TECHNICAL – ECONOMIC STUDY ON IMPLEMENTING A BIOGAS PLANT OPERATING WITH GREENHOUSE VEGETABLE WASTE GENERATED IN THE REGION OF ALMERIA Final Degree Project Biosystems Engineering Author: Pablo Calbo Antolino Tutor: Xavier Flotats Date: January 18th, 2018
Preface This research represents the culmination of a work that has taken place within the period from September 2016 to December 2017. The experimental work of this dissertation has been conducted in the Eco-technology laboratory of the Institute of Biosystems at Poznan University of Life Sciences, Poland. The scientific team of the Eco-technology laboratory of Poznan is established by PhD students, master degrees students and technics of laboratory. The team is currently conducting many researches and they have many arrangements with companies with comprehensive preparation of investment related to biogas plants and peripheral installations connected with using electricity, heat, digested and 𝐶𝑂2 from flue gas. The motivation for carrying out this work stems from the idea of working in a project and a research which could be useful to the organic waste treatment industry in Spain. Upon the research of several locations on organic waste treatment in Catalonia, including, for example, treatment of both sewage and organic residues from slaughterhouses, finally the huge biomass potential from greenhouse vegetable waste from the region of Almeria met my demands. Furthermore, the assumption of having to my disposal the biggest polish biogas laboratory to conduct the tests as well as already filed data sheets made this project option more encouraging and appealing. New innovative an advanced technologies for organic waste treatment and especially for agricultural waste has been developed at present by polish researchers alongside with a Swiss company and it opens the possibility to introduce new alternatives to Spanish biogas market. Nonetheless, further than the initial motivation, I must acknowledge that during the execution of the experiments my inability to collect vegetable samples as well as the appearing of some technical setbacks discouraged me slightly to face the writing of the memory and the results. The dissertation is structured with a short summary (English, Spanish and Catalan), followed by an introduction, objectives, methodology and a theoretical framework at the beginning and continuing with the body of the drafted containing the heavy development of the research/project.
Financial support The research of this thesis has been financially supported by the Eco-technology laboratory at Poznan University of Life Sciences belonging to the Biosystems Institute of the Agronomy and Bioengineering department. Acknowledgments Thanks to Prof. Dach for his kindness, understanding, help and valuable comments and knowledge provided in the preparation of this work; Thanks to colleagues from the laboratory of Eco-technology for help me and teach me with the implementation of the work; Thanks to Prof. Flotats for his help, patience and valuable comments and knowledge provided in the preparation of this work;
Mandatory page Title: Technical – economic study on implementing a biogas plant operating with greenhouse vegetable waste generated in the region of Almeria. Name Bachelor’s degree student: Pablo Calbo Antolino. Name and title of supervisor or any other supervisor: Professor Jaceck Dach, Institute of Biosystems, Poznan University of Life Sciences, Wojska Polskiego 42, 60-628 Poznan, Poland. Associate Professor Andzrej Lewicki, Institute of Biosystems, Poznan University of Life Sciences, Wojska Polskiego 42, 60-628 Poznan, Poland. Professor Xavier Flotats, Agro-Food Engineering and Biotechnology department at UPC BarcelonaTECH, Esteve Terradas, 8, 08860 Castelldefels, Barcelona, Spain. Conference participation: Oral Biogas plant exploitation under the low-subsidies market conditions: maize silage vs biowaste scenarios. Jacek Dach, Krzisztof Jozwiakowski, Alina Kowalczyk-Jusko, Kamil Kozlowski, Maciej Neugebauer, Pablo Calbo. Poznan university of Life Sciences, Poland. 16th International Multidisciplinary scientific Geoconference SGEM 2016, Viena, November 2016.
Abstract The work developed so far has shown that in the complex of greenhouses in the Region of Almeria more than 2 million of tons of vegetable waste are generated annually, whose destination is composting in piles for the production of biofertilizer in greater measure, providing a minimum economic value. The present work includes experiments of energy valorization of these by-products in order to verify that there is a big potential for generating both electric and thermal energy based on biogas. In net terms, the results show that can be generated around 102,23 GWh/year and 122,68 GWh/year respectively, which translates into an installed power of 12,47 GW and 14,96 GW. The main objective of the project is to determine the technical-economic viability of the valorization of these plant remains through the installation of a biogas plant. In addition, a biofertilizing product is acquired and the 𝐶𝑂2 from the flue gas is recovered to enrich the crops of the adjacent greenhouses and to be sold at better prices than the current ones. From this arises the opportunity to solve the existing problem of demand for the appearance of new treatment facilities for these agricultural residues as well as to valuing them more efficiently obtaining more income from the same input base. For these reasons, thanks to biogas, the agricultural waste that is currently a problem for the farmer becomes a source of multiple benefits. The design of the project contemplates the construction of a biogas plant on Dynamic Biogas technology (full mix reactor without recirculation), which is the most suitable for the selected substrates. For an optimal functioning of the plant with a hydraulic retention time estimated of 40 days and for a volume of 2.000 𝑚3 of digesters, 17.083 Mg of waste will be treated annually. As a result, a plant with a firm electrical power of 107 KW is obtained as well as 3.840 GJ of thermal energy from cogeneration. Besides, the digestate annually produced would replace 20% of the whole current demand of fertilizers in the greenhouses. In regards to the economic evaluation, with an investment of 2,3 million euros, a net present value of – 1,09 million euros and an internal rate of return of 2,26% is obtained. Through the sale of electric energy, thermal energy, biofertilizer, 𝐶𝑂2 and carbon credits, approximate revenues to 274 thousand euros/year are obtained. On the other hand, the expenses and costs
represent a sum around 113 thousand euros/year. The amortization is covered at 20 years, which is the lifetime of the installation and leaves the project with little slack. The viability of the project cannot be assured not only due to the negative results of the economic evaluation but also because of the risks involved in the installation site and the transmission costs - ensuring the sale of thermal energy is very important -. In addition, an investor will always look for projects with higher internal rates of return, for which the government has a fundamental role: to propose clear economic incentives for investors to decide to invest in this type of energy projects.
Resum Fins al moment, el treball desenvolupat ha posat de manifest que en l'explotació del complex d'hivernacles del Ponent d'Almeria es generen més de 2 milions de tones anuals de residus vegetals, els quals es destinen al compostatge en piles per a la producció de biofertilitzant en major mesura, aportant un valor econòmic mínim. El present treball inclou experiments de valorització energètica d'aquests subproductes amb l'objectiu de comprovar que hi ha un gran potencial de generació tant d'energia elèctrica com tèrmica basant-se en biogàs. En termes nets, es poden generar al voltant de 102,23 GWh/any i 122,68 GWh/any respectivament, la qual cosa es tradueix a unes potències instal·lades de 12,47 GW i 14,96 GW. El projecte té com a objectiu principal determinar la viabilitat tecnicoeconòmica de la valorització d'aquestes restes vegetals mitjançant la instal·lació d'una planta de biogàs. A més, s’adquireix un producte biofertilitzant i es recupera el 𝐶𝑂2 dels gasos de combustió per enriquir els cultius dels hivernacles adjacents i per ser venuts a millors preus que els actuals. A partir d'això sorgeix l'oportunitat de resoldre el problema existent de demanda d'aparició de noves instal·lacions de tractament d'aquests residus agrícoles a més de valorar-los de manera més eficient obtenint majors ingressos amb la mateixa base d’entrades. Per aquestes raons, gràcies al biogàs, els residus agrícoles que actualment són un problema per l'agricultor es converteixen en una font de múltiples beneficis. El disseny del projecte contempla la construcció d'una planta de biogàs tecnologia Dynamic Biogas (reactor de mescla completa sense recirculació), que resulta ser la més adequada per als substrats seleccionats. Per a un òptim funcionament de la planta amb un temps de retenció hidràulica estimat de 40 dies i per a un volum de 2.000 𝑚3 de digestors es podran tractar 17.083 Mg de residus anualment. Com a resultat s'obté una planta amb una potència elèctrica ferma de 107 KW a més de 3.840 GJ d'energia tèrmica per co-generació. A més, el digerit produït anualment reemplaçaria el 20% de la demanda actual total de fertilitzants als hivernacles. Pel que fa a l’avaluació econòmica, amb una inversió de 2,3 milions d'euros, s'obté un valor actual net de – 1,09 milions d'euros i un taxa interna de retorn de 2,26%. A través de la venda d'energia elèctrica, energia tèrmica, biofertilitzant, 𝐶𝑂2 i crèdits de carboni s'obtenen ingressos aproximats a 274 mil euros/any. D'altra banda, les despeses i costos representen una
suma al voltant de 113 mil euros/any. L'amortització es cobreix als 20 anys, la qual cosa és la vida útil de la instal·lació i deixa el projecte amb poca folgança. No es pot assegurar la viabilitat del projecte no només a causa dels resultats negatius de l'avaluació econòmica sinó també pels riscos que impliquen el lloc d'instal·lació i els costos de transmissió - assegurar la venda d'energia tèrmica és molt important -. A més, un inversor sempre buscarà projectes amb taxes internes de retorn més altes, per la qual cosa el govern té un paper fonamental: el de proposar incentius econòmics clars perquè els inversors decideixin invertir en aquest tipus de projectes energètics.
