Integrated simulation and optimization scheme of real-time large-scale water supply network: applied to Catalunya case study

Sun, Congcong,Puig Cayuela, Vicenç,Cembrano Gennari, Gabriela

Abstract

This paper presents an integrated simulation and optimization modeling approach in order to provide the optimal configuration for large-scale water supply systems (LSWSS) in real time. Model predictive control (MPC) has been chosen to handle the complex set of objectives involved in the management of LSWSS. The computation of control strategies by MPC uses a simplified model of the network dynamics. The use of the combined approach of optimization and simulation contributes to making sure that the effect of more complex dynamics, better represented by the simulation model, may be taken into account. Coordination between simulator and optimizer works in a feedback scheme, from which both real-time interaction and extensive validation of the proposed solution have been realized using a case study based on the Catalunya regional water network.

Full text

Integrated Simulation and Optimization Scheme of Real-time Large Scale Water Supply Network: Applied to Catalunya Case Study Cong Cong Suna, Vicenc¸ Puiga,∗, Gabriela Cembranoa,b aAdvanced Control Systems Group at the Institut de Rob`otica i Inform`atica Industrial (CSIC-UPC), Llorens i Artigas, 4-6, 08028 Barcelona, (Spain). Tel: +34 68 804 18 55 bCETaqua, Water Technology Centre at Esplugues 75, 08940, Cornell`a de Llobregat, Barcelona Abstract This paper presents an integrated simulation and optimization modelling approach in order to provide the optimal configuration for the large scale water supply system (LSWSS) in real time. Model Predictive Control (MPC) has been chosen to handle the complex set of objectives and also being shown its effectiveness. The computation of control strategies by MPC uses a simplified model of the network dynamics. The use of the combined approach of optimization and simulation contributes to making sure that the effect of more complex dynamics, better represented by the simulation model, may be taken into account. Coordination between simulator and optimizer works in a feedback scheme, from which both real-time interaction and also extensive validation of the proposed solution have been realized by realistic demonstrations. The Catalunya regional water network has been used as the case study. ∗Corresponding author Email address: [email protected] (Vicenc¸ Puig) The manuscript of this paper has been received on 2nd, February, revised on 06th, June and accepted on 20th of October, 2014. Preprint submitted to Journal of Simulation April 22, 2015 Keywords: MPC, simulation, optimization, coordination 1. Introduction Impacts of climate changes are likely to give rise to uncertainties in water availability and water demands, which may results in major economical and ecological consequences. [1] presented a discussion of uncertainty paradigms in water resources, and provided his views on water management tools that can be used in the future. LSWSS, which is composed of various physical elements such as reservoirs, channels, pumping stations, irrigation area and urban water supply systems, operates to supply water for municipal, industrial and irrigation needs. Management of these systems from planning to operation is very challenging since the problem deals with many complex modelling issues related to inflows, transportation delays, storage, irrigation and industrial as described at [2]. An effective management of LSWSS requires a supervisory control system that takes optimal decisions about the current operational configuration of the whole network. Such decisions are implemented automatically or offered as a decision support to operators and managers. The control system should take into account operating constraints, costs and consumer demands. The decisions of the control systems are translated into set-points to individual, localized, lower level systems that optimize the pressure profile to minimize losses by leakage and provide sufficient pressure. The whole control system responds to changes in network topology (ruptures), typical daily/weekly profiles, as well as major changes in demand as discussed in [3]. A number of systems analysis techniques involving simulation and optimization algorithms have been developed and applied over the last several decades 2 to study LSWSS and also have been reviewed in [4], [5] and [6]. [4] provides a comprehensive state-of-the-art review of theories and applications of systems analysis techniques to LSWSS with a strong emphasis on optimization methods. LSWSS simulation and optimization models were reviewed by [5] who evaluated the usefulness of each approach for different decision support situations in order to provide better understanding of modelling tools which could help the practitioner in choosing the appropriate model. [6], in his review on optimal operation of LSWSS, suggested the need to improve operational effectiveness and efficiency of water resources