BACHELOR'S DEGREE IN ARCHITECTURAL TECHNOLOGY AND BUILDING CONSTRUCTION FINAL DEGREE PROJECT CAN RIBÓ CORDAGE PLANT: STUDY, DIAGNOSIS AND INTERVENTION PROPOSALS Authors: Adrián Valdeolivas Rodriguez Dácil Rodríguez Mayor Directors: Montserrat Bosch González Joan Ramon Rosell Amigó Date: September 2018
Can Ribó cordage plant: Study, diagnosis and intervention proposals 1 SUMMARY The objective of the project is the study of the old cordage Can Ribó, located in the city of Badalona, in order to know how it has evolved and grow throughout its years of history, to know a little more this unknown historical building by the population and know their current status in order to perform an intervention in order to adapt and maintain the current facilities. For the realization of this project, it has been tried from the beginning to use the BIM tool through the Revit program of Autodesk in order to verify its use as a main tool or support in this type of projects. Since one of the most important parts for us was to know the original status and the history of the building and the factory, the first thing we did was look in the administrative, historical and photographic archives of the city of Badalona, for which several days were invested of information search in the Badalona museum mainly. In conjunction with the search for historical information, the preparation of the plans of the building was carried out, for which continuous visits were made to the building given the ease of access on our part, as one of the members of this working group of the tenant company. Once the basic preparation of building plans was carried out, a series of interviews were conducted with the people who carried out the different works in the building since the 80s, in order to know in depth the different construction systems. Once the operation of the building was known, we proceeded to analyse the damage found in it, for this, a series of photographs were taken, and thanks to the help of the BIM tool it was possible to deduce in part the origin of the injuries, but above all, thanks to the day-to-day experience during years of use of the building. When we’re collecting all the data and carrying out the pertinent diagnosis, a series of interventions is proposed in order to lengthen the life of the building and improve the day to day of the users.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 3 INDEX 0. INTRODUCTION Pg. 5 1. BUILDING DATA Pg. 7 - 9 1.1. Situation and emplacement Pg. 7 1.2. Urban data Pg. 7 2. HISTORY Pg. 11 - 16 2.1. The handicrafts of the rope, the process Pg. 11 2.2. Cordage plants in Badalona Pg. 11 2.3. Can Ribó evolution Pg. 11 2.4. Joan Amigó i Barriga Pg. 16 2.5. Current use Pg. 16 3. BUILDING DESCRIPTION Pg. 17 - 20 3.1. Plants description Pg. 17 3.2. Facades description Pg. 19 4. CONSTRUCTIVE ELEMENTS Pg. 21 - 28 4.1. Structural elements Pg. 21 4.2. Non-structural elements Pg. 24 5. DAMAGE ANALYSIS Pg. 31 - 37 5.1. Damage in the facades Pg. 31 5.2. Interior damage Pg. 36 6. DIAGNOSTIC Pg. 39 7. INTERVENTION PROPOSALS Pg. 41 - 45 7.1. Intervention criteria Pg. 41 7.2. Applicable regulations Pg. 41 7.3. Summary of the intervention proposals Pg. 42 7.4. Intervention Pg. 43 8. BUDGET Pg. 47 9. CONCLUSION Pg. 49 10. BIBLIOGRAPHY Pg. 51 11. ANNEX Pg. 53 - 210 11.1. Information search Pg. 55 11.2. Memory extension: Building data (Documents) Pg. 57 11.3. Memory extension: History (Documents) Pg. 73 11.4. Memory extension: Graphical uplifting Pg. 111 11.5. Memory extension: Building description Pg. 127 11.6. Memory extension: Constructive elements Pg. 137 11.7. Memory extension: Damage analysis (Facade plans) Pg. 199 11.8. Memory extension: Measurement and budget Pg. 203
Can Ribó cordage plant: Study, diagnosis and intervention proposals 5 0. INTRODUCTION The objective of this final degree project is the historical study, preparation of plans, diagnosis and intervention proposal of the Can Ribó cordage plant located in the city of Badalona. Can Ribó is a group of industrial plants that, in which we will know, as the main core, is made up of the industrial plants belonging to the main facade, located in Mataró National Road. The set has a total of 1680.61 m2 in three different levels. Once the study of the building is made it is clear that there have been a large number of expansions and evolutions over the years, since its first construction in 1910. It is an old cordage plant, nowadays converted and divided in several industrial buildings. In the first place, a historical study and the pertinent graphic survey have been carried out in order to fully understand the entire building. From this, a description of the building and the spaces has been made, followed by a constructive memory in order to understand the functioning and the history of the structure. Once the building is known in depth we proceed to the study of the damage found in all the buildings and facades, for them multiple visits, checks and interviews with users and property are made. Knowing both the original and the current state, a series of important interventions will be carried out in order to lengthen the life of the building and adapt it to the current regulations for the safety and comfort of the users.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 7 1. BUILDING DATA 1.1. SITUATION AND EMPLACEMENT Can Ribó is located in the municipality of Badalona in the region of Barcelonés, which is located about 10km from Barcelona and adjoins in the Southwest with Sant Adrià del Besòs, in the west with Santa Coloma de Gramanet, in the Northwest with Montcada i Reixac, in the North with Sant Fost de Campsentelles, in the Northeast with Tiana and Montgat and in the Southeast with the Mediterranean Sea. The building is located between the 5 Torrent del Vallmajor Street and Mataró National Road, in the Canyadó neighborhood, with zip code 08911. 1.2. URBAN DATA 1.2.1. Land classification Currently according to the urbanistic map of Catalonia, Can Ribó is located within Consolidated Urban Land. 1.2.2. Land qualification The building is, according to the MUC code as A1 (economic, industrial activity) and according to the City Council as 22nd (Industrial activity). 1.2.3. Cadastre The building is divided into two independent plots owned by the same tenant. The cadastre codes are: 8399804DF3889G0001EU and 8399805DF3889G0001SU. . 1.2.4. Heritage At the moment the building is not included in any category of heritage protection, and the museum of Badalona does not have any registry in its catalog. Figure1.1: Loction map of Badalona Figure1.2: Map of Can Ribó Figure1.3: Location map of Can Ribó
Can Ribó cordage plant: Study, diagnosis and intervention proposals 8 1.2.5. Characteristics of the environment Badalona has an extension of 21.18 Km2 and is situated at an altitude of 6m above sea level. Geologically it is situated between the Mediterranean Sea and the Sierra de la Marina, in the Litoral range, we can highlight the abundant streams of the city, such as the Canyet stream, Sant Joan, Canyadó, and Matamoros. "The part of the mountain range corresponding to the municipality of Badalona forms part of the southern end of the Sierra de Marina, in a subsector called the Conreria. The relief, with generally rounded forms as a consequence of the modeling of the initial granitic materials, does not present high altitudes, but its proximity to the sea means that there are steep slopes. " "The Sierra de Marina is influenced by the Mediterranean coastal climate. This, which in general terms is considered a temperate climate, provides warm and hot summers, and mild winters, with occasional frost. " "The rains have a maximum at the beginning of autumn, although in spring it also rains hard. On average about 600 L / m2 are collected annually. " "This amount of water, then, is not distributed throughout the year, and it may be the case that it does not rain in two months or that in a single day it falls 150 L / m2. This influences vegetation and soil erosion. " "So, from the reading of the data taken by the weather stations, it can be deduced that in Badalona, the month with the highest temperatures is in August, followed by July with little difference. The month that registers lower temperatures is January, followed by December and February. The maximum of the means is close to 30 ºC and the minimum does not reach 1 ºC above zero. " Figure1.4: Historical rainfall diagram in Badalona, 05/06/2017-05/06/2018 Source: https://www.eltiempo.es/badalona.html?v=historico Source S Figure1.5: Historical temperature diagram in Badalona, 05/06/2017-05/06/2018 Source: https://www.eltiempo.es/badalona.html?v=historico Source S
Can Ribó cordage plant: Study, diagnosis and intervention proposals 9 "As for the vulnerability of the physical environment, the ease of alteration of the granite materials that gives an abundance of sandstone soils together with the steep slopes, higher than 30% in some places, makes us find ourselves in a place of great erodibility. Fortunately, the modeling of the landscape made by the hand of the ancestors with the cultivation of the vine and other crops has shaped a terraced landscape that has avoided globally this erosion that is basically concentrated on margins, roads, paths and streams. " [1] 1.2.6. Property Originally the lands where Can Ribó is currently located belonged to the Millet i Estapé cordage plant during the 19th century. In 1911, Jaume Ribó bought the land and moved his business which was located in 23 of the Mercè St in Badalona. The property belongs to the Ribó family until in 1987, date in which Promociones Coribo, S.L. was founded and creates the internal divisions of the plant for rent the resulting warehouses. Nowadays, the plot is rented to Talleres Maristany, S.L. since 1987. Figure1.6:Geological plane Source:http://info.igme.es/cartografiadigital/datos/magna50/jpgs/d4_G50/Editado_MAGNA50_421.jpg 1 Source: http://badalona.cat/portalWeb/badalona.portal%3Bjsessionid=0QLQMQcX1T3K1Wn5dxcQKq87G9pYGTLznJQfxrRchyrb8rXP6hmM!- 2035279826?_nfpb=true&_pageLabel=contingut_estatic&dCollectionID=908#wlp_contingut_estatic (2018/4)
Can Ribó cordage plant: Study, diagnosis and intervention proposals 11 2. HISTORY 2.1. THE HANDICRAFTS OF THE ROPE, THE PROCESS It is known as rope maker the person who makes ropes and cords with vegetable fibres, initially the activity was carried out on the beach, later in long yards and finally in industries, these large land extensions were due to the manufacturing process of the ropes, which is described below: Preparation of the raw material: the hemp is prepared for spinning in two phases, first the stem is struck to eliminate the woody substances and then the fibers of the plant are separated for their selection. Spinning: process in which the roper is transforming the fibers of the plant into a long and continuous thread. Forced: in this last process the different runs are put together, twisting them, until forming a cord and, although this one is not yet a rope, the repetition of the forced one increase the cord until forming a rope. 2.2. CORDAGE PLANTS IN BADALONA Until the industrial development of the 19th century the inhabitants of Badalona were mainly engaged in agriculture and fishing, in relation to the growth and importance of marine economic activities grew the activity of the lamb. The boats, both fishing and transport, required a large number of ropes produced from hemp, an abundant product in the area. Initially, it is the fishermen themselves who manufacture the ropes, however with the passage of time, there was a specialization of the activity, which led to their professionalization. In the beginning, the trade was carried out in the open spaces known as roping beaches. In Badalona the most handicraft cordage plants were located in the inner courtyards of the houses, as is the case of the cordage plants of Nadal, Cuixart, Domènech or Ribó. The cordage plants of greater size were located in lands far from the urban area, where it was easier to have a long strip of land. The cordage plants of the city manufactured all kinds of polished thread of hemp, cotton, pita and ropes for agriculture, industry and the navy. Often the smallest cordage plants are sold in the thread to which they needed more volume to make ropes. 2.3. CAN RIBÓ EVOLUTION The Can Ribó cordage plant was founded in 1826 by Jaume Ribó Roure and remained on a small scale in the Mercè Street, a few meters from the center of town. In 1910, with Jaume Ribó Sayol as owner, the factory was expanded due to the increase in sales thanks to exports, and that same year the factory and the lands of Millet i Estapé cordage plant were acquired. The property moved all its production to the new facilities in the following years to expand the factory taking advantage of the large area available, in turn installing new machinery, this caused the factory to have capacity to supply the Spanish navy of hemp ropes among other tools. Thanks to the neutrality of Spain in the First World War, during the dictatorship of Primo de Rivera, the factory's Figure 2.1: Can Ribó factory, 1910 Source: Badalona Museum, Josep Maria Cuyás collection Source S Figure 2.2: Entrance to Can Ribó’s factory, 1920 Source: Badalona Museum, Josep Maria Cuyás collection