Resumen Hasta el momento, el trabajo desarrollado ha puesto de manifiesto que en la explotación del complejo de invernaderos del Poniente Almeriense se generan más de 2 millones de toneladas anuales de residuos vegetales, cuyo destino es el compostaje en pilas para la producción de biofertilizante en mayor medida, aportando un valor económico mínimo. El presente trabajo incluye experimentos de valorización energética de dichos subproductos con el objetivo de comprobar que existe un gran potencial de generación tanto de energía eléctrica como térmica en base a biogás. En términos netos, se pueden generar alrededor de 102,23 GWh/año y 122,68 GWh/año respectivamente, lo cual se traduce a unas potencias instaladas de 12,47 GW y 14,96 GW. El proyecto tiene como objetivo principal determinar la viabilidad técnico‐económica de la valorización de dichos restos vegetales mediante la instalación de una planta de biogás. Además, se adquiere un producto biofertilizante y se recupera el 𝐶𝑂2 de los gases de combustión para enriquecer los cultivos de los invernaderos adyacentes y para ser vendidos a mejores precios que los actuales. A partir de esto surge la oportunidad de resolver el problema existente de demanda de aparición de nuevas instalaciones de tratamiento de estos residuos agrícolas además de valorarlos de manera más eficiente obteniendo mayores ingresos con la misma base de insumos. Por estas razones, gracias al biogás, los desechos agrícolas que actualmente son un problema para el agricultor se convertirían en una fuente de múltiples beneficios. El diseño del proyecto contempla la construcción de una planta de biogás tecnología Dynamic Biogas (reactor de mezcla completa sin recirculación), que resulta ser la más adecuada para los sustratos seleccionados. Para un óptimo funcionamiento de la planta con un tiempo de retención hidráulica estimado de 40 días y para un volumen de 2.000 𝑚3 de digestores se podrán tratar 17.083 Mg de residuos anualmente. Como resultado se obtiene una planta con una potencia eléctrica firme de 107 KW además de 3.840 GJ de energía térmica por co-generación. Finalmente, el digerido producido anualmente reemplazaría el 20% de la demanda anual total de fertilizantes en los invernaderos. En cuanto a la evaluación económica, con una inversión de 2,3 millones de euros, se obtiene un valor actual neto de – 1,09 millones de euros y una tasa interna de retorno de 2,26 %. A través de la venta de energía eléctrica, energía térmica, biofertilizante, 𝐶𝑂2 y bonos de carbono
16 ARet – annual income for the produced thermal energy [EUR] ηep – energy efficiency furnace [-] in the present case is 0,6 Md – mass of produced of digestate [Mg] pd – selling price of the digestate [EUR · Mg¯¹] ηf – weight maintenance factor in the fermentation [-], we must accept a value in the range 0,90 – 0,93. Vbh – volume of biogas consumed within 1 hour of work [m3 · h-1] tCO2 – number of annual hours per day of pumped CO2 in a greenhouse [h]; typically, an average of 8 h/day for 10 months, giving 2400 h ϱCO2 – density of CO2 0,001842– 0,001977 [Mg m-3] CCO2 – unit price used in greenhouses as CO2 [EUR · kg-1] Cabi – cost of biogas installation [EUR] Csubr – cost of substrates [EUR] Cop –cost of operation [EUR] Cserv – cost of services [EUR] Cdepr – cost of depreciation [EUR] Cstaff – cost of staff [EUR] Cusubr – the unit price of the substrate [EUR · Mg-1] CT – the cost of transport of substrate [EUR] CSM – the cost of storage and management [EUR] Cserv – service cost [EUR] Cms – maintenance service cost [EUR] Ctechs – technological service cost [EUR] Cinst – cost of biogas installation [EUR] Ee – amount of electricity produced [MWh] Rtech – technological cost ratio [EUR · MWh-1]
17 Nstaff – number of employed persons [-] Sg – average annual gross salary of the employees [EUR] NPV – net present value N – number of years of plant life I – investment cost CFn – net cas flow in year N IR – interest rate - in the present case is 0,1 IRR – internal rate of return MYR – minimum yield required RD – risk differential
18 1. Introduction The project focus on the process of anaerobic digestion of agricultural waste from intensive farming in greenhouses developed in recent years in the Province of Almeria, and the work carried out so far has shown that more than 2 million of tons of organic waste are generated every year in this region. At present, part of these wastes are already treated and used for the generation of compost, but there is no demand high enough to eliminate all of them, so they are being accumulated generating a significant environmental impact in the area and barely economically contributing to either farmers or companies. The use of this biomass for energy uses represents an alternative route to the current electric model and has certain advantages over it. Neutral balance of GHG emissions in the atmosphere. Biogas is a renewable alternative fuel whose production source is inexhaustible. Streamlining the activity of local territories through the use of their own resources. Generation of jobs committed to society and the environment. Reduction of energy dependence of the territory. To undoing of agricultural residue and its economic valorization. Through this project is intended to put in value the potential that they have as a renewable energy source and as an agricultural biofertilizer thus aiming to evaluate whether the implementation of a greenhouse – biogas plant system in the Almeria Province is technical and economic feasible. The general and specific objectives and the methodology carried out are explained in the following sections. For the development of all this work has been carried out an extensive bibliographical work, using resources from different public entities, both at European level, National and Autonomous, companies specialized in the sector and studies in different fields on anaerobic digestion. For this has been consulted available literature, project reports and writers of biogas projects (professors and lab mates). Finally, this project will lead us to conclusions and future lines of research that will try to improve the current waste management of this study.
19 2. Objectives The main purpose of this project is to conduct both a technical and economic evaluation of a biogas plant built and connected with a type-scale modern greenhouse producing vegetables, exclusively in base of the results obtained subjecting samples of GVW to biogas production experimental tests. The general objectives can be listed below: Evaluate the energy potential of the GVW in the Almeria region in terms of both biogas (and methane) and power capacity; Perform a technical analysis of the power biogas plant, considering from construction aspects to aspects related to energy production during the evaluation period. Perform an economic analysis of the installation, ranging from the business model to a sensitivity analysis of the variables that control the cash flow of the project.
20 3. Methodology For the development of this project the following working methodology is defined: 1. Bibliographic review on the generation of agricultural waste in the Province of Almeria will be carried out and presented. 1. An overview of the prevailing regulatory framework on generating renewable energy in Spain and its downhill current policies that would impair the implementation of the project will be explained. For this, the available literature, project reports, companies and biogas project consultants will be approached. 2. The biogas production process and the principles of operation of a biogas plant will be studied. The different available technologies will be also studied in order to clarify the alternatives for the production of biogas and which are the most suitable for the particular case of the project, but they will not be included in the memory to reduce its extension. For all this, the available literature, project reports, companies and biogas project consultants will be approached. 3. From substrate specifications that currently owns the laboratory plus the results obtained from the biogas efficiency tests on samples of GVW, the energy potential of the substrates will be studied. 4. Based on the available volume of GVW estimated in the region and its energy potential the installable power capacity in the area will be estimated. 5. In view of the information gathered regarding biogas production and considering the relation of benefit between the greenhouses/farmers and the biogas plant, a general model will be recommended and the process to biogas obtaining and the biogas plant installation will be described. 6. Consulting with suppliers, using information from similar projects of biogas production and according to previously settled specifications, the investment and the operational costs for the biogas plant implemented will be determined as well as the possible income from the commercialization of its energy, fertilizer and 𝐶𝑂2 generation. Thus aiming to economically evaluate the project and to deliver relevant indicators. The method of calculation will be explained.
21 7. A sensitivity analysis will be carried out in order to understand the variables that would positively or negatively affect the project. As for example the sale price of the energy, the efficiency of the substrate, variable costs of production, etc. The method of calculation will be explained. 8. Based on the technical and economic analysis carried out, it will be concluded with respect to the project and definition of lines of work following the present study will be presented.
22 4. Greenhouse vegetable waste generation in Almeria The agriculture in the Province of Almeria has experienced a huge development in the last three decades. The economic engine of this movement forward has been the primary sector and specially the intensive agricultural sector under plastic. This horticultural sector is developed by a huge amount of greenhouses that have been increasing throughout the last twenty years. In 1984 the area was of 11.000 ha and nowadays in 2016 it is around 29.000 ha. For that reason upon the settlement of this broad amount of greenhouses, the Almeria region is today placed as the biggest vegetable producer of Spain as well as one of the leaders worldwide. Therefore, as it is logical, the production of this huge amount of vegetables entails the apparition of a stunning amount of waste mainly of organic composition accounting to 2.013.210 tons annually (López et al., 2016). Despite of Almeria currently has a 1,7 MW greenhouse gasification plant, being the only one in Spain with these characteristics (AAE, 2015), most of the GVW are currently subjected mainly to a composting process which allows to obtain organic fertilizers. However, the annual generation of GVW is far superior to the capacity of treatment of the composting plants thus accumulating and generating an important environmental impact in the area. As a matter of fact, the abandonment of waste in bays and lots is sanctioned since it can have many negative consequences. Among these, the vegetable wastes can be the focus of the spread of diseases and pests, which can seriously affect adjacent crops; it can degenerate in rotting with the resulting bad smell and contamination of the aquifers; as well as having a negative visual impact (Parra, 2004). During its development aforementioned, a “plastic sea” parallel to the sea has been spread throughout the West, which clearly clarifies its leadership in exportations of these products today (Figure 1).
23 Figure 1.- The ‘’plastic sea’’ in the Almeria Province. Source: Google Earth. The main crops are tomato, pepper, cucumber and zucchini, as it is identified graphically in the Figure 2, hogging the first three around 60% of the production. Figure 2.- Production by types of fruit and vegetable products of the province of Almeria during the 2012-2013 season. Source: Own elaboration according to Cabrera et al. (2015). Tomato 31% Eggplant 5% Pepper 17% Cucumber 13% Greenbean 1% Zucchini 12% Melon 4% Watermelon 11% Lettuce 5% Others 1%
24 In addition, the management and treatment of GVW is complex due to its heterogeneity, - including polyethylene wires used as tutors –its high dispersion that makes expensive and difficult the transport and storage operations and finally its generation throughout the year. During the months of May and June, at the end of the spring crops, and in the month of February, at the end of autumn and winter, about 70% of the remains are generated. As aforementioned, the extended current treatment in this region is the composting which allows to obtain a rich product with fertilizing and stabilizing feature. In the Table 1 are listed the current installations in the region and its poor annually capacity of treatment accounting approximately to one tenth of the total GVW generation. Table 1.- Current treatments of the vegetable residues en the Province of Almeria (Consejería de agricultura, pesca y desarrollo rural, 2016). Name of the instalation Province Municipality Treatment Capacity (t/year) Reciclados Almerienses 2005, S.L. Almeria Almeria Vermicompost 7.920 Ejido Medio Ambiente, S.A. Almeria El Ejido Composting 150 Albaida Residuos, S.L. (Paraje Cueva del Algarrobo) Almeria La Mojonera Composting 135.000 Transportes y Contenedores Antonio Morales, S.A. - El Jabonero Almeria Níjar Composting - Ecotech Valoriza, S.L. Almeria Rioja Vermicompost 1.800 Servicios Ambientales Las Chozas, S.L Almeria El Ejido Composting 47.600
25 5. Prevailing regulatory framework on REG in Spain In the adoption of the Electric Power Act in 1997, Spain has had a special tariff regime with strong financial incentives to renewable energy and combined heat and power (CHP) producers (International Energy Agency [IEA], 2009). In 2004, the Royal Decree 4361/2004 introduced an important change to this system, allowing the electricity generators under the special regime to choose between either getting a regulated tariff selling the electricity to the grid operator or a market price plus a premium selling the electricity on the wholesale market which will vary according to the hourly wholesale (pool) price. This costs were supposed to be covered by a third-party access tariff, paid by consumers. At any rate, both options still entailed a bounty from its power production which remained their facilities cost-effective while respectful with the environment. The table below represents the average data of subsidies that the energy producers from renewable energies received: Table 2.- Feed-in Tariffs and Premiums for Electricity from Renewable Sources in Spain, 2008 (IEA, 2009). On 2013, the Royal Decree Law 2/2013 containing urgent measures in the electricity and financial sectors was enacted for renewable energy, cogeneration and residues facilities. First of all the funding case consisting of the combined system of pool price plus a premium was
32 c) Alkalinity Alkalinity is a measure of the buffer capacity of the medium. It can be provided by a wide range of substances, being therefore a nonspecific measure. In the pH range of 6 to 8, the main chemical balance that controls alkalinity is carbon dioxide-bicarbonate. To ensure buffer capacity and avoid acidification, alkalinity higher than 1,5 g / l CaCO3 is recommended. The ratio of alkalinity is defined as the ratio between the alkalinity due to volatile fatty acids (VFA) and that due to bicarbonate (alkalinity). It is recommended not to exceed a value of 0,3-0,4 to avoid acidification of the reactor. d) Particle size During the anaerobic digestion of a solid residue, the rate of solubilization of the organic matter will be closely related to the granulometry of the residue (Sharma, 1988). Thanks to a previous pretreatment such as a brief crushing or an intense hydrolysis a particle size can be achieved allowing an increase of the available surface. Hence, allowing to improve the biological process and the yield of biogas production on substrates with a high fiber content and low biodegradability such as plant residues. e) Redox potential The recommended values must be less than -350 Mv. f) The nutrient content One of the inherent advantages of the anaerobic digestion process is its low need for nutrients as a consequence of its small growth rate. However, carbon and nitrogen are the main sources of food for methane-forming bacteria and they are of big importance for the fermentative process so a Carbon / Nitrogen (C/N) ratio of 20-30 is recommended as the optimum. The process requires, in addition to a source of carbon and energy, the presence of several mineral nutrients such as nitrogen, sulfur, phosphorus, potassium, calcium, magnesium, etc. g) The presence of toxins and inhibitors Inhibitory substances are compounds that are either present in the waste before digestion or are formed during the anaerobic fermentation process. These substances reduce the performance of digestion and may even cause the complete destabilization of the process.
