scieee Open visual document viewer

Construction planning of a car shopping centre at Darius and Girènas Street Nº 15 in Vilnius

Anula López, Adrián

Abstract

Trabajo Fin de Grado en modalidad Intercambios Académicos. Vilnius Gediminas Technical University

Full text

VILNIUS GEDIMINAS TECHNICAL UNIVERSITY FACULTY OF CIVIL ENGINEERING DEPARTMENT OF CONSTRUCTION TECHNOLOGY AND MANAGEMENT S uden : Ad ian, Anula López Supe iso : Jonas Sapa auskas Language – English S a ybos plana imas au omobiliǐ p ekybos cen e, Da iaus i Gi ơno g. 15 Vilniuje. Cons uc ion plannin o he ca shopping cen e a Da ius and Gi ơnas s . 15 in Vilnius. FINAL THESIS WORK VILNIUS, 2014 1 1. A chi ec u al Pa ..............................................................................Page 1 1.1 Desc ip i e Memo y .............................................................Page 2 1.1.1 In oduc ion ............................................................Page 2 1.1.2 Loca ion ..................................................................Page 2 1.1.3 Field .......................................................................Page 4 1.1.4 Dis ibu ion O The Floo s ......................................Page 4 1.2 Cons uc i e Memo y .....................................................................Page 5 1.2.1 Founda ion .............................................................Page 5 1.2.2 Columns .................................................................Page 7 1.2.3 Walls ......................................................................Page 8 1.2.4 Roo ........................................................................Page 8 1.2.5 Slabs ......................................................................Page 8 1.2.6 In e nal Walls And Pa i ions ..................................Page 11 1.2.7 S ai s ......................................................................Page 11 1.2.8 Façade ...................................................................Page 12 1.2.9 Ins ala ions .............................................................Page 12 1.2.10 Fi e Sa e y ............................................................Page 13 1.2.11 Heal h Condi ions .................................................Page 13 1.2.12 En i onmen .........................................................Page 13 1.2.13 Disabili y Needs ....................................................Page 13 2. Technological Ca ds .........................................................................Page 14 2.1 Technological Ca d O Founda ion ......................................Page 15 2.1.1 Gene al Desc ip ion ................................................Page 16 2.1.2 Desc ip ion O Tecnology And Sequence O Wo ks .................................................Page 16 2.1.3 Human Sa e y.........................................................Page 19 2.1.4 Ma e ial-Technical Resou ces ................................Page 20 2.1.5 Quali y Con ol........................................................Page 20 2.1.6 Labo Sa e y ...........................................................Page 22 2.1.7 Budge ....................................................................Page 26 2.1.7 O ganiza ion ...........................................................Page 28 2.2 Technological Ca d O Assembling O F ame ......................Page 29 2.2.1 Gene al Desc ip ion ................................................Page 30 2.2.2 Desc ip ion O Tecnology And Sequence O Wo ks ........................................................Page 30 2.2.3 Human Sa e y.........................................................Page 33 2.2.4 Ma e ial-Technical Resou ces ................................Page 33 2.2.5 Quali y Con ol........................................................Page 34 2.2.6 Labo Sa e y ...........................................................Page 35 2.2.7 Budge ....................................................................Page 37 2.2.7 O ganiza ion ...........................................................Page 40 2 2.3 Technological Ca d O Cu ain Wall .....................................Page 41 2.3.1 Gene al Desc ip ion ................................................Page 42 2.3.2 Desc ip ion O Tecnology And Sequence O Wo ks ........................................................Page 42 2.3.3 Human Sa e y.........................................................Page 44 2.3.4 Ma e ial-Technical Resou ces ................................Page 44 2.3.5 Quali y Con ol........................................................Page 45 2.3.6 Labo Sa e y ...........................................................Page 49 2.3.7 Budge ....................................................................Page 52 2.3.7 O ganiza ion ...........................................................Page 53 3.O ganiza ion Pa ..............................................................................Page 55 3.1 Desc ip ion O The Te i o y .................................................Page 56 3.2 Selec ion O Towe C ane ....................................................Page 57 3.3 Se ing O Dange ous Zone .................................................Page 63 3.4 Tempo a y Roads To The Building Place ............................Page 66 3.5 Tempo a y S o age Buildings And Si es ..............................Page 66 3.6 Tempo a y Buildings Fo Wo ke s And Managing ...............Page 66 3.7 Tempo a y Elec ici y Supply ...............................................Page 67 3.8 Cons uc ion Si e Ligh ning ...................................................Page 67 3.9 Tempo a y Wa e Supply .....................................................Page 68 3.10 Tempo a y Sewe age ........................................................Page 69 3.11 Fence O Cons uc ion Field ..............................................Page 69 3.12 Tempo a y Comunica ions .................................................Page 69 3.13 Gene al Requi emen s O Labo Sa e y .............................Page 70 3.14 En i onmen al P o ec ion Requi emn s ..............................Page 71 3.15 Fi e P o ec ion Requi