Full text
Solving the response time variability problem by means of the electromagnetism-like mechanism Alberto García-Villoria; Rafael Pastor EOLI: Enginyeria d’Organització i Logística Industrial IOC-DT-P-2008-03 Març 2008
1 Solving the Response Time Variability Problem by means of the Electromagnetism-like Mechanism† Alberto GARCÍA-VILLORIA * The RTVP was first time presented by Corominas et al. (2007). To solve it, they proposed a mixed integer lineal programming (MILP) model and five heuristic algorithms. In Corominas et al. (2006), it is proposed another MILP model, which and Rafael PASTOR Institute of Industrial and Control Engineering Technical University of Catalonia (UPC) {alberto.garcia-villoria / rafael.pastor}@upc.edu Abstract. The Response Time Variability Problem (RTVP) is an NP-hard combinatorial scheduling problem that has recently appeared in the literature. The RTVP has a wide range of real-life applications such as in the automobile industry, when models to be produced on a mixed-model assembly line have to be sequenced. The RTVP occurs whenever products, clients or jobs need to be sequenced so as to minimize variability in the time between the instants at which they receive the necessary resources. The field of Artificial Intelligence has provided us with efficient tools such as metaheuristic techniques for solving complex combinatorial scheduling problems. In a previous study, three metaheuristic algorithms (a multi-start, a GRAP and a PSO algorithm) were proposed to solve the RTVP. These three metaheuristic algorithms have been most efficient, until now, in solving non-small instances of the RTVP. We propose solving the RTVP by means of the electromagnetism-like mechanism (EM) metaheuristic algorithm. The EM algorithm is based on an analogy with the attraction-repulsion mechanism of the electromagnetism theory, where solutions are moved according to their associated charges. In this paper we compare the proposed EM metaheuristic procedure with the three metaheuristic algorithms previously mentioned and show that, on average, the EM procedure improves on the obtained results. Keywords: response time variability, fair sequences, scheduling, metaheuristics, electromagnetism-like mechanism, artificial intelligence 1. Introduction The Response Time Variability Problem (RTVP) is a scheduling problem that has recently been defined in the literature (Corominas et al., 2007). The RTVP occurs whenever products, clients or jobs need to be sequenced so as to minimize variability in the time between the instants at which they receive the necessary resources. Although this combinatorial optimization problem is easy to formulate, it is very difficult to solve (it is NP-hard, Corominas et al., 2007). The RTVP has a broad range of real-life applications. For example, it can be used to regularly sequence models in the automobile industry (Monden, 1983), to broadcast video and sound data frames of applications over asynchronous transfer mode networks as constantly as possible (Dong et al., 1998) and in the periodic machine maintenance problem when the distances between consecutive services of the same machine are equal (Anily et al., 1998). † Sponsored by the Spanish Ministry of Education and Science’s project DPI2004-03472; co-funded by the FEDER. * Corresponding autor: Alberto García, IOC – Institute of Industrial and Control Engineering, Av. Diagonal 647 (Edif. ETSEIB), 11th floor, 08028 Barcelona, Spain; e-mail: alberto.garcia[email protected]
2 improved on the one previously mentioned. Finally, García et al. (2006) proposed, three metaheuristic algorithms to solve the problem. One of the first problems in which seems to have appeared the importance of sequencing regularly is on the mixed-model assembly production lines at the Toyota Motor Corporation under the just-in-time (JIT) production system. This problem has a planning stage and a scheduling stage. In the planning stage, the number of units of each type to be sequenced in the planning horizon is determined. Subsequently, or better still, if possible, scheduling is decided simultaneously. In the Toyota system, scheduling is particularly important because it takes into account the production smooth by means of regular sequences. Monden (1983) explains the following example. Toyota has to make 20,000 Corona units in a month with 20 working days. There are four main types of Coronas: A, B, C and D. This month, the demand for these models is 8,000, 6,000, 4,000 and 2,000 units, respectively. Thus, 1,000 Corona units – 400, 300, 200 and 100 of type A, B, C and D, respectively –must be produced daily. According to Monden, the main objective for the scheduler is to obtain a regular sequence. For example, the sequence A, B, A, C, B, A, D, A, B, C, etc. seems intuitively more regular than the sequence A, A, A, A, B, B, B, C, C, D, etc. To measure the regularity of a sequence, different metrics can be used. The metric used in the RTVP, according to our experience with practitioners in manufacturing industries, is a reflection of the way in which practitioners