Full text
Multi-purpose marine infrastructure The outlook of M4 solutions and a case study of offshore hydrogen production Guido Enrico Mazza Ramos Thesis to obtain the Master of Science Degree in Energy Engineering and Management Academic supervisor: Prof. Duarte de Mesquita e Sousa External supervisor: Maria Xylia Examination Committee Chairperson: Prof. Name Supervisor: Prof. Duarte de Mesquita e Sousa Members of Committee: Prof. Name : Prof. Name August 2023
I declare that this document is an original work of my own authorship and that it fulfills all the requirements of the Code of Conduct and Good Practices of the Universidade de Lisboa.
Acknowledgements The work conducted in this project and presented in this document is the product of an internship in the Stockholm Environment Institute (SEI) and is part of the work package focused on marine, multifunctional, mobile and modular (M4) solutions of the Gridless initiative. It was a privilege to work with such talented, knowledgeable individuals, located all over the world in SEI’s centers in Stockholm, Tallin, Oxford, Bangkok, Nairobi and Boston, and who all share a passion and dedication to sustainable development. It was also a great privilege to be a part of SEI’s Energy and Industry Transitions team during this time, sharing in their unrelenting commitment to enable a sustainable and just transition to a net-zero global society. Special thanks to Maria Xylia, Senior Research Fellow at SEI, for the guidance, support, encouragement, trust, and rigor shown during her supervision of this project.
Abstract Multi-purpose offshore infrastructure has emerged as a way of sustainably providing demands for critical services in marine and coastal environments due to the possibility of integrating different marine activities in the same space. This study focuses on marine, multifunctional, modular, and mobile (M4) solutions, with the aim of understanding the outlook, opportunities, and barriers that industry led M4 projects face. Additionally, it has the goal to determine which use combinations are the most promising and evaluating them from a technical and economic perspective. A mixed methods approach, including a systematic review of online information and semi-structured interviews with stakeholders, was employed. Additionally, a case study on the combination of offshore wind energy and hydrogen production was conducted by means of a technoeconomic analysis. 30 projects were identified worldwide, primarily combining offshore wind energy with sectors such as wave energy, offshore floating solar energy, aquaculture, and hydrogen production. Hydrogen production emerged as the most prevalent combination. Most projects are in the concept or pilot testing phase and stakeholders have a strong focus on demonstration to showcase successful technology integration. The lack of an enabling regulatory environment is cited as the main barrier as existing regulations do not account for multiple use of marine space. Offshore hydrogen production from offshore wind shows significant promise due to hydrogen’s role as an energy carrier, and the case study shows that the LCOH decreases with wind farm size and that centralized offshore hydrogen production, with transmission to shore via pipeline yields the lowest LCOH among the studied configurations. Overall, overcoming regulatory barriers and developing clear frameworks are essential for successful implementation of M4s. Incentives are crucial to supporting largescale projects and advancing technology readiness. Future research should focus on small-scale M4 projects for remote communities, addressing regulatory gaps, and comparing hydrogen-based and electricity-based systems in end-to-end cost analyses. Keywords Marine, multi-purpose, multi-use, offshore, energy, wind energy, hydrogen, barriers, technoeconomic analysis, levelized cost of hydrogen.
Resumo As infra-estruturas offshore polivalentes surgiram como uma forma de satisfazer de forma sustentável a procura de serviços críticos em ambientes marinhos e costeiros devido à possibilidade de integrar diferentes actividades marinhas no mesmo espaço. Este estudo centra-se nas soluções marinhas, multifuncionais, modulares e móveis (M4), com o objetivo de compreender as perspectivas, oportunidades e barreiras que os projectos M4 liderados pela indústria enfrentam. Além disso, tem como objetivo determinar quais as combinações de utilização mais promissoras e avaliá-las numa perspetiva técnica e económica. Uma abordagem de métodos mistos, incluindo uma revisão sistemática de informações em páginas virtuais e entrevistas semi-estruturadas com as partes interessadas. Além disso, foi realizado um caso de estudo sobre a combinação de energia eólica offshore e produção de hidrogénio através de uma análise tecno-económica. Foram identificados 30 projectos a nível mundial, principalmente combinando a energia eólica offshore com sectores como a energia das ondas, a energia solar flutuante offshore, a aquicultura e a produção de hidrogénio. A produção de hidrogénio surgiu como a combinação mais predominante. A maior parte dos projectos encontra-se na fase de conceção ou de ensaio-piloto e as partes interessadas concentram-se na demonstração para mostrar o sucesso da integração tecnológica.A falta de um ambiente regulamentar favorável é citada como o principal obstáculo, uma vez que a regulamentação existente não tem em conta a utilização múltipla do espaço marinho. A produção de hidrogénio offshore a partir da energia eólica offshore é muito promissora devido ao papel do hidrogénio como observado no caso de estudo, que o LCOH diminui com o tamanho do parque eólico e que a a produção centralizada de hidrogénio offshore, com transmissão para onshore através de um gasoduto, produz o LCOH mais baixo entre as configurações estudadas. Em geral, a superação das barreiras regulamentares e o desenvolvimento de enquadramentos legais são essenciais para o êxito da implementação das M4. Os incentivos são cruciais para apoiar projectos de grande escala e promover a tecnologia. A investigação futura deve centrar-se em projectos de M4 em pequena escala para comunidades remotas, colmatando as lacunas regulamentares e comparando os sistemas à base de hidrogénio e sistemas baseados no hidrogénio e na eletricidade em análises de custos em todo o ciclo. Palavras-chave Ambiente marinho, multiusos, offshore, energia, energia eólica, hidrogénio, barreiras, análise tecnoeconómica, custo nivelado do hidrogénio.
Table of Contents 1. Introduction ..................................................................................................................................................... 1 1.1 Motivation ............................................................................................................................................... 1 1.2 Objective ................................................................................................................................................. 3 2. Background ...................................................................................................................................................... 4 2.1 Ocean multi-use (MU) ........................................................................................................................... 4 2.2 Multi-purpose platforms (MPPs) ......................................................................................................... 7 2.3 Marine-multifunctional-mobile-modular (M4s): Framework and previous work ....................... 9 3. Methods .......................................................................................................................................................... 12 3.1 Systematic online review ..................................................................................................................... 12 3.2 Stakeholder interviews ......................................................................................................................... 14 4. Results ............................................................................................................................................................. 16 4.1 Systematic online review ..................................................................................................................... 16 4.2 Stakeholder interviews ......................................................................................................................... 19 4.2.1 General knowledge .......................................................................................................................... 19 4.2.2 Technical aspects ............................................................................................................................. 20 4.2.3 Project planning and strategy ......................................................................................................... 20 4.2.4 Economic aspects ............................................................................................................................ 21 4.2.5 Policy and regulation ....................................................................................................................... 22 4.2.6 Barriers .............................................................................................................................................. 23 5. Case study: Hydrogen production from offshore wind energy ............................................................. 24 5.1 Context .................................................................................................................................................. 24 5.2 Methodology ......................................................................................................................................... 25 5.2.1 Offshore wind farm ........................................................................................................................ 26 5.2.2 Component sizing and costs .......................................................................................................... 28 AC/DC Converter ........................................................................................................................................ 28 HVDC Cable .................................................................................................................................................. 29 Electrolyzer .................................................................................................................................................... 29 Stand-by battery ............................................................................................................................................. 30 Desalination unit ........................................................................................................................................... 30 Hydrogen compressor .................................................................................................................................. 31 Hydrogen storage .......................................................................................................................................... 31 Hydrogen pipeline ......................................................................................................................................... 31
Platform adaptations ..................................................................................................................................... 32 Array pipelines ............................................................................................................................................... 32 LCOH Calculation ........................................................................................................................................ 32 5.3 Case study results ................................................................................................................................. 34 5.3.1 2 GW Wind Farm ............................................................................................................................ 35 Annual hydrogen production ...................................................................................................................... 35 Investment costs ............................................................................................................................................ 37 Total costs ...................................................................................................................................................... 38 Sensitivity analysis ......................................................................................................................................... 40 Effect of distance from shore on choice of production strategy .......................................................... 42 6. Discussion ...................................................................................................................................................... 44 6.1 Systematic online review ..................................................................................................................... 44 6.2 Stakeholder interviews ......................................................................................................................... 45 6.3 Case study .............................................................................................................................................. 45 7. Conclusions and future work ...................................................................................................................... 48 7.1 Conclusions ........................................................................................................................................... 48 7.2 Future work ........................................................................................................................................... 49 Bibliography ............................................................................................................................................................ 51 Appendix A – List of projects resulting from the online review .................................................................... 55 Appendix B – Description of projects ................................................................................................................ 56 Appendix C – Interview protocol ........................................................................................................................ 58 Appendix D – Case Study scenarios ................................................................................................................... 61
4 2. Background In this chapter, the background for this project is provided in the form of an explanation of the underlying concepts and the current state of research on the topic of M4s. The conceptual definitions and relevant research performed to date on the concepts of ocean multi-use and multipurpose platforms are provided, which after the inclusion of the modularity and mobility dimensions lead up to the definition of the M4 framework. Finally, this chapter provides a detailed summary of the work performed so far within that framework, which constitutes the starting point for this project. 2.1 Ocean multi-use (MU) Conflicts can arise between users due to the intensification of activity in marine space, be it by the incursion of new industries, the growth of existing ones or, in most cases, the combination of both. As a tool to manage these conflicts, marine spatial planning (MSP) was created and adopted as a means to achieve effective ocean governance. However, despite the adoption of MSP practices across different regions, the approach to planning has remained siloed by limiting the practice of MSP to the designation of different areas to different uses, overlooking possible synergies between uses that could be exploited. As a result, a new approach has emerged in the form of multi-use of ocean space, built on the idea that a single space can be allocated to more than one use in cases where the different uses could coexist, and the inclusion of this approach into MSP would thereby increase spatial efficiency, reduce competition for the same space and minimize potential conflicts. The following is a definition of multi-use proposed by [5]: “Ocean multi-use is the joint use of resources in close geographic proximity by either a single user or multiple users. It is an umbrella term that covers a multitude of use combinations in the marine realm and represents a radical change from the concept of exclusive resource rights to the inclusive sharing of resources and space by one or more users”. Extensive research has so far been conducted in the field of multi-use, including the technical design of specific use combinations, comparisons between them, techno-economic feasibility studies, business case evaluations, and analyses regarding the potential of different regions to host multi-use solutions. A significant number of research articles have been conducted in Europe as part of EU funded projects, each with a different focus and building upon the results of its predecessors. A summary of such projects and their objectives is summarized in Table 1. . Table 1 EU funded multi-use projects [7]–[9] Project Programme Focus MERMAID Seventh Framework Programme (FP7) Technological design of offshore platforms for MU. MARIBE Horizon 2020 Business case analysis for promising multiuse combinations MUSES Horizon 2020 Analyzing the state of multi-use in Europe. Identifying key drivers and obstacles
5 As part of the MUSES project, [5] aim to provide a universal definition of multi-use of space through reviewing the state of the art in Europe, resulting in a typology built on the interactions between uses in four dimensions: spatial, temporal, provisional and functional, yielding four distinct types of multi-use, which are summarized in Figure 1. In addition to developing the typology, the paper recommends joint development and licensing processes, clear regulatory frameworks, legislated relationships, and the development of regulatory frameworks to evaluate the environmental impact of repurposing infrastructure for each type of multi-use. Additionally, such frameworks should account for each user's rights and responsibilities, guaranteeing the free and equitable flow of information between all users, and establishing which structures are fit for which use. Figure 1 Multi-use typology. Adapted from [10] A representative example of the purpose of the MUSES project can be found in the work of [11], where they propose an analytical framework for assessing the potential of multi-use (MU) as a concept for sustainable resource exploitation and smart space allocation in eight EU countries of the Euro- Mediterranean sea basin, focusing on three maritime sectors: tourism, renewable energy, and the oil & gas industry. They identify ten existing and potential MU combinations and analyze the opportunities and challenges associated with MU development in terms of drivers, added values, barriers, and impacts (DABI). The authors highlight tourism-driven MU as having the highest potential due to facing fewer barriers than other sectors, while also identifying combinations with emerging potential, such as floating offshore wind energy and aquaculture and the repurposing of decommissioned oil and gas platforms. The authors provide a series of recommendations, such as developing EU-wide financial support programs, creating regulation that addresses MU safety, insurance and permitting process standards, and establishing pilot sites to test MU designs. The identified combinations, as well as the DABI factors are illustrated in Figure 2.
