”Socio-technical systems simulation and analysis: a goal-oriented framework” by Ruben Afonso Francos Master Thesis in Software Engineering June 1, 2010 Thesis Supervisors: Prof. Paolo Giorgini Universit´a degli Studi di Trento Prof. Oscar Pastor Universidad Politecnica de Valencia
2
Abstract One of the characteristics of the socio-technical systems (STS) is their dynamicity. By including factors traditionally considered external, as the social factor (the people involved), or elements from the environment, the system behaviour may vary in unsuspected ways depending on the circumstances. In many situations STS present an important level of complexity inherent to them; either to its structure, composed of many elements, or to the existent relationships among them. This can lead even to new, unforeseen, emerging features. Such complexity, coupled with the previously mentioned sensibility to changes, can lead to an unexpected behaviour of the system. This may result in the system ending in a state radically different, even undesired, from the initial state. In goal-oriented systems, there are situations where unforeseen events can produce very dramatic alterations, making it to stop satisfying goals considered critical goals. Interesting are also the possible actions the system could perform to reach again a valid state, if possible. From the designer point of view, it would be useful to have a mean to analyze this problematic easily in order to obtain knowledge that can help in an hypothetical decision making period. Having designer requirements in mind, in this work we provide a simulation framework of goal-oriented STS that allows their simulation under a set of predefined events, obtaining numerical results of defined metrics. Such results can be used as a part of the decision making support to the STS designer. Hoping to provide a higher level of detail than ordinary goal models, in our proposed framework inner characteristics of goals can be described using a process notation. This brings more flexibility and accuracy to scenario modeling capabilities. The solutions provided by our framework are valid processes that guaranteed the achievement of goals required by the actors of the modeled STS. Such processes are expressed in a graphical process notation, allowing an easy visualization by the designer; it is also possible to simulate them in a simulation environment and obtain valuable information associated with predefined metrics. As a output of cited simulations, our framework shows all obtained data through a userfriendly interface that simplifies the analysis. Keywords Socio-technical systems, goal-oriented modeling, simulation, BPMN, process modeling. 3
Declaration I declare that this thesis was composed by myself, that the work contained herein is my own except where explicitly stated otherwise in the text, and that this work has not been submitted for any other degree or professional qualification. Ruben Afonso Francos 4
Contents 1 Introduction 10 2 Background 14 2.1 Goal-Oriented Requirement Engineering . . . . . . . . . . . . . . . . . . 14 2.2 Tropos.................................... 15 2.3 PDDL .................................... 16 2.4 Business Process Modeling Notation . . . . . . . . . . . . . . . . . . . . 19 2.5 Business Process Simulation . . . . . . . . . . . . . . . . . . . . . . . . 21 2.6 Example................................... 22 2.7 Conclusion.................................. 25 3 Organization Model 26 3.1 Actor-goalModel .............................. 26 3.2 EventModel................................. 28 3.3 Evaluationmodel .............................. 29 3.4 SolutionModel ............................... 30 3.5 Conclusion.................................. 31 4 Framework Architecture 32 4.1 Model Manager & Editor . . . . . . . . . . . . . . . . . . . . . . . . . . 34 4.2 Template Generator Module . . . . . . . . . . . . . . . . . . . . . . . . 34 4.3 SolutionGenerator ............................. 36 4.4 SolutionManager.............................. 37 4.5 Solution Simulator & Visualizer . . . . . . . . . . . . . . . . . . . . . . . 38 4.6 Conclusion.................................. 39 5 Solution Process Generation and Simulation 40 5.1 Template Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 5.2 Organization level planning . . . . . . . . . . . . . . . . . . . . . . . . . 45 5.2.1 Formalized planner input . . . . . . . . . . . . . . . . . . . . . . 45 5.2.2 Planning problem . . . . . . . . . . . . . . . . . . . . . . . . . . 47 5.3 Solution Process Obtainment . . . . . . . . . . . . . . . . . . . . . . . . 48 5.4 Conclusion.................................. 49 5
Contents 6 Simulation 50 6.1 Process representation: Timeline . . . . . . . . . . . . . . . . . . . . . . 50 6.2 EvaluationMetric.............................. 53 6.3 Simulation with events . . . . . . . . . . . . . . . . . . . . . . . . . . . 54 6.3.1 Eventtypes............................. 55 6.3.2 Replanning ............................. 55 6.3.3 Solutioncost ............................ 55 6.4 Conclusion.................................. 56 7 Implementation 57 7.1 Eclipse Modeling Framework . . . . . . . . . . . . . . . . . . . . . . . . 57 7.2 AIPlanner.................................. 58 7.3 Business Process Modeling Notation . . . . . . . . . . . . . . . . . . . . 58 7.4 BPGoalApplication............................. 58 7.4.1 OMEditor ............................. 60 7.4.2 SolutionList ............................ 60 7.4.3 Simulation results . . . . . . . . . . . . . . . . . . . . . . . . . . 60 8 Case Study 63 8.1 Scenariodescription............................. 64 8.2 Results.................................... 66 8.3 Scalability .................................. 68 9 Conclusions and Future Work 71 Bibliography 75 10 Appendix 76 A. GoalDescription............................... 76 B. GoalDecomposition............................. 77 C. ActorCapability............................... 77 D. AssociatedProcesses ............................ 78 E. Activities’costs ............................... 79 F. Case Study solution processes . . . . . . . . . . . . . . . . . . . . . . . 79 G. CaseStudyGoalModel........................... 82 6
List of Figures 2.1 Format of a generic PDDL file Domain definition . . . . . . . . . . . . . 17 2.2 Format of a generic PDDL file Problem definition . . . . . . . . . . . . . 18 2.3 Example of PDDL domain description . . . . . . . . . . . . . . . . . . . 18 2.4 Example of PDDL problem description . . . . . . . . . . . . . . . . . . . 19 2.5 BPMN diagram of a payment by a customer . . . . . . . . . . . . . . . . 20 2.6 ExampleSTS ................................ 23 2.7 Example STS, associated processes . . . . . . . . . . . . . . . . . . . . 24 3.1 Actor-Goal Model class diagram . . . . . . . . . . . . . . . . . . . . . . 27 3.2 Event Model class diagram . . . . . . . . . . . . . . . . . . . . . . . . . 29 3.3 Solution Model class diagram . . . . . . . . . . . . . . . . . . . . . . . . 30 4.1 Architecture of the proposed framework . . . . . . . . . . . . . . . . . . 33 4.2 Architecture of the Template Generator Module . . . . . . . . . . . . . . 35 4.3 Architecture of the Solution Generator . . . . . . . . . . . . . . . . . . . 36 4.4 Architecture of the Solution Manager Module . . . . . . . . . . . . . . . 37 4.5 Simple transform of a goal reference to its associated process . . . . . . 37 4.6 Architecture of the Solution Simulator . . . . . . . . . . . . . . . . . . . 38 5.1 AND Decomposition with two child goals . . . . . . . . . . . . . . . . . 41 5.2 Parallel Gateway in an AND Decomposition . . . . . . . . . . . . . . . . 42 5.3 ORDecomposition ............................. 42 5.4 Bottom up transformation of an AND Decomposition . . . . . . . . . . . 43 5.5 Hierarchy in a scenario with an OR-Decomposition goal . . . . . . . . . . 44 5.6 Resulting diagram from a bottom-up transformation of an OR-Decomposition goal ..................................... 44 5.7 Example of intermediate states, candidates to removal . . . . . . . . . . 45 5.8 Example of intermediate states, candidates to removal . . . . . . . . . . 45 6.1 Timeline representation of a two-activities process . . . . . . . . . . . . 51 6.2 Timeline representation of a two-activities parallel process . . . . . . . . 52 6.3 Timeline representation of a process . . . . . . . . . . . . . . . . . . . . 53 6.4 Cost for simple simulation . . . . . . . . . . . . . . . . . . . . . . . . . 54 6.5 Cost for event simulation . . . . . . . . . . . . . . . . . . . . . . . . . . 56 7.1 BPGoal framework, showing process diagram and statistics . . . . . . . . 59 7
List of Figures 7.2 OM Editor and Solution List . . . . . . . . . . . . . . . . . . . . . . . . 60 7.3 Event Simulation result . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 8.1 Process information associated to G0 . . . . . . . . . . . . . . . . . . . 65 10.1 Case Study Solution S1 . . . . . . . . . . . . . . . . . . . . . . . . . . . 80 10.2 Case Study Solution S4 (selected solution) . . . . . . . . . . . . . . . . 81 10.3 Scenario Goal Model Diagram . . . . . . . . . . . . . . . . . . . . . . . 82 8
List of Tables 3.1 Constant values from Event Model . . . . . . . . . . . . . . . . . . . . . 30 3.2 One possible Solution from the example STS . . . . . . . . . . . . . . . 31 5.1 PDDLPredicates .............................. 46 5.2 PDDLPredicates .............................. 47 8.1 Actorsinvolved ............................... 65 8.2 Candidatesolutions............................. 66 8.3 Simulation Cost of each solution, without events . . . . . . . . . . . . . 66 8.4 Defined events of the simulation . . . . . . . . . . . . . . . . . . . . . . 67 8.5 Results of the simulation with defined events . . . . . . . . . . . . . . . 67 8.6 Time invested in the template generation (ms) . . . . . . . . . . . . . . 68 8.7 Time required for the solution generation (ms) . . . . . . . . . . . . . . 69 8.8 Time required for a process simulation (ms) . . . . . . . . . . . . . . . . 70 10.1GoalDescription............................... 76 10.2GoalDecomposition............................. 77 10.3ActorCapability............................... 77 10.4 Process Associated to goals . . . . . . . . . . . . . . . . . . . . . . . . 78 10.5 Case study: activities’ costs . . . . . . . . . . . . . . . . . . . . . . . . 79 9
