Full text
1 LAPPEENRANTA UNIVERSITY OF TECHNOLOGY School of Business and Management Supply Chain Management Iryna Maliatsina EMBEDDING SUSTAINABILITY INTO CONSTRUCTION SUPPLY CHAIN MANAGEMENT: AN EMPIRICAL INVESTIGATION Master’s Thesis, 2018 1st Supervisor: Mikko Pynnönen, Professor, D.Sc. 2nd Supervisor: Pietro Evangelista, Ph.D.
2 ABSTRACT Author: Title: Faculty: Major / Master’s Programme: Year: Master’s Thesis: Supervisors: Keywords: Iryna Maliatsina Embedding Sustainability Into Construction Supply Chain Management: An Empirical Investigation School of Business Supply Chain Management / Master’s Degree Programme in Supply Chain Management 2018 Lappeenranta University of Technology 125 pages, 19 figures, 45 tables; 7 appendices Prof., D.Sc. Mikko Pynnönen Ph.D. Pietro Evangelista Green Supply Chains; Construction Industry; Sustainable Supply Chains; Finland In the context of globalization and increased international market competition, various Finnish companies and organizations driven by different forces devote considerable efforts to assessing, preventing, and reducing the negative environmental impacts of their actions. Nevertheless, the construction industry still contributes significantly to the total amount of fossil carbon dioxide emission of the country. Moreover, the building construction process has a notable effect not only on air, but water, land and noise pollution. Many researchers acknowledge the positive effect of embedding sustainability principles into a company’s business strategy and operations on sustainable business performance. In the scope of this thesis, the link between green supply chain management and sustainable firm performance is investigated through different lenses from the theoretical and empirical perspectives and with consideration of the triple bottom line approach, which dynamically integrates the economic, ecological and social sustainability dimensions. This research addresses the critical problem of understanding the negative environmental impacts of the actions undertaken on each stage of the construction project and discovering the possible ways to prevent or overcome such issues identified. The evidence was collected from a cross-country sample of Finnish construction companies using the mixed quantitative and qualitative research methods. The empirical results support the NRBV concept of a firm's competitive advantage and demonstrate that organizations that consider the environmental impacts of their activities have better economic, social and environmental performance. The research findings of this thesis contribute to the development of the valuable reference for supporting the governmental decisions on establishing initiatives to incent embedding green supply chain practices in Finnish construction supply chains.
3 ACKNOWLEDGEMENTS First, I would like to record my sincere gratitude to my thesis supervisors, Prof. Mikko Pynnönen and Dr. Pietro Evangelista, for their continuous support and advice. Their instructions and comments contributed immensely to achieving the scientific goals of this research. My special thanks are directed to the head of my Master’s program, Prof. Katrina Lintukangas for the opportunity to study in such a wonderful and inspiring environment. I would like to give special thanks to Prof. Marko Torkkeli and my colleagues in the LUT Kouvola Unit. It is an honor to be a part of the team; the knowledge, and skills gained from the research work have been essential to me in this project. My special thanks are directed to Dr. Daria Podmetina, Ekaterina Albats, and Roman Teplov. Thank you for your support in terms of ideas and spirits. You are my role models of knowledgeable, skilled and successful academic professional. I would also like to thank Dr. Matylda Jablonska-Sabuka for her help in the research process. Special thanks I would like to address to Kirsi Taivalantti, Civil and Construction Engineering Degree program manager at Saimaa UAS, for her valuable professional support and insights. I am also very grateful to my colleague, Jaan-Pauli Kimpimaki, for his comments and inspiring discussions. This work includes case studies covering four companies: Mestaritoiminta Oy, Saint-Gobain Finland Oy, HKR-Rakennuttaja and Bionova Oy. I would like to thank the companies’ representatives for their willingness and time spent to participate in this study. Without their very open-minded attitude, compiling the case study data for analysis would not have been possible. A very special “Thank you” goes to my beloved family. My mum, my dad and, my grannies, thank you for always believing in me, for your support and motivation. Thanks to my grandpa, Dr. Vladimir Maliatsin, for encouraging me to take this venture. Finally, I would like to express my gratitude to my closest friends Helen, Amanda, Kate, Kirill and Nika for motivating me and reminding me to stay true to myself. Iryna Maliatsina Lappeenranta, August 2018
4 TABLE OF CONTENTS 1 INTRODUCTION ............................................................................................................ 9 1.1 Background ............................................................................................................... 9 1.2 Research Objectives and Questions ........................................................................ 13 1.3 Research Approach and Delimitations ..................................................................... 14 1.4 Methods Summary .................................................................................................. 15 1.5 Study Structure ........................................................................................................ 16 2 SYSTEMATIC LITERATURE REVIEW ........................................................................ 17 2.1 GSCM definition ...................................................................................................... 17 2.2 Methodological aspects and initial data statistics .................................................... 18 2.3 Bibliometric analysis ............................................................................................... 21 2.4 Network analysis of publications ............................................................................. 23 3 SUPPLY CHAIN MANGEMENT IN CONSTRUCTION ................................................ 28 3.1 Pre-construction Stage............................................................................................ 28 3.2 Construction Stage ................................................................................................. 30 3.3 Post-Construction Stage ......................................................................................... 31 3.4 Construction Life Cycle Assessment (LCA) ............................................................. 31 4 DEVELOPING A MEASUREMENT INSTRUMENT FOR GSCM ................................. 32 4.1 Conceptual model of GSCM in construction ............................................................ 32 4.2 GSCM practices ...................................................................................................... 33 4.2.1 Green Strategy ................................................................................................ 33 4.2.2 Green Design .................................................................................................. 35 4.2.3 Green Procurement ......................................................................................... 37 4.2.4 Green Transportation ...................................................................................... 39 4.2.5 Green Construction ......................................................................................... 40 4.2.6 Green Monitoring and Improvement ................................................................ 42 4.3 GSCM performance ................................................................................................ 43 4.3.1 Environmental performance (EP) measurements ............................................ 44 4.3.2 Economic performance (EcP) measurements .................................................. 44 4.3.3 Social performance (SP) measurements ......................................................... 45 4.4 GSCM drivers ......................................................................................................... 46 4.4.1 External drivers ............................................................................................... 46 4.4.2 Internal drivers ................................................................................................. 47 4.5 GSCM barriers ........................................................................................................ 47 4.5.1 External barriers .............................................................................................. 48 4.5.2 Internal barriers ............................................................................................... 48
5 5 RESEARCH METHODOLOGY .................................................................................... 50 5.1 Questionnaire survey method ................................................................................. 50 5.2 Case study method ................................................................................................. 53 6 ANALYSIS AND RESULTS ......................................................................................... 55 6.1 Quantitative Analysis............................................................................................... 55 6.1.1 Descriptive statistics ........................................................................................ 55 6.1.2 Missing-data Mechanism and Factor Analysis for GSCM practices ................. 60 6.1.3 Factor analysis and Reliability of Measurement scales for GSCM performance, GSCM drivers and barriers ....................................................................................... 64 6.1.4 Regression analysis ........................................................................................ 69 6.2 Qualitative Analysis ................................................................................................. 77 6.2.1 Description of cases ........................................................................................ 77 6.2.2 Reliability and validity ...................................................................................... 79 6.3 GSCM practices diffusion analysis .......................................................................... 85 7 CONCLUSION, LIMITATION AND FUTURE RESEARCH .......................................... 88 7.1 Discussion and conclusion ...................................................................................... 88 7.2 Theoretical implications ........................................................................................... 91 7.3 Managerial and governmental implications ............................................................. 92 7.4 Limitations and future research ............................................................................... 92 REFERENCES................................................................................................................ 94 APPENDICES APPENDIX 1 Evolution of the research on sustainable SCM from 2008 to 2018 APPENDIX 2: The questionnaire APPENDIX 3: Descriptive statistics of GSCM practices APPENDIX 4: Descriptive statistics of sustainable performance indicators APPENDIX 5: Descriptive statistics of GSCM practices drivers and barriers APPENDIX 6: Missing data summary for GSCM practices APPENDIX 7: Shapiro-Wilk test for normal data for GSCM performance, GSCM driver and barriers
6 LIST OF FIGURES Figure 1 A visual diagram of research methods............................................................... 15 Figure 2 The structure of study ........................................................................................ 16 Figure 3 The trend in the number of papers published in the field of GSCM from 2008 till 2018 ................................................................................................................................ 20 Figure 4 Geography of contributing parties ...................................................................... 23 Figure 5 The map of the nodes in four clusters................................................................ 24 Figure 6 The map of modularity classes and the top PageRank articles .......................... 25 Figure 7 Identified research streams in GSCM ................................................................ 25 Figure 8 Construction Supply Chain ................................................................................ 28 Figure 9 The conceptual model of GSCM in construction ................................................ 32 Figure 10 Green strategy pyramid ................................................................................... 34 Figure 11 The weighing systems of green building rating systems comparison ............... 36 Figure 12 Distribution of roles in the construction process ............................................... 56 Figure 13 The summary results of regression coefficients of H1-H10 hypothesizes testing ........................................................................................................................................ 76 Figure 14 Auerkulma building, Järvenpää ....................................................................... 77 Figure 15 Villa ISOVER, Helsinki .................................................................................... 78 Figure 16 NZEB office building, Helsinki.......................................................................... 78 Figure 17 Green Project Construction and possible events occurring .............................. 82 Figure 18 The number of ISO 14001 certified enterprises from 1994 to 2016 .................. 86 Figure 19 ISO 14001 curve from the fitted results ........................................................... 87