emen s ............................................Page 71 3.Bibliog aphy .......................................................................................Page 72 1 1. ARCHITECTURAL PART 8 The e will be columns o 30x30 cm o c oss sec ion o squa e columns, and 25 cm o diame e o ound sec ion columns ( igu e 1.7). We can ind squa e columns on he axes A, B, C, D, E and F which mee he axes 5, 6, 7, 8, 9, 10, 11 and 12 on he i s and second loo . We can ind ound columns on he axe 1 which mee s he axes A, B, C, D, E and F. Axe I mee s he axes 4, 5, 6, 7, 8, 9, 10, 11 and 12. Axe D mee s he axes 1, 4, and 5. Axe H mee s axe 3. Axe G mee s axe 2. Axe A mee s axe 4 on he i s and second loo . Figu e 1.7. Squa e and ound column example 1.2.3 WALLS In e io walls a e made o sandwich panel, gypsum and o ice pa i ions. Ex e io walls a e made o sandwich panels wi h co uga ed in and in ca idges inished wi h sandwich panel and cu ain wall. 1.2.4 ROOF The oo o he building has go an ex e nal ainwa e d ainage. We ha e a ligh oo s uc u e (s eel pla es wi h he mal insula ion). Roo lashings made o one- laye adhesi e olle bi uminous pa emen . I has been used polys y ene oam as he main laye o ock wool insula ion o he uppe oo . 1.2.5 SLABS Building slabs a e p es essed p e ab ica ed loo slab and p e ab ica ed beams ( igu e 1.8), is a kind o one-way slab. Slabs will con ain: - P es essed p e ab ica ed loo slab. - P es essed p e ab ica ed beams. - Rein o ced conc e e beams. - S eel ba . 9 Figu e 1.8. Floo slabs panels and beams Floo inished: -Tile: Au omobile exhibi ion, washing-ca and au o epai shops. -Ca pe : Show oom, managemen oom and Di ec ion. -Conc e e: S ock. 10 All he a eas o he building (Table 1.1-1.2) a e shown below: Below is shown all he a eas o he building Table 1.1. Fi s loo a eas Numbe Name A ea m 2 101 Au omobile exhibi ion 489.55 102 Show oom 9.64 103 Show oom 9.64 105 Adap ed ba h oom 4.16 106 Ba h oom 3.73 107 Ba h oom 3.87 108 Co ido 6.76 109 Show oom 7.04 110 Show oom 7.04 111 Wo kshop oom 15.37 112 Wo kshop 499.01 113 Main enance a ea - 114 Washing-wo kshop 48.07 115 Main enance 3.55 116 Technical oom 4.32 117 Technical oom 2.26 118 Wo kshop in o ma ion 9.04 120 S ock pa s 80.58 121 S ock gua an ees 5.14 122 S ock ca s oils and luids 6.34 123 S ock 11.62 To al 1226.73 11 Table 1.2. Second loo a eas Numbe Name A ea m 2 201 S ock pa s 24.08 202 S ock i es 23.92 203 Managemen oom 10.05 204 Di ec ion 10.05 205 Mee ing oom 43.10 206 Managemen oom 10.84 207 Room 9.05 208 WC 1.45 209 WC 1.76 210 Ki chene e 10.51 211 T aining oom 13.38 212 Ki chene e 14.26 213 Gangway 7.07 214 Locke oom 12.62 215 Toile 2.53 216 Showe ba h 2.56 217 WC 1.25 218 Technical oom comp esso 6.83 219 Technical space hea ing equipmen 14.15 To al 219.46 1.2.6 INTERNAL WALLS AND PARTITIONS The in e nal walls will be modula ed pa i ions: sandwich panel, gypsum and o ice pa i ions, depending on he ooms which i sepa a es. - O ice pa i ions: Show oom, managemen oom, di ec ion and aining oom. - Gypsum pa i ions: WC, ba h oom and ki chene e. - Sandwich panel i e esis an : S ocks and ga age pe ime e . - Sandwich panel: S ocks pa i ions. Wall deco a ion depends on he oom and i s unc ion. - Low P o ile Shee s: Au omobile exhibi ion pa o ga age's wall. - P o ec i e cemen boa d: Ga age. - Wall iles: Ba h ooms. - Plas e pain ed whi e: Ki chene e. - T im acade Casse es: Inside o he im acade panels. 1.2.7 STAIRS The in e io space s ai s a e designed by p e ab ica ed conc e e on me al beams. 12 1.2.8 FACADE Facades will be made up wi h cu ain wall and sandwich panel wall. The su ace o he acade co esponding o he sandwich panel is 717.40 m 2 . This is loca ed a he sou h acade and on he whole second loo o he building. Tha enhances he pa on he i s loo wi h cu ain wall, making he cus ome ocuses on he show oom. This sys em is obeying all equi emen s o sa e y, noise and he mal. The cu ain wall and he sandwich panel combina ion makes he building looks mode n. 1.2.9 INSTALATIONS Design wa e and was ewa e ne wo k STR 2.07.01:2003. Connec ing sewe codes and b anch join s elbows should no be s eepe han 45º angle and i is ins alled wi h he minimum numbe o bends. Domes ic was ewa e inds ho and cold wa e in ended o he design o he moun ing loca ions o he de ice. Node o p o ide wa e o i iga ion o lawn ca e p oduc s and wellness. Wa e me e on he op and bo om ame coun e s mus be emo ed and inspec ed. Sys ems o ho and cold wa e measu emen should be able o ead he da a emo ely. Wa e supply pipes a e designed om plas ic, pipes a e insula ed oo. Hea ing and en ila ion Hea ne wo ks: Connec ion o he dis ic hea ing ne wo k in Vilnius Vilniaus ene gy 2010 05 24 No speci ica ions issued. 10063 d Designed un-duc ed hea ail DN 48.3/110 o he ac o y insula ion. The subs a ion. Designed by 3 independen hea ing ci cui s node. Elec ic powe P ojec ed building is connec ed o an exis ing nea by ans o me . Powe consump ion emains wi hin he speci ica ions issued. Elec ici y ne wo ks and elec ici y accoun s designed on “Elec ical ins alla ion o gene al ules o 2007”, STR 2.01.04:2004 Fi e Sa e y. Basic equi emen s and ene gy acili ies i e sa e y egula ions. 13 1.2.10 FIRE SAFETY The building will mee he c i e ia o all he equi emen s o CTE-SI ( echnical cons uc ion code- i e sa e y). The acades, pa i ions and ceilings shall be i e esis an . S ai s design allows quick e acua ion in case o i e. The building is designed o easy access by i e ucks. 1.2.11 HEALTH CONDITIONS The building has been designed o mee all he c i e ia hygiene s anda ds acco ding o he CTE-HS ( echnical cons uc ion code-heal h secu i y). 1.2.12 ENVIRONMENT The building will be condi ioned by he en i onmen . Domes ic was ewa e is led o he cu en u ban sewe age ne wo ks and ea men plan s in he ci y. Du ing all he wo ks, he needs o he en i onmen will be sa is ied, being one o he mos impo an issues. 1.2.13 DISABILITY NEEDS The i s loo o he building is accessible o he disabled people, obeying all he necessa y egula ions. 14 2. TECHNOLOGICAL CARDS 15 2.1 TECHNOLOGICAL CARD OF FOUNDATION 16 2.1.1 GENERAL DESCRIPTION This echnological ca d consis s on he cons uc ion o deep ounda ion. The dep h o piles is 5 m and he diame e is 40 cm. We a e going o made ein o ced conc e e on-si e piles. I choose his ype o execu ion because is cheape and we can con ol he whole p ocess. 