systems through the use of computer modelling tools. Continuous development in information technology (hardware and software) creates a good environment for transition to new decision making tools. Spatial decision support systems using object oriented programming algorithms are integrating transparent tools that will be easy to use and understand at [1]. A number of text books on modelling and systems analysis of water resources including LSWSS are available like [2], [7], [8], [9], [10], [11] and [12]. MPC has been proven to be one of the most effective and accepted control strategies for the global optimal operational control of large-scale water networks in [13]. Applications to different large-scale infrastructures as LSWSS as in [14], sewer networks in [15], open-flow channel networks at [16] or electrical networks in [17] prove the applicability of this technique. The main characteristic is that after the plant dynamical model has been obtained, the MPC design just consists of expressing the desired performance specifications through different control objectives (e.g., weights on tracking errors and actuator efforts as in classical linear quadratic regulation), and constraints on system variables (e.g., minima/maxima of selected process variables and/or their rates of change) which are necessary to 3 ensure process safety and asset health. SIMULINK, as talked about in [18], is an environment for multi-domain simulation and model-based design for dynamic and control systems. It provides an interactive graphical environment and a customizable set of block libraries that allow to design, simulate, implement, and test a variety of systems, used in communications, control, signal processing, video processing, and image processing. According to these properties, SIMULINK is appropriate to develop a water network simulation environment that allows to include a network model and the cost function computation. This model allows to interface the controller, developed in this work in MATLAB using the MPC method, which provides the set points of the related elements and meanwhile close a control in a feedback loop as in [19]. The aim of this article is presenting simulation, optimization and integrated simulation-optimization modelling approaches in order to provide the optimal configuration for LSWSS in real time. MPC has been chosen to handle the complex set of objectives and also being shown its effectiveness. The computation of control strategies by MPC uses a simplified model of the network dynamics. The use of the combined approach of optimization and simulation contributes to making sure that the effect of more complex dynamics, better represented by the simulation model, may be taken into account. Coordination between simulator and optimizer works in an feedback scheme. The remainder of the paper is organized as follows. Control-oriented modelling methodology of MPC optimizer is first provided in Section 2. Then, in Section 3, controlling problem statement is described. In Section 4, integrated simulation and optimization scheme is explained in detail. Case study and preliminary results are outlined at Section 5 and finally, conclusion is provided at Section 6. 4 2. Control-Oriented Modelling Methodology Several modelling techniques dealing with the operational control of LSWSS have been presented in the literature, see [14], [20] and [21] and the references therein. Here, a control-oriented modelling approach is outlined, which follows the principles presented in the reference by [22] and [23]. The extension to include the pressure-model can be found in the references provided by [14] and [20]. A LSWSS generally contains tanks, which store the drinking water that comes from the network sources, a network of pressurized pipes and a number of sinks. Valves and/or pumping stations are elements that allow to manipulate the water flow according to a specific policy and to supply water requested by the network users. 2.1. Tanks and Reservoirs Water tanks/reservoirs provide the entire network with the water storage capacity. The mass balance expression relating the stored volume v, the manipulated inflows qi,j in and outflows qi,l out (including the demand flows as outflows) for the i-th tank can be written as the discrete-time difference equation vi(k+1) =vi(k)+ ∆t       X j qi,j in (k)−X l qi,l out(k)       ,(1) where ∆tis the sampling time and kdenotes the discrete-time instant. The physical constraint related to the range of admissible water in the i-th tank is expressed as vi≤vi(k)≤vi,for all k,(2) where viand videnote the minimum and the maximum admissible storage capacity, respectively. Although vimight correspond to an empty tank, in practice 5 this value can be set as nonzero in order to maintain an emergency stored volume enough to supply for facing extreme circumstances. For simplicity purposes, the dynamic behavior of these elements is described as a function of volume. However, in most of the cases, the measured variable is the tank water level (by using level sensors), which implies the computation of the water volume taking into account the tank geometry. 