scieee AI-readable full text Open interactive document viewer

Supply flexibility and risk preferences experiment for a microchip company

Zahera García, Diana Maria

Abstract

In this thesis we will focus our analysis in the inventory decisions with one specific kind of sourcing contract. More concretely, we will study and analyze the order quantities under a supply flexible contract conditions. The quantity flexibility contract in supply chain management is committed to reduce the risk of both retailers and suppliers, and optimize the profit of the whole supply chain at the same time. Under this contract, retailers are allowed to correct the base order quantity with an extra quantity order. This fact will benefit the retailer to suit the demand uncertainty. By experimental research, the thesis focuses on the limited-rational decision making of the human behavior in the operations management. The experiment is designed from the perspective of the retailer. Retailers make corresponding security quantity order decisions according to variable demand environment information. The thesis has established a mathematical model, which can derive the theoretical optimal values for the amount of extra quantity order. According to the statistical analysis of the actual quantity order, the study focuses on the differences between the actual decision and the theoretical optimum, and explains the reasons for deviation. The experiment set up four control groups to study the factors’ influence on retailers’ actual security quantity decisions by changing the reservation deposit and the product’s high or low profit margin level. The results show that the retailers are rational limited in the decision making. Their decisions are influenced by many factors, causing the ordering deviation. Through the comparison and analysis, the thesis attempts to provide a reference for retailers’ actual ordering decision, and lead to optimal largest possibly and ultimately achieve the best practices in order to try to resemble their real results with the theoretical optimum. At the same time, it’s necessary to reflect the deficiency of the research which can provide a new direction for the further theoretical research.

Full text

BEIHANG UNIVERSITY - UNIVERSIDAD POLITÉCNICA DE CATALUÑA Supply flexibility and risk preferences experiment for a microchip company Master Thesis Author: Diana María Zahera García Spring Semester 2015 Supervisor - Wang He-Xin Supply flexibility and risk preferences experiment for a microchip company 2 Supply flexibility and risk preferences experiment for a microchip company 3 "Before anything else, preparation is the key of success" Alexander Graham Bell To my father, for his engineering passion. Supply flexibility and risk preferences experiment for a microchip company 4 Abstract In this thesis we will focus our analysis in the inventory decisions with one specific kind of sourcing contract. More concretely, we will study and analyze the order quantities under a supply flexible contract conditions. The quantity flexibility contract in supply chain management is committed to reduce the risk of both retailers and suppliers, and optimize the profit of the whole supply chain at the same time. Under this contract, retailers are allowed to correct the base order quantity with an extra quantity order. This fact will benefit the retailer to suit the demand uncertainty. By experimental research, the thesis focuses on the limited-rational decision making of the human behavior in the operations management. The experiment is designed from the perspective of the retailer. Retailers make corresponding security quantity order decisions according to variable demand environment information. The thesis has established a mathematical model, which can derive the theoretical optimal values for the amount of extra quantity order. According to the statistical analysis of the actual quantity order, the study focuses on the differences between the actual decision and the theoretical optimum, and explains the reasons for deviation. The experiment set up four control groups to study the factors’ influence on retailers’ actual security quantity decisions by changing the reservation deposit and the product’s high or low profit margin level. The results show that the retailers are rational limited in the decision making. Their decisions are influenced by many factors, causing the ordering deviation. Through the comparison and analysis, the thesis attempts to provide a reference for retailers’ actual ordering decision, and lead to optimal largest possibly and ultimately achieve the best practices in order to try to resemble their real results with the theoretical optimum. At the same time, it’s necessary to reflect the deficiency of the research which can provide a new direction for the further theoretical research. Supply flexibility and risk preferences experiment for a microchip company 5 Table of contents Abstract ......................................................................................................................................... 4 Table of Figures ............................................................................................................................. 7 Table of Tables .............................................................................................................................. 8 1 Introduction................................................................................................................................ 9 2 Problem statement .................................................................................................................. 10 3 Theory - The Supply Chain definition ....................................................................................... 12 3.1 The concepts ..................................................................................................................... 12 3.2 The phases ......................................................................................................................... 13 3.3 Decision levels ................................................................................................................... 14 4 Introduction to the Supply Chain contracts ............................................................................. 16 4.1 Main types of Supply Chain contracts ............................................................................... 16 5 Quantity flexibility contract ...................................................................................................... 18 6 Literature review ...................................................................................................................... 19 7 Risk management and Supply Chain flexibility ........................................................................ 21 7.1 Risk sharing ........................................................................................................................ 21 7.2 Risk behavior evaluation factors ....................................................................................... 22 8 The general mathematical model for flexible quantity............................................................ 25 8.1 Optimal solution ................................................................................................................ 26 8.2 The demand treatment ..................................................................................................... 29 8.2.1 The generation of random values for the simulation ................................................ 30 9 Experiment hypothesis ............................................................................................................. 31 9.1 The base quantity .............................................................................................................. 31 9.2 High and Low profit conditions ......................................................................................... 31 9.3 Storage cost ....................................................................................................................... 32 9.4 Security cost ...................................................................................................................... 32 9.5 Optimal extra quantity order ............................................................................................ 33 9.6 Optimal Profit .................................................................................................................... 33 10 The experiment ...................................................................................................................... 35 10.1 Design .............................................................................................................................. 35 10.2 Decision description ........................................................................................................ 38 10.2 Extra quantity decision .................................................................................................... 40 11 Results .................................................................................................................................... 41 11.1 Survey Answers ............................................................................................................... 41 11.2 Risk results....................................................................................................................... 44 Supply flexibility and risk preferences experiment for a microchip company 6 11.3 Spanish results ................................................................................................................ 47 11.4 Chinese results ................................................................................................................ 49 11.5 Final decision ................................................................................................................... 51 12 Analysis ................................................................................................................................... 53 12.1 Statistic background ........................................................................................................ 53 12.2 Decision analysis of the levels combination .................................................................... 56 12.2 Comparison between the real quantity decision and the optimal ................................. 60 12.3 Effect of different nationalities ....................................................................................... 64 12.4 Effect of the subject's risk appetite ................................................................................. 65 12.5 Comparison between real profit and optimal profit ....................................................... 66 13 Conclusions............................................................................................................................. 67 14 References .............................................................................................................................. 69 15 Acknowledgements ................................................................................................................ 71 16 ANNEX .................................................................................................................................... 73 A .............................................................................................................................................. 