Journal of Industrial Engineering and Management JIEM, 2022 – 15(3): 416-432 – Online ISSN: 2013-0953 – Print ISSN: 2013-8423 https://doi.org/10.3926/jiem.3715 Production Sequence Determination to Minimize the Required Storage Space for the Multiple Items Production System Titirat Vivithkeyoonvong , Wisut Supithak* Industrial Engineering Department, Kasetsart University (Thailand)
[email protected], *Corresponding author:
[email protected] Received: September 2021 Accepted: March 2022 Abstract: Purpose: The research studies the production system having multiple items being processed on the same production line. The objectives are to (1) investigate the influence of production sequence on the optimal value of production run size, (2) explore the effect of production sequence on the maximum inventory level, which can affect the storage space required, and (3) propose a method to determine the proper production sequence in order to minimize the required storage space. Design/methodology/approach: Finding that the optimal production sequence, which yields the lowest storage space required, is independent of the production run size, the research problem is divided into two independent subproblems. The first subproblem is to determine the optimal production run size to minimize the total variable cost. Here, the solution obtained from the classical multiple items EPQ model still holds. The second subproblem is to explore the proper production sequence in order to minimize the storage space required. The relationship between the production sequence and the value of maximum inventory level is determined and formulated. To explore the proper production sequence, a genetic algorithm is developed. For the performance evaluation, two experimental studies are conducted. The first experiment is to compare the solution obtained from the proposed method with the optimal solution yielded from the enumeration method on 360 small size problems. The second experiment is conducted on 180 large size problems. The result obtained from the proposed method is compared with the result yielded from the Largest Pi First (LPF) heuristic constructed by arranging the production of each item according to its production rate in non-increasing order. Findings: It has been found that the optimal production sequence is independent of the production run size. Nonetheless, different production sequences yield different required storage spaces. With the proper production sequence, the manufacturer can reduce the total space required to keep its inventory. The proposed genetic algorithm can be applied to determine the proper production sequence in a reasonable amount of time. For the small size problem of 8 and 10 production items, the 95% confidence interval on mean of the percentage deviation between the solution yielded from the proposed genetic algorithm and the optimal solution is (0.0015, 0.0123). For the large size problem of 15 production items, the proposed genetic algorithm provides the better solution than the LPF heuristic for 158 out of 180 problems with the 95% confidence interval on mean of the percentage deviation of (5.5629, 7.0435). For those remaining 22 problems, the two methods yield the same results. In comparison to the LPF heuristic, the benefit of genetic algorithm is more pronounced when the slack proportion is getting smaller. Research limitations/implications: According to the research model, no shortages are allowed. Therefore, the model is applicable for the production system having the summation value of the ratio between demand rate and production rate for all items not greater than one. -416-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3715 Originality/value: Those traditional research involving the determination of optimal production run size and production sequence in the system having multiple items being produced on the same production line differs from each other in their production environments. However, most of them still have the objective function of minimizing the total system cost incurred. To the best of our literature searching, none of them discussed the influence of production sequence on the total inventory level, which directly affects the required storage space, one of the critical issues facing by many manufacturers. The originality of this work is to show that different production sequence yields different total storage space required and proposed the method to determine proper production sequence. Keywords: inventory management, production sequencing, genetic algorithm, multiple items To cite this article: