbines is an ambitious and thorough work which was undertaken in September 2013 under the intended purpose of following up and complementing a project arisen in the context of a subject which focuses on the procedure of developing a project from start to end. Additionally, this provides the engineering students a holistic approach to cope with a technological need or demand. The work gathered herein tries to give response to a matter of growing importance all around the globe, but more precisely in the French region of Poitou-Charente. Such matter is the necessity of clean energies that gradually replace part of the energy production, which is currently led by nuclear energy in France. As regards the previous fact, several coastal regions of France are nowadays fostering their tidal industry, among others, in order to share the leadership of this energy transformation. Be that as it may, what are the elements that can contribute to foster the tidal turbine industry in a certain zone? In all likelihood, such a technological business needs to test their new design and components to have a feedback that helps to somewhat link the Finite Element Method assessments with the actual behaviour in a real environment. One of the main troubles when tackling a testing procedure in fields concerning large machinery such as aeroplanes, hydroelectric turbines, vehicles, and so forth, consists in the aforementioned size of the elements to be tested. Generally, the costs of due infrastructure for testing purposes exceed by far the limits which would allow the investment to have final benefit. Therefore, the need for a shared testing infrastructure stems from an economic reason, and so happens in the field that concerns this project, the tidal turbine business. Nowadays, specific projects to build up new testing sites for tidal turbines are carried out in response to the increasing number of new companies that need to test their innovative designs, as the tidal technology is still in its first stage, chronologically speaking. Additionally, according to the awareness of slow tidal currents around the zone in question which are not bound to be sufficient, the need of a platform to accelerate the stream velocity is set as initial hypothesis, even though this is to be verified. In a nutshell, the Testing Platform for Tidal Turbines project is a feasibility study from a technical perspective to build a testing site in the Poitou-Charente to foster the tidal energy industry throughout said zone.

Full text

DISSERTATION As completion of the degree in Industrial Engineering, specialisation in Mechanics Universitat Politècnica de Catalunya (UPC) Escola Tècnica Superior d’Enginyeria Industrial de Barcelona (ETSEIB) Dissertation plan: Erasmus - Lifelong Learning Programme Hosting institution: L'Ecole d'Ingénieurs en Génie des Systémes Industriels (EIGSI), La Rochelle Field of search: Marine Energies Presented by: Oliver BRAVO GORRIZ ____________________________________ Testing Platform for Tidal Turbines ____________________________________ Project director: Yoann BARRANGER Date of delivery: April 20, 2014 “If you’re not prepared to be wrong, you’ll never come up with anything original.” Ken Robinson Testing platform for tidal turbines - 5 - Table of contents Introduction………...……………………………………………………..……..7 Objectives ...................................................................................................................... 8 1 Scope .............................................................................................................................. 8 2 Background ................................................................................................................... 9 3 3.1 Test conditions ................................................................................................................ 9 3.1.1 The test site .................................................................................................................. 9 3.1.2 Local site considerations in resource assessment at the pre-deployment stage ........... 9 3.1.3 Data measurement of speed and direction at the resource assessment stage ............. 10 3.1.4 Data analysis at the resource assessment stage ......................................................... 10 3.1.5 Transposing between sites and sea areas ................................................................... 10 3.2 Test equipment ............................................................................................................. 10 3.2.1 Electric power ............................................................................................................ 10 3.2.2 Tidal stream and current measurements .................................................................... 11 3.2.3 Seawater density ........................................................................................................ 11 3.2.4 Tidal energy conversion system operational status ................................................... 11 3.3 Measurements procedures for TECS device performance ........................................... 