7 LIST OF TABLES Table 1 Research question and sub questions ................................................................ 14 Table 2 Initial search results ............................................................................................ 19 Table 3 The ten journals that published the most articles on the topic of the GSCM ....... 20 Table 4 Five authors contributed the most to the topic investigation ................................ 21 Table 5 Organizations contributed to research and their locations................................... 22 Table 6 Top three the most contributing universities ....................................................... 22 Table 7 The most frequent keywords .............................................................................. 23 Table 8 “Green Strategy” practices constructs ................................................................ 34 Table 9 The weighing systems of LEED, Green Star and BREEAM ................................ 36 Table 10 “Green Design” practices constructs ................................................................. 37 Table 11 “Green Procurement” practices constructs ....................................................... 38 Table 12 “Green Transportation” practices constructs ..................................................... 39 Table 13 “Green Construction” practices constructs ........................................................ 41 Table 14 “Green Monitoring and Improvement” practices ................................................ 43 Table 15 “GSCM EP” practices constructs ...................................................................... 44 Table 16 “GSCM EcP” practices constructs .................................................................... 45 Table 17 “GSCM SP” practices constructs ...................................................................... 45 Table 18 “External drivers of GSCM” constructs.............................................................. 46 Table 19 “Internal drivers of GSCM” constructs ............................................................... 47 Table 20 “External barriers to GSCM” constructs ............................................................ 48 Table 21 “Internal barriers to GSCM” constructs ............................................................. 49 Table 22 Characteristics of respondents ........................................................................ 56 Table 23 Characteristics of companies ............................................................................ 57 Table 24 Rotated factor loadings on Green Design practices .......................................... 61 Table 25 Rotated factor loadings on Green Strategy and Green Monitoring practices ..... 62 Table 26 Rotated factor loadings on Green Purchasing and Green Transportation practices.......................................................................................................................... 63 Table 27 Rotated factor loadings on Green Construction practices ................................. 64 Table 28 Summary description for GSCM Practices ........................................................ 64 Table 29 Rotated factor loadings on GSCM Practices ..................................................... 65 Table 30 Summary description for GSCM Performance .................................................. 66 Table 31 Rotated factor loadings on GSCM Drivers ........................................................ 67 Table 32 Summary description for GSCM Drivers ........................................................... 68 Table 33 Rotated factor loadings on GSCM Barriers ....................................................... 68 Table 34 Summary description for GSCM Barriers .......................................................... 69 Table 35 Developed summary scales for GSCM performance and GSCM Drivers and Barriers ........................................................................................................................... 69 Table 36 Regression Results for Green Design effect on firm Performance .................... 70 Table 37 Regression Results for Green Strategy effect on firm Performance .................. 71 Table 38 Regression Results for Green Monitoring effect on firm Performance............... 72 Table 39 Regression Results for Green Procurement effect on firm Performance ........... 72 Table 40 Regression Results for Green Transportation effect on firm Performance ........ 73 Table 41 Regression Results for Green Construction effect on firm Performance ........... 73 Table 42 Regression Results for GSCM Drivers and Barriers effect on Green Design and Green Construction ......................................................................................................... 75 Table 43 Regression Results for GSCM Drivers and Barriers effect on Green Strategy, Green Monitoring, Green Purchasing and Green Transportation ..................................... 75 Table 44 Overview of the cases studied .......................................................................... 77 Table 45 The number of ISO 14001 certified enterprises from 1994 to 2016 ................... 86
8 LIST OF ABBREVIATIONS CSR – Corporate Social Responsibility DoI – Diffusion of Innovation EcP – Economic Performance of company EP – Environmental Performance of the company EU –European Union GSCM – Green Supply Chain Management LCA - Life Cycle Assessment MI - Multiple Imputation Method NZEB – Net-Zero Energy Building SCM – Supply Chain Management SP – Social Performance of company TBL – Triple Bottom Line RBV – Resource-Based View m – potential market size p – coefficient of innovation St – number of adopters at time t Yt – cumulative number of adopters as of time t q – coefficient of imitation
9 1 INTRODUCTION The first chapter gives insights into the empirical and theoretical background for the research presented in this thesis, identifies the potential research gap explored later with a systematic literature review, states the research objectives and questions. Subchapter 1.4 is devoted to a description of the methods applied, while the structure of this thesis is presented in the last subchapter 1.5. 1.1 Background In the following part of the thesis, the empirical background of the research will be explained with the particular focus on the case country. After that, the underlying theoretical foundation of the thesis will be introduced and explored further using a systematic literature review in chapter 2. 1.1.1 Empirical Background In the context of globalization and increased international market competition, various Finnish companies and organizations driven by different forces devote considerable efforts to assessing, preventing, and reducing the negative environmental impacts of their decisions. Various global, national, and regional governmental initiatives stimulate the industry practitioners and academic community to 'lean forward' in exploring the feasibility of actions, non-evident pollutants, and possible methods of the system performance improvement. Many countries including, for example Germany, France, the Netherlands, and Finland, have set the targets for a low-carbon and resource-efficient society and a sustainable national economy (Brunila, 2017). On the other hand, the ambitious goals have been stated in the European Union (EU) for greening the construction industry by 2030 (FTP, 2012a, FTP, 2012b). Finland has been chosen as the case country for several reasons that will be discussed next. Finnish national policy, inter alia, gives a notable importance to sustainable development carried out in line with the EU policies (Ministry of the Environment, 2018). Construction industry emitted considerably large, 1,23 million tons, amount of fossil carbon dioxide (CO2) into the air in Finland in 2015 (Tilastokeskus, 2018a). As required for the sustainably built environment in Finland, much emphasis is placed on energy efficiency and green technology development. For example, Energy efficient Mortgages Action Plan
16 1.5 Study Structure The thesis starts with an introductory chapter that states the objectives of the study and research questions. Based on the focus and theoretical direction given, a systematic literature review on the topic is conducted. Results of network analysis and article clustering, the leading works in the field of GSCM and specifically GSCM in the construction field are outlined and studied in-depth. In the next chapter, the main characteristics of construction supply chain are described. After that, the thesis continues with discussion of developed scales and measurement items of the future questionnaire. Next, the qualitative and quantitative research methods of data collection are stated, and the analysis results are interpreted with consideration on hypotheses previously mentioned. Lastly, the main findings and conclusions on the work are discussed in more details. Schematically the structure of the study is presented in figure 2. Figure 2 The structure of study
17 2 SYSTEMATIC LITERATURE REVIEW In this chapter, GSCM practices are studied from a holistic point of view and the GSCM topic development in the last ten years is examined through a systematic literature review and bibliometric analysis of articles published from 2008 to 2018. The conducted literature review intends to uncover aspects not discussed by previous researchers. This part of the work is structured as follows: the remainder of the chapter begins with an overview of the GSCM explaining how the concept has been defined and analyzed in the past. Secondly, the research methodology is outlined. Some general observations will be made before presenting an in-depth analysis conducted using the software SciMAT, BibExcel, and Gephi as bibliometric and network analysis tools. After that, the results of the literature review are summarized, some limitations are presented, and the research gap is identified. 2.1 GSCM definition The theories of SCM and environmental management as strategic organizational practices used to achieve competitive advantages have been getting greater attention during the period of the late 1980s and early 1990s (Fahimnia, Sarkis, and Davarzani, 2015). As the field evolved, anecdotal case studies developed into theoretical improvement investigations, and ultimately theory is testing empirical studies with more advanced formal modeling instruments for assessing GSCM (Sarkis, Zhu and Lai, 2011). At the beginning of the 2010s, GSCM practices have already matured in some developed countries. However, GSCM was still a relatively new trend for most of the developing countries (Luthra, Garg and Haleem, 2014). By and large, the GSCM has been recognized as a system that can contribute to sustainability performance enhancement and plays an essential role in determining the cumulative environmental impact of any company involved in supply chain activities. The most recent practical evidence was provided by the United Nations Global Compact sustainability study of major companies. This report evaluates progress regarding how organizations are taking action on the sustainable development goals and features ten interviews with business leaders. The results emphasize that 75% of companies say they are taking action on sustainable SCM (United Nations Global Compact, 2017). Currently, there is no universal definition of green and sustainable supply chains that has been accepted by academics. Partly it is caused by the difficulty of giving a definition of a supply chain and stating its boundaries. An often cited article by Ahi and Searcy (2013) identified a total of 22 definitions for GSCM and 12 definitions for sustainable SCM. In
18 general, the most commonly cited definition in the articles is one stated by Srivastava (2007) (discussed in chapter 1.1). All in all, the greening of a supply chain is considered as a potentially powerful tool to enhance a company's record on corporate social responsibility, diminish reputational risks, decrease wastes, and improve flexibility to react to new environmental regulations (Simpson, Power, and Samson, 2007). In their research Testa and Iraldo (2010) have identified the primary drivers of implementation of GSCM such as positive corporate image, increased efficiency, and innovation leadership. Regarding the underlying purposes of GSCM Hervani, Helms and Sarkis (2005) name external reporting, internal control and internal analysis. The existing literature encompasses different approaches to GSCM based on the primary features of various contexts such as process design (Chen et al., 2012), purchasing (Mirhedayatian, Azadi and Farzipoor Saen, 2014), supplier selection (Villanueva-Ponce et al., 2015; Jens K. Roehrich, Hoejmose and Overland, 2017) and development (Hoejmose, Brammer and Millington, 2012), product lifecycle (Besbes et al., 2013), environmental and operational performance (Woo et al., 2016). Research has been concentrated on assessment of the field growth, research gap identification, case studies, and particular areas of research interest. By applying content analysis and descriptive statistics, the examination of the literature across authors, topics, and areas has been developed. In this work, network analysis has been applied to clusters of research evolution within the GSCM literature and on graphically inspecting the evolution of the topic from 2008 to 2018. 2.2 Methodological aspects and initial data statistics Literature reviews identify vital scientific contributions to a field or question, while metaanalysis offers a statistical method for synthesizing findings to get overall reliability unavailable from any single study alone (Tranfield, Denyer and Smart, 2003). As has been recommended in the research by Rowley and Slack (2004) and Fahimnia, Sarkis and Davarzani (2015), a structured, five-step methodology approach for data collection and thorough evaluation is applied in this study. The aim is to identify the most important papers on the topic, define the topical fields of research and give insights for research interests in this work.
