scieee AI-readable full text Open interactive document viewer

Study for the design of a management system for AGV networks

Hu, Daniel Lijia

Abstract

Automated Guided Vehicles are a vital part of the future intelligent manufacturing processes. In order to make the better profit, it is important to study if deadlocks can occur and how to tackle them. In this project we demonstrate how Petri Net models, which are perfect for representing deadlocks, can be mapped in the simulation software FlexSim. Eventually, we are using this software in order to evaluate different study cases with deadlocks.

Full text

Degree course: Master’s Degree in Management Engineering Student: Daniel Lijia Hu TFM title: Study for the design of a management system for AGV networks TFM Director: Antoni Guasch Petit Expedition date: June 2019 Study for the design of a management system for AGV networks Page 3 Declaration of Honor I declare that, the work in this Master is completely my own work, no part of this Master Thesis is taken from other people’s work without giving them credit, and all references have been clearly cited. I understand that an infringement of this declaration leaves me subject to the foreseen disciplinary actions by The Universitat Politècnica de Catalunya - BarcelonaTECH. Page 4 Memory Abstract Automated Guided Vehicles are a vital part of the future intelligent manufacturing processes. In order to make the better profit, it is important to study if deadlocks can occur and how to tackle them. In this project we demonstrate how Petri Net models, which are perfect for representing deadlocks, can be mapped in the simulation software FlexSim. Eventually, we are using this software in order to evaluate different study cases with deadlocks. Acknowledgments I want to thank the director of this thesis, Toni Guasch, for giving me this idea in which I could develop this subject. This work could not been possible without his valuable advices, teachings and guides. It was a really interesting insight in a fascinating new field. I am also grateful to the Automatic Control department, for the confidence you have expressed in me by using little pieces of my work for the Winter Simulation Multiconference’19. Thanks all for trusting me. Study for the design of a management system for AGV networks Page 5 Table of Contents 1. Structure .............................................................................................................................. 11 1.1. Objectives .................................................................................................................... 11 1.2. Scope ........................................................................................................................... 11 1.3. Requirements .............................................................................................................. 11 1.4. Usefulness ................................................................................................................... 12 2. Automated Guided Vehicles ............................................................................................... 13 3. Deadlocks ............................................................................................................................ 14 3.1. Deadlock characterization ........................................................................................... 14 3.2. Deadlocks in AGV systems .......................................................................................... 15 3.3. Deadlock handling ....................................................................................................... 16 3.3.1. Deadlock prevention ........................................................................................... 16 3.3.2. Deadlock avoidance ............................................................................................ 17 3.3.3. Deadlock detection and recovery ....................................................................... 17 4. Petri Nets ............................................................................................................................. 18 4.1. Basics definition .......................................................................................................... 18 4.2. Timed Petri Nets .......................................................................................................... 19 4.3. Colored Timed Petri Nets ............................................................................................ 19 5. Mapping Petri Nets to an FlexSim Model ........................................................................... 20 5.1. Sequential execution ................................................................................................... 20 5.2. Conflict ........................................................................................................................ 20 5.3. Concurrency with temporal entities ........................................................................... 22 5.4. Synchronization with temporal entities ...................................................................... 22 5.5. Concurrency and synchronization with resources ...................................................... 23 6. Deadlock cases .................................................................................................................... 24 6.1. Case I: An AGV and a Machine .................................................................................... 24 6.1.1. Place Transition Petri Net Model ........................................................................ 24 6.1.2. Possible solutions ................................................................................................ 26 6.2. Case II: Intersection deadlock ..................................................................................... 27 6.2.1. Place Transition Petri Net Model ........................................................................ 28 6.2.1. Possible solutions ................................................................................................ 29 6.3. Case III: Cyclic deadlock ............................................................................................... 31 Page 6 Memory 6.4. Case IV: Bridge crossing deadlock ............................................................................... 32 6.4.1. Place Transition Petri Net Model ........................................................................ 33 6.4.2. Possible solutions ................................................................................................ 34 6.4.3. FlexSim process simulation flow ......................................................................... 37 6.4.4. Results and discussion ......................................................................................... 41 6.5. Case V: Shop deadlock ................................................................................................ 44 6.5.1. Place Transition Petri Net Model ........................................................................ 44 6.5.2. Possible solutions ................................................................................................ 48 6.5.3. FlexSim process simulation flow ......................................................................... 49 6.5.4. Results and discussion ......................................................................................... 55 6.6. Case VI: Manufacturing system ................................................................................... 60 6.6.1. Place Transition Petri Net Model ........................................................................ 61 6.6.2. Possible solutions ................................................................................................ 63 6.6.3. FlexSim process simulation flow ......................................................................... 64 6.6.4. Results and discussion ......................................................................................... 67 7. Conclusions ......................................................................................................................... 