12 3.3.1 Data collection ........................................................................................................... 12 3.3.2 Data issues ................................................................................................................. 12 3.4 Derived results .............................................................................................................. 13 3.4.1 General ...................................................................................................................... 13 3.4.2 Prediction from the power curve from measurements ............................................... 13 3.4.3 Power coefficient ....................................................................................................... 15 Assessment of the offshore location for the platform installation .......................... 17 4 Data gathering ............................................................................................................ 19 5 Tidal technology .......................................................................................................... 23 6 Design of the platform ................................................................................................ 25 7 Simulation 1 ................................................................................................................ 31 8 Simulation 2 ................................................................................................................ 33 9 Structural assessment ................................................................................................. 40 10 Bibliography………...…………………………………...……………….……44 Testing platform for tidal turbines - 6 - Testing platform for tidal turbines - 7 - Introduction The project Testing Platform for Tidal Turbines is an ambitious and thorough work which was undertaken in September 2013 under the intended purpose of following up and complementing a project arisen in the context of a subject which focuses on the procedure of developing a project from start to end. Additionally, this provides the engineering students a holistic approach to cope with a technological need or demand. The work gathered herein tries to give response to a matter of growing importance all around the globe, but more precisely in the French region of Poitou-Charente. Such matter is the necessity of clean energies that gradually replace part of the energy production, which is currently led by nuclear energy in France. As regards the previous fact, several coastal regions of France are nowadays fostering their tidal industry, among others, in order to share the leadership of this energy transformation. Be that as it may, what are the elements that can contribute to foster the tidal turbine industry in a certain zone? In all likelihood, such a technological business needs to test their new design and components to have a feedback that helps to somewhat link the Finite Element Method assessments with the actual behaviour in a real environment. One of the main troubles when tackling a testing procedure in fields concerning large machinery such as aeroplanes, hydroelectric turbines, vehicles, and so forth, consists in the aforementioned size of the elements to be tested. Generally, the costs of due infrastructure for testing purposes exceed by far the limits which would allow the investment to have final benefit. Therefore, the need for a shared testing infrastructure stems from an economic reason, and so happens in the field that concerns this project, the tidal turbine business. Nowadays, specific projects to build up new testing sites for tidal turbines are carried out in response to the increasing number of new companies that need to test their innovative designs, as the tidal technology is still in its first stage, chronologically speaking. Additionally, according to the awareness of slow tidal currents around the zone in question which are not bound to be sufficient, the need of a platform to accelerate the stream velocity is set as initial hypothesis, even though this is to be verified. In a nutshell, the Testing Platform for Tidal Turbines project is a feasibility study from a technical perspective to build a testing site in the Poitou-Charente to foster the tidal energy industry throughout said zone. Testing platform for tidal turbines - 8 - Objectives 1 The global aim pursued is to develop a platform to perform tests of hydraulic turbines whose purpose is to convert the kinetic energy of water in movement into electricity. Moreover, the specific objectives which this project set out to achieve in its origin, as well as the date in which each one was completed, are stated as follows: - [10/04/2013] Test procedure. Survey of the main systems and methodologies for data acquisition and data post-process, taking account of the desired outputs. - [07/10/2013] Tidal developers and technologies. Evaluation of the current tidal technology in the market in order to be acquainted with the elements to test and for which the testing platform has to be designed. - [07/10/2013] Stream conditions on site. Assessment