Can Ribó cordage plant: Study, diagnosis and intervention proposals 12 exports increased substantially, a fact that was used by Jaume Ribó to position himself as one of the most important entrepreneurs in the sector. It was during this period of boom that it was decided to remodel the main facade with a luxurious and modern style, hiring for it the architect who took all the project and expansion until now, Joan Amigó i Barriga and the ceramist Lluís Bru i Salelles. The activity of the factory continued in the same way until 1932, when, after a fire, a large part of the factory was destroyed. Far from declining this fact was used to modernize production, the factory was roofed, an entry and exit of goods for heavy vehicles was created and modern machinery was acquired. During the following years the factory remained unchanged, adapting to the times and becoming the largest manufacturer of ropes in the state, however from the 60s the production of ropes declined, the modernization of the country caused that gradually the demand for the product it would decrease, and although they ended up replacing the raw materials and importing new ones, finally, with the entry of Spain to the EEC, it caused the definitive fall of the business. The Can Ribó cordage plant, after more than 150 years of history, ended closing in 1986. After a year, in which the building remained without activity, the heirs of Jaume Ribó created the company Promociones Coribo, SL, with the purpose to split the factory of his family and rent the resulting warehouses, and so it was that, in 1987 the interior of the factory was demolished leaving the divisions that we find today. This section has had the following sources: [2] [3] [4] Figure 2.3: Fire in Can Ribó’s factory, 1932 Source: Arxiu Nacional Catalunya Figure 2.4: Fire in Can Ribó’sf actory, 1932 Source: Badalona Museum, Joan Silvestre Magriñà collection Figure 2.5: Can Ribó’s factory interior, 1936 Source: Badalona Museum, Josep Cortinas collection Figure 2.6: Cordage factory’s, 1945 Source: www.icgc.cat 2 Carreras i García, Montserrat. La indústria a Badalona. Del 1700 a 1936. Carrer dels Arbres, 3ª època nº4 (1993) 3 Abril Fornaguera, Joan. Les Corderies d’antany. Revista de Badalona nº 2959, p.124-126 (1989) 4 Dionis Piquero, Cristina. Oficis artesanals. Carrer dels Arbres, 3ª època nº9 p. 31-44 (1989)
Can Ribó cordage plant: Study, diagnosis and intervention proposals 19 3.1.2.3. First floor This floor is divided into two spaces separated by the work area, in the east, adjacent to the main facade, we find the employee's locker room and showers (FF.12-13), as well as a storage area. On the other hand, on the other side of the ship, we find a last storage (FF.15). 3.2. FACADES DESCRIPTION 3.2.1. Principal facade (SE) The walls of the main facade are made of solid brick with a total thickness of 45 cm, plastered with lime mortar treated in different ways along the facade and which gives it a finish it still maintains today, either in the form of lightly stucco or imitating stone blocks. The facade is characterized by having seven modules, the central module has a balcony decorated with mortar moldings that imitate hemp ropes, elements that we find as a decoration throughout the facade, reminding us of the use that the building had as a factory in its origins. In the same module we find the most important decorative element of the facade given its author, a mosaic of white and blue ceramic that form the name and logo of the old factory, commissioned in 1920 to the ceramist Lluís Bru i Salelles. The other modules are symmetrical to the side and side of the central module and we find two typologies, a typology that is repeated up to a total of four times, it is a smaller and simpler module than the others with the moldings of the ropes in the part superior and with an imitation stone finish. Finally we find a section delimited by an imitation of stone pilasters culminated with pinnacles imitating a skein of rope, on the surface of the facade we can also see two large arches created from the moldings. Figure 3.6: General view of the facades Figure 3.5: First Floor (Mataró National Road Industrial plant)
Can Ribó cordage plant: Study, diagnosis and intervention proposals 20 On the other hand we find the different openings in the facade, small windows in the upper part and bigger windows in the lower one, closed with grille in the outside, as well as the sliding door that gives access to the bodyshop. . 3.2.2. Lateral facade (E) Like the main facade, the east facade is composed of a solid brick wall of 45 cm. and plastered with a layer of mortar to protect the bricks, but unlike the other this plaster has been applied in a simple manner. We can find several openings, such as the doors for entry and exit of vehicles, the door for staff, windows and various ventilation grilles. In its upper part the facade lowers or climbs in a staggered way to hide the roof from the street. Figure 3.8: East facade Figure 3.7: South-east facade
Can Ribó cordage plant: Study, diagnosis and intervention proposals 21 4. CONSTRUCTIVE ELEMENTS 4.1. STRUCTURAL ELEMENTS The Can Ribó cordage plant is an original building of the early XX century, although over the years has been modified still retains part of its original structure, both brick factory and steel structure. Additionally in the interior partitions we find modern structure made with concrete. 4.1.1. Foundations It has not been possible to carry out any type of prospecting or geotechnical study due to the inaccessibility of the foundation area. Even so we deduce that due to the changes made in different epochs we will be able to find at least 4 types of foundations, one for the facade wall, another for the steel structure, another for the carrier elements of the larger industrial plant and a last typology for the supporting elements of the smaller building. 4.1.2. Estructura vertical Inside the building we find several types of vertical structure well differentiated, which respond, as already explained, to the construction in different periods of the same. The supporting walls form the structure that supports the horizontal structure, on these walls the beams that support the weight of the different types of slabs and the roof rest directly, which transmit the load directly to the foundations and these to the ground. Among the different types of load-bearing walls we can find the one of the facade wall, enlarged throughout the first years of the building's life, within the same one we can find diverse materials and constructive techniques, in its origin it was a masonry wall, used as a perimeter wall for the terrains of Figure 5.1: Vertical structure (Ground Floor and Loft) (expanded in VI.1 annex) Figure 5.2: Vertical structure (First Floor)(expanded in VI.1 annex)
Can Ribó cordage plant: Study, diagnosis and intervention proposals 22 the Millet i Estapé cordage plant, later this wall was extended with solid bricks to have the current geometry. Today we find a supporting wall 45 cm thick. Inside we find a type of load-bearing wall found in the mechanichal workshop of the, of 15cm thickness, formed by double hollow brick, this type of bricks is also found as a dividing wall in the whole building and finally as a party wall with the other plants. Among the pillars we find three types according to the material they are built of, first of all in the mechanical workshop we find brick pillars; in the bodyshop we find reinforced concrete pillars, this difference responds to the moment in which they were built and by whom, that is, in the 80s the different tenants built with the materials they had at their disposal and with which they worked more easily. Finally, as a more modern construction, we find the metallic pillars, of different types and sizes. 4.1.3. Horizontal structure Analyzing the horizontal structure we have observed variety in the construction systems of the building. Among the roofs of beams we find several types: roofs of prestressed concrete joists with brick vaults; of metal joists with and without brick vaults and structure of wooden beams, as well as support of the roof we find a set of metal trusses. This variety of typologies corresponds in most part to the type of work carried out in the different periods, from an industrial architecture, to a modern one, professionalized or not. Types of slabs: As already mentioned in the set of the two industrial plants we find different types of slabs, next we will analyze these constructive solutions. In order to carry out the following construction details, prospections and photographs of all of them have been carried out, in addition to the testimony of the people who carried out the construction of the interior elements, currently owners of the company Talleres Maristany SL. Roofs of prestressed concrete joists Much of the slabs found in the mechanical workshop are of this type, this slab, like the rest, with the exception of the roof structure, appeared at the end of the 80s, once the factory was divided into different buildings that we can find today. This typology of slabs is mostly concentrated in the south-east corner of the building (roofs in spaces GF.1-2-3-4-5-10). These slabs can be found resting on different types of support, such as the metallic beam of the spare parts storage (GF.5) (Figure 5.6), as well as reinforced concrete beam (GF.5-10) (Figure 5.4) , finally we also find it on load-bearing walls, either in the facade or in the interior walls formed by double hollow brick with a 15 cm thickness. This type of slab is found uncoated in the spare parts storage, which allows to easily observe the different elements that make it up and the supports, in the rest of the areas the slab is covered by plaster. The slab is formed by pre-stressed concrete beams T-18 with brick vaults with an inter-axis of 60 cm and forming a total thick of 22 cm. Figure 5.5: Support section between metallic beam and pillar. Figure 5.3: Slab of concrete joist with brick vaults. Figure 5.4: Support section between concrete joist and concrete beam. Figure 5.6: Support section between concrete joist and metallic beam.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 23 Roofs of metallic joists with brick vaults In this case, we can find this type of slabs in almost all the slabs of the bodypaint, as well as in the changing rooms and bathrooms of the mechanical workshop employees (GF.6-7-8-9). These slabs are formed by IPN 140 profiles in their entirety and brick vaults forming an inter-axis of 60 cm., We can also find two different types, the slabs with a total thick of 22 cm. (roofs GF 6-7-8-9 and floors FF.13-13- 14) (Figure 5.7) and slabs with total thick of 17 cm. (roofs GF 13-14-15) (Figure 5.8). On the other hand we can see different types of supports, these slabs are found resting both on the load wall of the facade and on the beams, both reinforced concrete and metal. Roofs of metallic joists without brick vaults Lastly, we find a type of slab built in recent years (with the exception of the roof of GF.11) seeking to increase the storage needs in the building. To do this, two platforms were built, FF.11 and FF.15, one in each workshop, with FF.15 closed by aluminum carpentry. This type of slab found on the two platforms is formed in the same way: HEB-120 profiles as a joist and profiles IPN-260 acting as a beam, as a flooring has been used plywood on both platforms, joined to the joists using self-drilling screws (Figure 5.9 and 5.10). Finally we find a different type of slab of metal joists without brick vaults, found in the roof of GF.11, in this case, both the joists, formed by IPN-200 profiles, and the beams, formed by profiles IPN- 300, have been covered with mortar, filled with ceramic pieces and finally covered with plaster, as indicated by the workers who made them (Figure 5.11 and 5.12). Roof structure: The roof structure dates back to the 1930s, after the factory fire the owner decided to expand it, closing the entire work area, for this purpose he extended the walls and demolished the small warehouses that were on the land, as an enclosure solution of cover was chosen by a metal structure formed by L profiles and screwed, on which lie the purlins (IPN 120) that hold the cover plates, currently of asbesto. On the other hand was built on this structure a false ceiling lattice framework, to hold it was made a small wooden structure, formed by beams of 150x80 mm which in turn hold others of 20x70 mm, this small structure is sustained to its once for the trusses. Figure 5.7: Slab of metallic joist with brick vaults of thickness 22 cm. Figure 5.8: Slab of metallic joist with brick vaults of thickness 17cm. Figure 5.9: Slab of metal beam without brick vaults and beam-pillar union. Figure 5.10: Slab of metal beam without brick vaults and beam-pillar union. Figure 5.12: Slab of coated metal beam without brick vaults and union between beams. Figure 5.11: Slab of coated metal beam without brick vaults.