69 8. Future work ......................................................................................................................... 69 Bibliographic references ............................................................................................................. 70 Study for the design of a management system for AGV networks Page 7 List of figures: Figure 1. Automated Guided Vehicle handling material (source: http://ca.wikipedia.org) ....... 13 Figure 2. Deadlock of a road intersection ................................................................................... 14 Figure 3. Automated operations at the Port of Hamburg (source: http://www.joc.com) ......... 15 Figure 4. Example of a reachability graph ................................................................................... 17 Figure 5. Example of a basic Petri Net ......................................................................................... 18 Figure 6. Graphical representation of an immediate transition (up) and a timed one (down) .. 19 Figure 7. Simplification of a timed Petri Net (left) adding labels (colors) to it, resulting in a colored time Petri Net (right) ................................................................................................................... 19 Figure 8. Sequential execution in Petri Net (left) and FlexSim (right)......................................... 20 Figure 9. Conflict in Petri Net (left) and FlexSim (right) .............................................................. 20 Figure 10. Example of deterministic decision with FlexSim (label version) ................................ 21 Figure 11. Example of deterministic decision with FlexSim (conditional version) ...................... 21 Figure 12. Example of probabilistic decision with FlexSim ......................................................... 21 Figure 13. Concurrency with temporal entities in FlexSim ......................................................... 22 Figure 14. Synchronization with temporal entities in FlexSim .................................................... 22 Figure 15. Queue-server model Petri Net ................................................................................... 23 Figure 16. Resources activities in FlexSim ................................................................................... 23 Figure 17. Case I: Simple manufacturing system composed by an AGV and a Machine ............ 24 Figure 18. Case I: Initial marking of Petri Net.............................................................................. 24 Figure 19. Case I: Reachability/Coverability Graph obtained by PIPE simulator ........................ 25 Figure 20. Case I: Deadlock situation represented in Petri Net .................................................. 25 Figure 21. Case I: Possible solution represented in Petri Net ..................................................... 26 Figure 22. Case I: Reachability/Coverability Graph obtained by PIPE simulator for proposed solution ........................................................................................................................................ 26 Figure 23. Case II: Screenshot of a Cross Lane Deadlock example, represented with FlexSim .. 27 Figure 24. Case II: Intersection deadlock and possible collision ................................................. 27 Figure 25. Case II: Different sectors for the AGV network .......................................................... 28 Figure 26. Case II: Initial marking of Petri Net............................................................................. 28 Figure 27. Case II: Reachability/Coverability Graph obtained by PIPE simulator ....................... 29 Figure 28. Case II: Deadlock represented in Petri Net ................................................................ 29 Figure 29. Case II: Possible solution, represented in Petri Net, changing the road division to solve deadlocks..................................................................................................................................... 30 Page 8 Memory Figure 30. Case II: Reachability/Coverability Graph obtained by PIPE simulator for proposed solution ........................................................................................................................................ 30 Figure 31. Case III: Screenshot of an example of cyclic Deadlock, represented with FlexSim .... 31 Figure 32. Sketch from a part from the Automated Port of Singapore. [7] ................................ 32 Figure 33. Case IV: Screenshot of an example of Bridge Crossing Deadlock, represented with FlexSim ........................................................................................................................................ 32 Figure 34. Case IV: Different sectors for the AGV network ......................................................... 33 Figure 35. Case IV: Initial marking of Petri Net ........................................................................... 33 Figure 36. Case IV: Reachability/Coverability Graph obtained by PIPE simulator ...................... 34 Figure 37. Case IV: Deadlocks represented in Petri Net (S10 at the left, S11 at the right) ......... 34 Figure 38. Case IV: First proposed solution (blocking the middle road) ..................................... 35 Figure 39. Case IV: Reachability/Coverability Graph obtained by PIPE simulator for first proposed solution ........................................................................................................................................ 35 Figure 40. Case IV: Second proposed solution (same entrance and exit) ................................... 36 Figure 41. Case IV: Reachability/Coverability Graph obtained by PIPE simulator for second proposed solution ....................................................................................................................... 37 Figure 42. Case IV: Process created in FlexSim for the original problem .................................... 38 Figure 43. Case IV: Process created in FlexSim for the first proposed solution: blocking middle road ............................................................................................................................................. 38 Figure 44. Case IV: Process created in FlexSim for the second proposed solution: same entrance and exit ........................................................................................................................................ 39 Figure 45. Case IV: Process created in FlexSim for the second proposed solution alternative: same entrance and exit along with flexible AGVs ................................................................................ 39 Figure 46. Case IV: Flow Diagram for the second alternative solution, in order to the AGV to decide where to go after the intersection .................................................................................. 40 Figure 47. Case IV: Deadlock represented in FlexSim ................................................................. 41 Figure 48. Case IV: Accumulated Lead time for the three proposed solutions in Scenario 4 – Unbalanced System ..................................................................................................................... 43 Figure 49. Case V: Screenshot of an example of Shop Deadlock, represented with FlexSim ..... 44 Figure 50. Case V: Possible different sectors for AGV network .................................................. 44 Figure 51. Case V: Initial marking of Petri Net ............................................................................ 45 Figure 52. Case V: Initial marking of Petri Net, when the problem is bounded and reduced .... 46 Figure 53. Case V: Initial marking of reduced Petri Net .............................................................. 47 Figure 54. Case V: Reachability/Coverability Graph obtained by PIPE simulator ....................... 47 Figure 55. Case V: Example of system outside the painting boundaries .................................... 48 Figure 56. Case V: Process created in FlexSim for the original problem ..................................... 