6 Figure 2 Multi-use DABI factors [11] A series of studies were conducted as part of the MARIBE project to develop business cases for promising multi-use combinations. One of such combinations is the co-location of OWFs and aquaculture, which is frequently identified as having large potential for development as there are apparent synergies between the two uses, such as potential reductions in O&M costs that could be achieved by, for example, having shared multipurpose vessels. One of such studies performed a business case analysis to quantify the benefits of multi-use aquaculture of blue mussels in offshore wind farms, specifically in the Borssele wind farm in the North Sea [3]. The analysis used a specific design for the aquaculture farm, with input parameters taken from previous literature, and a risk assessment was conducted based on defined hazards. The analysis showed that the business case is profitable, achieving positive IRR and NPV, and a sensitivity analysis confirmed the business case's robustness. The authors suggest that the OWE sector is unlikely to pursue this type of multi-use due to perceived lack of benefits and safety concerns, and the initiative falls with the aquaculture sector, which lacks resources and organization compared to the wind energy sector. They recommend building a full-scale pilot to showcase the benefits of this combination and create momentum for development at scale. Upon conclusion of the MUSES and MARIBE projects, researchers conducted joint work in order to gather the findings of both projects and identify the main research gaps and actions required to foster the development of multi-use platforms [12] . The study proposes a new typology to classify the different types of multi-use based on the combinations explored in two previous projects as well as merging the typologies established by [5] and [13]. After establishing the typology, the authors identify and classify the barriers that were identified in the reviewed literature. Most barriers fall under the economic category, specifically related to the high cost of multiuse platforms and the lack of supporting business cases. Technical and social barriers also pose obstacles to the development of multi-use platforms as drivers of blue growth, with the former associated with the lack of technology and infrastructure for grid connection and the latter related to the lack of acceptance from local communities and trust building between involved sectors. In conclusion, the authors highlight the need to further study the social dimension of multi-use platforms, as it can be a significant obstacle to their development. They also suggest that research should identify
7 concepts that deliver benefits not only from a technical and economic perspective but also from an environmental and societal standpoint. Finally, they emphasize the need for in situ trials to address both technical and non-technical barriers, such as increasing investor confidence and social acceptance. Building on the future work needs and research gaps that were clearly identified in the previous projects, the H2020 UNITED project was started in 2020 as a way of addressing the identified barriers for multiuse through the deployment of a series of in situ demonstrators. As a way to clearly assess how all types of barriers are evaluated and addressed, the project is built on five pillars, namely technological, economic, environmental, societal and governance, thereby ensuring that there is robust evidence to support the development of multi-use activities as a viable option economically, environmentally and socially. The project will consist of five demonstrator projects located in 3 different regional seas in the European Union (North, Baltic, and Mediterranean seas), which will first be tested near-shore in milder conditions, before being implemented offshore in critical conditions. Furthermore, the tests performed within the project aim to take the technologies across three different technology readiness levels (TRL), from TRL5 to TRL7, demonstrating the prototypes in their operational environment. The five demonstrator projects will cover five sectors of the blue economy through different multi-use combinations, such as renewable energy, aquaculture, bio-resources, tourism, and maritime transport. The pilots involve multiple countries, each focusing on specific combinations. Among the combinations that will be explored are the combination of OWE and floating solar energy with aquaculture of seaweed and blue mussels, aquaculture with nature restoration and the relationship between OWE and tourism. All the pilots will be conducted in three operational phases, mirroring the phases that projects of this kind will have to undergo once they are deployed at commercial scale, such as a pre-operational, operational and a decommissioning phase. 2.2 Multi-purpose platforms (MPPs) Within the field of ocean multi-use, a technological concept enabling the combination of different oceanbased activities into a single physical unit has emerged in the form of multipurpose platforms (MPPs). MPPs are offshore platforms that serve the need of different offshore industries, which aim at exploiting the synergies and addressing the conflicts that arise when closely locating systems from these industries [6]. Such platforms could be supported by floating or bottom-fixed structures and be located near shore or at large distances offshore depending on their purpose. For instance, a device that combines a wind turbine (WT) with a wave energy converter (WEC) could consist of a floating platform located far offshore and be connected to an electrical grid through undersea cables. Conversely, in the case of remote islands and communities without access to utility grids, an MPP could be located near shore to provide electricity, drinking water or food, depending on the demand for these services. MPPs have been researched at length, with work so far being concentrated in the technical design and technoeconomic evaluation of different offshore renewable energy (ORE) technology combinations, with a comparatively lower number of studies incorporating aquaculture and seawater desalination. One early example of such research is the work of [14], which studies the combination of OWE with wave energy, as a response to the need of both industries to reduce costs and optimize the exploitation of resources. Their study consists of a comprehensive review of this combination, addressing the general aspects of it, such as synergies, the different options for combining the two technologies, as well as the technical aspects involved.
8 The review starts with an evaluation of the combined wave and wind resource in Europe, focusing on three European regional seas and identifies synergies between the two technologies. Following this, it identifies the synergies between the two technologies, cataloguing them as legislative or project/technology synergies. Legislative synergies include the development of a common regulatory framework and the simplification of licensing procedures, while project and technology synergies include increased energy yield and operational benefits, such as smoother power output, reduction in system balancing costs and the possibility to share logistics, substructures, and O&M costs. After identifying synergies, the study proposes a classification of combined wind-wave systems in three categories, namely co-located systems, hybrid systems and floating islands. Such systems could be independent or combined, and they could consist of bottom-fixed or floating structures. Both hybrid systems and floating islands are MPPs, while in co-located systems the core infrastructure is not shared. Following the trend of technoeconomic analysis of different MPP configurations, [15] developed a model for the reconversion of end-of-life Oil & Gas (O&G) platforms into MPPs. In their work, they evaluate different configurations for the production of renewable energy (from wind or solar), green hydrogen, synthetic natural gas (SNG) and freshwater from desalination, based on two types of common O&G platforms present in the North Sea and in the Adriatic Sea. In the study, nine different technical scenarios are studied, and for each scenario the economic and environmental feasibility is evaluated based, respectively, on a discounted cash flow analysis (DACF) and a comparative life-cycle analysis (LCA) with respect to a standard decommissioning scenario. The study concludes that for the case of the Adriatic Sea, the most beneficial scenario is the production of hydrogen and electricity from an offshore solar power plant, given largely to the fact that among all the products, the green hydrogen is the most profitable, followed by the electricity provided to the grid. The same is true for the case of the North Sea, where all the scenarios present a shorter payback period and positive return on investment, mainly due to the higher quality wind resource. Scenarios including water desalination present a negative return on investment and are deemed adequate only for regions that have a critical demand for freshwater. Perhaps the most comprehensive study performed to date on MPPs is that of [6]. where a multidisciplinary review of the state of the art of MPPs is performed, complemented by single purpose or single discipline studies where relevant. The review is built on the outcome of previous MPP projects and provides a recollection of insights regarding the technical, economic, environmental, and social aspects of MPPs studied to date. The overview offered by this study covers a significantly wide range of studies and projects, starting with the work of [14] and moving on to a variety of large projects with different outcomes, such as the MARINA platform project, and the ORECCA project and TROPOS projects. Large research projects such as H2OCEAN and MERMAID are also included in the review. These projects explore the combinations of different OREs as well as their combination with aquaculture in different ways, all with the aim of proposing designs for an MPP. Additionally, commercial MPPs which combine OWE and WE are evaluated. In terms of the aspects considered in the review, the authors perform a comparison of functionality to establish the differences between the designs for both ORE and ORE-aquaculture combinations. Furthermore, they identify environmental and social impacts as well as the main risks associated with MPPs. Acoustic disturbance is identified as the main environmental impact of ORE, while increased parasite and pathogen densities represent the main impact of aquaculture. Noise and visual pollution are identified
9 as the main socioeconomic impacts derived from ORE installations, together with possible restrictions on the use of marine space, while the negative socioeconomic effects of aquaculture are difficult to quantify. Finally, the corrosion of equipment and high forces due to operation in an offshore environment, the complicated bureaucracy, conflicts with traditional marine space users and low social acceptance are identified as the main risks associated with MPPs. Similarly to what occurred in the UNITED project, efforts were also made to produce a demonstrator for an MPP within the Horizon 2020 program, in a project known as The Blue Growth Farm. The project had the purpose of designing and MPP hosting aquaculture operations and wind and wave energy harvesting at large scale, as well as building and testing a prototype in 1:10 scale to achieve TRL5. Furthermore, the project had the goal of developing a suitable business plan to facilitate future investment. The project started in June of 2018 and concluded in March 2022, when the demonstrator platform, that was in operation off the coast of Reggio Calabria, Italy was decommissioned. The main outcomes of the project were a series of technical advancements on the design and operation of a wind-wave-aquaculture MPP, such as the generation of new scaling strategies for the physical models of MPPs [16] a detailed engineering approach for the design of the MPP to optimize all three activities [17] and, among others, a study on the perception local communities have on MPPs in Europe [18]. 2.3 Marine-multifunctional-mobile-modular (M4s): Framework and previous work As previously mentioned, MUPs have traditionally been understood as fixed, ad hoc solutions for a specific set of uses and conditions. However, the inclusion of mobility and modularity into the design of such platforms adds a degree of flexibility that can unlock the full potential of MUPs to accelerate the transition to more sustainable service provision while increasing resilience in island and coastal geographies. As a result, the framework of M4 solutions was developed within SEI’s Gridless Initiative as a way to incorporate these two dimensions into the analysis of MUPs, MPPs or in general, solutions in the field of multi-use of marine space, and to classify them in a systematic way. M4 stands for Marine, Multifunctional, Mobile, and Modular solutions[19]. As a first step within this new framework, a systematic review was conducted to explore how M4 solutions have been addressed so far in peer-reviewed literature and to identify the synergies and most common themes discussed in the field. A combination of methods was used to conduct the review. First, systematic literature review methods were applied to screen, classify, and analyze recent research in the field. Then, keyword text mining and data visualization techniques were used to identify trends, synergies and aspects not covered in the literature. After following the systematic literature review steps, the included articles were classified according to a set of parameters regarding, i.a, the geographical focus, type of structure and combination of technologies. Furthermore, they are scored in terms of their M-degree, with each M referring to one dimension in the M4 framework. For example, a solution that is marine and multifunctional has an M- degree of M2 whereas a solution that is marine, multifunctional, and mobile has an M-degree of M3, and so on. The results of this classification are then visually summarized in terms of their M-degree, geographic focus, and interlinkages between types of technologies, which can be seen in Figure 3.