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 24 Below are details, sections and 3D modeling, through the Revit program, of the cover structure to understand it (expanded in VI.3 annex): 4.2. NON-STRUCTURAL ELEMENTS 4.2.1. Interior dividers A large part of the interior or dividing walls are built with double hollow brick, which are used as either 10 or 15 cm partitions or as a load wall in some cases. We also find hollow brick partitions 7 cm thick to a lesser extent. Another distinct typology is that of dividing walls of lacquered aluminum carpentry, found in GF.2 and FF.15. 4.2.2. Interior coatings We can say that practically all the interior of the building is covered with white painted plaster, however we can find ceramic coating in wet areas, in some cases the use of metal sheets as a coating and finally we can find dividers simply painted without additional coating. 4.2.3. Pavements In the whole building we find different types of pavements, on the one hand, both in the work areas of both workshops and in the spare parts storage we find one of concrete, given the working characteristics of these spaces, with large heavy vehicles rotation on the part of the workshops and of elements of great weight in the storage, this solution was chosen in order to increase the life of the pavement with respect to other solutions. In the case of the mechanical workshop and the storage, we find the pavement painted, with this two things are achieved: limit the working areas of the pavement and protect the concrete from oils and other substances, in addition to the finishing of both pavements. It is the same, in the case of the mechanical workshop the pavement was treated better in its outer layer to create a much smaller pore. In the bodyshop we found a much older pavement, while the other two pavements were renovated at the beginning of the 21st century, in this workshop the same pavement that was executed in 1987 is maintained, given that its degradation at the the time of the reform of the other industrial plant was minor due to the type of work carried out here. In the rest of the building we find a diversity of ceramic pavements reflected in the photographic summary of the VI.4 annex. Figure 5.13: General view of the metal structure Figure 5.14: General view of the false ceiling structure
Can Ribó cordage plant: Study, diagnosis and intervention proposals 25 Figure 5.15: Ground floor/Loft pavement plan (expanded in VI.4 annex) Figure 5.16: First floor pavement plan (expanded in VI.4 annex)
Can Ribó cordage plant: Study, diagnosis and intervention proposals 26 4.2.4. Carpentry As has already been discussed throughout this work, the building has been evolving and improving step by step, consequently so much of the elements and, in this case the carpentry, we can find a great differentiation of both materials and shape. Among all the existing joineries we can highlight three types in particular: the sliding doors to access the workshops, formed by steel plates, the oldest carpentry of the facades, made with wood and simple glass and finally the different solutions applied by aluminum. For more information about the joineries, go to the VI.5 annex. 4.2.5. Singular facade elements The facade that we call main, located in the Mataró National Road, is undoubtedly the most singular and outstanding element of the whole complex with the naked eye. The intention to stand out from other factories in the city is fully reflected in the details that can be found along the facade. The current state at a decorative level dates back to the year 1920 and was built by the architect Joan Amigó i Barriga and decorated by the ceramist Lluís Bru i Salelles, decorations that still remain mostly today, although there have been some changes, such as be the openings located on the ground floor or the disappearance of some pinnacles. One of our first intentions when analyzing the decorative elements that make up the facade was to find meaning in the real world to the knots found along the facade, however, after analyzing them, we have reached the conclusion that the knots found in the balcony of the central module, which could correspond to knots of fishing nets, the other knots are simple decorations, being sometimes, nonrealizable knots. The coating of the facade is practically common throughout the facade, formed by a sgraffito created with hydraulic lime mortar and subsequently painted and depending on where we find it, we can see it with different finishes On the other hand we have the decorations of the strings, created from a mold in negative by artificial stone, that is to say, a conglomerate of hydraulic lime mortar with a support of steel as a bar to give cohesion, and it is thanks to this that we can find in the facade a true variety of elements (see 4.1 and 4.2 details and VI.6 annex). Like the ropes, we can say that the pinnacles have been shaped in the same way. In the upper part of the central module we find the two mosaics by Lluís Bru i Salelles, both designed as a poster, with the name of the factory and the family that owns it. The mosaics are formed by white and blue enameled ceramic pieces, and based on these colors and with unique cuts in the pieces, all the elements have been formed. Figure 5.17: Example of sgraffito Figure 5.18: Example of sgraffito Figure 5.19: Example of sgraffito Figure 5.20: Example of sgraffito
1 x8 2 x4 3 x4 4 x4 5 x4 6 x8 7 x18 8 x2 9 x2 10 x2 11 x2 12 x2 16 x2 13 x2 14 x2 15 x2 17 x7 18 x1 19 x1 20 x1 21 x1 22 x1
Can Ribó cordage plant: Study, diagnosis and intervention proposals 37 5.2.4. Physical damages (damage to pavements) Due to the great activity of entry and exit of trucks, the slab that forms the pavement of the building of bodyshop has suffered a great degradation, arriving to find fissures in all surface, on the other hand it is also degraded the pavements of the showers of both workshops due to the use. Figures 6.29 and 6.30: Deterioration of pavements
Can Ribó cordage plant: Study, diagnosis and intervention proposals 39 6. DIAGNOSTIC Can Ribó cordage plant is a building that dates back to 1910. The current building is the result of a follow-up of reforms and extensions that have given it a great difference in materials and construction techniques. The building currently consists of two industrial plants with large open areas of work and office areas, with two levels in the largest ship and up to three in the smallest. The total area of the complex is 1680.61 m2. Once the constructive analysis and damage that affect the building have been carried out and find out how they affect it, we have come to the conclusion that: In a high percentage, the damages found inside the buildings are caused by the poor condition of the roof and its subsystems, as it can't evacuate the water properly and when bad plates are found according to maintenance operators, the rainwater easily introduced into the interior of the building causing daily deterioration of the facilities. Part of the fissures found in the main facade is produced by a differential settlement of the structure in the ground. It is known to us that during the last years there have been infrastructural works in the areas adjacent to the building, due to the presence of water and gas channels and a stream that end at the corner of the Mataró National Road and the Torrent del Vallmajor street. These works lead to the emptying of the lands that partially support the foundations of the facade walls and this has caused the appearance of these fissures. Another origin of the fissures found in both facades are dilatations and movements in general of the different elements and materials that converge in the facade, such as slabs, the lintels of the access doors to the workshops and the artificial stone elements of the main facade. The most worrying damage of the artificial stone elements of the main facade is the corrosion of the internal reinforcement of the same, as can be seen in the deficient repairs carried out previously, the reinforcement has been expanding, which has caused the detachment of the coating in the affected areas, destroying the decorative elements. Due to the corrosion we also find detachments and stains in the areas adjacent to the grides found in the different openings of the facades, due to the lack of anchoring of the anchors which has caused the water to penetrate more easily to them and provoke the corrosion eventually, in addition has also favored corrosion the lack of maintenance of the grides themselves. In the same facades we also find a series of detachments and spots in the low areas due to moisture by capillarity, we must bear in mind that adjacent to the building we find a stream and it is at a height of 5 meters above sea level, all this facilitates that the moisture goes ascending on the porous wall and with the step of the time causing serious detachments, as they are those found in the main facade. On the other hand we also find stains and detachments of the coating and paint caused by filtrations of rainwater because of the accumulation of it due to lack of drainage or poor maintenance of the evacuation system, these most serious damages are found in the set of the balcony of the main facade. In the mosaic we find the lack of pieces that have been detached over time and the loss of grouting them, although it is not something serious is an element to be taken into account and should be restored. We also find in bad condition the concrete slab of the bodyshop, the pass of heavy vehicles for 30 years and the foreseeable lack of reinforcement have caused cracks and detachments of outer layers. On the other hand, also by the use we found deteriorated the pavement of the showers of both workshops. Finally, although there is no damage, as we have seen in the analysis of construction elements, we have been able to find a large number of load-bearing walls formed by double hollow brick with a thickness of 15 cm. an element not designed to act as a structural element. All these exposed elements will be taken into account for the intervention proposal and all those items that are necessary to correct the damage suffered by the building should be adopted.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 41 7. INTERVENTION PROPOSALS 7.1. INTERVENTION CRITERIA The main objective of this project is the maintenance of the industrial plants located in the 5 of Mataró National Road and the 5 of Torrent del Vallmajor Street, two contiguous plants that are part of the Can Ribó cordage plant, and which are integrated in their modernist facade. Given that there is no change of activity or use in the building, nor a change of ownership, and that the activity generated in the interior must stop as short as possible, we opt for a minor intervention, however the arguments presented in the diagnostic must be taken into account. The intervention aims to conserve and consolidate the existing building, for which purpose it will intervene in the most critical points to extend the life of the building as much as possible, and try to return the original essence of the elements that best represent it, such as the main facade and the metallic structure. It will intervene in a different way in the elements that are in poor condition, either with substitution or reform of them. In order to decide the most suitable process for each element, the arguments given in the diagnosis will be taken into account. During the intervention of the different systems and construction elements of the building, a series of criteria must be taken into account so that it is respectful of the environment and the building. The intervention criteria to be followed are the following: The exterior volume of the buildings as well as their architectural formalization will be maintained: structure, facade, material, chromatism, texture, as well as all the singular elements. Eliminate the causes of the damages that degrade the building, both those that do it on the structure and those that do it on the rest of the elements. Rehabilitate and restore the unique elements of the facade. The constructive systems applied during the intervention will take into account and respect the architectural concept and existing construction techniques. All applicable regulations will be taken into account for the current type of use, especially anti-fire regulations, in the same way the continuity of the current activity in the building will also be taken into account. Improve and maintain the carpentry elements of the facade. Increase the interior volume of the plant in order to create access to the structure. Improve the structural safety of the load walls. 7.2. APPLICABLE REGULATIONS Real Decreto 2267/2004 Regulation of Fire Safety in Industrial Establishments (RFSIE). Ley 3/2010, of February 18, prevention and safety in the field of fires in establishments, activities, infrastructure and buildings. The rules and procedures defined by Ley 3/2010 must be applied in order to reduce the risk of loss in the event of fire, for this purpose, maximum dimensions of spaces, fire resistance of the different structures and creation of firewalls with buildings must be respected. From among all the document the most important parts to take into account for the elaboration of this intervention are: Fire stability of load-bearing construction elements: The stability to the fire of these elements will not have a lower value than that indicated in table 2.2 of RD 2267/2004, having to meet a minimum of R-90, a condition that does not comply with the fastening elements of the false ceiling, for this, they should be eliminated and consequently apply fireproofing to the roof elements now exposed. Fire resistance of the enclosing construction elements: the fire resistance of the delimiting elements within a fire sector shall not be less than that required in table 2.2. Then the delimitations of the fire sectors with respect to others will be of EI-90. When the party wall of one of the sectors reaches the roof, the fire resistance must be at least half of that required in the construction element, in a strip equal to one meter, by which it should have a firewall with EI-60 resistance that should not be placed more than 40 cm from the roof. Real Decreto 314/2006, of March 17, which approves the technical code of the building and its complementary basic documents. Ley 31/1995, of November 8, prevention of occupational risks. RD 39/1997, of January 17. Health regulations: The rules and procedures defined by the Basic Document HS belonging to the CTE must be applied in order to reduce to acceptable limits the risk that the users of the building suffer discomfort or illnesses, as well as the risk that buildings deteriorate and deteriorate the environment. as a result of its construction, use and maintenance. The DBHS specifies parameters, objectives and procedures with which the satisfaction of the basic requirements and exceeding the minimum quality levels of the basic health requirement is assured, in order to achieve these requirements, the basic requirements provided by the following must be met documents:
Can Ribó cordage plant: Study, diagnosis and intervention proposals 42 HS1: Protection against moisture This document defines that the risk of inadequate presence of water or moisture from rainfall, spills on the ground or condensation will be limited, providing the means to prevent its penetration or evacuation without causing damage. This will be applied to the elements in contact with the ground and the enclosures. HS3: Indoor air quality The basic requirement of the document defines that means will be available so that the enclosure can adequately ventilate, eliminating the pollutants produced by the use of the building, so that a sufficient external air flow and expulsion of the stale air are provided. 7.3. SUMMARY OF THE INTERVENTION PROPOSALS Once all the elements, damages and intervention criteria for the building have been studied, the number of elements necessary to intervene is enumerated and quantified. The intervention proposal will include: 7.3.1. Vertical structure Proposal for intervention inside the facade walls: Renovation of the walls affected by moisture: repair of detachments (repair on the base of the walls). Renovation of dry walls: repair of detachments (partial repair). Proposal for intervention of the exterior face of the facade walls: Renovation of the walls affected by moisture: repair of detachments (repair on the base of the walls). Renovation of dry walls: repair of detachments (partial repair). Proposal to repair fissures in the walls: Fissure repair technique. Proposal for consolidation of the walls: Intervention on the foundations (technique of ground consolidation through injections under the foundation). Proposal for intervention on the walls in contact with the ground: Treatment in the walls against moisture by capillary action (resin injection technique). Proposal improvement of structural safety Replacing the double hollow brick load walls. 7.3.2. Horizontal structure Proposal for rehabilitation of the inclined roof: Removal and replacement of asbestos sheets. Proposal for intervention of the upper false ceiling structure: Removal of the wooden structure of the false ceiling. Proposal for intervention of the cover structure: Maintenance of the roof and application of fire regulations. 7.3.3. Pavements Pavement intervention proposal: Replacement of the concrete slab of the workshop. Replacement of the pavement of the showers.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 43 7.3.4. Singular elements Proposal for intervention on facade elements: Repair of moldings. Stucco repair. 7.3.5. Carpentry Maintenance proposal on the facade carpentry. Restoration of wood and steel joinery. Replacing the grides. 7.4. INTERVENTION Next, the necessary works for the intervention of the building according to the order of action will be described: 7.4.1. Intervention in the foundation Given that a differential settlement process has taken place in the building, the foundations existing in the facade walls are reinforced by consolidating the ground. To do this, proceed as follows: I. Realization of drills on the outside face of 26 mm diameter facade at a depth of up to 3 meters and at a distance between them of 20 cm, at a distance from the wall that allows reaching the ground found under the foundation. II. Injection of polyurethane expansive resin with injection gun. III. Filling the drills with cement grout. 7.4.2. Roof intervention Many of the damages that we find in the building are caused by the filtration of rainwater through the roof, either caused by poor maintenance of the water evacuation system or the bad state of the sheets, in this case, when we meet a system formed by asbestos sheets and given its danger, the brick support of the roof will also be removed, leaving only the purlins. Then it was also decided to eliminate the false ceiling of the hurdle and its structure, given the state of rot of a large part of the system. As a substitution, a sandwich panel made of steel sheet and polyurethane foam will be used. The intervention of this element will proceed as follows: I. Manual removal of the false ceiling and the false ceiling of the offices, as well as the wooden elements that form it and deposit them in the relevant area for waste. II. Disassembly of mechanical ventilation elements and installations. III. Removal of the elements of asbestos and its support by a certified company. IV. Cleaning and preparation of the surface of the roof metal structure, scraping and sanding of the rusted parts. V. Application of passive fire protection of metallic structure, through of pneumatic projection of fireproof mortar, reaction to fire class A1, according to R.D. 110/2008, composed of cement in combination with perlite or vermiculite, to form a minimum thickness of 23 mm and achieve a fire resistance of 120 minutes. VI. Roof assembly consisting of steel insulating sandwich panels, 40 mm thick and 1000 mm width, formed by double-sided metal made of standard steel sheet, pre-lacquered finish, with an exterior thickness of 0.5 mm and an interior thickness of 0.5 mm and insulating core of medium density polyurethane 40 kg / m³, and accessories, mechanically fixed to any type of structural strap and skylight in covers, covered with 40 mm thick colorless "ACH" polycarbonate sheets. VII. Installation of horizontal firewall, 1 m width, with fire resistance EI 90, for industrial use building, mechanically fixed to the party wall with support substructure, D113-FC.es 02 "KNAUF"system ,composed of 3 plates of DF / UNE-EN 520 - 1200 / length / 15 / laminated gypsum with the longitudinal edges refined, "KNAUF" firewall, fixed to the support substructure composed of channels and uprights, forming separate brackets 750 mm apart, connectors and separate guides 400 mm between each other. Even screws for fixing the plates, and paste and tape for the treatment of joints. VIII. Mounting false ceiling of the office by holding it in the roof structure.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 44 7.4.3. Pavement intervention Given the state in which the slab that forms the pavement in the bodyshop is, it is decided to remove it and build a new one. To carry it out, the following procedure is followed: I. Removal of the existing slab through mechanical works and transfer of waste. II. Preparation of the ground by mechanical works, removal of the remains, cleaning of the area in contact with the walls by manual works and compaction of the base. III. Base placement of gravel, using aggregate of 30 to 40 mm and compacting it. IV. Placement of the assembly based on ME 15x30 Ø 6-6 B 500 T 6x2,20 UNE-EN 10080 electrowelded mesh on approved separators. V. Cleaning of the surface in contact with the perimeter wall, placement of expanded polystyrene expansion joints 3 cm thick in the side wall, wetting of the support prior to the pouring of the concrete. VI. HA-35 / B / 20 / IIIa + Qc concrete pouring manufactured in central with SR cement, from truck, extended and manually vibrated. 7.4.4. Intervention of the interior walls (substitution) Since the double hollow brick is not an element that was thought as a structural element, but to create partitions, it is decided to replace all these load walls with perforated brick walls, for which the following process will be carried out: I. Shoring of the upper slabs near the point of support with the load walls by placing struts, with girders and sleepers. II. Demolition of the walls: All previous actions foreseen in the corresponding demolition project must have been completed once the wall of the ceramic brick has been demolished, with manual works, and manual loading on a truck or container. III. Execution of loading wall, 15 cm. of thickness, of perforated ceramic brick, for coating, 24x12x9 cm, received with M-5 cement mortar, with horizontal reinforcement "MURFOR" RND.4 / Z 30 mm, with proportional part of overlaps and hooks for lintels and corners, arranged according to the calculations and recommendations of the "MURFOR" manual. IV. Disassembly of the shore and entry into loading of the wall. V. The coating process will be carried out according to the following section. 7.4.5. Intervention of internal walls and partitions (coatings) In this case, the main damages are generated by moisture, but we also find erosions, chipping and dirt caused by the activity inside. The intervention in the interior will be carried out in the following way: I. For areas over 3 meters high, it must be taken into account that it will be necessary to pre-assemble a tubular type scaffolding, 6 m maximum heigh, consisting of platforms 60 cm width, arranged every 2 meters high, interior staircase and rear railing with two bars and baseboard and front rail with a bar. II. Preparation of the surface: hand rubbing and brushing with air pressure, cleaning the dry surface with deionized water under pressure, cleaning the surface with moisture with a 10% water and bleach solution, removing the previous coating (in the case of areas with moisture up to 50 cm from the affected area) until reaching a stable support. (At this point, in parallel, the anti-capillary treatment process will be applied, a process explained later in the following section). III. Cleaning and wetting of the surface prior to the application of the coating. IV. Application of hydraulic lime mortar with thicknesses of 10 to 15 mm applied in two coats on the wall, after placing fiberglass mesh in material changes and contact areas with slabs, manually with metal flat. V. Prepare the surface, once the material has hardened enough; give flatness to the enclosure, by manual works, for subsequent application of the coating. VI. Application of the coating: Cleaning of dust or particles of the surface of the support that hinder the adhesion of the coating, wetting prior to application. Application of the plastering to good view with C6 plaster and a thickness of 3 to 6 mm., With manual works and metallic flat, of compact and uniform form, without irregularities. VII. Once hardened and dried, smooth the surface by hand until a smooth surface is obtained. 7.4.6. Intervention on the facades (Anti-capillary treatment) One of the most obvious damages in the walls of the facades is the efflorescence and detachment in the low areas, caused by moisture by capillarity, it is tried to apply a treatment by injection of resins prior to the restoration of the facade and the interior, in order to create a zone of saturation where moisture cannot rise and thus prevent future damage.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 45 I. Preparation of the surface (described in point B of the previous section). II. Perform 18 mm diameter drilling by drilling every 100 mm on the base of the wall, the total length of the drill must be slightly less than the total thickness of the wall to be treated, in this way the width of the wall can be covered in its entirety without need to drill on both sides of it. III. Cleaning of dust and residues of the perforations by aspiration. IV. Injection of siloxane resin by injection gun in each of the perforations. V. Application of the coating according to the previous section. 