Vivithkeyoonvong, T., & Supithak, W. (2022). Production sequence determination to minimize the required storage space for the multiple items production system. Journal of Industrial Engineering and Management, 15(3), 416-432. https://doi.org/10.3926/jiem.3715 1. Introduction The problem relevant to the lot size determination, for either making or buying decisions, is one crucial issue facing most organizations. One of the oldest pieces of research involving the lot size determination is the work of Harris (1990). In his work, a well-known economics order quantity (EOQ) model was presented to determine the optimal replenishment lot size. The optimal ordered quantity was calculated by taking the first derivative of the annual total cost respected to the ordered quantity. In the past several decades, plenty of research has been developed by relaxing the assumption of the basic EOQ model in several ways. A literature survey on the evolution of Harris’s EOQ model was presented by Andriolo, Battini, Grubbström, Persona, and Sgarbossa (2014). An essential extension of the EOQ model is the case when the system has a finite rate of replenishment. This condition can be found in most production environments. Taft (1918) proposed the economics production quantity (EPQ) model to determine the optimal production quantity by relaxing the assumption of the infinite production rate of the EOQ model. The research assumes that the finite production rate is known and constant. With a finite production rate, the replenishment item is produced and added to the system gradually rather than all at once. The EPQ model and its variants have gained much attention from many researchers. Misra (1975) discussed an EPQ model for a system with a deteriorating inventory. The cost of inventory deterioration was included in the total variable cost. For the case of constant deterioration rate, the optimum production cycle length and production lot size were determined by taking the derivative of total variable cost. A numerical method was suggested to determine the solution when the inventory deterioration rate is Weibull distributed. Darwish (2008) studied the relationship between the setup cost and the production run length in the EPQ model. The research assumes that the setup cost is a function of the production run length defined by a setup cost shape factor. The total cost functions associated with two different cases, EPQ models with and without backorders, were proved to be convex. The optimal solution is, then, determined by separately taking the partial derivative of the total cost function respected to the production cycle length and the backorder level. The result obtained from the numerical experiment shows that the optimal production cycle length increases when the setup cost shape factor approaches zero. Cárdenas-Barrón (2011) presented the basic concepts of analytic geometry and algebra to determine the optimal lot size and backorders level for the system having both linear and fixed backordering costs. The economic production quantity model with backordering cost and imperfect items was discussed by Hayek and Salameh (2001). The model assumes that, for each production cycle, there are two portions of production time: the regular production time and the production time required to rework those nonconforming items occurred. The optimal production lot size and backordering quantity were determined by taking the partial derivative of the expected value of the total cost function. Similar research with multiple shipments was examined by Chiu, Lin, Wu, and Yang -417-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3715 (2011). Unlike the traditional EPQ model, which assumes a continuous inventory issuing policy, the research investigated the realistic case of multiple shipments in each production cycle. The optimal production lot size and number of deliveries are determined by taking partial derivatives of a long-run average total cost function respected to those corresponding decision variables. For the intermittent production processes, a number of products are generally required to share the same equipment on a rotating basis. Different production items are produced on a regular cycle in predetermined production lot sizes (Tersine, 1994). This situation leads to the research area known as the multiple items EPQ model. Some of those earliest research involving the multiple item EPQ model with the objective of production cycle length determination can be found in the works of Bomberger (1966), Goyal (1973), and Eilon (1985). Taleizadeh, Najafi, and Akhavan Niaki (2010) addressed the problem of multiple items EPQ model with imperfect quality. The defective rate of each item is a random variable and all defective items must be scrapped. Shortages are allowed and fully backordered. The optimal production cycle length and backordered quantities of each item were determined by equating the partial derivatives of the total cost function with zero. The research was later extended by Taleizadeh, Cárdenas-Barrón, and Mohammadi (2014) to the case when some imperfect items can be reworked. Pirayesh and Poormoaied (2015) discussed the research relevant to multiple items EPQ model with production capacity limitation. In order to prevent shortages, those items that cannot be supplied by the production must be procured from outside suppliers. The metaheuristic based on genetic algorithm and particle swarm optimization is presented to search for a good problem solution. In the situation that many jobs must be processed on the same production line, the determination of proper production sequence is another research area that has gained a lot of attention from many researchers. Comprehensive reviews on the production sequencing and scheduling with job sequence-dependent setup time and/or cost can be found in the works of Allahverdi, Gupta, and Aldowaisan (1999) and Zhu and Wilhelm (2006). Gilmore and Gomory (1964) considered the job sequencing problem on a single machine with sequence-dependent changeover cost as the shortest path traveling salesman problem. Barnes and Vanston (1981) discussed the job sequencing problem for the production system having sequence-dependent setup cost and delay penalty cost. The Dynamic Programming/Branch and Bound (DPBB) algorithm was employed to search for the problem solution. Ángel-Bello, Álvarez, Pacheco, and Martínez (2011) studied a single machine scheduling problem with sequence-dependent setup time and preventive machine maintenance. Here, both time between two consecutive maintenance activities and maintenance time are known and constant. Besides those regular jobs to be processed, each maintenance activity is considered as a job with sequence-dependent maintenance preparing time. The mixed-integer linear model was introduced to determine the solution for the objective of make-span minimization. Dolgui, Kovalyov, and Shchamialiova (2011) presented the multiple items EPQ model with sequence-dependent setup time and imperfect machine. Two different problem cases are considered. While the first one assumes that all product demands are satisfied and the objective is to minimize the make-span, the second one allows some demands to be unsatisfied and has the objective of total dissatisfaction cost minimization. Traditionally, that research involving the multiple items EPQ model do not consider the effect of production sequence on the total inventory level, which is varied over the time of production. In fact, the maximum value of total inventory level can directly affect the storage space required, a significant constraint concerned by most organizations. Unlike traditional research, this research studies the influence of production sequence on the total inventory level and the optimal production run size. The genetic algorithm is presented to determine the proper production sequence with the objective of minimizing the required storage space. 2. Problem Description The research study the production system having multiple items being produced on the same production line. Each item has its own setup cost, holding cost, demand rate, and production rate. The shortage is not allowed and, hence, the production rate of each item must be greater than or equal to its demand rate. The total production time required to satisfy the total annual demand of all items must be less than or equal to the available working time per year. The production of all items is conducted in the production cycle. For each production cycle, different items may have different amounts of production quantity to be produced. Nonetheless, each production cycle produces the same amount of each item and has the same production sequence. For any production item, each unit being produced requires one cubic volume of storage space. The research objective is to determine the proper -418-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3715 production run size and production sequence in such a way that the total variable cost, composed of the production setup cost and the inventory holding cost, and the required storage space are minimized. The following notations are applied throughout the paper. nnumber of production