19 The preliminary search results have shown that there is a lack of publications on the specific topic of GSCM in construction industry. Therefore, in this paper, focus is placed on the GSCM in general with considerable attention to the construction industry. Based on the paper by Gurtu, Searcy and Jaber (2015) that studied the keywords used in the environmentally focused supply chain literature, the keywords "sustainable supply chains" and "green supply chains" were the most popular among authors during the period of 2007 and 2012. Accordingly, the keywords used for this data collection included “sustainable,” “supply chain,” “green,” “environmental.” The combinations of these keywords used in this study are (1) Green Supply Chain, (2) Environmental Supply Chain, (3) Sustainable Supply Chain. Regarding this stage of analysis, it has been decided to begin with the selection of the most encompassing databases. In their work, de Oliveira et al. (2017) have identified that the majority of the research articles related to the topic of SCM were included comprehensively in two databases: Web of Science and Scopus. However, because of the scope and software compatibility, a choice was made for continuing with the search procedure using only the Web of Science database. Following previous steps, the articles in which the search terms were used in the title, abstract and keywords were collected and stored. Furthermore, the language was limited to English, the year of publication included from 2008 to 2018, the search was narrowed to "journal articles" and excluded "conference papers," "books" and "chapters of books." The Web of Science categories not related to the business field such as “Law,” “Biology,” “Mechanics,” and others were excluded from the search. A total of 479 papers were found using this query. The categorization of search results for both sets of search terms is presented in table 2. The Mendeley and Zotero software were used to store and study the search results to include all the necessary article details such as title, authors׳ names, abstract, keywords, and references. Table 2 Initial search results Database Search terms Search results (no. of papers) Web of Science Green Supply Chain 450 Environmental Supply Chain 27 Ecological Supply Chain 2 Total 479
20 After elimination of duplicates, 474 unique papers remained in the dataset. Next, the data was preliminary scanned to remove articles written by anonymous authors or ones that were published in commercial magazines and do not have a robust research study behind. To investigate how the popularity levels of the topic among academics has been changing over time, the trend in the number of papers published is drawn (presented in figure 3). The figure 3 shows there is a clear geometric growth in the number of publications per year, even though the topic is still in the early stage of the investigation. The year 2018 has been included as well; although it does not have a representative power (only data from half a year available was analyzed). Figure 3 The trend in the number of papers published in the field of GSCM from 2008 till 2018 According to the statistic conducted remaining 474 papers were published in more than 130 different scientific journals. The top 10 journals have contributed to publishing 262 studies that represent about 55% of all articles published. The matrix of journals and years of publishing can be seen in table 3. Moreover, the Journal of Cleaner Production as the key contributor to the area is also the most cited by other journals. Table 3 The ten journals that published the most articles on the topic of the GSCM Name of the Journal / Year 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Total Journal of Cleaner Production 1 1 2 1 13 2 6 25 22 12 85 International Journal of Production Economics 2 2 3 8 2 5 12 5 4 3 46 International Journal of Production Research 2 1 6 3 2 7 3 1 3 28 Transportation Research Part E-Logistics and Transportation Review 2 1 6 1 6 3 1 20 Production Planning & Control 3 1 4 3 3 4 18 Supply Chain Management – an International Journal 4 1 4 1 3 1 3 17 Resources Conservation and Recycling 1 6 1 2 2 2 2 1 17 Expert Systems with Applications 1 4 2 3 1 11 Benchmarking – an International Journal 1 7 2 1 11 International Journal of Operations and Production Management 1 1 3 1 1 2 9 Total 6 4 5 15 29 26 27 38 47 40 25 262 0 50 100 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Number of published acticles
21 After the initial analysis was finalized, the process that included two parts of later data analysis was carried out. The database was structured to conduct bibliometric and network analyses. For these reasons, BibExcel and Gephi software were opted for due to their effectiveness, advanced visualization and investigation options. In the next part of the analysis, the systematic literature review map was developed, concept matrix was drawn, and all articles were sorted into the different categories. Each of the defined categories were later investigated in-depth and main findings are summarized in the latter part of the review. 2.3 Bibliometric Analysis On the following stage, the bibliometric analysis was carried out using the databases combined during the previous steps. The leading software used during this process was BibExcel due to convenience of importing data exported from Web of Science, and various tools provided to conduct an extensive and in-depth data analysis. At first, the data was systematically organized, and a number of different OUT-files were created. In principle, the primary analysis was to investigate the information on the authors' names, titles of the articles, years of publications, keywords used and regions where the authors were located. After that, references and networks were investigated separately. Because of the complexity of BibExcel, a paper by Persson, Danell, and Schneider (2009) has been used as a manual for running the process of analysis. As can be seen from the table 4, J.Sarkis dominates the list of total papers published. Out of 30 papers presented by him, most were focused on Industrial Engineering and Operations Research. Some of the papers were co-written with the second most contributing author Q.H. Zhu, who is mainly studying the GSCM practices in the Chinese originations and Asian market. Table 4 Five authors contributed the most to the topic investigation Author Number of articles published Sarkis, J. 30 Zhu, Q. H. 19 Govindan, K. 17 Jabbour, A. B. L. D. 12 Jabbour, C. J. C. 12 One more part of systematic literature analysis is the geographic distribution of knowledge and the research conducted on the topic. The distribution of the papers across the globe was systematized and is presented in table 5.
22 Table 5 Organizations contributed to research and their locations Geographical Region Number of papers Contribution, (%) Europe 136 28,69 Northern Europe 25 5,27 East Europe 8 1,69 Western Europe 77 16,24 Northeastern Europe 3 0,63 Southern Europe 23 4,85 North America 56 11,81 United States 46 9,70 Canada 10 2,11 Asia 216 45,57 South Asia 33 6,96 Southeast Asia 19 4,01 Western Asia 25 5,27 Middle East 139 29,32 Oceania 21 4,43 South America 24 5,06 Africa 3 0,63 Sub-Saharan Africa 2 0,42 Northern Africa 1 0,21 Rest of the World 18 3,80 Total 474 100,00 As can be seen from the table 5, most of the papers come from the Asian region (45 %), in particular from countries from the Middle-East. The next most contributing region is Europe totaling approximately 30 % of the 474 articles. In general, three of the most contributing research centers are the Dalian University of Technology, the University of Southern Denmark and Islamic Azad University (Table 6). Table 6 Top three the most contributing universities Name of the University Location Number of Papers Dalian University of Technology Dalian City, China 12 University of Southern Denmark Odense, Denmark 11 Islamic Azad University Tehran, Iran 9 The data on the geographic distribution was also visually analyzed using GPS mapping tools. Figure 4 shows the map of the locations of the research origins. The size of the circles is equivalent to the contribution level of each research center. As it can be seen, the United States of America, China, and Western Europe can be characterized by the higher density of contributing organizations. Looking at figure 4, it could reasonably be stated that the research on the topic of GSCM has been carried out all over the globe.
23 Figure 4 Geography of contributing parties Finally, the data was reviewed to investigate the keywords and identify the authors who most frequently use them in their articles. The information collected has been evaluated using the frequency tools, and the list of the top twenty keywords named in the papers are presented in table 7. The most repeated words are “performance,” “management” and “model.” Moreover, there some specific terms used like “environmental management,” “sustainability” and “green” that are indicators of the important focus of the articles on the topic of GSCM. Table 7 The most frequent keywords Key Word Frequency Key Word Frequency ”Performance” 163 ”Implementation” 41 ”Management” 109 ”Logistics” 41 ”Model” 96 ”Design” 39 ”Industry” 93 ”Management-practices” 35 ”Impact” 72 ”Green” 35 ”Environmental-management” 69 ”Selection” 34 ”Framework” 66 ”Integration” 33 ”Perspective” 63 ”Competitive advantage” 32 ”Sustainability” 57 ”Firm performance.” 31 ”Reverse logistics.” 47 ”Initiatives” 31 2.4 Network analysis of publications In the following part of the work, a network analysis of the data sample is studied using the visualization tools. Although many software can be used for this kind of analysis, Gephi was opted for because of the various guidelines available, and compatibility with BibExcel applied on the previous steps. Firstly, the information on the citations used in all 474 articles was edited and converted to the “.net” format and imported to Gephi. Gephi is open-source
24 software for network visualization and analysis. It allows investigating patterns and trends, highlights outliers and uses a 3D render engine to display large graphs in real-time (Gephi, 2018). The primary citation analysis showed that only 228 papers out of 474 had cited each other. The remaining 228 are connected through 14 996 different links between each other and explore the evolution of topic over time. The results of mapping the leading authors on the subject during three periods: (1) 2008-2012; (2) 2013-2015; (3) 2016-2018 are presented in appendix 1, figure1-3. After running the modularity statistics and getting the results, four different classes were identified. As it is visually represented class three includes the most significant number of articles, 47,71% of the whole data sample. The list of the most highly cited papers in each of the four clusters can be seen in Figure 5. Further, the undirected PageRank tool was applied. This tool ranks nodes “pages” according to how often a user following links will non-randomly reach the node “page.” Therefore, the diagram in Figure 5 lists the articles according to the results of their PageRank. SciMAT software was applied as well to investigate the leading authors and clusters evolution over time with results presented in appendix 1. After the analysis has been done, the most cited articles in each class have been studied to understand the main topics they were focused on and what are the potential research gaps to be addressed in this research. Figure 5 The map of the nodes in four clusters
25 Modularity classes Class 3 Class 0 Class 1 Class 2 (Zimon, 2016) (Zhu and He, 2017) (Zhu, Tian, and Sarkis, 2012) (Zhang, Zhang, and Tang, 2017) (Xie and Breen, 2012) (Zhu et al., 2008) (Zhu, Sarkis, and Lai, 2012) (Zhu, Sarkis, and Lai, 2008) (Younis, Sundarakani, and Vel, 2016) (Yu et al., 2014) (Zhu et al., 2017) (Wu et al., 2015) (Vijayvargy, Thakkar and Agarwal, 2017) (Sellitto, 2018) (Cheng and Sheu, 2012) (Cheng, 2011) (Cheng, Yeh and Tu, 2008) GSCM practices Effects of GSCM practices on company performance GSCM in emerging economies Trust and knowledge sharing in GSCM Figure 6 The map of modularity classes and the top PageRank articles Systematic literature review analysis helped to identify the most influential articles in the broad and highly researched topic of GSCM. All four classes will be discussed and compared in the rest of this chapter with the greater emphasis placed on the first two classes to develop a holistic understanding of the research topic (see figure 7). Figure 7 Identified research streams in GSCM Even though many studies have reported the importance of GSCM and eco logistics in creating a strategy for the company (e.g. Zimon, (2016); Zhu, Tian and Sarkis, (2012); Xie and Breen, (2012)), a generic framework for embedding the environmental principles in managing supply chains has not yet been developed. Majority of authors see GSCM mostly through the context of standardized quality management systems, such as ISO 9001 and ISO 1400 (Zimon, (2016); Xie and Breen, (2012)). On the other hand, the papers from the second cluster are discussing the environmental sustainability from the perspective of trust, inter-organizational relationships and knowledge sharing (Cheng and Sheu, (2012); Cheng, (2011); Cheng, Yeh, and Tu, (2008)).