50 Study for the design of a management system for AGV networks Page 9 Figure 57. Case V: Process created in FlexSim for the first proposed solution: input area not full ..................................................................................................................................................... 51 Figure 58. Case V: Process created in FlexSim for the first proposed solution: system not full . 52 Figure 59. Case V: Process created in FlexSim for the first proposed solution: try while not blocking ....................................................................................................................................... 53 Figure 60. Case V: Process created in FlexSim for the first proposed solution: try and repeat .. 54 Figure 61. Case V: Deadlock represented in FlexSim .................................................................. 55 Figure 62. Case V: Different time concepts with the final sectors of the AGV network represented in a diagram ................................................................................................................................. 55 Figure 63. Case V: Lead time of each box, from the 15th to the 50th .......................................... 59 Figure 64. Case VI: Diagram of a Flexible Manufacturing System ............................................... 60 Figure 65. Case VI: Initial marking of Petri Net ........................................................................... 61 Figure 66. Case VI: Initial marking of Bounded Petri Net ............................................................ 62 Figure 67. Case VI: Initial marking of Bounded and Reduced Petri Net ...................................... 63 Figure 68. Case VI: Deadlock state in a section from the reachability graph .............................. 63 Figure 69. Case VI: Process created in FlexSim for the original problem .................................... 64 Figure 70. Case VI: Process created in FlexSim for the first proposed solution: assign part number per station ................................................................................................................................... 65 Figure 71. Case VI: Process created in FlexSim for the first proposed solution: assign part arrival per station ................................................................................................................................... 65 Figure 72. Case VI: Process created in FlexSim for the first proposed solution: assign “n” load stations and “12-n” unload stations ........................................................................................... 66 Figure 73. Case VI: Process created in FlexSim for the first proposed solution: block station if 3 parts in machine and 1 on the stations ....................................................................................... 66 Figure 74. Case VI: Deadlock represented in FlexSim ................................................................. 67 Page 16 Memory lanes along this system. Because of this condition, deadlock prediction must focus on this fact in order to prevent an imminent problem [7]. The most common kinds of deadlock in AGV systems are explained with some examples in section 6. However, before seeing the examples it is highly recommended to see how Petri Nets work in order to understand the development and solution. 3.3. Deadlock handling Now that the basics of deadlocks have been exposed, they must be controlled anyhow in order to avoid them. Deadlocks can be handled in three ways [8]:  Deadlock prevention: Ensures that at least one of the four necessary conditions characteristics explained in section 3.1 does not occur. Most approaches work by preventing the last condition of circular wait, and in fact, it is the only preventable condition in AGV systems.  Deadlock avoidance: Examines the system’s date dynamically and avoids deadlock states  Deadlock detection and recovery: Allows the system to enter into deadlock state and then recovering from deadlock 3.3.1. Deadlock prevention The simplest way to avoid deadlocks is to use systems where any of the characteristics explained in section 3.1. Using this limits ensure that deadlocks will never happen. Nevertheless, possible side effects of preventing deadlocks by this method are low device utilization or reduced system throughput. As it has been mentioned, only the fourth and final condition for deadlocks can be preventable. This one is the circular-wait condition. One way to ensure that this condition never holds is to impose a total ordering of all resources types and to require that each process requests resources in an increasing order of enumeration [9]. In order to see if the system deadlocks are prevented, a reachability graph must be used. This representation corresponds to a finite graph that represent all states that can be reached from the initial state. Study for the design of a management system for AGV networks Page 17 Figure 4. Example of a reachability graph However, this clearly harms the flexible manufacturing process as the system becomes static because of the policies needed to prevent this deadlock. This is known to result in poor resource utilization. Additionally, the reachability analysis technique to arrive at deadlock prevention policies can become infeasible if the state space is very large. [4] 3.3.2. Deadlock avoidance As a consequence of the previous sections, the usage of alternative methods is preferred for AGV systems. In deadlock avoidance, falsifying one or more of the necessary conditions dynamically is attempted by current state and possible future situations tracking. The idea is to let the necessary conditions prevail as long as they do not cause a deadlock but falsify them as soon as a deadlock becomes a possibility in the immediate feature. This leads to better resource utilization and that is vital for industrial processes [4]. AGV are expensive resources and because of that, the total downtime for the system must be minimized yet optimizing the resource utilization. Hence, a prediction-avoidance strategy is better, since the strategy makes sure that no deadlocks occur, resulting in better operations and higher throughput. In order to avoid deadlocks, with the knowledge of the complete sequence of requests and releases for each process, the system can decide for each request whether or not the process should wait in order to avoid a possible future deadlock. The various algorithms that use this approach differ in the amount and the type of required information [9]. 3.3.3. Deadlock detection and recovery If a systems does not employ either a deadlock-prevention or a deadlock-avoidance algorithm then a deadlock situation may occur. In this environment, the system may provide and algorithm that examines the state of the system to determine whether a deadlock has occurred and other algorithm to recover from the deadlock. At this point, however, we note that this scheme requires overhead that includes not only the run-time costs of performing the maintenance of the necessary information and executing the detection algorithm, but also potential losses inherent in recovering from a deadlock. [9] Page 18 Memory 4. Petri Nets Petri Nets have established themselves as a powerful modeling formalism in computer science, system engineering and many other disciplines. They are a combination of well-defined mathematical theory with a graphical representation dynamism of the behavior of systems. The theoretic aspect of Petri nets models precisely the system behavior so as to be analyzed while the graphical representation enables the visualization of changes in the modeled system and simplifies the visualization of these complex systems. This combination is the main reason for the huge spread of the usage of Petri Nets. [10] 4.1. Basics definition A Petri net is a particular kind of graphs compounded by three kinds of objects. These are places, represented by circles; transitions represented by bars; and directed arcs, which connect the first two ones. The dynamic nature of the system is represented by the movement of entities, represented as dots, through the net. They can be temporal, in that it moves through the system, or permanent in that it serves other entities (normally called resources). Figure 5. Example of a basic Petri Net A Petri net is formally defined as a 5-tuple N = (P, T, I, O, M0), where:  P = {P1,P2,P3,.....,Pnp} is a finite set of places;  T = {T1,T2,T3,.....,Tne} is a finite set of transitions;  A = {A1,A2,A3,.....,Ana} is a finite set of arcs that connect places to events and vice versa;  W: Ai → {1,2,3,....