10 Figure 3 M4 technology combinations [19] Then, in order to identify the main discussed themes within each M4-degree, a keyword text mining technique was applied based on the Term-frequency – inverse document frequency (TF-IDF) computational methodology [20]. This is a method that scores keywords based on two factors: their frequency of appearance in a document and their frequency of appearance across the whole set of reviewed documents. The results of the analysis show that the dimension of multifunctionality is prioritized in the literature, while modularity is the least explored concept. M2 solutions appear as the most frequently addressed, being either marine-multifunctional or marine-mobile, followed by M3 solutions, while only 15% of the solutions explored in literature qualified as M4. Figure 4 shows the number of papers where each dimension is addressed, as well as the M-degrees present in each dimension. Regarding geographical focus, the studies were found to be concentrated in Europe, with the North Sea region featuring prominently as the most discussed location, while on the other hand, only one study focused on the African continent and no studies featured South America.
11 Figure 4 M-degree classification of reviewed literature [19] The results of the keyword analysis within the M-degree categories showcases how different themes emerge as one moves from M1 to M4, with the decommissioning and repurposing of O&G platforms dominating the M1 category, while combinations of different renewable energy technologies are most frequently discussed within M2 and cost considerations start to emerge in the M3 category, showcasing how economic concerns come into play as the complexity of the solutions increases. Throughout the categories, it is evident that there is a lack of focus on modularity and mobility as central themes. Overall, the results of the study show that the most explored combination of M4 technologies is that of wind and wave energy, followed by their combination with aquaculture. Interestingly, a focus on marine solar technologies and hydrogen also emerges, showing how recent developments in these technologies have been gathering more attention from the scientific community. Furthermore, there is an evident concentration of studies in Europe, which could be explained by the large EU funded projects previously discussed in this chapter. In their conclusion, the authors of the study point to the need for future research to increasingly focus on the aspects of mobility and modularity to explore the full potential of M4 applications. Moreover, it is recommended that the state of the art beyond euro-centric studies and conceptual designs should be studied in order to understand what solutions are the most feasible and beneficial, as well as the scale and potential location of most promising alternatives. For this reason, they suggest that a valid alternative is to include non-scientific literature as a source of information which should be systematically reviewed and analyzed incorporating the methods described in the paper. It is on this final recommendation that the scope of the present study is built.
12 3. Methods To answer the research questions specified in Chapter 1, a mix of quantitative and qualitative methods was used, allowing for a comprehensive analysis of the state, outlook, opportunities, and barriers faced by M4 solutions. The first quantitative method used was that of conducting a systematic online search to identify the amount of M4 projects that are currently planned, as well as quantitatively establishing a comparison in terms of stage, location, use combinations, M-degree, and other criteria. This step provides a clear understanding of the characteristics of the different projects, as well as identifying the combinations that are being predominantly explored, therefore hinting at the most promising use cases. Secondly, a variety of stakeholders involved in the studied projects are selected for semi-structured interviews, with the purpose of gathering qualitative insights about specific projects as well as about M4s as a whole, in terms of opportunities, barriers, business cases and business models from a technical, economical, strategic, and regulatory point of view. Finally, based on the previous mix of methods, an M4 use case is selected for a quantitative technoeconomic analysis. The combination of OWE and green hydrogen production is selected based on the share that this type of project represents in the total number of studied projects, as well as the opportunities and benefits it is expected to offer based on the conversations with stakeholders. The methodology followed for the case study is presented in detail in Chapter 5. 3.1 Systematic online review In order to identify ongoing M4 projects that fall outside of scientific literature, a systemic online search was conducted, adapting the systematic review methods utilized in the previously described literature review, and incorporating the principles described in [21] for the systematic review of grey literature through the use of online search engines. As a first step, a pre-screening was performed by typing the original search string from [19] into the Google search engine Search string: ((((ALL=energ*) AND ALL=(off$shore OR marine OR aquaculture) AND ALL=(multi$purpose OR multi$use OR multi$mod* OR platform OR mobil* )))) However, given that this is an approach that is typically fit for academic databases, the relevance of results for pre-screening was limited. Therefore, a second pre-screening search was performed by incorporating different combinations of search terms, taken from the main combinations of technologies identified in the literature review. In this stage, at least one relevant result was identified for each of the main combinations, which provided information as to the nature of the content to be found online regarding M4 projects, which mainly consisted of news articles and press releases. After all useful information was extracted from the pre-screening, a strategy for the main search was designed. A new consolidated search string was established, given that creating different search strategies for each possible combination may cause some combinations to be overlooked, as well as affecting the consistency of the search and creating an overwhelming volume of results for screening. This new search string differs from the one used in the literature review in two ways: 1) the word energy and its variations are removed from the search, because its inclusion leads to a great number of non-relevant results; 2) the keyword project is introduced given that it produces results directly related to ongoing projects in the field.
13 Furthermore, all identified technologies are included using Boolean operators, resulting in the following search string: Search string: offshore AND (multi-use OR wind OR aquaculture OR solar OR wave OR desalination OR tourism OR artificial reef OR hydrogen) AND project Once the search string is established, criteria for the inclusion of results into the review are defined. Firstly, only results related to ongoing projects were included. News articles referring to general targets, plans and intentions either by industry or government are excluded from the analysis. Secondly, projects regarding single use, i.e., the use of ocean space by only one of the researched industries are excluded. So too are projects which fulfil multiple uses within the same industry, such as multipurpose ships which fulfil different functions in the O&G sector. With the defined search string and inclusion and exclusion criteria, results from the Google search engine are screened in order of appearance, as this search engine produces results in order of relevance according to the input search terms. Each Google page produces ten results, and pages were screened until most results in one page were found to be no longer relevant and there was a high occurrence of results referring to projects identified in previous pages. Relevant results are then selected for coding and classification. Aside from the projects that are a direct result of the search, additional projects mentioned in the search results are included if deemed relevant. Following the screening stage, the selected projects were coded and classified based on the categories listed in Table 2. Table 2 Project coding categories Category Variable Project Name Name of project or involved organization Region Continent where project is located Specific Location Country where project is located Type Of Structure Floating, static or both Combination Combination of uses or technologies M-Degree M1 to M4 Energy Source Energy production technologies Stage Concept, pilot or operation Publication Year Year of publication of web result Within the stage category, projects are sorted into one of three stages. The concept stage refers to projects undergoing the planning and design phases and that have no physical infrastructure deployed at the moment of writing. The pilot stage consists of projects where physical infrastructure has been deployed at sea in the form of functional prototype tests or projects exploring combinations of mature technologies. Finally, operation refers to projects that are effectively in commercial operation. In total, 29 projects were identified as relevant to the scope of the study. The search results span the last five years (2019-2023) while 2022 presents the largest number of results. Only 3 results belong to the year 2023 given that the search was concluded in March of that year. Relevant results consisted mainly of press releases and news articles, and in a handful of cases they belong to online publications by the
20 farms with floating solar power plants, as well as the combination of floating offshore wind energy and wave energy. Other projects are instead in a design and planning stage, where technological designs have been produced and testing sites have been secured but no demonstrations are yet ongoing, such as is the case for hydrogen and Power-to-X projects. 4.2.2 Technical aspects In terms of technical aspects, the interview questions centered around understanding if there were any necessary technological developments that were needed to enable the development of the interviewee’s projects. These questions also had the purpose of determining if there were any innovations that were expected to emerge once these projects were deployed at commercial scale. A common theme that emerged among participants was that there are no major technological barriers as most, if not all, of the necessary equipment to carry out these projects already exist. There are however technologies that are still immature and therefore there is a pressing need for in-situ demonstration in order to move forward with commercialization. In the case of the combination of different renewable energy sources, conducting demonstrations while connected to the grid is expected to be an enabling development as it will produce reliable data on the combined functioning and integration of different technologies. A similar thing occurs when combining OWE and hydrogen production, with some equipment still needing third-party certification and the main technical challenges are expected to come from the development of the supply chain and hydrogen offtake. When discussing possible innovations that could emerge from the different projects and multi-use cases, a common thought among interviewees was that developments would mostly come from the areas of control and optimization. These developments could enable the operation of a multi-source farm with the simultaneous control of the different energy sources and optimizing annual energy production. Similar developments are expected in the area of offshore hydrogen production, where the integration of the different components will be crucial. Finally, in the case of combined wind energy and aquaculture, advances towards energy independent and automated aquaculture are expected. One consideration that stood out when conducting the interviews was that contrary to what is found in literature [3], the sharing of moorings and foundations might not be appealing for some stakeholders such as renewable energy developers and operators. Even if technically possible, the possible savings and efficiencies that could be derived from it do not seem to outweigh the possible structural and operational risks. Finally, in two interviews the aspect of modularity was addressed. In the case of wave energy, it was mentioned that there is a benefit in building modular farms made up of smaller WEC units, given that they are easier to build, transport and install, as well as making it easier to swap faulty units while the rest of the farm remains in operation. Additionally, it allows for reduced complexity and the use of smaller vessels in offshore maintenance operation, as well as having a smaller onshore infrastructure for onshore maintenance activities. In general, the inclusion of modularity into the design makes the projects more attractive in terms of O&M, since both costs and downtime are decreased, resulting in larger annual energy production. Finally, modular configurations allow for projects to be built in phases and to subsequently be scaled up in capacity, which was a benefit also mentioned for projects that combine floating OWE and hydrogen production. 4.2.3 Project planning and strategy The project planning and strategy questions were aimed at understanding the relationships between stakeholders and determining if any type of stakeholder played a more important role in enabling the
21 widespread adoption of ocean multi-use and M4 solutions. Additionally, this section had the goal of understanding where the potential for this type of project can be found, according to stakeholders involved in the field. The perception of which stakeholder plays a more important role in enabling their project or multi-use case varies significantly between interviewees and largely depends on the type of activity they perform. In the case of EU funded projects, no stakeholder is identified as playing a more important role than another, as they are all compelled to work together and are exposed to the challenges of other participants. When it comes to commercial deployment, however, one relationship that stands out is that between technology providers and project developers. Technology providers largely depend on project developers to test and deploy their equipment, as developers are the ones who participate in bids and have the financial capability to support these projects. On the other hand, developers rely on technology providers to develop and test their equipment, as a multi-use case simply would not exist if these technologies were not available. Unsurprisingly, partnerships between these stakeholders were found to be the most common. One category of stakeholder that was identified as important by all the interviewees are policymakers and regulators. They are perceived to play a central role in enabling multi-use projects because existing regulations are targeted to exclusive use of marine space and multi-use is not considered. For this reason, it is considered impossible to deploy commercial multi-use projects at the moment. There are also differences between interviewees regarding which combination offers the most potential given that, as expected, they largely perceived their own case as the most beneficial. In spite of this, the combination of different renewable energy sources stood out, followed by the integration of hydrogen production in OWF, and finally the combination of offshore renewables and aquaculture. When discussing which regions offered the most potential, the role of regulators was again highlighted, as it was frequently said that regions with local policy support will offer a clear advantage. 4.2.4 Economic aspects The interview questions on economic aspects had the goal of identifying the perceived advantages and disadvantages of the different cases, as well determining the level of uncertainty that is faced when developing a business case for multi-use projects and identifying which business models or business interactions offer the most benefits. Similarly to what was found in literature, the main economic advantages that would result from these projects would come from savings in operation and maintenance (O&M). In the case of the combination between OWE and aquaculture, the expected developments in automation would reduce the need for periodic maintenance and human operation. Additionally, the access to cleaner waters and better nutrients offshore is expected to increase the yield of aquaculture products, resulting in higher income and better project economics when combined with the expected O&M reductions. Savings in O&M are also expected when combining different RES, given that onshore infrastructure for maintenance facilities could be shared between different technologies. Savings could also come from the use of common maintenance fleets which would allow maintenance crews to perform different functions simultaneously. Alternatively, in the case of incorporating hydrogen production into OWF, the benefits differ depending on the case. When hydrogen production is incorporated as an offtake of excess electricity produced by the wind farm, the main economic benefits would come from the possibility to convert electricity that would otherwise be curtailed and sell it as hydrogen for different uses or convert it back to electricity which could be sold in periods of high electricity prices, or to provide services to the grid. Conversely, when OWE and hydrogen production are combined with the sole purpose of producing and selling