32 4 DEVELOPING A MEASUREMENT INSTRUMENT FOR GSCM The comprehensive review of the literature on GSCM, covering current trends in the field, shows that existing frameworks that define the most common GSCM practices and their impact on the economic, social and environmental performance of the company are not directly applicable for analysis of GSCM in the building sector. In the previous chapter, the stages, flows, and members of the construction supply chain have been identified. This part of the thesis discusses (1) conceptual model of GSCM in construction; (2) GSCM practices that could be implemented on each stage of construction supply chain; (3) barriers that prevent implementation on GSCM practices; (4) drivers that initiate implementation of GSCM practices; (5) impact of GSCM practices on company performance. 4.1 Conceptual model of GSCM in construction Many research studies in the field of SCM (Youn et al., 2011; Zhu, Sarkis and Lai, 2012a; Mitra and Datta, 2014; Das, 2017; Tortorella, Miorando and Marodin, 2017) are following the similar conceptual approach of “SCM practices and their impact on company performance.” In this thesis the same framework is implemented based on existing research in the field and covers (1) the primary constructs of GSCM practices encompassing economic, environmental, and social dimensions (TBL), (2) constructs of GSCM performance measures and (3) constructs of drivers and barriers that effect GSCM implementation in the company. The conceptual model of this thesis depicting the impact of GSCM on the sustainable performance of the firm is presented in figure 9 and will be further discussed in the following part of the chapter. Figure 9 The conceptual model of GSCM in construction
33 4.2 GSCM Practices Green supply chain practices are activities performed in the companies to lessen the adverse environmental, social and economic impact related to their operations. The main GSCM practices in construction industry identified based on the existing literature review and included in the conceptual model of this thesis, are: • Green Strategy; • Green Design; • Green Procurement; • Green Construction; • Green Transportation; • Green Monitoring. At the same time, it should be noted that the relevance of those green practices varies for each construction chain member. This matter will be addressed during discussion of proposed sustainable practices. 4.2.1 Green Strategy Building companies and other members of construction supply chain are faced with increasing pressure to reduce the negative impacts of their activities and incorporate environmentally sustainable strategies in their businesses (Labuschagne and Brent, 2005; Akadiri and Fadiya, 2013). A green strategy essentially helps a firm to make grounded decisions that have a positive impact not only on the business but on the environment. The principles that determine the basis of a green strategy should direct the business to make decisions based on solid business reasoning and make good business sense (Olson, 2008). The best practices that support a green strategy establishment in the company are (1) lead by example (leadership support and coordination); (2) training provision (refreshing training and new hire training); (3) appropriate tools installation (i.e., video conferencing, recycling receptacles); (4) performance measuring and reporting; (5) shared responsibility (responsibility at all levels of the company); (5) communication and change management plan in place (Olson, 2008). On the other hand, taking into consideration the value management approach, Abidin and Pasquire (2005) have identified the sustainability principles as showing concern for people by ensuring they live in a healthy, safe environment; taking long-term perspective and safeguarding the interests of future
34 generations, combating poverty and social exclusion; respecting environmental limits. The strategy pyramid influenced through a green strategy is presented in figure 10. Figure 10 Green strategy pyramid (Olson, 2008) Although it is crucial to promote the sustainable development mission within the company, the decision makers will be most likely to actively engage in developing these green practices only if they perceive that this cognition can support them in achieving competitiveness in the market (Zhang, Shen and Wu, 2011a). In this context, it is also important to indicate that the effective communication on the environmental issues between all layers of subcontractors can ensure that green strategy is implemented not only within the company boundaries but across the whole supply chain (Shen and Tam, 2002; Adetunji, Price and Fleming, 2008). The “Green Strategy” was measured using five items adapted from different literature sources (see table 8). Table 8 “Green Strategy” practices constructs Measurement Items Key references GS1 Stating clearly the environmental goals in the business strategy (Edvardsson, 2007) GS2 Evaluating the benefits and costs of the project to society and environment (Abidin and Pasquire, 2005) GS3 Effective communication on the environmental issue between all layers of subcontractors (Shen and Tam, 2002); (Adetunji, Price and Fleming, 2008) GS4 Inclusion of environmental management in tendering requirements GS5 Top-management commitment to sustainability (Akadiri and Fadiya, 2013) The developed and implemented green strategy inherently leads to ‘greening’ of decisions on SCM that consequently have a positive impact on the environment and society. The clear vision and understanding of the mission can not only contribute to the positive financial performance of the firm but to develop a strong sense of unity, mutual responsibility, and strategic vision among the workers. Hence, the following hypothesis was posited: H1: Green Strategy developed and implemented has a positive impact on a firm’s sustainability performance.
35 4.2.2 Green Design The energy-efficient buildings are designed with an aim toward reducing heating, cooling and lighting energy consumption and lifecycle matters: fabrication of materials, construction, maintenance, and waste treatment (Peuportier, Thiers and Guiavarch, 2013). The green design practices are the most relevant for the pre-construction stage in which architects and consultants are the primary stakeholders. Nevertheless, often the customer/end user has the most power in the future design decision-making process. The green design of construction project that takes into consideration the energy consumption, water consumption and other aspects of future operating costs of the house is vital for LCA of the project. The principles of green architecture are implemented in the new type of environmentally friendly houses – an Eco-house - which can be defined as a house that has a low impact on the environment, consumes less energy and is constructed using the eco-friendly material and technology. Although the green building design topic and Ecohouse concept are gaining much attention in the recent years, they are still considered niche markets. The reason for niche market status is that the designs of eco-houses are hard to standardize as they can require the installation of a variety of unique features and technologies (Maruejols, Ryan and Young, 2013). A different perspective can be adopted to investigate how sustainable building design is – from the viewpoint of green building rating systems. Currently, various existing green building rating systems that aim to identify the environmental performance (EP) of the building design include (Retzlaff, 2008; He et al., 2018): LEED (United States and Canada), BRE Environmental Assessment Method (United Kingdom), GS (Australia) ASGB (China), Comprehensive Assessment System for Built Environment Efficiency (Japan), Green Mark Scheme (Singapore), DGNB (Germany), etc. The central three green building rating systems were selected for later comparison to give more details on what are the categories that were investigated to evaluate the sustainability of the building design are LEED, Green Star, and BREEAM. The overview of the classes is presented in Table 9. Moreover, figure 11 shows the comparison of the different weighting categories of the selected rating systems. As can be seen, the most significant focus area is the sustainable energy category followed by indoor environmental quality, materials and project location. These categories will be included as constructs of the later developed and applied measurement system.
36 Table 9 The weighing systems of LEED, Green Star and BREEAM (Abd El-Hameed, Mansour, and Faggal, 2017; BREEAM, 2016; He et al., 2018b) LEED V4 (the United States and Canada) Category Weighting, % Green Star (New Zealand) Category Weighting, % BREEAM (United Kingdom) Category Weighting, % Location and transportation 17 Management 14 Management 12 Sustainable sites 10 Indoor environment quality 17 Energy 43 Water efficiency 11 Energy 22 Water 11 Energy and atmosphere 33 Transport 10 Materials 8 Material and resources 13 Water 12 Pollution 6 Indoor Environmental Quality 16 Materials 14 Waste 3 Land use and ecology 6 Health and Wellbeing 17 Emissions 5 Figure 11 The weighing systems of green building rating systems comparison “Green Design” was measured using eleven items adapted from different literature sources (see table 10). Important to highlight that according to research organized by the World Green Building Council (WGBC, 2010), it is possible to attach a financial value to the cost and benefits of green buildings due to the number of reasons. Firstly, the design and construction costs of green building have decreased significantly in the recent years. Moreover, the legislation on sustainable construction became stricter. Thirdly, the supply chain for durable material and equipment matured. Fourthly, the level of knowledge and awareness about environmental issues among investors, shareholders, and final customers increased influencing the market. Fifthly, the results of the analysis reveal that workers can become more creative and productive, and tenants can become healthier if they inhabit 0 10 20 30 40 50 Management Energy Water Indoor environment quality Location and transportation Emissions Materials LE ED V4 (the United States and Canada) Green Star (New Zealand) BREE AM (United Kingdom)
37 green buildings. Lastly, the sustainability risks can affect the rental income and the expected value of real estate assets severely. Thus, green building design has also a positive impact on risk mitigation. Table 10 “Green Design” practices constructs Measurement Items Key references GD1 Environmental impact assessment of design (Zhang, Shen and Wu, 2011a) GD2 Consideration for flora and fauna populations (Mayrand and Clergeau, 2018) GD3 Provision for natural lighting (Zhang, Shen and Wu, 2011a); (Tam et al., 2006); (Balasubramanian and Shukla, 2017) GD4 Provision for wastewater recycling GD5 Consideration for energy efficient (EE) lighting system GD6 Consideration for EE heating system GD7 Consideration for EE automation systems GD8 Consideration for EE ventilation and air conditioning systems GD9 Consideration of materials with high recycled content and low embodied energy GD10 Consideration to reduce the use of hazardous materials GD11 Consideration methods and materials for noise control/noise reduction (Tam et al., 2006) Various green architecture initiatives implemented in the design of the future buildings such as energy efficient lighting system, energy efficient heating system, energy efficient automation systems and others are aimed at negative footprint reduction. Besides, the green design might be considered as more attractive by customers. Hence it might lead to higher demand in the construction market and consequently to higher profitability. On the other hand, the considered waste management systems can contribute to the material savings and less waste generated. Moreover, the modern Eco-house architectural design is usually considered as more modern, smart and stylish improving the company’s image because of the enhanced aesthetics of the final building and surrounding area. Hence the following hypothesis was proposed: H2: Green building design has a positive impact on a firm’s sustainability performance. 4.2.3 Green Procurement Green procurement has become a sizeable cross-disciplinary area of the research that includes various topics such as eco-labeling (Bratt et al., 2012), supplier selection (Igarashi, De Boer and Michelsen, 2015; J.K. Roehrich, Hoejmose and Overland, 2017), green public procurement (Igarashi, De Boer and Michelsen, 2015; Rainville, 2018), knowledge sharing (Kai, Wei and Meng-Lin, 2014), LCA (Butt, Toller and Birgisson, 2015), etc.