} ∀ Ai is the weight associated with each arc;  M0: Pi → {1,2,3,....} ∀ Pi is the initial number of entities in each place (initial marking). The current location and distribution of entities in a Petri Net is called a marking of the system. A transition can be fired if each transition input has the required number of entities specified by the weight associated with the arc from the place to the transition. Firing the event removes entities from the input places and adds entities to the output places. The number of entities removed or added equals the weight of the associated arc. [11] Study for the design of a management system for AGV networks Page 19 4.2. Timed Petri Nets Time is a crucial aspect when dealing with dynamic logistics, manufacturing or transportation processes, such as AGV systems. Therefore, it is needed to include the notion of time on the Petri Nets. The most used model shows the associated time of delay for enabling a transition to be fired. The firing of a transition in a Petri Net corresponds to an event that changes the state of the system, it might be result of a verification of a logical condition in the system, as it happens in the previous section (immediate transitions) or can be induced by the completion of an activity, which naturally takes some amount of time (timed transitions). Figure 6. Graphical representation of an immediate transition (up) and a timed one (down) As a convention, this document will use the PIPE software representation. Black rectangles for immediate transitions and white rectangles for timed ones. For sure, this white rectangle needs a time function (tf), which specifies the duration of that transition. [11] 4.3. Colored Timed Petri Nets In order to increase the simplicity of the Petri Nets system, entities may acquire a value, often referred as “color”. By means of this variable, too-big-to-handle nets get simplified very much. Additionally, these entities may be object or resources in the modelled systems and have attributes that might be not easily represented by a simple point. [12] For example, in a manufacturing a process, a machine might process both pieces A and pieces B, but each piece have their own processing time. If we assign label (or color) “A” and “B”, the Petri Net gets much simplified, as it is seen in Figure 7. Now the different processing times are a time function, depending on the color of the entity. Figure 7. Simplification of a timed Petri Net (left) adding labels (colors) to it, resulting in a colored time Petri Net (right) Page 20 Memory 5. Mapping Petri Nets to an FlexSim Model Once a Petri net conceptual model has been created and validated with the problem owners, it is significant to carry the validity and relevance of the model to the executable model. This is achieved by the mapping approaches explained below, and finally confirmed by the verification. This state-space and causal or flow process logic expressed in the Petri Net must be mapped into a model that uses the FlexSim library blocks. It is convenient to use a table to map the Petri Net process model and the transition specifications to a FlexSim Model [13]. These Petri Net models can be mapped into equivalent FlexSim model code: 5.1. Sequential execution In the Petri Net shown in Figure 8, transition T1 can only be fired after the firing of T0. This Petri net construct models the sequential relationship between activities. The place/timed transition pair can be coded in FlexSim using the Delay activity. Figure 8. Sequential execution in Petri Net (left) and FlexSim (right) 5.2. Conflict Transitions T0 and T1 are in conflict in this Petri Net: both are enabled, but the firing of either one disables the other. This situation will arise, for example, when an AGV must choose in an intersection between two different routes. The resulting conflict may be resolved in a nondeterministic way or in a probabilistic way. This situation where the entity must choose between two different transitions can be coded in FlexSim using the Decide activity. And it can be resolved in both mentioned ways. Figure 9. Conflict in Petri Net (left) and FlexSim (right) Decide activity can have one or multiple inputs as well as one or multiple outputs. Each output has assigned a positive integer number (first option is number 1, second option is number 2… etc.) All inputs enter in the activity “Decide” and exits to the assigned output. Therefore, in order to solve the conflict either in a deterministic or a probabilistic way will depend in the number that is “assigned” to each token, as the number assigned for each output is not changeable. Study for the design of a management system for AGV networks Page 21 To solve it with a deterministic decision, labels (equivalent to colors in a colored Petri Net) can be used. This labels can be assigned before the Decide activity or they might exist from previous processes. Figure 10. Example of deterministic decision with FlexSim (label version) For example, let’s imagine that depending on the weight of the cargo we will choose one option or another (deterministic decision). Concretely, if the cargo weights less than 1000 u, it will exit by option 1, otherwise if will exit by option 2. There is an option in FlexSim that allows the user to do that, if previously those labels were assigned. Figure 11. Example of deterministic decision with FlexSim (conditional version) Conflict can also be solved probabilistically by means of this system, but adding a statistical expression. For instance, in Figure 12, the condition is selected by a normal distribution. There are several different statistical distributions as Bernoulli, uniform, Poisson, etc. Figure 12. Example of probabilistic decision with FlexSim Page 22 Memory 5.3. Concurrency with temporal entities In Figure 13, both transitions T1 and T2 are concurrent between them. Concurrency is an important attribute of system interactions. So as to create concurrent transitions, there must exist a forking transition that deposits a temporal entity in two or more output places. This might represent, for example, an AGV that transports two packages in its rack and splits the cargo anyhow between two different conveyor belts. The Split activity found in FlexSim deposits temporal entities at two (or more) output places. Figure 13. Concurrency with temporal entities in FlexSim 5.4. Synchronization with temporal entities In Figure 14, both places P0 and P1 need to receive an entity in order to T0 to be enabled. Synchronization is quite usual in a dynamic system for an event. This can be represented, for example, by a situation where two pieces need to be assembled before being transported. The existence of two different parts makes no sense from the point where they have joined into a sole entity. Figure 14. Synchronization with temporal entities in FlexSim Study for the design of a management system for AGV networks Page 23 5.5. Concurrency and synchronization with resources The Timed Petri Net that is shown in Figure 15 models a single-queue single-server process. This is a classic queuing model where arriving entities (T0) wait at a queue (P0) for the resource. When that resource is available (T1) it starts to process the entity. It remains at P1 until T2 is fired. Resource comes back to P2 and final pieces go to P3. As it can be seen, we have a synchronization with the resource (P0-P2-T1) and a concurrency (T2-P2-P3) Figure 15. Queue-server model Petri Net This whole Petri Net can be all simulated using Join and Split activities, as it has been explained above. However, because resources are so common in Petri Nets and in order to facilitate a rapid and comprehensive view of the scheme (imagine using the same resource for several different Petri nets), there are specific activities for them. Therefore, Figure 15 can be represented in FlexSim software as it is shown in Figure 16. Figure 16. Resources activities in FlexSim This easy scheme is the basic of using a resource in our manufacturing systems. For example, it might signify the usage of an AGV (the resource), and the delay is the time of transportation from the source to the destination of the product. Page 24 Memory 6. Deadlock cases In this section, a number of deadlock cases where AGVs are involved is presented as examples of problems that these vehicle systems may encounter during its usage. These problems are used as examples for validating FlexSim as a useful tool to study this situations and to come across with a solution for these. Each problem will have the same structure: Description of the problem, Petri Net and deadlock study, possible solutions, and finally, if needed so as to compare different solutions, the FlexSim simulation process flow with the correspondent results and discussion. 