33 There are a lot of substances that can inhibit anaerobic digestion. Among them, oxygen should be noted, although its inhibitory effect is not permanent, since in the bacterial flora there are microorganisms that will consume the oxygen that the medium may have. Also, if the biomass is rich in nitrogen, an excess of ammonia can be produced then inhibiting the process. Other inhibitors are heavy metals, which act on methanogenic microorganisms. In addition, some organic substances, such as antibiotics and detergents in certain concentrations, can inhibit the process. Finally, a high concentration of volatile acids can produce an inhibitory effect. Table 4 shows the inhibitory concentration values of the most common inhibitors. These values are indicative, since bacteria can adapt over time to the most unfavorable conditions. Table 4.- Inhibitory concentration values of the most common inhibitors (Jarauta, 2005) Inhibitors Concentration [mg/ml] Sulfide (Sulfur) 200 Copper (Cu) 10 – 250 Chrome (Cr) 200 – 2000 Zinc (Zn) 350 – 1000 Nickel (Ni) 100 – 1000 CN 2 Sodium (Na) 8000 Calcium (Ca) 8000 Magnesium (Mg) 3000 h) Agitation There are different reasons to maintain an adequate degree of agitation in the digestion medium such as to maintain the mixing and the homogenization of the substrate, to uniform distribution of heat to maintain the homogeneous temperature, to favor the transfer of gases or to avoid the formation of foams and sedimentation. Agitation may be mechanical or pneumatic through the bubbling of recirculated biogas at the appropriate pressure. In any case should be violent, because it could destroy the aggregates of bacteria.
34 Depending on the type of reactor, the level of energy necessary to favor the transfer of substrate to each population or aggregates of bacteria must be transferred to the system, as well as homogenized to maintain low mean concentrations of inhibitors. i) Hydraulic retention time (HRT) It is the quotient between the volume and the treatment flow, ergo, the mean residence time of the influent in the reactor, subject to the action of the microorganisms to reach the energy levels and / or reduction of the pollutant load that have been prefixed. It is expressed as follows: 𝐻𝑅𝑇 = 𝑚3 𝑑𝑖𝑔𝑒𝑠𝑡𝑒𝑟 𝑚3𝑠𝑢𝑏𝑠𝑡𝑟𝑎𝑡𝑒/𝑑𝑎𝑦 Figure 5 shows the general trend of organic matter removal rates (expressed in the form of volatile solids, SV) and of specific gas production, per unit of reactor volume, as a function of retention time. Figure 5.- Volatile solids removal, VS (%) and volumetric production of Pv gas (𝑚3biogas / 𝑚3 dig · day) for a continuous anaerobic reactor of complete mixing, depending on the hydraulic retention time (IDAE, 2007).
35 This parameter is closely linked to the type of substrate and its temperature. The selection of a higher temperature will imply a decrease in the required retention times and, consequently, the reactor volumes necessary to digest a certain volume of material will be lower. j) Organic loading rate (OLR) This parameter is the amount of organic matter introduced per unit of volume and time. Low values imply low concentration in the influent and / or high retention time. The increase in the OLR implies a reduction in gas production per unit of organic matter introduced (see Figure 6), having to find an optimal technical / economic value for each installation and waste to be treated. Besides, if it is too low, the metabolic activity of the bacteria is lower and only small amounts of gas will occur. If the feed rate is too high, there will be an overload that will increase the formation of volatile acids with the consequent increase of the proportion of carbon dioxide in the gas or what would be even worse, the stoppage in the production of biogas due to inhibitions of bacteria involved in fermentation due to high concentrations of fatty acids and variations in pH. It is expressed as follows: 𝑂𝐿𝑅 = 𝑘𝑔 𝑉𝑆 𝑚3𝑑𝑖𝑔𝑒𝑠𝑡𝑒𝑟 · 𝑑𝑎𝑦 Figure 6.- Gas production per load unit based on the organic loading rate (OLR) (IDAE, 2007).
36 7. Experiment design The experiments of energy valorization of GVW allow us to verify the existing big potential in the Region of Almeria on generating both electric and thermal energy based on biogas. These experiments were carried out in the Eco-technology laboratory at Poznan University of Life Sciences which is the largest biogas laboratory in Poland. This laboratory has over 250 fermenters working in temporary or permanent mode (Cieślik et al., 2016). The physical – chemical analysis of the vegetable wastes which fed the reactors are essential to conduct in order to establish a proper characterization of the substrates. The C/N ratio test allows to select the proper proportions for a fermentation process in a biogas plant but given the lack of equipment during the experimental period this test was not performed. Conductivity would be also important in the digestion process since it is a tool that tells us about the correctness of the process flow in terms of conversion of organic matter to the mineral form. On the other hand, the mesophilic fermentative inoculum used to conduct the biogas production efficiency testes and the simple continuous fermentation test was gained by separating the liquid fraction of the digestate pulp from an operating agricultural biogas plant in Poland. 7.1 Physical – chemical analysis test stand The following physicochemical parameters were examined in the selected discarded fruits: melon, eggplant, zucchini, cucumber and pepper according to Polish standards - Total Solids or dry matter content (PN-75 C-04616/01), Volatile Total Solids or dry organic matter and ashes content (PN-Z-15011- 3) and pH (PN-90 C-04540/01) -. These parameters were essential for the calculation of the biogas efficiency of the substrates into the units m3/Mg FM.; m3/Mg TS; m3/Mg VTS (Lewicki et al., 2016). Analysis of substrates and characterization of the fermentation process was based on the labels parameters made according to the following methodology: pH: the solid was measured in aqueous solution immersing electrodes and thermometer in test sample (internal standard PE 001/2012 and PE 002/2012) using the multifunction CPC-411 Business Elmetron; dry mass: drying at 105 ° C for 24 hours in a desiccator (PE 003/2012);
37 dry organic mass: the burning of dried attempts at 550 ° C by 3-5 hours in the muffle furnace (PE 004/2012); 7.2 Biogas efficiency test stand The experiments of biogas production efficiency were conducted through anaerobic digestion in the selected discarded fruits: melon, eggplant, zucchini, cucumber and pepper in a set of multi-chamber biofermentor (Figure 7) constructed in the Laboratory of Eco-technologies. This biofermentor is commonly used for testing biogas efficiency for large amount of biomass samples. Methane fermentation was conducted in the glass gastight and thermostatted reactors with capacity of 2 𝑑𝑚3. The tested substrates were placed in the reactors (170 g) and then flooded with sufficient amount of inoculum (1030 g) according to the standards. The reactors were placed in a water bath with temperature of 39 ° C ± 1 (mesophilic fermentation) to ensure optimal conditions for the methane fermentation process. Biogas produced in each separate chamber was transferred to cylindrical store filled in with liquid resistant for gas solubility. Figure 7.- Scheme of biofermentor for biogas production research (3-chamber section) 1 - water heater with temperature regulator, 2 - water pump, 3 - insulated conductors of calefaction liquid, 4 - water coat, 5 – fermentation reactor with charge capacity 2 dm3, 6 - sampling tubes, 7 - biogas transporting tube, 8 - gas sampling valve, 9 - biogas volume-scale (Cieślik et al., 2016).