of the offshore conditions at the coast so as to find the most adequate location to install the testing platform. - [12/12/2013] Design, model creation and simulation. Shape the platform and perform a theoretical and numerical calculation of its hydrodynamic behaviour. - [22/01/2014] Design and simulation improvement. Once obtained the first results, utilise them as feedback to ameliorate and enhance the design and simulate closer to real conditions. - [18/02/2014] Technological feasibility. According to the boundary conditions that have been set and extreme condition streams, evaluate the hydrodynamic pressure effect in terms of stress and deformation in the platform. Scope 2 Taking account of the necessity of restraint in order to focus on definite objectives, the following points were stated as boundaries of the project: - The coastal zone to be assessed solely concerns to La Rochelle and surroundings - The sort of tidal turbines to be tested in the platform fulfils the following characteristics:  Up to 5 meters in rotor diameter  Suitability for pitch movement as well as for fixed axis directions  Environmentally friendly materials and the least sea impact possible Testing platform for tidal turbines - 9 - Background 3 The Tidal Energy Conversion Systems (TECS) are the category of technology whose purpose is to transform the kinetic and/or potential energy of tides into electricity. Most of these technologies involve tidal turbines and, therefore, it stands as an essential component in the field. During the process of design of new TECS in order to be finally launched in the market, it is vital the stage of testing, data acquisition, redesign and adjustment, mainly in a closed loop so that the final product is reliable, effective and efficient. In consequence, in regard to the topic and final goal of this project it is, first of all, necessary to be acquainted with the TECS testing procedure that is nowadays applied to certify the tidal turbines. 3.1 Test conditions 3.1.1 The test site A survey of the bathymetry of the test site shall be carried out to ensure that it is free from obstacles and topology that could affect the performance of the TECS, or adversely affect the local quality of the tidal currents. Sub-bottom profiling might also be required in situations where there is a considerable volume of suspended sediment, or layers of liquefied mud that may affect the device installation. Bathymetry: the study of underwater depth of lake or ocean floors. In other words, bathymetry is the underwater equivalent to topography. It usually shows seafloor relief or terrain as contour lines (called depth contours or isobaths) and selected depths (soundings). 3.1.2 Local site considerations in resource assessment at the pre-deployment stage The effects of seasonal migration of currents need to be considered (influence upon predicted longterm power capture). Moreover, tidal stratification might also need to be taken into consideration, and the scale of its existence and the need to consider it should be inferred from numerical modeling. Likewise, wave–current interaction also exerts an influence upon the total current resource (assessment through the application of a suitable nonlinear numerical wave analysis). Water stratification occurs when water masses with different properties - salinity (halocline), oxygenation (chemocline), density (pycnocline), temperature (thermocline) - form layers that act as barriers to water mixing. These layers are normally arranged according to density, with the least dense water masses sitting above the denser layers. Water stratification also creates barriers to nutrient mixing between layers. Testing platform for tidal turbines - 16 - ( ) A power capture area of the device P recorded power output (kW) Uperf average performance velocity of the tidal current In general, the performance of the device is likely to fall below the theoretical Betz limit. 3.4.3.2 Annual energy production The expected annual energy production (AEP) in kWh for a device with a defined power curve shall be obtained by combining the power curve described before with a frequency distribution of velocity for the site: ∑ Av the predicted availability AEP expected annual power production in kWh NB total number of velocity bins set in increments of 0,10 m/s, in the device power curve Pi(Uperf(i)) the power in kW generated by velocity bin i of the power device curve Uperf(i) the average performance current velocity of bin i of the power device curve fi(Uperf(i)) the proportion of time during the year for which the average performance current velocity occupies a value within bin i of the device power curve If the TECS is fixed, having no yaw capability, only the component of velocity perpendicular to the power capture surface should be used for the identity of Uperf(i) in Equation 5. However, if the TECS device is capable of orientating to the dominant tidal current direction prevailing at a given time, the velocity vector irrespective of direction should be used. This consideration also arises in the derivation of the device power curve, as discussed previously. Testing