refers to a desirable regular sequence. As the RTVP is a relatively new problem, in this paper we focus our efforts on efficiently solving the RTVP prior to successfully integrating it in planning and scheduling. Artificial Intelligence (AI) techniques are being successfully used to solve a whole range of intractable problems and the metaheuristic framework is one of the most widely used to solve hard combinatorial problems. In this paper, the electromagnetismlike mechanism (EM) algorithm is proposed to solve the RTVP. The EM algorithm is a recent population-based metaheuristic algorithm that was first proposed by Birbil and Fang (2003). It is based on an analogy with the attraction-repulsion mechanism of electromagnetism theory. Each solution is considered as a point with an electrical charge that is measured by the objective function. This charge determines the magnitude of attraction or repulsion of the other points for applying the electromagnetism equations and the EM algorithm iteratively calculates the movement of the points. The EM algorithm has yielded good results when it has been used to solve several combinatorial optimization problems (Debels and Vanhoucke, 2004 and Yuan et al., 2006). The proposed EM procedure to solve the RTVP is compared with the more efficient procedures for solving non-small instances published until now based on Artificial Intelligence techniques: three metaheuristic procedures presented by García et al. (2006), which are a multi-start, a GRASP (Greedy Randomized Adaptive Search Procedure) and a PSO (Particle Swarm Optimization) algorithm. On average, the EM procedure improves on previous results. The rest of this paper is organized as follows. Section 2 presents a formal definition of the RTVP and briefly exposes the three metaheuristic procedures presented by García et
3 al. (2006); Section 3 describes the basic scheme of the EM; Section 4 proposes a procedure based on the EM metaheuristic algorithm for solving the RTVP; Section 5 provides the computational experiments and the comparison with the other metaheuristics; finally, some conclusions and suggestions for a future integration of the planning and the scheduling are given in Section 6. 2. The Response Time Variability Problem (RTVP) The importance of a regular sequence can be observed in the mixed-model assembly production lines at the Toyota Motor Corporation under the just-in-time (JIT) production system. One of the most important JIT objectives is to avoid any kind of waste or inefficiency. According to Toyota, stock is the main source of waste. To reduce stock, JIT production systems must only produce the necessary product types in the necessary quantities at the necessary time. As Monden (1983) pointed out, one of the main goals that must be attained in order to achieve this is to schedule the units to be produced in such a way that constant consumption rates of the components involved in the production process are maintained. Miltenburg (1989) dealt with this scheduling problem and he assumed that product types require approximately the same number and mix of parts. Thus, he only considers the rate of demand for the product types. Miltenburg proposes four objective functions based on the regularity of scheduling the product types so that the proportion of product type i produced over each time period to the total production is as close to its ideal production as possible. That is, if the number of product types is p (i = 1,...,p) and the units of product type i to be produced is di, then the total number of units to be produced (D) is equal to 1 p i i d = ∑ (time periods k = 1,...,D) and the ideal production of product type i at the period time k is i d k D . This problem is known as the Product Rate Variation (PRV) problem (Kubiak, 1993). Kubiak and Sethi (1991, 1994) reformulated the PRV problem as an assignment problem and, therefore, it can be solved with an algorithm whose complexity is polynomial in D. The aim of the Response Time Variability Problem (RTVP) is to minimize the variability in the distances between any two consecutive units of the same type of product. Our experience with practitioners in manufacturing industries showed that they usually refer to a good mixed-model sequence as one in which the distances between the units for the same product type are as regular as possible, rather than in terms of ideal production, as is usual in the literature (Miltenburg, 1989; Kubiak, 1993; Steiner and Yeomans, 1993). Thus, the RTVP is a more realistic problem. This problem does not only occur in the manufacturing industry, but also in computer multi-threaded systems and network servers (Waldspurger and Weihl, 1995; Dong et al., 1998). For example, the data to be sent by an asynchronous transfer mode network is divided into cells of a fixed size. There are voice and/or video applications whose data cells must be regularly sequenced in the stream. Other contexts in which the RTVP appears are the periodic machine maintenance problem (Anily et al., 1998) and the scheduling of waste collection (Herrmann, 2007).