2.1.2 DESCRIPTION OF TECNOLOGY AND SEQUENCE OF WORKS The basics componen s o ou ounda ion a e: -Conc e e HA-25 -I on a mo s B500s CONSTRUCTION SEQUENCE (Figu e 2.1): 1. D illing (Figu e 2.2). 2. Wi hd awal and conc e ing. 3. S eel cage ins alla ion. 4. Headed pile. 5. Beam o mwo k. 6. Beam s eel cage. 7. Beam conc e e. Figu e 2.1. Piles cons uc ion sequence 17 Wo ks o de : 1. Piles s aking (Figu e 2.3) Each pile has o be co ec ly posi ioned in plane o “line”. The d illing mus also be plumbed. We will wo k om cen e lines: he lines will be ma ked on he g ound. We will ha e a main line o piles, and hen any line pa allel o his one a a knowning dis ance can be used. 2. Connec ing piles wi h beams. Each pile mus be headed o elease i on a mo and so o connec he beams o he piles. A e emo ing excess piles’ conc e e a mo s mus be un olded o p ope placemen in beams. 3. Lea e Columns s a s. When we connec piles’ s eel cage wi h beams, we ha e o pu also columns s a ing in hei igh posi ion. Figu e 2.2. Pile d illing 24 Du ing placemen o a mo : - A med ein o cemen o e ical suspension o an in oduc ion in he pile will be made by guide opes a ached o he ee end. Ne e wi h ba e hands. - Simila ly, he pe sonal p o ec i e equipmen o hands, ee and head should be used. - Employees will be ained and in o med in he p ope handling o loads, as he di e se na u e o he eams. When he dimensions o he load, o he weigh o he same wa an , handling cha ges a e held by pe sonnel. - Also, all en ies made in ela ion o he handling and placemen o ein o cemen o wo king a e aken in o accoun . - Special emphasis will be gi en in his chap e a he manipula ion o me allic elemen s domina ed by he leng h o e wid h, such as ubes, s eel ba s, e c. So ha hey can con ac o e head powe lines. - I is ad isable o collec was e and sc ap ein o cemen , s o ing hem in an app op ia e place o u he anspo ing o land ill. Du ing illing o piles: - All nomina ions made o he asks o " ounda ion” will be conside ed, wi h special a en ion and ca ing o all hose sc upulous use o PPE equi ed. - Dug wells wai ing o be conc e ed o a mo ed shall be p o ec ed by gua d ail wi h a sa e y dis ance om no less han 1.5 m. - When a conc e e pile canno be eady be o e he end o he day, i will be placed on he wellhead a me al g ille o p e en acciden al alling in o he well a nigh o du ing pe iods o es . - Whene e wo ke s o e 1.5m close o he well, hey should wea an i all sys em ancho ed o a s ong poin . - A all imes, he wo k a ea should be kep wi h p ope housekeeping. - Ope a o s esponsible o managing and assis ing he d illing equipmen will be amilia wi h he ollowing p e en i e ules: o No e ha his machine is dange ous and can cause acciden s. Be ca e ul in handling. Adhe e o hese p e en i e measu es and a oid he possibili y o acciden s. o Be o e s a ing wo k check he i es o chains. Wa n o possible damage. A i e blowou in se ice could p o e a se ious acciden . o Do no allow access o machine con ols o unau ho ized o un ained, because hey can cause acciden s o damage o o he ope a o s. o Check he condi ion o he bi . Conside ha up u e can cause se ious acciden s. o Ne e ope a e his machine in si ua ion o damage o semi b eakdown. Ha e i epai ed i s and hen esume wo k. 25 o A e s oping he wo k and be o e pu ing he machine back in se ice, check ha all p essu e cu s a e igh . A slee e b eakage can lead o acciden s o The enginee is he only pe son au ho ized o manage he machine on each shi . You will be ained and in o med. o When he machine is unning, he d i e will no be allowed o lea e. o The maneu e ing a ea ig will be clea ed o equipmen and d illing ou side s. o The d i e and helpe s on he coo dina ion will be ained and in o med o mo emen s be ween hem. Also, obse e maneu e s loosening ool employing key suppo ed on he mas . o Pe sonal hands p o ec i e equipmen should be used be. o Pe iodically, be o e s a ing he ac i i y, a p ocedu e mus be es ablished o moni o he s a us o he essen ial pieces ha ha e o do wi h he sa e y o he d illing. o Ex ac ion o land and he load on he uck will no un simul aneously on he same pile. The bu den o land om he exca a ion will ake place whe e piles ha e al eady been conc e ed, hus a oiding in e e ence be ween man and machine. o All machines will ha e lashing ligh ( lashing and o a ing ligh ) and audible (beeping ho n and e e se). o Wo ke s in ol ed in he pilo , was e land exca a ion o any o he ask in wo k a eas whe e he e is a p esence o ehicles o mobile machine y, should wea high isibili y clo hing. PROTECTION GROUP AND INDIVIDUAL. Mesh ape and ma kings. Ce i ica ed sa e y helme . P o ec i e glo es (lea he , la ex, neop ene, e c). Hea ing p o ec o s. Sa e y boo s wi h oe p o ec ion and secu i y s a . Sa e y boo s wi h high ubbe (wi h muddy e ain), wi h empla e and oe. 26 2.1.7 BUDGET TECHNICAL-ECONOMICS INDICATORS 1. Quan i y o wo ks: 5 m x 60 Piles = 300 m. 2. Ins alla ion cos : 66.13€/m x 300 = 19,839€ o 68,444.55 Li as. 3. Wo ks du a ion: 5 Days. 4. Wage: Specialis S eel: 300 x 11.20€/m = 3360€ o 11,592 Li as. Con inuous ligh auge : 300 me e x 15.72€/m = 4,716€ o 16,270.20 Li as. TECHNICAL-ECONOMICS INDICATORS 1. Quan i y o wo ks: 0.5 m x 60 Piles = 30 m. 2. Ins alla ion cos : 33.92€/m x 30 = 1,017.60€ o 3,510.72 Li as. 3. Wo ks du a ion: 2 Days. 27 4. Wage: Cons uc ion helpe : 30 x 10.47€/m = 314.10€ o 1,083.65 Li as. TECHNICAL-ECONOMICS INDICATORS 1. Quan i y o wo ks: 288 m 2 2. Ins alla ion cos : 19.63€/m 2 x 288 = 5,653.44€ o 19,504.37 Li as. 3. Wo ks du a ion: 8 Days. 4. Wage: S eel wo ke : 288 x 6.77€/m 2 = 1,949.76€ o 6,726.67 Li as. S eel helpe : 288 x 6.34€/m 2 = 1,825.92€ o 6,299.42 Li as. TECHNICAL-ECONOMICS INDICATORS 1. Quan i y o wo ks: 72 m 3 2. Ins alla ion cos : 151.44€/m 3 x 72 = 10,903.68€ o 37,617.70 Li as. 3. Wo ks du a ion: 1 Days. 4. Wage: S eel wo ke : 72 x 1.10€/m 2 = 79.20€ o 273.24 Li as. S eel helpe : 72 x 1.03€/m 2 = 74.16€ o 255.85 Li as. TOTAL 19,829+1,017.60+5,653.44+10,903.68 = 37,403.72€ o 129,042.83 Li as Id Modo de a ea Nomb e de a ea Du ación Comienzo 1 DRILLING 5 días lun 19/05/14 2 WITHDRAWAL AND CONCRETING 5 días lun 19/05/14 3 STEEL CAGE 5 días lun 19/05/14 4 HEADED PILE 3 días lun 26/05/14 5 BEAM 9 días jue 29/05/14 S D L M X J V S D L M X J V S D L M X J V S D L M X semana 1 semana 2 semana 3 semana 4 Ta ea Di isión Hi o Resumen Resumen del p oyec o Ta eas ex e nas Hi o ex e no Ta ea inac i a Hi o inac i o Resumen inac i o Ta ea manual Sólo du ación In o me de esumen manual Resumen manual Sólo el comienzo Sólo in Fecha lími e P og eso Página 1 P oyec o: ounda ion Fecha: dom 08/06/14 30 2.2 TECHNOLOGICAL CARD OF ASSEMBLING OF FRAME 31 2.2.1 GENERAL DESCRIPTION This echnological ca d consis s in he cons uc ion o conc e e ame, and s eel ame and oo . The building leng h is 31.25 m and wid h is 25.25 m. We a e going o use ein o ced conc e e columns 30x30cm o he columns and CHS ∅25 cm o me al columns wi h conc e e ille , and in e ed wa en ype uss o oo and me al sec ions ype IPE 200 o beams. The uss and me al beams a e only a di ec ion and upon i es s he oo . The oo d ains wa e only one side wi h a slope o 3%. I choose his kind o ma e ial o he ealiza ion o ame o i is quick and easy ins alla ion. 2.2.2 DESCRIPTION OF TECNOLOGY AND SEQUENCE OF WORKS The basics componen s o ou ame a e: -P e ab ica ed ein o ced conc e e columns 30X30 cm -CHS 244.5x6 mm illed wi h conc e e -IPE 200 -UPN 100x50 mm -L p o ile 60x40x5 mm The uss (Figu e 2.4)measu ed is 14.9, 13.4 and 11.2 m. T uss come al eady assembled and is composed o : -RHS 100x100x5 mm -RHS 80x80x5 mm -RHS 60x60x5 mm Figu e 2.5. T uss 32 Roo will be moun ed on wo ks and is composed o : - P o iled shee s wi h hea insula ion - Adhesi e olle bi uminous pa emen - Insula ion polys y ene oam - Rock wool insula ion CONSTRUCTION SEQUENCE: 1. Pilla s s aking. 2. Connec columns wi h ounda ions. 3. Connec columns wi h beam and usses (Figu e 2.5). 4. Raise usses and beams ha need assembling wi h c ane. 5. Assembly wo k uploaded o a sca old. 6. Connec he usses wi h diagonal s abilizing. 7. Lea e holes in he oo o skyligh s. 8. Pu he di e en laye s o he oo . Figu e 2.6. Beams and usses. 33 Wo ks o de : 1. Pilla s s aking Each column has o be co ec ly posi ioned in plan o line, bu also co ec in le el and in o ien a ion. I mus also be plumb. We will wo k om cen e lines: he lines will be ma ked on he g ound. We will ha e a main line o columns, o be e ec ed will need guying i he holding-down bol g oup is no su icien ly s ong. 2. Connec columns wi h ounda ions The op su ace o he conc e e ounda ion is se sligh ly low o pe mi s eel nu s o be packed benea h he s eel column’s base pla e. The s eel base packs a e placed and le eled be o e e ec ion o columns. • P e ab ica ed ein o ced conc e e column Pu he columns in e ical o e he bol s wi h he help o a c ane and place washe s and nu s highe . Res he column be ween 10% and 20% o column weigh o be able o le el i . Plumb he column and all connec ions igh and p oceed o es he column weigh . Fill he join wi h mo a G ou . • Me al columns wi h conc e e ille Le el nu s and washe s lowe . Take one benchma k. Pu he mo he boa d and sc ew he uppe nu s. Fill he join wi h mo a G ou . Fill he column wi h conc e e. 3. Connec columns wi h beam and usses Connec he beams and usses h eading sc ews and nu s. Raise usses and beams ha need assembling wi h he c ane. Make assembly wo k uploaded o a sca old. 4. Raise usses and beams ha need assembling wi h c ane 5. Assembly wo k uploaded o a sca old 6. Connec he usses wi h diagonal s abilizing 7. Lea e holes in he oo o skyligh s 8. Pu he di e en laye s o he oo 34 2.2.3 HUMAN SAFETY The wo k will be ca ied ou in acco dance “wi h heal h and sa e y ules in cons uc ion eques ”. 1. Wo ke s a e allowed o wo k only wi h he knowledge o sa e y equipmen . 2. Each wo ke mus use p o ec i e equipmen (special clo hing, oo wea and glo es) 3. Unnecessa y collec ion o ma e ials and deb is om he wo kplace. 4. Should be g ounded elec ical equipmen . 5. Mus be all elec ical de ices absolu ely clean. 6. All cables mus be in pe ec condi ion. 2.2.4 MATERIAL-TECHNICAL RESOURCES Below could be seen a able wi h he ools, mechanism and ma e ials needed (Table 2.2). (Table 2.2).Tools, mechanism and ma e ials o assembling o ame. Numbe Name Quan i y 1 TOOLS 1.1 Me al oule e 2PK 2 1.2 Ladde pla o m wi h 10m 2 1.3 Hamme ST-1 3 1.4 Elec odes 42A 2 1.5 Le els Topcon AT-B4 1 1.6 C owba LM-24 2 1.7 Building le el 700mm 2 1.10 Theodoli e P exiso T.O.2 1 1.11 Guying weigh 13.3 Kg 2 1.12 Viso welding 2 1.13 Helme 12 1.14 Secu i y bel s 2 1.15 Me al b ushes 2 1.16 Chemical cleaning de ail and ound 2 1.17 Chalk axes ma ked 2 1.18 W ench 2 2 MECHANISMS 2.1 Elec ic welding machine o Tc-500 Q=1.2kW 1 2.2 C ane 130 EC-B6 1 2.3 T a e se TS-12, 5 weigh 242 Kg 1 2.4 Hook and e sa ile sling 4 3 S uc u es and ma e ials bo ed piles ins alled Cons uc ion 3.1 T usses 9 Ma e ial 3.2 Ancho bol s 362 Id Modo de a ea Nomb e de a ea Du ación Comienzo 1 COLUMNS ANCHORAGE PLATE 2 días jue 22/05/14 2 ROUND COLUMN 4 días lun 26/05/14 3 PREFABRICATED REINFORCED COLUMNS 2 días ie 30/05/14 4 ROOF ANCHORAGE PLATE 2 días ma 03/06/14 5 TRUSSES 4 días jue 05/06/14 6 STEEL BEAMS 12 días mié 11/06/14 X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V semana -1 semana 1 semana 2 semana 3 semana 4 semana 5 Ta ea Di isión Hi o Resumen Resumen del p oyec o Ta eas ex e nas Hi o ex e no Ta ea inac i a Hi o inac i o Resumen inac i o Ta ea manual Sólo du ación In o me de esumen manual Resumen manual Sólo el comienzo Sólo in Fecha lími e P og eso Página 1 P oyec o: s uc u e Fecha: dom 08/06/14 42 2.3 TECHNOLOGICAL CARD OF CURTAIN WALL 43 2.3.1 GENERAL DESCRIPTION In his echnological ca d we will ocus on analyzing he ins alla ion o he cu ain wall. The su ace o he acade co esponding o he cu ain wall is 254.02 m 2 . This is he No h and wes acades. This sys em is mee ing all he c i e ia equi emen s o sa e y, noise and he mal. The e a e mo e mode n solu ions. The cu ain wall makes he building looks sophis ica ed and mode n. And i is a pe ec combina ion wi h he o he ypes o acades. 