Chapter 2 Background •Goal: representing actor‘s strategic interests. •Plan: which represents, at an abstract level, a way of doing something. •Resource: which represents a physical or an informational entity. •Dependency: between two actors, which indicates that one actor depends, for some reason, on the other in order to attain some goal, execute some plan, or deliver a resource. The former actor is called the depender, while the latter is called the dependee. The object around which the dependency centers is called dependum. In general, by depending on another actor for a dependum, an actor is able to achieve goals that it would otherwise be unable to achieve on its own, or not as easily, or not as well. At the same time, the depender becomes vulnerable. If the dependee fails to deliver the dependum, the depender would be adversely affected in its ability to achieve its goals. •Capability: which represents the ability of an actor of defining, choosing and executing a plan for the fulfillment of a goal, given certain world conditions and in presence of a specific event. •Belief: which represents actor knowledge of the world. 2.3 PDDL PDDL (Planning Domain Definition Language) is a standard encoding language for classical planning tasks. It has a syntax inspired by LISP. A PPDL planning task is composed by: •Objects: things in the world that interests us. •Predicates: properties of the objects that we are interested in; they have a binary value, being true or false. •Initial state: the state of the world that we start in. •Goal specification: the desired states we want to be true. •Actions/operators: ways we have to change the state of the world where we are. In PDDL, the planning tasks are divided into two files: •domain file: where we keep the predicates and actions. •problem file: file with the objects, initial state and goal specification. 16
Chapter 2 Background The domain definition contains the domain predicates and operators (called actions in PDDL). It may also contain types, constants, static facts and many other things, but these are not supported by the majority of planners. The parameters used in predicate declarations (the :predicates part) have no other function than to specify the number of arguments that the predicate should have, i.e. the parameter names do not matter (as long as they are distinct). Predicates can have zero parameters (but in this case, the predicate name still has to be written within parenthesises). The format of a (simple) domain definition is shown in Figure 2.1 (define (domain DOMAIN˙NAME) (:requirements [:strips] [:equality] [:typing] [:adl]) (:predicates (PREDICATE˙1˙NAME ?A1 ?A2 ... ?AN) (PREDICATE˙2˙NAME ?A1 ?A2 ... ?AN) ...) (:action ACTION˙1˙NAME [:parameters (?P1 ?P2 ... ?PN)] [:precondition PRECOND˙FORMULA] [:effect EFFECT˙FORMULA] ) (:action ACTION˙2˙NAME ...) ...) Figure 2.1: Format of a generic PDDL file Domain definition The problem definition contains the objects present in the problem instance, the initial state description and the goal. The initial state description (the :init section) is simply a list of all the ground atoms that are true in the initial state. All other atoms are by definition false. The goal description is a formula of the same form as an action precondition. All predicates used in the initial state and goal description should naturally be declared in the corresponding domain. In difference to action preconditions, however, the initial state and goal descriptions should be ground, meaning that all predicate arguments should be object or constant names rather than parameters. (An exception is quantified goals in ADL domains, where of course the quantified variables may be used within the scope of the quantifier. Note, however, the even some planners that claim to support ADL do not support quantifiers in goals.) The format of a (simple) problem definition is shown in Figure 2.2 17
Chapter 2 Background (define (problem PROBLEM˙NAME) (:domain DOMAIN˙NAME) (:objects OBJ1 OBJ2 ... OBJ˙N) (:init ATOM1 ATOM2 ... ATOM˙N) (:goal CONDITION˙FORMULA) ) Figure 2.2: Format of a generic PDDL file Problem definition As an example, Figure 2.3 shows a domain for a simple scenario: in an industry, there is a robot arm that moves assembly pieces from one belt (named belt1) to another belt (named belt2). Initially, there is one piece in the first belt, also where the robot is. We want to move the piece to the second belt and move back the arm again to the first belt. (define (domain robot-belt) (:predicates (belt ?b) (piece ?p) (at-belt ?p ?b) (robot-arm ?r) (robot-belt ?r ?b) ) (:action take-piece :parameters (?belt1 ?belt2 ?piece ?r) :precondition (and (at-belt1 ?piece ?belt) (robot-belt ?r ?belt1) :effect (and (at-belt ?piece ?belt2) (robot-belt ?r ?belt2)) ) (:action restart-robot :parameters (?r ?belt1 ?belt2) :precondition (and (robot-belt ?r ?belt2)) :effect (robot-belt ?r ?belt1) ) ) Figure 2.3: Example of PDDL domain description And the corresponding problem is shown in Figure 2.4 18
Chapter 2 Background (define (problem robot-scenario-simple) (:domain robot-belt) (:objects belt1 belt2 robot1 piece1) (:init (belt belt1) (belt belt2) (piece piece1) (robot-arm robot1) (at-belt piece1 belt1) (robot-belt robot1 belt1) (:goal (at-belt piece1 belt2))) ) Figure 2.4: Example of PDDL problem description PDDL was created in 1998 by Drew McDermott for the first International Planning Competition (IPC). After that many versions have appeared, introducing new features, but not all have survived. After its creation, the next important version was PDDL 2.1, created in 2002 by Maria Fox and Derek long for IPC3. It included new features as metrics and the use of declarative actions, thus, actions having a duration over the time. The next version, PDDL 2.2 came in 2004 by Stefan Edelkamp, J¨org Hoffman and Michale Littman for the next IPC congress, IPC 4. PDDL 2.2 introduced derived predicates and timed initial literals. Derived predicates are predicates that are not affected by any of the action available to the planner. Timed initial literals are facts that will become true or false at time points that are known in advance. 2.4 Business Process Modeling Notation The Business Process Management Initiative (BPMI)[23] has developed the standard Business Process Modeling Notation (BPMN). The BPMN 1.0 specification was released to the public in May 2004. This specification represents more than two years of effort by the BPMI Notation Working Group. The primary goal of the BPMN effort was to provide a notation that is readily understandable by all business users, from the business analysts who create the initial drafts of the processes, to the technical developers responsible for implementing the technology that will perform those processes, and, finally, to the business people who will manage and monitor those processes. In the original specification, BPMN is expected to support an internal model that enables the generation of executable BPEL4WS. Thus, BPMN would create a standardized bridge for the gap between the business process design and process implementation. However this is a difficult issue and, to this date, there is not a full transformation from 19
Chapter 2 Background one model to another. BPMN defines a Business Process Diagram (BPD), which is based on a flowcharting technique tailored for creating graphical models of business process operations. A Business Process Model, then, is a network of graphical objects, which are activities (i.e., work) and the flow controls that define their order of performance. Historically, business process models developed by business people have been technically separated from the process representations required by systems designed to implement and execute those processes. Thus, there was a need to manually translate the original business process models to the execution models. Such translations are subject to errors and make it difficult for the process owners to understand the evolution and the performance of the processes they have developed. To help alleviate the modeling technical gap, a key goal in the effort to develop BPMN was to create a bridge from the business-oriented process modeling notation to IT-oriented execution languages that will implement the processes within a business process management system. Figure 2.5 shows an example of a BPMN representation of a payment where a customer choose the payment method before receiving its products. Figure 2.5: BPMN diagram of a payment by a customer A BPD is made up of a set of graphical elements that enable the easy development of simple diagrams that will look familiar to most business analysts (e.g., a flowchart diagram). The elements were chosen to be distinguishable from each other and to utilize shapes that are familiar to most modelers. For example, activities are rectangles, and decisions are diamonds. It should be emphasized that one of the drivers for the development of BPMN is to create a simple mechanism for creating business process models, while at the same time being able to handle the complexity inherent to business processes. The approach taken to handle these two conflicting requirements was to organize the graphical aspects of the notation into specific categories. This provides a small set of notation categories so that the reader of a BPD can easily recognize the basic types of elements and understand the diagram. Within the basic categories of elements, addi20
Chapter 2 Background tional variation and information can be added to support the requirements for complexity without dramatically changing the basic look-and-feel of the diagram. The modeling of business processes often starts with capturing high-level activities and then drilling down to lower levels of detail within separate diagrams. There may be multiple levels of diagrams, depending on the methodology used for model development. However, BPMN is independent of any specific process modeling methodology. 2.5 Business Process Simulation Business Process Simulation field got more and more attention in past decades as a tool for improving the performance of companies. These types of simulation help in understanding, analyzing, and designing processes, and they provides quantitative estimates of the impact that a process design is likely to have on process performance and a quantitatively supported choice for the best design can be made [27]. Early insights on the business modeling problem were provided by the use of Petri nets in academical environments. Petri nets were originally developed in the 60’ies and the 70’ies, and they were soon recognised as being one of the most adequate and sound languages for description and analysis of synchronisation, communication and resource sharing between concurrent processes. However, attempts to use Petri nets in practice revealed two serious drawbacks. First of all, there were no data concepts and hence the models often became excessively large, because all data manipulation had to be represented directly into the net structure (i.e., by means of places and transitions). Secondly, there were no hierarchy concepts, and thus it was not possible to build a large model via a set of separate submodels with well-defined interfaces. [30]. The development of high-level Petri nets in the late 70’ies and hierarchical Petri nets in the late 80’ies removed these two serious problems. Coloured Petri Nets (also called CPnets or CPN) is one of the two most well-known dialects of high-level Petri nets. CP-nets incorporate both data structuring and hierarchical decomposition - without compromising the qualities of the original Petri nets. Despite of these difficulties, Petri nets were in use as a graphical modeling language for more than 40 years and mathematical analysis techniques allowed for analytical verification of many relevant properties of systems” behaviour. However, Petri nets nevertheless were seldom used in business applications. Even the few commercially available Petri net based software development tools exploited Petri net theory to a very limited extend only, maybe because there was an apparent gap between practical needs of business process management in industry and theoretical investigations of Petri nets in the academic sector [29]. Nowadays the most extended business process language is BPEL, short for Web Services Business Process Execution Language, born in 2002, and standardized by OASIS organization [28] as a standard execution language for specifying interactions with Web Services. With the diffusion of web services technologies the popularity of BPEL has 21