platform for tidal turbines - 17 - Assessment of the offshore location for the platform installation 4 The make a proper decision when selecting the site where the platform will be fixed is fundamental. Thus, to carry out such a crucial evaluation to lead the evidences to a final conclusion, the sea conditions and the feasibility to fix a structure of remarkable dimension are to be taken into account. The variables that are considered in this decision-making process are listed as follows: - Water speed - Stream direction - Variation of stream direction - Variation of water speed throughout the year - Ship traffic Figure 5. Map satellite view of the coastal zone of La Rochelle and surroundings. To start off, the use of PREVIMER provides key information to start with. The PREVIMER system aims to provide a wide range of users with observations and forecasts along French coasts (English Channel, Bay of Bisquay and Mediterranean sea) concerning: - Current - Temperature, salinity - Sea level, storm surge - Waves - Nutrients and plankton concentrations The relevant data that was observed from the PREVIMER system was the speed of the water in several days and times in which the peak current speed is created in some areas. The following image shows a capture of the interface in which a map of the coast is shown and, furthermore, relatively small mesh elements depict the current velocity at that precise time and position. Testing platform for tidal turbines - 18 - Figure 6. Interface at the website previmer.org. After the collection and observation of several current-speed maps, a direct conclusion is reached: the mesh elements in which the speed is maximum throughout the zone are seamlessly the same, fact that implies that the hydrodynamic behaviour of the current that produces one stream velocity or another is mostly due to bathymetry conditions rather than weather or other changing conditions. Moreover, it is observed a constant location of the current speed highs around the corners of Île de Ré and Île d’Oléron. Even though four feasible zones have been short-listed at this point (the pair of corners of both islands), the two corners nearer to the shore are deemed as inadequate because of ship traffic in the whereabouts. In regard to the two lasting possible zones of greater current speed, the one whose speed is always higher than the other is the North edge of Île d’Oléron. Hence, this is the selected offshore point where further data gathering will be performed at from now. Notwithstanding the current speed, it is of the same importance to consider the bathymetry of the zone stated above as optimal. Testing platform for tidal turbines - 19 - Figure 7. Bathymetry in the North of Île d’Oléron. In all likelihood, a platform that has to perform a successful test of a tidal turbine up to a 5-meter rotor might conceivably request a water depth greater than 10 meters. If the previous image is divided in the Cartesian 4-quadrant system, the first quadrant (corresponding to the upper right zone) is the zone where current speed conditions and water depth converges. Thus, the PREVIMER system is to be the mean to assess the stream velocity at the aforementioned point. Data gathering 5 The SHOM (Service Hydrographique et Océanographique de la Marine) is a state organisation which is in charge of, among others, gathering data on marine conditions. Via those that, other organisations with fairly different purposes are capable of analysing the past, very often in order to forecast the future and forthcoming natural events. One of those organisations depending on SHOM’s data is the website maree.info, from which the following data at La Rochelle-Pallice from 15/10/2012 to 15/10/2013, this is one year time, is collected to later process: - Date [dd/mm/yyyy] - Time [h:min] - Water height [m] - Tidal coefficient [-] Testing platform for tidal turbines - 20 - Figure 8. Interface of the website mare.info. Each day contains about 4 data lines, the so-called bins, corresponding to the time when the 2 highs and 2 lows of water level occurred. The evolution of the water height with respect to time is the first and most intuitive result that is obtained from the database. Figure 9. Evolution of water height. 0 1 2 3 4 5 6 7 118355065809711213114816317819320822323825927629731232734235737238740241943444946447949450952453955657358860362063565266868470171673875477178680382083585086588089991493194896397899310081023104010571072108911041119113411491164118111961211122612411256127112881305132013351352136713821397141214271444146114781493 10 11 12 1 2 3 4 5 6 7 8 9 10 2012 2013 Water height [m] Evolution of water height (1 year) Testing platform for tidal turbines - 21 - The water height amplitude of the daily tides is actually experiencing a maximum or minimum each 7 days approximately. This fact implies that the tide amplitude increases during a week, and afterwards it decreases during the second week, and so forth in a repetitive way. Furthermore, the amplitude presents another repetitive pattern that groups the wide amplitude tides and the thin amplitude tides each 4 weeks during 6 months, and then