38 The green, sustainable material, service or product have a minimal negative overall impact on the environment if compared with similar standard product or service (Bohari et al., 2017). The negative effect related to purchasing is often associated with carbon dioxide emission generate during product usage, high water or energy consumption during the manufacturing process, negative impact on the health and other aspects of the human environment. Another important aspect of the green procurement is in boosting of demand for green, sustainable products, services, and materials manufacturing, innovation, and development. Green procurement adoption increases knowledge about the sustainable practices and processes spreading on the market. In the construction industry, green procurement practices consider the whole lifecycle of the product starting from the raw material produced, its transportation to the site, packaging used, warehousing and later disposal (Wong, Chan and Wadu, 2016). Furthermore, the green procurement is relevant to the pre-construction, tendering stage as well as to construction stage. Many researchers consider the close collaboration with suppliers, sharing the knowledge and requirement to obtain necessary environmental certification as an essential part not only green procurement but green strategy. The “Green Procurement” practices are measured using four items adapted from different literature sources (see table 11). Table 11 “Green Procurement” practices constructs Measurement Items Key references GP1 Environmental criteria are included in material purchase decisions (Adetunji, Price and Fleming, 2008); (Ofori, 2000) GP2 Information sharing with suppliers regarding the technological developments relating to their operations (Ofori, 2000) GP3 Require suppliers to disclose information about their environmental practices GP4 Require suppliers to obtain certification of their environmental management systems The material costs share the most significant part of the overall project construction expenses. On the other hand, the materials selected must meet not only price but the quality criteria as well. The choice of the future supplier, building long-term win-win relationships and working closely on effective partnerships can have an extraordinary impact not only on the project costs reduction and improvement of the firm's image, but may also contribute to enhanced environmental impact of the whole construction supply chain. These led to the proposition of the following hypothesis: H3: Green procurement practices have a positive impact on a firm’s sustainability performance.
39 4.2.4 Green Transportation The vast majority of researchers associate the negative side of transportation activities of construction primary with GHG emissions (Wong et al., 2014; Hong et al., 2015; Zhang and Wang, 2016; Balasubramanian and Shukla, 2017b). GHG emissions are generated during (1) material transportation, (2) equipment transportation and (3) staff transportation (Hong et al., 2015), and among them, the building material transportation has the most significant impact on nature. Building materials can be transported by rail, road, and sea (Zhang and Wang, 2016). The emissions amount depends on the transportation method, the average transportation distance, and the weight of the building materials. The same study by Zhang and Wang, (2016) revealed that CO2 emission from transportation via road shares the most significant part of the CO2 emissions in building materials’ transportation stage. The reason behind popularity of this mean of transportation is the increasing demand for a method with the highest efficiency, mobility, and flexibility that road transport offers. In the paper by Evangelista, Santoro and Thomas (2018), the authors were discussing the energy efficiency in road freight transport based on a comprehensive literature review and revealed the importance of implementation of the number of energy efficiency actions such as eco-driving, vehicle efficiency, collaborative actions with another supply chain members, etc. According to the current research, the environmental sustainability in transportation can be achieved in different ways. Firstly, fuel-efficient vehicles can be utilized to reduce the negative environmental footprint. On the other hand, considering the emissions generated while transporting employees can be cut if video conferencing will be used rather than face- to-face meetings. One more reasonable solution would be public or shared means of transportation as alternatives to personal transport. Lastly, the accommodations of staff can be organized near project sites to decrease staff transportation impacts (BRE, 2003). “Green Transportation” was measured using four items adapted from different literature sources (see table 12). Table 12 “Green Transportation” practices constructs Measurement Items Key references GT1 Provision of accommodation to employees near project sites (Balasubramanian and Shukla, (2017); (Zhang and Wang, 2016); (BRE, 2003) GT2 Employees are encouraged to use shared transport and public transport GT3 Materials are transported in full truckload quantities GT4 Materials are transported in fuel efficient vehicles
40 Both large and small construction projects include the logistics and transportation stages usually related to the process of materials and equipment delivery to the site. In the European market, much attention is placed on the reduction of the carbon emissions to the atmosphere produced from transportation processes. Considered allocation, means of transportation and fuel selection can reduce the costs of the building project, while the influence on the environment is particularly notable. Ultimately, there might be a relationship between a firm's image enhancement and green transportation. Hence, the following hypothesis was proposed: H4: Green transportation practices have a positive impact on a firm’s sustainability performance. 4.2.5 Green Construction During the construction phase of the buildings' development, most of the resources used are non-renewable and have a negative impact on the nature. The team efforts on-site determine how efficient the environmental management is. That includes engagement and support from the developer, main contractor and other parties involved (Tam, Tam, and Tsui, 2004). Ensuring the water quality control on the construction site is critical. According to CIRIA report (1999), anything that can potentially pollute water, for instance, muddy water, has to be blocked from water drainage surface. Therefore, the water recycling system installation, as well as monitoring of water usage and wastewater collection during the construction process, are recommended. To ensure the sustainability of the construction process managers are required to consider the workers' health and safety, the health of occupants, and community disturbance. Moreover, consideration of the methods and materials for noise control and reduction during construction of the building is critical along with the using of prefabricated components that contributes to reduction of amount of on-site construction activities and construction duration. Consequently, the nuisance factors such as light pollution, dust and other pollutants negatively affecting the wellness of the nearby community must be carefully considered (Chen, Okudan, and Riley, 2010; Zhang, Shen and Wu, 2011). According to the study by Chen, Okudan, and Riley (2010) the effective waste conversion, reduction of the material consumption, and recyclability possibility contributes effectively to the reduction in energy consumption and negative environmental footprint. The most
41 considerable part of construction processes is carried out at the manufacturing plant, where strict control of quantities of constituent materials is possible, and waste materials are easer to be reused. As a result, the amount of waste can be significantly eliminated. Tam et al. (2007) acknowledge that prefabrication might contribute to the reduction of waste arising from plastering by 100%, timber formwork by 74-87%, and concrete works by 51%–60%. Construction supply chain members are held accountable to enhance their EP by setting and accomplishing their environmental goals. Better EP during the construction phase of the project can also be achieved by employing automated technologies at the project level. Consequently, construction automation and robotics should be used to reduce the negative environmental impacts and be considered as a construct of green practices implemented by managers (Qi et al., 2010; Pan et al., 2018). “Green Construction” was measured using nine items adapted from different literature sources (see table 13). Table 13 “Green Construction” practices constructs Measurement Items Key references GC1 Provision for waste water recycling at project/manufacturing site (Zhang, Shen and Wu, 2011a) (Balasubramanian and Shukla, (2017) GC2 Use of prefabricated components in projects GC3 Implementation of comprehensive waste abatement plan for project/manufacturing sites (Tam, Tam and Tsui, 2004); (Zhang, Shen and Wu, 2011a) GC4 Implementation of comprehensive material saving plan (Tam, Tam and Tsui, 2004) GC5 Implementation of comprehensive land saving plan (Liu et al., 2006); (Shen et al., 2005) GC6 Automation is used for onsite construction/manufacturing activities (Chen, Okudan and Riley, 2010); (Pan et al., 2018) GC7 Fuel efficient equipment/machinery is used at project/manufacturing site (Shi et al., 2013) GC8 Investment in green equipment and technology (Tam, Tam and Tsui, 2004) GC9 Consideration methods and materials for noise control/ noise reduction during construction (Ying Liu, Pheng Low and He, 2012) The longest part of the construction process is the actual on-site works that require much attention and influential decision-making processes. Much can be done by the contractor to improve the sustainability of the project. The wastewater recycling provision, as well as implementation of the comprehensive material saving plan and land saving plan, can have a positive impact on the sustainability performance of a company on construction site. The actions such as noise control during construction, advanced green technologies used and other might lessen the community disturbance and the associated costs and duration of the project. Therefore, the following hypothesis was proposed: H5: Green site construction practices have a positive impact on a firm’s sustainability performance.
48 drivers can become barriers (Walker, Di Sisto, and McBain, 2008). For instance, in a situation where regulations can promote or block GSCM initiatives (Porter and Linde, 1995). 4.5.1 External Barriers The external barriers can be defined as the obstacles that cannot be controlled by the organization. Firstly, green practices implementation requires human resources with the professional experience in the field, and as found in the previous study by Ofori (2000), this barrier might be the most important for the construction industry. Secondly, another common barrier for embedding sustainability in managing construction supply chain is the lack of suppliers' and other partners’ commitment. Moreover, often firms are opposed to green knowledge exchange because of the risks of opportunistic behavior and revealing weaknesses that might lead to a loss of competitive advantage on the market. Nevertheless, nowadays there is a definite trend towards more cooperating partnership that can lead to win-win results and higher efficiency in the supply chain. The last two indicators adopted from the literature and used in this study are related to the customer's attitude toward environmental sustainability. As previously mentioned the development of green practices, technologies and innovation often require higher financial investments. If the market does not recognize this initiative, meaning that customers are not willing to pay for additional construction costs, it can become a critical barrier for a GSCM practices implementation. The external barriers were measured using five items and are listed in table 20. Table 20 “External barriers to GSCM” constructs Measurement Items Key references EB1 Shortage of green professionals (Shi et al., 2013); (Zhu et al., 2005); (Ofori, 2000) EB2 Lack of partners’ commitment EB3 Inflexible and tight stakeholders’ deadlines EB4 Lack of buyer awareness EB5 Pressure for lower prices 4.5.2 Internal Barriers The internal barriers are the limits that arise within the firm's boundaries and are under company’s control. Similar to the internal barriers, lack of knowledge in sustainability can be an obstacle that stops the company from initiation of sustainable action. Moreover, if
49 managers are perceiving commitment to sustainability as a trade-off to business profitability the changes in their attitudes should be regarded as the first and most important step to reaching the environmental sustainability of firm’s operations. The change in mindsets can be achieved though specific training as recommended by Bowen et al. (2001) that will help to overcome the issue of ‘environmental illiteracy.’ The internal barriers were measured using three items and are indicated in table 21. Table 21 “Internal barriers to GSCM” constructs Measurement Items Key references IN1 Lack of sustainability knowledge (Shi et al., 2013); (Zhu et al., 2005); (Ofori, 2000) IN2 High costs of implementation IN3 Lack of training and commitment To conclude on this discussion, the supply chain is not operating in a completely closed environment. The influence of the various stakeholders such as NGOs, government, competitors, suppliers can be positive or negative and rather stop or encourage GSCM practices implementation. Because the drivers and barriers that construction firms face in Finnish market have not been investigated in-depth before, this gap will be addressed while testing the following hypotheses: H7: External barriers have a negative impact on GSCM practices. H8: Internal barriers have a negative impact on GSCM practices. H9: External drivers have a positive impact on GSCM practices. H10: Internal drivers have a positive impact on GSCM practices.