items Tproduction cycle length (years) mnumber of production runs (cycles/year); Diannual demand of item i (units); for i = 1, 2, …, n D[i]annual demand of item being produced at position i (units); for i = 1, 2, …, n Rtotal annual demand of all items (units); R = ∑ni=1 Di πiannual production rate of item i (units); for i = 1, 2, …, n π[i]annual production rate of item being produced at position i (units); for i = 1, 2, …, n Hiholding cost of item i (dollars per unit per year); for i = 1, 2, …, n Siproduction setup cost (dollars per production setup of each item); for i = 1, 2, …, n Qiproduction quantity of item i (units); for i = 1, 2, …, n Q[i]production quantity of item being produced at position i (units); for i = 1, 2, …, n tpproduction time of item i (years/cycle); for i = 1, 2, …, n tp[i]production time of item being produced at position i (years/cycle); for i = 1, 2, …, n tslack slack time; tslack = T –∑ni=1 tp[i] jiproduction item i; for i = 1, 2, …, n j[i]production item being produced at position i of the sequence; for i = 1, 2, …, n I[0] total inventory level at the beginning of each production run (units) I[i]total inventory level after the production of the item being produced at position i is ended (units); for i = 1, 2, …, n Imax maximum value of I[i] (units); for i = 1, 2, …, n V[i]total inventory changing amount from I[i–1] to I[i] (units); V[i] = I[i] – I[i–1]; for i = 1, 2, …, n ρiratio of Di to πi; for i = 1, 2, …, n ρ[i]ratio of D[i] to π[i]; for i = 1, 2, …, n ρslack slack proportion which is the ratio between remaining time per production cycle and the production cycle length; ρslack = tslack/T or ρslack = 1 –∑ni=1 ρi Nnumber of parent chromosomes rxprobability of crossover rmprobability of mutation Fpfitness value of the chromosome p; for p = 1, 2, …, 2N Ppprobability that the chromosome p is selected; for p = 1, 2, …, 2N The problem characteristics can be illustrated as shown in example 1. Example 1: Given that there are five items to be produced on the same production line. The information regarding annual demand, annual production rate, holding cost rate, and setup cost of each production item is demonstrated in Table 1. Here, the total available number of working days per year is assumed to be 250. -419-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3715 Item i DiπiHiSi 1 5,000 25,000 1.60 40 2 10,000 100,000 1.40 25 3 7,000 87,500 0.60 30 4 15,000 50,000 1.15 27 5 4,000 25,000 1.65 80 Table 1. Parameters of each production item One possible solution is to have ten production runs in a year (m = 10) with the production sequence of 1→3→5→2→4 for each production run (note that this solution may not be optimal). The production quantity of each item (Qi) in each production cycle can be calculated by dividing the annual demand by the annual number of production runs. The production time of each item (tpi) for each production cycle can be determined by dividing its production quantity by its annual production rate. The result of production quantity and production time of each item, in each production cycle, can be calculated as shown in Table 2. Item i Qi (units) tpi (years) 1 5,000/10 = 500 500/25,000 = 0.02 2 10,000/10 = 1,000 1,000/100,000 = 0.01 3 7,000/10 = 700 700/87,500 = 0.008 4 15,000/10 = 1,500 1,500/50,000 = 0.03 5 4,000/10 = 400 400/25,000 = 0.016 Table 2. Production quantity and production time of each item for each cycle The total annual system cost is the summation of annual setup cost and annual inventory holding cost of all items, as shown in equation (1). (1) According to equation (1), the annual setup cost and the annual inventory holding cost of the solution mentioned earlier can be calculated as shown in Table 3. Here, the total annual cost is 2,020.00 + 2,024.15 = 4,044.15 dollars. Item i Annual setup cost (dollars) Annual holding cost (dollars) 1 (10)(40) = 400.00 (1.60)(5,000)(25,000 – 5,000) (2) (10) (25,000) = 320.00 2 (10)(25) = 250.00 (1.40)(10,000)(100,000 – 10,000) (2) (10) (100,000) = 630.00 3 (10)(30) = 300.00 (0.60)(7,000)(87,500 – 7,000) (2) (10) (87,500) = 193.20 4 (10)(27) = 270.00 (1.15)(15,000)(50,000 – 15,000) (2) (10) (50,000) = 603.75 5 (10)(80) = 800.00 (1.65)(4,000)(25,000 – 4,000) (2) (10) (25,000) = 277.20 Total 2,020.00 2,024.15 Table 3. Annual setup cost and annual holding cost of each production item -420-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3715 Consider the production sequence of 1→3→5→2→4 and the production time of each item (tpi) calculated in Table 2, the inventory level of each item and the total inventory level can be illustrated as shown