7.4.7. Facade intervention The main facade is one of the most interesting elements of the building given its complexity and historical interest, which is why it will be treated with the utmost care, on the facades is where we find more damages due to its age and lack of maintenance, intervention of the facade in a complex process that will be carried out in the following way: I. For areas of more than 3 meters in height, it must be taken into account that it will be necessary to pre-assemble a tubular-type scaffolding, with a maximum height of 10 m, consisting of platforms 60 cm widht, arranged every 2 meters high, interior staircase and rear railing with two bars and baseboard and front rail with a bar. II. Removal of overlapping elements on the facade, such as the sign or the grides of the windows and / or facilities. III. Elimination of the reinforcement in poor condition and cleaning of the surface in contact, replacement of the metal assembly by fiberglass bars, reconstruction of the molding according to details by craftsman. IV. Preparation of the surface: hand rubbing and brushing with air pressure, cleaning the dry surface with deionized water under pressure, cleaning the surface with moisture with a 10% water and bleach solution, removing the previous coating (in the case of areas with moisture up to 50 cm from the affected area) until reaching a stable support. V. Cleaning and wetting of the surface prior to the application of the coating. VI. Brushing and cleaning moldings not repaired by manual works. VII. Repair of fissures: Saturate the surface with water at low pressure until getting rid of the residues of the wall, sealing the fissure with hydraulic lime mortar NHL 5, removal of the remaining material by trowel, once the mortar is hardened, the cleaning of the wall preparing the support to receive the following layers of plaster. VIII. Application of hydraulic lime mortar with thicknesses of 10 to 15 mm applied in two coats on the wall, after placing fiberglass mesh in material changes and slab edges, manually with metal flat. IX. Execution of the sgraffito stucco: application of base layer of hydraulic lime mortar with trowel. Once dried this layer apply a second layer using a trowel, achieving a smooth and uncompressed finish, then apply one more layer to regularize the surface for the final layer, finally apply a compact layer by trowel and seal the wall with water of lime taking care not to remove the previous layer. Next, the stenciling of the sgraffito is marked on the wall as a template and quickly while the support is still wet, the drawings are marked with a metallic sheet, grated little by little until the lines are marked so that the cut is not horizontal and has an inclination of 45º approximately and leaving the smooth cut. Once cut, continue to empty the rest of the drawing with the tool that best suits the size of the drawing. X. Restoration of the mosaics, cleaning of the surface by means of pressurized water, removal of the loose pieces for subsequent placement, selection of tiles with characteristics similar to those found in the mosaic, placement of the new pieces and those previously extracted by C2 cement glue using trowel on the partial surface of the facing, then grate the adhesive and place the pieces tapping gently. XI. Once the adhesive has hardened, proceed to grout the entire mosaic with grout applied with a rubber trowel, removing the excess diagonally. XII. When drying the grout, with a hard and slightly damp sponge remove the excess cement without applying too much pressure so as not to remove the material from the joints. Finally let dry. XIII. Cleaning and sweeping of the wall. XIV. Coloring by painting the different facade elements following the color scheme marked on the facade plan. XV. Placement of the facade overlapping elements. 7.4.8. Carpentry intervention The maintenance of the exterior carpentry has been deficient for many years, so it is decided to conserve and restore them. On the other hand, the state of the external bars is unrecoverable, therefore they are replaced.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 47 8. BUDGET Once the intervention proposal has been prepared, the budget for the works is drawn up. You can find an expanded budget in VIII annex. CHAPTER DESCRIPTION AMOUNT 1 Auxiliary resources 32.092,61 € 2 Previous works 7.118,46 € 3 Demolitions and disassembly 88.445,49 € 4 Restoration of facades 76.416,92 € 5 Structure 27.015,52 € 6 Roof 118.385,58 € 7 Coating 34.199,15 € 8 Pavements 43.812,87 € 9 Carpentry and exterior locksmith 9.889,15 € 10 Waste management 1.998,17 € 11 Safety and health 15.000,00 € 12 Tests and quality control 1.090,90 € TOTAL MATERIAL EXECUTION 455.464,82 € 13% General expenses 59.210,43 € 6% Industrial profit 27.327,89 € SUBTOTAL 542.003,14 € 10% I.V.A. 54.200,31 € TOTAL BUDGET FOR CONSTRUCTION CONTRACT 596.203,45 €
Can Ribó cordage plant: Study, diagnosis and intervention proposals 49 9. CONCLUSIONS The Can Ribó cordage plant is a historic building dating back to 1910, over the years the building has evolved from an open space with small warehouses that grew, to the factory that we find today. We must take into account the amount of problems and history that this company has gone through in its early years, but that, finally, managed to overcome thanks to a will that led it to stand out from others, as reflected in the facade modernist that today is conserved. The realization of this project has helped us to consolidate and expand knowledge acquired throughout the degree, uniting knowledge that in an origin we saw unconnected in a project in which, being two members, we worked as if it were a small office, documenting us, conducting interviews and doing office work. Being a building with so much history, we have been able to see and study a lot of systems and constructive elements different from those that we could find today, and, although a large part of them we have been able to observe them during the realization of the degree, it has not been until we have them in front of us, we have realized what they represent. In terms of damages, the building has suffered a degradation since the closure of the factory in 1986, from becoming a representative building has become only a source of income for the family owner beyond what was formerly, in otrer words, the building and its history have not been respected at any time, even destroying part of the facade in order to obtain more benefits with the resulting industrial plants. It must be taken into account that the intervention proposal is focused on maintaining the current economic activity of the building, without having to do too much damage to the current tenants of the plants, having all the income of the company Talleres Maristany SL. blocked during the time that the reform was carried out, and that is why it has not been decided to create a new project and that only those interventions necessary to maintain the building in its current state are carried out. Once the necessary intervention is known and the budget is drawn up, we realize that the amount to intervene in the building is too much, in comparison, for example, with the acquisition of a new plant, which is why after the end of this project we discourage the intervention as it is proposed. The intervention, from our point of view, should be carried out at the moment in which the tenants leave and a change of use is made in the building, this would also help to amplify the intervention, granting for example the original appearance to the facade and recovering the entire interior structure.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 51 10. BIBLIOGRAPHY WEB Cadastral Data Consultation [Consulted in: May 24, 2018] Available in: http://www.sedecatastro.gob.es/ Statistical Institute of Catalonia (Idescat) [Consulted in: June 16, 2018] Available in: https://www.idescat.cat/ Registry of urban planning of Catalonia (RPUC), 2011 [ONLINE] Scale 1:5.000. Badalona [Consulted in: May 24, 2018] Available in: http://ptop.gencat.cat/rpucportal/inici/ca/index.html Cartographic and Geological Institute of Catalonia, 2018. Mapa topogràfic de Catalunya [ONLINE] Scale 1:5.000. Badalona [Consulted in: May 24, 2018] Available in: http://www.icgc.cat/ Badalona city hall website [Consulted in: June 16, 2018] Available in: http://badalona.cat/portalWeb/ IGME's Geoscientific Information [Consulted in: May 24, 2018] Available in: http://info.igme.es/catalogo/default.aspx Catalan Journals with Open Access (RACO) [Consulted in: August 10 , 2018] Available in: https://raco.cat/index.php/raco Weather website [Consulted in: June 16, 2018] Available in: https://www.eltiempo.es/ CYPE price generator [Consulted in: September 6, 2018] Available in: http://generadorprecios.cype.es/ Company ACH [Consulted in: September 6, 2018] Available in: http://www.panelesach.com/ Company KNAUF [Consulted in: September 6, 2018] Available in: http://www.knauf.es/ Company GRUPOPUMA [Consulted in: September 6, 2018] Available in: https://www.grupopuma.com/es-ES/productos/ver/morcemsec-active-capa-fina-cr-csiv- w2-es-es NORMATIVE Fomento, G. d. Código Técnico de la Edificación. CTE. [ONLINE] 2015. Available in: www.codigotecnico.org/index.html Asociación Española de Normalización y Certificación. AENOR UNE-EN 1993: Eurocodigos Estructurales. [ONLINE] 2008. Available in: http://www.aenor.es Ministerio de Industria, Turismo y Comercio. Real Decreto 2267/2004, de 3 de diciembre, por el que se aprueba el Reglamento de seguridad contra incendios en los establecimientos industriales. A: Boletín oficial del Estado [ONLINE]. Madrid: BOE, 3 diciembre 2004, nº 303 [Consulted in: August 7, 2018] Available in: https://www.boe.es/buscar/act.php?id=BOE-A- 2004-21216 DOCUMENTS Asociación Rehabimed. Método RehabiMed. Arquitectura tradicional mediterránea II. Rehabilitación del Edificio. [ONLINE] 2007. [Consulted in: April 28, 2018] Available in: www.rehabimed.net Notes of the bachelor's degree in Architectural Technology and Building Construction by “Escola Politècnica Superior d’Edificació de Barcelona” (EPSEB) Brangulí, Josep. Fire of the Jaume Ribó Sunyol cordage plant [PHOTO] Badalona. Generalitat de Catalunya. Arxiu Nacional de Catalunya. November 29, 1932. ANC-1-42-N-16024 Cuyás, Josep Maria. Can Ribo’s cordage plant [PHOTO] Badalona: 1900’s. Josep Maria Cuyás collection. Badalona Museum Cortinas, Josep. Can Ribo’s cordage plant [PHOTO] Badalona: 1900’s. Josep Cortinas collection. Badalona Museum Silvestre Magriñà, Joan. Can Ribo’s cordage plant [PHOTO] Badalona: 1900’s. Joan Silvestre Magriñà collection. Badalona Museum Sarasas, Jaume. Ribo’s cordage plant [PHOTO] Badalona: 1900’s. Jaume Sarasas collection. Badalona Museum REFERENCES [1] http://badalona.cat/portalWeb/badalona.portal%3Bjsessionid=0QLQMQcX1T3K1Wn5 dxcQKq87G9pYGTLznJQfxrRchyrb8rXP6hmM!-2035279826?_nfpb=true&_pageLabel=contingu t_estatic&dCollectionID=908#wlp_contingut_estatic (2018/4) [2] Carreras i García, Montserrat. La indústria a Badalona. Del 1700 a 1936. Carrer dels Arbres, 3ª època nº4 (1993) [3] Abril Fornaguera, Joan. Les Corderies d’antany. Revista de Badalona nº 2959, p.124-126 (1989) [4] Dionis Piquero, Cristina. Oficis artesanals. Carrer dels Arbres, 3ª època nº9 p. 31-44 (1989) [5] Bohigas, Oriol. Joan Amigó i Barriga. Otro modernista desconocido. Cuadernos de arquitectura, nº63 (1966)
Escala 1:2500 Data impressió:21/5/2018 *Plànol sense valor normatiu Badalona-Barrios 1.5k Visor GIS intranet v4.1 2017 PDF plànol
Data impressió: 22/05/2018Escala 1:2000 (a DIN-A4) MUC. Mapa de valor informatiu
Carrer de Jaume Ribó Carrer del Torrent de Vallmajor Carrer de Joaquim Vayreda Carrer del Pomar de Baix Ferrocarril de rodalies C-1 Carrer d'Orient Passeig Marítim N-II Carrer d'Isidre Nonell Carrer de Ramon Casas Carrer del Drac P l a t j a d e l C r i s t a l l P l a t j a d e l a B a r c a M a r i a Mar Mediterrània
Carrer de Jaume Ribó Carrer del Torrent de Vallmajor Carrer de Joaquim Vayreda Carrer del Pomar de Baix Ferrocarril de rodalies C-1 Carrer d'Orient N-II
Can Ribó cordage plant: Study, diagnosis and intervention proposals 73 A.III. MEMORY EXTENSION: HISTORY (DOCUMENTS)
Can Ribó cordage plant: Study, diagnosis and intervention proposals 75 Figure III.1: Entrance to Can Ribó factory, 1920 Source: Badalona Museum, Josep Maria Cuyás collection Source S Figure III.2 and III.3: Can Ribó factory, 1910 Source: Badalona Museum, Josep Maria Cuyás collection Source S
Can Ribó cordage plant: Study, diagnosis and intervention proposals 76 Figure III.4, - III.5, III.6 and III.7: Can Ribó’s factory interior, 1936 - 1937 Source: Badalona Museum, Josep Cortinas collection
Can Ribó cordage plant: Study, diagnosis and intervention proposals 77 Figure III.8 and III.9: Can Ribó’s factory interior, 1936 - 1937 Source: Badalona Museum, Josep Cortinas collection Figure III.10 and III.11: Can Ribó factory, 1910 and Fire in Can Ribó 1932 Source: Badalona Museum, Josep Maria Cuyás collection Source S
Can Ribó cordage plant: Study, diagnosis and intervention proposals 78 Figure III.12 and III.13: Fire in Can Ribó’s factory, 1932 Source: Arxiu Nacional Catalunya
Can Ribó cordage plant: Study, diagnosis and intervention proposals 79 Figure III.14, III.15, II.16 and III.17: Can Ribó’s factory interior, 1980 Source: Badalona Museum, Jaume Sarasas collection
Can Ribó cordage plant: Study, diagnosis and intervention proposals 86 Figure III.27: Can Ribó’s plan, 1918 Source: Badalona Museum
250m Torrent de Vallmajor "Carretera de Madrid a Francia por la Junquera" Storage Storage Storage Storage Storage Garden Rooms Yard Yard Electric motor 9 P. Electric motor 3 P. Electric motor 5 P.