73 B............................................................................................................................................... 81 C ............................................................................................................................................... 83 D .............................................................................................................................................. 85 E ............................................................................................................................................... 86 Supply flexibility and risk preferences experiment for a microchip company 7 Table of Figures Figure 3 - Problem period ........................................................................................................... 10 Figure 1- The Supply Chain Flow Process .................................................................................... 13 Figure 2 - The Supply Chain Management .................................................................................. 14 Figure 4 - Column graph for the survey answers ........................................................................ 43 Figure 5 - Percentage graph for the survey answers .................................................................. 43 Figure 7 - Circle Graph of the subject's classification .................................................................. 46 Figure 6 - Column Graph of the subject's classification .............................................................. 46 Figure 8 - Dispersion Graph of the Spanish results for High-High condition .............................. 47 Figure 9 - Dispersion graph of the Spanish results for High-Low conditions .............................. 47 Figure 10 - Dispersion Graph of the Spanish results for Low-High conditions............................ 48 Figure 11 - Dispersion Graph of the Spanish results for Low-Low conditions ............................ 48 Figure 12 - Dispersion Graph of the Chinese results for High-High conditions........................... 49 Figure 13 - Dispersion Graph of the Chinese results for High-Low conditions ........................... 49 Figure 14 - Dispersion Graph of Chinese results for Low-High conditions .................................. 50 Figure 15 - Dispersion Graph of Chinese results for Low-Low conditions .................................. 50 Figure 16 - ANOVA table ............................................................................................................. 54 Figure 17 - Comparison between qa and qa* for High-High combination ................................. 61 Figure 18 - Comparison between qa and qa* for High-Low combination .................................. 61 Figure 19 - Comparison between qa and qa* for Low-High combination .................................. 62 Figure 20 - Comparison between qa and qa* for Low-Low combination ................................... 62 Supply flexibility and risk preferences experiment for a microchip company 8 Table of Tables Table 1 - Hypothesis for the purchasing and selling prices ......................................................... 32 Table 2 - Hypothesis for the security deposit ............................................................................. 32 Table 3 - General Questions ........................................................................................................ 35 Table 4 - Specific questions ......................................................................................................... 36 Table 5 - Parameter's levels ........................................................................................................ 38 Table 6 - Experiment order for parameter's levels ..................................................................... 38 Table 7 - Key for encoding survey answers ................................................................................. 41 Table 8 - Spanish testers survey answers .................................................................................... 41 Table 9 - Chinese testers survey answers ................................................................................... 42 Table 10 - Count answers for the total sample ........................................................................... 42 Table 11 - Answers percentage for the total sample .................................................................. 42 Table 12 - V vector for each subject ............................................................................................ 45 Table 13 - Level combinations ..................................................................................................... 56 Table 14 - General results for the comparison between the 4 levels combination .................... 56 Table 15 - ANOVA results for the comparison between the 4 levels combination .................... 56 Table 16 - General results for the fixed High Profit Condition .................................................... 57 Table 17 - ANOVA results for the fixed High Profit Condition .................................................... 57 Table 18 - General results for the fixed Low Profit Condition..................................................... 57 Table 19 - ANOVA results for the fixed Low Profit Condition ..................................................... 58 Table 20 - General results for the fixed High Security level ........................................................ 58 Table 21 - ANOVA results for the fixed High Security level ......................................................... 59 Table 22 - General results for the fixed Low Security level ......................................................... 59 Table 23 - ANOVA results for the fixed Low Security level ......................................................... 59 Table 24 - General results for the comparison between qa and qa*.......................................... 60 Table 25 - ANOVA results for the comparison between qa and qa* .......................................... 60 Table 26 - General results for the comparison between nationalities ....................................... 64 Table 27 - ANOVA results for the comparison between nationalities ........................................ 64 Table 28 - General results for the comparison between risk appetites ...................................... 65 Table 29 - ANOVA results for the comparison between risk appetites ...................................... 65 Table 30 - General results for the comparison between real and optimal profit ....................... 66 Table 31 - ANOVA results for the comparison between real and optimal profit ........................ 66 Table 32 - Spanish Extra Quantity Order decision ...................................................................... 81 Table 33 - Spanish Extra Quantity Order decision ...................................................................... 82 Table 34 - Chinese Extra Quantity Order decision ...................................................................... 83 Table 35 - Chinese Extra Quantity Order decision ...................................................................... 84 Supply flexibility and risk preferences experiment for a microchip company 9 1 Introduction Nowadays companies must function in a challenging business environment with extensive uncertainties and variations. To operate in this conditions, enterprises must be able to anticipate market swings and have the ability to react to adjust costs and make effective responses. The key to do this is planning an effective management strategy in the supply chain between the buyers and suppliers in order to accommodate the uncertainties and variations in each other's businesses. In this situation, the importance of having a robust relationship between the retailer and the supplier under changing supply conditions becomes crucial. It's essential to know the different types of supply chain contracts and arrange the most appropriate for both. This robustness relationship can be defined as the supply chain flexibility, which is the parameter for characterizing the behavior of variable supply chains. Supply chain management presents an especially important domain where such flexibility is critical to achieving a consistently successful performance. In this thesis we introduce an experiment of the supply flexibility estimation and the risk preferences in the decisions taken. Using a mathematical model we can estimate the supply flexibility and hence make a quantifiable choice. For this kind of arrangement, the type of contract that we will work with is the "Quantity flexible supply chain contract". Some studies confirm that the order quantities are the most common variable parameter in the supply chain, and it can cause supplier-retailer grievance. So we are going to work in this field in order to find out the weaknesses of the process and analyze them in order to make efficient improvements in the decision makings. Supply flexibility and risk preferences experiment for a microchip company 16 4 Introduction to the Supply Chain contracts Nowadays there are so many kinds of companies and businesses which have different needs of Supply Chain Management (SCM) and control. It is a key element for the enterprises competitiveness because it's directly related to the business results, the profit margin, the lead-times, the product/service quality and the customer's satisfaction. The objectives alignment between retailers and suppliers is essential in order to have the most efficient supply chain, and therefore the better performance possible and the maximum profit for both. It is in that point where the negotiation between the buyer and the supplier is involved and the conditions of the contract must be thoroughly worked and detailed. With the current studies of Supply Chain Management (SCM), several kind of contracts have been defined and detailed that can be the base in the negotiation. The main strategic components of the contracts are the following: o Pricing and volume discounts. o Minimum and maximum purchase quantities. o Delivery lead times. o Product or material quality. o Product return policies. 4.1 Main types of Supply Chain contracts 1. Buyback contract This kind of contract allows the buyer to return unsold inventory up to a specified amount at an agreed upon price. Therefore, we can find that the optimal order quantity for the customer increases. This increase result in a higher product availability and higher profits for both buyer and supplier. It gives most effectiveness for products with low variable cost, such as music, software, books or newspapers. But it also can increase the supply chain costs because the buyback contract results in surplus inventory for the supplier that must be disposed of. We cannot forget that this kind of arrangement can be misleading for the supply chain as it reacts to (inflated) retail orders, not real customer demand. 2. Quantity discount contract Under quantity discount contract, the buyer must pay a wholesale price depending on the order quantity. This resembles to the sales rebate contract, but there is no threshold defined. The mechanism for specifying the contract can be Supply flexibility and risk preferences experiment for a microchip company 17 complex. The contract has been applied in many situations, for example, in an international supply chain with fluctuating exchange rates. 