2.2. Actuators Two types of control actuators are considered: valves/gates and pumps (more precisely, pumping stations). The manipulated flows through the actuators represent the control variables, denoted as qu. Both pumps and valves/gates have lower and upper physical limits, which are taken into account as system constraints. As in (2), they are expressed as qui≤qui(k)≤qui,for all k,(3) where quiand quidenote the minimum and the maximum flow capacity, respectively. 2.3. Nodes These elements correspond to the points in the whole water system where water flows are merged or split. Thus, the nodes represent mass balance relations, being modelled as equality constraints related to inflows (from other tanks through valves or pumps) and outflows, the latter being represented not only by manipulated flows but also by demand flows. The expression of the mass conservation in these nodes can be written as X j qi,j in (k)=X h qi,h out(k).(4) 6 Node inflows and outflows are still denoted by qin and qout, respectively, despite the fact that they can be manipulated flows and hence denoted by qu, if required. 2.4. River Reaches A single canal reach can be approximated by using the modelling approach proposed by [24] that leads to the following relation between the upstream (qups) and downstream (qdns) flows: qdns(k+1) =a1qdns(k)+b0qups(k−d) (5) where d=τd/Ts,τdis the downstream transport delay, Tsis the sampling time, b0=1−a1and a1=e−Ts T. 2.5. Demand and Irrigation Sectors Demand and irrigation sectors represent the water demand made by the network users of a certain physical area. For the purpose of computing control actions, it is considered as a measured disturbance of the system at a given time instant. The demand in urban areas can be anticipated by a forecasting algorithm that is integrated within the MPC closed-loop architecture in [13]. The demand forecasting algorithm typically uses a two-level scheme composed by (i) a timeseries model to represent the daily aggregate flow values, and (ii) a set of different daily flow demand patterns according to the day type to cater for different consumption during the weekends and holidays periods. Every pattern consists of 24 hourly values for each daily pattern as explained in [25]. This algorithm runs in parallel with the MPC algorithm. The daily series of hourly-flow predictions are computed as a product of the daily aggregate flow value and the appropriate 7 hourly demand pattern. On the other hand, irrigation demand is typically planned in advance with farmers. Pre-established flows for irrigation are planned for agricultural areas in certain periods of the year. 3. Control Problem Statement Because of the complex large scale property and multi-variable control characteristic of LSWSS as described in Section 2, a feasible and efficient control method is needed. MPC is one of the most advanced control methodologies which has made a significant impact on industrial control. MPC does not consider a specific control strategy but a very wide range of control methods which make an explicit use of the process model to obtain the control signal by minimizing an objective function which represents the desired control goals. MPC can handle multi-variable control problems and it can consider actuator limitations as well as operational and physical constraints. The standard MPC problem based on the linear discrete-time prediction model is considered as described in [26]: x(k+1) =Ax(k)+Bu(k),(6a) y(k)=Cx(k),(6b) where x(k)∈Rnxis the state vector and u(k)∈Rnuis the vector of command variables at time step k, and y(k)∈Rnyis the vector of the measured outputs. Following the formalism provided by [26] for the basic formulation of a predictive control, the cost function is assumed to be quadratic and the constraints are in the form of linear inequalities. The model (6) is obtained applying the control- 8 oriented modelling methodology presented in previous section taking into account the LSWSS topology and physical parameters. 3.1. Operational Goals The main operational goals need to be achieved in LSWSS are: •Goal 1. Cost reduction (Jcost): Economic cost is usually includes water source costs and water transportation costs two parts. Water source cost is usually related to acquisition, which may have different prices at different sources, while transportation cost is affected by power tariffs which may vary during different time steps in a day. Assuming Waas the related weight of Goal 1, the vectors e u,a1and a2 contain control variables, cost of water source and pumping at time step k, respectively, the object function of Goal 1 is Jcost =Wa(a1+a2(k))e u(k),(7) •Goal 2. Operational safety (Jsa f ety): This criterion refers to maintain appropriate water storage levels in dams and reservoirs for emergency-handling. Operated in both supply and transportation layers. Assuming We xas the related weight of Goal 2,e x(k) and e xrrepresent realtime water level