22 hydrogen, the main benefits would come as a result of the increased utilization rate of the electrolysers, which would result in a lower levelized cost of hydrogen (LCOH). In both cases, there was a difference of opinion among interviewees on whether it would be more beneficial to produce hydrogen offshore or onshore, given that it is still uncertain if the benefits that could be obtained by producing offshore would outweigh the additional costs and added complexity when compared to onshore production. When it comes to economic disadvantages, a common opinion was that most of these projects would require large CAPEX, which could deter investors in early stages as the projects will be perceived to have a higher risk than traditional investment. However, they suggest that this could be counteracted by building the projects in phases, and adding new capacity once the performance is proven, thereby derisking investment in these new projects. One common theme identified between all the cases is the high level of uncertainty that is involved when developing a business case for any of these projects. In the case of offshore wind and aquaculture, this uncertainty is mainly related to the fact that no large-scale demonstrations have been conducted and, in the case of small-scale applications, one interviewee attributes the uncertainty to the fact that there are no small-scale offshore wind farms in operation and few, if any, small-scale aquaculture farms. In the case of combinations of RES and the combination of OWE and hydrogen, it is possible to develop comparative business cases, but it is difficult to establish absolute values given that most technologies are still immature, and the lack of large-scale demonstrators means that there is still skepticism regarding the performance and survivability of certain technologies offshore. Finally, the convergence of maintenance schedules as well as other possible synergies have not yet been explored to a significant level of detail. 4.2.5 Policy and regulation In the case of policy and regulatory considerations, interviewees pointed out a series of key aspects that affect the development of their projects. In general, there is a common concern that there are a series of gaps in existing regulations, and in the cases where there are regulations in place, these are largely ineffective. One example is the case of OWE and hydrogen, which falls into a regulatory gap as current policies address either OW or O&G, and hydrogen falls in the middle, causing significant uncertainty. Conversely, in the case of projects combining different RES, regulations are clear and similar for each technology, but projects face significant delays due to cumbersome permitting processes, making the regulations inconsistent with national strategies and ineffective at achieving national goals. In that sense, the development of policies targeting multiple use of ocean space is considered as a crucial step in enabling its widespread adoption. At the moment, the Netherlands is the only country that has rolled out MU policies, but interviewees mentioned their involvement with authorities in different countries, with promising developments in Portugal, Ireland, and the Canary Islands in Spain. Regulators should develop policies targeting multi-use or leave maneuvering room when developing MSP policies, as mentioned by some interviewees. The case of the Netherlands serves as a good example, where the policy of “area passports” has been put in place in the Borssele OWF, dividing the farm into different areas and assigning it to different uses [24]. There was however a degree of skepticism among interviewees for this type of policy, as it carries the risk of arbitrary designations of space or technology choices. It was mentioned that in recent bids for OWF, authorities are including requirements for offshore solar and hydrogen production, without providing much justification, which could lead to forced coexistence without adequate evaluation.
23 4.2.6 Barriers The final set of questions of the interviews had the purpose of identifying, from the point of view of the involved stakeholders, the main barriers faced by M4 projects, as well as the actions that could be taken to counteract them. A recurrent theme was the lack of an enabling regulatory environment, as there are no policies which specifically incentivize the development of areas with multiple use of ocean space, with the previously mentioned exception of the case of the Netherlands. It was mentioned by one interviewee that the MSP policies currently in use around Europe took longer than a decade to develop, which would put the development of multi-use policies beyond the short-term plans of some countries. This lack of regulation could put countries with limited marine space at a disadvantage since the available space would fill up faster and cause them to miss out on valuable opportunities both for business and achieving environmental and economic goals. The other main barrier identified by stakeholders was the immaturity of the technologies involved in most M4 projects. The immaturity of supply chain and markets was also cited for the case of hydrogen production. Given that there are currently a limited number of test sites, the demonstration of these technologies is one of the most pressing concerns, as the bankability of these projects remains uncertain. To address these concerns, the consensus among interviewees was that marine multi-use should be incorporated into regulations, and that there should be engagement with policymakers by all types of project stakeholders in order to share experiences and develop common technical and regulatory standards. In that sense, the case of the Netherlands could serve as an example, but it will be interesting to see the developments in other countries. In the case of hydrogen production offshore, it was pointed out that policy support is needed to ensure that the technology competes on a level playing field with electricity. This is because at the moment, bids for OWF areas are mostly awarded based on electricity price, without taking into account the end-to-end costs associated with both technologies, such as the need to increase the capacity of onshore transmission grids to accommodate the new electricity that will be produced. If these end-to-end costs were taken into consideration, together with a clear understanding of which sectors could be decarbonized by either electricity or hydrogen in each case, the competition between the technologies would be more objective. In the meantime, an increase in the number and size of demonstrators is understood as the most effective short-term measure, as it would create a wealth of reliable data about the performance, costs and overall benefits of these projects. This would in turn reduce the uncertainty of the business case, de-risk new technologies, bring further investments and make a clear case for the development of an enabling regulatory environment.
24 5. Case study: Hydrogen production from offshore wind energy As mentioned in Chapter 1, upon conclusion of the online review and stakeholder interview stages, a case study was performed to quantitatively assess a technology combination identified as promising according to the results of the previous stages. This chapter presents the context and relevance of said case study within this project followed by a description of the methodology that was used. Finally, the obtained results are presented and discussed. 5.1 Context In Section 4.1, the results of the online review clearly show that 11 out of 30 reviewed projects belong to the combination of OWE and hydrogen production, with projects at different stages of development showing that there is indeed a clear intention to develop this combination further and deploy it at commercial scale. Moreover, the stakeholder interviews conducted during the second phase of the project further validate these findings. The production of hydrogen from electrolysis with electricity fed directly from an OWF was mentioned by interviewees as either a complement for electricity production where excess electricity could be used to produce hydrogen, or as an alternative to electricity as a final product, where the electricity produced by the farm is entirely dedicated to the production of hydrogen. In both cases, there exists the option to produce hydrogen either onshore or offshore, with different options to transmit either the electricity or the hydrogen. Given the scope of this project and given the fact that all the identified projects belonging to the combination of OWE and hydrogen production consist of offshore production, it is relevant to assess this configuration. Furthermore, as mentioned in Section 4.2.1, there was a difference of opinion among interviewees on whether offshore production was truly more beneficial than the onshore alternative, indicating that it would be useful to compare the two options. Finally, one of the identified projects consisted of not only producing hydrogen offshore, but in doing so directly on the platforms of floating offshore wind turbines, in a decentralized manner, and transporting the hydrogen to shore via pipeline. This additional configuration brings with it an added dimension of modularity, making it especially relevant in the context of the M4 solutions being studied in this project. As previously mentioned, the main differences between the production alternatives lie in the location (onshore or offshore) and the transmission infrastructure. In the case of offshore production, the most commonly explored configuration is to transmit the electric power to shore by means of a high voltage direct current cable (HVDC), whereas in the case of offshore production, the most commonly explored alternative is that of transporting the hydrogen to shore in compressed gas form by means of a dedicated pipeline, while options to transport it in the form of liquid hydrogen, ammonia or liquid organic hydrogen carriers (LOHC) also exist. Each strategy has its own associated challenges and costs. For example, HVDC systems are expensive due to the cost of the cables and the necessary converter stations. Conversely, according to some authors, hydrogen pipelines have a higher cost per unit length, but possess larger energy transmission capacity, resulting in lower normalized costs when transmitting the same energy [25]. Studies such as those by [26] and [27] assess the different production strategies while accounting for these differences, while other studies simply evaluate one strategy for a specific region or project, such as [28] and [29]. One shared characteristic between these studies, especially those centered around production strategy comparisons, is that they do not take into consideration the effect that the size of the wind farm
25 could have on the viability of the different strategies and on which strategy could be more beneficial. For example, the increase in electricity generation and in corresponding hydrogen production could justify the additional costs that would stem from the installation of a complex transmission infrastructure. Therefore, a technoeconomic analysis was designed to comprehensively evaluate and compare the different configurations of hydrogen production from offshore wind energy encountered during the previous stages of this project. The analysis is based on the different factors that define each hydrogen production strategy and has the aim of evaluating the effect that the sizing of the wind farm can have on determining which strategy is more beneficial. The following sections of this chapter describe the methodology used to carry out this analysis, as well as the obtained results and corresponding discussion. 5.2 Methodology To carry out this analysis, three scenarios were developed to compare the different production strategies. In the first scenario (Scenario 1 – Onshore hydrogen production) electricity produced by the OWF is converted to DC by a Voltage Source Converter (VSC) in an offshore substation, is transmitted to shore via an HVDC cable and is then fed to an electrolyser to produce hydrogen. The second scenario consists of offshore hydrogen production and is divided in two: in Scenario 2.1 (Centralized hydrogen production), the electricity from the OWF is also converted to DC but is fed to a centralized electrolysis plant located in an offshore platform in the vicinity of the wind farm. This platform contains the power converter, a desalination unit, an electrolyser, a stand-by battery to serve as backup when the electrolyser is in stand-by mode, a storage unit and a compressor. The compressed hydrogen is then transmitted to shore via a dedicated pipeline. Finally, in Scenario 2.2 (Decentralized hydrogen production), hydrogen production takes place at each of the wind turbine platforms. In this scenario, all the components of the electrolysis plant are present in each platform except for the storage unit and the compressor, which remain in a separate centralized platform from which the hydrogen is sent to shore via pipeline just as in Scenario 2.1. Figure 10 Case study scenarios
26 For the purpose of the calculations performed in this study, the centralized platforms or substation were located 2 km from the wind farm. Figure 10 provides a graphic description of the three studied scenarios, which can also be found in Appendix D in a larger format. All scenarios were evaluated based on the levelized cost of hydrogen (LCOH) for 20 different wind farm sizes ranging from 100MW to 2GW. The levelized cost of hydrogen is a measure that indicates the cost of producing 1 kg of hydrogen by considering the total amount of hydrogen produced over the lifetime of a project or plant, and the total costs incurred in the same period. The LCOH is calculated according to the following Equation: 𝐿𝐶𝑂𝐻=∑𝐶𝐴𝑃𝐸𝑋+𝑂𝑃𝐸𝑋 (1+𝑟)𝑖 𝑇𝑖=0∑𝑀𝐻2,𝑖 (1+𝑟)𝑖 𝑇𝑖=0 ( 1) Where T is the project lifetime, r is the discount rate and MH2 is the annual amount of hydrogen produced, in kg. 5.2.1 Offshore wind farm The next necessary step to conduct this analysis was to identify a feasible production site, for which the previous stages of the project were especially helpful. During the online review stage, the North Sea was identified as an area of concentration of this type of projects, and the stakeholder interviews further highlighted this as an area of particular interest. Moreover, one of the projects studied during both stages, which aims to build floating OWFs dedicated to the production of hydrogen directly on each floating platform, is planned to start off the coast of Scotland, having not yet secured a location for commercial operation. To have a more concrete case to base the calculations on, a wind farm was chosen from the list of ScotWind projects, the latest offshore wind leasing round by Crown Estate Scotland. The chosen project is the Campion Wind OWF which is co-owned by Shell and Scottish Power and will be located 100km off the coast of Peterhead, Scotland, with an installed capacity of 2 GW. Since the average water depth in the site is around 77 m, the wind turbines will have to be installed on floating platforms. Figure 11 shows the location of the projects in the ScotWind leasing round, where Campion Wind is identified with the number 4 [30].