4 Hermann came up with the RTVP while working with a healthcare facility that needed to schedule the collection of waste from waste collection rooms throughout the building. Based on data about how often a waste collector had to visit each room and in view of the fact that different rooms require a different number of visits per shift, the facility manager wanted these visits to occur as regularly as possible so that excessive waste would not collect in any room. For instance, if a room needed four visits per eight-hour shift, it would ideally be visited every two hours. These real-life problems are usually considered as distance-constrained scheduling problems (Han et al., 1996; Dong et al., 1998). Although the main objective of the distance-constrained problem and the RTVP is to find as regular a sequence as possible, the advantage of the RTVP is that it will always come up with a feasible solution, contrary to the distance-constrained problem. The RTVP is formulated as follows. Let p be the number of product types, i d the number of units of the product of type i (i = 1,…,p) and D the total number of units ( ∑ = = p ii dD 1 ). Let s be a solution of an instance in the RTVP that consists of a circular sequence of units ( D ssss 21 = ), where sj is the unit sequenced in position j of sequence s. For all products of type i in which 2 i d≥ , let i k t be the distance between the positions in which the units k + 1 and k of the product of type i are found (i.e., the number of positions between them, where the distance between two consecutive positions is considered equal to 1). As the sequence is circular, position 1 comes immediately after position D; therefore, i d i t is the distance between the first unit of the product of type i in a cycle and the last unit of the same type of product in the preceding cycle. Let i t be the average distance between two consecutive units of the product of type i ( i i d D t= ). For all products of type i in which 1= i d , i t1 is equal to i t . The objective is to minimize the ∑∑ = = −= p i d ki i k i ttRTV 1 1 2 )( . For example, let 3=p , 2= A d , 2= B d and 4= C d ; thus, 8=D , 4= A t , 4= B t and 2. C t= Any sequence is a feasible solution. For example, the sequence (C, A, C, B, C, B, A, C) is a solution, where ( ) ( ) ( ) ( ) ( ) ( ) 22 22 54 34 24 64RTV =−+− +−+− ( ) ( ) ( ) ( ) ( ) 2 2 22 22 22 32 12 28212+−+−+−+− =++= . The RTVP was first presented by Corominas et al. (2007), in which a simple optimal algorithm for a two-product case, an MILP model to solve the problem optimally and five greedy heuristic algorithms were proposed. The MILP model has a practical limit for obtaining optimal solutions around 25 units to be scheduled. Corominas et al. (2006) improve the MILP model and increase the practical limit to 40 units. García et al. (2006) solved the RTVP by means of three metaheuristic procedures: a multi-start, a GRASP (Greedy Randomized Adaptive Search Procedure) and a PSO (Particle Swarm Optimization) algorithm. These three algorithms are the most efficient algorithms published to date for solving non-small instances; we compare them with the
5 proposed EM algorithm in Section 5. Next, the algorithms are briefly explained (for more details of the three algorithm procedures, see García et al., 2006). The multi-start method is based on generating initial random solutions and on improving each of them to find a local optimum, which is usually done by means of a local search procedure (Martí, 2003). Random solutions are generated as follows. For each position, a type of product to be sequenced is randomly chosen. The probability of each type of product is equal to the number of units of this type of product that remain to be sequenced divided by the total number of units that remain to be sequenced. The local search procedure used is applied as follows. A local search is performed iteratively in a neighbourhood that is generated by interchanging each pair of two consecutive units of the sequence that represents the current solution; the best solution in the neighbourhood is chosen; the optimization ends when no neighbouring solution is better than the current solution. GRASP, designed by Feo and Resende (1989), can be considered to be a variant of the multi-start method in which the initial solutions are obtained using directed randomness. The