38 The samples were tested in 3 replications and the readings of produced biogas volume were made with 24-hour intervals. The test gases were methane, carbon dioxide, ammonia, hydrogen sulfide and oxygen in test, and the results were recorded to the nearest 0,01 dm3. Measurements were made using a certified GA5000 gas analyzer of GeoTech Company (PE 008/2013). Ranges detected by the gas analyzer were as follows: 0÷100 % 𝐶𝐻4, 0÷100 % 𝐶𝑂2, 0÷25 % 𝑂2, 0÷10.000 ppm 𝐻2𝑆 and 0÷1.000 ppm 𝑁𝐻3. Production of biogas, including methane was calculated using mathematical formulas created in an Excel spreadsheet which allows to take into account the inoculum activity as well as to calculate the means of the 3 replications easily. The analyzer was calibrated once a week using the standards: 65 % 𝐶𝐻4, 35 % 𝐶𝑂2,, 500 ppm 𝐻2𝑆 and 100 ppm 𝑁𝐻3. The following tasks has been carried manually during the period of the test for the three replicas conducted: a) Daily check of the biogas volume production. b) Check of the biogas quality (when the volume is equal or superior to 0,45 ml). c) Daily manual mixing of the medium. 7.3 Simple continuous fermentation test stand Since the impossibility to obtaining real samples from the Greenhouses of Almeria a simple continuous fermentation test has been conducted with a mixture of vegetable wastes from a countryside farm in Poland. This substrate allows to represent fairly accurate the experimental conditions required. In regards to the laboratory equipment, the test basically consists on the same reactor used for biogas efficiency tests (Figure 7) but with a feed and outlet system which are controlled manually while also allow to regulate the pH value if is necessary (Figure 8). The samples were tested in 3 replications and the readings of produced biogas volume were made with 24-hour intervals. The test gases were methane, carbon dioxide, ammonia, hydrogen sulfide and oxygen in test, and the results were recorded to the nearest 0,01 dm3. Measurements were made using a certified GA5000 gas analyzer of GeoTech Company (PE 008/2013). Ranges detected by the gas analyzer were as follows: 0÷100 % 𝐶𝐻4, 0÷100 % 𝐶𝑂2, 0÷25 % 𝑂2, 0÷10.000 ppm 𝐻2𝑆 and 0÷1.000 ppm 𝑁𝐻3. Production of biogas, including methane was calculated using mathematical formulas created in an Excel spreadsheet which allows to take into account the inoculum activity as well as to calculate the means of the 3 replications
39 easily. The analyzer was calibrated once a week using the standards: 65 % 𝐶𝐻4, 35 % 𝐶𝑂2,, 500 ppm 𝐻2𝑆 and 100 ppm 𝑁𝐻3. Proper preparation of the samples has a significant impact on the speed of the process of biological waste treatment as well as on the composition of the biogas, thus the original samples which were too dry were moisten being diluted the following way: From an initial sample = 500 g; from 15.1% of initial dry content to 10% of final dry content: 500 15,1 ∗10 =331,1 𝑔 𝑜𝑓 𝑆𝑎𝑚𝑝𝑙𝑒 (15,1% 𝑑𝑐) 500 15,1 ∗ 5,1 = 168,5 𝑔 𝑜𝑓 𝑤𝑎𝑡𝑒𝑟 𝑡𝑜 𝑎𝑑𝑑 𝑜𝑟 500 −331,1 𝑔 = 168,5 𝑔 𝑜𝑓 𝑤𝑎𝑡𝑒𝑟 𝑡𝑜 𝑎𝑑𝑑 The batch bioreactor technology available to conduct the test presented some deficiencies in comparison to the big and monitored by software lab scale bioreactors. 1 Kg of inoculum was added to each reactor starting with 0,5 [g · day-1 · Kg-1] of organic load. This fermentation substrate was added by means of pumping through pipes rather than introducing the real particle sizes. For this reason the substrate has been previously diluted and crushed to be able to fit through the syringe and feeding tube. At any rate, before being loaded to the reactors, VW must undergo the previous hydrolysis process which has not been conducted in this experiment so that this previous crushing process replaces it. Finally, unlike to what the VDI 4630 protocol states, the fermentation process lasted 7 efficient weeks instead of 18 since the samples got contaminated inhibiting the process. A continuous fermentation test is an experiment that must be carried with accuracy maintaining the proper parameters to prevent inhibitions. All the same, it is sharply important to increase the organic load throughout the process to reach a stable biogas production on its maximum efficiency. In case the process follows the regular protocol the organic load should be increased every 14 days. However, in this case the lack of time was the limiting factor and the speed of feeding had to be much faster. However, under no circumstances the processes in the digesters were inhibited by overloading and increasing the concentration of organic fatty acids and thus wasting the experiment. It is assumed since the FOS/TAC test was established in order to monitor the amount of organic fatty acids in the medium, and thus controlling the feeding doses and allowing to stop the feeding properly.
40 The following tasks has been carried manually during the period of the test for the three replicas conducted: d) Daily check of the biogas volume production. e) Check of the biogas quality (when the volume is equal or superior to 0,45 ml). f) Daily manual mixing of the medium. g) Daily pH checking of the medium. h) Daily removal of the output from the medium (the amount relies in the daily fed). i) Daily introduction of the feeding to the medium. j) FOS/TAC test every 3 days. Figure 8.- Picture of fermentation reactor. Source: Taken by myself. Biogas transporting tube Valve of sampling tube Sampling tube
41 7.4 Results and discussion As aforementiened in the previous section, the substrates were initialy tested to know the parameters of humidity and dry matter content [% d.m.], organic dry matter content [% d.o.m.] and pH. The table 5 shows the results of the characterizations conducted in this project alongside some others conducted in the past in the lab by other researchers which are marked with an asterisk. Table 5.- Substrates characterization. Source: Own elaboration from experimental data and lab resources. Substrate Humidity [%] [% d.m] [% d.o.m.] pH Tomato fresh leaves* 89,85 10,15 73,34 6 Tomato stalks* 65,39 34,61 81,67 5,8 Tomato discarded fruits* 95,21 4,79 90,02 4,4 Pepper discarded fruits 94,58 5,42 90,98 5,5 Eggplant discarded fruits 93,19 6,81 91,32 - Cucumber leaves* 89,92 10,08 77,75 7,2 Cucumber discarded fruits 95,49 4,51 87,72 6,4 Greenbean peel* 89,25 10,75 39,14 - Greenbean discarded fruits* 88,23 11,77 93,97 5,5 Zucchini discarded fruits 95,64 4,36 84,36 6 Melon discarded fruits 95,29 4,71 87,84 6 Watermelon discarded fruits* 93,86 6,14 84,12 - In the Table 6 one can observe the biogas and methane efficiencies as well as their methane content in fresh matter. On the other hand, to better compare the energy potential of the analyzed organic wastes, the tested substrates have been summarized in terms of efficiency for the content of dry weight and the organic dry weight, as shown in Table 7.
48 30%. This effect is usually associated with insufficient quantities of some trace elements in some substrates, or their mixtures, which causes reduction of fermentation dynamics based on the mechanisms of acting according to Liebig’s Law of the Minimum. At any rate, the theoretical amount of methane produced from different substrates has been calculated taking into account the biogas efficiency tests exclusively since the simple continuous fermentations turned to be invaluable. The formula regards the sum of the individual amounts of methane obtainable with single fermentation bio-wastes in play and the Figure 9 shows the results. VTCH4 = VCH41 + VCH42 + …. + VCH4n [m³] [4] Where: VTCH4 – the total volume of the produced methane [m³] VCH41 – the volume of methane produced by the susbtrate 1 [m3] VCH42 – the volume of methane produced by the substrate 2 [m3] VCH4n – the volume of methane produced by the substrate n [m3] Figure 9.- Biogas production and methane production of the vegetable wastes in fresh matter. Source: Own elaboration from experimental and data calculations. The results showed a total annual biogas and methane production of 61.13 hm3 and 27.87 hm3 respectively with a methane average content of 46%. Tomato waste Pepper waste Eggplant waste Cucumber waste Greenbean waste Zucchini waste Melon waste Watermelon waste Biogas production [hm3] 24,64 10,50 3,62 6,02 1,38 8,10 2,54 4,34 Methane production [hm3] 10,95 4,89 1,75 2,93 0,62 3,64 1,14 1,94 0,00 5,00 10,00 15,00 20,00 25,00 30,00 Biogas and methne production [hm3] Annual biogas and methane production by the type of vegetable waste
49 8.3 Electrical and thermal energy generation Once the maximum and minimum available biogas and methane values are found, the respective calculations are made in order to find the amount of electrical energy that can be generated using the biogas produced in a cogeneration unit. For conversion to the amount of energy produced, it is necessary to introduce the energy efficiency coefficient of methane equal to 0,00917 MWh/m3 (9,17 kWh/m3). To determine the amount of electricity produced in cogeneration, in addition, is mandatory to include the electrical efficiency of the co-generation unit (CHP (ηe)). Hereby the amount of produced electricity is calculated from this formula: Ee = VCH4 ReCH4 ηe [MWh] [5] Where: Ee – quantity of electricity produced in cogeneration [MWh] VCH4 – volume of methane produced [m³] ReCH4 – energy efficiency coefficient of methane [0,00917 MWh· m-³] ηe – electrical efficiency of cogeneration unit [-] ηe = 0.36-0.44 [-]; It takes the value of 0.4 Similarly as in the case of electricity, the amount of heat energy produced in cogeneration is calculated from the following dependencies: Et = VCH4 ReCH4 ηt [MWh] [6] Where: Et – the amount of heat produced in a cogeneration [MWh] VCH4 – the volume of methane produced [m³] ReCH4 – energy efficiency coefficient of methane [0.00917 MWh· m-³] ηt – thermal efficiency of cogeneration unit [-] ηt = 0.43-0.54 [-], It takes the value of 0.48
50 Figure 10.- Electric and thermal annual energy production by type of vegetable waste in fresh matter. Source: Own elaboration from experimental data and calculations. Once the respective energetic conversions were made, the graph of the Figure 10 was drawn up, which indicates the amount of annual electric energy that can be generated with each analyzed vegetal waste resulting to a total annual electric and thermal energy production of 102.23 GWh and 122.68 GWh respectively. The total energy potential counting the losses (12%) amounts to 255.57 GWh. It is possible to observe that the type of vegetal waste with greater energetic potential in the greenhouses of Almeria corresponds to the wastes from the production of tomatoes because of its huge availability. These have an annual electrical and thermal production of 40,16 Gwh/year and 48,20 Gwh/year respectively, reaching about 40% of energy production of the total vegetal waste of Almeria. In view of the fact that in the practice is more often give the amount of heat per Gigajoule [GJ] than Gigawatts hour [GWh], knowing that 1 GJ is equal to 0,274 MWh, we can easily convert the energy expressed to GJ according to the following equation: Et [GJ] = Et [GWh]/0,274 [GJ] [7] Where: Et [GJ] – quantity of produced thermal energy expressed in [GJ] Et [GWh] – quantity of produced thermal energy expressed in [GWh] The annual thermal energy production expressed in GJ resulted to 447,72 GJ/year Tomato waste Pepper waste Eggplant waste Cucumber waste Greenbean waste Zucchini waste Melon waste Watermelon waste Electric energy [Gwe·h] 40,16 17,95 6,42 10,76 2,27 13,36 4,20 7,10 Thermal energy [Gwt·h] 48,20 21,55 7,70 12,92 2,72 16,04 5,03 8,52 0,00 10,00 20,00 30,00 40,00 50,00 60,00 Electric and thermal energy production [Gwh] Annual electric and thermal energy production by type of vegetable waste