and emergency-handling level in dams and reservoirs at time step k, respectively, the object function of Goal 2 is Jsa f ety =(e x(k)−e xr)>We x(e x(k)−e xr),(8) 9 integration is achieved by the two S-functions (see SIMULINK manual for more details) S−controller and S−simulator, where they produce, transfer and receive the useful information in a closed loop as shown in Fig. 3. In this closed loop, the optimizer will first produce the optimized control actions and send them to the simulator as set-points. After the simulation, the updated states and the implemented control actions are transferred into the controller as state estimation and initial set-point values respectively for the next optimizing process. Initial data for the first optimizer process is provided. The scheme is working emulating real time operation by receiving and updating the demand and the measurements of the network real state from the telemetry system provided by SCADA system. Figure 3: Integration of optimization and simulation blocks In order to make sure the optimizer and simulator in the integrated scheme can work at a consistent pace, variable sampling steps have been used. There are two sampling time deltaT and mindeltaT, where deltaT is the sampling time for MPC optimizer, which equals with 10800 seconds, while mindeltaT is the sampling time for simulator, here equals with 30 seconds. The two different 16 sampling time synchronize the simulator and optimizer as presented in Algorithm 1 and are selected according to the network dynamics. 5. Case Study: The Catalunya Regional Water Network 5.1. Description The Catalunya Regional Water Network lies within the Catalunya Inland Basins, and supplies the Metropolitan area of Barcelona, where most of the population is concentrated (approximately 5.5 million people). The sources of the Catalunya Regional Water Network are related mainly to two rivers (Llobregat and Ter). An assessment based on data obtained by the supply companies in the Barcelona metropolitan area shows that in 2007, 81 percent of the water input came from surface sources. Of the total water input, 90 hm3came from the Llobregat system and 124 hm3from the Ter system. The water flow supplied by the Ter and Llobregat rivers are regulated respectively by three and two reservoirs and purified by one and two water treatment plants, respectively. Fig. 4 is the whole simulation network scheme of Catalunya Regional case study, where the two part at the sides are two rivers which names Llobregat and Ter and the center part is the aggregated network of water transportation in Barcelona city. 5.2. Results Among demands in this network, some demands can receive water from both of the two rivers. In practical applications, there are three kinds of scenarios divided by the amount of water in Llobregat and Ter rivers, they are: •Scenarios 1: More water in Llobregat than in Ter. 17 Algorithm 1 Integrated Simulation and Optimization Algorithm in S-functions 1: DeltaT :=10800 seconds {sampling time of optimizer} 2: mindeltaT :=30 seconds {sampling time of simulator} 3: K:=Tsim/mindeltaT {scenario of simulator, Tsim is the simulating time} 4: for k:=1 to Kdo 5: if mod(k∗mindeltaT,deltaT)== 0then 6: i:=(k∗mindeltaT)/deltaT {step of optimizer} 7: if i== 1then 8: xinit (i)=XINIT {XINIT is known value} 9: S im.U(k)=Optimizer (xinit (i),block (i) ) {Run MPC optimizer} {block (i) are known values of demands, objective weights, electricity price.} 10: end if 11: end if 12: S tate (k)=S imulator (S im.U(k),block(k) ) {Run Simulator} 13: if mod(k∗mindeltaT,deltaT)== 0then 14: i:=(k∗mindeltaT)/deltaT 15: xinit (i+1) =S tate (k) 16: end if 17: end for 18 Figure 4: Simulation network scheme of Catalunya Regional Case Study 19 •Scenarios 2: More water in Ter than in Llobregat. •Scenarios 3: Abundant water in both of the rivers. For the first two scenarios, when water in one river is adequate while in another river is limited, management policies will set the shared demands ask water from the abundant river. For the scenario 3, when water is abundant in both of rivers, according to the balance management, which is one of control objectives in the MPC controller, water consumption in both of rivers will be proportional to their supplying ability. In this paper, only scenario 3 is considered as the case study. The following results are used to show the usefulness of this tool and also the benefits of the integrated scheme that make the water supply and transport keep the supply of both rivers balanced. In Section 5.2.1, optimal results of the MPC controller are provided while integrated results between MPC controller and simulator are described in Section 5.2.2. 