27 Figure 11 Map of ScotWind lease areas [30] Once the location was chosen, hourly wind speed data of the site was collected from [31] for the year 2022. Then, to calculate the hourly power output of each of the wind farm sizes, it was necessary to select a specific wind turbine model. Given that the largest wind turbine currently in operation in a floating platform is the Vestas V164 – 9.5 in the Kincardine OFW, this model was chosen for the analysis. Figure 12 shows the power curve of the chosen wind turbine model [32]. Figure 12 Power curve of Vestas V164 - 9.5 wind turbine The wind speed data of the site, which was obtained for a reference height of 50m, is adjusted for a hub height of 105 m chosen for the turbine, according to Equation 2. Then, the power output of the farm can be obtained by adding the power output of each turbine, as per Equation 3. The power output of each wind farm size can then be obtained by simply increasing the number of turbines.
28 𝑈𝑤𝑖𝑛𝑑=𝑈ℎ𝑟𝑒𝑓(𝑍𝐻 𝑍ℎ𝑟𝑒𝑓)𝑎 ( 2) 𝑃𝑓𝑎𝑟𝑚(𝑡)=∑𝑃(𝑈𝑤𝑖𝑛𝑑)𝑖 𝑁𝑇 𝑖=1 ( 3) In Equation 2, Uwind represents the wind speed at the turbine hub height, Uhref is the wind speed at the reference height, ZH is the hub height, Zhref is the reference height and a is the Hellman coefficient, taken as 0.15 in this case [33]. In Equation 3, Pfarm(t) represents the hourly power output of the farm, NT is the number of turbines and P(Uwind) is the power output of each turbine, which will vary in each hour depending on the wind speed. Figure 13 shows the hourly power output of one turbine for an entire year. Figure 13 Hourly electricity generation over 1 year in the selected site 5.2.2 Component sizing and costs Once the power output of the farm is calculated, the next step is to size the components of the electrolysis plant, as well as the transmission infrastructure used in the different scenarios, and to calculate the investment and operational costs of said components. AC/DC Converter The first considered component is the power converter, taken in this case as a VSC converter. The rated power of the converter is the same as the rated power of the wind farm, and the losses are assumed as 1.5% according to [26]. The investment cost of the converter is taken from [34], and is calculated according to Equation 4, where CVSC is the investment cost in M€ and Pfarm is the rated power of the wind farm, in MW. 𝐶𝑉𝑆𝐶=0.1437∙𝑃𝑓𝑎𝑟𝑚 ( 4)
29 HVDC Cable Given that in Scenario 1, hydrogen is produced from electricity transmitted through an HVDC cable, this component needs to be sized, and its losses need to be accounted for when calculating the amount of produced hydrogen. Similarly to the power converter, the rated power of the HVDC cable is that of the wind farm, and the losses are taken as 0.3% per 100km of cable. The investment cost of the power converter is calculated according to [34] using Equation 5, where Pcab is the rated power of the cable and CHVDC is the investment cost, expressed in M€/km. 𝐶𝐻𝑉𝐷𝐶=1.452∙(1.31∙10−7∙𝑃𝑐𝑎𝑏 2+1.47∙10−4∙𝑃𝑐𝑎𝑏+0.29+0.85) ( 5) Electrolyzer For this analysis, a PEM electrolyser was chosen due to its high operational flexibility and quick ramp-up and ramp-down times. PEM electrolysers operate at high current densities and in a wide range of temperatures, which allows them to adjust to variable power levels within seconds and makes them especially suitable for hydrogen production from variable renewable electricity sources [35]. To size the electrolyser, the theoretical hydrogen production that could be obtained in every hour is calculated from Equation 6, where Eelec is the theoretical electricity consumption of the electrolyser in kWh/kg, ηconv is the conversion efficiency and Eaux is the consumption of the additional components in the electrolysis plant, which are the desalination unit and the compressor. 𝑊𝐻2𝑡ℎ𝑒𝑜𝑟𝑒𝑡𝑖𝑐𝑎𝑙(𝑡)= 𝑃𝑓𝑎𝑟𝑚(𝑡) 𝐸𝑒𝑙𝑒𝑐 𝜂𝑐𝑜𝑛𝑣+𝐸𝑎𝑢𝑥 ( 6) Then, the size of the electrolyzer can be obtained by multiplying the electricity consumption by the maximum theoretical hourly hydrogen production (Equation 7). 𝑃𝐻2,𝑝𝑙𝑎𝑛𝑡≤𝑚𝑎𝑥𝑊𝐻2𝑡ℎ𝑒𝑜𝑟𝑒𝑡𝑖𝑐𝑎𝑙(𝑡)∙𝐸𝑒𝑙𝑒𝑐 ( 7) In order to maintain efficient operation and to preserve the lifetime of the PEM stack, a value of 5% of the rated power of the electrolysis plant, Plow, was chosen as a lower threshold for the operation of the electrolyser. PEM electrolysers typically have a minimal load between 0% and 10% of the rated power, and this is mainly due to gas purity and safety concerns associated with gas crossovers that occur inside the electrolyser [36]. When the power output of the wind farm is larger than the energy demand of the electrolyser and additional components of the plant, the hydrogen production would depend exclusively on the electrolyser’s electricity consumption and conversion efficiency. Equation 8 summarizes the operation of the electrolyser based on the power output of the wind farm [37].
36 Figure 15 Annual hydrogen production for all scenarios - 2 GW WF size The annual hydrogen production for all scenarios stands around 130 thousand tons of compressed hydrogen per year. With Scenario 1 standing at 130930 t/y, Scenario 2.1 at 130510 t/y and Scenario 2.2 at 130060 t/y. The differences between scenarios are not particularly significant, given that between the highest yielding scenario and the lowest there is a mere difference of around 0.7%. These differences are mainly due to the fact that there are larger losses assumed for the hydrogen pipelines than for the HVDC cable, as shown in Table 3. Studies such as [26] assume losses of around 0.01% in the hydrogen pipeline, considerably less than what considered in this study, which is based on assumptions from [45]. One additional factor that results in the differences in annual hydrogen production is the fact that in Scenario 1 there is no desalination unit, and therefore more electricity from the wind farm is available for use in the electrolyser. The chosen lifetime for the project was 30 years, which means that over the entire period, Scenario 1 would produce 12600 tons of H2 more than Scenario 2.1 and 17100 tons of H2 more than Scenario 2.2. Even if these values appear considerably large, the relative differences are almost insignificant in percentual terms, with Scenario 1 producing 0.32% more than Scenario 2.1 and 0.44% more than Scenario 2.2. One factor that could affect the annual hydrogen production was not considered in this study, and that is the difference in maintenance downtime that could exist between the different configurations. For example, a hydrogen pipeline might need more maintenance than an HVDC cable, which would result in lower lifetime production for Scenarios 2.1 and 2.2. Additionally, when comparing Scenarios 2.1 and 2.2, the fact that there would be an electrolysis plant in each turbine means that there would be a considerably larger number of components to maintain which would also reduce the lifetime hydrogen production. This could however be counteracted by the fact that a modular configuration would mean that if one electrolysis plant fails, the rest could continue with normal operation. Estimating these downtimes was considered out of the scope of this study, as there are currently no hydrogen pipelines built from an offshore wind farm to shore, as well as modular hydrogen producing wind farms such as those studied in Scenario 2.2, and any estimation of these downtimes would at best consist of a guess.
37 Investment costs Another major component of the LCOH calculation are the investment costs, or CAPEX (capital expenditures) of the project. The total CAPEX of the three Scenarios was calculated by adding the CAPEX of each of the components. The total investment cost for the three studied scenarios is presented in Figure 16. Scenario 1 is the largest with a total of 1567.9 million €, which 2.6% higher than Scenario 2.2 with a total investment of 1528.3 million €. When comparing with Scenario 2.1, the difference is more pronounced, with the CAPEX of Scenario 1 being 11.7% higher than for Scenario 2.1 which stands at 1404 million €. Figure 16 Investment cost for all scenarios - 2 GW WF size The investment cost of each scenario can be expressed in terms of each component in order to determine which of these has the most influence in terms of the total CAPEX. The major differences in components are that Scenario 1 requires no desalination unit and transmits electricity to shore via an HVDC cable, while Scenarios 2.1 and 2.2 transmit hydrogen to shore via a hydrogen pipeline, require desalination units (1 in Scenario 2.1 and 211 in Scenario 2.2), and platform adaptations in the case of Scenario 2.2. Figure 17 shows the investment cost expressed in terms of the components present in each Scenario. The electrolyser is the most expensive component, with a cost of around 608.34 million € in all scenarios, as it is sized according to the maximum theoretical production. The cost of the electrolyser represents 38.8%, 43.3% and 39.8% of the investment cost of Scenarios 1, 2.1 and 2.3 respectively. Another component common in all scenarios is the power converter, necessary to convert the alternating current coming from the wind farm into direct current used for the electrolysis plant. The cost of the VSC (voltage source converter) stands at around 288 million €, representing 18.4%, 20.5% and 18.8% of the total investment cost of the respective scenarios. Similarly, the storage unit is present in all three scenarios, with a value of around 154 million €, and representing roughly 9.8%, 11% and 10% respectively. This shows that the storage unit is a relatively expensive component, especially considering that it was sized to contain 1 day of maximum hydrogen production.