in Figure 1. It can be seen that the maximum total inventory level occurs after the production of the item being produced at the last position (I[5] = I4) is finished. Here, the required storage space should be assigned large enough to keep all 2,158 units, the maximum total inventory level. Figure 1. Inventory levels for the production sequence of 1→3→5→2→4 End of example 3. Problem Analysis 3.1. The Effect of Production Sequence on Maximum Inventory Level Given that there are n items to be produced in each production cycle, the total inventory level, I[i] (i = 1, 2, …, n), is the sum of inventory levels of all items after the production of the item being produced at the position i is ended. Here, the (I[0] is defined as the total inventory level at the beginning of each production run. The maximum inventory level, Imax, is the maximum value of I[0], I[1], I[2], …, I[n]. Note that the storage space required should be set equal to the maximum inventory level. Consider the changes in the amount of total inventory level from I[i–1] to I[i] as V[i], the relationship between the V[i] and I[i] for the system having five production items is demonstrated as shown in Figure 2. Figure 2. Inventory levels for the production sequence of 1→3→5→2→4 -421-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3715 From Figure 2, there are five items to be produced on the same production line with the sequence of j[1] = j1, j[2] = j3, j[3] = j5, j[4] = j2, and j[5] = j4. The relationship between the I[i] and the V[i] can be written as follows. (2) According to equation (2), the calculation of I[i] relevant to the I[0] is shown in equation (3). (3) Consider Figure 2, the value of I[0] can be calculated as shown below. (4) The tp[k], the time required to produce the item placed at the position k of the production sequence can be calculated as follows. (5) The changes in the amount of total inventory level (V[i]) is the increasing amount of the item produced during the production time (tp[i]) subtracted by the demand of other items during that time. The calculation can be shown as follows. (6) The following example illustrates the use of equations (3), (4), and (6) to determine the total inventory levels of the problem mentioned in example 1. Example 2: Given the data provided in Tables 1 and 2 of example 1, the value of I[0] can be calculated using equation (4) as follows. I[0] = (7,000)(0.02) + (4,000)(0.02 + 0.008) + (10,000)(0.02 + 0.008 + 0.016)+(15,000)(0.02 + 0.008 + 0.006 + 0.01) I[0] = 1,502 units Reveal the data related to the production rate, demand rate, and production time of each item in example 1, the values of total inventory level changing amount (V[1] to V[5]) can be determined using equation (6) as follows. V[1] = (25,000 – 41,000)(0.02) = –320 units V[2] = (87,500 – 41,000)(0.008) = 372 units V[3] = (25,000 – 41,000)(0.016) = –256 units V[4] = (100,000 – 41,000)(0.01) = 590 units V[5] = (50,000 – 41,000)(0.03) = 270 units Applying equation (3), the values of total inventory levels (I[1] to I[5]) can, then, be calculated as shown below. I[1] = 1,502 + (–320) = 1,182 units -422-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3715 I[2] = 1,502 + (–320 + 372) = 1,554 units I[3] = 1,502 + (–320 + 372 – 256) = 1,298 units I[4] = 1,502 + (–320 + 372 – 256 + 590) = 1,888 units I[5] = 1,502 + (–320 + 372 – 256 + 590 + 270) = 2,158 units Consider all total inventory levels (I[0] to I[5]), the maximum value occurs at I[5] = 2,158 units. Here, for the production sequence of 1→3→5→2→4, the storage space should be designed such that it can keep the maximum inventory level of 2,158 units. End of example In fact, different production sequences can result in different storage spaces required. Figure 3 illustrates two different production sequences of the problem mentioned in example 1. Note that the maximum total inventory levels obtained from both production sequences are not the same. While the maximum total inventory level for the production sequence of 1→3→5→2→4 is 2,158 units, the maximum total inventory level for the production sequence of 2→1→3→5→4 is 1,878 units. Here, the optimal production sequence should be the one that yields the minimum value of the maximum total inventory level. Figure 3. Inventory levels of the example problem for two different sequences 3.2. The Relationship between Optimal Production Sequence and Number of Production Runs To determine the relationship between the optimal production sequence and the number of production runs, replace the value of I[0] and V[i] from equations (4) and (6), respectively, to equation (3). The result is shown in the following equation. (7) The production time of the item processed at the position i, tp[i], is the value of the production quantity of that item divided by its production rate. Knowing that the production quantity is the annual demand divided by the number of production runs in a year, the relationship between the production time of the item processed at the position i and the number of production runs can be determined as shown in equation (8). (8) Replacing equation (8) in equation (7), the calculation of each I[i] can be rearranged as shown in equation (9). -423-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3715 (9) Consider equation (9), the value of total inventory level can be decreased (or increased) according to the multiplication factor 1/m. Here, when there are m production cycles in a year, the total inventory level of any item in the sequence can be calculated as 1/m times the inventory level of the item when there is only one production cycle per year. Therefore, it can be concluded that the optimal production sequence is independent of the number of production runs. 4. Methodology From the previous section, the optimal production sequence is independent of the number of production runs. In other words, determining the proper solution for the research problem can be divided into two independent subproblems. The first subproblem is to determine the optimal number of production runs in such a way that the total system variable cost composing of inventory holding cost and setup cost is minimized. The second subproblem is to search for the optimal production sequence with the objective of minimizing the required storage space. In order to determine the solution for the first subproblem, the traditional multi-item economics production quantity model may be applied. Taking the derivative of equation (1) respected to the number of production runs, the optimal number of production runs can be determined as shown in equation (10). Equation (11) demonstrates the calculation of the production quantity of each item at the specific number of production runs. (10) (11) Since the optimal production sequence is independent of the number of production runs per year, to determine the optimal production sequence for the first subproblem, the production cycle length of T = 1 year may be considered. Note that this is the situation when there is only one production cycle in a year. With the value of m = 1, equation (9) can be rewritten as shown in equation (12). (12) The research presents the genetic algorithm to determine a proper production sequence in a reasonable amount of time. The procedure is to, with the assumption of one production cycle in a year, search for a proper production sequence via the evolutionary mechanism. Here, equation (12) is integrated to determine the total inventory level by the time that the production of each item in the sequence is finished. Then, the concept of multiple items EPQ model is applied to determine the optimal number of production runs per year, as shown in equation (10). Finally, with the optimal number of production runs per year, equation (9) can be applied to calculate the total inventory level after the production of the item being produced at the position i is ended. 5. Genetic Algorithm The genetic algorithm is a powerful metaheuristic that imitates the biological evolutionary concept to search for a proper solution to the problem. It is suitable to be applied to the problem with a large size possible solution set. Figure 4 illustrates the structure of the genetic algorithm employed in this research. -424-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3715 the percentage deviation is (5.5629, 7.0435). The average and maximum percentage deviations are 6.3032 and 17.6680, respectively. While the main effect of setup cost to holding cost ratio is not remarkable, the main effect of slack proportion is found to be significant. In comparison to the LPF heuristic, the GA performance is more pronounced as the value of slack proportion is decreased. Declaration of Conflicting Interests The authors declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article. Funding The authors received no financial support for the research, authorship, and/or publication of this article. References Allahverdi, A., Gupta, J.N.D., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. OMEGA - International Journal of Management Science, 27, 219-239. https://doi.org/10.1016/S0305- 0483(98)00042-5 Andriolo, A., Battini, D., Grubbström, R.W., Persona, A., & Sgarbossa, F. (2014). A