solutions are generated by means of a greedy strategy in which random steps are added and the choice of elements to be included in the solution is adaptive. The random step in the GRASP proposed by García et al. (2006) consists in selecting the next type of product to be added to the solution; the probability of each candidate type of product is proportional to the value of its Webster index, which is based on the parametric method of apportionment with parameter 12 δ = (Balinski and Young, 1982). The Webster index for the type of product i = 1,…,p is evaluated as ( ) i it d x δ +, where xit is the number of units of the product of type i in the sequence of length t = 0,…,D. The local search procedure applied to the initial solutions is the same local search as in the multi-start method. PSO is a population-based metaheuristic algorithm designed by Kennedy and Eberhart (1995), which is based on an analogy of the social behaviour of flocks of birds when they search for food. The population or swarm is composed of particles (birds), which have an n-dimensional real point (which represents a feasible solution) and a velocity (the movement of the point in the n-dimensional real space). The velocity of a particle is typically a combination of three kinds of velocities: 1) inertia velocity; 2) velocity to the best point found by the particle; and 3) velocity to the best point found by the swarm. These components of the particles are iteratively modified by the algorithm as it looks for an optimal solution. García et al. (2006) propose four PSO variations, although the comparison is only carried out for the best of these (referred to as PSO-M1F). Although the PSO algorithm was originally designed for working in an n-dimensional real space, PSO-M1F is adapted to work with a sequence of integer numbers that represents the solution. In this adaptation of the PSO algorithm, a point is now the sequence of integer numbers that represents a solution and the velocity is an ordered list of transformations that must be applied to the particle so it changes from its current point to another point; each transformation consists of a pair of positions of the point (sequence) to be swapped. In the case of the velocity to the best point found by the particle, this velocity is a list of transformations needed to obtain the best particle point from the current position; the case is the same for the velocity to the best point found by the swarm. The initial points are generated as in the multi-start method.
6 3. The EM algorithm The electromagnetism-like mechanism (EM) algorithm is a new population-based metaheuristic algorithm created by Birbil and Fang (2003). The EM algorithm has been applied to a few problems successfully: for example, the resource-constrained project scheduling problem (Debels and Vanhoucke, 2004), neural network training (Wu et al., 2004), the permutation flowshop scheduling problem (Yuan et al., 2006) or multiobjective optimization problems (Tsou and Kao, 2006). The EM algorithm basically operates as follows. The EM algorithm starts with an initial population of solutions that will be attracted to the deep valleys and repulsed from the steep hills (if we wish to minimize the value of the solution). Each solution can be thought of as a particle charged according to its objective function value. Then, an analogy of the attraction-repulsion mechanism of the electromagnetism theory can be applied. Moreover, some solutions are improved by a local search. Next, we present the framework of the EM algorithm; for further details, see Birbil and Fang (2003). This algorithm works with a special class of optimization problems with bounded variables in the following form: min (max) ( ) xf subject to njuxlx jjj n,,1,| =≤≤ℜ∈ where f is the function that evaluates a point (which represents a solution), n is the dimension of the problem (in the case of the RTVP, n would be equal to D, which is the total number of units) and xj is the coordinate of the jth dimension, which is lower bounded by lj and upper bounded by uj. The EM algorithm is divided into four phases (which are explained in Subsections 3.1 to 3.4): 1) the initialization of the population of the points; 2) the application of the local search; 3) the calculation of the total force vector; and 4) the movement according to the total force. The pseudocode of the algorithm is shown in Figure 1. Figure 1. Pseudocode of the EM algorithm. 3.1. Initial population The algorithm starts randomly generating the initial population, which consists of m points of the feasible domain. Each coordinate of each point is uniformly distributed between their upper and lower bounds. 3.2. Local search 1: P = initial population 2: while the stopping criteria is not reached do 4: xbest = best point of P 3: Local search 4: For each point x do: Fx = total force vector(x, P) 5: For each point x do: Move(x, Fx) 6: end while