38 Figure 17 Investment cost per component - 2 GW WF size The differences in investment costs become more evident when the different energy transmission components are evaluated. The HVDC cable present in Scenario 1 has a CAPEX of 175 million €, whereas the hydrogen pipeline present in the remaining scenarios has a CAPEX of 115 million €, meaning that it costs 34.5% less. This results in the HVDC cable representing 11.2% of the total investment cost in Scenario 1, while the hydrogen pipeline represents 8.17% and 7.52% of the total CAPEX of Scenarios 2.1 and 2.2 respectively. Another difference in energy transmission components is the fact that in Scenarios 1 and 2.1, electricity from the wind farm is transmitted to the VSC converter through interarray AC cables. Conversely, in Scenario 2.2 inter-array pipelines are present to bring the hydrogen produced in each floating turbine platform to the centralized storage and compression platform. The cost of these components however is similar, at around 0.5 million €/km, and therefore does not represent a major difference in the investment costs. As previously mentioned, Scenario 2.2 requires adaptations for each floating platform to accommodate the electrolysis plant. For a 2 GW wind farm, these adaptations add a considerable investment cost of 137 million €, which represents 8.9% of the total investment cost of Scenario 2.3. The increase in costs due to the platform adaptations and the losses in the hydrogen pipeline are what ultimately contribute to Scenario 2.3 having the highest LCOH. Finally, components such as the stand-by battery, desalination unit and compressor do not represent a significant cost when compared to the components previously described, and therefore have virtually no effect on the total investment cost and LCOH of the system. Total costs In order to fully understand the costs affecting the LCOH, the total costs of the system over the entire lifetime of the project are evaluated. Aside from the CAPEX, the other cost components of this project would be the O&M costs, the replacement cost of the electrolyser stack and the compressor, and the electricity costs incurred when running the equipment. The lifetime costs in the 30 years of operation of the project are presented in Figure 18 for each of the studied scenarios. The total costs of the three scenarios are similar and are all within the range of 23 billion €. Scenario 1 presents the largest total cost at 23.24 billion €, while Scenarios 2.1 and 2.2 respectively stand at 23.1 and 23.23 billion €. The total costs found in this study are in a similar range to what is found in [26], where the total costs for a hydrogen
39 production system in a 1.3 GW OWF range from 22.2 billion € for centralized offshore hydrogen production and transmission via pipeline, and 25 billion € for HVDC electricity transmission and onshore hydrogen production. There are some parameters affecting these results. The electricity cost represents the largest share of the total cost of the system, given that for this case study, all the electricity coming from the wind farm is being used to produce hydrogen, and there is no grid connection which would allow to sell the electricity that is not being used when the output of the farm falls under the lower operational threshold of the electrolyser. The electricity costs add up to 21.1 billion €, representing roughly 90.1% of the total costs of Scenarios 1 and 2.2 and 91.8% in the case of Scenario 2.1. This percentage is considerably higher than what is typically expected, as the electricity cost is expected to constitute around 75% of the LCOH when hydrogen is produced from PEM electrolysis [47]. As shown in Table 3, an LCOE of 67.29 €/MWh was used for this study, which is the global average for offshore wind projects globally [46]. This LCOE average is mainly made up of bottom-fixed turbine projects, however it was assumed that by the commissioning date of this wind farm (2028) the cost of floating offshore wind electricity could reach the same value as that of bottom-fixed. Figure 18 Total lifetime costs – 2 GW WF Size The share that the rest of the cost items represent of the remaining share of the total costs can barely be observed in Figure 18, for this reason the total costs are represented in Figure19 without the electricity costs, allowing to distinguish between the different cost components and to visualize the difference between scenarios. In Scenario 2.1, CAPEX represents 73.5% of the total costs when electricity costs are not considered, while O&M costs represent 19.1% and the replacement costs represent 7.4%. As previously seen, the CAPEX is lower in Scenario 2.1, which is why it represents a lower share, standing at 70% of the total costs excluding electricity. Meanwhile, O&M costs represent 22% and replacement costs represent 7.9%. Finally, in Scenario 2.2, CAPEX represents 71.8%, O&M represents 20.7% and replacements represent 7.5% of the total costs when electricity costs are excluded.
40 Figure 19 Total lifetime costs excluding electricity costs - 2 GW WF Size Given that the desalination unit is assumed to last for the entire lifetime of the project, the replacement costs remain the same throughout all scenarios. If that wasn’t the case, Scenarios 2.1 and 2.2 would naturally have an increase in replacement costs, which would however not be significant given that, as seen previously, the CAPEX of the desalination unit is barely noticeable when compared to the other CAPEX elements. Finally, there is a slight difference in O&M costs, due to the fact that in Scenarios 2.1 and 2.2 the O&M of the desalination unit is considered, whereas in Scenario 1 this is replaced by the cost of freshwater. Table 4 provides a summary of the results obtained in the studied scenarios. Table 4 Summary of technoeconomic analysis results Scenario 1 Onshore production Scenario 2.1 Centralized offshore production Scenario 2.2 Decentralized offshore production LCOH (€/kg) Highest 7.67 6.51 6.58 Lowest 5.99 5.93 6 2 GW wind farm Rated power (MW) 2004.5 Hydrogen production (t/y) 130930 130510 130060 Lifetime costs CAPEX (billion €) 1.57 1.4 1.57 O&M (billion €) 0.41 0.44 0.44 Electricity (billion €) 21.1 Replacement CAPEX (billion €) 0.16 Total costs (billion €) 23.2 23.1 23.2 Sensitivity analysis In order to evaluate the effect that different cost elements would have on the final value of LCOH, a sensitivity analysis was conducted. Given that Scenario 2.1 (Centralized Offshore Production) presents the lowest LCOH and is the preferred scenario, the sensitivity analysis presented here is for this scenario alone.
41 As seen in the previous subsection, the cost of electricity represents most of the total costs of the project and therefore exerts a high influence in the value of LCOH, regardless of the scenario that is chosen. In order to evaluate this in more detail, a sensitivity analysis is conducted by varying the value of the LCOE and calculating the corresponding LCOH while maintaining all other variables unchanged. The values of LCOE were changed from 50% to 150% of the original value (equivalent to 100% in Figure 20). The sensitivity to the wind farm’s distance from shore was also analyzed, given that it has a direct impact on the energy transmission components which, as seen previously, represent the largest share of CAPEX after the electrolyser. It is also useful to evaluate the effect of the distance from shore, given that this is a variable parameter for every wind farm. The map of the ScotWind lease areas shown in Figure 11 shows the location of all the projects that were part of the leasing round, and it can be seen how the distance from shore will vary from project to project. In a similar manner to the LCOE analysis, the distance from shore was changed while keeping all other variables unchanged. Since the effect of the change in distance from shore would affect the CAPEX, and this represents around 7% of the total costs, the range of values used for the distance from shore was larger than the one used for the LCOE analysis. The selected range was between 40% and 500% of the original distance from shore. Figure 20 shows the results of the sensitivity analysis for Scenario 2.1. Figure 20 Sensitivity to LCOE and distance from shore - Scenario 2.1 (2 GW WF size) As expected, the LCOH is highly sensitive to the LCOE. When a change of 50% of the value of LCOE is made, a resulting change of 50% is observed in LCOH, constituting a 1:1 relationship. The LCOH goes from 2.93 €/kg for an LCOE of 33.65 €/MWh, to 8.8 €/kg for an LCOE of 100.94 €/MWh. The effect of the distance from shore is minimal when compared to that of the LCOE, as the LCOH changes from 5.88 €/kg to 6.26 €/kg in the range of 40km to 500km, representing a change of LCOH of 6.5%, for a change in distance from 40% to 500% of the original value. Another parameter chosen for a sensitivity analysis was the cost of the platform adaptations needed in Scenario 2.2. This is because the assumed cost is highly uncertain, as there are currently no built prototypes for this configuration. The cost was taken as a fraction of the cost of a WindFloat floating platform since this platform is expected to be used for this type of hydrogen production system. In order to evaluate the sensitivity of LCOH to changes in this parameter, a range of 50% to 150% of the original value was used, while keeping other variables unchanged. The results are shown in Figure 21.
42 Figure 21 Sensitivity to platform adaptation cost - Scenario 2.2 (2 GW WF size) The results show that for the selected range, the LCOH is not particularly sensitive to the change in platform adaptation costs. A reduction of 50% of the cost would result in a 0.65% reduction in LCOH, while a 50% cost increase would result in a 0.66% increase in LCOH. Effect of distance from shore on choice of production strategy As seen in the sensitivity analysis, the distance from shore does not have a significant impact on the value of LCOH for the selected case. However, since the main goal of this case study was to compare the LCOH of the different hydrogen production strategies across a range of wind farm sizes, it is interesting to determine if a change in the distance from shore would affect the choice of preferred strategy in any of the studied wind farm sizes. For this purpose, two additional distances from shore were introduced: 50 km and 200 km, representing 50% and 200% of the original value, respectively. Then the calculations of LCOH were performed for the entire range of wind farm sizes for each of these distances and the results were compared to those obtained in the original case. The results of these calculations can be seen in Figure 22.
43 Figure 22 LCOH vs WF Size for different distances from shore The results show that for a distance of 40 km, Scenario 1 would have a lower LCOH than Scenario 2.2 for farm sizes larger than 500 MW, which changes the relationships between strategies, as in the original case, Scenario 1 has lower LCOH only when reaching 2 GW. In the case of a 200 km distance, the relationship between the scenarios remains unchanged when compared to the original case, with the exception that Scenario 1 has a higher LCOH even for a 2 GW farm size. Given that for a distance of 40 km from shore, wind farms would typically be of the bottom-fixed type, this result cannot be directly applied to this case study, as it was conducted for a floating OWF. Finally, it is worth noting the distance from shore does have an impact on the LCOH in the lower ranges of wind farm size, and this could be due to the fact that the large investments made in transmission infrastructure for both electricity and hydrogen would not be compensated by the amount of hydrogen that is produced over the lifetime of the project.
44 6. Discussion This chapter presents a discussion of the results that were obtained during the three phases of the project, namely, the systematic online review of marine, multifunctional, modular and mobile (M4) projects, the interviews with relevant stakeholders and the technoeconomic analysis performed in the case study. 6.1 Systematic online review The systematic review of online information on M4 projects provided a measure of the quantity, status and individual characteristics of currently ongoing projects. The classification of these projects into the different subcategories provides an indication of the general status and direction that multi-use marine platforms are taking. Characteristics such as energy sources and use combinations, deployment stage, and geographical distribution were found to be amongst the most useful to describe the outlook for M4 projects. The online nature of the review meant that the information that was retrieved belonged for the most part to news articles or press releases from which further information was extracted through the review process. Given that utility-scale projects in which large organizations are involved predominantly gather media attention, a large portion of the results were obtained from announcements made for these types of large-scale projects. However, rather than showing that the benefits of M4s are exclusive to large-scale applications, these results simply indicate that the efforts being made to deploy M4s at this scale are generating the most announcements and therefore gathering most attention. As mentioned in the introduction and background sections, the benefits of M4s could be particularly useful for island and remote coastal communities, where large, utility-scale projects are unlikely to be located as these locations do not represent points of significant demand for services such as energy. However, only two of the 30 reviewed projects were focused on local applications. These were the MUSICA and the AquaWind project, both of which are EU-funded projects. The low occurrence of small-scale projects among the results of the online review could indicate that these solutions are currently not being deployed or explored at length in these settings or could simply show a limitation in the used review method in detecting the occurrence of this category of projects. A modification of the used method or the definition of a new method, focused exclusively on this category, could be useful in identifying the status of M4s in these settings. One additional consideration that should be made is that the concepts of marine multi-use, multi-purpose platforms and M4s are not frequently used outside of the academic environment, and therefore in order to identify relevant projects, a search string was designed to find projects related to the technologies that make up these solutions. Once the search string was defined, detailed examination of the search results was needed to determine if the projects could be included within the M4 framework. Finally, the concentration of projects in the northern hemisphere, and particularly around the area of the North Sea, is intrinsically tied to the fact that a large fraction of the reviewed projects are linked to the offshore wind energy industry, where this area plays a central role due to the high availability of renewable energy resources and its proximity to large energy demand centers in Europe. This result is in line with the findings of the literature review conducted by [19], where a similar geographic concentration was found in academic studies. Therefore, the online review did not significantly modify the perspective when it comes to the geographical distribution of M4 solutions.