Chapter 2 Background increased. Unfortunately, BPEL standard does not specify a standard graphical notation, as the OASIS technical committee decided it was out of scope. This has derived in a variety of graphical representations, as each software vendor, even using the BPEL language, has provided its own graphical notation. BPEL was created with web services in mind and it has been used in a wide variety of sectors as a general purpose modeling language, even inside companies, sometimes pushing its semantic to the limit. For example, human interactions are not in the domain of BPEL. Despite wide acceptance of web services in distributed business applications, the absence of human interactions is a significant gap for many real-world business processes. This motivated the creation of an extension to fill this gap and to allow the representation of role-base human activities as well, named BPEL4People [31]. A range of commercial business process management applications capable of process simulation have been developed; they usually are distribute as complete business solutions, sometimes including advanced features as data mining knowledge extraction methods. As said before, many of these tools use BPEL as execution language for the simulation engine, giving the designer a set of graphical elements to create diagrams. Trying to solve this lack of expressiveness and looking for a general purpose business notation, BPMN (Business Process Model and Notation) [14] was created and defined as standard. The combination of BPMN graphical benefits with the BPEL execution capabilities at this moment have not showed all its potential yet; there is still a semantic gap between both and sometimes changes in a BPMN diagram cannot be reflected accurately in its equivalent in BPEL (and vice versa) [16]. This is an important issue in business software applications, where graphical editors are often used. Recent works try to formalize model-to-model transformations between them [7], [8]. Despite this difficulties, BPMN is considered to have a greater expressiveness than BPEL, and it opens a new dimension in business process management, being flexible enough to model not only web services scenarios, but a wider set of them. 2.6 Example In order to illustrate the kind of problem we are aiming to model we provide a theoretical example with some elements. We show the characteristics of a simple STS, depicted in Figure 2.6 using Tropos notation to describe goals and actor´s capabilities. Specific details of the framework model will be discussed in following chapters. A more detailed case study based in real requirements is provided in Chapter 8. The proposed STS shows the structure of a data center administration, having a main goal G1, the data center administration) decomposed in two goals, G2:network administration, and G3:storage administration, each one satisfied by any of the involved actors (A1, A2, A3, A4, A5 and A8). The storage administration goal is subdivided by an AND-Decomposition in two goals 22
Chapter 2 Background :G8 for security testing and G9, performance testing operations. In a similar way, the network administration goal is decomposed in G4, if the network supervision is provided by a third private company, and G5, if the administration is carried on by the own company. In this case, the administration can be assigned to communications’ department personnel, goal G7, or to systems’ department employees, goal G6. Figure 2.6: Example STS Actor A1 is a worker hired from an external company for network administration tasks; actor A2 is an employee from system department who serves for the same purpose but he works for the own data center company instead of a private one. A3 represents the storage systems administrator. Actor A5 is a network admin assigned from the communications department. Actor A8 is an outsourced administrator for storage’s performance testing thus he has the capability of G9. The data center manager, actor A4 does not provide any goal but request the accomplishment of top goal G1. Each goal has one associated process (at least) describing its inner details. In Figure 2.7 we provide their diagrams. Shown processes match goals with the same number (i.e. process P1 describes goal G1, P2 details G2, etc). 23
Chapter 2 Background Figure 2.7: Example STS, associated processes The first process,P1, describes how the AND-Decomposition is performed: first G3 is satisfied and then G2.P1 has one associated process, it means it can be decomposed only in one possible way. Goals G2 and G5 are decomposed in their own OR-Decompositions, translated in the addition of an exclusive gateway in their associated processes P2 and P5. Process P6, associated to G6:system department administration, has two tasks in its process definition that must be executed to considered the goal as satisfied: network supervision and routing configuration supervision. Goal G4: outsourced administration is satisfied executing the task defined in P4,network remote supervision, that represents a remote supervision by an outsourced worker. Processes associated with storage administration, P8 and P9 have self-describing tasks, showing some operations related to testing and security analysis. Observing both pictures it is possible to deduce the number of solutions of this STS, i.e. number of ways of satisfying the requested goal G1: having two OR-Decompositions in the G2 side of the goal model and an AND-Decomposition in the other part with three valid actor’s combinations, we deduce there are nine possible assignments. This information is all the input our framework needs to start the process of solution 24
Chapter 2 Background generation (some values, as activities’ cost take one specified by default). 2.7 Conclusion Through this chapter we have described the key elements that serve as theoretical support of our framework. As noted before, there is a increasing interest in business process simulation as a tool to undertand complex system behaviours. Process theory by itself cannot model complex systems behaviour properly, it is needed a greater level of abstraction. This can be acchieved using a goal-oriented approach as we propose. Taking advantage of Tropos, we also benefit of a flexible methodology to design complex socio-technical systems. 25
Chapter 4 Framework Architecture In this chapter we provide a description of the architecture of our framework. The steps performed since the designer defines its STS through the editor until solution processes are obtained are not performed by one single module but a chain of them. The different modules carry out a part of all involved operations, obtaining their input as a data flow from the previous module, then performing certain operations, and finally providing an output to feed next modules. As an example, the planner takes care of the assessment problem, providing the Solution Manager with crucial information to calculate the final solution. The Figure 4.1 shows a diagram of the architecture of our framework. We provide a description of each part; some of then will be discussed on next chapters. All represented edges between modules are important, as all of them contribute in one way or another. The execution starts when the designer ends the STS definition, and then continues automatically until the Solution Manager provides, if no errors were present, a set of solution processes. All the steps are automatized and do not require any designer intervention further than defining the number of solutions and the maximum search time in the planner options (even these values could be omitted and the framework would use default ones). If finally solution processes are found, it is possible to simulate them. This is done in the Solution Simulator module, which also allows to specify events altering such simulation. In any case, the simulation is performed without any other intervention as well. Metric values obtained from the simulation may be analyzed in the Simulation Visualizer. One relevant detail is that, once calculated, resulting solution processes are stored in the Solution Manager; this means several events may be defined and different cost values tested on the simulator without having to recalculate previous phases (as the planner). 32
Chapter 4 Framework Architecture Figure 4.1: Architecture of the proposed framework The described architecture consists of: •Model Manager: it is the main element of our framework, holding the Organization Model (OM) information, the event model and the cost model. •Model Editor: is an editor that allows the manipulation of the data contained in the OM. It provides the GUI facilities expected from a visual editor. •Template Generator: it builds a template diagram from the process information contained in the OM. In a template diagram all information related to goals hierarchy is reflected into the process information, obtaining a hierarchical diagram of processes as the final result. Description of this module is extended in Chapter 5. •Solution Generator: is the module in charge of transforming the model information from the OM into a valid PDDL description file used as input of the AI planner. This module runs the planner with the specified parameters, looking forward to 33
Chapter 4 Framework Architecture finding as many solutions as indicated. It usually has a slow performance due to the assessment searching, which is a resource consuming task. •Solution Simulator: obtained solution processes can be simulated in this module, obtaining relevant information concerning execution costs. •Simulation Visualizer: provides a facility to show the simulation results to the user through a GUI consisting on charts and diagrams. 4.1 Model Manager & Editor The Model Manager keeps the information from the Organization Model. This information is used later by other parts of the framework as the Template Generator and Solution Generator. It is also deeply integrated with the Model Editor, that provides the graphical appearance of the manager, allowing the user to manipulate the information through a user-friendly interface. Model Manager also is used as main axis of our application because all functionalities provided by the Solution Manager and the visualization utilities can be reached from it. The Organization Model (OM) is the data model that organizes the data structure necessary for other parts of the framework. The OM contains the information about the organizational model including list of goals, process information associted to them, actors, and all the dependency relationships among actors and goals. The description of the Organization Model is provided in Chapter 3. 4.2 Template Generator Module The Template Generator Module (TGM) is the module in charge of validating the process information associated with the goals. It also checks for cyclic relationships, both direct and indirect. Analyzing the process information associated to each goal, this module generates a process diagram, called template diagram editable by the user, that reflects the global goal hierarchy of the Organization Model. This diagram will be then analyzed by the Solution Manager to generate the solution processes associated with each assessment solution; this way we could consider the Template Generator as the first step in the solution process generation. It is important to note that the creation of the template is static: the template only reflects the hierarchical nature of the defined Organization Model, and it does not depends of the solution assessments. The Template Generator is composed of three submodules, which are depicted in Figure 4.2. 34