50 5 RESEARCH METHODOLOGY In the previous chapters, the study commenced with a comprehensive literature review to gather a necessary knowledge and develop a set of indicators to access the influence of green construction SCM practices in the firm’s performance. This research aims to identify the importance of different GSCM constructs in achieving the company’s sustainability. This study utilized a two-step sequential method of (1) a structured questionnaire survey and (2) case study analysis. The green practices in construction project management are well studied in Asian markets, for example, Zhu, Sarkis, and Lai (2012b); Moon Gyu Kim et al. (2016); Balasubramanian and Shukla (2017b); Mathiyazhagan et al. (2018). To explore the effect of GSCM in the context of Finnish construction sector the primary data were collected using the questionnaire. Important to highlight, that measurement scales used in this research are predesigned, meaning that they were developed and tested in previous research. Nevertheless, the scales were adjusted to the purposes of the current study. The independent variables of the model analyzed are GSCM practices which include (1) Green Strategy; (2) Green Design; (3) Green Procurement; (3) Green Construction; (4) Green Transportation; (5) Green Monitoring. The main dependent variables in the model are (1) economic (2) environmental and (3) social performance of the company. The questionnaire used for research data collection can be seen in Appendix 2. Furthermore, to develop a holistic view on the matter the case studies were conducted to validate the findings from the quantitative questionnaire and discover strategies applied by Finnish companies to improve the sustainability of their performance in construction process. All interviewees that took part in research had broad knowledge and experience in the current green practices in construction field. 5.1 Questionnaire survey method The questionnaire survey method has been applied in this study to investigate the importance of implementing the GSCM practices in managing construction supply chains in Finland. As claimed by Saunders, Lewis and Thornhill (2016) the survey questionnaire is more common, objective, and quantifiable method for testing hypotheses. The previous literature review has laid a strong foundation for a future measurement instrument design.
51 The survey has been constructed based on the measurement instrument illustrated in-depth in chapter 4. Besides, as some of the items were not relevant for some of the construction chain members (i.e., green design elements are more relevant for architecture enterprise than for raw materials supplier), the combination of GSCM practices were adjusted for each of the stakeholders and non-relevant items were removed for: (1) developer; (2) architect/consultant; (3) contractor; (4) supplier. The form of the questionnaire was designed in a way similar to the survey used in the studies conducted by Zhu et al. (2007) and Balasubramanian and Shukla (2017a). The survey consists of five main parts. The first part explains the objectives of the research and their importance. In part two, the respondents are asked about the company's details (such as size, year of establishment) and some personal information (such as position in the company and number of years of relevant experience). The third part deals with questions related to GSCM practices and invites respondents to describe actions adopted using a five-point Likert scale ranging from 1 (‘Not considering it’) to 5 (‘Implementing successfully’). Next part consists of statements evaluating the sustainable performance of the firm and asks respondents to describe the performance of the organization using a five-point Likert scale ranging from 1 (‘Strongly disagree’) to 5 (‘Strongly agree’). The last two parts are focused on drivers and barriers of GSCM implementation in the company and request respondents to assess the importance of them to the firm using a five-point Likert scale ranging from 1 (‘Very low’) to 5 (‘Very high’). Prior to the main survey project embarking, pilot testing was conducted to examine the comprehensiveness of the questionnaire, the significance of the elements and their relevance to the stakeholders. The survey questionnaire was translated from the English version to Finnish language with the assistance of a native Finnish speaker and brought back to English version by another native speaker to secure a clear understanding of the elements and to verify the meaning of the terms was retained. The pilot survey has been delivered to a number of experts: industry professional, professor in the field and graduate researcher, that had the necessary experience and knowledge in the field of construction and SCM asking for their feedback on the structure of the questions, use of technical construction language and terms, and whether the elements are proper for evaluation purposes or some of them should be eliminated or edited. Two experts stated their concerns about using the Finnish language in the survey explaining it with the difficulty to understand some technical terms after translation and the overall preponderance of the English language among Finnish construction practitioners. Hence, it has been decided to use the
52 English version of the survey for further data collection. The questionnaire was finalized based on all relevant comments received during the pilot testing stage. The survey in this study has been conducted among Finnish companies operating in the construction industry and, in particular, among employees responsible for project management or sustainable development representatives of these companies. The survey was carried out from June to August 2018. The Amadeus database has been used to identify the list of 318 enterprises potentially suitable for this study. Initially, the list of all companies’ contractors, architectures, consultants and suppliers of raw materials and equipment have been obtained. After that, the list was cleaned - every companies' description and available information were investigated to eliminate non-relevant organizations. Next, an email explaining the purpose of the study was sent to the managers of these 318 companies. To increase the response, rate a number of methods advised by the EU national statistical entities related to the survey project management were applied. In the last question, the option of communicating the survey's results to the respondents completed the questionnaire was indicated. The three emails with reminders of different level of importance and different messages were sending to the potential respondents weekly. Finally, 51 surveys were completed with a response rate of 16 percent. However, due to time constraints only first 48 responses were used in this study. This sample is considered representative and reasonable as many empirical research studies conducted on the similar topic have accepted similar survey sample size. For example, Zhang, Shen and Wu (2011) in their research investigated the green strategy in housing development and were analyzing the total of 45 responses. Deserving to be mentioned, is that a small by population country such as Finland (Tilastokeskus, 2018b), although showing the high level of standards and competitiveness in many sectors of the economy, does not have as many construction enterprises operating in the market, as, e.g. the Chinese or Russian markets do. This questionnaire survey was focused on various members of the construction supply chain and respondents with different managerial levels to enhance the representativeness of the study. Of the 48 responses, six responses were removed because of their incompleteness, leaving 42 valid responses for further data analysis. The survey questionnaire includes 36 questions divided into five groups. The last question in the first section is related to the role of the company in the construction process and leads to the “if” condition for four separate branches with different sets of questions relevant for
53 each of the role types. The next section includes the items related to the GSCM practices incorporated in the organization. The third, fourth and fifth sections are identical for all companies and include questions related to the sustainable performance of the enterprise, drivers, and barriers to green practices’ implementation respectively. Analysis of the respondents’ background information shows that reliability and credibility of the study results are high, as most of respondents hold managerial position in the company, e.g., top manager (30,9%), middle manager (54,7%). Furthermore, most (64,3%) of the respondents have more than ten years of professional experience in the construction industry. 5.2 Case study method Because this study can be considered as an exploratory in some aspects of its nature, a qualitative research design was chosen to be carried out among green construction cases in Finland (Patton, 1990). To understand what kind of benefits commitment to the GSCM in construction can have to the company, four case studies with three Finnish construction companies and one software developer firm were conducted to deepen understanding of the topic and corroborate survey results findings. The principal data collection method in this study was interviewing. The list of the sample companies to be contacted for an interview was obtained from the record of the green building examples quoted by Green Building Council Finland (GBC Finland) (Green Building Council Finland, 2014). The potential interviewees have been firstly contacted via email that described the research and the importance of company participation. Round of interviews was enacted in August 2018. The interviews were conducted via Skype or phone and structured as a set of open question and discussion topics. The semi-structured interview format enabled participants to raise issues and questions that were not preparatory queried. Only one key informant per case was interviewed. Besides, internal documentation, including technical reports, construction plans, project diaries, and other material was used as a secondary data source to extend and confirm the interview data. The discussion themes of the first three interviews reflect the conceptual framework of GSCM in construction (figure 9) used to develop a measurement instrument and include:
54 (1) The green practices/elements/technologies/systems used in construction project (see ‘GSCM practices’ in figure 9); (2) The influence of the GSCM practices undertaken in the project on social, economic and EP of the company (see ‘GSCM performance’ in figure 9); (3) The barriers and drivers the company faced in adopting GSCM practices (see ‘GSCM Drivers and Barriers’ in figure 9). One interview has been carried out with the representative of the software developer company that offers GSCM solutions to Finnish construction sector. The similar topics have been discussed with interviwee but with more focuse on the fields the company operates in. If the interviewee accepted, the dicussion had been recorded. Otherwise, the notes have been taken during the conversation. A comprehensive data collection process in this research was aimed to be kept transperent and sytematic. Therefore, while with some limitations related to the qualitative research bias (addressed in the next chapter), the data sample gathered can be cosidered representative of the population. As the final dataset has been formed from two types of data: qualitative and quantitative, two separated analysis were performed, and their results and findings are discussed in the next chapter.