2.3.2 DESCRIPTION OF TECNOLOGY AND SEQUENCE OF WORKS Cu ain wall is a highly de eloped ype o açade o e he las yea s in Li huania because i p o ec s he acade in e o ma ion cases. The e a e many ypes o cu ain wall. I ha e chosen his kind o cu ain wall because i has no p onounced join s whe e wa e can en e and i damages he join s wi h he ozen and un ozen pe iods. The b and o ou cu ain wall supplie will be “TECHNAL”. This cu ain wall consis s in an auxilia y ame whe e pu glass modules (Figu e 2.6). The dimensions o ou cu ain wall modules a e p incipally wo: 1000x2400x14 and 1100x2500x14 mm. Figu e 2.7. Cu ain wall de ails 44 CONSTRUCTION SEQUENCE: 1. T anspo a ion, s o age and handling. 2. Ancho age and connec ion p o ision. 3. Connec ions’ s akeou . 4. Ins alla ion a angemen . 5. Placemen o he up igh wi h he help o he c ane. 6. Glazing o he auxilia y s uc u e wi h he help o he c ane. 7. Final ixing and inspec ion. Wo ks o de : 1. T anspo a ion, s o age and handling We ha e o check he ma e ials: auxilia y ame and modules, and lea e hem whe e we ha e planned. 2. Ancho age and connec ion p o ision Be o e using he conc e e on he i s loo we ha e o do a s udy o he connec ion o he auxilia y ame wi h he main ame. 3. Connec ions’ s akeou Be o e using he conc e e on he i s loo we ha e o ma k whe e he connec o s and he co ec place o auxilia y ame will be placed. 4. Ins alla ion a angemen Be o e s a ing wi h he ins alla ion we ha e o check and pu he s anchions o de o see i e e y hing is igh and eady o ge he cu ain wall jus as we had planned. 5. Placemen o he s anchions wi h he help o a c ane Use a c ane o li he s anchions and place hem in hei co ec posi ion. 6. Glazing o he auxilia y s uc u e wi h he help o he c ane Two wo ke s will ha e o ge on he li ing pla o m and ix he glass modules in he co ec place. 7. Final ixing and inspec ion A supe iso has o check he connec ions done. 45 2.3.3 HUMAN SAFETY The wo k will be ca ied ou in acco dance “wi h heal h and sa e y ules in cons uc ion eques ”. 1. Wo ke s a e allowed o wo k only wi h he knowledge o sa e y equipmen . 2. Each wo ke mus use p o ec i e equipmen (special clo hing, oo wea and glo es) 3. Fo welds, wo ke s should wea glo es and goggles. 4. Unnecessa y collec ion o ma e ials and deb is om he wo kplace. 5. Should be g ounded elec ical equipmen . 6. Mus be all elec ical de ices absolu ely clean. 7. All cables mus be in pe ec condi ion. 2.3.4 MATERIAL-TECHNICAL RESOURCES Below could be seen a able wi h he ools, mechanism and ma e ials needed (Table 2.3). Table 2.3.Tools, mechanism and ma e ials o assembling o cu ain wall Numbe Name Quan i y 1 TOOLS 1.1 Me al oule e 2PK 2 1.5 Le els Topcon AT-B4 1 1.10 Theodoli e P exiso T.O.2 1 1.11 Guying weigh 13.3 Kg 2 1.12 Viso welding 2 1.13 Helme 6 1.14 Secu i y bel s 4 1.15 Me al b ushes 4 1.16 Chemical cleaning de ail and ound 4 2 MECHANISMS 2.2 C ane 130 EC-B6 1 2.3 T a e se TS-12, 5 weigh 242 Kg 1 2.4 Hook and e sa ile sling 4 46 2.3.5 QUALITY CONTROL 1. Design Da a Submi s uc u al and he mal calcula ions o comple e wall assembly. S uc u al calcula ions and design shop d awings shall be signed and sealed by a s uc u al enginee egis e ed in s a e in which p ojec is going o be loca ed. 2. Fac o y Tes Repo s Tes epo s: p o ide ce i ied es epo s, o each o ollowing lis ed es , om a quali ied independen es ing labo a o y showing ha cu ain wall sys em assembly has been es ed in acco dance wi h speci ied es p ocedu es and complies wi h pe o mance cha ac e is ics as indica ed by manu ac u e ’s es ing p ocedu es. Manu ac u e shall submi app op ia e es ing numbe s o speci ic es : 1) De lec ion and s uc u al es . 2) Wa e pene a ion es . 3) Ai in il a ion es . 4) Delamina ing es . 5) The mal conduc ance es . 6) Sound ansmission. 7) Submi ac o y equi ed excep ha whe e a cu ain wall sys em o componen o simila ype, size and design as speci ied o his p ojec has been p e iously es ed wi hin las yea , unde condi ions speci ied he ein, esul ing es may be submi ed in lieu o lis ed es ing. 3. Manu ac u e ’s Ce i ica es: Submi Ce i ica es o Compliance, wi h speci ica ion equi emen s o : 1) Me al ex usions. 2) Me al accesso ies. 3) S a ing ha aluminum has been gi en speci ied hickness o anodizing o o ganic coa ing inish. 4) Indica ing manu ac u e ’s and ins alle ’s mee quali ica ions as speci ied. 5) Submi lis o equi alen size ins alla ions, o bo h manu ac u e and ins alle , which ha e had sa is ac o y and e icien ope a ion. 47 4. Manu ac u e ’s Field Repo s: Submi ield epo s o manu ac u e ’s ield ep esen a i e obse a ions o cu ain wall ins alla ion indica ing obse a ions made du ing inspec ion a he beginning o p ojec , du ing ins alla ion and conclusion o he p ojec . Indica e esul s o ield es ing, and any di ec ions gi en by he Con ac o o co ec i e ac ion. INSTALLATION 1. Ins alla ion and e ec ion o glass wall sys em and all componen s shall be in acco dance wi h w i en di ec ions o cu ain wall manu ac u e , and ma ch p o iles, sizes and spacing indica ed on app o ed shop d awings. 2. Bench ma ks and e e ence poin s: es ablish and pe manen ly ma k bench ma ks o ele a ions and building line o se s o alignmen a con enien poin s on each loo le el. Any mis ake o disc epancy should be disco e ed in loca ion o ma ks, s op e ec ion wo k in ha a ea un il disc epancies ha e been sol ed. 3. Ensu e ha d ainage sys em ope a es igh ly. 4. Do no p oceed wi h s uc u al silicone wo k when empe a u e is below 0ºC deg ees. 5. Isola e be ween aluminum and dissimila me als wi h p o ec i e coa ing o plas ic s ip o p e en elec oly ic co osion. 6. Ins all cu ain wall sys em so as o main ain a i ually la ace cap, wi h no isible bowing. 7. Ins all an en i e sys em so ha as ene s a e no isible. 8. Tole ances: • Maximum a ia ion om plane o loca ion shown on app o ed shop d awings: 3 mm pe 3600 mm o leng h up o no mo e han 13 mm in any o al leng h. • Maximum o se om ue alignmen be ween wo iden ical membe s abu ing end o end in line: 0.8 mm. • Sealan space be ween cu ain wall mullion and adjacen cons uc ion: Maximum 19 mm and minimum 6 mm. 48 9. Doo : 1) Ins all doo in acco dance wi h de ails indica ed and app o e shop d awing de ails. 2) Seal ex e io me al join s among membe s o doo s, ames, mullions and mullion co e s in acco dance. Remo e excess o sealan . 