Chapter 4 Framework Architecture Figure 4.2: Architecture of the Template Generator Module •Cyclic Dependencies: the first step of the process is to analyze the process information associated to goals to verify that no cyclic dependencies are present. This checking is performed starting from the leaf goals of the hierarchy and ending at the top goals of the hierarchy, following a classical bottom-up strategy. Acyclic dependency would exist if one goal had in its associated process a reference to at least one of its parent goals. This cycle would prevent the template template from being created correctly, therefore a validation mechanism to check this situation is mandatory. •Bottom-Up Substitution: this is the core operation of the TGM. If no cycles are present among the goal references, the TGM starts a bottom-up substitution where parent goal references in each process diagram are substituted by the template obtained in its child goals. •Clean Up: in this last operation the resulting template is cleaned up in order to obtain at the end a clean diagram suitable for being edited and analyzed easily by the designer. Performed operations include removal of redundant incoming and outgoing edges, and elimination of orphan intermediate events, among others. The Bottom-Up substitution is performed until the processes associated to the top goals (those having no parent) are also transformed. The top template, associated with the top goals of the model is called main template, because it includes all model goals. Every intermediate template generated along the hierarchical tree is stored as a separated template. This is done for performance purposes, but also because in further steps of the process, the Solution Generator Module (SGM) will make use of them to determinate whether processes associated to a goal are executable or not (see Chapter 3.1). All steps compounding the Template Generator are performed automatically without being necessary any designer intervention. A more in-depth description of the Template Genetor module is provided in Section 5.1 35
Chapter 4 Framework Architecture 4.3 Solution Generator The Solution Generator accesses the information in the OM and generates the solutions space. From the OM, the Solution Generator tries to generate solutions by assigning goals to appropriate actors according to their capabilities. Since a goal can be provided by many actors, there are many ways to do the assignment. Therefore, it is impossible to search into the solution space one by one and perform the evaluation to find which one is the best. The mission of the Solution Generator is to extract a subgroup of solutions from the whole search space, maybe not the optimal ones, but approximately. Instead of building the generator from scratch, we employ a general AI planner that takes an input describing the planning problem specified following the format of the Problem Domain Definition Language (PDDL) (see Chapter 2.3 for further information). The Solution Generator runs the AI planner externally, and when it has find the specified numbers of solutions (or search time is expired, whatever happens first) it parses the solutions and insert them into the OM. All this is performed automatically, without any kind of intervention of the designer. Figure 4.3 shows the architecture of the Solution Generator. Figure 4.3: Architecture of the Solution Generator •PDDL Generator: extracts the information from the OM and generates a PDDL file. It also access to the Template Generator module to check that each goal has associated at least one valid process. •AI-Planner Execution Controller: initializes the AI planner with the generated PDDL in the previous step. Being the planner executed outside of the framework as an external process, it is necessary to controls its status. The planner is executed until it arrives to the specified number of solutions, or the search time expires. Generally this is a time consuming task that is executed for a relative long period of time, depending of the number of solutions to be found and the complexity of the problem. •Solution Loader: it parses the obtained files from the planner and save the information into the OM. It is important to notice that the Solution Loader parses all the information from the solutions, action by action. This means all information provided by the parser will be available in further steps if needed. 36
Chapter 4 Framework Architecture 4.4 Solution Manager The Solution Manager Module (SMM) receives as input the template obtained by the Template Generator Model (TGM), and the assessment solutions found by the Solution Generator. Having both, the SMM generates a process associated to each solution, called solution process because in a simulation environment, the execution of this type of process guarantees all goals referenced in the corresponding assessment solution are achieved. Basically, the SMM chops the main template removing the references to unused goals. Then proceeds to substitute all goal references with the content of the associated processes to such goal, following the assessments of the planner. Figure 4.4 shows the architecture of the SMM. Figure 4.4: Architecture of the Solution Manager Module All this steps will be applied to each assessment solution found by the Solution Generator Module (SGM). •Template chopping: in this stage, a list of referenced goals is obtained from the solution, and a copy of the main template is created. Each goal reference from the template that is not used in the solution is deleted, therefore remaining only those useful for the solution process. •Goal to Process Substitution: the next step is, goal by goal, transforming each goal reference to the corresponding process reference. It is not allow to reference a goal having no process associated (this situation is detected previously by the Template Generator). The Figure 4.5 shows an example of this transformation. Figure 4.5: Simple transform of a goal reference to its associated process 37
Chapter 4 Framework Architecture •Process Content Insertion: in this step, references to processes are translated into real content, removing them and inserting into the diagram the content of each process diagram. This operation is done bottom-up, starting from the leaf goals of the hierarchy and ending in the top ones, keeping this way the consistency and ensuring at the end there is not any process reference left. •Clean Up: as last step, some clean up operations are performed on the result solution process, as removing useless intermediate states and gateways. All cited transformations of the main template are performed automatically, without any further user intervention. 4.5 Solution Simulator & Visualizer This module takes the selected solution process from the Solution Simulator Module (SSM) and simulates it. The result then is displayed to the designer through a graphical interface using charts and tables. The figure 4.6 shows the architecture of the SSM. Figure 4.6: Architecture of the Solution Simulator •Solution Planner (splanner): it is the core of the SSM. Given a solution it simulates the associated solution process. If the simulation is taking events into account, the splanner checks if any of them triggers an interruption of the execution. In such case, it calculates what part of the process has been executed so far and base on this decides which other solution to choose (replanning), analyzing the involved costs. All this actions are logged for further analysis. It is also possible to run simulations without events; the splanner will just execute 38
Chapter 4 Framework Architecture the solution process from beginning to end without interruptions and metric will be calculated as well. •Event Model: The simulation may be done without events or using the Event Model contained in the Organization Model, therefore taking into account events defined by the designer. •Solution Visualizer: it provides a graphical representation of the results obtained in the simulation. If the simulation involved events, all triggered events, replanning actions and chosen solutions are showed to the designer in a tree view representation. 4.6 Conclusion Our proposed framework has a high scalable modular-oriented architecture; as can be seen in this chapter, there are many modules having each one its own tasks to perform. This allows adding new features without producing a high impact in the rest of elements, and details of a module (for example, the AI planner) may be changed to adapt the framework to diverse requirements without redesigning the whole architecture. The framework can be divided in two parts, attending to the type of results the provide. We have a more static part, formed by the Template Generator and the Solution Generator: their outputs, template and assessment solutions respectively, are expected to be generated and stored for further use. Their obtention is time consuming, so the designer usually will calculate them once, when the STS is properly defined, and then proceed to the simulation phase, which is considered to be more dynamic because it is expected to be executed many times using different conditions (of metrics values and defined events). 39