5.2.1. Results of Optimization In the Catalunya Regional Water Network, water transportation implies economic cost when pumped from the lower elevation to the higher elevation. As Goal 1, the MPC controller optimized this cost to produce the most optimal solution. Figure 5 shows a comparison between pump flow and its electricity fee where the pump works more during the cheaper time while it nearly does not work when the electricity price is high. Fig. 6 shows water level of one reservoir comparing with its safety level, where the required storage is kept for emergency handling, which corresponds to the Goal 2. Table 1 provides detailed results and also improvement of water usages in the 20 Figure 5: Pump flow with electricity price Figure 6: Water of reservoir comparing with safety level 21 two rivers achieved by the balanced management, as explained in Goal 3, in the MPC optimizer. In this table, Source means flow into the rivers from external sources, Fixed Demand refers to demands which cannot choose their water source while Variable Demand is the demand which can receive water from more than one river. BD, abbreviation of Balanced Demand, is water volume that has been consumed from each of the reservoirs and PB, abbreviation of Proportion of Balanced demands, is the proportion of BD for the two reservoirs. PR, abbreviation of Proportion of Reservoir capacity, is the proportion of storage capacities of the two reservoirs. The similar values for PB and PR is what the multi-layer scheme seeks to achieve. And SA, abbreviation of Supplying Ability, is water supply ability (in days) of the whole water network before meeting deficit problem in case of no rain and no external water flow into the reservoir. The comparisons prove that, after adding the objective of balance management, the proportion of water usage from both rivers (58.93%, which is ratio of Llobregat/Ter) is much closer to the proportion of their storage capacities (53.48%). Moreover, the Catalunya Regional Water Network can supply water 65 days longer than without balance management, which is a good benefit regarding the sustainable usage of water resource in the long term perspective. 5.3. Result of the integrated Scheme In the integrated scheme, simulator and MPC controller keep communicating at every time step. MPC optimizer send control action as set-point to the simulator, after simulating, state variables used as initial value for the next iteration. The computation of control strategies by MPC uses a simplified model of the network dynamics. The use of the combined approach of optimization and simulation contributes to making sure that the effect of more complex dynamics, better repre- 22 Table 1: Water usage comparison of Scenarios 3 Sc. MPC optimizer with balancing management Es. Source Fixed Demand Variable Demand BD PB PR SA L. 3008 2981 724 697 58.93% 53.48% 242 Days T. 3532 3518 1196 1182 Sc. MPC optimizer without balancing management Es. Source Fixed Demand Variable Demand BD PB PR SA L. 3008 2981 7.6 -19.4 -1.02% 53.48% 177 Days T. 3532 3518 1914 1900 sented by the simulation model, may be taken into account. State variables, which represent water volume evolution produced by this integrated scheme should be similar with that provided by the independent MPC controller which means MPC controller without communicating with simulator. As Fig. 7 shows, the solid line is water volume evolution from the integrated scheme, while the dashed line shows the water volume produced by independent MPC controller, which work in a similar way. Another hand, according to the simulation structure, flow in nodes have to keep balance in every simulating and optimizing iteration. In Fig. 8, the number 1 means demands satisfaction and node flow balance. Fig. 9 compares the value of each operational goal in the objective function of the integrated and the independent control models. These values do not differ by significant amounts, so that the integrated approach does not significantly increase the operational cost. Table 2 provides results in detailed numbers and compares the obtained control results in terms of economical and computational performance over four days 23 Figure 7: Volume comparison achieved by optimizer and by the integrated scheme Figure 8: Demands satisfaction and node balance 24 Figure 9: Comparisons of operational goals achieved by optimizer and by integrated scheme Table 2: Closed-loop performance results (all values in e.u.) Define Day Current Control Integrated Scheme Ele. Wat. Tot. Comp.(in s) Ele. Wat. Tot. Comp.(in s) 1st 240 100 340 23 141 40 181 58 2nd 239 106 345 21 170 39 209 57 3rd 246 94 340 19 171 41 212 61 4th 264 110 374 21 168 42 210 62 Prop. -34% -61% -42% 183% between the control techniques using heuristic strategies by human operators (simplified as current control) and this integration scheme. In the Table 2, Wat., abbreviation of Water, refers to water cost during the day, while Ele., abbreviation of Electricity, refers to electricity cost, Tot., abbreviation of Total, means the total cost which includes both water and electricity and Comp., 25 Spanish Ministry of Science and Innovation (2010 −2012) and scientific director of the European Commission project EFFINET Integrated Real-time Monitoring and Control of Drinking Water Networks FP7ICT −318556(2012 −2014). She has published over 50 journal and conference papers in this field. 32