3. Quantity flexibility contract Allows the buyer to modify the order (within limits) as demand visibility increases closer to the point of sale. Better matching of supply and demand Increased overall supply chain profits if the supplier has flexible capacity Lower levels of misleading demand information than either buyback contracts or revenue sharing contracts 4. Option contract This kind of contract makes the buyer pre-pays a relatively small fraction of the product price up-front. In this situation, the supplier commits to reserve capacity up to a certain level. This initial payment is called the reservation price or premium. After, if buyer does not exercise option, the initial payment is lost. The buyer can purchase any amount of supply up to the option level by: a) Paying an additional price (execution price or exercise price) agreed to at the time the contract is signed c) Total price (reservation plus execution price) typically higher than the unit price in a long-term contract. 5. Sales rebate contract Provides a direct incentive to the buyer to increase sales by means of a rebate paid by the supplier for any item sold above a certain quantity. Basically, this contract specifies two prices and a quantity threshold. If the order size is below the threshold, the buyer must pay the higher price, and if it is above, he can pay a lower price for the units above the threshold. 6. Revenue sharing contract In this contract, the buyer pays a minimal amount for each unit purchased from the supplier but shares a percentage of the revenue for each unit sold. This makes decrease the cost per unit charged to the buyer, which effectively decreases the cost of overstocking. This kind of contract is misleading for the supply chain as it reacts to (inflated) retail orders, not actual customer demand. Supply flexibility and risk preferences experiment for a microchip company 18 5 Quantity flexibility contract The flexibility of the Supply Chain is determined by the capacity of response in terms of volume and variety in front of the changes of consumer behavior. Quantity Flexibility Contract has been used in many industries (automotives, computers, apparel etc.) as a tool to minimize the impact of demand uncertainty and develop trust between supply chain actors. This contracts allow the retailer to modify his order, within a predefined range, to the supplier after better forecasts updating of the customer demand become available. On the other hand, the supplier benefits from more accurate order forecasts that result into smoother production schedule and less overage and underage costs. There are so many kinds of quantity flexible contracts, depending on the sector of the enterprises, the parts of the Supply Chain involved and the conditions arranged between them. This study will evaluate a specific kind of quantity flexible contract, between a retailer which buys microchips to sell them to its customers and a supplier who manufactures them. In the electronic market, we have the advantage that the microchips are not perishable, so the risk in the supply chain operations is reduced because the complexity in lead times and storage is easier. Our retailer will ask for a fixed base quantity in order to cover its usual demand, and it will pay a security cost in order that the supplier reserve a certain production capacity for possible demand peaks. This security cost is fix, but the decision of purchasing the extra quantity or not is after, when the demand is already known. This situation is beneficial for the retailer, as it is always guaranteed to cover its demand. Also can be beneficial for the supplier in the cases that the retailer finally reject the extra quantity order, because the fix cost is already paid. The amount of the reservation and the fixed cost for it can be adapted to their specific situation, in order not to take advantage one to the other. The goal of this contract is to try to apply flexibility in the quantity ordered in order to maximize both profits and covering all the demand requested. Supply flexibility and risk preferences experiment for a microchip company 19 6 Literature review The Supply Chain management is an emergent discipline, and therefore it possesses the characteristics of a continuous development theory and applications. The lack of clarity in certain concepts or the weak overlap between the different areas which form the SCM lead to result a body of knowledge that is still in construction. Now we are at a time of literature explosion that is trying to fill the numerous gaps and uncertainties living with SCM. That is why some of the information that is handled as certain becomes obsolete. The literature devoted to aspects of the chain such as logistics, purchasing, operations management, etc. is plentiful. (Rungtusanatham et al., 2003; Croom et al., 2000; Carter & Ellram, 2003). In the particular case of the Supply Chain contracts what we can find in literature are concrete applications of each kind of contract in a determined environment, that cannot be extrapolated to the generality, but it can works as a data base or for general theories checking test. Over the last decade the supply chain management has become in a prominent research area. (Mentzer et al.,2001). Nevertheless, there are still clear opportunities of growth and improvement in the SCM research. The professionals criticize the researchers for the lack of focus in the real causes of the daily management dynamics and they encourage them in spend more effort in the challenges faced by the SC managers every day. (Tushman & O’Reily, 2007; Markides, 2007; Gulati, 2007; McGahan, 2007). Supply Flexibility contracts We can find Tsay & Lovejoy (1999) which publish their study about the importance of flexible quantity contracts under a rolling planning horizon. They discuss some fundamental aspects about such contracts, as the limits and thresholds which determine the minimum or maximum quantities to order in each revision, and the damping of bullwhip effect that provide this type of contract. Tsay (1999) extends the previous study and characterizes the implications in the behavior and the performance of the chain steps. Wu (2005) studies it under the Bayesian update of demand information and Sethi et al. (2004) under the demand updating in each period. Wang et al. (2006) analyze it under an inflexible production environment. Lian & Deshmukh (2009) develop a dynamic model of finite horizon in order to characterize the buyer's optimal sourcing strategy. Supply flexibility and risk preferences experiment for a microchip company 20 It is very common in the Supply Chain Management that its different participants don't work together for maximize the global revenue of the chain, but make decisions based on strict maximizing their own profit. This results in a system efficiency loss supported by the local incentives provided, which contradict the objective in the global system. One possible answer for this problem is to reconsider the Supply Chain contracts nature and the redefinition of them. Some flexible risk-sharing contracts have been analyzed in more realistic conditions by Bassok & Anupindi (1995). Eppen & Iyer (1997) analyze the security agreements in which the buyer is allowed to buy a certain security quantity in excess of its initial forecast without any extra cost, but with the penalty for the units not purchased. Kamrad & Siddique (2004) analyze why a buyer and a supplier must accept a flexible contract, in terms of their own revenue. Finally, Sethi &Yan & Zhang (2004) analyze the model of quantity flexible contract with information updates in the demand. Their study is based in a buyer's who is allowed to order an additional quantity with an extra cost which is specified at the contract. This theoretical model can be adapted to the particular case that we are going to develop in this thesis. The hypotheses will be extrapolated to our specific problem and the mathematical model will be simplified to the study environment. Supply flexibility and risk preferences experiment for a microchip company 21 7 Risk management and Supply Chain flexibility Uncertainties in the operating environment of firms reduce the reliability in terms of delivering at the right time, at the right amount and quality. Uncertainty requires firms to quickly respond to changing environments. Operating in a flexible supply chain helps the firms to accomplish this rapid adaptation. On the other hand, increasing flexibility brings along additional risks for the firms to undertake. Alignment, adaptability and agility (flexibility) are fundamental elements for supply chain risk management. It is accepted that flexibility increases Supply Chain resilience. However, firms are reluctant to invest in flexibility when it is not clear how much flexibility is required. The higher the flexibility, the riskier is the chain. However, there are some methods and models which help to mitigate the level of risk associated with the level of flexibility. This section analyses the relationship between supply chain flexibility and supply network risk management. 7.1 Risk sharing In the sequential supply chain:  Buyer assumes all of the risk of having more inventory than sales.  Buyer limits his order quantity because of the huge financial risk.  Supplier takes no risk.  Supplier would like the buyer to order as much as possible.  Since the buyer limits his order quantity, there is a significant increase in the likelihood of out of stock. If the supplier shares some of the risk with the retailer:  It may be profitable for buyer to order more .  Reducing out of stock probability.  Increasing profit for both the supplier and the retailer.  Supply contracts enable this risk sharing . Supply flexibility and risk preferences experiment for a microchip company 22 7.2 Risk behavior evaluation factors In this chapter we will define the way to evaluate the risk factors in the experiment we will explain forward. In order to determine daily risk behaviors in a subjects set is to make a survey with key questions. The sincere results will help us to determine the risk level of each subject in a mathematical format. There are so many studies about the factors of the personal behavior and how to quantify the risk taken in daily situations. Firstly, we will define a vector called: . Each vector component corresponds to a survey question which reveals the risk taking from a subject. In the Chapter 10 it is exposed the final survey questions and it will be explained which 10 have been choice to risk evaluation. After making the survey, it is must to codify the answers into numbers in order to work with them. It is also required to use a specific code that permits to see that the most risky situations are the bigger numbers. therefore, the order of the answers must be specific (from safety to risky for example) in order to make the codification easier. From now, when we have already the answers encoded, it is needed to calculate another vector with the common factor variance of each question: Being: This vector will mark the weigh or the importance of each of the survey questions, as it depends on the variance in the answers. The objective is to get a final vector which reveals how risky a tester is. This vector is called: Supply flexibility and risk preferences experiment for a microchip company 23 Where the position of the maximum number of the vector corresponds to the risk level of the subject. V1 V2 V3 V4 V5 High Risk Medium Risk Risk Safe High Safe In