7 The local search procedure provides the EM algorithm with a good balance between the exploration and exploitation of the feasible region. Birbil and Fang (2003) propose two approaches according to the points to which the local search can be applied: local search applied to all points and local search applied only to the current best point. Local search applied to all points promotes a more meticulous examination of the region around the points. However local search applied only to the best point usually gives as good results and less time is spent on the local search. In both cases, a simple local search is recommended rather than a powerful one because it is enough for a good convergence (Birbil and Fang, 2003). The local search is not applied until a local optimal point is reached; the local search stops when a number of iterations (let it be called lsiter) is executed. 3.3. Calculation of the total force vector The charge of each point x belonging to the population P (let it be called qx), which determines the intensity of attraction or repulsion of the point, changes at each iteration of the EM algorithm. The charge is first evaluated as follows: ( ) − − −= ∑ ∈Py best best xxfyf xfxf nq )()( )()( exp (1) Note that, unlike electrical charges, no signs are associated with the charges. The direction of a particular force between two points is determined once their objective values have been compared. The total force for each point belonging to the population P (let it be called x F ) is evaluated as follows: 2 | 2 ( ) ( ) ( ) (Attraction) ( ) ( ) ( ) (Repulsion) xy xy Py x xy qq y x if f y f x yx Fqq x y if f y f x yx ∈≠ −< − = −≥ − ∑ (2) where xy − is the euclidean distance between the two points. 3.4. Movement according to the total force Each point x belonging to the population P is moved according to the next equation: x x F xx F λ = + (3) where λ denotes a random number uniformly distributed between 0 and 1 and x F is the norm of the force vector. The parameter λ is used to ensure that the points have a
8 nonzero probability of moving to the unvisited regions in this direction. Furthermore, the force applied to each point is normalized, so the feasibility is maintained (i.e., each coordinate of each point will be between lj and uj). 4. The EM algorithm procedure for the RTVP The objective function and the equations of the EM algorithm work with points of a region of the n-dimensional real space. Others procedures such as the PSO or other optimization algorithms of real variables are also designed for working in an ndimensional real space. However, a solution of many combinatorial optimization problems is usually represented as an ordered sequence of integer numbers (as in the RTVP), so these algorithms (EM, PSO and others) are incompatible with this representation of the solution as an ordered sequence of integer numbers. There are two ways of applying algorithms of this kind to the RTVP: to adapt the algorithm to work with a sequence of integer numbers or to adapt the representation of the solution as an n-dimensional real point. To adapt the PSO algorithm to a sequence of integer numbers for the RTVP is done in García et al. (2006), as explained in Section 2. As would happen in the EM algorithm, this way involves redefining several mathematical operators used by the algorithm. For example, the difference between two points ( ()yx− and ()xy− ) in Equation 2) would now be the difference between two sequences of integer numbers and this new difference operator would have to be defined. On the other hand, a sequence of integer numbers can be represented by an ndimensional real point using random key representation (Bean, 1994), which is used in an EM procedure for solving the permutation flowshop scheduling problem, for