250m Torrent de Vallmajor "Carretera de Madrid a Francia por la Junquera" Storage Storage Storage Storage Storage Garden Rooms Yard Yard Electric motor 9 P. Electric motor 3 P. Electric motor 5 P.
Storage
20m16,80m 210m Torrent de Vallmajor "Carretera de Madrid a Francia por la Junquera" Storage Storage Storage Storage Storage Garden Rooms Yard Yard Electric motor 9 P. Electric motor 3 P. Electric motor 5 P.
Storage
250m Torrent de Vallmajor "Carretera de Madrid a Francia por la Junquera" Storage Storage Storage Rooms Yard Electric motor 9 P. Electric motor 5 P. Entrance Electric motor 3 P.
Storage Storage Torrent de Vallmajor "Carretera de Madrid a Francia por la Junquera"
40m 100m70m Torrent de Vallmajor Electric motor 30 P. Spinning machine Spinning machine Ribbon lap machine Combing machine
Storage Storage Torrent de Vallmajor "Carretera de Madrid a Francia por la Junquera"
Section A1 - A1' GF FF
Section A3 - A3' Section A2 - A2' GF FF
Section B1 - B1' Section B2 - B2' GF FF
Lateral facade Principal facade
33% 33% 33% 33% 33% 20% Air extractor Skylight
Can Ribó cordage plant: Study, diagnosis and intervention proposals 127 A.V. MEMORY EXTENSION: BUILDING DESCRIPTION
Can Ribó cordage plant: Study, diagnosis and intervention proposals 129 V. BUILDING DESCRIPTION V.1. PLANTS DESCRIPTION V.1.1. Mechanical workshop V.1.1.1. Ground floor The ground floor is characterized by being divided by double-hollow brick, either in the form of a partition or in the form of a structural wall. From the main doors there is access to the mechanical workshop being the largest space of the building, with a total of 675.97 m2 and which in turn gives access to the other spaces of the building. On the other hand, the small access door from the street gives us a small hall that gives access to the offices on the first floor and the waiting room. Inside the ground floor we find two spaces, the workshop as we have already described, and a core of rooms with different uses, adjacent to the facade of the Mataró National Road, some of which we can find are the locker room and the storage of spare parts. Below is a set of photographs of the rooms on the floor: Figure V.1: GF.2 (Office 1) Figure V.2: GF.3 (Staircase) Figure V.5:GF.4 (Waiting room) Figure V.6:GF.5 (Storage 1) Figure V.3: GF.9 (Locker room 1) Figure V.4: GF.10 (Electrical workshop) Figure V.7: GF.11 (Passage area 1) Figure V.8: GF.12 (Workshop)
Can Ribó cordage plant: Study, diagnosis and intervention proposals 130 V.1.1.2. First floor On this floor we find a series of spaces destined mainly for an administrative use, separated from each other by partitions of double hollow brick, the main spaces of the floor are the office and the meeting room. Figure V.9: FF.1 (Storage 3) Figure V.10: FF.2 (Bath 2) Figure V.11: FF.4 (Passage area 2) Figure V.12: FF.5 (Storage 4) Figure V.13: FF.6 (Storage 5) Figure V.14: FF.8 (Office 2) Figure V.15: FF.9 (Meeting room) Figure V.16: FF.10 (Storage 7) Figure V.17: FF.11 (Storage 8)
Can Ribó cordage plant: Study, diagnosis and intervention proposals 131 V.1.2. Bodyshop V.1.2.1. Ground floor On the ground floor we find three spaces separated by double hollow brick partitions, the main one, the bodyshop, with a total extension of 339.43 m2, through which the building is accessed from the outside and at the same time gives access to the other two rooms, the office and the bathrooms. Below is a set of photographs as a tour of the plant: V.1.2.2. Loft Between the first floor and the ground floor we find a small space used as a warehouse for material that is accessed through stairs from the bodyshop. V.1.2.3. First Floor On the first floor we can see two spaces at each end of the nave; Adjacent to the facade and accessible from the spiral staircases we find a warehouse and the locker rooms. On the other hand at the bottom of the workshop we find a last warehouse built on a steel structure and plywood panels. Below are photographs of the first floor: Figure V.18: GF.14 (WC 2) Figure V.19: GF.15 (Office 2) Figures V.20 and V.21: GF.16 (Bodyshop) Figure V.22: L.1 (Storage 2) Figure V.23: FF.13 (Bath 3) Figure V.24: FF.14 (Storage 9)
GF.1 GF.2 GF.3 GF.4 GF.5 GF.6 GF.7 GF.8 GF.9 GF.10 GF.11 GF.12 GF.16 GF.14 GF.13 GF.15 S.1 S.2 S.3 S.4 S.5 L.1 S.3 S.4 LOFT
LOFT
1 2 3 4 25 3 4 5 2 3 4 5 1 2 3 4 5 A Slab of concrete joists with brick vaults PLAN KEY 1 T-18 prestressed concrete joist 2 Brick vault 3 Solid concrete 4 Cement mortar F Slab of of metallic joists with brick vaults of thickness 22cm G Slab of of metallic joists with brick vaults of thickness 17cm C Support section between concrete joist and supporting wall B Support section between metallic beam and pillar D Support section between concrete joist and metallic beam E Support section between concrete joist and concrete beam 5 30 x 30 cm tile 6 6 IPN 200 7 Ring beam 8 Double hollow brick 29x14x9 cm 9 Double hollow brick 24x12x7 cm 3 7 8 9 1 1 1 2 2 2 3 4 5 3 4 5 34 5 6 8 8 10 11 10 Conector 11 Strap 10 12 12 Concrete beam 13 13 13 IPN 140 A F G B C E D
1 2 3 5 6 4 6 5 3 24 1 1 2 3 4 5 7 A Slab of metal beam without brick vaults and beam - pillar union B Slab of metal beam without brick vaults and beam - pillar union C Slab of metal beam without brick vaults and beam - pillar union D C EA B D Slab of coated metal beam without brick vaults E Slab of coated metal beam without brick vaults and union between beams 7 8 9 10 11 13 14 15 12 9 8 9 10 11 12 13 14 15 9 PLAN KEY 1 Plywood 2 HEB 120 3 IPN 260 4 Self-drilling screw 4,8x19 5 Metal plate 10mm thick 6 HEB 140 7 IPN 300 8 30 x 30 cm tile 9 Cement mortar 10 Solid concrete 11 Electrowelded steel lath 15x30 cm 12 Conector 13 IPN 200 14 Simple brick 30x4x15 cm 15 Glass-fibre mesh
Can Ribó cordage plant: Study, diagnosis and intervention proposals 153 VI.3. ROOF: 3D, PLANS AND DETAILS Figure VI.1: General view of the metal structure Figure VI.2: North-east view of the metal structure Figure VI.3: North-west view of the metal structure Figure VI.4: Detailed view of the newer metal structure Figure VI.5: Detailed view of the truss
PLAN KEY 1 7 x 2 cm wooden strip 2 8 x 15 cm wooden beam 3 Lathwork 4 Gesso 5 Supporting wire 6 T metal profile 7 Rockwool panel 1 2 3 4 False ceiling with wood laths / sleepers and plastered lathwork 1 2 3 4 1 2 3 4 6 7 5 False ceiling with wood laths / sleepers and plastered lathwork with office false ceiling
A C D F E B A A 1 3 1 3 4 4 2 1 2 3 4 FD C 1 1 1 2 2 2 3 3 3 44 4 PLAN KEY 1 L 60x5 metallic profile 2 Round-head metallic screw 10mm x 30mm 3 Round-head metallic screw 8mm x 30mm 4 Metal plate 5mm thick B E 11 3 3 4 4
Can Ribó cordage plant: Study, diagnosis and intervention proposals 161 VI.4. PAVEMENT PLANS
GF.3 GF.12 GF.16 GF.15 GF.13GF.14 GF.11 GF.10 GF.9 GF.8 GF.7 GF.6 GF.5 GF.4 GF.2 GF.1 L.1 S.3 S.4 LOFT
FF.1 FF.2 FF.3 FF.5 FF.6 FF.4 FF.10 FF.9 FF.8 FF.7 FF.11 FF.12 FF.13 FF.14 FF.15
D.1 1 Unit Interior hollow varnished wooden single door, with 7cm thick frame. D.2 2 Units Exterior steel sliding door. D.3 1 Unit Exterior steel single door. D.6 1 Unit Interior hollow varnished wooden single door, with 7cm thick frame. D.7 1 Unit Interior hollow varnished wooden single door, with 7cm thick frame. D.9 1 Unit Interior hollow varnished wooden single door, with 7cm thick frame. D.8 1 Unit Interior aluminum with glass double door, with 7cm thick aluminum frame. D.4 1 Unit Exterior steel double door. D.5 1 Unit Exterior steel sliding door, divided in tree parts with pedestrian door.