order to get this vector, we need to define a evaluating matrix for every tester with a new code depending on their answers. This matrix is called being testers. The matrix dimensions are in order to adapt the number of questions with the 5 risk levels. The main characteristic of this matrix is it's encode in which it is created. This encode classify each answer with its risk level as it is explained in the following table: Assuming that the answers are sequenced from low risk to high risk: A<B<C<D<E Answer Encode A 0 0 0 0.2 0.8 B 0 0 0.2 0.3 0.5 C 0 0.2 0.3 0.3 0.2 D 0.5 0.3 0.2 0 0 E 0.8 0.2 0 0 0 So, from this, we can create the evaluating matrix of each subject for all their answers, as we can see in the next example: Questions Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Answers A B C D E A B C D Therefore, the evaluating matrix will be: Supply flexibility and risk preferences experiment for a microchip company 24 Finally, when the vector A is defined and the evaluating matrix of each subject is already calculated, we can find the vector V with the following expression: The results of the experiment are exposed in the chapter 10 of this thesis. Supply flexibility and risk preferences experiment for a microchip company 25 8 The general mathematical model for flexible quantity In this section we will design a quantity flexible contract between our supplier and us (the buyers). In this kind of contract, we have the option in a second stage to make an extra quantity order which can increase our initial purchase. The specifications of the contract are the following. We will refer to stage 1 as t1 and to stage 2 as t2. (1) = Demand distribution is uniform U(0,100). [un] (2) = The base quantity order at t1. [un] (3) = Additional quantity that can be ordered at t2. [un] (4) = Fix cost for ordering. We can consider that each order have the same ordering cost. If we need to order the extra quantity it will take another ordering cost. (5) = cost for buying the products to the supplier. [m.u./un] (6) = Security deposit for booking capacity of the supplier for ensuring the supply of the extra quantity . (7) = Selling price for the revenue. [m.u./un] (8) = Storage cost for unsold quantity [m.u./un] (9) Binary variable which becomes 2 if the decision of ordering an extra quantity it's taken. Thus, we can define the buyer's optimal profit where The term represents the purchase cost of buying at a price p an amount at . Similarly, the term is the cost of purchasing the additional quantity at the same price in the second stage . The conditional expectation represents the buyer's profit at . And we will work with the following notations in the solution development: Supply flexibility and risk preferences experiment for a microchip company 32 selling price in 8$. So the purchasing price will have two levels in order to satisfy the profit conditions: Prices Low level High level p 3 $ 7 $ r 9 $ Table 1 - Hypothesis for the purchasing and selling prices 9.3 Storage cost Regarding the storage cost, normally it is considered to be a little percentage of the selling price. It is very common to be about 10% of the selling price. In our case with this percentage the storage cost would be of 0,9$. In order to work with integers and simplify the results, it has been decide the storage cost to be 1$, which suppose a 11.1% of the selling price . 9.4 Security cost Respecting the security deposit, it is one of our main goals to relate it to the security quantity order decisions. Therefore, in order to analyze the relationship between them, we must make the parameter variable. Only this way we will be able to study the variation of one with the variation of the other. Thus, we will fix a low and high level for the security deposit as follows: Security deposit Low level High level m 20 $ 50 $ Table 2 - Hypothesis for the security deposit The choice of the range of this cost levels is related to the storage cost. The theory of reserve production capacity to the supplier's is directly related to the risk of an uncertain demand increase and when the base quantity order is insufficient. This situation can also be seen from the perspective of the safety stocks in which can be stored product "just in case". Therefore, it was decided to link the security deposit to the storage cost in which we would keep the base order quantity for the next season in the worst case (high level), or the 20% of the maximum demand in a more relaxed case (low level). Supply flexibility and risk preferences experiment for a microchip company 33 9.5 Optimal extra quantity order The optimal extra quantity order will be calculated by the mathematical model equation: As the parameter depends on the profit conditions, we will work with two different optimal extra quantities in each condition case. For the high profit condition we have the following: Therefore, the total quantity to order will be: For the low profit condition the extra quantity order is: Therefore, the respective total quantity to order will be: 9.6 Optimal Profit The optimal profit will be calculated by the mathematical model expression: This expression depends of the combination of the 4 levels conditions, so we will work with different optimal profits. For the High Profit - High Security Condition, the final optimal profit is: Supply flexibility and risk preferences experiment for a microchip company 34 For the Low Profit - High Security Condition, the final optimal profit is: For the High Profit - Low Security Condition, the final optimal profit is: For the Low Profit - Low Security Condition, the final optimal profit is: Note that we have two different results for each case, this is because the final profit depends whether we finally take the decision of ordering the extra quantity order or not. Supply flexibility and risk preferences experiment for a microchip company 35 10 The experiment Having developed a theoretical background of the above, we are going to carry out a real experiment in order to analyze the decision making behavior of a sample. This experiment investigates inventory orders in a repeated environment. The demand distribution is known and subjects made decisions for both high and low profit margin products. 10.1 Design We recruited 40 subjects from Beihang University who are studying several majors. The sample used is going to be half Chinese population and half Spanish population. Each subject received the same experiment description. First of all, a survey has been designed with two different parts. The first one features only 5 general questions about the gender, nationality, occupation and knowledge about economics and supply flexibility. With this part we can classify respondents to analyze the future results with different parameters or variables, and we will be able to make better comparisons. It will also help us to look for relationships between the result variation and the parameters variation. The second part features 12 more specific questions which can help us to measure the risks that the participants take in their everyday life. We will measure the risk of each participant and will see if it is related to their decision making in the experiment. See the survey questions in the tables bellow (Table 3 and Table 4) 1.Your Gender 2. Are you studying or working? A Male A Studying B Female B Working 3. Have you studied economics and investment? 4. Do you have knowledge about Supply Flexible? A Professional Certificate A Yes B Finance Graduate B No C Some experience D Some E No idea 5. Which is your country A China B Spain Table 3 - General Questions Supply flexibility and risk preferences experiment for a microchip company 36 6. If you drive, do you use the safety belts? 7. How often do you get drunk? A Every time A Never B Often B Seldom C Sometimes C Sometimes D Seldom D Often E Never E Every time 8. Do you use the crosswalk to cross the roads? 9. If the salaries were equal, what would you prefer to be? A Every time A Librarian B Often B Pilot C Sometimes D Seldom E Never 10. Do you prefer a fixed salary or with adjustments because of your performance? 11. Do you break traffic lights? A Fixed Salary A Every time B Salary adjustments with performance B Often C Sometimes D Seldom E Never 12. Do the cautious car drivers make you feel impatient? 13. Do you like to bet? A No A I don't like B Yes B Do not dislike C I usually like D I like E I especially like 14. Do you close doors and windows in the night? 15. When someone jumps the queue, do you complain? A Every time A Never B Often B Seldom C Sometimes C Sometimes D Seldom D Often E Never E Every time 16. Would you like to try extreme sports? 17. Which of the followings do you think that best describes yourself? A No A I'm not willing to take risks B Yes B I need to considerate carefully before willing to take risks. C I am an adventurer Table 4 - Specific questions Supply flexibility and risk preferences experiment for a microchip company 37 After making the participants answer the survey, we proceed to the experiment. Each subject received a computer program (Microsoft Excel) that described an inventory problem for a retailer. See the following experiment description for subjects: " As retailers, our suppliers have to accept our order quantities in accordance with provision of goods. In the negotiation of the ordering quantities, the suppliers can maintain a production capacity for us. For this king of negotiation the retailer must pay a deposit fee in order to reserve this production capacity for the supplier in the first stage of the ordering season. The reservation of production capacity includes raw materials, production line, labor and storage space. If the updated demand information shows that the basic quantity ordered by retailers is not enough to cover the forecast and this information is before the selling season, the supplier is required to provide the guaranteed quantity of goods. The price of these extra quantity order is the same as the basic order. Your role as a retailer, is to take the decision of which security quantity it's better to reserve in order to have the maximum profit. You will have to decide the extra quantity in 4 different cases. (with low profit, high profit, high reservation fee and low reservation fee). The parameters of the experiment are the following: p - Purchase price. The unit price that we are buying to the supplier. We will work with two levels for it in order to experiment with the high and low profit situations. [$/unit] r - Market price of our products. The price we are going to sell the products for our customers. We will work with a fixed market price. [$/unit] m - Security deposit in order to guarantee the reservation of production capacity. We will work with two levels in order to experiment with high and low deposit. [$] D- Demand of our product, which follows a uniform distribution between 0 and 100. U(0,100). We will work with random numbers from 0 to 100 which have the same probability to occur. [units] s - Unit storage cost. We will have a storage cost in case that our demand is lower than our total ordered quantity. [$/unit] c - Ordering cost. We will have an ordering cost for each order that we make. If we order an extra quantity, the ordering cost will double (2·c). [$/order] Q - The base quantity order, we will work with it fixed in 50 units. [units] - The extra quantity that subjects are going to decide. [units] Supply flexibility and risk preferences experiment for a microchip company 38 Now, given the following parameters limit, you