the pattern turns the opposite (it occurs around March the 22nd for the year 2013, see chart above). Once arrived to this point, it is essential to define the tidal coefficient and the information that provides. Tidal coefficient In order to compare tidal ranges of various harbours, Laplace characterized each harbour with a height unit: “the height unit is the average value of the amplitude (semi-tidal range) of the largest tide which occurs after about one day and a half the full or new moon, towards syzygies” The notion of coefficient directly results from this definition: usually, the coefficient hundred is given to the average tide range of neaps occurring after syzygy which is the closest to the equinox, and hence the following equation holds: Within which C is the tidal coefficient, H is the height of the high waters, Nmm is the semi-tide level and Uh is the unit height. The success in France of this coefficient notion comes from the fact that it quite rapidly provides an indication on the amplitude of the tide. This is obviously only a relative indication, but is largely used by anyone within the French coastal zones located at the edge of the English Channel and of the Atlantic Ocean. In addition, this coefficient presents the advantage of leading to rapid calculation processes of the water or current heights. Indeed, the correction charts of the handbooks, for the calculation the tidal heights in the subordinate stations, and the current atlases provide some elements in the case of average neaps and average springs situations which respectively correspond to coefficients of 95 and 45. Knowing the coefficient of the occurring tide, it is then quite easy to perform a cross multiplication in order to calculate the corresponding heights or the currents. The results of these calculations are only approximate ones, and the navigators have to bear it in mind, knowing that the coefficient calculated in Brest can be adopted for any French coast, except the harbours located in the North Sea where the relative variations of the tide are sensitively lower than in Brest. However, it would be quite dangerous to apply the validity zone of the Brest coefficient to some too far away zones and it would not even make any sense for the tides which are not of the semidiurnal type. However, due to the practical advantage of this notion, it could be interesting to give it some definition which could be then used in any case. The most commonly used procedure to evaluate the power production of tidal turbines is by means of the following three tidal conditions: - An average neap tide (tidal coefficient 45) Testing platform for tidal turbines - 22 - - An average tide (tidal coefficient 70) - An average spring tide (tidal coefficient 95) In spite of having this notion regarding the tidal coefficient, it is deemed to be of remarkable importance to plot the statistical absolute frequency of this coefficient of the overall 1-year data. Figure 10. Absolute frequency of tidal coefficient The previous chart depicts the fact that most of the data is contained between the average neap tide (tidal coefficient 45) and the average spring tide (tidal coefficient 95). Notwithstanding the aforesaid first conclusion, it is also true that the absolute frequency of the tidal coefficient 104 is far from being negligible. Therefore, this unexpected value is also to be taken into account. The database is, at this point, composed of a register of information regarding the time when the maximum and minimum water heights occurred. Thus, the current speed in those instants is zero approximately, due to the inversion from increasing to decreasing water level, or backwards. This fact implies that the time when the stream speed is maximum arises between a high and a low. By means of the PREVIMER system, it has been searched the instant when the current velocity is maximum. Nonetheless, this information is solely deemed relevant, and therefore collected, in the following cases: - Neap tide: tidal coefficients of 44, 45 and 46 - Spring tide: tidal coefficients of 94, 95 and 96 - Wide amplitude tide: coefficient of 104 The chart below provides a succinct summary of the current speed with respect to the tidal coefficient. It has been grouped in the aforementioned cases to enhance the understanding. The current speed is given twice for each bin, in subgroups of two touching column, thus depicting the surface water speed on the left column and the bottom water speed on the right column. 