D.10 1 Unit Interior hollow varnished wooden single door, with 7cm thick frame. D.11 1 Unit Interior hollow varnished wooden single door, with 7cm thick frame. D.12 1 Unit Interior hollow varnished wooden single door, with 7cm thick frame. D.14 2 Units Interior hollow varnished wooden single door, with 7cm thick frame. D.15 1 Unit Interior hollow varnished wooden single door, with 7cm thick frame. D.17 1 Unit Interior hollow varnished wooden single door, with 7cm thick frame. D.18 1 Unit Interior hollow varnished wooden single door, with 7cm thick frame. D.19 9 Units Interior hollow varnished wooden single door, with 7cm thick frame. D.13 2 Units Interior glass single door, with 5cm thick aluminum frame. P.1 1 Unit Interior aluminum with glass wall composed by door and four windows, with 7cm thick aluminum frame. D.16 1 Unit Interior aluminum with glass single door, with 7cm thick aluminum frame.
W.1 4 Units Exterior folding wooden window with single glass, with 4cm thick wooden frame. W.2 1 Unit External steel grid. W.3 2 Units Exterior sliding aluminum window with double glass, with 7cm thick aluminum frame. W.4 1 Unit External concrete grid. W.5 1 Unit External steel grid. W.6 1 Unit Exterior fix wooden window with single glass, with 4cm thick wooden frame. W.7 1 Unit Interior aluminum with glass fix window, with 7cm thick aluminum frame.
W.8 1 Unit Interior aluminum with glass sliding window, with 7cm thick aluminum frame. W.9 1 Unit Interior aluminum with glass sliding window, with 7cm thick aluminum frame. W.10 1 Unit Interior aluminum with glass fix window, with 7cm thick aluminum frame. W.11 2 Units External steel grid. W.12 1 Unit Exterior swing wooden window with single glass, with 4cm thick wooden frame. W.13 1 Unit Exterior swing wooden window with single glass, with 4cm thick wooden frame. W.14 3 Units Exterior swing wooden window with single glass, with 4cm thick wooden frame. W.15 1 Unit Interior aluminum with glass fix window, with 7cm thick aluminum frame. W.16 5 Units Interior aluminum with glass fix window, with 7cm thick aluminum frame.
Can Ribó cordage plant: Study, diagnosis and intervention proposals 183 VI.6. FACADE PLANS
1 2 3 4
5 67 8 9 10 11 12 16 13 14 15
1 2 3 4
19 7 20 21 22 17 18
1 2 3 4
Can Ribó cordage plant: Study, diagnosis and intervention proposals 206 3.5 M2 Disassembly of all those signage elements located on the facade that interfere with and/or could deteriorate during the execution of the rehabilitation works, such as posters, signs, masts, etc., with manual works, and recovery, collection and assembly of the material in the same location, and manual loading on a truck or container. 2,00 4,87 € 9,74 € 3.6 M2 Raised, with manual works and equipment of oxy-fuel welding and cutting, of metallic grate, located in hollow of facade and fixed to the surface by without deteriorating the constructive elements to which it is subject and manual load on truck or container. The price includes disassembly of accessories and fasteners. 46,46 6,76 € 314,07 € 3.7 M2 Demolition of wood framework, with manual means and chainsaw, and manual loading on truck or container. 1256,75 24,36 € 30.614,43 € 3.8 M2 Demolition of a plastered hurdle false ceiling, located at a height greater than or equal to 4 m, with manual works, without damaging the continuous building elements, and manual loading on a truck or container. 1060,99 6,46 € 6.854,00 € 3.9 M2 Disassembly of false ceiling registrable of plates of mineral fibers, located at a height of less than 4 m, with manual works and recovery, collection and assembly of the material in the same location, without affecting the stability of the constructive elements to which it is subject, and manual loading on a truck or container. 201,33 5,11 € 1.028,80 € 3.10 M2 Disassembly of asbestos fiber cement sheeting, mechanically fastened on a structural belt less than 20m high, by a qualified company registered in the Register of Companies with Risk of Asbestos, on a sloping roof with an average slope of 33%, for an average area to be dismantled between 1,000 and 2,000 m²; with adequate works, and mechanical loading on a truck. The price includes the disassembly of fasteners, finishes, gutters and downspouts and measurements of asbestos (environmental and personals) 1319,56 26,01 € 34.321,76 € 3.11 M2 Demolition of continuous concrete pavement in mass, with a pneumatic hammer, without damaging the contiguous building elements, and manual loading on a truck or container. 345,00 10,27 € 3.543,15 € 3.12 M2 Demolition of existing pavement in the interior of the building, of ceramic tiles, with manual means, without deteriorating the contiguous constructive elements, and 7,37 10,31 € 75,98 € manual loading on truck or container. The price includes the chopping of the grip material attached to the support, but does not include the demolition of the support base. 3.13 M2 Removal of plaster coating applied on vertical facing more than 3 m high, with manual works, without damaging the support surface, which will be uncovered and prepared for its subsequent coating, and manual loading on truck or container. 928,58 8,05 € 7.475,07 € 3.14 M2 Removal of plaster or stucco of lime and its plastering base, applied on external vertical facing of more than 3 m in height, with manual works, without damaging the support surface, which will be uncovered and prepared for its subsequent coating, and manual loading on truck or container. 193,11 14,61 € 2.821,34 € 3.15 M3 Demolition of brick wall with hollow ceramic brick covered, with manual works, and manual loading on truck or container. The price includes the demolition of the coating. 10,77 91,78 € 988,47 € TOTAL CHAPTER 3 88.445,49 € CHAPTER 4 RESTORATION OF FACADES Measurement Price Amount 4.1 U Facade restoration, composed of: location of singular elements in poor condition through the facade surface (with greater incidence on cornices, lintels, overhangs, bulges and decorative figures) by visual methods, sound or any other suitable in each case , to find all lose and damaged parts with danger of falling to the public road, with removal of them, repair, emptying of decorative elements affected and relocation by epoxy resins, staples or the medium that in each case is considered more appropriate to the sight of the state of the same, reconstruction of its state or primitive figure, until leaving everything in perfect conditions and without falling danger. It will be measured by development in vertical projection of the facade without deduction of holes or increased bulges. 1,00 7.623,49 € 7.623,49 € 4.2 M Treatment of dampness by capillarity in walls, by emulsion injection of silanes and siloxane based emulsion through high pressure injection nozzles introduced in 18 mm diameter perforations, previously made in the wall every 10cm, staggered and inclined to 72,47 88,97 € 6.447,66 €
Can Ribó cordage plant: Study, diagnosis and intervention proposals 207 the ground from 10° to 30°. Even setting out, cleaning the perforations, placing the injection nozzles, sealing the perforations with cement mortar and M-2,5 lime, removing the nozzles and sealing the perforations, filling the drilling with fluid cementitious mortar and cleaning of the excess grout injected and the remains generated. 4.3 U Repair of fissures in ceramic brick wall structure by sealing joints and fissures with cement bastard mortar CEM II / A-P 32.5 R, lime and sand, made on site. 1,00 1.347,32 € 1.347,32 € 4.4 M2 Manual cleaning of facade facing with mold or moisture stains by applying 10% water and bleach solution, with a yield of 0.3 l/m² and subsequent rinsing of the surface with plenty of clean water until the waste of the applied product. 346,68 3,46 € 1.199,51 € 4.5 M2 Manual cleaning of facade facing with presence of saline efflorescence by applying hydrochloric acid solution, with a yield of 0.3 l/m² and subsequent rinsing of the surface with plenty of clean water until the waste of the applied product is eliminated. 346,68 7,65 € 2.652,10 € 4.6 M2 Manual cleaning of façade face with presence of dirt, grease or dust by the application of alkaline detergent, with a yield of 0.2 l/m² and subsequent rinsing of the surface with plenty of clean water until the residues of the applied product are eliminated. 346,68 3,63 € 1.258,45 € 4.7 M2 Elimination of plastic paint layer, smooth finish, applied on surface of the facade, with manual works, application with brush of 0.18 l/m² of high efficiency universal paint remover, impregnating the existing paint, eliminating it with a spatula once softened and posterior washed with pressurized hot water jet to eliminate the remains of the paint stripper. 346,68 11,39 € 3.948,69 € 4.8 M2 Plastering of cement, in good view, applied on a vertical exterior face, surface finish with a float, with cement mortar, type GP CSIII W1, after placement of antialcalis mesh in changes of material and in the forging fronts, after application of a first layer of grout on the wall. 346,68 22,13 € 7.672,03 € 4.9 M2 Sgraffito plaster, made with lime mortar on an exterior facing, after placement of antialcalis mesh in changes of material and in the forging fronts. 346,68 105,98 € 36.741,15 € 4.10 M2 Restoration of enamelled stoneware mosaic 2.5x2.5 cm, 8 €/m², water absorption capacity E <3% group BIb, slip 7,00 27,43 € 192,01 € resistance Rd <= 15, class 0, placed on a cement mortar support surface or concrete, in exterior walls, received with improved cementitious adhesive, C2 gray, with open joint (separation between 3 and 15 mm). 4.11 M2 Cleaning of glazed ceramic mosaic in bad condition, eliminating stains, salts, saline efflorescence and microorganisms, by pouring on the surface of an aqueous solution of acetic acid, brushing, rinsing and subsequent application of specific etching liquid for enameled stoneware, considering a high degree of complexity. 7,00 14,87 € 104,09 € 4.12 M2 Manual application of two coats of Pliolite color paint to choose, matte finish, smooth texture, first coat diluted with 5% diluent and the next diluted with 5% diluent or undiluted, (yield: 0.09 l/m² each hand); previous application of a coat of acrylic primer regulator of the absorption, on exterior facing of mortar. The price includes the protection of the elements of the environment that may be affected during the work and the resolution of singular points. 761,90 9,49 € 7.230,43 € TOTAL CHAPTER 4 76.416,92 € CHAPTER 5 STRUCTURE Measurement Price Amount 5.1 M2 Dry projection of particles of abrasive material (aluminum silicate) on metal profiles until reaching a Sa3 degree of preparation according to UNE-EN ISO 8501-1, eliminating the deteriorated residues of paint and oxide, to proceed subsequently to the application of an antioxidant protection. 434,23 11,89 € 5.162,99 € 5.2 M2 Training of passive fire protection of metallic structure, by means of pneumatic projection of fireproof mortar, reaction to fire class A1, according to R.D. 110/2008, composed of cement in combination with perlite or vermiculite, to form a minimum thickness of 23 mm and achieve a fire resistance of 120 minutes. 434,23 16,51 € 7.169,14 € 5.3 U Simple injection of expansive resin, based on polyurethane, at a level under the foundation plane, with a low degree of complexity, through perforations that go through the existing foundation, of 26mm in diameter, up to 3m maximum depth , to achieve the consolidation of the land located below it, filling in the gaps in the land, stabilizing it and increasing its carrying capacity until reaching the needs obtained according to a previous study of load transmission. 112,33 96,44 € 10.833,11 €