3) A e ins alling and glazing he doo s, adjus he en ila o s and ha dwa e o ope a ing smoo hly and o be wea he - igh when en ila o s a e closed and locked. Lub ica e he ha dwa e and mo ing pa s. 4) Ins all o make wea he - igh con ac wi h ames when en ila o s a e closed and locked. Do no cause binding o sash o p e en en ila o closing and locking. 5) P o ide o en ila ing sec ions o all windows o insu e a wea he - igh seal mee ing in il a ion es s speci ied. Use easily eplaceable ac o y- applied wea he -s ipping o manu ac u e ’s s ock ype. 10. Join Sealan s: • Su aces o be p imed and sealed should be clean, d ied when ouching, ee om os , mois u e, g ease, oil, wax, lacque , pain o o he o eign ma e . Enclose join s on h ee sides. Clean ou g oo es o p ope dep h. Join dimensions should con o m o app o e de ail d awings wi h a ole ance o plus 3 mm. do no apply compound unless ambien empe a u e is be ween 5 and 35 ºC deg ees. Clean ou loose pa icles and mo a jus be o e sealing. Remo e p o ec i e coa ings o co e ing om su aces in con ac wi h sealan s be o e applying sealan s o apes. Sol en s used o emo e coa ings should be yped as hose which lea es no esidue on me als. • Ma ch app o ed sample. Fo ce compound in o g oo es wi h p essu e enough o ill g oo es solidly. Sealing compound shall be uni o mly smoo h and ee o w inkles and, unless indica ed o he wise, shall be ooled and le su icien ly con ex o esul in a lush join when d ying. Do no im edges o sealing ma e ial a e join s a e ooled. Mix only amoun s o mul i-componen sealan which can be ins alled wi hin ou hou s, bu a no ime shall his amoun exceeds 19 li e s. • Apply p ime o mason y, conc e e, wood and o he su aces as ecommended by sealan manu ac u e . Do no apply p ime o su aces which will be exposed a e caulking is comple ed. • Tigh ly pack backing in bo om o join s which a e o e 13 mm in dep h wi h speci ied backing ma e ial o dep h indica ed o speci ied. Roll backing ma e ial o hose o od s ock in o join s o p e en leng hwise s e ching. • Ins all bond p e en i e ma e ial a back o bo om o join ca i ies in which no backs op ma e ial is equi ed, co e ing ull wid h and leng h o join ca i ies. 49 • Remo e compound smea s om su aces o ma e ials adjacen o sealed join s as wo k p og esses. Use masking ape on each side o join whe e ex u e o adjacen ma e ial will be di icul o clean. Remo e masking ape immedia ely a e illing join . Sc ape o esh compound om adjacen su aces immedia ely and ub clean wi h app o ed sol en . Upon comple ion o caulking and sealing, emo e emaining smea s, s ains and o he soiling and lea e wo k in cleaning nea condi ion. 11. Glass • Ins all in acco dance wi h manu ac u e ’s ecommenda ions as modi ied he ein. • Be o e ins alling glass, inspec sash and ames o ecei e glass o de ec s such as dimensional a ia ions, glass clea ances, open join s o o he condi ions ha will p e en sa is ac o y glass ins alla ion. Do no p oceed wi h ins alla ion un il de ec s ha e been co ec ed. • Clean sealing su aces a pe ime e o glass and sealing su aces o eba es and s op beads be o e applying glazing compound, sealing compound, glazing ape o gaske s. Use only app o ed sol en s and cleaning agen s ecommended by compound o gaske manu ac u e . All sashes shall be designed o ou side glazing. P o ide con inuous snap in glazing beads o sui glass as speci ied. • Insula e and empe ed glass and glass o o he ypes ha exceed 100 uni ed inches in size: P o ide oid space a head and jamb o allow glass o expand o mo e wi hou exuding sealan . Pe ime e ames and en ila o sec ions shall ha e glazing eba es p o iding an unobs uc ed glazing su aces 19 mm in heigh . Glazing eba e su aces mus be sloped o shed wa e . • P o ide adequa e means o weep inciden al wa e and condensa ion away om sealed edges o insula ed glass uni s and ou o wall sys em. Weeping o lock-s ip gaske s should be in acco dance wi h ecommenda ion o glass manu ac u e . 50 2.3.6 LABOR SAFETY Ri sk Chance Consequences Ra ed - Falls o s a a he same le el. . Medium Sligh ly ha m ul Tole able - Falls o pe sons a di e en le els High Ex emely ha m ul Impo an - S epping on objec s Low Sligh ly ha m ul Tole able - Run o e people Low Ex emely ha m ul Mode a e - Dump, shock and inco ec ope a ion o ele a ion equipmen Medium Ex emely ha m ul Impo an - Cu s wi h sha p edges o he s uc u e Medium Sligh ly ha m ul Tole able - En apmen s Low High ha m ul Mode a e PREVENTIVE MEASURES. Du ing unloading and s o age o ma e ials and equipmen : - The ma e ial will be ga he ed in one place p ese in ad ance. - This loca ion is con enien ly signaled and acing he mo emen o ehicles on si e. - Collec ing i ems o be a anged nea ly and in g oups. - I he s o ed elemen s we e able o mo e, as in he case o ubes, hey will be p opped o a oid undesi ed mo emen o ma e ials. - When hese ma e ials we e s o ed poin s o sha p elemen s p e iously emo ed, such as planks. - I he g ound is so , i will place igid base ma e ials o make he ole o bu den-sha ing, and no sink in o he g ound. - Own aining and in o ma ion measu es ela ing o ca go handling, discussed in p e ious sec ions will be aken. - Helme , boo s and glo es: he pe sonal p o ec i e equipmen p o ided should be used. 57 3.2 SELECTION OF TOWER CRANE In his pa i is explained why we choose ou owe c ane LIEBBHERR 130 EC-B6. Towe c ane a e selec ing by wo ways: • Acco ding o echnical pa ame e s. • Acco ding o economical pa ame e s In his ask we a e going o use he i s way, we a e going o selec ou c ane acco ding o echnical pa ame e s. This way is di idided in o wo s eps: 1. Towe c ane selec ion when he unde g ound and o e -g ound wo ks a e ul illing. 2. Towe c ane selec ion when only he o e -g ound wo ks a e ul illing. Calcula ion o echnological pa ame e o owe c ane. Fi s o all we ha e o know he ollowing pa ame e s: 1. Building dimensions and loca ion (unde g ound and o e -g ound pa s). 