0 5 10 15 20 25 29 34 40 45 50 55 60 65 70 75 80 85 90 95 100 105 Absolute frequency [-] Tidal coefficient [-] Absolute frequency of tidal coefficient (1 year) Testing platform for tidal turbines - 23 - Figure 11. Stream speed for tidal coefficients In conclusion, the peak current speed for those days in which the neap tides occur is 0,42 m/s on average (at a certain depth between the top and the bottom). On the other hand, at the time when spring tides arise the water speed reaches 0,97 m/s on average, which an actual maximum during the 104-coefficient tides that increases up to 1,11 m/s on average. Hence, once arrived to this stage, the awareness of the water stream speed available is clear, and the imminent further step is to verify whether it is enough to operate tidal turbines without intervention or not. Tidal technology 6 The tidal turbines that are currently in the market and their operational characteristics may very well provide a not too rough idea of the technology that has to be tested. The EMEC (European Marine Energy Centre), established in 2003, is the first and only centre of its kind in the world to provide developers of both wave and tidal energy converters (technologies that generate electricity by harnessing the power of waves and tidal streams) with purpose-built, accredited open-sea testing facilities. The EMEC has created a database of the tidal developers which is periodically updated to reflect changes of such an incipient industry. It has been listed the name of the companies and their websites, and the list gathered 88 tidal providers at the time it was consulted. Most of the tidal providers do not give thorough information of the technical features of their products, as plenty of those are project under development. Nonetheless, certain product characteristics are available to be read. Some of that information has been shortlisted below in order to come up to a conclusion. 0 0,1 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1 1,1 1,2 1,3 1,4 1,5 1,6 44 45 46 94 95 96 104 Current speed at the surface and bottom [m/s] Tidal coefficient [-] Stream speed for tidal coefficients (average 1 year) 45 / 95 / 104 Testing platform for tidal turbines - 24 - Figure 12. Tocardo technical information on tidal turbine products. Testing platform for tidal turbines - 25 - Figure 13. Clean Current technical information on tidal turbine products. Figure 14. New Energy technical information on tidal turbine products. It is remarkable to further examine the graph and table provided by Tocardo, as it depicts the inverse relationship between the rotor diameter and the operational range of speed. The larger the rotor is, the slower the operational water speed requested. These three are only examples of a larger group of turbines which operate under similar conditions. The previous gathered information elucidates that the operation water speed range goes from 1 or 1,5 to 3 or 3,5 m/s. Therefore, the current speed existing in the North corner of Île d’Oléron is not enough to operate and test tidal turbines as, in many cases, the turbines would not even start to rotate. Design of the platform 7 Once assured of the necessity to accelerate the current speed that flows at the sea location previously selected, the design of a platform for such purpose is carrying out within this section. First, it is important to be aware of the speed increment needed. Consequently, the three tide cases herein mentioned are to be taken into account. As the maximum current speed at which the turbine requests to be tested is the greater value in the operation range, the higher speed to be reached is set as 3 m/s. This velocity it is comparable with the current speed at the surface, as it is also the maximum speed at which the water flows. Testing platform for tidal turbines - 32 - the two parameters of the model epsilon and k. After few iterations, the values remain fairly constant and the iterative processes is stopped at 350, as the following graph shows. Figure 28. FLUENT convergence after 350 iterations. The important variable to display is the distribution of the stabilised current speed. For this purpose, the velocity in contours is deemed as the most suitable since it provides an intuitive idea of the speed module in each element, regardless of the direction, and grouped in intervals of velocity that are mapped in different colours. The images below correspond to the speed contours in m/s Figure 29. Contours of velocity Magnitude (m/s) Testing platform for tidal turbines - 33 - Figure 30. Details of Contours of velocity Magnitude (m/s) The main conclusion is that, despite the theoretical calculation carried out to achieve a speed increment of 300%, the FLUENT simulation shows solely a speed boost of about 35%, from 1 to 1,35 m/s. Furthermore, an important reduction of the speed at the so-called section 1 (the largest of the platform) which stems from the impact of fluid atoms that attempt to continue moving in the same direction although the section shrinks along the way. Apart from that, the expected impact on the edge occurs and, as the previous image shows, the gradient of speed in the region is remarkable and, consequently, it was a well-made decision to mesh finer in its surroundings. Finally, both contact layers are shown so as to be able to highlight their essential role, as it is the fluid volume in which the fluid fits the objects and boundaries. Therefore, the behaviour observed within the layers is the one expected. Simulation 2 9 After the first simulation results obtained, the slow speed effect at the broad section of the platform inlet is deemed as the main responsible for the velocity boost smaller than expected. Because of that, several improvements are introduced to the geometry in