example (Yuan et al., 2006). In this paper, random key representation is also used in the EM procedure for solving the RTVP. Random key representation for the RTVP is explained in Subsection 4.1. How the initial population is generated is described in Subsection 4.2. The local search used in the EM procedure is explained in Subsection 4.3. The calculations of the total force vectors and the movements according to the total force are directly implemented according to Equations (1), (2) and (3). Finally, Subsection 4.4 explains the fine-tuning of the parameter values of the EM algorithm: the size of the initial population (m) and the maximum number of iterations of the local search procedure (lsiter). 4.1. Random key representation Random key representation (Bean, 1994) consists of an n-length sequence of different real numbers called keys. Let the key sequence be r = r1, …, rn, where rj is the key of the position j. In the context of the proposed EM procedure, the key sequence has D (number of units to be sequenced with di units of the product of type i) keys. As the EM algorithm works with bounded variables, the values of the keys are bounded between 0 and 1. Given a key sequence r, the solution s (sequence of types of products) that is represented by r is as follows. First, for each position j = 1,...,D of r, the key rj is
15 Another suggestion for future research is the following. With a good heuristic (for example, the EM method proposed in this paper) good solutions to the scheduling problem can be obtained. The solutions obtained could be analyzed to find their good characteristics, which could then be incorporated in the planning decision. For example, let us assume that 13 units of product A must be made in 2 days, and that the total production capacity for these two days, which must be shared with other products, is 103 units (33 units on the first day and 70 units on the second day). If the planning proportionally distributes the units of product A between the two days according to their production capacity, then 4 units of product A will be made on the first day and 9 units of product A on the second day. The RTV value for product A is certain to be higher than 0 because its ideal distance between two consecutive units on the first day will be 33/4 = 8.25, and on the second day it will be 70/9 = 7.78, neither of which are integers. Furthermore, for example, it can be observed that it is better to produce 3 units of A on the first day and 10 units of A on the second day because the ideal distances would be 33/3 = 11 and 70/10 = 7, respectively, which are integers. Thus, the RTV value for product A could be 0. In future work, we will investigate how to find good characteristics in the solutions. ACKNOWLEDGEMENTS The authors wish to express their gratitude to the anonymous reviewers and to Professor Albert Corominas (Technical University of Catalonia) for their valuable comments, which have improved the quality of this paper. This is a preprint of an article whose final and definitive form has been published in the International Journal of Production Research © 2009 [copyright Taylor & Francis]; International Journal of Production Research is available online at informaworldTM REFERENCES Adenso-Díaz, B. and Laguna, M. (2006) ‘Fine-tuning of algorithms using fractional experimental designs and local search’, Operations Research, Vol. 54, pp.99-114. Anily, S., Glass, C.A. and Hassin, R. (1998) ‘The scheduling of maintenance service’, Discrete Applied Mathematics, Vol. 82, pp.27-42. Balinski, M.L. and Young, H.P. (1982) ‘Fair Representation: meeting the ideal of one man, one vote’, Yale University Press, New Haven CT. Bean, J.C. (1994) ‘Genetic Algorithms and Random Keys for Sequencing and Optimization’, ORSA Journal on Computing, Vol. 6, No. 2, pp.154-160. Birbil, S.I. and Fang, S.C. (2003) ‘An Electromagnetism-like Mechanism for Global Optimization’, Journal of Global Optimization, Vol. 25, pp.263-282. Boysen, N., Fliedner, M. and Scholl, A. (2007) ‘Production Planning of Mixed-Model Assembly Lines: Overview and Extensions’, Jena Research Papers in Bussines and Economics. Corominas, A. (2005) ‘Empirically Adjusted Greedy Algorithms (EAGH): A new approach to solving combinatorial optimisation problems’, Working paper IOC-DT- P-2005-22, Universitat Politècnica de Catalunya, Spain.