Chapter 5 Solution Process Generation and Simulation Once the designer has completed the goal model definition and all involved goals and assigned actors have been specified, it is necessary to add the process description to model goals. This information, joined with the solution assessments provided by the AI planner, will be used as guideline to create a set of solution processes. Following chapter provides a detail view of the solution obtention. In the first part it shows how, taking all information associated to the goals of the model, it is possible to create a general diagram, that we have called maintemplate, which is nothing but a process where all activities are goal references. We also describe how process information is attached to the goal model. In the second part we describe the information provided to the planner, the format used for defining PDDL files and the type of information it provides as solution. In the third part of the chapter, we give details about steps taken to clean the obtained template, using as filter the assessments obtained by the AI planner. Described steps will be performed for each one of the assessments. Finally in the last section we discuss the simulation of the solution processes and the considerations involved in the defined metrics. The introduction of events into the simulation phase and how they alter the considered metrics is cover as well. 5.1 Template Generation One important characteristic of our goal model is that each goal has associated at least one process definition. Definitions attached to leaf goals are different of the associated with intermediate goals. A typical leaf goal will have a representation formed by a list of connected activities, events and more business process elements (depending of the supported level of BPMN features). It is important to notice that a leaf goal should not have a goal reference directed to one of its parent goals. In such case, the cycle checking algorithm would stop the template generation and no template would be generated. An intermediate goal, on the other hand, typically will have same cited BPMN elements 40
Chapter 5 Solution Process Generation and Simulation but mixed with goal references. It is also possible to have plain process references inside intermediate goals process definition; we have added this feature for allowing more flexibility but it use is discourageous because it lacks some semantical meaning. Processes are expected to be associated to goals; a goal reference means its associated process are executed, thus satisfying such goal. Having only a process reference does not provide enough information about achieved goals. Goal references may be in any place of the diagram where an BPMN Activity element is expected. If we want to keep the semantical expressiveness between the goal model and the generated template, each intermediate goal must have at least one process containing a goal reference to each one of its child goals. Figure 5.1 shows a part of the previously proposed Example 2.6, where the top goal is represented through two child goals by means of an AND-Decomposition. In this type of decomposition, a goal is decomposed in two child goals; both must be satisfied to considered its parent goal satisfied as well. The provided process in the Figure corresponds to goal G1. If the goal were a AND-Decomposition having many child elements, the process would be similar but having one goal reference for each one. Between processes could be placed more BPMN elements as events, other activities, etc. Figure 5.1: AND Decomposition with two child goals Note that goal references could be in any order (in last example G3 is performed before G2), depending of the requirements of the designer. This provides a mechanism to specify the order of the decomposition, thus adding an extra level of detail. Also it is possible to specify whether an AND Decomposition is done sequentially or concurrently. Figure 5.2 shows the same last example but considering if it were a parallel AND-Decomposition. 41
Chapter 5 Solution Process Generation and Simulation 5.3 Solution Process Obtainment Solution Manager module is the module of our framework in charge of taking the solutions obtained by the AI planner and perform the necessary substitutions on the main template of the model to obtain the solution processes. This operation is performed automatically and starts a chain of substitutions that ends providing the designer a group of valid solutions expressed as business processes. Given a solution from the planner, the Solution Manager extracts all actions of type Satisfies (described in Table 5.2) to get the assigned actor and process of each goal. Using such this information, the template is transformed removing all goal references not cited in the planner assessments. This leaves the template populated only with the goals referenced in the solution. The next step is to substitute each goal reference for its template diagram, which has been generated by the Template Generator in a previous phase. This substitution phase is guaranteed to finish thanks to the cycle detection algorithm used previously in the template generation (see Section 5.1). If the process has reached this point without errors, after the substitution all remaining goal references are pointing to leaf goals; as we described in Section 5.1, stored templates only contain leaf goal references. These are then substituted for the process reference associated by the planner. We consider again the previous Example 2.6. Assuming the planner has provided the solution including G4 as a goal assigned to a certain actor, after processing the main template with the planner assessments we obtain the process describe in the next Figure. We illustrates steps describing how the process diagram evolves through substitutions until it arrives to the final solution process. (a) (b) (a) diagram after removing unnecessary goal references, following planner assessments.(b) goal to process substitution, following same assessments. The remaining step is to substitute process references with the content of the processes, taking care of keeping coherence between the inserted content and the location where it is represented in the diagram (adding business intermediate activities or readapting sequence edges if necessary). To ensuring the resulting process is clear enough to be 48
Chapter 5 Solution Process Generation and Simulation easily understood by the designer, some cleaning operations are performed at the end. Following we illustrate corresponding process substitution in the previous Figure. (c) (d) (c) process content insertion, (d) process after clean up. The cleaning operation helps to clarify and remove such remaining elements from transformations. This step, while making the solution process clearer, also helps to make easier the simulation process, removing unnecessary elements that could confuse the simulator. 5.4 Conclusion In this chapter we have analyzed the whole solution obtention procedure, from the template generation to the final solution processes; it is also completely automatic thus it does not require any designer intervention. As we said in the conclusion of the previous chapter, this part it is not considered to be used so often as the simulator module because the solution obtention requires an important amount time, specially the AI planner. The Solution Manager is the point of the process where the benefits of the goaloriented methodology and the process notation converges. As we have described before, assignments provided by the planner in its output indicate the processes to be substituted in the main template, therefore creating the set of solution processes. Being described using a business process notation, solution processes can be easily analyzed by the designer; this fact is taking specially into account by our framework, doing clean up operations after each important manipulation of process diagrams. The simulation phase allows the designer to evaluate the results in a plain simulation or in a more complex environment defining customized events. This provides great flexibility to our framework, the designer can model his STS and then study their behaviour under certain circumstances. Our framework is intended to serve as a first approach, more complexity could be added to the simulation part, specially to the replanning decision part, a field the research community has studied for many years. 49
Chapter 6 Simulation All the effort invested in the processes of generating the template and obtaining solutions from the planner would be in vain without a mechanism to evaluate the candidate solutions and extract some information about the system behaviour. Our framework provides a simulation environment where it is possible to run the obtained solution process, showing the output by means of tables and charts. Being our work focused on business process, shown results are centered on process metrics more than in actor and goals assessments. We provide a metric on process activities that is used to evaluate process quality. It is possible to change such metric values on each activity without having to recalculate process solutions; this means solutions can be obtained once and simulated many times testing different metric configurations. Our framework provides also a workbench where events affecting the simulation can be defined easily. Including events give an idea of the response of the different solution processes to unexpected situations. All results from simulations are available to the designer, including replanning costs, events occurrence and alternative plans found. This chapter provides details of the simulations, which metrics are used and how they are calculated. 6.1 Process representation: Timeline Resulting solution processes are represented using BPMN, a business process notation mainly focused in graphical interpretation. BPMN diagrams are easily understood by a user with minimal business notation knowledge. However, this notation is not execution oriented and some previous steps must be done before simulating a BPMN diagram properly. In our work we have used a data structure called Timeline that simplifies the simulation process, event definition and allows additional information extraction, as event’s failure time or process’s total cost. When a simulation starts (with or without events), a Timeline is obtained from each involved solution process. Then, the simulation is performed using the Timeline as reference. Note that Timeline structures are dynamically generated every time a simulation is carried out and then destroyed, i.e. they are not stored anywhere. 50
Chapter 6 Simulation The Timeline structure is a proposed data structure that represents activities of a business diagram as a sorted list of instants. Each instant has a list of activities associated. The position where they are placed depends of their associated cost (see next Section 6.2), which gives us a kind of time sequence describing the order of simulation of such activities. Figure 6.1 shows the Timeline equivalent to a possible solution process of the example 2.6. This example consists only of two activities; in case of having more they would be converted in a similar way. Figure 6.1: Timeline representation of a two-activities process Using a Timeline structure we transform the process expressed in a flow-oriented style to a more time-oriented representation that suits better with the simulation phase. The first activity starts at instant zero because it is the first one. The total duration of the process would be the last represented instant (in this case c1 plus the duration of the last group of activities, in our example, c2), thus is, c1+c2. We do not take into account the rest of elements of the business notation as event items or intermediate gateways. Last figure depicted how a Timeline is obtained from a simple sequencial process. The process notation also allows parallel flow, this is, execution of diverse elements at the same time. Timeline structure represents concurrent behaviour grouping together, in the same position of the Timeline, those activities that must be executed in a parallel way. Figure 6.2 shows activities from Figure 6.1 but assuming they are executed parallely, this is, they start to be executed at the same instant of time, but each of them may ends at a different one. 51