2. Weigh s, dimensions and loca ion o ins alling cons uc ions. 3. Wo k condi ions (building si e pa icula i ies, soil cha ac e is ics and unde g ound s uc u es peculia i ies). We mus check i c ane echnical cha ac e is ics ma ch he inequali ies: Qk>Q Hk>H Lk>L Qk- ascension powe o selec ed c ane , . Q - equi ed ascension powe , . Hk- each o selec ed c ane boom, m. H - equi ed each o c ane boom, m. Lk-li ing heigh o selec ed c ane hook, m. L - equi ed li ing heigh o hook, m. The echnological pa ame e s o c ane a e calcula ed acco ding o he building cha ac e is ics. The equi ed c ane is selec ed acco ding o c ane echnical cha ac e is ics able. 58 Towe c ane selec ion when he unde g ound and o e -g ound wo ks a e ul illing. Fi s o all we a e going o de e mina e heigh equi es o hook li ing: H = Building heigh + 3m= 7.2+3=10.2m Then he ascension powe o c ane: Q = P + Ps = 2.5+0.15= 2.65 P-weigh o hea ies li ing cons uc ion, (in ou case conc e e o columns) Ps - weigh o hi ching equipmen , When he alues o L , H and Q a e calcula ed, he c ane could be selec ed. Whe eas o de e mining he each o c ane boom L , will be needed o know he unde c ane wid h o suppo s and dimensions o pla o m u n. These alues a e ound in c ane diag ams. The each o c ane boom L is calcula ed acco ding o ou needs. I decide o pu he c ane in he loo o he building, in he sou h-wes co ne , because in his co ne we ha en’ acade, so he c ane doesn’ dis u b us in he cons uc i e p ocess and i can minimize he owe a m leng h. L = 35 m. When we know he alues o L , H and Q , he c ane could be selec ed using he diag ams o he owe c ane. The diag ams show ha he c ane we can use is LIEBBHERR 130 EC-B6. Qk>Q 3 >2.65 Hk>H 17.2m>10.2m. Lk>L 35m>32.5m As we can see, he c ane we ha e selec ed is capable o pe o ming he equi ed wo ks. 63 3.3 SETTING OF DANGEROUS ZONE Du ing he ins allmen wo ks in some pa s o he cons uc ion si e, ba s, wo kplaces and c ossings he dange ous a eas a e appea ing. Du ing he cons uc ion such a eas a e known as dange ous zones. A he beginning o cons uc ion wo ks and du ing cons uc ion dange ous zones, in which cons an ly a ise o may a ise isk ac o s should be de e mined. The dange ous zones a e di iding in o wo g oups: 1. Dange ous zones in which dange ous and/o haza dous ac o s cons an ly a ec he p ocesses. 2. Dange ous zones in which dange ous ac o s could appea . - Dange ous zones in which dange ous and/o haza dous ac o s cons an ly a ec he p ocesses, a e: • Nea he elec ical equipmen wi h non-insula ed pa s elec ic cu en • Fenceless zones a a heigh when heigh di e ence is 1.3 m highe • Place whe e haza dous was es and/o he concen a ion o ha m ul subs ances in wo kplace ai may exceed he limi alues. (Table 3.1) Limi ing he dange ous zones om he enceless un-insula ed pa s o he elec ical equipmen Vol age, kW Dis ances, limi ing he dange ous zones om he enceless un-insula ed pa s o he elec ical equipmen o om he e ical plane, which is he nea es powe line wi e, wi h a p ojec ion on he land, m <1 1.5 1-20 2.0 35-110 4.0 150-220 5.0 330 6.0 500-750 9.0 800(cu en ) 9.0 The limi s o dange ous zones whe e he isk ac o s o ha m ul subs ances exceeding appea s should be de e mined by measu emen . 2. Dange ous zones in which dange ous ac o s could appea a e: • Nea buildings unde cons uc ion and assembling/disman ling buildings s uc u es o equipmen . • Places o e which he s uc u es o equipmen ins alla ion/disman ling wo ks a e execu ing. • Places o e which loads a e li ing and anspo ed by c anes. • Places whe e he machine y, hei pa s o wo k equipmen a e mo ing. 64 The de e mina ion o c ane dange ous zones The limi s o dange ous zones whe e he e is a ans e o elemen s pe o med by c ane a e de e mined by calcula ions, he sum o ho izon al p ojec ion o li ed elemen , he maximum leng h o bigges elemen s and i s possible all dis ance. Due o he condi ions su ounding ou lo we ha e o conside ou dange zone should no o e ide exis ing buildings. Then, le pu some limi a ions on he mo emen o loads wi h he c ane: - Raise he load e ically o a easonable heigh , and hen ca y he load o he cen e u ning adius o educe he a ea o dange zone. - The p ojec ion o he a m o c ane will no be pe o med on exis ing buildings. The nex isk will be conside ed: -P esence o obs acles. -A eas o way. -Jobs in p oximi y o high ol age powe lines. The p e en ion measu es a e es ablished on he basis o he ollowing legal ex : -Royal Dec ee 836/2003 o 27 June, app o ing a new Technical Ins uc ion “MIEAEM2” Regula ions Li ing and handling equipmen , e e ing o owe c anes o cons uc ion o o he applica ions. -Royal Dec ee 1215/1997 o 18 July, laying down minimum sa e y and heal h o use by wo ke s in eams. 65 P esence o obs acles In pa ag aph 7.3 o he UNE 58-101-92, s a es: “The e ical clea ance be ween he pen and he las a ea o mo emen o pe sonnel shall be minimum 3 me e s. I he load o emp y hook passes wi hin 3 me e s o he a ea (Figu e 3.1), will be necessa y placed on i enough o p e en he indica o s o his app oach.” This means ha when he c ane wea he ane u n mus espec he dis ances. And he a ea, which ine i ably we mus conside he bu den. We a e no inclined o use signaling and also aking in o accoun he lexibili y o hese s uc u es, walkways in pa ag aph 4.1 o he UNE 58-101-92 s a es: ”The minimum clea ance o he passage o pe sonnel, among he mos p ominen pa s o he c ane and any obs acle is 0.60 me e s wide and 2.50 me e s high. In case o ailu e applica ion o his condi ion will p ohibi he access o s a o his a ea dange ous”. We ha e conside ed a minimum dis ance be ween he ip o he a ow and he nea es obs acle o 2 me e s(Figu e 3.1). (Figu e 3.1). Diag am o owe c ane sa e y dis ances. 66 3.4 TEMPORARY ROADS TO THE BUILDING PLACE Tempo a y oads a e buil o b ing cons uc ion ma e ials. Tempo a y oads a e buil combining exis ing oads o each wa ehouses, wo k places, machines, e c. ou side he building place. The e a e wo di e en ways o empo a y oads. The wide o he oad has o be a leas 6 me e s, and he smalles dis ance om he oad o he s o age place is 1 me e . These oads a e buil o ensu e easy d i ing o he building place and as wo k. 3.5 TEMPORARY STORAGE BUILDINGS AND SITES The cons uc ion si e will con ain wo s o age buildings model C20-P on he eas side o he ield (6x2.44x2.60 m) o s o e all ools; also we will need one on co e ed si e (acco ding he leng h o uss) on wes side o he cons uc ion plo . 