Can Ribó cordage plant: Study, diagnosis and intervention proposals 208 5.4 M2 14 cm thick reinforced brick wall made of perforated ceramic brick (gero), for cladding, 29x14x7,5 cm, compression strength 10 N/mm², received with industrial cement mortar, gray color, M-5, supplied in bulk, reinforced with prefabricated steel armature made of hot galvanized steel with an epoxy resin coating, 3.7mm in diameter and 75mm wide, investment 2.45 m/m². 67,62 56,94 € 3.850,28 € TOTAL CHAPTER 5 27.015,52 € CHAPTER 6 ROOF Measurement Price Amount 6.1 M2 Supply and assembly of roof coverings of inclined roofs, with a slope greater than 10%, with insulated steel sandwich panels, Basic model "ACH", 40mm thick and 1000mm wide, formed by double metal sheet metal steel standard, pre-lacquered finish, Pearl Gray, with an outer thickness of 0.5mm and internal thickness of 0.5mm and insulating core of medium density polyurethane 40 kg/m³, and accessories, mechanically fixed to any type of structural belt. Even fasteners, accessories and gaskets. 1319,56 27,20 € 35.892,03 € 6.2 M2 Skylight formation to a water roof, with self-supporting structure of lacquered aluminum profiles for a maximum light dimension of less than 3m, covered with 40mm thick colorless "ACH" polycarbonate honeycomb plates. Even fasteners, fasteners and anchoring pieces for forming the bearing element, plate cuts, universal aluminum profiles with EPDM sealing rubber, stainless steel screws and special pieces for the placement of the plates. Completely finished in sealing conditions. 258,57 242,96 € 62.822,17 € 6.3 U Helical fan with three-phase motor speed 920rpm, power 0.55kW, for a flow rate of 7720 m³/h, sound pressure level 66dB (A), approved to transport air at 400°C for 2 hours, installed in local apart from the fire risk zone, vacuuming directly from the duct. Even antivibration elements, fasteners and accessories. Fully assembled and tested connections. 5,00 1.765,24 € 8.826,20 € 6.4 M Horizontal fire barrier strip, 1m wide, with fire resistance EI 90, for industrial use building, mechanically fixed to the dividing wall with support substructure, system D113-FC.es 02 "KNAUF", composed of 3 plasterboards Laminated DF / UNE-EN 520 - 1200 / length / 15 / with the longitudinal edges refined, "KNAUF" firewall, fixed to the support substructure composed of channels and uprights, forming separate brackets 750mm apart, 151,30 71,68 € 10.845,18 € connectors and masters separated 400mm each. Even screws for fixing the plates, and paste and tape for the treatment of joints. TOTAL CHAPTER 6 118.385,58 € CHAPTER 7 COATING Measurement Price Amount 7.1 U Repair of fissures in ceramic brick wall structure by sealing joints and fissures with cement bastard mortar CEM II/A-P 32,5 R, lime and sand, made on site. 1,00 863,50 € 863,50 € 7.2 M2 Manual cleaning of facing with the presence of saline efflorescence by applying hydrochloric acid solution, with a yield of 0.3 l/m² and subsequent rinsing of the surface with abundant clean water until the residues of the applied product are eliminated. 215,39 7,65 € 1.647,73 € 7.3 M2 Base layer of lime mortar, type GP CSIII W2, according to UNE-EN 998-1, grey color, reinforced and reinforced with fiberglass mesh anti-alkaline, 15mm thick, good view with rough finish, applied manually, on ceramic facing, vertical factory, of more than 3m height; previous application of the same mortar, to eliminate flatness defects, present in 20% of the support surface. Even PVC beads, for joint formation. The price includes the protection of environmental elements that may be affected during the work and the resolution of singular points, but does not include the mortar finishing layer. 1267,01 22,89 € 29.001,86 € 7.4 M2 Formation of continuous internal coating of plaster, on vertical facing, more than 3m high, 3mm thick, formed by a layer of plaster with gypsum paste applied in thin layer C6, which constitutes the termination or finishing, applied on a previously trimmed surface (the trim layer is not included in the price). Even auctions with skirting, and assembly, disassembly and removal of scaffolding. 1267,01 2,12 € 2.686,06 € TOTAL CHAPTER 7 34.199,15 €
Can Ribó cordage plant: Study, diagnosis and intervention proposals 209 CHAPTER 8 PAVEMENTS Measurement Price Amount 8.1 M2 Supply and installation of tiling with smooth finish tile, 15x15cm, 8 €/m², water absorption capacity E > 10%, group BIII, according to UNE-EN 14411, with slip resistance Rd<=15 according to UNE-ENV 12633 and slip class 0 according to CTE, placed on a support surface of cement or concrete mortar, in interior walls, received with cement adhesive exclusively for interior use, Ci without any additional feature, gray color, and grouted with cement mortar type L, white color, for joints up to 3mm. Even preparation of the support surface of cement or concrete mortar; setting out, cuts, PVC corners, and joints; finishing and final cleaning. 7,37 22,56 € 166,27 € 8.2 M2 Industrial flooring, suitable for workshops, composed by: reinforced concrete slab 40cm thick, made with concrete HRA-35/B/20/IIIa+Qc manufactured in central with SR cement, and poured from truck, extended and vibrated manual. And electrically welded mesh ME 15x30Ø 6-6 B500 T 6x2,20 UNE-EN 10080 on approved separators; and application on the fresh concrete of the hardening mortar layer CT-C60-F10-A6, according to UNE-EN 13813, gray color (5 kg/m²), with a surface finish by mechanical screwing and polishing. 345,00 92,74 € 31.995,30 € 8.3 M2 Preparation of concrete floor by mechanical grinding with diamond disk, obtaining a roughness of less than 2mm, eliminating surface grout or deteriorated paints, and increasing the surface porosity of the concrete, to subsequently proceed with the application of a coating (not included in this price). Even cleaning and collecting dust and debris generated by mechanical suction, collection, removal and loading on truck or container. 772,48 5,68 € 4.387,69 € 8.4 M2 Manual application of two coats of plastic paint, matt finish, smooth texture, first coat diluted with 20% water and the next one undiluted, (yield: 0.09 l/m² each hand), previous application of a coat of primer based on acrylic copolymers in aqueous suspension, on a horizontal concrete inner wall. The price includes the protection of the elements of the environment that may be affected during the work and the resolution of singular points. 1117,48 6,50 € 7.263,62 € TOTAL CHAPTER 8 43.812,87 € CHAPTER 9 CARPENTRY AND EXTERIOR LOCKSMITH Measurement Price Amount 9.1 M2 Restoration of wood joinery. Composed by: disassembly of the same, pickling, repair of damaged parts, three coats of paint and placement. Even masonry aids, measure the unit completely finished and placed. 30,48 48,72 € 1.484,99 € 9.2 M2 Repair of exterior steel joinery "in situ", with a minimum degree of deterioration, through the correction of defects and replacement of deteriorated fittings. Even replacement of coatings and paintings of the walls located in areas adjacent to the intervention. 1,89 47,91 € 90,55 € 9.3 M2 Metal grating consisting of square frame of solid profile of hot rolled steel of 12x12mm, horizontal bars of round of solid profile of hot rolled steel of diameter 10mm and vertical bars of round solid profile of hot rolled steel of diameter 10mm. All metal elements have been submitted to an anti-corrosion treatment in accordance with UNE-EN ISO 1461 and SHOP-PRIMER primer based on polyvinyl-butyral resin with an average coating thickness of 20 microns. Even plates for fixing by chemical anchor in factory work with threaded rods and resin. Elaboration in workshop and final adjustment in work. 49,26 168,77 € 8.313,61 € TOTAL CHAPTER 9 9.889,15 € CHAPTER 10 WASTE MANAGEMENT Measurement Price Amount 10.1 U Transport of inert waste from concrete, mortar and prefabricated produced in construction and/or demolition works, with a 7m³ container, to a specific landfill, a facility for the treatment of construction waste and external demolition to the site or a recovery or disposal waste center. The price includes the outward journey, the unloading and the return trip. 4,00 109,03 € 436,12 € 10.2 M3 Transport by truck of inert waste of concrete, mortar and prefabricated produced in construction and/or demolition, to specific landfill, installation of waste treatment of construction and external demolition to the work or center of valorization or elimination of waste, located at 20km away. The price includes the waiting time at work during loading operations, the outward journey, the unloading and the return trip. 183,77 8,50 € 1.562,05 € TOTAL CHAPTER 10 1.998,17 €
Can Ribó cordage plant: Study, diagnosis and intervention proposals 210 CHAPTER 11 SAFETY AND HEALTH Measurement Price Amount 11.1 U Safety and health promotion. Measure the finished unit. 1,00 15.000,00 € 15.000,00 € TOTAL CHAPTER 11 15.000,00 € CHAPTER 12 TEST AND QUALITY CONTROL Measurement Price Amount 12.1 U Tests to be carried out in an accredited laboratory in the corresponding technical area, on a sample of fresh mortar, taken on site according to UNE-EN 1015-2, for the determination of the following characteristics: consistency according to UNE-EN 1015-3. Even displacement to work and report results. 5,00 200,16 € 1.000,80 € 12.2 U Test to be carried out in an accredited laboratory in the corresponding technical area, on a sample of fresh concrete, taken on site according to UNE-EN 12350-1, for the determination of the following characteristics: consistency of fresh concrete by means of the settlement method of the cone Abrams according to UNE-EN 12350- 2 and characteristic resistance to compression of the hardened concrete with manufacture and curing of four specimens cylindrical test tubes of 15x30cm according to UNE-EN 12390-2, facing and compression fracture of the same according to UNE-EN 12390- 3. Even displacement to work, sample taking and report of results. 1,00 90,10 € 90,10 € TOTAL CHAPTER 12 1.090,90 €