51 The following diagram shows the process of gasification of the GVW to obtain electrical and thermal energy and the values used for the calculations: Figure 11.- Sankey diagram of the process of gasification of GVW to obtain electrical and thermal energy. Source: Own elaboration. 8.4 Electrical and thermal power generation The next step is the calculation of the installable both electrical and thermal power produced in a cogeneration unit assuming annual average time of its work. A typical year (nonleap) has 8760 hours. However, the cogeneration unit is based on the internal combustion engine which requires periodic maintenance services (e.g. oil change, spark plugs, etc.) and some repairs from breaks. Hence, it is assumed that a typical cogeneration unit should work per year approximately 8200 hours. On this basis, we can calculate the power of the electric generator from the following dependencies: Pe= Ee / t [MW] [8] Where: Pe – electric power of the biogas plant [MW] Ee – quantity of electricity produced in cogeneration [MWh] t – operation time of cogeneration unit [h], ~ 8200 [h] Exhaust gases 3.83 Gwh 1.5% % Electric energy 102.23 Gwh Alternator losses 2.56 Gwh Thermal energy 122.68 Gwh 7% 3.5% Total QVW E = 255.58 Gwh Biogas E = 237.69 Gwh Gasification losses and acclimatization 8.95 Gwh Thermal losses 17.89 Gwh 48% 1% 40% 100 % 93 % 89.5 % E = 228.74 Gwh Biogas
52 By analogy from the electric power we enumerate the thermal power on predefined substrates: Pt = Et / t [MW] [9] Where: Pt – thermal power [MW] Et – quantity of produced thermal energy [MWh] t – operation time of cogeneration unit [h], ~ 8200 [h] Figure 12.- Electric and thermal annual power production by type of vegetable waste in fresh matter. Source: Own elaboration from experimental data and calculations. The results showed an total annual electric and thermal power production of 12,47 GW and 14,96 GW respectively. The total power potential counting the losses (12%) amounts to 31,17 GW. Tomato waste Pepper waste Eggplant waste Cucumber waste Greenbean waste Zucchini waste Melon waste Watermelon waste Electric power [Mwe] 4,9 2,19 0,78 1,31 0,28 1,63 0,51 0,87 Thermal power [Mwt] 5,88 2,63 0,94 1,58 0,33 1,96 0,61 1,04 0 1 2 3 4 5 6 7 Electric and thermal power generation [Mw] Annual electric and thermal power generation by type of vegetable waste
53 9. Greenhouse – biogas plant system 9.1 General model In this very particular case is desired to implement a Greenhouse – biogas plant system operating with the GVW from these outstanding conglomerate of greenhouses in the Almeria Province (mainly in those under strict climate control) producing both electric and thermal energy. Besides, it comes the innovative idea of implementing a CO2 recovery system on its generation in the co-generation after biogas combustion. Hence, two bonus are added to the benefits of this idea since the CO2 pumping to the very greenhouses will improve plant growth and the biofertilizer usage implies a cost reduction for the greenhouses owners. As a result of the anaerobic digestion a digestate is generated that presents a richness in organic matter and nutrients for the soil which maintains the nutrient concentration (NPK) of the feed and presents a high degree of mineralization, which translates into greater availability for cultivation. The re-use of GVW as a source of heat and CO2 would not only eliminate an environmental problem, but also raise the temperature in the cold periods and the concentration of CO2, which are usually below the optimum (López et al., 2008; Sánchez-Guerrero et al., 2005). This could lead to a production increase of around 15%, as shown by different experiences in the area with the use of heating (López et al., 2008) or CO2 enrichment (Sánchez-Guerrero et al., 2005). And very significant increases when both techniques are combined (Sánchez-Guerrero et al., 2005). The main assumptions of the system are as follow: a. Produced biogas should be combusted in co-generation unite; b. Electric energy will be sold directly to the grid; c. Thermal energy will be used for greenhouse heating; (Esen M. et al., 2013) (Qi X. et al., 2005); d. Exhausted gases from cogeneration unit (mainly 𝐶𝑂2 and 𝑁2) will be used for increasing 𝐶𝑂2 level inside the greenhouse in order to accelerate plant growing process (Janczak et al., 2016); e. Digestates from fermentation will be used as ecological fertilizer by the greenhouses;
54 f. Vegetable waste from greenhouse will be used as substrates for biogas plant; In the Figure 13 the general model is presented: Figure 13.- The idea of a complex system greenhouse – biogas plant. Source: Own elaboration. Natural gas stove stove Vegetables production in Greenhouse Vegetables Cogeneration unit 𝐶𝑂2 Electricity Energy grid BIO-WASTES Energy grid Direct substrate application Electricity Heat Heat Exhaust gases Fertilizer value gases Biogas plant
55 9.2 Definition of the installation Figure 14 shows an outline of an anaerobic digestion plant. In it you can see the main areas of work. Figure 14.- Model of biogas plant for anaerobic digestion (ARC, 2017). 9.2.1 Anaerobic digestion zone: Dynamic Biogas Technology (number 6 of Figure 14) Some of the questions that will determine which type of digester is the most appropriate to treat the type of waste object of study are the capital for investment, the quality of the biogas to be generated and the raw material to be introduced into the digester. The patented Dynamic Biogas Technology (DBT) taken from the Swiss company Dynamic Biogas is one of the world’s most advanced systems for creating electricity from the fermentation of wide range organic materials and is developed to maximize the biogas yield with higher methane content for efficient use in on-site power generation. It has been already proved in Poland with excellent results using agricultural wastes and multiple laboratory experiments assert its accelerator reliability (number 3 of Figure 15).
56 This type of plant makes possible to degrade even the cellulosic elements with ease by separating the hydrolysis from the bottom of the process and it has been proven recently in biogas plant already operating. The following illustration shows the basic schema of a dynamic biogas plant. Figure 15.- Schema of biogas plant in dynamic biogas technology (Dynamicbiogas.com, 2018). As references, experiments in the application of enzymatic hydrolysis in algae biomass as a pretreatment for biogas production turned out to be highly effective. The process triggered to release a considerable quantity of carbohydrates becoming more available and more rapidly by the microorganisms during the process of fermentation (Grala et al.,2012). On the other hand, a 15% increase in the biogas production was determined in a reactor containing a bio-enzymatic preparation in comparison with a reference reactor (Vítěz et al., 2011). The main characteristics of this type of bioreactor operating currently in Poland as well as the explanation of its process of operation and its advantages over conventional biogas plants are detailed in the Annex E.
57 9.2.2 Building services and offices (number 1 of Figure 14). In it are installed the necessary computer equipment for the management of the plant and it will be in charge of receiving the waste that arrives to the plant. 9.2.3 Substrates storage area (numbers 2 and 3 of Figure 14) Vegetable wastes do not need a special container since they are solid and they can be stacked and handled by common machinery. It identifies a solid waste storage area, properly limited and it will have a recovery system of possible leachates that are generated for later use in the digester. This zone will act as a buffer, since it will allow to introduce the residue little by little in the digesters. Some examples are shown in Figure 16. Figure 16.- Examples of storage of plant residues. 9.2.4 Pretreatment and mixing of wastes (number 4 of Figure 14) In this area of the installation the residue must be subjected to a pretreatment so that in the digestion process the maximum possible yield in the generation of biogas is obtained. It is important for its degradation by the microorganisms, that the residues present a composition as homogeneous as possible. This will facilitate their work and it will not act as a limiting factor. According to the testes executed in Poland the vegetable wastes would not require a previous grinding before entering to the digester with this kind of technology because the biochemical hydrolyzer process is very effective and powerful (number 3 of Figure 14). Nonetheless they still have to be chopped with a size between 6 and 10 mm so that their silage is optimal. Carrying out a chemical pretreatment is not advisable, since in this particular type of
64 The hydraulic retention time (HRT) is calculated from the following dependencies: 𝑯𝑹𝑻 = 𝑪𝑭 · 𝑯𝑹𝑻𝑰 [𝐝𝐚𝐲𝐬] [10] Where: HRT – hydraulic retention time [days] CF – correction factor [-] 𝐻𝑅𝑇𝐼 – ideal hydraulic retention time [days] According to the results of biogas production tests we know that we cannot technically build a biogas plant of 500 KWe or 1 MWe because the biomass to treat would be too big and to build the installation would be impossible. Therefore, in base of the volume of the digesters (for example 4 digesters accounting 2000 m³) we will calculate the electrical power we can obtain with the following dependencies: 𝑻𝑭 =𝑽𝑫/𝑯𝑹𝑻 [𝐦³/𝐝𝐚𝐲] [11] Where: TF – treatment flow [m³/day] VD – volume digesters [m³] 𝐻𝑅𝑇 – hydraulic retention time [days] Is considered that the biomass has a density equivalent to that of water since the substrates are mainly water. Hence the mass of annually biomass is: 𝐌𝐲’ = 𝑻𝑭 · 𝒕 [Mg] [12] Where: My’– mass of the substrate needed to supply the biogas plant for a year [Mg] TF – treatment flow [Mg/day] t – operation time of cogeneration unit [h], ~ 8200 [h] Finally, the electric power of the biogas plant is calculated: 𝐏𝐞 = (𝐌𝐲′·𝐄𝐦 · 𝐑𝐞𝐂𝐇𝟒 · 𝛈𝐞)/𝐭 [𝐌𝐖𝐞] [13] Where: Pe – electric power of the biogas plant [MW]; 100 KWe My’– mass of the substrate needed to supply the biogas plant for a year [Mg] t – operation time of cogeneration unit [h], ~ 8200 [h] Em – methane production efficiency [m³ · Mg-1] ReCH4 – energy efficiency coefficient of methane [0.00917 MWh* m-³] ηe – electrical efficiency of cogeneration unit [-]; 0,4
65 Table 12.- Starting data for the economic evaluation. Parameter Value Hydraulic retention time [days] 40 Volume reactor [m3] 2000 Treatment flow [m3/day] 50 Mass of substrates [Mg/year] 17083 Electrical energy generation [MWh] 877 Electrical power [KWe] 107 Thermal power [KWt] 128 Thermal energy generation (Eh) [Gj] 3840 Biogas production [m3/year] 524993 Mass of digested [Mg/year] 15375 Mass of CO2 generated [Mg/year] 997 Therefore, this section will tackle the economic issue of installing a 107 KWe of electric power and biogas plant previously designed. According to the reports provided by different companies and according to the experience in the sector, the useful life of a biogas plant has been estimated accounting to 20 years (evaluation horizon). First of all the methodology will be explained and finally the results will be presented. Further details of the cash flow can be found in the Annex F. 10.2 Investment This considers the gasification and cogeneration equipment as well as civil works (construction of ponds, piping, gasometers, engine room, silos, CO2 pumping equipment and minor works). It should be noted that the initial investment includes the acquisition, installation and commissioning of equipment. Due to possible unforeseen and inaccuracies in the investment calculation, it is appropriate to consider a contingency amount equivalent to 15% of the total investment. It finally accounts to 2.300.000 euros.