Chapter 6 Simulation Figure 6.2: Timeline representation of a two-activities parallel process In our approach, the duration of a group of parallel activities is the maximum value of their durations. This is done to keep the consistency with the adopted process notation. Once a group of activities has started the simulation, the next group of activities will be simulated only when the longest activity has been successfully simulated. Note that this forces to have durations strictly greater than zero. In case of having two parallel activities with the same duration, they will be considered to finish at the same instant of time. In previous examples we have described simple examples of how Timeline data structures are generated to be accurated with represented processes. More complex processes, having a combination of parallel and sequence activities, can be used as well. Figure 6.3 shows a complex process having some sequence and parallel activities together. Below is shown also its associated Timeline. Assuming each activity has a cost ci, where c1> c2and c3> c4(this means the first group in the Timeline has a duration of c1and the second, c3). The Figure shows an intermediate event activity that, as stated in the specification of BPMN, it is supposed to serve for synchronization purposes. However it could be ommited and the meaning would remain the same: the synchronization would take place before starting the next activity. 52
Chapter 6 Simulation Figure 6.3: Timeline representation of a process The benefits of adopting Timeline structures are noticed in the simulation phase. An event interrupting a certain activity can be easily located in the time sequence just obtaining the instant where such activity is placed. Resuming operations and, specially, processes comparison are easier with this kind of representation; checking whether two processes are similar is a matter of comparing their activities’ lists. 6.2 Evaluation Metric We define a metric in order to set a mechanism to evaluate the quality of found solution processes. It must be a representative value that gives us a mean to compare such solutions. considering a process simulation time is in the order of milliseconds, the metric should be relatively easy to obtain as well. One possible measure could be the simulation time required for each solution; however it is not different enough from one solution to another to consider it valid. Another possible alternative could be the length of the solution: that one having less tasks would 53
Chapter 6 Simulation be considered better. This could be valid if all task had the same importance, but usually not all tasks contribute the same to the solution. Being interested on process tasks, and taking into account that usually each task has its own characteristics, one possible metric is to evaluate the cost of a process taking into account the cost of its tasks. This way each task of the solution process has an associated cost value. In case it is not provided, a default value taken from the Evaluator Model is assumed (see section 3.2 on Chapter 3 for a description). We define the value Ctask as the cost associated with a certain task of a process. This value is shared by all the instances of the task that exist in the framework; it means that a task being referenced in many solution process will have always the same value in all its occurrences. This allows to keep the task cost coherent in all solutions, insuring conclusions extracted from the results are consistent. Our framework provides also a mechanism to modify such task costs globally. Given a process pwith ntasks, we define its cost value as Costp=Pn i=1 Ctask (i) Figure 6.4: Cost for simple simulation This means for evaluating the quality of a solution process we only take into account the cost of its tasks. This value is representative only for plain simulations, simulations where not events are introduced. Metrics when process may be interrupted will be covered later. We do not consider a cost for event elements of the process diagram, neither for process gateways (both are special elements of the process element notation). 6.3 Simulation with events Having a metric as the previously defined and a set of candidate solutions it is possible to simulate them and decide which one is better in terms of global cost. However, it still leaves open the question of which one has a better response facing to unexpected events. Because of this our framework also provides an environment for defining events and study how different solution processes behave. This introduces new factors in the simulation to keep metric accurate. For example, it is necessary to set a cost for replanning operations. Every time an event takes place and interrupts a process, there is a cost associated to the operation of choosing another solution to restart from (if this is possible); even may happens that, instead of just restarting from the beginning of the chosen solution, the simulation algorithm reuses part of the stopped solution, thus reducing part of the global cost. As can be seen, including events adds some new dynamics that must be taken into account when the final cost of the solution is calculated. 54
Chapter 6 Simulation In this section we describes the simulation when events are present, what types of events can be used and how defined metric is modified. 6.3.1 Event types We initially provide two possible types of events to be used by the designer. However, our framework is flexible enough to permit adding more of them easily. Events can be defined and then set as enabled or disabled. This allows to keep them stored and test a variety of scenarios switching easily between different configurations. •ActivityFailure Event: it is an event affecting a certain task. It affects all instances of the task in all solutions. •ActivityFamilyFailure Event: it defines a family of affected events: a group of affected tasks grouped together. These events may happen in no predefined order. Also it is possible to define as many of them as needed. When an event is activated (because the current task in the process simulator matches that one defined for the event), the process is stopped in the affected task. It means all precedent executed tasks can be reused if a valid process to restart from is found. This leads us to another factor to take into account in the event simulation: the replanning. 6.3.2 Replanning A replanning operation takes place when an event stops the simulation of a solution process and it is necessary to decide which alternative solution use in order to continue the simulation. In the best case, a valid enough candidate to reuse part of the interrupted solution is found. In this case we talk of replanning with resuming: the impact of the replanning in the total cost will be reduced as it is possible to reuse what has been done. In the other hand, if the best solution candidate forces to restart from the beginning because no task can be reused, the total cost is more affected by the cancelled initial process. There are many strategies and heuristics developed around replanning decision. We have taken a simple approach based on the speed. When a replanning is needed, our simulator tries with the rest of solutions. This way, at the end we have a description of all possible alternatives of replanning. 6.3.3 Solution cost Taking into account replanning cost, now we define the cost associated to the simulation of a solution process when an event takes place. It is a modification of Formula 6.4 55
Chapter 6 Simulation adapting it to replanning and resuming operations. Given, •two candidate solutions s1, the initial solution, and s2, the alternative, with n1 and n2 tasks respectively. •an event E1 affecting s1 at instant of time M, •rs2the resuming position in s2, that is, the greatest position where to resume from (0 in the worst case, if no replanning can be performed). costsolution =PM i=1 Ctasks1(i) + costreplanning +Pn2 j=rCtasks2(j) Figure 6.5: Cost for event simulation The replanning cost takes a default value set in the Event Model that may be changed by the designer. 6.4 Conclusion The simulation of processes is a complex task that starts selecting a proper process representation. BPMN, the process notation selected for representing our solution processes provides a graphical set that simplifies its description and provides a friendly GUI for data handling. However from a simulation-oriented point of view the process could be represented in a better way if its behaviour were described in a time scale. Timeline data representation allows an easy manipulation of processes information in a simulation environment and it is flexible enough to support future additions of more BPMN diagrams elements (for example, intermediate events and messages). Process simulation without event is straightforward if we compare it with all decisions involved in the simulation involving events. Our framework provides two types of events to be defined but it is flexible enough to allow new ones. The strategies proposed nowadays for the replanning decision are many and diverse, we have implemented a simple one as reference. A simulation environment is incomplete if it does not measure any characteristic. We have described a simple metric (cost associated to each activity) that permits the comparison of processes quality. 56
Chapter 7 Implementation In this chapter we provide a brief description of the involved technologies and details regarding the implementation of our framework. We have used Java as the main programming language due to its performance and its wide use by the research community. The developed implementation is based on Eclipse Modelling Framework (EMF) technologies. The processes handling and representation is done with Business Process Model and Notation (BPMN). The AI planner chosen among all available alternatives is a general purpose planner, LPGtd. It was a winner in IPC competition, providing the required flexibility for modelling a variety of scenarios and it was used in related works as well [20]. 7.1 Eclipse Modeling Framework The Eclipse Modeling Framework (EMF) [18] is a modeling framework that provides model-driven development inside the Eclipse framework, being able to automatically generate code from a structured model description. The main strength of EMF is it model facility code generation, that allows to work with a metamodel editable through a graphical interface. Once the model is completed, EMF generates code automatically for it, optionally even also a model editor. This code can also be manipulated and edited by the developer, remaining unmodified in sucesives code generations. It also provides tools for automatic testing and editor creation. One point of interest is its framework development environment for Rich Client Application (RCP) that allows generating a fully Eclipse-independent application, that can be deployed easily on any Java-compliant system. Asides the EMF, the Eclipse Framework also provides the Graphical Modelling Framework (GMF) [19]. More modeling tools can be installed thanks to an extensive repository where search for plugins and download them directly to the platform. 57