55 6 ANALYSIS AND RESULTS In the following chapter, the data sample collected will be analyzed with the STATA SE15 (Data Analysis and Statistical Software), NVivo 12 (Qualitative and Mixed Method Software) and MATLAB (Mathematical Computing Software). In each analysis, firstly, the basic information about the responses and cases is described. Next, the reliability and validity of the multi-item scales are assessed in the quantitative and quality of research design is examined in qualitative analysis parts. Furthermore, at the end of each analysis the finding results are summarized and illustrated. Lastly, as the study is conducted for the case country, the additional analysis on the Finnish market and diffusion of innovation practices among Finnish companies is presented in the last part of this chapter. 6.1 Quantitative Analysis The first part of the analysis discusses the results of examining data collected through the survey. First, the descriptive statistics of the dataset is provided. After that, the missing data mechanism is discusses, and the imputation method explained. Next, based on the factor analysis conducted the reliability measurement instrument is evaluated. Finally, the regression analysis aimed to answer the research question is performed and the results of hypothesizes tested are evaluated. 6.1.1 Descriptive statistics This part of the chapter is focused on the basic features of the collected information: describes the characteristics of respondents and company related data, the frequency, variation, dispersion of GSCM indicators. Characteristics of respondents and company related information Table 22 presents the profile of the respondents. Most of the respondents are between 35 and 45 years old (57,1%), while none of the respondents is under 25 years old. Moreover, most of the respondents have more than ten years of professional experience in the construction industry (64,3%). In addition, the majority of respondents hold either middle management (54,8%) or top management (31,0) position.
56 Table 22 Characteristics of respondents Characteristics of respondents (sample size, N=42) Frequency % Respondents’ age Under 25 0 0,0 25-35 3 7,1 35-45 24 57,1 45-55 11 26,2 Over 55 4 9,5 Number of years of professional work experience in the construction industry 0-2 3 7,1 3-5 3 7,1 6-10 9 21,4 Over 10 27 64,3 Respondents’ positions in the company Top management (i.e. President, CEO, Vice President) 13 31,0 Middle Management (i.e. Director, Senior Manager, Manager) 23 54,8 Non-managerial (i.e. accountant, assistant, specialist, etc.) 6 14,3 Table 23 presents information on the distribution of the companies regarding the age, size and the central role in the construction process. Most of the companies were established between 1990 and 2010 (50%). The majority of the firms in the dataset are small and medium-sized enterprises while the least represented category is companies with more than 5000 employees (2,4%). Various members of the construction process took part in the study with the “Contractor” and “Supplier” representing the largest group, 52,4%, and 53,8% respectively (Figure 12). Figure 12 Distribution of roles in the construction process (N=42) 14% 10% 52% 24% Developer Architect/Consultant Contractor Supplier
57 Table 23 Characteristics of the companies Characteristics of respondents (sample size, N=42) Frequency % Year of establishment Before 1950 4 9,5 1950-1970 8 19,0 1970-1990 6 14,3 1990-2010 21 50,0 2010 and earlier 3 7,1 Number of employees Less than 50 12 28,6 51-100 18 42,9 101-300 5 1,9 301-500 3 7,1 501-5000 3 7,1 More than 5000 1 2,4 Main role in construction supply chain Developer 6 14,3 Architect / Consultant 4 9,5 Contractor 22 52,4 Supplier 10 23,8 Descriptive statistics of GSCM practices indicators Based on the survey results the relative weight of each of the green practice variables was determined by the mean values of responses and presented in appendix 3, table 1. The results are shown graphically in figure 1 in appendix 3. It can be seen from the table 1 that most of the respondents indicated they take into consideration Green Strategy practices in their companies. However, the responses of the representatives from the Contractor companies are less focused on this category than others. The least popular among all respondents is the item GS3 ‘Effective communication on the environmental issue between all layers of subcontractors.’ The reason behind might be in the practical implication of the communication channels. The top management commitment is practiced or considered in most of the companies-respondents. Regarding Green Design, the means of nearly all items are higher than four meaning that they were selected as implemented in practice by most of the companies. It is important to highlight that in the case of Architect/Consultant ten out of eleven items were opted as “implemented successfully” indicating the very high level of sustainable design practice in the architectural industry. However, it might be reasonable to assume that the elements
64 Table 27 Rotated factor loadings on Green Construction practices Variable Label Rotated loadings Uniqueness Factor 1 Factor 2 GC1* Provision for waste water recycling at project/manufacturing site GC2* Use of prefabricated components in projects GC3* Implementation of comprehensive waste abatement plan for project/manufacturing sites -0,443 0,802 GC4 Implementation of comprehensive material saving plan 0,966 0,065 GC5 Implementation of comprehensive land saving plan 0,804 0,353 GC6* Automation is used for onsite construction/manufacturing activities 0,481 0,768 GC7 Fuel efficient equipment/machinery is used at project/manufacturing site 0,500 0,750 GC8 Investment in green equipment and technology 1,000 0,000 GC9* Consideration methods and materials for noise control/ noise reduction during construction Eigenvalue 1,777 1,481 MSA 0,598 0,462 Cronbach alpha 0,868 0,709 * items GC1-3, GC6 and GC9 were dropped to improve internal consistency of the scale Table 28 Summary description for GSCM Practices Summarized scale Number of variables Min Max Mean Std. Dev. EE_Syst 4 1,00 5,00 3,25 1,357 Mater 3 1,00 5,00 3,18 1,114 Prov_Nat_Res 2 2,00 5,00 4,25 1,006 Gr_Strat 5 1,00 5,00 3,01 1,242 Monitor 3 1,00 5,00 2,73 1,303 Procur 4 1,00 4,50 2,87 0,892 Transp 4 1,00 4,75 2,71 1,124 Sav_Plan 2 1,00 4,00 2,37 1,031 Gr_Techn 2 1,00 5,00 2,75 1,350 6.1.3 Factor analysis and Reliability of Measurement scales for GSCM performance, GSCM drivers and barriers Previously, the statements were grouped into GSCM performance, GSCM drivers and barriers based on the literature review and experts’ opinion. However, the way the statements were viewed by respondents and grouped during measurement instrument developmet may be different. The factor analysis can be used to determine the factorial validity of the GSCM measures assessed by various indices (Hardy and Bryman, 2009, pp. 25-26). Moreover, with factor analysis summated scales can be computed and used in the later analysis (Hair et al., 1998, p.90). The factor analysis was conducted separately for (1) GSCM performance, (3) GSCM drivers and (4) GSCM barriers (see chapter 4). All variables are continuous and interdependent in
65 each category. Results of Shapiro-Wilk test, designed for datasets with 4 ≤ N ≤ 2000 observations (STATA, 2018), however, indicate that the null hypothesis that variables EM1- 4, EM7, EB5 and IN2 are normally distributed can be rejected, but the hypothesis that all remaining variables are normally distributed cannot be rejected (see Appendix 6, table 1 and 2). It places some limitations to the interpretation of the test results. GSCM performance – Factor Analysis All 15 variable used to measure the GSCM performance of the company were tested in Factor Analysis. The recommended ratio of responses per variable is 10 (Joseph F Hair et al., 1998, p.99). However, as it can be seen in the case of EP related items the requirement is not met (42 cases, 8 variables). Therefore, the test was conducted several times to ensure the results are the most valid. Table 29 presents the results of GSCM practices testing. Table 29 Rotated factor loadings on GSCM practices Variable Label Rotated loadings Uniqueness Factor 1 Factor 2 Factor 3 Factor 4 EM1* Number of environmental accidents has declined 0,413 0,829 EM2 Greenhouse gas emissions have decreased 0,766 0,401 EM3 Water consumption has decreased 0,837 0,330 EM4 Energy consumption has decreased 0,668 0,622 EM5 Landfill waste has decreased 0,782 0,388 EM6 Hazardous material use has decreased 0,755 0,430 EM7 A company’s environmental situation has improved 0,787 0,379 EM8 Site disruption has decreased 0,764 0,416 ECM1 Material expenses per unit constructed/manufactured have decreased 0,757 0,427 ECM2* Cost of waste treatment and discharge per unit constructed/manufactured has decreased ECM3 Environmental penalties and fines per unit constructed/manufactured has decreased 0,650 0,577 SM1 The corporate image in environmental performance has improved 0,875 0,234 SM2 The number of environment-related sickness and injuries has reduced 0,352 0,876 SM3 Aesthetic of design has improved 0,816 0,334 SM4 Community disturbance during construction has decreased 0,801 0,358 Eigenvalue 1,734 1,803 1,581 2,197 Cum % 0,455 0,601 0,527 0,549 MSA 0,600 0,660 0,607 0,665 Cronbach alpha 0,602 0,649 0,586 0,696 * items EM1 and ECM2 were dropped to improve internal consistency of the scale
66 The Kaiser criteria of sampling adequacy (MSA) is used for deciding on number of factors to be retained. It can be seen, that MSA is 0,60 or higher in all four factors, suggesting the acceptable mediocre sampling adequacy (Cerny and Kaiser, Henry, 1977). Moreover, the extraction method applied is Principal Component and factor rotation method used is varimax, that maximizes the variance within the factor by decreasing low loadings and increasing high loadings. The results of Factor Analysis indicate which items should be combined to form a scale to measure GSCM practices. Four factors were determined, and in some cases the items were dropped out or replaced. The variable EM1 was removed from Factor 1 because of the high uniqueness to improve the internal consistency of the scale. Moreover, the reliability of adjusted scales was tested with Cronbach’s Alpha coefficient. Although the reliability of Factor 3 has improved by deleting variable ECM2, it remained a bit lower than recommended level 0,60. However, it was decided to continue with all the factors created. Important to note, that although initially variable EM8 has been considered as EP, based on the test results item “Site disruption has decreased” became a part of EcP. That could be explained logically as decreased site disruption in most cases directly associated with higher EcP. Finally, the new variables with following labels were created: • Factor 1 – “Env_Perf_B” - EP of Building (variables EM2, EM3, EM4); • Factor 2 – “Env_Perf_S” – EP on Site (variables EM5, EM6, EM7); • Factor 3 – “Econ_Perf” – EcP (variables EM8, ECM1, ECM3); • Factor 4 – “Soc_Perf” – SP (variables SM1, SM2, SM3, SM4). The summarized scales description is presented in table 30. The results of Pearson Correlation indicates that there is a positive relationship between EcP and EP of Building (Correlation = 0,46 at 0,01 level) and between EcP and SP (Correlation = 0,53 at 0,01 level). That means that the higher the EcP of construction company, the more likely the SP will be high and similar to this the higher EcP of the company, the higher likelihood of higher EP of the constructed buildings. Table 30 Summary description for GSCM Performance Summarized scale Number of variables Min Max Mean Std. Dev. Env_Perf_B 3 2,33 4,33 3,476 0,489 Env_Perf_S 3 2,33 4,67 3,619 0,549 Econ_Perf 3 2,33 4,00 3,286 0,475 Soc_Perf 4 2,25 4,50 3,560 0,490
67 GSCM drivers – Factor Analysis To conduct the factor analysis for GSCM drivers, all eight variables were tested. To meet the requirement of 10 items per variable the test has been conducted for each half and repeated several times with different combination to ensure the highest validity. The results of the analysis are presented in table 31. As seen, MSA is higher than 0,60 in both factors, suggesting the acceptable mediocre sampling adequacy (Cerny and Kaiser, Henry, 1977). Moreover, the extraction method applied is the Principal Component and factor rotation method used is varimax, that maximizes the variance within the factor by decreasing low loadings and increasing high loadings. To improve the internal consistency of the scale, the variable ID4 was removed from Factor 2. The reliability of adjusted scales was tested with Cronbach’s Alpha coefficient. The following new variables with adopted scales were created: • Factor 1 – “Ext_Dr” – External Drivers (variables ED1, ED2, ED3, ED4); • Factor 2 – “Int_Dr” – Internal Drivers (variables ID1, ID2, ID3). The description of summarized scales is presented in table 32. Table 31 Rotated factor loadings on GSCM drivers Variable Label Rotated loadings Uniqueness Factor 1 Factor 2 ED1 Government regulations 0,660 0,564 ED2 Pressure from supply chain stakeholders 0,803 0,355 ED3 Pressure from competitors 0,803 0,309 ED4 Pressure from the client 0,753 0,432 ID1 Improving reputation and brand image 0,867 0,247 ID2 Environmental commitment 0,817 0,332 ID3 Cost Reduction 0,691 0,522 ID4* Internationalization opportunities 0,169 Eigenvalue 2,340 1,897 Cum % 0,585 0,633 MSA 0,758 0,616 Cronbach alpha 0,762 0,709 * item ID4 was dropped to improve internal consistency of the scale Furthermore, the results of Pearson Correlation indicate that there is a positive relationship between Internal Drivers and External Drivers (Correlation = 0,45 at 0,01 level), meaning that the company that considered the importance of External Drivers being high will more likely find the External Drivers being high as well.