order to enhance the performance. The modifications are listed as follows. Testing platform for tidal turbines - 34 - - Addition of a surface at the inlet and outlet of the platform, aligned to the overall current direction. Figure 31. Geometry modification between simulations 1 and 2. - Thickness reduction from 400 mm to 10 mm in all the walls except the inlet and outlet flowdirection surface, which reduces its thickness from 10 mm to 5 mm in the edge throughout a slope. Figure 32. Detail of the inlet edge. Model for simulation 1 Model for simulation 2 5 cm Testing platform for tidal turbines - 35 - - Application of the double symmetry that occurs. Thus, instead of simulating a half of the real body, it is reduced to a quarter. Figure 33. Application of the double symmetry. Once all these changes have been introduced, the process of meshing is the same as in the simulation 1. The global mesh structure is shown as follows. Figure 34. Mesh comparison between simulation 1 and 2. Testing platform for tidal turbines - 36 - The element distribution along the platform is similar to the one carried out for the first simulation. Figure 35. Platform mesh. However, having reduced to half of the body is essential because of the reduction of thickness, fact that demands the use of smaller elements in contact with the inlet edge of the platform that, as a reminder, has reduced its size from 400 mm to 5 mm. Figure 36. Platform edge mesh. A posteriori to the meshing, the simulation with FLUENT is performed. This time, it has to be ensured that the contact layer is adequate and capable to provide precise results. For this purpose, the parameter Y+ should be constrained to values between 30 and 300. To modify its value, the thickness of the contact layers when meshing has to be changed in a closed loop, performing several simulations and re-meshing until Y+ fits inside the desired interval. The chart below shows that the majority of values of Y+ are suitable for the position corresponding to the platform, from -12,5 m to +12,5 m which are the overall 25 meters in length. Testing platform for tidal turbines - 37 - Figure 37. Y+ distribution. Once the Y+ is adequate, it is proceeded to display the velocity contours. Figure 38. Contours of velocity Magnitude (m/s) Testing platform for tidal turbines - 38 - Figure 39. Contours of velocity Magnitude (m/s) At this point, it is of remarkable relevance to display the direction of the current when in contact with the platform in order to evaluate afterwards the hydrodynamic behaviour, as the contours of velocity solely shows the magnitude of the fluid speed in a certain element. Figure 40. Velocity vectors coloured by velocity Magnitude (m/s) As already mentioned, the inlet edge of the platform presents the greatest modification within the fluid movement, and therefore it is regarded as a zone needing further assessment. Testing platform for tidal turbines - 39 - Figure 41. Velocity vectors coloured by velocity Magnitude (m/s) Finally, the fluid speed distribution within its volume is a proper visual aid to understand the general fluid behaviour. Figure 42. Velocity vectors coloured by velocity Magnitude Likewise, as did for a current stream of global speed 1 m/s, the simulation has been done with different speeds so as to ensure that the Law of Conservation of Mass is fulfilled in the simulations. Testing platform for tidal turbines - 40 - INLET OUTLET 1,0 m/s  1,33 m/s (+32,5%) 1,5 m/s  1,95 m/s (+29,7%) 2,0 m/s  2,61 m/s (+30,3%) 3,0 m/s  3,97 m/s (+32,17%) As conclusion of this second simulation, it ought to be mentioned that the geometry improvements have not succeeded in producing a greater acceleration of the current velocity. The phenomenon which occurs at the platform inlet consisting in a decrement of the speed in this section still arises in spite of the new shape of the platform. It is also possible to observe an important deviation in the direction of the global stream which attempts to shun the obstacle, that is to say the platform. A similar behaviour occurs in the field of electronics when the electric current has more intensity along the wires which offer less resistance. Structural assessment 10 Figure 43. Platform geometry The evaluation of the hydrodynamic pressure on the platform structure is conservatively performed at a current speed of 3 m/s, as this value has been considered to take place in extreme conditions. Once the FLUENT simulation has converged, the values of wall pressure are imported to the ANSYS structural analysis environment in order to calculate the impact in terms of strain and stress. Testing platform for tidal turbines - 41 - Figure 44. The three partial pressures and the overall pressure distribution. Arrived to this point, it is interesting to simulate the structural behaviour of two materials that could be undoubtedly candidates to be installed underwater in the sea because they are environmentally friendly and resist corrosion properly. These are concrete and stainless steel. The displacements and stresses in the concrete are shown as follows. Figure 45. Total deformation of the concrete structure.