need suppliers to provide you with a guarantee amount . How much?" See in the table below the resume of the parameters we will work with according with the hypothesis we explained at Chapter 9: Current market information Parameters Low Level High Level Purchase Price [p] 3 7 Market price [r] 9 Security deposit [m] 20 50 Market Demand [D] U(0,100) Unit Storage costing [s] 1 Ordering cost [c] 10 20 Basic Order Quantity [Q] 50 Table 5 - Parameter's levels 10.2 Decision description After answering the survey and reading the experiment description, subjects are able to make the experiment. It will consist in make 4 decisions of the security quantity to be, combining the 4 variable levels. Therefore, we will have a total of 160 experiments to analyze. The decisions of each subject will be made for the 4 possible situations of high/low profit and high/low security deposit combination. See the following table with the order of the parameter's level: Experiment Purchase price (p) Security deposit (m) 1 + + 2 - + 3 + - 4 - - Table 6 - Experiment order for parameter's levels The subjects must decide which would be the best quantity to order under the given conditions with a totally demand uncertainty. The only demand information that they can have is that it is uniformly distributed between 0 and 100. They also will know about the fixed base order quantity, and they will decide if it's worth it to reserve a extra quantity or not. Supply flexibility and risk preferences experiment for a microchip company 39 The microchips are sold for 9$ and salvaged for 1$. In the low profit condition, the microchips are purchased for 7$ and in the high profit condition they are purchased for 3$. Knowing this, we can calculate the critical rates1 of the two fractiles we are going to work with: Thus, the corresponding expected profit-maximizing order quantities are: High profit condition: Low profit condition: Therefore, the total optimal quantities to order are: High profit condition: Low profit condition: Before making the decisions, the subjects are able to see the information of all parameters in each case. Also, they can see the results from prior rounds done in order to improve the next profits experiments. 1 The critical rate is the parameter that was described at the end of Chapter 9. This parameter will help us to calculate the optimal extra quantity in the high profit and low profit conditions. Supply flexibility and risk preferences experiment for a microchip company 40 10.2 Extra quantity decision Now we have the optimal solution for calculating the extra quantity. However, the point of our problem is to make the decision of ordering that quantity or not. Hence, to decide if the order of an extra quantity must be made, we will study three factors that will help us to take the decision. These factors are directly related to parameters of the problem that we will change in order to simulate the largest number of possible cases. Factor 1 - Security deposit m We will work with a ratio This ratio help us to relate the amount of the cash deposit with the cost of ordering an extra quantity. This way we can quantify whether is worthwhile or not to order an extra quantity depending on the cash deposit. From now, we can establish some limits for this ratio. If it is higher than 0,5 we can consider it in the high level. And therefore, if it's lower than 0,5 we will considerate it in the low level. For future studies and simulations we will fix this value in the two levels: Ratio Low Level High Level a 0.25 0.75 Factor 2 - High profit/Low profit We will work whit a ratio This ratio help us to know the profit level in which the businesses are. As with the prior ratio we can assume that if it is higher than 0,5 we will considerate high profit, and if it is lower than 0,5 we will considerate it low profit. Factor 3 - Risk taken In the Chapter 5 we have already defined the risk modeling we are going to work with. Through the survey done, we will calculate for each subject the risk vector that will classify them in a risk behavior level. Supply flexibility and risk preferences experiment for a microchip company 41 11 Results 11.1 Survey Answers The survey's answers have been encoded in order to transform the results in numbers to work with. The key is the following: Letter answer Encoded number A 1 B 2 C 3 D 4 E 5 Table 7 - Key for encoding survey answers This encode follows the rule that such as greater is the number, greater is the risk behavior on the answer. So, it will help us to catalog the risk appetite of each subject in a simply and effectively way. The Spanish results for the survey are the following: SPANISH T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12 T13 T14 T15 T16 T17 T18 T19 T20 Q1 1 1 1 1 1 2 1 1 1 1 2 2 2 1 1 1 1 1 1 1 Q2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Q3 3 4 4 4 3 4 4 4 4 3 3 1 4 4 4 3 1 3 3 4 Q4 2 2 2 2 2 2 2 2 2 2 2 2 2 1 2 2 2 2 2 2 Q5 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Q6 3 4 2 1 3 1 1 3 3 4 4 3 1 4 1 2 2 2 1 2 Q7 4 4 1 2 4 3 1 3 2 4 4 2 2 3 3 4 1 4 3 4 Q8 2 4 4 3 1 4 3 3 3 1 1 1 1 2 3 2 1 2 3 4 Q9 2 2 2 1 2 1 2 2 2 1 1 1 2 2 2 2 2 2 1 1 Q10 2 2 2 2 2 2 1 2 2 2 2 1 2 2 2 2 2 2 2 2 Q11 4 4 2 3 3 1 2 5 3 4 4 5 5 5 5 5 4 3 3 4 Q12 2 2 2 2 2 1 2 2 2 1 2 2 1 2 2 2 2 2 1 2 Q13 5 4 3 3 2 2 1 1 4 4 3 3 4 5 1 3 2 3 3 2 Q14 3 3 1 2 4 3 2 4 3 3 4 3 3 4 3 3 3 3 4 2 Q15 5 4 4 5 3 4 3 4 5 5 3 4 4 3 1 4 3 5 1 3 Q16 2 2 2 2 2 1 2 2 2 2 2 2 1 2 2 2 2 1 1 2 Q17 3 2 2 2 3 1 2 2 3 2 2 1 2 3 2 2 2 1 1 3 Table 8 - Spanish testers survey answers Supply flexibility and risk preferences experiment for a microchip company 48 As we can see graphically, the extra quantity order decisions lead to be higher than the optimal solution in this conditions. Nevertheless, it is needed a statistical study to have comprehensive conclusions. For the Low Profit and High Security Cost, the Spanish results are the following: Figure 10 - Dispersion Graph of the Spanish results for Low-High conditions For the Low Profit and Low Security Cost, the Spanish results are the following: Figure 11 - Dispersion Graph of the Spanish results for Low-Low conditions In this last 2 cases we can see that the trend of the ordered quantity decision is similar to the optimal one. Nevertheless, it is needed a statistical study to have comprehensive conclusions. Supply flexibility and risk preferences experiment for a microchip company 49 11.4 Chinese results In this chapter we will analyze graphically the extra quantity decisions in general results of the Chinese subjects gathering also between the 4 cases of the decision taken. See in the Annex C the extra quantity order decisions. For the High Profit and High Security Cost, the Chinese results are the following: Figure 12 - Dispersion Graph of the Chinese results for High-High conditions As we can see graphically, the extra quantity order decisions lead to be lower than the optimal solution in this conditions. Nevertheless, it is needed a statistical study to have comprehensive conclusions. For the High Profit and Low Security Cost, the Chinese results are the following: Figure 13 - Dispersion Graph of the Chinese results for High-Low conditions Supply flexibility and risk preferences experiment for a microchip company 50 As we can see graphically, the extra quantity order decisions lead to be higher than the optimal solution in this conditions. Nevertheless, it is needed a statistical study to have comprehensive conclusions. For the Low Profit and High Security Cost, the Chinese results are the following: Figure 14 - Dispersion Graph of Chinese results for Low-High conditions As we can see graphically, the extra quantity order decisions lead to be lower than the optimal solution in this conditions. Nevertheless, it is needed a statistical study to have comprehensive conclusions. For the Low Profit and Low Security Cost, the Chinese results are the following: Figure 15 - Dispersion Graph of Chinese results for Low-Low conditions As we can see graphically, the extra quantity order decisions lead to be similar than the optimal solution in this conditions. Nevertheless, it is needed a statistical study to have comprehensive conclusions. Supply flexibility and risk preferences experiment for a microchip company 51 11.5 Final decision This experiment has been done by the subjects with the demand uncertainty, this implicates that the final decision of purchasing the extra quantity is not already done. The purchase decision must be done in the stage 2 of the planning season, when the demand is already defined. This decision will be taken from the point of view of profitable business, which is always to maximize the final profit. In this way, for each experiment done, the final profit will be calculated for both cases, whether purchasing the extra quantity order decision or not. We will use this method because sometimes, even if the demand is higher than the base quantity, is not worth it to purchase an extra quantity, depending on the profit conditions and the security deposit level. On the one hand, the case that it is sure that the extra quantity order will be rejected because the storage cost will increase, and therefore the final benefit will be reduced. On the other hand, we can have the case: . This situation is where we must compare the final profit with both decisions, purchasing or not the extra quantity order. Depending on the profit conditions, security deposit level and the difference will be worth it or not. Knowing that: We will have 4 different cases, and 2 possible profits for each: (1) High profit condition - High security level: (2) High profit condition - Low security level: (3) Low profit condition - High security level: Supply flexibility and risk preferences experiment for a microchip company 52 (4) Low profit condition - Low security level: The higher profit will define if it is worth it to purchase the extra quantity or not. Find attached in the Annex D, the graphic with the differences between the profits of each experiment. From the 160 done in total, the final decision has been to not purchase the extra quantity order in 95 cases and to purchase it in the remaining 65. Find attached in the Annex E the tables with the profits before and after the decision. It should be mentioned that this final results are also conditioned by the value that the subjects have given for the extra quantity order. As in some cases, if their extra quantity order decision would had been lower, probably the final profit would be higher than if we do not purchase nothing extra. However, we assume this cases as isolated because the need of the experimentation with a total demand uncertainty, and the final profit it's calculated with an already defined demand. Supply flexibility and risk preferences experiment for a microchip company 53 12 Analysis 12.1 Statistic background In this chapter we will compare the samples of the 4 levels experimentation with all the variables chosen. Our main goal is to analyze the differences between group averages and their associated variation between and within them. The analysis of variance (ANOVA) is especially useful when applied to complex situations because it allows us, by a single test and single risk, answering questions as: The data set of hypothetical populations are different from one another? Are these significant differences? There are 3 requirements to use ANOVA: 1. Independence of observations 2. Normality: the distributions of the residuals are normal. 