16 Corominas, A., Kubiak, W. and Pastor, R. (2006) ‘Solving the Response Time Variability Problem (RTVP) by means of mathematical programming’, Working paper IOC-DT, Universistat Politècnica de Catalunya, Spain. Corominas, A., Kubiak, W. and Moreno, N. (2007) ‘Response time variability’, Journal of Scheduling, Vol. 10, pp.97-110. Debels, D. and Vanhoucke, M. (2004) ‘An electromagnetism meta-Heuristic for the resource-constrained project scheduling problem’, Working Paper, Dept. Econ. & BA, Ghent Univ., Hoveniersberg, Belgium. Dong, L., Melhem, R. and Mossel, D. (1998) ‘Time slot allocation for real-time messages with negotiable distance constraint requirements’, Real-time Technology and Application Symposium, RTAS, Denver. Feo, T.A. and Resende, M.G.C. (1989) ‘A probabilistic heuristic for a computationally difficult set covering problem’, Operations Research Letters, Vol. 8, pp.67-81. García, A., Pastor, R. and Corominas, A. (2006) ‘Solving the Response Time Variability Problem by means of metaheuristics, Special Issue of Frontiers in Artificial Intelligence and Applications on Artificial Intelligence Research and Development, Vol. 146, pp.187-194. Han, C.C., K.J. Lin and C.J. Hou (1996) ‘Distance-Constrained Scheduling and Its Applications in Real-Time Systems’ IEEE Trans. on Computers, Vol. 45, pp. 814- 826 Herrmann, J.W. (2007) ‘Generating Cyclic Fair Sequences using Aggregation and Stride Scheduling’, Technical Report, University of Maryland, USA. Kennedy, J. and Eberhart, R.C. (1995) ‘Particle swarm optimization’, IEEE International Conference on Neural Networks, Australia. Kubiak, W. (1993) ‘Minimizing variation of production rates in just-in-time systems: A survey’, European Journal of Operational Research, Vol. 66, No. 3, pp. 259-271. Kubiak, W. and Sethi, S.P. (1991) ‘A Note on Level schedules for mixed-model assembly lines in just-in-time production systems’, Management Science, Vol. 37, pp. 121-122. Kubiak, W. and Sethi, S.P. (1994) ‘Optimal just-in-time schedules for flexible transfer lines’, The International Journal of Flexible Manufacturing Systems, Vol. 6, pp. 137-154. Martí, R., (2003), ‘Multi-start methods’, Handbook of Metaheuristics, Glover and Kochenberger (eds.), Kluwer Academic Publishers, pp.355-368. Miltenburg, J. (1989) ‘Level schedules for mixed-model assembly lines in just-in-time production systems’, Management Science, Vol. 35, No. 2, pp. 192-207. Monden, Y. (1983) ‘Toyota Production Systems’, Industrial Engineering and Management Press, Norcross, GA. Nelder, J.A. and Mead, R. (1965) ‘A simplex method for function minimization’, The Computer Journal, Vol. 7, pp.308-313. Steiner, G. and Yeomans S. (1993): Level Schedules for Mixed-Model, Just-in-Time Processes, Management Science, Vol. 39, pp. 728-735. Tsou, C.-S. and Kao, C.-H. (2006) ‘An Electromagnetism-Like Meta-Heuristic for Multi-Objective Optimization’, Evolutionary Computation, CEC 2006. IEEE Congress on Computational Intelligence, Canada. Waldspurger, C.A. and Weihl, W.E. (1995) ‘Stride Schedulling: Deterministic Proportional-Share Resource Management’, Technical Report MIT/LCS/TM-528, Massechusetts Institute of Technology, MIT Laboratory for Computer Science.
17 Wu, P., Yang, K.-J. and Hung, Y.-Y. (2004) ‘A study of electromagnetism-like mechanism for training fuzzy neural network’ in Proc. 1st Annu. Conf. OR Society at Taiwan, Taipei, pp.471-480. Yuan, K., Hennequin, S., Wang, X. and Gao, L. (2006), ‘A new heuristic-EM for permutation flowshop scheduling’, 12th IFAC Symposium on Information Control Problems in Manufacturing, INCOM’06, Saint-Etienne, France.