Chapter 8 Case Study 8.1 Scenario description The incident response starts with an avalanche event. Initially, Intervention chief (IC)) starts the operation with traffic and crowd control, delegated operations to the Police in first place or to Alaska State Troopers (AST) if necessary. The next step in the procedure is to decide if the avalanche zone is secure enough from secondary avalanches, requesting the intervention of South Alask Avalanche Center (SAC) specialists. They evaluate on the ground the risks of the incident area giving the agree if there is no danger. On the other hand, if the area is still insecure, they may decide to wait a certain amount of time or use explosives if necessary for clearing the surrounding slopes. This dangerous task may be perform by them or with the help of AST units. After the SAC green light, if there are buildings involved in the incident, the IC requests the checking of structural hazards to the engineers group of the City Council Fire Team (CCFR). Once these two approvals are obtained, the IC gives the order of setting an operational area in the affected zone, creating a delimited area, setting up an on-site hospital and the landing zone for the helicopters. These tasks are performed by CCFR or AST, depending of the availability. When the security of the searchers is guaranteed, starts the recover victim phase with the help of the CCFR for obtaining information about the possible victims location, the use of specialized search dogs (Seadogs) for trails following and collaboration of available medical units in charge of assisting and transporting victims to the hospital. The incident is considered as resolved when all victims have been found and evacuated. In our proposed scenario, the two main goals to accomplish are to ensure the searchers safety and to recover victims as soon as possible, in this order. Satisfying these goals means the incidence is resolved. Each one is decomposed in other subgoals until arrive to the leaf goals, which are not decomposed but assigned to one or more actors, who have the capability of achieving the goal. Such actors are shown in Table 8.1. For the safety concerns, when a incident response starts, the main tasks are safety related operations, as crowd control, zone security analysis, and setting an operation area for resources deploying. The victim recovery goal is also guaranteed being decomposed in other goals as finding the victims and victims evacuation. In this case two goals (G26, Ask familiars, and G27 Ask survivors) has been represented as concurrent in the process diagram associated to its parent goal (G28). Goals can be accomplished by a certain actor or in some cases by many of them, providing this a wider solution search space. The main goal G0, is requested by the actor A1, Incident Chief, (IC) who delegates associated subgoals to trusted actors, starting this way the goal assignment process. Actors and its corresponding capabilities are included in the Appendix, 10.3. 64
Chapter 8 Case Study Name Abbreviation Description A1 IC Incident Chief A2 Seadogs Seadogs rescue team A3 CCFR City Council Fire Team A4 AST Alaska State Troopers A5 JPD Juneau Police Department A6 SAC South Alaska Avalanche Center A7 MS Medical Staff Table 8.1: Actors involved Many of the defined goals have a precedence constraint, this is, they cannot be performed until another certain goal is satisfied. This is mandatory because some goals can be achieved only when certain conditions are met. For example, goal G2 (victims recovery) can be satisfied only when the security of the searchers is guaranteed; also G2 (victims evacuation) can only be accomplished, obviously, after victims have been found (G21, find victims goal). Adding these precedences goals will be achieved following an explicit order, which is also common in these types of scenarios. The Table 10.1 in the Appendix provides a description of each goal. Using a classical goal-oriented modelling approach, it would be necessary to add explicitely such precedence information to the goal model, this way the planner would take it into account, generating the solution assessments in the correct order. However, our framework uses also process information attached to every goal where it is indicated the order of the decompositions. This means the resulting solution processes from the template transformation will execute the goals in the correct order. Having these mechanism, parent goals as G0 can determine easily the order of precendence of its child goals. For example, the first goal G0 has the process information shown in the Figure 8.1 where the order of the AND decomposition is specified to accomplish first G1 and then G2. Figure 8.1: Process information associated to G0 The total of goals in our scenario is 37, being 20 child goals and 17 intermediate goals. Each one has its own process description associated, therefore obtaining 37 process definitions. In these definitions there is a mean value of 2 goal references (max value of 3 for both decomposition types, AND e OR). 65
Chapter 8 Case Study 8.2 Results Attending only to the goal structure represented there are 48 different solutions. But taking into account also the number of processes associated to goals, the total number of solutions grows to 86 (there is a goal, G31, with two possible associated processes). Despite this, because of the complexity of the task, the used planner gets six different solutions for the proposed scenario in the maximum given time (1 min). This obtained solutions are different each time the planner is executed because the search algorithm starts with a random seed. This makes saving found solutions even more important. Table 8.2 shows the found solutions. Results are shown in rows, Goals columns represent the different goals assessments provided by the parser. Sol Goals sol1 G31 G4 G14 G15 G161 G163 G164 G18 G26 G24 G25 G28 G29 sol2 G31 G4 G14 G15 G162 G163 G164 G18 G26 G24 G25 G28 G29 sol3 G31 G4 G14 G15 G162 G163 G164 G18 G27 G24 G25 G28 G29 sol4 G32 G4 G135 G133 G15 G162 G163 G164 G18 G26 G24 G25 G28 G29 sol5 G31 G4 G135 G133 G15 G162 G163 G164 G18 G26 G24 G25 G28 G29 sol6 G31 G4 G135 G133 G15 G162 G163 G164 G18 G26 G24 G25 G28 G29 Table 8.2: Candidate solutions Once the set of solutions has been obtained, the next step is to start the simulation and analyze their quality. Initially we perform the simulation with the events disabled, therefore the solutions are executed completely without interruptions or replannings. As evaluator of the results we use the cost value of the solution process (see Chapter 5). Table 8.3 shows the resulting cost detailed in Cost column and the the number of steps performed by the plannet to obtain each solution. The details of the activities’ assigned costs are provided in the Appendix, Table 10.5. Sol Steps Cost value Sol Steps Cost value sol1 38 68 sol4 42 84 sol2 38 69 sol5 43 88 sol3 38 67 sol6 42 93 Table 8.3: Simulation Cost of each solution, without events As can be seen in the results, solution #3 has the lowest cost of all the candidates. This means in a ideal situation, without unexpected events, this would be our choice. It is also one of the shortest solutions, with 13 goals satisfied (solutions #4, #5 y #6 have one more goal). Analyzing each associated process we observe that the lower cost value of is due to the goal G11 (SAC aproval); here the solution #3 has assigned the 66
Chapter 8 Case Study goal G14 (SAC gives ok), while others accomplish G13 (Use of explosives), with higher child goals costs. The difference between #3 and solution #1 is the associated process in G31; last one uses process P31, with a higher cost than P312, used in solution #3. Now we proceed to analyze the behaviour of found solutions in a simulation environment where some unexpected events happen, altering the expected process flow. Using the capabilities provided by our framework we define two new events, described in Table 8.4. The first one, SAC ok, represents a failure in the SAC decision regarding its capability to decide successfully whether a zone is secure from secondary avalanches or not. The second event added, AST unavailable affects not one but two activities, representing the hypothetical situation of a limitation in the services provided by AST group, in this case being unable to delimit an operational area and to perform the survivors information retrieving. Event Involved process activity Affected goals SAC ok SAC gives OK G14 AST unavailable Delimit area,Ask survivors G133, G27 Table 8.4: Defined events of the simulation Using these events and the solutions shown in Table 8.3 as input, our framework tries to find a valid execution plan, simulating the processes and replanning when necessary. Results of the simulation are shown in Table 8.5; this information can also be analyzed graphically, the output of our framework provides this features by means of charts. Having six solutions, if one of them is not valid due to the defined events, there are many replanning alternatives when starting from each solution. Solution Found plans Minimum Plan Cost Mean Plan Cost Sol1 2 92 94 Sol2 2 92 94 Sol3 1 90 90 Sol4 - - - Sol5 1 88 88 Sol6 1 93 93 Table 8.5: Results of the simulation with defined events As can be seen in the results, solution #5 have only one plan associated and also the lowest cost value. This means its obtained plans (in this case just one) are less affected by events. In this case, it means #5 is not affected at all, because its cost value is the same with or without events. Solutions #1 and #2 increased its costs because of the events (without them, they have the lowest values of the solution set). It interested to observe that solution #4 does not provide any plan: it is because execution cannot be 67