3. Homoscedasticity: The variance data in groups should be the same. In our experimental case, the three requirements are met, therefore, it will be used the Analysis of Variance (ANOVA) which provides a statistical test of whether or not the means of several groups are equal. The hypothesis used are the following: The test procedure that is used is based on checking the variance of all data without regard to their cause. The total variance between the proven and experimental error factor is divided. The two variances are compared by a F-test, of Single Factor ANOVA, which is a frequency distribution that helps us to decide whether two processes have no such variability. The analysis of variance is based on the decomposition of the total variability in two parts. One part due to the variability between different populations or treatments (variability between groups) and another part which can be regarded as variability intrinsic observations (variability within groups). The variability between groups measures the discrepancy between the groups and the global average, so if there are no differences between them (the null hypothesis is true) obtain small variability. If, however, the null hypothesis is false, it is expected that the variability between groups is large. Supply flexibility and risk preferences experiment for a microchip company 54 The variability within groups measures the intrinsic variability of observations, that is, if the experiment is well designed and there are not included factors of variation different as the studied, should be purely random error occurred as a result of biological variability of the experimental material. The contrast analysis of variance is based on the comparison of variability between and within. We will always reject the null hypothesis if the variability between is great, but using as a comparison pattern the variability within. That is, we will accept a treatment effect provided that they produce greater differences in experimental units than would have without the application thereof. Before we compare the sums of squares we have to divide them by their respective degrees of freedom related to the number of observations with which the calculation is made. Thus we obtain the mean squares estimators or variability estimators. The complete information is summarized in the following table, It is what is known as ANOVA table and it resumes all the information necessary to make the corresponding contrast: ANOVA Source of Variation SS df MS F Between Groups r-1 Within Groups n-r Total n-1 Figure 16 - ANOVA table Supply flexibility and risk preferences experiment for a microchip company 55 Where: r is the number of experimental treatments. is the sample size of each treatment. is the observation j for the experimental group i. is the average of the group samples. is the average of all the observations. The hypothesis which is tested in this model is that the population mean are equal. If the averages result equal, it means that the groups are not different in the variables studied. The strategy to try out the hypothesis of equal averages consists in obtain a statistic F, which reflects the degree of similarity between the averages being compared. The numerator of the statistic F it's an estimation of the population variance based in the existing variances between the averages of the groups. The denominator it's also a population variance estimation, but it is based in the existing variance within groups. If the population means are equal, then the samples means will be similar, existing only differences due to chance. In this case, the statistic F will take a lower value than the critical F statistic. If the F value is higher than the critical F value, then the population means will be different, and the sample means too. So there's a statistically significant effect on the test results. Supply flexibility and risk preferences experiment for a microchip company 56 12.2 Decision analysis of the levels combination Firstly, we will analyze the relationship between the decisions taken with the different combination of variable levels we have worked with. What we want to see is if really levels have influenced or have had effect in the subjects decisions. In our particular case, we will analyze the results for the 40 subjects in the 4 levels of the experiment done. The levels are: Security Level High 50$ of security cost Low 20$ of security cost Profit Level High 6$ of profit Low 2$ of profit Table 13 - Level combinations We will study the combination of the 4 levels above as: High - High, High - Low, Low-High and Low-Low. The null hypothesis we have is the averages to be equal. The general results are the following: RESUME Groups Count Sum Average Variance Std. Dev High-High 40 1205 30,125 50,72756 7,12233 High-Low 40 385 9,625 47,83013 6,91593 Low-High 40 1684 42,1 30,29744 5,50431 Low-Low 40 562 14,05 95,79231 9,78735 Table 14 - General results for the comparison between the 4 levels combination And the ANOVA results for single factor are the following: ANOVA Source of Variation SS df MS F P-Value F crit Between Groups 26830,65 3 8943,55 159,246 2,85022E-47 2,66257 Within Groups 8761,25 156 56,1619 Total 35591,9 159 Table 15 - ANOVA results for the comparison between the 4 levels combination As we can see: This means that we have statistically significant results that the averages of the 4 levels are different. Extrapolating these facts to our case, this means that the decisions taken for the Extra Quantity Order are different in each level given. Therefore, we can say that our subjects have made their decisions based on the given levels. So that the levels have influence in the decisions taken. Supply flexibility and risk preferences experiment for a microchip company 57 Therefore, the design of the experiment can be considered as successful, as the subjects have decided according to the conditions given. 12.2.1 Extra Quantity Decision Order - Profit level fixed Now we will conduct the same test but fixing one of the variables in order to see the significance to the levels of the other one. This will help us to see if there is a relationship between the decisions and the two levels of the security cost. Fixing the High Profit Condition, the general results are the following: RESUME Groups Count Sum Average Variance High Security Cost 40 1205 30,125 50,7275641 Low Security Cost 40 1684 42,1 30,2974359 Table 16 - General results for the fixed High Profit Condition And the ANOVA results are the following: ANOVA Source of Variation SS df MS F P-Value F crit Between Groups 2868,013 1 2868,0125 70,79327 1,48233E-12 3,9634719 Within Groups 3159,975 78 40,5125 Total 6027,988 79 Table 17 - ANOVA results for the fixed High Profit Condition As we can see: So, there exist a significant difference in the decisions between the levels of the security cost in the same high profit condition. As we can see in the general results, the average for the decisions in the high level of the security cost is lower than with the low security cost. This is so rational because even if we are in a high profit condition, the subjects are reluctant to reserve more quantity because of the high fix cost to do it and its direct influence to the final profit. Fixing the Low Profit Condition, the general results are the following: RESUME Groups Count Sum Average Variance High Security Cost 40 385 9,625 47,8301282 Low Security Cost 40 562 14,05 95,7923077 Table 18 - General results for the fixed Low Profit Condition Supply flexibility and risk preferences experiment for a microchip company 64 12.3 Effect of different nationalities Now, we will make the comparison between both nationalities tested, Spanish and Chinese. We will compare their decisions trying to get if there are differences between the subjects thinking and if it is related to their original countries. RESUME Groups Count Sum Average Variance Spanish 80 1935 24,1875 250,204905 Chinese 80 1901 23,7625 200,234019 Table 26 - General results for the comparison between nationalities ANOVA Source of Variation SS df MS F P-Value F crit Between Groups 7,225 1 7,225 0,032079 0,858082 3,900988 Within Groups 35584,675 158 225,2194 Total 35591,9 159 Table 27 - ANOVA results for the comparison between nationalities As we can see: Therefore, we cannot reject the null hypothesis for the averages to be equal. So there is not a significantly differences between the decision making of the Spanish subjects and the Chinese subjects. All the testers did the experiment in the same conditions with the same environment and description. So we can conclude that even with the cultural differences and living habits there is not a significant difference in the decision making of this experiment. Nevertheless, we cannot forget that this experiment has been developed with only 20 subjects of these country. even if each subject did 4 experiments, the sample it's maybe too small to have robust conclusions regarding the differences in the decision making. Also, we have to say that the subjects are all students of Beihang University, with very similar profiles of knowledge. This can also be a factor that they are not significantly different. Supply flexibility and risk preferences experiment for a microchip company 65 12.4 Effect of the subject's risk appetite Now, we will analyze the relationship between the decisions taken with the subject's risk appetite that we have already defined in the Chapter 5. The general results for the test are the following: RESUME Groups Count Sum Average Variance High Risk 60 1852 30,86667 176,01582 Medium Risk 28 683 24,39286 183,50661 High Safe 72 1301 18,06944 209,67117 Table 28 - General results for the comparison between risk appetites The ANOVA results for the test are the following: ANOVA Source of Variation SS df MS F P-Value F crit Between Groups 5365,6353 2 2682,8177 13,93498 2,6861E-06 3,053628 Within Groups 30226,2647 157 192,5240 Total 35591,9 159 Table 29 - ANOVA results for the comparison between risk appetites As we can see: Therefore, the risk appetite has a significantly impact on the decision making of subjects. The high risk behavior has the higher average, as the risky people tends to order a greater quantity order. Their behavior makes them assume a potential risk which usually result in a clear loss of ultimate benefit. In fact, we can say that is a success to have this results. The method of classification of risk appetite has given results which are directly related to the experiment decisions. Supply flexibility and risk preferences experiment for a microchip company 66 12.5 Comparison between real profit and optimal profit In this section we will analyze the relation between the real profit obtained with the subject's decisions and the optimal profit obtained by the mathematical model. RESUME Groups Count Sum Average Variance Real Profit 160 10164,3524 63,52720 52590,79499 Optimal Profit 160 81320 508,25000 77339,37107 Table 30 - General results for the comparison between real and optimal profit ANOVA Source of Variation SS df MS F P-Value F crit Between Groups 15822269,33 1 15822269,334 243,550 3,657E-41 3,87086 Within Groups 20658896,40 318 64965,083 Total 36481165,74 319 Table 31 - ANOVA results for the comparison between real and optimal profit As we can see: Therefore, there exist a significantly difference between the averages of the real profit obtained in the experiment and the optimal profit obtained by the mathematical model. In fact, the optimal profit average is so much greater than the real one obtained. The reason for this is that the