66 10.3 Cash – flow To perform the cash – flow the costs and revenues, as well as other elements of this, such as depreciation of the installation and taxes, should be analyzed separately and thus estimating the annual gross profit.. From here is formulated the following relation: CF = AR – AC – T + D [EUR] [14] Where: CF – cash – flow or annual profit from the exploitation [EUR] AR – annual revenue in the biogas plant exploitation [EUR] AC – annual costs in the biogas plant exploitation [EUR] T – annual taxes in the biogas plant exploitation [EUR] D – annual depreciation in the biogas plant exploitation [EUR] 10.3.1 Revenues The biogas plant processing the bio-wastes from the greenhouses of Almeria will be built on the sale of electricity, thermal energy, digestate, carbon dioxide and carbon certificates. Hence, on this basis, we can specify the following equation: AR = ARee + ARet + ARpp + ARCO2 + ARcc [EUR] [15] Where: AR – annual revenue in the biogas plant exploitation [EUR] ARee – annual income from the sale of electricity [EUR] ARet – annual income from the sale of thermal energy [EUR] ARpp – annual income from the sale of digestate [EUR] ARCO2 – annual income from the sale of CO2 [EUR] ARcc – annual income from the sale of carbon certificates [EUR] 10.3.1.1 Revenue from electricity generation The annual revenue only depends on the price established in the wholesale Spanish electricity market. The electricity selling price to the wholesale market is constantly fluctuating and volatile but according to RD 413/2014 of June 6, which is regulated the activity of production of electric energy from renewable energy sources, cogeneration and waste treatment, the market price is set to 52 EUR · MWh-1 from 2015 and onwards.
67 Furthermore it will be taken into account an especial tax (IVPEE) of a 7 % on the value of energy production established by the Spanish government and that the 5% of electric energy will be used for the own consumption of the installation: ARee = Ee pe 0, 95 0, 93 [EUR] [16] Where: ARee – annual income from the sale of electricity [EUR] Ee – quantity of electricity produced [MWh] pe – estimated selling price of electricity [EUR · MWh-1]; 52 [EUR MWh-1] 0.95 – coefficient of the real sale of electricity [-] 0.93– coefficient of reduction for special tax for energy production [-] 10.3.1.2 Revenue from thermal energy generation Looking for opportunities to take advantage of thermal energy - along with electrical energy - can bring revenues that justify the installation of a project. Under certain conditions the selling price of thermal energy (EUR / MWh) will be lower than that of other fossil fuels. The revenue from the thermal energy produced depends on the amount of heat produced and its price. There are no prices for the sale of thermal energy in Spain, but the closest is the comparison with the price of natural gas and propane for industrial customers. These prices are 50 and between 80 and 140 [EUR/MWh] respectively (Página de Preciogas, 2017). If it is sold at a price of 30 EUR / MWh entails a competitive and considerably much lower comparing with the habitual fuels prices. It should be noticed that the 5% is used for the own consumption of the installation since the fermenters must be heated. Hence, this revenue is calculated with the formula: ARet = Et pt · 0,95 0, 93 [EUR] [17] Where: ARet – annual income from the sale of thermal energy [EUR] Et – quantity of thermal energy produced [GJ] pt – selling price of thermal energy [EUR GJ-1]; 8,22 [EUR GJ-1] 0.95 – coefficient of real sale of thermal energy [-] 0.93– coefficient of reduction for special tax for energy production [-] 10.3.1.3 Revenue from digestate generation We know the mass of digestate decreases in fermentation by about 7 – 10% from the initial value of substrate as a result of biogas emissions. After the process practically the 100%
68 of the digestate will be liquid and thus becoming to a high quality fertilizer. Hence, the mass digestate can be calculated according to the equation: Md = M ηf [Mg] [18] Where: M – mass of the substrate for biogas plants [Mg] ηf – coeficient of weight maintainance after fermentation [-]; a value of 0,90 has been taken Due to the high degradation efficiency of the wastes in the process, the solid fraction is virtually negligible. Hereby, this digestate appears to be a very good candidate to replace inorganic fertilizers, also contributing, to the short-term soil organic matter turnover (Tambone et al., 2010). The revenue from digestate is supposed to be calculated from its value based in mineral content since the price allocated to the recovered nutrients is in accordance with the market price of N, P and K in mineral fertilizers. Unfortunately, we do not dispose of the lab devices to conduct the NPK analysis from our samples to reach a sharp accuracy on the results and reliable data from references has been not found. For this reason, knowing that the annual costs from fertilizers in the Almeria greenhouses entails the 7 % of the total costs for the farmers (Valera et al., 2014), their current annual total costs have been estimated resulting to 28,8 [EUR/ha] and 14,42 [EUR/Mg] (the estimations are in the Annex G). On this basis, the value of the digestate has been established as the half of fertilizers price that they are currently using in order to promote this new product (7.21 [EUR/Mg]). Revenues are calculated according to the formula: ARpp = Md pd [EUR] [19] Where: ARpp – annual income from the sale of biofertilizer [EUR] Md – mass of biofertilizer produced [Mg] pd – selling price of the biofertilizer [EUR · Mg¯¹] The greenhouses of Almeria are consuming in average around 2.000 kg/ha of mineral fertilizers, reaching in some cases up to 3.400 kg/ha (Ramos-Miras, 2002). It means a consumption between 58.000 and 98.600 Mg per year in the 29.000 ha. It means that the 15.375 Mg of biofertilizer produced annually in the biogas plant would replace 20% of the whole annually demand.
69 10.3.1.4 Revenue from CO2 generation Revenue obtained from the use of CO2 pumped to the greenhouse can be calculated on the basis of the costs currently incurred by the greenhouse. By way of extension, it should be noted that the starting price for CO2 is between 0.10 € / kg and 0.19 € / kg, when maximum purity (required for the food industry) is reached. Therefore, a value of 100 € / Mg CO2 (the minimum to be competitive in the market) was taken in order to calculate the revenues from CO2 recovery. The value of the carbon dioxide produced by the cogeneration unit and used in the greenhouse will be thus calculated from the formula: ARCO2 = MCO2 · CCO2 [EUR] [20] Where: ARCO2 – annual income from the sale of CO2 [EUR] MCO2 – mass used in greenhouses as CO2 [Mg] CCO2 – selling price of CO2 [EUR · Mg-1]; 100 [EUR/Mg] To calculate the masss of carbon dioxide generated we need to know that after burning one molecule of methane is formed to one molecule of carbon dioxide. Hence, stoichiometrically counted number of molecules of carbon dioxide in the flue gas will be equal to the sum of the molecules of methane and carbon dioxide in the biogas before combustion. It is assumed that the average time to deliver CO2 to the greenhouse is 8 h/day (this is the time of the most intense assimilation of carbon dioxide during the intense sun exposure). Hence, we must take into account that only 1/3 parts of the day the CO2 produced in CHP will be pumped to the greenhouses. It accounts to 2432 h annually. MCO2 = Vb · ϱCO2 [Mg] [21] Where: MCO2 – mass of carbon dioxide produced after combustion [Mg] Vb – volume of biogas produced [m3] ϱCO2 – density of CO2 0,001842– 0,001977 [Mg m-3] 10.3.1.5 Revenue from carbon credits Carbon credits are an international decontamination mechanism to reduce emissions to the environment; it is a trading system through which the various agencies involved can sell or acquire emission reduction certificates (CERs). One CER corresponds to one metric ton of carbon dioxide equivalent and the market offers a solution to reduce the effects of this
70 phenomenon since greenhouse gases are quantified in the same unit. Although this type of emission reductions are highly critical, it is the current way in which it is tried to control the gases of greenhouse effect. This analyzed project will be able to sell CERs since non carbon dioxide emissions are released to the atmosphere. According to Kantor (2005), a good project raises the rate of return of investment between 10 and 30% per year. However, it is not ruled out that a few more years later another system is chosen. If we have a look of the price of carbon certificates in the market in 2017, we can see that it has declined considerable reaching a value of 25 EUR · Mg¯¹ (IETA, 2017). It is due to two factors: overpopulation of carbon credits and European recession - one of the main customers of CERs -. Nonetheless, according to forecasts, depending on the purpose of reducing emissions to be adopted by Europe for 2020, its price will increase enormously thus encouraging to invest in this kind of projects again. For this reason, since the project is intended to be implemented in a far future in a scenario with new favorable conditions, in this project we will assume a carbon certificates 5 EUR · Mg¯¹ of carbon dioxide equivalent and from 2023 and on, we assume a value of 20 EUR · Mg¯¹. ARcc = MCO2 · pcc [EUR] [22] Where: ARcc – annual income from carbon certificates [EUR] TMCO2 – total mass of CO2 [Mg] pcc – selling price of carbon certificates; 5 [EUR · Mg¯¹] until 2023 and 20 [EUR · Mg¯¹] from 2023 and beyond. 10.3.2 Costs The annual costs of biogas plants in simplified terms, include the costs of substrates, operation, service, technological support and staff: Cabi = Csale + Csubr + Cop + Cserv + Cdepr + Cstaff [EUR] [23] Where: Cabi – annual cost of biogas installation [EUR] Csale – cost of sale [EUR] Csubr – cost of substrates [EUR] Cop – cost of operation [EUR] Cserv – cost of services [EUR] Cstaff – cost of staff [EUR]
71 10.3.2.1 Cost of sale Cost of sale includes tolls for acces to the transmission and distribution grids: Fortunately this plant will not be subjected to them because it does not exceed 1 MW. You will find further information about this toll in the Annex H. On the other hand, the costs of transmission of thermal energy are not considered since the analysis required for the demand of thermal energy is only relevant to nearby locations, since the sale of heat - in the form of hot water or hot steam (number 15 of Figure 14) - is not justified by operational costs and heat dissipation for distant customers. Nonetheless for the sale of carbon credits it is first necessary to certify the validity of these and then look for a buyer in the market. This means using both time and resources of the company. Given the difficulty of accurately calculating the cost of this work, it will be valued as a percentage of the revenues from the sale of carbon credits equivalent to 40%. Ccc = ARcc · 0.4 [EUR] [24] Where: Ccc – costs of carbon credits selling [EUR] ARcc – annual income from carbon certificates [EUR] 0,4 – coefficient of investment [Mg] Csale = Celtrans + Ccc [EUR] [25] Where: Csale – cost of sale [EUR] Celtrans – cost of electric transmission [EUR] Ccc – cost of carbon credits sales [EUR] 10.3.2.2 Cost of substrates In this project is assumed that such price is negligible and the cost of the mass of substrate will be negligible. However, in other circumstances is possible to get a price up to 50 EUR/Mg of substrate is possible since farmers are willing to pay to remove the bio-wastes from their greenhouses. The following formula is presented below: Csubr = M · Cusubr + CT [EUR] [26] Where: Csubr – the cost of feedstock [EUR] M – mass of used substrates [Mg] Cusubr – the unit price of the substrate [EUR · Mg-1]
72 10.3.2.3 Cost of operation Operating costs are mainly those incurred to maintain running the system. The main cost of operation is the biomass transport variable from its production center to its collection center or location where the plant will be located. The management of the substrates is also considered an operating cost. Cop = CSM · CT [EUR] [27] Where: Cop – the cost of operation [EUR] CSM – the cost of management [EUR] CT– the cost of transport of substrate [EUR] Table 13.- Main operational costs (Consejería de agricultura, pesca y desarrollo rural, 2016). Split Activity Costs [€/𝒎𝟐] Operation costs Management costs Removal of greenhouse waste 0,012 Management costs Separation of raffia and plastic elements 0,012 Management costs Raffias management 0,045 Management costs Crushing of plant elements 0,04 Transport costs Transport to the plant 0,018 10.3.2.4 Cost of service Service cost is divided into the cost of maintenance service and technology. In the case of maintenance service, based on data about the cost of repair for machines and installations referred to by different authors (Karwowski 1996, 1998; Grześ, 2002; Muzalewski 2010) and our own data, we can assume that the basket of all service will be annually an average of 3% of the value of the installation. We can assume that the technology cost is 2 EUR/MWh of energy produced (Przyrodniczy et al., 2014). Hence the annual service costs can be approximate based on the following: Cserv = Cms · Cs [EUR] [28] Where: Cserv – service cost [EUR] Cms – maintenance service cost [EUR] Ctechs – technological service cost [EUR]
73 Cms = Cinst · 0, 03 [EUR] [29] Where: Cms – maintenance service cost [EUR] Cinst – cost of biogas installation [EUR] Ctechs = Ee · Rtech [EUR] [30] Where: Ctechs – technological service cost [EUR] Ee – amount of electricity produced [MWh] Rtech – technological cost ratio [EUR · MWh-1]; we assume 2 EUR/MWh 10.3.2.5 Cost of staff The technical personnel cost (maintenance technician, plant operator, process engineer) has been taken into account in technic services. To calculate the cost of the staff is taken the average wage, the number of workers (4), their annual average wage (12.000 euros) and then calculate the approximate cost of personnel on the basis of: Cstaff = Nstaff · Sg [EUR] [31] Where: Cstaff – the cost of staff [EUR] Nstaff – number of employed persons [-] Sg – average annual gross salary of the employees [EUR] 10.3.2.6 Other costs Additional expenses related to the administrative work of the plant, insurance, stabilizers, chemical compounds for the measurement of parameters, etc. For this will be considered an annual amount of 5.000 EUR net. 10.3.3 Taxes A) Value – added tax (VAT – 21%) to balance. B) Economic activity tax (EAT – 20%) every year. If the net amount of the turnover in the penultimate year is less than 1.000.000 euros it will be exempt, which happens in this particular case. C) Corporation tax (CT – 20%). If the total income of the entity does not exceed the value of 100.000 euros it will be exempt, which happens in this particular case.