6.1. Case I: An AGV and a Machine A simple case can be seen in Figure 17. A lone AGV is in charge of carrying raw pieces from the load station to the machine which processes them, and also from the machine (when eventually processed) to the unload station. If the AGV carries the raw piece while the machine still holds the processed piece, there will be a deadlock, as both processes cannot happen at the same time: 1. AGV wants to put the pieces into the machine to process them 2. Machine wants to put the final pieces in the AGV Figure 17. Case I: Simple manufacturing system composed by an AGV and a Machine 6.1.1. Place Transition Petri Net Model Case shown in Figure 17 can be transformed into a Petri Net. Note that each token has the variable “loc (location)” assigned. This is because time for transitions T1 and T5, which correspond to the part waiting for the AGV, is variable. It depends on where is the AGV in each moment (next to the warehouse, loc = 0; or by the machine, loc = 1). Figure 18. Case I: Initial marking of Petri Net Study for the design of a management system for AGV networks Page 25 So as to input this system into the PIPE Petri Net Simulator, in order identify the possible deadlocks, it needs to be bounded. Infinite states are reachable due to the constant input of parts in the system. One easy way to bind the system is to connect the “Finished Products” with the input of the raw parts. This can be translated to: whenever a part has been finished and processed, automatically means that a new part comes into the system. We will assume that 2 pieces are entering the system waiting for being processed. The obtained result is shown in Figure 19, where it is pointed that “S10” is a terminal state (deadlock). Figure 19. Case I: Reachability/Coverability Graph obtained by PIPE simulator S10 represents the following system state: At some point, a new part arrives into the warehouse while the machine is processing another part. The AGV picks up this new part and transports it to the machine, where a deadlock happens clearly, because the machine is full and cannot put the finished piece on the AGV, and AGV is unable to unload its charge into the machine, causing the whole manufacturing process to stop. Figure 20. Case I: Deadlock situation represented in Petri Net Page 32 Memory Figure 32. Sketch from a part from the Automated Port of Singapore. [7] 6.4. Case IV: Bridge crossing deadlock The most basic deadlocks in AGV systems would be when two of the vehicles use the same bidirectional lane in opposite directions. An example on this is shown in Figure 33. Figure 33. Case IV: Screenshot of an example of Bridge Crossing Deadlock, represented with FlexSim In this example, AGV1 needs to move cargo from Load1 to Unload1 and analogously for AGV2. Eventually, a situation might occur where AGV1 and AGV2 would enter in the same lane from opposite sides and the whole system will be blocked. That is because AGV1 wants to access to Unload1 and AGV2 wants to access to Unload2, but they cannot also collide neither pass over other. Two vehicles that want to move and both vehicles have found that its path has been blocked. Study for the design of a management system for AGV networks Page 33 6.4.1. Place Transition Petri Net Model Case shown in Figure 33 can be transformed into a Petri Net, although it is not trivial to define. While an AGV covers certain part of the tracks, the other AGV cannot. Ideally every inch of the tracks should be a resource, but this is neither helpful nor able to be simulated. Therefore, the sketch must be divided in different sections regarding the usage of the path by the AGVs. It has been decided to divide the different paths like displayed in Figure 34, where are represented with different colors. Figure 34. Case IV: Different sectors for the AGV network Now that each path has been labeled, the Petri Net can be constructed as in Figure 35. Figure 35. Case IV: Initial marking of Petri Net In this case, we had to assume that there is just one part waiting for being charged in both load stations, and when coming back, is again waiting to be charged so as to represent it in PIPE simulator. Figure 36 shows the different possible states in which two different systems terminal states can be found (S10 and S11). Page 34 Memory Figure 36. Case IV: Reachability/Coverability Graph obtained by PIPE simulator Those deadlocks correspond to the following ones, represented in Figure 37. Note that it is really easy to understand imagining two vehicles in one lane bridge. They cannot use it at the same time because they are going through it in opposite ways. Figure 37. Case IV: Deadlocks represented in Petri Net (S10 at the left, S11 at the right) 6.4.2. Possible solutions The system gets deadlocked if both AGVs are using the middle road at the same time by opposite sides. Therefore, this situation must be prevented anyhow. Study for the design of a management system for AGV networks Page 35 Blocking the middle road by one AGV One possible solution is that the first AGV that arrives to the middle road, traps all the resources until the vehicle gets off from it. The other AGV, if waiting, must wait until the first one releases the resource. New Petri Net is displayed in Figure 38. Figure 38. Case IV: First proposed solution (blocking the middle road) Note that the different sub-paths that had been declared for the middle way do not longer exist. This is originated because for the new situation it is non-sense to continue describing the path as three different resources since one catches them all up at the same time. The obtained reachability graph is shown in Figure 39, which shows that the system is totally cyclic which means no deadlocks. Figure 39. Case IV: Reachability/Coverability Graph obtained by PIPE simulator for first proposed solution Page 36 Memory Switching directions of one AGV (road has one entrance and one exit) Other smart solution is to switch directions of one of the AGVs, so that both enter the common path by the same entrance and use the same exit. This lets both AGVs use the bridge at the same time without deadlocking the system. This case might not apply for all situations in bigger systems, since it might be structurally difficult or inconvenient to do so. Figure 40. Case IV: Second proposed solution (same entrance and exit) It is also remarkable that for this solution, there is also other extra one where AGVs are even more flexible and can use both routes. This happens because the red/blue paths are free when both AGVs are using the middle way. This might increase the productivity of the transport system, depending on the cases. Study for the design of a management system for AGV networks Page 37 Figure 41. Case IV: Reachability/Coverability Graph obtained by PIPE simulator for second proposed solution 6.4.3. FlexSim process simulation flow In order to compare both proposed solutions, they need to be simulated in FlexSim to get results for different state systems so as to compare them. This one is different from the previous cases, as it encounters two different alternatives to prevent deadlocks. All previous information (Petri Nets) is used along with the explanation exposed in section 5. All four cases and solutions will be simulated. To recapitulate: - Original case (possible deadlock) - Solution 1 (blocking middle way by only one AGV) - Solution 2 (both AGVs use the same