optimal solution always guarantee the maximum benefit possible in every case. However, the optimal conditions have to be considered as ideal, and even if they are impossible to reach, we must work hard for our results to resemble the optimal solution. Supply flexibility and risk preferences experiment for a microchip company 67 13 Conclusions The Supply Chain Management is a field with a great extension of theory development, due to the high dependence of this field in the business flows between companies nowadays. Flexible quantity contracts have been also researched from a theoretical point of view, however, they are still unexplored in an experimental research way. In a specific market environment, the mathematical models for this contract are developed, focused on the global optimum quantity order accomplishing the flexibility restrictions and maximizing the global profit margins throughout the supply chain. Nevertheless, the real environment sustain factors and human behaviors which are far from optimal results. And is in this point where this thesis have been focused. The order quantity with the flexibility option allows the retailers to react faster to the fluctuations in the demand market and to reduce the risk taken in the business process. However, from the standpoint of the supplier, the reserve of production capacity to introduce this flexibility in the process carries a risk that must be compensated by a security deposit in the event that finally the sale is not carried out. Different retailers have different degrees of risk preferences, and this causes deviation between the quantity order decisions from the theoretical optimal values. As well as the risk appetite, the factors of profit levels and security deposit levels have also effect in the decision making. Therefore, this thesis studies the relationship between these three factors and their affectation to the decision making. To achieve the main objectives, four experiments were designed, with the combination of two variables levels, high profit, low profit, high security cost and low security cost. It was tested in four market situations to ensure that the enough number of decisions were made in order to have robust conclusions. With the statistical analysis by organizational experiments and experimental data, we can summarize the following conclusions: 1. The decision making from subjects with limited rationality, is not in full conformity with the order of the optimal values. 2. The risky behavior clearly affects the return results of decisions, whose values are above to the optimal ones. And their decisions order are also higher than the conservative subjects. Therefore, the risk appetite is a significant factor in the experiment, and it is a point to take care and make further research trying to stop the influence in the decisions and therefore in the business. Supply flexibility and risk preferences experiment for a microchip company 68 3. The high profit condition groups were significantly higher than the theoretical optimal results, however, the low profit condition groups were significantly lower than the optimal value or with not significant differences. 4. With the high profit condition, we can see that even with the high security cost or low security cost, the quantity decisions are significantly higher than in the low profit condition. So the profit level has a clear effect in the decision making. 5. In order to avoid disadvantages, the retailers benefit expectations level of the product is the main factor in the decision making. However, the excessive pursuit of high profits and low risks will lead to miss profit maximum points. During the research process has found the following deficiencies: Firstly a research about the market information was done, but it may not match the actual situation of the microchip sector. In second place, in order to facilitate the experiment design, several hypothesis were taken to simplify some situations and the subsequent analysis. For instance, in the actual environment, for retailers it is impossible to accurately know the market demand and adjust ordering decisions. In third place, we cannot forget our inadequate sample size. To have completely reliable statistical studies it is needed to have a large sample size to resemble the population and get robust conclusions. Nonetheless, the experiment results have been significant enough for considering the goals reached. In conclusion, we can say that the risk appetite is a factor which is present in our environment and it is need to be aware of it and its consequences. In the Supply Chain Management the risky behavior has no place because it leads to risky situations that endanger the business processes and the final benefit of all parties. Supply flexibility and risk preferences experiment for a microchip company 69 14 References Andy A. Tsay, Steven Nahmias, Narendra Agrawal. Quantitative models for supply chain management. Santa Clara USA: Springer US. 1999. Bassok, Y., & R. Anupindi. Analysis of supply contracts with forecast & flexibility. Working paper, Northwestern University. 1995. Cachon Gérard P. Decision Bias in the Newsvendor Problem with a Known Demand Distribution.North Carolina USA: Management Science/Vol.46. 2000. Cachon Gérard P. Chapter 6: Supply Chain Coordination with Contracts. Carter, C.R. and L.M. Ellram. Thirty-Five Years of the Journal of Supply Chain Management: Where have We Been and Where are We Going?, The Journal of Supply Chain Management, 2003. Cheng Feng, Ettl Markus Ettl, Lin Grace. Flexible supply contracts via options. IBM T.J. Watson Research Center:Yorktown Heights, NY. 2003 Croom, S., P. Romano and M. Giannakis. Supply Chain Management: an Analytical Framework for Critical Literature Review, European Journal of Purchasing and Supply Management, 2000. Dilek Onkal. Supply Chain Management. United Kingdom: Intech. 2011. Dilek Onkal, Emel Aktas. Supply Chain flexibility: Managerial implications. United kingdom: Intech. 2011. Eppen, G. D., & A. V. Iyer. Backup agreements in fashion buying - the value of upstream flexibility. Management Science 43. 1997. Gulati, R. Tent Poles, Tribalism, and Boundary Spanning: The Rigor-Relevance Debate in Management Research, Academy of Management Journal, 2007. Kamrad, B., & A. Siddique. Supply contracts, profit sharing, switching, & reaction options. Management Science 50. 2004. Lian, Z., & A. Deshmukh. Analysis of supply contracts with quantity flexibility. European Journal of Operational. Research 2009 Markides, C. In Search of Ambidextrous Professors, Academy of Management Journal, 2007. McGahan, A.M. Academic Research that Matters to Managers: On Zebras, Dogs, Lemmings, Hammers, and Turnips, Academy of Management Journal. 2007. Mentzer, J.T., W. DeWitt, K.S. Keebler, S. Min, N.W. Nix and C.D Smith. Defining Supply Chain Management, Journal of Business Logistics, 2001. Supply flexibility and risk preferences experiment for a microchip company 70 Rungtusanatham, Survey Research in Operations Management: Historical Analyses, Journal of Operations Management, 2003. Sethi, S. P., H. Yan, & H. Zhang. Quantity flexibility contracts: Optimal decisions with information updates. Decision Sciences. 2004. Steve Graves, Ton de Kok. Handbooks in Operations Research and Management Science: Supply Chain Management. Chapter 6. North-Holland. 2001. Suresh P. Sethi, Houmin Yang, Hanqin Zhang. Quantity Flexible Contracts. USA, Hong Kong and China: RGC Grants. 2003. Tsay, A. The quality flexibility contract and supplier-customer incentives: Management Science 45. 1999. Tushman, M. and C. III O'Reilly. Research and Relevance: Implications of Pasteur's Quadrant for Doctoral Programs and Faculty Development, Academy of Management Journal, 2007. Wang, Y., L. Jiang, & Z. -J Shen. Channel performance under consignment contract with revenue sharing. Management Science. 2006. Wu, J. Quantity flexibility contracts under bayesian updating. Computers & Operations Research. 2005. Supply flexibility and risk preferences experiment for a microchip company 71 15 Acknowledgements I would like to express my sincere gratitude for my supervisor Prof. Wang He Xin for his continuous support on my research, for his motivation and engagement through the learning process of this final thesis. Furthermore I would like to thank my research mates, specially Shi Xiaoqian, in the experiments carried out, without which the development of the research would not have been possible. My sincere thanks for Beihang University, for giving me the opportunity of doing my final thesis here. And also thanks for UPC for the strong study background that I've earned during the last 5 years. At last but not the least, I would like to thank my family for making possible my exchange here. They are who have supported me throughout the entire process and throughout my life. Supply flexibility and risk preferences experiment for a microchip company 72 Supply flexibility and risk preferences experiment for a microchip company 73 16 ANNEX A 1 2 0.5 0.3 0.2 0.0 0.0 0.0 0.0 0.2 0.8 0.5 0.0 0.0 0.2 0.3 0.5 0.2 0.3 0.3 0.2 0.5 0.0 0.0 0.2 0.3 0.5 0.0 0.0 0.2 0.8 0.0 0.5 0.3 0.2 0.0 0.0 0.0 0.2 0.3 0.5 0.0 0.5 0.0 0.2 0.3 0.5 0.0 0.0 0.2 0.8 0.5 0.8 0.2 0.0 0.0 0.0 0.0 0.0 0.2 0.8 0.0 0.0 0.2 0.3 0.3 0.2 0.0 0.2 0.3 0.5 0.0 0.8 0.2 0.0 0.0 0.0 0.2 0.3 0.3 0.2 0.5 0.0 0.0 0.2 0.3 0.5 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.8 0.0 3 4 0.0 0.0 0.0 0.0 0.0 0.2 0.8 0.0 0.0 0.2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.0 0.3 0.2 0.0 0.0 0.0 0.0 0.2 0.8 0.0 0.2 0.0 0.2 0.3 0.5 0.0 0.0 0.2 0.8 0.0 0.0 0.0 0.2 0.3 0.5 0.0 0.2 0.3 0.5 0.0 0.0 0.3 0.2 0.0 0.0 0.0 0.0 0.2 0.8 0.0 0.0 0.0 0.2 0.3 0.5 0.0 0.2 0.3 0.5 0.8 0.2 0.3 0.2 0.0 0.0 0.0 0.2 0.3 0.5 0.0 0.0 0.2 0.3 0.3 0.2 0.0 0.0 0.2 0.8 0.0 0.2 5 6 0.3 0.2 0.0 0.0 0.2 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.2 0.3 0.5 0.0 0.2 0.3 0.5 0.0 0.0 0.2 0.0 0.2 0.8 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.5 0.0 0.0 3.0 0.0 0.0 0.0 0.0 0.2 0.3 0.5 0.0 0.0 Supply flexibility and risk preferences experiment for a microchip company 80 0.0 0.0 0.2 0.3 0.5 0.0 0.0 0.2 0.3 0.5 39 40 0.5 0.3 0.2 0.0 0.0 0.5 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.2 0.8 0.0 0.2 0.3 0.3 0.2 0.0 0.0 0.2 0.3 0.5 0.0 0.0 0.0 0.2 0.8 0.0 0.0 0.2 0.3 0.5 0.0 0.0 0.0 0.2 0.8 0.0 0.2 0.3 0.3 0.2 0.0 0.2 0.3 0.3 0.2 0.0 0.0 0.2 0.3 0.5 0.0 0.0 0.0 0.2 0.8 0.5 0.3 0.2 0.0 0.0 0.0 0.2 0.3 0.3 0.2 0.5 0.3 0.2 0.0 0.0 0.0 0.2 0.3 0.3 0.2 0.5 0.3 0.2 0.0 0.0 0.0 0.2 0.3 0.3 0.2 0.0 0.0 0.2 0.3 0.5 0.0 0.0 0.2 0.3 0.5 Supply flexibility and risk preferences experiment for a microchip company 81 B Subjects Experiments qa Security Cost Level Profit Level 1 1 35 high high 2 19 high low 3 50 low high 4 32 low low 2 5 32 high high 6 20 high low 7 50 low high 8 28 low low 3 9 21 high high 10 9 high low 11 40 low high 12 5 low low 4 13 25 high high 14 10 high low 15 38 low high 16 0 low low 5 17 33 high high 18 10 high low 19 47 low high 20 16 low low 6 21 25 high high 22 5 high low 23 38 low high 24 8 low low 7 25 24 high high 26 7 high low 27 39 low high 28 0 low low 8 29 25 high high 30 0 high low 31 40 low high 32 0 low low 9 33 36 high high 34 15 high low 35 50 low high 36 20 low low 10 37 38 high high 38 16 high low 39 43 low high 40 22 low low Table 32 - Spanish Extra Quantity Order decision Supply flexibility and risk preferences experiment for a microchip company 82 Subjects Experiments qa Security Cost Level Profit Level 11 41 40 high high 42 20 high low 43 50 