80 operation with reduced costs. However, the 107 KW electric power biogas plant in the case of study needs already 17.000 tons/year treatment flow representing a 5 times less efficient installation in terms of energy production, which is a fact reflected in the negative results of the economic evaluation. Therefore, a big biomass must be treated to install a biogas plant with a minimum and reasonable nominal power permitting to obtain a cost-effective installation. Finally, we can conclude to explain the negative results that the costs associated with the GVW management facility through anaerobic digestion are high and productivity is very low in terms of the energy contained in the biogas compared to the amount of waste treated. However, to emulate the same chemical and physical properties in the samples than the original substrates of the GVW was obviously primordial to perform an appropriate study.
81 12. Future lines of research Conduct a more thorough benchmarking of international and national cases in the production of biogas with the purpose of extracting opportunities and relevant learning for the study and to find out the latest advances. Carry out a market study that includes the energy market in order to have a wider vision of the market that allows validating the possible alternatives of the project. Vegetable remains possess a great capacity for biodegradability which makes them potentially very good residues for obtaining biogas as long as they were mixed with substrates with higher biogas potential. For example, there are other elements such as slurry that can be used as a conditioner or even as a constituent for a better mix on anaerobic digestion and they use increasing in recent years. This complementarity of the compositions improves the C/N ratio and increases energy efficiency and therefore the profitability of the facilities through co-digestion. According to AAE (2011) livestock waste and meat and dairy waste are potential substrates for co-digestion in the Almeria region. These co-substrates addition compensates the nutritional deficiencies of GVW and it has several advantages allowing to share treatment facilities, to unify management methodologies - to soften temporal variations in composition and production of each waste separately - and to reduce investment and exploitation costs. Study the composition of the digestate in a lab simulation in order to know if it is as valuable as the chemical fertilizer currently being applied in the greenhouses of Almeria and whether it would have enough quality and nutrient content to replace the chemical fertilizer with it. The main risks of the project are the installation site and the transmission costs. The viability of the project cannot be assured if there are restrictions by area of influence, so it would be interesting to evaluate its location in depth. Additionally, ensuring the sale of thermal energy is very important so it would be mandatory to ensure an affordable heat transmission installation. Finally, different sources of financing might be studied, either for example native companies, government institutions or foreign investors.
82 13. Annexes Annex A: Subsidies for a biogas plant exploitation.
83
84
85 Annex B. Graphics of biogas efficiency tests on VW. 0,00 0,50 1,00 1,50 2,00 2,50 3,00 3,50 4,00 4,50 5,00 1357911131517192123252729313335373941434547495153555759 Volume [dm3] Time of fermentation [days] Average of biogas production on Zucchini samples during the fermentation process Remaining gases[dm3] Methane [dm3] 0,00 1,00 2,00 3,00 4,00 5,00 6,00 7,00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 Volume [dm3] Time of fermentation[days] Average of the biogas biogas on Melon samples during the fermentation process Remaining gases[dm3] Methane [dm3]
86 0,00 5,00 10,00 15,00 20,00 25,00 30,00 35,00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 3133 35 37 39 41 43 45 47 49 51 53 55 57 59 Volume [dm3] Time of fermentation [days] Average biogas cumulative for Zucchini samples during the fermentation process [dm3] 0,00 2,00 4,00 6,00 8,00 10,00 12,00 14,00 1357911 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 Volume [dm3] Time of fermentation [days] Average methane cumulative for Zucchini samples during the fermentation process [dm3]
87 0,00 5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00 1357911 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 Volume [dm3] Time of fermentations [days] Average biogas cumulative for melon samples during the fermentation process [dm3] 0,00 2,00 4,00 6,00 8,00 10,00 12,00 14,00 16,00 18,00 1357911 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 Volume [dm3] Time of fermentation [days] Average methane cumulative for Melon samples during the fermentation process [dm3]
88 Annex C. Graphics of simple continuous fermentation test on VW. 0,00 0,20 0,40 0,60 0,80 1,00 1,20 1,40 1,60 1,80 2,00 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176 183 190 197 Volume [dm3] Time of fermentations [days] Average biogas production on VW samples during the fermentation process Other gases [dm3] Methane [dm3] 6,8 7 7,2 7,4 7,6 7,8 8 8,2 1357911 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 pH Time of fermentation [days] Average pH during the fermentation process
89 0,00 10,00 20,00 30,00 40,00 50,00 60,00 1 3 5 7 9 1113 151719 212325 2729 313335 373941 434547 495153 555759 Volume [dm3] Time of fermentation [days] Average biogas cumulative for VW samples during the fermentation process [dm3] 0,00 5,00 10,00 15,00 20,00 25,00 30,00 1 3 5 7 9 11131517192123252729313335373941434547495153555759 Volume [dm3] Time of fermentation [days] Average methane cumulative for VW samples during the fermentation process [dm3]
96
97
98 Annex G. Fertilizer cost estimation. Annual incomes for the farmers 7,01 eur/𝑚2·year Annual costs for the farmers 4,12 eur/𝑚2·year Annual benefits for the farmers 2,89 eur/𝑚2·year % of cost that entails the cost of fertilizers 7 % Total area of greenhouses 29.000 ha Use of fertilizers 2.000 Kg/ha·year Total annual fertilizer cost 836.360 eur/year Total annual use of fertilizers 58.000 Mg/year Fertilizer cost 14,42 eur/Mg 𝑇𝑜𝑡𝑎𝑙 𝑎𝑛𝑛𝑢𝑎𝑙 𝑓𝑒𝑟𝑡𝑖𝑙𝑖𝑧𝑒𝑟 𝑐𝑜𝑠𝑡 = 4,12 𝑒𝑢𝑟 𝑚2· 𝑦𝑒𝑎𝑟 ·100 𝑚2 1 ℎ𝑎 · 0,07 ·2900 ℎ𝑎 = 836360 𝑒𝑢𝑟 𝑦𝑒𝑎𝑟 𝑇𝑜𝑡𝑎𝑙 𝑎𝑛𝑛𝑢𝑎𝑙 𝑢𝑠𝑒 𝑜𝑓 𝑓𝑒𝑟𝑡𝑖𝑙𝑖𝑧𝑒𝑟𝑠 = 2000 𝐾𝑔 ℎ𝑎 · 𝑦𝑒𝑎𝑟 ·2900 ℎ𝑎 · 1 𝑀𝑔 1000 𝐾𝑔 = 58000 𝑀𝑔 𝑦𝑒𝑎𝑟 𝑭𝒆𝒓𝒕𝒊𝒍𝒊𝒛𝒆𝒓 𝒄𝒐𝒔𝒕 = 836360 𝑒𝑢𝑟 𝑦𝑒𝑎𝑟 58000 𝑀𝑔 𝑦𝑒𝑎𝑟 =𝟏𝟒,𝟒𝟐 𝒆𝒖𝒓 𝑴𝒈