century of evolution from Harris’s basic lot size model: Survey and research agenda. International Journal of Production Economics, 155, 16-38. https://doi.org/10.1016/j.ijpe.2014.01.013 Ángel-Bello, F., Álvarez, A., Pacheco, J., & Martínez, I. (2011). A single machine scheduling problem with availability constraints and sequence-dependent setup costs. Applied Mathematical Modelling, 35(4), 2041-2050. https://doi.org/10.1016/j.apm.2010.11.017 Barnes, J.W., & Vanston, L.K. (1981). Scheduling Jobs with Linear Delay Penalties and Sequence Dependent Setup Costs. Operations Research, 29(1), 146-160. https://doi.org/10.1287/opre.29.1.146 Bomberger, E.E. (1966). A Dynamic Programming Approach to a Lot Size Scheduling Problem. Management Science, 12(11), 778-784. https://doi.org/10.1287/mnsc.12.11.778 Cárdenas-Barrón, L.E. (2011). The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra. Applied Mathematical Modelling, 35(5), 2394-2407. https://doi.org/10.1016/j.apm.2010.11.053 Chiu, S.W., Lin, H.D., Wu, M.F., & Yang, J.C. (2011). Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues. Scientia Iranica, 18(6), 1537-1544. https://doi.org/10.1016/j.scient.2011.09.008 Darwish, M.A. (2008). EPQ models with varying setup cost. International Journal of Production Economics, 113(1), 297-306. https://doi.org/10.1016/j.ijpe.2007.07.010 Dolgui, A., Kovalyov, M.Y., & Shchamialiova, K. (2011). Multi-product lot-sizing and sequencing on a single imperfect machine. Computational Optimization and Applications, 50(3), 465-482. https://doi.org/10.1007/s10589-010- 9346-2 Eilon, S. (1985). Multi-product batch production on a single machine-A problem revisited. Omega, 13(5), 453-468. https://doi.org/10.1016/0305-0483(85)90073-8 Gilmore, P.C., & Gomory, R.E. (1964). Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem. Operations Research, 12(5), 655-679. https://doi.org/10.1287/opre.12.5.655 Goyal, S.K. (1973). Scheduling a Multi-Product Single Machine System. Operational Research Quarterly (1970-1977), 24(2), 261-269. https://doi.org/10.2307/3007854 Harris, F.W. (1990). How many parts to make at once. Operations Research, 38(6), 947-950. https://doi.org/10.1287/opre.38.6.947 -431-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.3715 Hayek, P.A., & Salameh, M.K. (2001). Production lot sizing with the reworking of imperfect quality items produced. Production Planning & Control, 12(6), 584-590. https://doi.org/10.1080/095372801750397707 Lee, C.Y., & Choi, J.Y. (1995). A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights. Computers and Operations Research, 22(8), 857-869. https://doi.org/10.1016/0305- 0548(94)00073-H Misra, R.B. (1975). Optimum production lot size model for a system with deteriorating inventory. International Journal of Production Research, 13(5), 495-505. https://doi.org/10.1080/00207547508943019 Pirayesh, M., & Poormoaied, S. (2015). GPSO-LS algorithm for a multi-item EPQ model with production capacity restriction. Applied Mathematical Modelling, 39(17), 5011-5032. https://doi.org/10.1016/j.apm.2015.03.047 Supithak, W., & Plongon, K. (2011). Memetic algorithm for non-identical parallel machines scheduling problem with earliness and tardiness penalties. International Journal of Manufacturing Technology and Management, 22(1), 26-38. https://doi.org/10.1504/IJMTM.2011.038481 Taft, E.W. (1918). The most economical production lot. Iron Age, 1410-1412. Taleizadeh, A.A., Cárdenas-Barrón, L.E., & Mohammadi, B. (2014). A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process. International Journal of Production Economics, 150, 9-27. Taleizadeh, A.A., Najafi, A.A., & Niaki, S.T.A. (2010). Economic Production Quantity model with scrapped items and limited production capacity. Scientia Iranica, 17(1), 58-69. https://doi.org/10.1016/j.ijpe.2013.11.023 Tersine, R.J. (1994). Principles of inventory and materials management (4th ed.). Prentice-Hall International. Zhu, X., & Wilhelm, W.E. (2006). Scheduling and lot sizing with sequence-dependent setup: A literature review. IIE Transactions, 38(11), 987-1007. https://doi.org/10.1080/07408170600559706 Journal of Industrial Engineering and Management, 2022 (www.jiem.org) Article’s contents are provided on an Attribution-Non Commercial 4.0 Creative commons International License. Readers are allowed to copy, distribute and communicate article’s contents, provided the author’s and Journal of Industrial Engineering and Management’s names are included. It must not be used for commercial purposes. To see the complete license contents, please visit https://creativecommons.org/licenses/by-nc/4.0/. -432-