low high 44 30 low low 12 45 35 high high 46 10 high low 47 45 low high 48 20 low low 13 49 20 high high 50 10 high low 51 35 low high 52 0 low low 14 53 45 high high 54 10 high low 55 50 low high 56 30 low low 15 57 20 high high 58 0 high low 59 40 low high 60 0 low low 16 61 40 high high 62 20 high low 63 50 low high 64 25 low low 17 65 20 high high 66 0 high low 67 35 low high 68 10 low low 18 69 35 high high 70 15 high low 71 50 low high 72 25 low low 19 73 20 high high 74 0 high low 75 35 low high 76 10 low low 20 77 22 high high 78 0 high low 79 42 low high 80 0 low low Table 33 - Spanish Extra Quantity Order decision Supply flexibility and risk preferences experiment for a microchip company 83 C Subjects Experiments qa Security Cost Level Profit Level 21 81 34 high high 82 15 high low 83 42 low high 84 20 low low 22 85 35 high high 86 16 high low 87 47 low high 88 23 low low 23 89 30 high high 90 12 high low 91 40 low high 92 10 low low 24 93 30 high high 94 0 high low 95 40 low high 96 9 low low 25 97 43 high high 98 21 high low 99 47 low high 100 28 low low 26 101 30 high high 102 8 high low 103 40 low high 104 10 low low 27 105 32 high high 106 17 high low 107 42 low high 108 20 low low 28 109 35 high high 110 15 high low 111 45 low high 112 10 low low 29 113 35 high high 114 11 high low 115 43 low high 116 13 low low 30 117 25 high high 118 7 high low 119 35 low high 120 12 low low Table 34 - Chinese Extra Quantity Order decision Supply flexibility and risk preferences experiment for a microchip company 84 Subjects Experiments qa Security Cost Level Profit Level 31 121 23 high high 122 5 high low 123 32 low high 124 9 low low 32 125 29 high high 126 6 high low 127 33 low high 128 10 low low 33 129 20 high high 130 2 high low 131 37 low high 132 18 low low 34 133 31 high high 134 15 high low 135 43 low high 136 17 low low 35 137 24 high high 138 6 high low 139 36 low high 140 10 low low 36 141 40 high high 142 20 high low 143 50 low high 144 30 low low 37 145 35 high high 146 10 high low 147 45 low high 148 10 low low 38 149 20 high high 150 0 high low 151 35 low high 152 0 low low 39 153 33 high high 154 3 high low 155 45 low high 156 12 low low 40 157 30 high high 158 0 high low 159 40 low high 160 10 low low Table 35 - Chinese Extra Quantity Order decision Supply flexibility and risk preferences experiment for a microchip company 85 D Supply flexibility and risk preferences experiment for a microchip company 86 E Experiments Extra Quantity Order [qa] Total Revenue Total cost Total profit Revenue with qa=0 Cost with qa=0 Profit with qa=0 DECISION FINAL PROFIT 1 35 607,7 332,5 275,2 450,0 210,0 240,0 YES QA 275,2 2 19 621,0 553,0 68,0 450,0 410,0 40,0 YES QA 68,0 3 50 555,3 368,3 187,0 450,0 180,0 270,0 NOT QA 270,0 4 32 106,7 674,1 -567,4 106,7 418,1 -311,4 NOT QA -311,4 5 32 738,0 316,0 422,0 450,0 210,0 240,0 YES QA 422,0 6 20 630,0 560,0 70,0 450,0 410,0 40,0 YES QA 70,0 7 50 394,9 386,1 8,8 394,9 186,1 208,8 NOT QA 208,8 8 28 576,0 590,0 -14,0 450,0 380,0 70,0 NOT QA 70,0 9 21 521,3 286,1 235,2 450,0 210,0 240,0 NOT QA 240,0 10 9 206,1 509,1 -303,0 206,1 437,1 -231,0 NOT QA -231,0 11 40 786,7 302,6 484,1 450,0 180,0 270,0 YES QA 484,1 12 5 366,7 429,3 -62,6 366,7 389,3 -22,6 NOT QA -22,6 13 25 675,0 295,0 380,0 450,0 210,0 240,0 YES QA 380,0 14 10 339,5 502,3 -162,7 339,5 422,3 -82,7 NOT QA -82,7 15 38 131,3 367,4 -236,1 131,3 215,4 -84,1 NOT QA -84,1 16 0 450,0 390,0 60,0 450,0 380,0 70,0 NOT QA 70,0 17 33 747,0 319,0 428,0 450,0 210,0 240,0 YES QA 428,0 18 10 215,8 516,0 -300,2 215,8 436,0 -220,2 NOT QA -220,2 19 47 773,0 332,1 440,9 450,0 180,0 270,0 YES QA 440,9 20 16 208,8 534,8 -326,0 208,8 406,8 -198,0 NOT QA -198,0 21 25 29,2 356,8 -327,6 29,2 256,8 -227,6 NOT QA -227,6 22 5 495,0 455,0 40,0 450,0 410,0 40,0 YES QA 40,0 23 38 361,9 341,8 20,1 361,9 189,8 172,1 NOT QA 172,1 24 8 522,0 446,0 76,0 450,0 380,0 70,0 YES QA 76,0 25 24 328,7 319,5 9,2 328,7 223,5 105,2 NOT QA 105,2 26 7 513,0 469,0 44,0 450,0 410,0 40,0 YES QA 44,0 27 39 644,5 314,4 330,1 450,0 180,0 270,0 YES QA 330,1 28 0 149,1 413,4 -264,4 149,1 413,4 -264,4 YES QA -264,4 29 25 126,2 346,0 -219,8 126,2 246,0 -119,8 NOT QA -119,8 30 0 450,0 420,0 30,0 450,0 410,0 40,0 NOT QA 40,0 31 40 740,5 307,7 432,8 450,0 180,0 270,0 YES QA 432,8 32 0 450,0 390,0 60,0 450,0 380,0 70,0 NOT QA 70,0 33 36 152,3 387,1 -234,7 152,3 243,1 -90,7 NOT QA -90,7 34 15 22,4 577,5 -555,1 22,4 457,5 -435,1 NOT QA -435,1 35 50 551,5 368,7 182,8 450,0 180,0 270,0 NOT QA 270,0 36 20 106,2 578,2 -472,0 106,2 418,2 -312,0 NOT QA -312,0 37 38 178,6 392,2 -213,5 178,6 240,2 -61,5 NOT QA -61,5 Supply flexibility and risk preferences experiment for a microchip company 87 38 16 594,0 532,0 62,0 450,0 410,0 40,0 YES QA 62,0 39 43 265,2 372,5 -107,3 265,2 200,5 64,7 NOT QA 64,7 40 22 648,0 544,0 104,0 450,0 380,0 70,0 YES QA 104,0 41 40 138,4 404,6 -266,2 138,4 244,6 -106,2 NOT QA -106,2 42 20 458,0 569,1 -111,2 450,0 410,0 40,0 NOT QA 40,0 43 50 378,2 388,0 -9,8 378,2 188,0 190,2 NOT QA 190,2 44 30 720,0 600,0 120,0 450,0 380,0 70,0 YES QA 120,0 45 35 705,2 321,6 383,6 450,0 210,0 240,0 YES QA 383,6 46 10 540,0 490,0 50,0 450,0 410,0 40,0 YES QA 50,0 47 45 349,8 371,1 -21,3 349,8 191,1 158,7 NOT QA 158,7 48 20 630,0 530,0 100,0 450,0 380,0 70,0 YES QA 100,0 49 20 513,5 282,9 230,6 450,0 210,0 240,0 NOT QA 240,0 50 10 540,0 490,0 50,0 450,0 410,0 40,0 YES QA 50,0 51 35 373,5 328,5 45,0 373,5 188,5 185,0 NOT QA 185,0 52 0 25,2 427,2 -402,0 25,2 427,2 -402,0 YES QA -402,0 53 45 482,9 386,3 96,5 450,0 210,0 240,0 NOT QA 240,0 54 10 455,7 489,4 -33,7 450,0 410,0 40,0 NOT QA 40,0 55 50 439,8 381,1 58,7 439,8 181,1 258,7 NOT QA 258,7 56 30 720,0 600,0 120,0 450,0 380,0 70,0 YES QA 120,0 57 20 2,3 339,7 -337,4 2,3 259,7 -257,4 NOT QA -257,4 58 0 119,8 446,7 -326,9 119,8 446,7 -326,9 YES QA -326,9 59 40 805,5 300,5 505,0 450,0 180,0 270,0 YES QA 505,0 60 0 94,8 419,5 -324,7 94,8 419,5 -324,7 YES QA -324,7 61 40 237,2 393,6 -156,5 237,2 233,6 3,5 NOT QA 3,5 62 20 630,0 560,0 70,0 450,0 410,0 40,0 YES QA 70,0 63 50 240,6 403,3 -162,7 240,6 203,3 37,3 NOT QA 37,3 64 25 308,9 595,7 -286,8 308,9 395,7 -86,8 NOT QA -86,8 65 20 630,0 280,0 350,0 450,0 210,0 240,0 YES QA 350,0 66 0 450,0 420,0 30,0 450,0 410,0 40,0 NOT QA 40,0 67 35 612,2 302,0 310,2 450,0 180,0 270,0 YES QA 310,2 68 10 540,0 460,0 80,0 450,0 380,0 70,0 YES QA 80,0 69 35 134,4 385,1 -250,7 134,4 245,1 -110,7 NOT QA -110,7 70 15 585,0 525,0 60,0 450,0 410,0 40,0 YES QA 60,0 71 50 322,8 394,1 -71,3 322,8 194,1 128,7 NOT QA 128,7 72 25 498,7 574,6 -75,9 450,0 380,0 70,0 NOT QA 70,0 73 20 151,2 323,2 -172,0 151,2 243,2 -92,0 NOT QA -92,0 74 0 394,0 416,2 -22,2 394,0 416,2 -22,2 YES QA -22,2 75 35 181,5 349,8 -168,3 181,5 209,8 -28,3 NOT QA -28,3 76 10 540,0 460,0 80,0 450,0 380,0 70,0 YES QA 80,0 77 22 648,0 286,0 362,0 450,0 210,0 240,0 YES QA 362,0 78 0 450,0 420,0 30,0 450,0 410,0 40,0 NOT QA 40,0 79 42 633,5 327,6 305,9 450,0 180,0 270,0 YES QA 305,9 Supply flexibility and risk preferences experiment for a microchip company 88 80 0 70,9 422,1 -351,2 70,9 422,1 -351,2 YES QA -351,2 81 34 490,2 341,5 148,6 450,0 210,0 240,0 NOT QA 240,0 82 15 318,5 544,6 -226,1 318,5 424,6 -106,1 NOT QA -106,1 83 42 809,0 308,1 500,9 450,0 180,0 270,0 YES QA 500,9 84 20 522,8 531,9 -9,1 450,0 380,0 70,0 NOT QA 70,0 85 35 636,1 329,3 306,8 450,0 210,0 240,0 YES QA 306,8 86 16 594,0 532,0 62,0 450,0 410,0 40,0 YES QA 62,0 87 47 646,3 346,2 300,1 450,0 180,0 270,0 YES QA 300,1 88 23 315,3 579,0 -263,6 315,3 395,0 -79,6 NOT QA -79,6 89 30 287,8 348,0 -60,2 287,8 228,0 59,8 NOT QA 59,8 90 12 32,6 552,4 -519,8 32,6 456,4 -423,8 NOT QA -423,8 91 40 213,6 366,3 -152,6 213,6 206,3 7,4 NOT QA 7,4 92 10 540,0 460,0 80,0 450,0 380,0 70,0 YES QA 80,0 93 30 421,1 333,2 87,8 421,1 213,2 207,8 NOT QA 207,8 94 0 450,0 420,0 30,0 450,0 410,0 40,0 NOT QA 40,0 95 40 757,8 305,8 452,0 450,0 180,0 270,0 YES QA 452,0 96 9 216,1 478,0 -261,9 216,1 406,0 -189,9 NOT QA -189,9 97 43 678,5 356,6 321,8 450,0 210,0 240,0 YES QA 321,8 98 21 118,3 614,9 -496,5 118,3 446,9 -328,5 NOT QA -328,5 99 47 478,4 364,8 113,6 450,0 180,0 270,0 NOT QA 270,0 100 28 71,7 646,0 -574,4 71,7 422,0 -350,4 NOT QA -350,4 101 30 487,4 325,8 161,6 450,0 210,0 240,0 NOT QA 240,0 102 8 475,8 471,1 4,7 450,0 410,0 40,0 NOT QA 40,0 103 40 267,9 360,2 -92,3 267,9 200,2 67,7 NOT QA 67,7 104 10 339,4 472,3 -132,9 339,4 392,3 -52,9 NOT QA -52,9 105 32 355,7 348,5 7,2 355,7 220,5 135,2 NOT QA 135,2 106 17 603,0 539,0 64,0 450,0 410,0 40,0 YES QA 64,0 107 42 608,5 330,4 278,2 450,0 180,0 270,0 YES QA 278,2 108 20 302,6 556,4 -253,8 302,6 396,4 -93,8 NOT QA -93,8 109 35 765,0 325,0 440,0 450,0 210,0 240,0 YES QA 440,0 110 15 447,2 530,3 -83,1 447,2 410,3 36,9 NOT QA 36,9 111 45 10,8 408,8 -398,0 10,8 228,8 -218,0 NOT QA -218,0 112 10 540,0 460,0 80,0 450,0 380,0 70,0 YES QA 80,0 113 35 682,0 324,2 357,8 450,0 210,0 240,0 YES QA 357,8 114 11 326,1 511,8 -185,7 326,1 423,8 -97,7 NOT QA -97,7 115 43 151,1 385,2 -234,1 151,1 213,2 -62,1 NOT QA -62,1 116 13 567,0 481,0 86,0 450,0 380,0 70,0 YES QA 86,0 117 25 41,2 355,4 -314,2 41,2 255,4 -214,2 NOT QA -214,2 118 7 172,9 496,8 -323,9 172,9 440,8 -267,9 NOT QA -267,9 119 35 3,8 369,6 -365,8 3,8 229,6 -225,8 NOT QA -225,8 120 12 349,1 487,2 -138,1 349,1 391,2 -42,1 NOT QA -42,1 121 23 617,9 283,3 334,6 450,0 210,0 240,0 YES QA 334,6 Supply flexibility and risk preferences experiment for a microchip company 89 122 5 495,0 455,0 40,0 450,0 410,0 40,0 YES QA 40,0 123 32 738,0 286,0 452,0 450,0 180,0 270,0 YES QA 452,0 124 9 101,9 490,7 -388,8 101,9 418,7 -316,8 NOT QA -316,8 125 29 620,2 307,1 313,1 450,0 210,0 240,0 YES QA 313,1 126 6 504,0 462,0 42,0 450,0 410,0 40,0 YES QA 42,0 127 33 222,5 337,3 -114,8 222,5 205,3 17,2 NOT QA 17,2 128 10 20,7 507,7 -487,0 20,7 427,7 -407,0 NOT QA -407,0 129 20 213,4 316,3 -102,9 213,4 236,3 -22,9 NOT QA -22,9 130 2 164,1 457,8 -293,6 164,1 441,8 -277,6 NOT QA -277,6 131 37 529,3 319,2 210,1 450,0 180,0 270,0 NOT QA 270,0 132 18 127,0 559,9 -432,9 127,0 415,9 -288,9 NOT QA -288,9 133 31 151,9 367,1 -215,2 151,9 243,1 -91,2 NOT QA -91,2 134 15 585,0 525,0 60,0 450,0 410,0 40,0 YES QA 60,0 135 43 192,3 380,6 -188,3 192,3 208,6 -16,3 NOT QA -16,3 136 17 50,1 560,4 -510,4 50,1 424,4 -374,4 NOT QA -374,4 137 24 494,8 301,0 193,7 450,0 210,0 240,0 NOT QA 240,0 138 6 504,0 462,0 42,0 450,0 410,0 40,0 YES QA 42,0 139 36 152,9 357,0 -204,1 152,9 213,0 -60,1 NOT QA -60,1 140 10 92,2 499,8 -407,6 92,2 419,8 -327,6 NOT QA -327,6 141 40 416,4 373,7 42,7 416,4 213,7 202,7 NOT QA 202,7 142 20 630,0 560,0 70,0 450,0 410,0 40,0 YES QA 70,0 143 50 491,5 375,4 116,1 450,0 180,0 270,0 NOT QA 270,0 144 30 720,0 600,0 120,0 450,0 380,0 70,0 YES QA 120,0 145 35 574,8 336,1 238,7 450,0 210,0 240,0 NOT QA 240,0 146 10 394,8 496,1 -101,3 394,8 416,1 -21,3 NOT QA -21,3 147 45 614,9 341,7 273,3 450,0 180,0 270,0 YES QA 273,3 148 10 540,0 460,0 80,0 450,0 380,0 70,0 YES QA 80,0 149 20 366,8 299,2 67,6 366,8 219,2 147,6 NOT QA 147,6 150 0 450,0 420,0 30,0 450,0 410,0 40,0 NOT QA 40,0 151 35 635,6 299,4 336,2 450,0 180,0 270,0 YES QA 336,2 152 0 450,0 390,0 60,0 450,0 380,0 70,0 NOT QA 70,0 153 33 743,6 309,4 434,3 450,0 210,0 240,0 YES QA 434,3 154 3 477,0 441,0 36,0 450,0 410,0 40,0 NOT QA 40,0 155 45 855,0 325,0 530,0 450,0 180,0 270,0 YES QA 530,0 156 12 31,3 522,5 -491,2 31,3 426,5 -395,2 NOT QA -395,2 157 30 720,0 310,0 410,0 450,0 210,0 240,0 YES QA 410,0 158 0 450,0 420,0 30,0 450,0 410,0 40,0 NOT QA 40,0 159 40 810,0 310,0 500,0 450,0 180,0 270,0 YES QA 500,0 160 10 478,0 456,9 21,2 450,0 380,0 70,0 NOT QA 70,0