3.6 TEMPORARY BUILDINGS FOR WORKERS AND MANAGING All he s a will ha e hei own empo a y buildings o sa is y all hei needs. We calcula e all he necessa y empo a y buildings knowing he wo ke s olume. Acco ding on “Royal Dec ee 486/1997, o 14 o Ap il laying down gene al p o isions minimum sa e y and heal h in he wo kplace” app oaching he changing su ace o 2 m 2 pe wo ke . The maximum numbe o wo ke s ha we will ha e wo king a same ime will be 33. So we calcula e 66 m 2 o su ace o empo a y changing building. 1 sink/ 10 wo ke s 1 showe / 10 wo ke s 1 oile / 10 wo ke s 1mi o / 10 wo ke s S= 33x2 m 2 = 66 m 2 . Chosen Buildings: - 1 Toile Model M 65 (6.00x2.44m) = 14.64 m 2 . - 1 Model M 6C (6.00x2.44m) = 14.64 m 2 . - 1 Model M 6 (6.00x2.44m) = 43.92 m 2 . The wo ke s will use a empo a y buildings Model M 6 as place o es , ea …; and he Model M 65 as oile and showe . The managing s a will ha e one empo a y building Model M 6C, whe e will be si ua ed he o ice. 67 3.7 TEMPORARY ELECTRICITY SUPPLY A empo a y supply will be needed in o de o make mos ly all he wo ks. A gene al elec ici y coun e will be needed in he building ence connec ed o he elec ical ush supply connec ed o he gene al elec ical ci y sys em placed close he oad, will be made an indi idual 4x16mm 2 de i a ion. 3.8 CONSRUCTION SITE LIGHTNING To calcula e he numbe o lumina ies necessa y o he co ec wo k illumina ion (Fo mula 3.1): N= ா௫஺ ∅ ೙ ௫ி ೆೣಷಾ (Fo mula 3.1) Whe e: N: Lumina ies numbe a e equi ed E: A e age luminance in lux A: Local a ea m 2 ∅ n : low lamp a e in lumens F U : Fac o o use F M : Main enance ac o The su ace o he wo k a ea is 4300 m 2 , o be illumina ed wi h an a e age illumina ion o 15 lux, wi h 1x150 W me al halide lamps, which p oduce a luminous lux o 13000 lumens pe lamp. Will be used a no mal main enance ac o 0.95. Da a om he ligh ing a ea a e: Leng h: 91.60 m Wid h: 33.85 m Heigh : 4.50 m Index K= ௟௫௕ ௛ሺ௟ା௕ሻ = ସଷ଴଴ ସ.ହ଴ሺଽଵ.଺଴ାଷଷ.଼ହሻ = 7.61 Wi h his index, and media wi h loo colo s and ceiling, and clea ing o he walls, is a ac o in ini ial use in di ec ligh ing lumina ie 1. 68 This he lamps numbe equi ed will be: N= ா௫஺ ∅ ೙ ௫ி ೆೣಷಾ = ଵହ௫ସଷ଴଴ ଵଷ଴଴଴௫ଵ௫଴.ଽହ ≈ 6 By calcula ion we ha e ob ained ha we need a minimum o 6 lamps. 3.9 TEMPORARY WATER SUPPLY We will need a empo a y wa e supply (Figu e 3.2). A gene al accoun an will be ins alled in he building ence connec ed o he ci y wa e supply ush placed close o he oad. The empo a y wa e supply line will equi e an accoun an , s opcock gene al, pipe ube 32 mm, wash s ep and ap. (Figu e 3.2).Tempo a y wa e supply. 69 3.10 TEMPORARY SEWERAGE The sewe cons uc ion will consis on emo ing wa e om ain and he elimina ion o was e wa e as a showe , basins and oile s. D ainage is connec ed o he ne wo k o u ban was ewa e . The d ainage plan consis on connec ing ou ne wo k o exis ing ne wo ks o he ci y. The sewe age sys em will ha e a diame e o 200 mm. 3.11 FENCE OF CONSTRUCTION FIELD The cons uc ion ence will p o ec he pa cel’s pe ime e . The maximum wid h o he s ip o public o p i a e space o be occupied by wo k o enced will be o 2 me e s. The minimum s ep wid h should co e he sepa a ion o bounda y be ween pedes ian and a ic. Fo mal condi ions: - The ence will be o ced o ha e a minimum heigh o 2 me e s measu ed a any poin on he ou e ence ace. - The c own heigh is uni o med and ho izon al p ojec ion admi ing only o sui he e ain slopes, subjec o compliance wi h he minimum heigh indica ed in he p e ious sec ion. - Is exp essly o bidden idges and sha p objec s, which can be inco po a ed in o he ence, bo h empo a ily and pe manen ly. - The ou e ence ace shall no allow he isualiza ion hollow in e io o p o usions o holes ha allow he s encil. The p ojec ions equi ing good pe o mance o he encing cons uc ion will be made, whe e e possible, by he inne ace he eo . - I Is no allowed o o e he space o public o p i a e oad bounded by he encing wo k. I will be manda o y he placemen o ligh s signaling pa hway hedges occupying public o p i a e. - We will need 232.57 me e s o he en i e pe ime e . - The ence will be opaque, pe ec o cons uc ion by he apid assembly and disassemble. 3.12 TEMPORARY COMUNICATIONS Tempo a y communica ions will consis on cell phones and USB modem in e ne o lap ops ( h ee o hem) in managing empo a y building. 70 3.13 GENERAL REQUIREMENTS OF LABOR SAFETY He e we will e alua e he gene al haza ds and choose he indi idual p o ec i e measu es which mus be a ailable o wo ke s p o ec ion. Lis o haza dous jobs: - Exca a ion wo ks - Wo king c ane - Rein o cemen and conc e e wo ks - Fo mwo ks ins alla ion - Welding - Heigh wo k - Roo and acade ins alla ion - Ins alla ion wo ks - Wo k wi h hand ools and powe machine y Indi idual p o ec i e elemen s: - The sa e y helme is expec ed pe wo ke e e y six mon h. - The sa e y helme wi h iew inde , jus one e e y en wo ke s is expec ed, because hei use is mo e speci ic han no mal helme s. - Helme wi h ea p o ec o s: Is p o ided o one e e y i e wo ke s. - Sa e y glasses: A e expec ed e e y h ee wo ke s. - Hea ing p o ec ion ( oam ea plugs): Some ones pe wo ke e e y wo mon h o wo ks a ound loud noises. - Fine dus il e mask: One pe wo ke e e y wo mon h. - Glo es: Some glo es pe wo ke e e y six mon h. - High esis ance o cu ing and ab asion glo es: One e e y i e wo ke s e e y six mon h. - Welde glo es: A pai s o glo es o welde e e y en wo ke s e e y nine mon h. - Dielec ic glo es: Two pai s, hei use is limi ed o elec ical wo k. - PVC Boo s: A pai o boo s e e y i e wo ke s e e y nine mon hs o wo k du a ion. - PVC wa e boo s: A pai o shoes pe wo ke e e y nine mon hs o wo k du a ion. - Dielec ic boo s: Two pai s o all he wo k, hei use is limi ed o elec ical wo ks. - - Sea bel li eline: One e e y en wo ke s and wel e mon hs o wo k, o wo king a heigh oge he wi h sa e y lines. - Sa e y bel : One e e y h ee wo ke s and six mon hs. - De ice all a es sa e y bel : One e e y h ee wo ke s and six mon hs. - Fall a es sys em: One e e y h ee wo ke s and six mon hs.