45 6.2 Stakeholder interviews The results of the interview phase provide insight into the field of M4s from the point of view of stakeholders involved in currently ongoing projects. The methodology followed during the semistructured interviews made identification of common themes and perspectives possible. One of such themes is the fact that technological developments are not perceived as major challenge or barrier when it comes to the discussed projects. Even though the involved technologies are at different stages of commercialization, most of them have been demonstrated to work in their own specific application, as for example shown by the demonstrators performed by Oceans of Energy [48] and Corpower [49], for floating offshore solar and wave energy, respectively. However, challenges remain when it comes to combining different technologies to work together at sea, and there is therefore an overarching focus on demonstration. This focus on demonstration was expressed in all interviews, as it is the final step before commercial deployment of M4 projects can take place. There was also a common understanding when it came to the possible economic benefits that M4 projects could bring. These were in large part related to savings in O&M costs that came with combining different technologies or commercial offerings, improvements in energy yields due to the complementarity of different renewable energy sources, and increased revenues due to reductions in electricity curtailment. Even though the nature of economic benefits is clear, there is still a high degree of uncertainty regarding the absolute values that such benefits could amount to, which at the moment results in uncertain business cases. This reiterates the need for commercial scale demonstration projects, which would enable project developers to accurately quantify expenses and reduce financial uncertainty and risk. Such projects could consist of collaborations between large project developers and technology providers, where the developers can offer their project sites for testing as well as providing much needed funding. The benefit for developers would lie in accelerating the development of technologies that will in the future be incorporated into their projects and improve their commercial offerings and revenues. Demonstrator projects could also take place as part of research and innovation government funded programs. The EU Scores project, found in the results of the project mapping, stands out as an example of privately led projects, whereas the UNITED project, mentioned in Section 2, constitutes a good example of a government funded initiative. Finally, another common theme identified across interviews is the existence of regulatory gaps and the fact that existing policies fail to provide a clear regulatory framework for M4 projects. Current MSP regulations tend to separate marine areas for different uses and do not contemplate the coexistence of different marine based industries in a single space, which creates significant uncertainty for M4 project developers. Consequently, the lack of an enabling regulatory environment is cited as the main barrier M4 projects face nowadays. The reason for the existence of such regulatory gaps could lie in the fact that M4 solutions are a new development in the field of marine-based activities, as evidenced by the early-stage state of most projects. For this reason, the formulation of specific policies and regulations could face some uncertainties of its own, as there is still no definitive idea of how the sector will develop. 6.3 Case study The technoeconomic assessment of hydrogen production from dedicated offshore wind energy established a comparison of different hydrogen production strategies based on the levelized cost of hydrogen (LCOH) The location chosen for this analysis was that of the Campion Wind project off the coast of Scotland, where a 2 GW wind farm is expected to be commissioned in 2028.
52 [18] S.-L. Billing et al., “Combining wind power and farmed fish: Coastal community perceptions of multi-use offshore renewable energy installations in Europe,” Energy Res. Soc. Sci., vol. 85, p. 102421, Mar. 2022, doi: 10.1016/j.erss.2021.102421. [19] M. Xylia, M. Vieira Passos, T. Piseddu, and K. Barquet, “Exploring multi-use platforms: a literature review of marine, multifunctional, modular, and mobile applications (M4s),” Heliyon, vol. 9, 2023, doi: https://doi.org/10.1016/j.heliyon.2023.e16372. [20] G. Salton and C. Buckley, “Term-Weighting Approaches in Automatic Text Retrieval,” Inf. Process. Manag., vol. 24, no. 5, pp. 513–523, 1988. [21] K. Godin, J. Stapleton, S. I. Kirkpatrick, R. M. Hanning, and S. T. Leatherdale, “Applying systematic review search methods to the grey literature: a case study examining guidelines for school-based breakfast programs in Canada,” Syst. Rev., vol. 4, no. 1, p. 138, Dec. 2015, doi: 10.1186/s13643-015-0125-0. [22] IRENA, “Renewable Capacity Statistics 2023,” 2023. Accessed: Apr. 04, 2023. [Online]. Available: https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/- /media/Files/IRENA/Agency/Publication/2023/Mar/IRENA_RE_Capacity_Statistics_2023.p df?rev=b357baf054584e589c8ab635140d0596 [23] Wind Europe, “Europe can expect to have 10 GW of floating wind by 2030,” Feb. 06, 2022. https://windeurope.org/newsroom/news/europe-can-expect-to-have-10-gw-of-floating-wind- by-2030/ (accessed Apr. 04, 2023). [24] Nordzeeloket, “Borssele wind farm zone,” Borssele wind farm zone, 2023. https://www.noordzeeloket.nl/en/functions-and-use/offshore-wind-energy/free-passage- shared-use/borssele-wind-farm-zone/ (accessed Jun. 30, 2023). [25] B. Miao, L. Giordano, and S. H. Chan, “Long-distance renewable hydrogen transmission via cables and pipelines,” Int. J. Hydrog. Energy, vol. 46, Apr. 2021, doi: 10.1016/j.ijhydene.2021.03.067. [26] A. Giampieri, J. Ling-Chin, and A. P. Roskilly, “Techno-economic assessment of offshore wind- to-hydrogen scenarios: A UK case study,” Int. J. Hydrog. Energy, p. S0360319923006316, Feb. 2023, doi: 10.1016/j.ijhydene.2023.01.346. [27] G. Calado and R. Castro, “Hydrogen Production from Offshore Wind Parks: Current Situation and Future Perspectives,” Appl. Sci., vol. 11, no. 5561, Jun. 2021, doi: https://doi.org/10.3390/app11125561. [28] K. Lindblad, “An economic feasibility study of hydrogen production by electrolysis in relation to offshore wind energy at Oxelösund.” 2019. [Online]. Available: http://www.divaportal.org/smash/record.jsf?pid=diva2%3A1372873&dswid=2852 [29] N. Lundvall, “MODELLING HYDROGEN PRODUCTION FROM OFFSHOREWIND PARKS A Techno-Economic Analysis of Dedicated Hydrogen Production.” Jul. 06, 2022. [Online]. Available: http://mdh.divaportal.org/smash/record.jsf?aq2=%5B%5B%5D%5D&c=23&af=%5B%5D&searchType=LIST _LATEST&sortOrder2=title_sort_asc&query=&language=sv&pid=diva2%3A1677797&aq=%5 B%5B%5D%5D&sf=all&aqe=%5B%5D&sortOrder=author_sort_asc&onlyFullText=false&no OfRows=50&dswid=-1687 [30] Crown Estate Scotland, “Map of Option Areas,” ScotWind Awarded Sites, Jan. 17, 2022. https://www.crownestatescotland.com/resources/documents/scotwind-map-of-option-areas- 170122 [31] NASA, “POWER | Data Access Viewer,” NASA Data Access Viewer, 2023. https://power.larc.nasa.gov/data-access-viewer/ (accessed May 22, 2023). [32] TheWindPower, “Vestas V164/9500 - Manufacturers and turbines - Online access - The Wind Power,” V164/9500, 2023. https://www.thewindpower.net/turbine_en_1476_mhi-vestas- offshore_v164-9500.php (accessed May 24, 2023). [33] G. Gualtieri and S. Secci, “Methods to extrapolate wind resource to the turbine hub height based on power law: A 1-h wind speed vs. Weibull distribution extrapolation comparison,” Renew. Energy, vol. 43, pp. 183–200, Jul. 2012, doi: 10.1016/j.renene.2011.12.022.