entrance and exit, changing the direction of the original configuration) - Solution 2b (same approach as solution 2, but with a possible improvement in which AGVs are flexible and after unloading, decides which cargo get) The constructed diagrams are shown as it follows: Page 38 Memory Original Case (possible deadlock) Figure 42. Case IV: Process created in FlexSim for the original problem Solution 1 (blocking middle way by only one AGV) Figure 43. Case IV: Process created in FlexSim for the first proposed solution: blocking middle road Study for the design of a management system for AGV networks Page 39 Solution 2 (both AGVs use the same entrance and exit) Figure 44. Case IV: Process created in FlexSim for the second proposed solution: same entrance and exit Solution 2b (both AGVs use the same entrance and exit + flexible AGVs) Figure 45. Case IV: Process created in FlexSim for the second proposed solution alternative: same entrance and exit along with flexible AGVs Page 40 Memory The selected algorithm for the activity decide: “Which load station to go?” is based on the flow diagram that can be found in Figure 46, as well as the program coded below the mentioned diagram. This procedure has been selected in order to get a higher usage of the AGVs, avoiding them to be stopped in the load stations if there is no cargo, or sending various AGVs if one station is overloaded. Moreover, it uses a FIFO system in case of draw in both stations, which allows us to improve our Key Performance Indicator. Figure 46. Case IV: Flow Diagram for the second alternative solution, in order to the AGV to decide where to go after the intersection if (getstat(getactivity(processFlow, "WaitingAGV1"), "Content", STAT_CURRENT, current) >= 2 && getstat(getactivity(processFlow, "WaitingAGV2"), "Content", STAT_CURRENT, current) >= 2 && getlabel((gettoken(current, getactivity(processFlow, "WaitingAGV1"), 1)),"InitialTime") <= getlabel((gettoken(current, getactivity(processFlow, "WaitingAGV2"), 1)),"InitialTime")) return 1; else if (getstat(getactivity(processFlow, "WaitingAGV2"), "Content", STAT_CURRENT, current) >= 2 && getstat(getactivity(processFlow, "WaitingAGV1"), "Content", STAT_CURRENT, current) >= 2 && getlabel((gettoken(current, getactivity(processFlow, "WaitingAGV2"), 1)),"InitialTime") <= getlabel((gettoken(current, getactivity(processFlow, "WaitingAGV1"), 1)),"InitialTime")) return 2; else if (getstat(getactivity(processFlow, "WaitingAGV1"), "Content", STAT_CURRENT, current) >= 2) return 1; else if (getstat(getactivity(processFlow, "WaitingAGV2"), "Content", STAT_CURRENT, current) >= 2) return 2; else if (getstat(getactivity(processFlow, "Initial State AGV1"), "Input", STAT_CURRENT, current) > getstat(getactivity(processFlow, "ArrivalPart1"), "Input", STAT_CURRENT, current)) return 2; else if (getstat(getactivity(processFlow, "Initial State AGV2"), "Input", STAT_CURRENT, current) > getstat(getactivity(processFlow, "ArrivalPart2"), "Input", STAT_CURRENT, current)) return 1; return token.Way; Study for the design of a management system for AGV networks Page 41 6.4.4. Results and discussion Because this is a generic case with no values for each variable (mostly time arrivals and transport times), in order to compare some results, we find the need of present different situations to evaluate the different solutions. Results might vary differently depending on the different variables, and it is very likely that there is no global solution for all situations. First of all, it is easy to demonstrate that it is very likely to originate a deadlock in the system. If both AGV’s enter to the “bridge” at the same time, the problem occurs in FlexSim and the process cannot continue, as it is seen in Figure 47. Figure 47. Case IV: Deadlock represented in FlexSim The different times to declare are, according to Figure 34: Table 1. Case IV: Different time concepts and its variable assignation Concept Variable Concept Variable Concept Variable Arrival 1 tarrival1 Green Path tgreen Arrival 2 tarrival2 Load 1 tload1 Yellow Path tyellow Load 2 tload2 Unload 1 tunload1 Pink Path tpink Time Unload 2 tunload2 Red Path tred1 Blue Path tblue1 Red Path (back) tred2 Blue Path (back) tblue2 Now, different cases can be presented and studied depending on the different solution systems. There are different ways to study how well the transportation system works. For example, the utilization of the AGV’s, the time that lasts between the arrival of the piece and its unloading, the amount of pieces that have been unloaded, etc. The main objective in this problem is to optimize the transportation between the arrival and the unloading. Therefore, the only key performance indicator would be the time between the piece arriving to the system and its exit, taking into account all possible idle times (AGV is stopped or unavailable). Subsequently, different times are proposed in order to see which solution might fit the best. Scenario 1: Underused system, where arrival times are significantly longer than the vehicle operational times. tarrival1 = tarrival2 = exp(15) min tred1 = tblue1 = tred2 = tblue2 = 1 min tload1 = tunload1 = tload2 = tunload2 = 1 min tgreen= tyellow = tpink = 0,33 min Page 48 Memory 6.5.2. Possible solutions The system gets deadlocked when the system is full (9 boxes in the load station, 9 boxes in the unload station and 1 box in the painter) and the first AGV that enters is the introducer. This is the only situation where the deadlock can happen, and this situation must therefore be avoided. Note there are several structural solutions in this case (which might fit the best). For instance, an additional parallel lane for the AGV withdrawer to advance the stuck AGV introducer. Other possible solutions are changing the route in a way in which both AGVs do not interact between themselves. However, in the scope of this work, no structural solutions can be proposed. Before proposing solutions, a little assumption must be made to concrete the problem. Figure 50 show the studied system in this case, but what exists out of it might influence in the capabilities of using one solution or not. All proposed solutions are based on the following premises that take place outside the system: - There is a space where the AGV Introducer can remain still without blocking the Withdrawer - There is a space where the AGV Withdrawer can remain still without blocking the Introducer An example of this system could be this one: Figure 55. Case V: Example of system outside the painting boundaries Here are some possible solutions: Input Area Not full Let the AGV introducer in if the input area is not full. This happens when the input area contains less than 9 boxes. If this is not the case, the AGV introducer shall wait outside until this conditional happens. System not full Let the AGV introducer in if the system has < 19 boxes. The vehicle might occasionally have to wait to the painter to finish its job and free one space in the input area, but for sure it will eventually happen because the system is not completely full. Study for the design of a management system for AGV networks Page 49 Try while not blocking This approach works the same as the previous one, but if the withdrawer arrives and the introducer is idle waiting for the cargo unload, the introducer should exit the system and try again later to let the withdrawer do its job. Try-and-repeat If the input area is full and the AGV introducer is trying to unload boxes, let the AGV introducer get out the system and try again later. This means that the vehicle might exit the system with the cargo that is needed to be painted and enter again with the same box. 6.5.3. FlexSim process simulation flow So as to compare all proposed solutions FlexSim will be used to get results for different state systems as the previous case. All previous information (Petri Nets) is used along with the explanation exposed in section 5. All five cases and solutions will be simulated. To recapitulate: - Original case (possible deadlock) - Solution 1 (Input Area not full) - Solution 2 (System not full) - Solution 3 (Try while not blocking) - Solution 4 (Try-and-repeat) The constructed diagrams are shown as it follows: Page 50 Memory Original Case (possible deadlock) Figure 