99 Annex H: Tolls to access to the transport and distribution grids.
100 14. References Agencia Andaluza de la Energía [AAE] (2011). Estudio básico del biogás. Consejería de empleo, empresa y comercio, Junta de Andalucía. Available at: https://www.agenciaandaluzadelaenergia.es/sites/default/files/documentos/estudio_basico _del_biogas_0.pdf [Accessed 24 Dec. 2016], 1-155. Agencia Andaluza de la Energia [AAE] (2015). Informe de Infraestructuras energéticas Provincia Jaén. Consejería de empleo, empresa y comercio, Junta de Andalucía. Available at: https://www.agenciaandaluzadelaenergia.es/sites/default/files/documentos/informe_prov_ almeria_miea.pdf [Accesed 24 Dec. 2016], 1-24. Agència de Residus de Catalunya [ARC] (2017). Digestión anaerobia. [online] Available at: http://residus.gencat.cat/es/ambits_dactuacio/valoritzacio_reciclatge/instal_lacions_de_ge stio/tractament_biologic/digestio_anaerobia/ [Accessed 15 May 2017]. Barth, C., Powers, T. (2008). Agricultural waste characteristics. Agricultural waste management field handbook. United States Department of Agriculture. South Carolina, 1-32. Bouallagui, H., Lahdheb, H., Romdan, E., Rachdi, B. & Hamdi., M. (2009). Improvement of fruit and vegetable waste anaerobic digestion performance and stability with co-substrates addition. J. Environ*, 90(5), 1844-1849. Cabrera, A., Uclés, D., Agüera, T. (2015). Análisis de la campaña hortofrutícola de Almería. Campaña 2014/2015. Servicio de Estudios de Cajamar. Informes y Monografías / 51. Available at: http://www.publicacionescajamar.es/pdf/series-tematicas/informescoyuntura-analisis-de-campana/analisis-de-la-campana-hortofruticola-15.pdf [Accessed 23 Dec. 2016], 1-82. Cepero, L., et al. (2012). Producción de biogás y bioabonos a partir de efluentes de biodigestores. Pastos y Forrajes, 35(2), 219-226. Cieślik, M., Dach, J., Lewicki, A., Smurzyńska, A., Janczak, D., Pawlicka-Kaczorowska, J. & Jóźwiakowski, K. (2016). Methane fermentation of the maize straw silage under meso- and thermophilic conditions. Energy, 115(2), 1495-1502. Consejería de agricultura, pesca y desarrollo rural (2016). Estrategia de gestión de restos vegetales en la horticultura de Andalucía hacia una economía circular. Junta de Andalucía Available at: http://www.juntadeandalucia.es/export/drupaljda/Estrategia_gestion_restos_vegetales_hor
101 ticultura_Andalucia_BORRADOR_V12.pdf [Accessed 24. Dec. 2016], 1-40. Cubero Madriz, G. A. (2011). Evaluación de un sistema de digestión anaerobia para la estabilización de lodos provenientes de las aguas residuales. Ingeniería ambiental. Instituto Tecnológico de Costa Rica, 1-131. Deloitte (2015). European energy market reform Country profile: Spain. Energy market reform in Europe. European energy and climate policies: achievements and challenges to 2020 and beyond, 119-134. Dudek, J. & Zaleska-Bartosz, J. (2010). Production and use of biogas for energy purposes. Problems of Ecology, 14(1). Dupuis, I. (2006). Estimación de los residuos agrícolas generados en la isla de Tenerife. Servicio técnico de agricultura y desarrollo rural. Available at: http://www.agrocabildo.org/publicaciones_detalle.asp?id=28 [Accessed 8 Feb. 2017].1-20. Dynamic biogas Home page (nd). [Figure]. Dynamic Biogas®. Poland. [online] Available at: http://dynamicbiogas.com/ [Accessed 21 Feb. 2017]. Edwiges, T., Frare, L., Mayer, B., Lins, L., Mi Triolo, J., Flotats, X., & de Mendonça Costa, M. S. S. (2017). Influence of chemical composition on biochemical methane potential of fruit and vegetable waste. Waste Management. [online] Available at: www.elsevier.com/locate/wasman [Accessed 25 Jan. 2018] Esen, M. & Yuksel, T. (2013). Experimental evaluation of using various renewable energy sources for heating a greenhouse. Energy and Buildings, 65, 340-351. Francisco, M. A. (2007). Gasificación de residuos de invernadero para la obtención de energía eléctrica en el sur de España: ubicación mediante sig, 32(2), 131-136. Grala, A., Zieliński, M., Dębowski, M., & Dudek, M. (2012). Effects of Hydrothermal Depolymerization and Enzymatic Hydrolysis of Algae Biomass on Yield of Methane Fermentation Process, 21(2), 363-368. Grześ, Z. (2002). Badania rzeczywistych kosztów obsługi technicznej nowoczesnych kombajnów zbożowych. Rocz. AR Pozn. CCCXLIII, Ekon, 1, 123-127. Hills, D.J. & Nakano, L. (1984). Effects of particle size on anaerobic digestion of tomato solid waste. Agric Wastes, 10(4), 285-295. IDAE (2007). Biomasa: Digestores anaerobios. Instituto para la Diversificación y Ahorro de la Energía (IDAE). Ministerio de industria, turismo y comercio. Gobierno de España. [online] Available at: http://www.idae.es/uploads/documentos/documentos_10737_Biomasa_Digestores_Anaer obios_A2007_0d62926d.pdf [Accessed 22 Mar. 2017], 1-48.
102 IETA (2017). Precios CO2. Sendeco2. International Emissions Trading Association [online] Available at: https://www.sendeco2.com/es/precios-co2 [Accessed 21 Dec. 2017]. International Energy Agency [IEA] (2009). Energy Policies of IEA Countries. Spain 2009 Review. Available at: https://www.iea.org/publications/freepublications/publication/spain2009.pdf [Accessed 28 Dec. 2016], 1-162. Janczak, D., Dach, J., Bugala, A., Slowij, P. & Neugebauer, M. (2016). Complex energetic systems: case analysis of connected greenhouse and biogas plant. Book 4 Energy and Clean Technologies, 3, 243-249. Jarauta, L. (2005). Digestión anaerobia para el tratamiento de residuos orgánicos : estudio de las necesidades para la implantación en Perú. Energía, 1-2. Kantor, D. (2005). El negocio de limpiar el aire. Clarin.com. Argentina [online] Available at: http://edant.clarin.com/suplementos/economico/2005/03/27/n-00311.htm [Accessed 6 Feb. 2018]. Karwowski T., (1996). Zasady eksploatacji i opłacalności zakupu maszyn. IBMER, Warszawa, 4-8. Karwowski T. (1998). Polska w drodze do Unii Europejskiej. Zespołowe użytkowanie maszyn warunkiem unowocześnienia polskiego rolnictwa. Przegl. Tech. Roln. Leśn, 1, 2-6. Kivaisi, A.K. & Mtila M. (1998). Production of biogas from water hyacinth in a two-stage bioreactor. World J Microbiol Biotechnol, 14, 125-31. Lee, M., Hidaka, T., Hagiwara, W. & Tsuno. H. (2009). Comparative performance and microbial diversity of hyperthermophiclic and thermophilic co-digestion of kitchen garbage and excess sludge. Bioresour. Technol., 100, 578-585. Lewicki, A., Koz, K., Pietrowski, M., Zbytek, Z., Przyrodniczy, U., Instytut, P. & Rolniczych, I. M. (2016). Methane fermentation of chicken droppings, 61(4), 60-62. López, J.C., Baille, A., Bonachela, S. & Pérez-Parra, J. (2008). Analysis and prediction of greenhouse green bean (Phaseolus vulgaris L.) production in a Mediterranean climate. Biosystems Engineering, 103(3), 344-356. López, J. C., Pérez, C., Acien, F. G. (2016). Residuos vegetales procedentes de los invernaderos de almería. Fundación Cajamar. Departamento de Ingeniería. Universidad de Almería. Available at: https://www.cajamar.es/pdf/bd/agroalimentario/innovacion/formacion/actividades-de- transferencia/017-restos-vegetales-1466406472.pdf [Accessed 15 Dec. 2016], 1-9. Wilken, D. (nd). El uso del biogás en Alemania. Condiciones político-legales, económicas y
103 técnicas. [online]. Energy. Federal Ministry of Economics and Technology. Available at: http://www.ahkzakk.com/fileadmin/ahk_zakk/Events/Delegationsreise_EE_2012/Presenta ciones_Infotag/Biogas.pdf [Accessed 15 Feb. 2017], 1-27. Monforte, C. (2016). Los precios del ‘pool’ eléctrico repuntan un 60% desde Abril. Electronic Newspaper. Energía. Madrid: Spain. Muzalewski, A. (2010). Koszty eksploatacji maszyn. Wydawnictwo ITP. Falenty – Warszawa. 1- 25. Página de Preciogas (2017). Precio kWh gas natural. [online] Available at: http://preciogas.com/conceptos/precio-kwh [Accessed 24 Feb. 2017]. Parra, S. (2004). Análisis económico de la valoración de residuos agrícolas orgánicos. Tesis doctoral. Escuela Politécnica Superior. Universidad de Almería, 1-206. Przyrodniczy, U., Wydzia, P., Rozprawa, D. J., Promotor, J. D., & Pilarski, K. (2014). Technologia wytwarzania biogazu z wykorzystaniem wybranych odpadów z produkcji i przetwórstwa warzyw. Warszawa. Qi X., Zhang S., Wang Y. & Wang R. (2005). Advantages of the integrated pig-biogas-vegetable greenhouse system in North China. Ecological Engineering, 24, 177-185. Ramesh, S. Jayanthi, S & Gandhimathi, S. (2008). Feasibility study on anaerobic digestion of garbage using lime pretreatment. Jr of Industrial Pollution Control. Department of Civil Engineering. National Institute of Technology, India, 24(2), 123-128 [online] Available at: http://www.icontrolpollution.com/articles/feasibility-study-on-anaerobic-digestion-of- garbage-using-lime-pretreatment-123-128.pdf [Accessed 8 Feb. 2017]. Ramos-Miras, J.J. (2002). Estudio de la contaminación por metales pesados y otros procesos de degradación química en los suelos en los invernaderos del Poniente Almeriense. Editorial Universidad de Almería, Tesis doctoral, Almería. Sánchez-Guerrero, M. C., Lorenzo, P., Medrano, E., Castilla, N., Soriano, T. & Baille, A. (2005). Effect of variable CO2 enrichment on greenhouse production in mild winter climates. Agricultural and Forest Meteorology, 132, 244-252. Sharma, S. K., Mishra, I. M., Sharma, M. P. & Saini, J. S. (1988). Effect of particle size on biogas generation from biomass residues. Department of Chemical Engineering. Department of Mechanical Engineering. University of Roorkee, India. Biomass (17), 251- 263. Tambone, F., Scaglia, B., D’Imporzano, G., Schievano, A., Orzi, V., Salati, S., & Adani, F. (2010). Assessing amendment and fertilizing properties of digestates from anaerobic
104 digestion through a comparative study with digested sludge and compost. Chemosphere, 81(5), 577-583. Tolón Becerra, A. & Lastra Bravo, X. (2010). La agricultura intensiva del poniente almeriense. Diagnóstico e instrumentos de gestión ambiental. M+A. Revista Electrónica de Medioambiente, 8, 1-22. Trujillo, D., Perez, J. F. & Cebre, F.J. (1993). Energy recovery from wastes: anaerobic digestion of tomato plant mixed with rabbit wastes. Bioresour Technol, 45, 81-83. Valera, D. L., Belmonte, L. J., Domingo, F., & López, A. (2014). Los invernaderos de Almería. Análisis de su tecnología y rentabilidad. Serie Economía. Fundación Cajamar Caja Rural, 1- 504. Vítěz, T., Haitl, M., Karafi, Z., Mach, P., Fryč, J., Lošák, T., & Szostková, M. (2011). Use of bio - enzymatic preparations for enhancment biogas production. Volume LIX (3), 203-208. Wang, G., (2010). Biogas Production from Energy Crops and Agriculture Residues (PhD). National Laboratory for Sustainable Energy. Riso-DTU, Technology University of Denmark, 1-89.