53 [34] V. Timmers, A. Egea-Àlvarez, A. Gkountaras, R. Li, and L. Xu, “All-DC offshore wind farms: When are they more cost-effective than AC designs?,” IET Renew. Power Gener., vol. n/a, no. n/a, Feb. 2022, doi: 10.1049/rpg2.12550. [35] T. Wang, X. Cao, and L. Jiao, “PEM water electrolysis for hydrogen production: fundamentals, advances, and prospects,” Carbon Neutrality, vol. 1, no. 1, p. 21, Jun. 2022, doi: 10.1007/s43979- 022-00022-8. [36] C. Wulf, J. Linssen, and P. Zapp, “Chapter 9 - Power-to-Gas—Concepts, Demonstration, and Prospects,” in Hydrogen Supply Chains, C. Azzaro-Pantel, Ed., Academic Press, 2018, pp. 309–345. doi: 10.1016/B978-0-12-811197-0.00009-9. [37] V. N. Dinh, P. Leahy, E. McKeogh, J. Murphy, and V. Cummins, “Development of a viability assessment model for hydrogen production from dedicated offshore wind farms,” Int. J. Hydrog. Energy, vol. 46, no. 48, pp. 24620–24631, Jul. 2021, doi: 10.1016/j.ijhydene.2020.04.232. [38] International Energy Agency, “The Future of Hydrogen,” Jun. 2019, [Online]. Available: https://iea.blob.core.windows.net/assets/9e3a3493-b9a6-4b7d-b499- 7ca48e357561/The_Future_of_Hydrogen.pdf [39] G. Azinheira, R. Segurado, and M. Costa, “Is Renewable Energy-Powered Desalination a Viable Solution for Water Stressed Regions? A Case Study in Algarve, Portugal,” Energies, vol. 12, no. 24, Art. no. 24, Jan. 2019, doi: 10.3390/en12244651. [40] J. André, S. Auray, D. De Wolf, M.-M. Memmah, and A. Simonnet, “Time development of new hydrogen transmission pipeline networks for France,” Int. J. Hydrog. Energy, vol. 39, no. 20, pp. 10323–10337, Jul. 2014, doi: 10.1016/j.ijhydene.2014.04.190. [41] F. Di Bella, “DEVELOPMENT OF A CENTRIFUGAL HYDROGEN PIPELINE GAS COMPRESSOR,” Apr. 2015. [Online]. Available: https://www.osti.gov/servlets/purl/1227195 [42] T. Wlodek, S. Kuczyński, A. Olijnyk, M. Łaciak, and A. Szurlej, “Thermodynamic and Technical Issues of Hydrogen and Methane-Hydrogen Mixtures Pipeline Transmission,” Energies, vol. 12, p. 569, Feb. 2019, doi: 10.3390/en12030569. [43] A. Ghigo, L. Cottura, R. Caradonna, G. Bracco, and G. Mattiazzo, “Platform Optimization and Cost Analysis in a Floating Offshore Wind Farm,” J. Mar. Sci. Eng., vol. 8, no. 11, p. 835, Oct. 2020, doi: 10.3390/jmse8110835. [44] International Energy Agency, “Global Hydrogen Review 2022,” 2022, [Online]. Available: https://iea.blob.core.windows.net/assets/c5bc75b1-9e4d-460d-9056- 6e8e626a11c4/GlobalHydrogenReview2022.pdf [45] Z. Fan et al., “HYDROGEN LEAKAGE: A POTENTIAL RISK FOR THE HYDROGEN ECONOMY,” Jul. 2022. [46] BloombergNEF, “2H 2022 Levelized Cost of Electricity Update,” BloombergNEF, Dec. 27, 2022. https://about.bnef.com/blog/2h-2022-levelized-cost-of-electricity-update/ (accessed Jun. 16, 2023). [47] Department for Business, Energy and Industrial Strategy, “Hydrogen production costs 2021,” Aug. 2021. [Online]. Available: https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data /file/1011506/Hydrogen_Production_Costs_2021.pdf [48] A. Garanovic, “Oceans of Energy’s floating solar system weathers through all North Sea storms,” Offshore Energy, Jul. 15, 2021. https://www.offshore-energy.biz/oceans-of-energys-floating-solar- system-weathers-through-all-north-sea-storms/ (accessed Jul. 06, 2023). [49] A. Garanovic, “CorPower Ocean scores €9 million for HiWave-5 commercial-scale demo,” Offshore Energy, Feb. 23, 2021. https://www.offshore-energy.biz/corpower-ocean-scores-e9- million-for-hiwave-commercial-scale-demo/ (accessed Jul. 06, 2023). [50] Department for Energy Security and Net Zero, “Contracts for Difference Allocation Round 4 results.” Jul. 07, 2022. [Online]. Available: https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data /file/1103022/contracts-for-difference-allocation-round-4-results.pdf
54 [51] Department of Energy, “Hydrogen Pipelines,” Energy.gov, 2022. https://www.energy.gov/eere/fuelcells/hydrogen-pipelines (accessed Jul. 06, 2023). [52] European Parliament and Council of the European Union, “DIRECTIVE 2014/89/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL.” Jul. 23, 2014. [Online]. Available: https://eur-lex.europa.eu/legalcontent/EN/TXT/?uri=uriserv:OJ.L_.2014.257.01.0135.01.ENG%20
55 Appendix A – List of projects resulting from the online review Name Region Specific location M4 type Type of structure Combination of technologies Energy source M- degre e Stage Publication year EU Scores Project Europe Multiple Co-located Static/Floati ng Wind, Solar / Wind, Wave Multiple 2 Concept 2022 Floating Power Plant Europe Denmark/Canary Islands Hybrid/Com bined Floating Wind Energy, Wave Energy Wind,Wave 3 Pilot 2021 WavePiston Europe Denmark/Canary Islands Hybrid/Com bined Floating Wave Energy, Desalination Wave 3 Pilot 2022 AquaWind Europe Spain Hybrid/Com bined Static Wind Energy, Aquaculture Wind 3 Pilot 2022 Dalian OWF Asia China Co-located Static Wind Energy, Aquaculture Wind 2 Pilot 2021 CGN New Energy Asia China Co-located Static Wind Energy, Aquaculture Wind 2 Concept 2021 CTG Asia China Co-located Static Wind Energy, Aquaculture Wind 2 Concept 2019 FWD Synlift Europe Germany Hybrid/Com bined Static Wind Energy, Desalination Wind 2 Concept 2021 Rampion Wind Farm Europe UK Co-located Static Wind Energy, Tourism Wind 2 Operati onal 2023 Middelgrunden Tours Europe Denmark Co-located Static Wind Energy, Tourism Wind 2 Operati onal 2020 Vattenfall Europe UK Co-located Static Wind Energy, Hydrogen Wind 2 Concept 2022 PosHydon Europe Netherlands Hybrid/Com bined Static Wind Energy, Gas, Hydrogen Wind 2 Pilot 2021 Lhyfe Europe France Co-located Static/Floati ng Wind Energy, Hydrogen Wind 2 Pilot 2022 RWE Aquaventus Europe Germany Co-located Static/Floati ng Wind Energy, Hydrogen Wind 2 Concept 2020 RWE Floating Solar 1 Europe Belgium Co-located Floating Wind Energy, Floating Solar Wind, Solar 3 Pilot 2022 RWE Floating Solar 2 Europe Netherlands Co-located Floating Wind Energy, Floating Solar Wind, Solar 3 Concept 2022 Orsted Taiwan Asia Taiwan Hybrid/Com bined Static Wind Energy, Nature conservation Wind 2 Pilot 2022 Orsted Denmark Europe Denmark Hybrid/Com bined Static Wind Energy, Nature conservation Wind 2 Pilot 2022 TNC North America United States Hybrid/Com bined Static Wind Energy, Nature conservation Wind 2 Concept 2021 Amazon Seaweed Europe UK Co-located Static Wind Energy, Aquaculture Wind 2 Concept 2023 SPIC Floating Solar Asia China Co-located Static/Floati ng Wind Energy, Floating Solar Wind, Solar 3 Pilot 2022 Musica Europe Greece Hybrid/Com bined Floating Wind Energy, Solar, Wave, Desalination, Grid services Wind, Solar, Wave 4 Concept 2021 Orsted Power to X Denmark Europe Denmark Co-located Static Wind Energy, Hydrogen Wind 2 Concept 2022 Oyster consortium FCHJU Europe UK Hybrid/Com bined Static/Floati ng Wind Energy, Hydrogen Wind 2 Concept 2021 Uruguay offshore green H2 South America Uruguay Co-located Static Wind Energy, Hydrogen Wind 2 Concept 2021 Deep purple pilot Europe Norway Co-located Static Wind Energy, Hydrogen Wind 2 Pilot 2023 HyMed Floating H2 Europe Italy Co-located Static Wind Energy, Hydrogen Wind 3 Concept 2022 Salamander ERM Dolphyn Europe Scotland Hybrid/Com bined Floating Wind Energy, Hydrogen Wind 3 Concept 2022 AmpHytrite Europe Netherlands Co-located Static Wind Energy, Hydrogen Wind 2 Pilot 2022
56 Appendix B – Description of projects • EU Scores Project: EU Project aimed at testing prototypes and further commercial deployment with participation of large developers such as RWE. • Floating Power Plant: Floating wind platform with WEC at the bottom (Secured PLOCAN test site, no construction yet). • WavePiston: WEC coupled with desalination technology (testing in PLOCAN) • AquaWind: Floating wind platform with plans to attach aquaculture structure at the bottom of the platform. Currently testing in PLOCAN. • Dalian OWF: Aquaculture cage co-located with bottom-fixed OW. Pilot ongoing with fish farm deployed. • CGN New Energy: Aquaculture co-located with bottom-fixed OW. No further information about deployment. • CTG: Aquaculture co-located with bottom-fixed OW. No further information about deployment. • FWD Synlift: Bottom-fixed OW with large desalination plant at the bottom. No documented tests. • Rampion Wind Farm: Offshore wind farm tours, adapted by local diver. • Middelgrunden Tours: Offshore wind farm tours, part of UNITED project. • Vattenfall: Offshore wind farm and electrolyzer pilot project. • PosHydon: Repurposing of O&G platform to produce hydrogen from offshore wind. • Lhyfe: Offshore electrolysis, currently testing quayside. • RWE Aquaventus: Offshore electrolysis, concept. • RWE Floating Solar 1: Pilot project between RWE & SolarDuck for co-locating offshore wind and floating solar in Merganser. • RWE Floating Solar 2: Succesful bid for HKW Wind farm including floating solar. • Orsted Taiwan: Artificial reef in Greater Changhua OWF, ReCoral project coral seeding. • Orsted Denmark: Artificial reef in Anholt OWF for Atlantic Cod. • TNC: Project to incorporate artificial reefs in OWF, has list of artificial reef manufacturers (Turbine Reefs). • Amazon Seaweed: First commercial scale seaweed farm funded by Amazon to be built soon, in collaboration with North Sea Farmers. • SPIC Floating Solar: Project testing 0.5MW Floating Solar from OceanSun. • Musica: Development of multi-use platform for Greek island of Oinousses. • Orsted Power to X Denmark: Plans for large scale Power-to-X facility in Denmark. • Oyster consortium FCHJU: Consortium between Orsted, Siemens Gamesa, ITM Power to build combined turbine and electrolyzer. • Uruguay offshore green H2: Government plan to build offshore hydrogen production facility from OW. • Deep purple pilot: • HyMed Floating H2: Plan to build large OW+H2 facility in Italian waters between Aquaterra Energy and SeaWind Ocean technology. • Salamander ERM Dolphyn: Testing of ERM Dolphyn technlogoy on Salamander floating project, Principle Power awarded FEED.
57 • AmpHytrite: Project to test feasibility and build offshore H2 production unit.
58 Appendix C – Interview protocol Interview script Date and Location: Interviewee: Color code: Text in red is not meant to be seen by or mentioned to interviewee and are there only as guidance for the interviewer as examples or to identify themes in the answer. Text in light blue is to be read out as is and it is meant for the main questions that need to be asked during the interview. Text in dark blue is used for optional or follow-up questions that can be asked depending on the specific case. Introductory statement As mentioned in our email, we are conducting a project with the aim of mapping ocean multi-use projects around the world and understanding their current state, main advantages and challenges. In that sense, this interview will be about multi-use of marine space, in the context of your project (name project here, if interviewing regulatory body or agency just refer to MU). The interview is made up of 5 parts and should take between 30-45 minutes. Multi-use refers to the joint use of marine space by two or more users, which takes place in the same area and at the same time and, depending on the case, could share core or peripheral services and infrastructure. With that in mind, let’s get started with the questions about your project (their specific case). 1. Introductory questions 1.1. Are you familiar with the concept of MU? Is it a present consideration in your organization? 1.1.1. Could you tell us more about the project in your own words?
59 2. Technical aspects of multi-use case 2.1. Do you think technological/technical developments could enable your specific multi-use case? 2.2. Do you think the combination of different technologies/uses could lead to shared technological developments? 3. Project Planning & Strategy 3.1. Have you identified any particular stakeholder that plays a fundamental role in enabling your specific multi-use case? 3.2. Have you established any strategic partnerships for present and future multi-use projects? 3.3. Where do you see the most potential for MU applications in terms of combinations of uses and application in different regions of the world? 3.4. Are you aware of any other multi-use projects that we should know about? 4. Economic/Funding considerations 4.1. Are there any economic advantages from combining X and X? What do you think are main ones from the point of view of both participants? (New sources of revenue, cost reduction, cost sharing, access to funding) 4.2. What level of uncertainty is involved when quantifying these benefits and developing an MU business case? 4.3. What do you think would be the main economic disadvantages and how could they be addressed? 4.4. What kind of business model/interaction do you see as offering the most potential in a multi-use scenario? 5. Policy & Regulation 5.1. What aspects do you think should be targeted by authorities to make the environment more favourable for multi-use projects?
60 (Support, policies, incentives, conflict prevention) 5.2. What are the necessary licenses or permits for your type of MU? What is the procedure to obtain them? 5.3. Is there any overlap or conflict between regulations? 6. Barriers 6.1. What do you think are the main barriers MU projects are facing? (Interconnection issues, administrative, O&M, legal & liability, regulation, etc) 6.2. (AGENCY) What are the main barriers for the application of multi-use areas? 6.3. What are some actions that could be taken to address these barriers by your organization and other involved stakeholders?
61 Appendix D – Case Study scenarios