56. Case V: Process created in FlexSim for the original problem Study for the design of a management system for AGV networks Page 51 Input Area not full Figure 57. Case V: Process created in FlexSim for the first proposed solution: input area not full Page 52 Memory System not full Figure 58. Case V: Process created in FlexSim for the first proposed solution: system not full Study for the design of a management system for AGV networks Page 53 Try while not blocking Figure 59. Case V: Process created in FlexSim for the first proposed solution: try while not blocking Page 54 Memory Try-and-repeat Figure 60. Case V: Process created in FlexSim for the first proposed solution: try and repeat Study for the design of a management system for AGV networks Page 55 6.5.4. Results and discussion As the previous case, this problem comes across the same “issue”. As a generic case there are no stipulated time values. So, in order to get some results, various cases with different values must be studied. At first, it is relatively easy to get a deadlock in our system. If the AGV withdrawer is significantly slower than the AGV introducer, and there is enough input of unpainted boxes, the deadlock can be encountered as it is shown in Figure 61. What this figure shows is the detected deadlock from before, where the AGV introducer cannot acquire input space because is full, but the AGV withdrawer cannot withdraw any box from the system since the previous vehicle is blocking the road. Figure 61. Case V: Deadlock represented in FlexSim The different times to declare can be stipulated to be quite parallel between themselves, as it is shown in Figure 62 and summarized in Table 6. Note that the figure is not in scale and the shape of the factory is not even represented. Figure 62. Case V: Different time concepts with the final sectors of the AGV network represented in a diagram Page 56 Memory Table 6. Case V: Different time concepts and its variable assignation AGV Introducer (1) AGV Withdrawer (2) Concept Variable Concept Variable Load Unpainted Box t1load Unload Painted Box t2unload Unload Unpainted Box t1unload Load Painted Box t2load Go to intersection t1A Go to intersection t2A Go to Input Point t1B Go to Input Point t2B Go to Output Point (Cross Input Area) t1C Go to Output Point (Cross Input Area) t2C Cross Output Area t1D Cross Output Area t2D Go to starting point t1E Go to starting point t2E Painting the box tpaint Painting the box tarrival As the Bridge crossing deadlock, different ways exist to see the good planning of the whole system. For example, the idle time of the AGV’s, or the time that a box is not being used (neither painted nor transported). However, the same key performance indicator will be used as the previous case, since the better output of this system is to optimize the time that passes from when the unpainted box is picked by the AGV introducer and the exiting of the same box but painted. Even that Figure 49 shows nine boxes in both input and output areas, the simulated scenarios will have just space for two boxes. This is done to reach the deadlock situation in a shorter time, and to not record unnecessary lead times. Scenario 1: Underused system, where the arrival of boxes can be assumed by the system tarrival = exp(15) min t2unload = t1unload = t1load= t2load =1 min t1X, 2X = 1 min for X= A, B, C, D, E tpaint = 1 min Boxes in input area = Boxes in output area = 2 Table 7. Case V: Results for Scenario 1, simulations for a horizon time = 4 days Original case Input Area not full System not full Try while not blocking Try-and-repeat Min. Lead Time (min) 12,00 12,00 12,00 12,00 12,00 Max. Lead Time (min) 12,00 12,00 12,00 12,00 12,00 Avg. Lead Time (min) 12,00 12,00 12,00 12,00 12,00 Number of batches 365 365 365 365 365 As it is expected, if the system is way underused, the system will not encounter any deadlock, and therefore all deadlock-solving systems are equivalent to the original problem. If this were the case, there would be no need to create a deadlock avoidance algorithm although this is not recommended since the system become susceptible to any deadlock if there is an unexpected alteration. Study for the design of a management system for AGV networks Page 57 Scenario 2: AGV Withdrawer has a longer path than the Introducer outside the main process tarrival = exp(15) min t2unload = t1unload = t1load= t2load =1 min t1X = 1 min for X= A, B, C, D, E = t2B,2C,2D t2A,2E = 4 min 30 sec tpaint = 1 min Boxes in input area = Boxes in output area = 2 Table 8. Case V: Results for Scenario 2, simulations for a horizon time = 4 days Original case Input Area not full System not full Try while not blocking Try-and-repeat Min. Lead Time (min) Deadlocked at box number 14 19,00 19,00 19,00 19,00 Max. Lead Time (min) 85,50 85,50 92,50 85,62 Avg. Lead Time (min) 56,33 56,33 63,49 55,23 Number of batches 364 364 356 364 In this scenario the first deadlock is encountered. This happens because the AGVs are no longer balanced, as the Introducer works at a higher rate than the withdrawer, which originates a bottle neck in the input area. This makes the AGV introducer to be blocked in the input road until some cargo is liberated, and as a consequence, the times for the “Try while not blocking” system are higher than the rest, since the AGV introducer remains still until the other vehicle arrives. Even it has been taken into account that the same number of batches were delivered at the end of the period, it is bad for the system to have higher lead times for the boxes. Additional boxes arriving at higher rate will make the differences between algorithms grow. It can also be noted than there are no notorious differences between the other three algorithms, so each solution will be appropriate for the system. Scenario 3: Higher loading and unloading times for a painted box tarrival = exp(15) min t1unload = t1load = 1 min t1X, 2X = 1 min for X= A, B, C, D, E t2unload = t2load = 4 min Boxes in input area = Boxes in output area = 2 tpaint = 1 min Table 9. Case V: Results for Scenario 3, simulations for a horizon time = 4 days Original case Input Area not full System not full Try while not blocking Try-and-repeat Min. Lead Time (min) Deadlocked at box 177 18,00 18,00 18,00 18,00 Max. Lead Time (min) 79,00 79,00 86,00 80,00 Avg. Lead Time (min) 41,40 41,40 46,28 41,11 Number of batches 364 364 364 364 This is a similar scenario than before, but the higher times correspond to the unload/load process of the AGV withdrawer. For the same reason, the “Try while not blocking” is also punished to be the worst algorithm. The other solutions are also pretty similar between themselves, almost tied. Page 64 Memory Assigning “n” load stations and “12 - n” unload stations Separating the loading stations and the unloading stations is also a way to categorize these resources and preventing systems deadlocks. The operator loads all the parts from certain preassigned stations, and unloads them from the other ones. Block a station if there are already 3 parts at the machines and 11 on the stations This possible solution is different from the previous ones, since the system deadlocks are not prevented yet avoided. The deadlock occurs when a piece enters into the system when 11 stations have pending-to-load pieces and 3 parts are at the machines (future unload). An operator can still have all the stations loaded, but only if not all machines are in use. Because of this condition, the circular wait is eliminated dynamically with a condition. 