Chapter 8 Case Study resumed when its execution is stopped. For further analysis, at the end of this document we provide the solution process S1 (10.1) and S5 (10.2). Given our set of events solution #5 seems to be the best solution to take, having a good performance with defined events (in fact, it is not altered). 8.3 Scalability The scalability and performance of our framework depends of each of its parts and the type of task they perform. The analysis implies dividing the whole simulation in two parts. Following we describe each of them step by step. The first stage, considered as a static part because it is done once and then reused, is the phase composed by the template and solution generations: these steps do not need to be repeated again every time a solution simulation is performed. The second stage, more dynamic, is the simulation of found solutions, optionally involving also events simulation. The performance of this part is important because simulations could be repeated many times, having an important number of candidates solutions and events, and is supposed to be the part of the simulator more stressed by the designer. As first step of the framework workflow, when the designer has finished the description of the goal model, the Model Manager checks the consistency of the goal model, i.e. making sure there are not leaf goals without associated actors. This is a fast operation, without significant impact on performance. The next stage is the template generation from the process diagrams of each goal, operation performed by the Template Generator module. This task could become more time consuming in large models because the module checks for cyclic references among goals, operation resulting in a bottom-up checking algorithm along the whole goal model tree. As final step, the template generation involves the analysis of all process diagrams present in the goal model, generating a template for each intermediate goal, resulting at the end in the main template generation. Because of the involved number of disk access, intermediate templates are saved and reused when possible. The time invested in this stage is high, so we decide to test the template generator performance increasing the number of goal references in the processes which template is generated from. Results in Table 8.6 were obtained using our scenario goals. References Cycles checking Template generation 2 100 963 4 934 3368 6 5362 19546 Table 8.6: Time invested in the template generation (ms) 68
Chapter 8 Case Study It seems that the number of goal references in the process diagrams may be a factor to take into account in scalability matters. Its growth increases significantly the amount of time invested in the template generation. These results show that the best performance is reached when we have a small number of goal references in the process diagrams. The number of such references depends of the number of child goals of the goal, therefore cited value will be low is most cases. The next part of our framework to be evaluated is the Solution Generator. Once templates are generated, the Solution Generator uses the intermediate templates to calculate the executability of involved goals; this operation is fast and it does not represent a problem to the scalability. Such information then is translated into the PDDL definition file generated from our scenario. This file will be used to feed the chosen AI planner. When the planner ends, result solutions (if any) are parsed back to the model. They will be used later to generate the solution processes through the Solution Manager. In order to illustrate the performance of these steps in Table 8.7 we provide some results. Time required by the planner serves only as orientation: it uses a different random seed every time it is executed so discrete search times are not representative of its performance. A more detailed study of the scalability of the chosen AI planner (LPG-Td) can be found in [3]. The time needed for the solution search depends of the selected planner. Being a goal-oriented problem with many actors and goal decompositions it may be high. Solution Planner Planner solution parsing Solution process generation 1 9373 6 102 2 9000 6 109 3 9300 7 150 4 9780 9 186 5 9000 9 240 6 9200 9 290 Table 8.7: Time required for the solution generation (ms) As we have indicated, planner time is not representative so we will leave it outside our analysis. The second column of the table, the parsing time needed for parse the solution from PDDL format to our model, reveals that the cost of this operation is irrelevant; its value remains almost constant while increasing the number of solutions to parse. The last column reflects the time needed by the Solution Manager to clean the main template with each solution in order to obtain its process representation. This operation is not time consuming even having more than one solution to generate. Finally we arrive to the Solution Simulator, the module in charge of simulating solution processes. In this stage, processes to be simulated dont have any conditional task to evaluate. This 69
Chapter 8 Case Study means that simulation without events is performed with no decisions to be made, like replanning branches or interruptions. Again, we carry out a test. Taking as example a process with 12 activities, we increase the number of them to view how required simulation time increases, first without events. Results are shown in Table 8.8. Activities Time 12 15 36 21 48 32 84 63 Table 8.8: Time required for a process simulation (ms) The advantage of all performed transformations along the framework is visible in this phase of the workflow. Thanks to assessment solutions joined with a process representation, simulations can be performed in a fast way. When the simulation requires replanning, the decision of which other solution should be taken is made just taking one of the candidate solutions and trying to execute it (avoiding those already discarded). This, although could lead to picking the wrong alternative, minimizes the time dedicated to this task. 70
Chapter 9 Conclusions and Future Work The STS approach, taking into account the human dimension and relationships between technical systems and involved actors, allows a flexible modelling of complex software systems. Nowadays the human factor is even more important than ever; we are used to be surrounded by software systems in our workplaces but also in our everyday life, and the design of such systems must recognize the importance of users and the potential impact of their behaviour in the software system. Choosing a goal-oriented methodology as we have done in our framework provides us with a robust tool resource for modelling STS systems. It allows the designer to focus on important features of the model, as system goals and user interactions. Goal-oriented methodologies have been studied and analyzed for years, having therefore a consolidated formal base. The solid theoretical background allows to evaluate system features in a consistent way, even finding emergent characteristics not guessed at a first sight (i.e. performance and scalability analysis). This also contributes to expand the use of such methodologies in automatic environment, as our framework for example, where information contained in the goal model feeds an autonomous AI planner and generates solutions using a business process notation, all without intervention of the designer. In this work we have complemented descriptive capabilities of a goal methodology with the benefits of process theory used to describe inner details of the goal systems. This approach provides some important benefits in the simulation phase. Using BPMN, a modern business notation widely extended in business environments, resulting diagrams can be represented in a clear way, easily understood by users with minimal business notation background. One point of special interest seems to be the performance of the selected planner, responsible of searching valid assessments among all possible combinations. Thanks to the PDDL format translation phase and the modular approach used in our framework, it is possible to change the planner with one that fits better our requirements. This leaves the door open to future planner with better performance in goal-oriented scenarios. From a general point of view, starting from the first step of the workflow, we have gone from a goal-oriented scenario, harder to understand for a non technical user, to a 71
Chapter 9 Conclusions and Future Work result represented as a set of solutions expressed in a more friendly notation that can be also executed and simulated. The combination of the goal-oriented approach with the inherented benefits of a process notation in terms of understanding and simulation capabilities. Event Module provides the final user a simple and straight forward way of defining events, analyzing the scenario through a graphical and intuitive tool. These advantages make working with goal-oriented models an easier task, and over all, they allow to study the system behaviour against possible events scenarios, giving valuable information hardly guessed without using a simulator framework as this we present. Using the Eclipse platform, and the framework it provides for the fast development of applications, has contributed to a graphical implementation faster than using traditional methods. Being a highly modular platform, we have been able to set up a customized development environment quickly. The simulation framework proposed in this work is based on modern, well known technologies, as Java, Eclipse and the BPMN notation are. This guaranteed our work to be extended easily, keeping it in the line of nowadays software development trends. Future revisions of our framework will provide a graphical editor for the goal model edition, and also a better support of the whole set of features of the BPMN notation. Our implementation, given its experimental state, only uses a reduced set of them. Regarding the Event module, some more event definition types will be added, looking forward a more event-detailed solution simulation platform. 72
Bibliography [1] Volha Bryl and Paolo Giorgini. Automated design of socio-technical systems: From organizational structure to instance level design. In Proc. of 23rd IEEE/ACM International Conference on Automated Software Engineering, 2008. [2] Paolo Bresciani, Anna Perini, Paolo Giorgini, Fausto Giunchiglia, and John Mylopoulos. Tropos: An agent-oriented software development methodology. Autonomous Agents and Multi-Agent Systems, 8(3):203¨ı¿1 2236, 2004. [3] Volha Bryl, Paolo Giorgini, and John Mylopoulos. Designing sociotechnical systems: from stakeholder goals to social networks. Requir. Eng., 14(1):47-70, 2009. [4] F Dalpiaz, R Ali, Y Asnar, V Bryl and P Giorgini. Applying Tropos to Socio-Technical System Design and Runtime Configuration. In Proceeding of the Italian workshop Dagli OGGETTI agli AGENTI (WOA08), 2008. [5] P. Giorgini and M. Kolp and J. Mylopoulos and M. Pistore. The Tropos Methodology: an overview. Methodologies And Software Engineering For Agent Systems. Kluwer Academic Publishers, 2004. [6] Volha Bryl and Paolo Giorgini. Self-configuring socio-technical systems: Redesign at runtime. International Transactions on Systems Science and Applications, 2(1):3140, 2006. [7] Pau Giner, Victoria Torres, Vicente Pelechano. Bridging the Gap between BPMN and WS-BPEL: M2M Transformations in Practice. Department of Information Systems and Computation, Technical University of Valencia, Valencia, Spain. [8] Victoria Torres, Pau Giner and Vicente Pelechano. From BPMN to BPEL4People: A MDE Approach. IV Jornadas Cient´ıfico-T´ecnicas en Servicios Web y SOA, 29-41, 2008, [9] Rajdeep K. Dash, Nicholas R. Jennings, and David C. Parkes. Computational mechanism design: A call to arms. IEEE Intelligent Systems, 18(6):40 - 47, 2003. [10] Eric Siu-Kwong Yu. Modelling strategic relationships for process reengineering. PhD thesis, Toronto, Ont., Canada, Canada, 1996. [11] Eli Berniker. Some Principles of Sociotechnical Systems Analysis and Design. School of Business Administration Pacific Lutheran University Tacoma, Washington, October 1992. 73
Chapter 10 Appendix Figure 10.1: Case Study Solution S1 80
Chapter 10 Appendix Figure 10.2: Case Study Solution S4 (selected solution) 81
Chapter 10 Appendix G. Case Study Goal Model Figure 10.3: Scenario Goal Model Diagram 82