6.6.3. FlexSim process simulation flow In order to identify the different parts that arrive to the system, a label will be assigned corresponding to the “part number” that belongs to. As it is shown in Table 13, 1694 pieces arrive each month, which corresponds to a piece each 17 minutes. All different situations correspond to different resources labeling, so all process flows are different among them. The different options are presented as it follows. Original Case (possible deadlock) Figure 69. Case VI: Process created in FlexSim for the original problem Study for the design of a management system for AGV networks Page 65 Assigning part number per station Figure 70. Case VI: Process created in FlexSim for the first proposed solution: assign part number per station Assigning part arrival per station Figure 71. Case VI: Process created in FlexSim for the first proposed solution: assign part arrival per station Page 66 Memory Assigning “n” load stations and “12 - n” unload stations Figure 72. Case VI: Process created in FlexSim for the first proposed solution: assign “n” load stations and “12-n” unload stations Block a station if there are already 3 parts at the machines and 11 on the stations Figure 73. Case VI: Process created in FlexSim for the first proposed solution: block station if 3 parts in machine and 1 on the stations Study for the design of a management system for AGV networks Page 67 6.6.4. Results and discussion Once simulated all the processes mentioned in the previous section, some results can be obtained in order to see the performance of the different solution proposals. But first of all, it can be demonstrated by FlexSim that Case VI originates a deadlock. If we simulate as the problem states (20 days), the system seems to flow correctly until certain point where a deadlock is found, which is unbreakable: Figure 74. Case VI: Deadlock represented in FlexSim Because of this, it makes sense to study different solutions for studying the performance of the system. There might be different ways to study the performance in this system, as the utilization of the different resources, or the waiting time for each part before being processed. However, for this system, the idle time for each part has been selected (Time that the piece is in the system and is not being processed, transported nor loaded/unloaded) After performing the simulations, the obtained results are the ones showed in Table 14. As it can be seen, the Part Number per Station method is the worst solution, since the average lead time is significantly higher than the other ones. Ensuring always 1 unload station is also inefficient, if it is compared with having 2 unload stations. The other cases are practically equivalent, since the difference among them is just some minutes. As it is said in 3.3.2 Deadlock avoidance, deadlock avoidance should have been better than the other systems since it signifies better resource. This is not seen in the first sight because the optimizable resource is just one station out of twelve and the system is pretty equilibrated and underused. In fact, most of the systems, in this case, will give similar outputs. As a manner of fact, according to the simulations, this system has avoided 6 deadlock situations. Table 14. Case VI: Results for simulations for a horizon time = 20 days Part Number Per Station Part Arrival Per Station 11 Load and 1 Unload 10 Load and 2 Unload 9 Load and 3 Unload 8 Load and 4 Unload Avoid Deadlocks Total Idle Time (h) 748 391 423 391 391 391 391 Avg. Idle Time (min) 26,15 13,7 14,8 13,7 13,7 13,7 13,7 Page 68 Memory In order to see more statistical difference between the deadlock prevention and avoidance, it has been decided to change the number of resources. If we suppose that the system is only composed by 4 stations, and counting a horizon time of 200 days, scenarios are pretty different. This is because optimizing one resource out of four is more critical. The results can be seen in Table 15. Table 15. Case VI: Results for simulations, modifying number of stations to 4, for a horizon time = 200 days Part Arrival Per Station 3 Load and 1 Unload 2 Load and 2 Unload Avoid Deadlocks Total Idle Time (h) 4653 4279 4071 4010 Avg. Idle Time (min) 16,5 15,1 14,4 14,2 With these simulations, it can be seen that in the long run, deadlock avoidance usually works better than deadlock prevention. Study for the design of a management system for AGV networks Page 69 7. Conclusions It is totally possible to map Petri Nets into FlexSim, so it is a very useful simulation software for manufacturing system processes. The software can detect deadlocks with an appropriate mapping of the real process by simulating the different cases; but more importantly, the whole process diagram can be easily changed and understand thanks to its user-friendly environment. It has shown several successful cases in which different detailed solutions have been obtained. All times and entities are trackable and the user can see where and when a problem rises, and study its causes and consequences. It is a user friendly software similar to Arena, which is the currently used software in ESEIAAT. Inside the scope of work of this project it is demonstrated that both software’s are equivalent because of the possibility of both to assume Petri Nets mapping. However, FlexSim is quite complete and can also be synchronized with visual and location-based simulation. It is possible to model directly in 3D, which can be tremendously useful when translating a real plant into a simulation model. It has also its own pseudocode which is not very difficult to interpret, which is highly useful for conditionals that can afterwards be applied in the program logic controller on the AGV systems, so as to improve the flexible manufacturing systems. To sum up, it is possible to use FlexSim as a simulation tool in order to solve deadlocks with AGV systems. Moreover, it was demonstrated that mapping Petri Nets into this software was possible so that many parallelisms with Arena could be observed. 8. Future work It is possible to use FlexSim for deadlocks associating the cases to a 3D modelling. The software also has a special AGV package module, so as to get an even more user friendly scenario. Using this modelling offers a visual representation and the user can see immediately what is happening, and is also able to determine if the process was correctly simulated seeking for its similarities to the real world process. Other future work that can be done is using FlexSim for handling deadlocks by more cases of “deadlock avoidance”. This field is really interesting but requires some expertise on programming. Page 70 Memory Bibliographic references [1] J. Wilkins, "Interempresas," 24 August 2017. [Online]. Available: https://www.interempresas.net/Electronica/Articulos/194384-Guiando-a-la-industria- con-robots-inteligentes-autonomos.html. [Accessed 11 August 2018]. [2] D. M. Products, 11 October 2017. [Online]. Available: https://www.dmmetalproducts.com/news/35-why-is-there-a-need-for-automated- guided-vehicles-agvs. [Accessed 11 August 2018]. [3] K. H. Kim and H.-O. Günther, Container Terminals and Cargo Systems: Design, Operations Management and Logistics Control Issues, Springer, 2007. [4] N. Viswanadham, Y. Narahari and T. Johnson, "Deadlock Prevention and Deadlock Avoidance in Flexible Manufacturing Systems using Petri Net Models," Transactions on Robotics and Automation, vol. 6, no. 6, pp. 713-723, 1990. [5] E. Coffman Jr, M. Elphick and A. Shoshani, "System Deadlocks," Computing Surveys, vol. 3, no. 2, pp. 67-78, 1971. [6] Q. Li, J. T. Udding and A. Y. Pogromsky, "Modeling and control of the AGV system in an automated container terminal," Proceedings of the AsiaMIC , 2010. [7] K. M. R. L. Moorthy and W. H. Guan, "Deadlock Prediction and Avoidance in an AGV system," Singapore-MIT Alliance, 2000. [8] R. Bhattacharya and S. Bandyopadhyay, "An improved strategy to solve shop deadlock problem based on the study of existing benchmark recovery strategies," International Journal of Advanced Manufacturing Technology, no. 47, pp. 351-364, 2010. [9] A. Silberschatz, P. B. Galvin and G. Gagne, Operating System Concepts (9th edition), Kendallville: Wiley, 2013. [10] J. Wang, "Petri Nets for Dynamic Event-Driven System Modeling," in Handbook of Dynamic System Modeling, Chapman & Hall/CRC, 2007. [11] A. Guasch, J. Figueras and J. Casanovas, "Conceptual modeling using Petri Nets," in Formal languages for computer simulation: transdisciplinary models and applications, IGI Global, 2013, pp. 1-37. [12] W. M. P. van der Aalst, "Timed coloured petri nets and their application to logistics," TNO Institute for Production and Logistics, Eindhoven, 1992. Study for the design of a management system for AGV networks Page 71 [13] H. J. Pels and J. Goossenaerts, "A Conceptual Modeling Technique for Discrete Event Simulation of Operational Processes," IFIP International Federation for Information Processing, vol. 246, pp. 305-312, 2007.