68 Table 32 Summary description for GSCM Drivers Summarized scale Number of variables Min Max Mean Std. Dev. Ext_Dr 4 2,25 4,75 3,369 0,710 Int_Dr 3 1,66 4,66 3,714 0,669 GSCM barriers – Factor Analysis Lastly, the Factor Analysis has been conducted for GSCM barriers, and included eight items. Because the requirement of at least 10 observations per variable are not met, the analysis was conducted for different combinations of four items. The results are presented in table 33. The test shows that MSA is higher than 0,60 in both factors, suggesting the acceptable mediocre sampling adequacy (Cerny and Kaiser, Henry, 1977). Table 33 Rotated factor loadings on GSCM barriers Variable Label Rotated loadings Uniqueness Factor 1 Factor 2 EB1* Shortage of green professionals EB2 Lack of partners’ commitment 0,218 0,952 EB3 Inflexible and tight stakeholders’ deadlines 0,795 0,368 EB4 Lack of buyer awareness 0,783 0,387 EB5 Pressure for lower prices 0,860 0,261 IN1 Lack of sustainability knowledge 0,785 0,384 IN2 High costs of implementation 0,725 0,475 IN3 Lack of training and commitment 0,663 0,560 Eigenvalue 2,031 1,581 Cum % 0,508 0,527 MSA 0,656 0,602 Cronbach alpha 0,609 0,570 * item EB1 was dropped to improve internal consistency of the scale To improve the internal consistency of the scale, the variable EB1 was removed from Factor 1. The reliability of adjusted scales was tested with Cronbach’s Alpha coefficient. Although scale External Barriers could have been improved by deleting item EB2, it was decided to keep it as the scale is close to original and at acceptable level. Moreover, the result of the analysis of scale “Internal Barriers” shows the reliability being lower that recommended level. However, because the received result was the highest possible with all elements combinations and the scale is the same as the original it has been decided to accept it. Thus, the following new variables were created: • Factor 1 – “Ext_Bar” – External Barriers (variables EB2, EB3, EB4, EB5); • Factor 2 – “Int_Bar” – Internal Barriers (variables IN1, IN2, IN3).
69 The description of summarized scales is presented in table 34. Table 34 Summary description for GSCM Barriers Summarized scale Number of variables Min Max Mean Std. Dev. Ext_Bar 4 1,50 4,25 3,191 0,607 Int_Bar 3 2,00 4,33 3,214 0,588 GSCM performance, GSCM drivers and GSCM barriers – Final Scales As a result of previous analysis, the summarized scales were developed for GSCM performance, drivers, and barriers. In all developed scales the reliability stayed at the same level or improved as indicated by Cronbach value criteria. In the case of EP the scale has been divided into performance related to constructed buildings and performance on construction site. Table 35 Developed summary scales for GSCM performance and GSCM driver and barriers Scale Initial Scale Final Scale Mean Std. Dev. Number of variables Cronbach alpha Number of variables Cronbach alpha GSCM peformance EP 8 0,563 3 0,602 3,476 0,489 3 0,649 3,619 0,549 EcP 3 0,164 3 0,586 3,286 0,475 Social Performance 4 0,696 4 0,696 3,560 0,490 GSCM drivers and barriers External Drivers 4 0,762 4 0,762 3,369 0,710 Internal Drivers 4 0,629 3 0,709 3,714 0,669 External Barriers 5 0,603 4 0,609 3,191 0,607 Internal Barriers 3 0,570 3 0,570 3,214 0,588 6.1.4 Regression Analysis In the previous analysis some preliminary tests and analysis have been conducted for scales improvement: (1) missing values were imputed for GSCM particles; (2) factor analysis conducted for GSCM performance; (3) factor analysis conducted for GSCM drivers and barriers. The following part of the thesis is focused on investigating the relationship between: (1) GSCM practices and GSCM performance; (2) GSCM divers and GSCM practices; (3) GSCM barriers and GSCM practices. Each method of analysis will be discussed in its own paragraph, detailing the method, any ancillary tests conducted, as well as the results of the test. The small data sample is usually characterized as having less than 20 observations (Hair et al., 1998, p.163). However, the data sample used for this analysis is two times larger than this limit. Thus the sample size is deemed sufficient for running a linear regression analysis.
70 Effect of GSCM Practices on firm Performance Regression is the method often used in social science research to test the hypothesis of the existence of causal effects between variables, estimate the strength of those effects and compare it across groups (Hardy and Bryman, 2009, p.165). Regression analysis was used to test if the GSCM practices significantly predicted the firm’s sustainable performance. Therefore, tests performed aim to verify hypothesis H1, H2, H3, H4, H5 and H6. Because the models were tested with imputed values, the tests for basic assumptions were performed only for the models with no missing data. Effect of Green Design on Firm Performance The results of the regression (see table 36) indicate that (1) three predictors explain 52,6% of the variance (R-squared = 0,526, F = 9,65, p<0,001) in EP of Construction. It was found that Energy Efficient Systems significantly predict EP of Construction (β = 0,221, p<0,01), other Green Design variables are not significant predictors of EP of Building; (2) all three Green Design items were not significant for predicting EP on Site (R-squared = 0,152, F = 1,55, p>0,05); (3) it was found that Energy Efficient Systems alone significantly predicts EcP (β = 0,292, p<0,001). All three predictors are not significant for predicting EcP; (4) three predictors explain 48,3% of the variance (R-squared = 0,483, F = 8,13, p<0,001) in Social Performance. It was found that Energy Efficient Systems significantly predict SP (β = 0,252, p<0,05), other Green Design variables were not significant predictors of SP. Table 36 Regression Results for Green Design effect on Firm Performance Variable Label Model (1) Dependent variable: Env_Perf_B Model (2) Dependent variable: Env_Perf_S Model (3a) Dependent variable: Econ_Perf Model (3b) Dependent variable: Econ_Perf Model (4) Dependent variable: Soc_Perf Mater Consideration of materials 0,112 (0,078) 0,212 (0,106) 0,049 (0,097) 0,070 (0,083) EE_Syst Energy efficient systems 0,221* (0,089) -0,072 (0,122) 0,292*** (0,074) 0,148 (0,111) 0,252* (0,095) Prov_Nat _Res Provision for natural resources 0,047 (0,048) 0,011 (0,066) -0,094 (0,060) 0,051 (0,051) Constant 2,141 (0,500) 3,150 (0,686) 2,281 (0,260) 3,126 (0,626) 2,260 (0,535) Model Fit F 9,65 1,55 15,59 8,58 8,13 Prob>F 0,000 0,224 0,000 0,000 0,001 R-squared 0,526 0,152 0,464 0,497 0,483 Adjusted R-squared 0,472 0,054 0,434 0,439 0,424 Standard errors are reported in parentheses. *p<0,05, **p<0,01, ***p<0,001
71 Based on the results of the test it can be seen that: Green Design (Consideration of Energy Efficient Systems in Building Design) has a positive effect on Sustainable Performance of the company. Thus, the hypothesis H2 receives partial support. Effect of Green Strategy on Firm Performance The results of the regression (see table 37) indicate that (1) Green Strategy item is not significant for predicting EP of Building (R-squared = 0,052, F = 2,21, p>0,05), EcP (R- squared = 0,053, F = 2,21, p>0,05) and SP of the company (R-squared = 0,075, F = 3,27, p>0,05); (2) it was found that Green Strategy significantly predict EP on Site (β = 0,180, p<0,01). Table 37 Regression Results for Green Strategy effect on firm Performance Variable Label Model (5) Dependent variable: Env_Perf_B Model (6) Dependent variable: Env_Perf_S Model (7) Dependent variable: Econ_Perf Model (8) Dependent variable: Soc_Perf Gr_Strat Green Strategy established 0,090 (0,060) 0,180** (0,063) 0,087 (0,058) 0,108 (0,059) Constant 3,204 (0,197) 3,075 (0,207) 3,022 (0,191) 3,232 (0,195) Model Fit F 2,21 8,00 2,21 3,27 Prob>F 0,145 0,007 0,145 0,078 R-squared 0,052 0,166 0,053 0,075 Adjusted R-squared 0,028 0,145 0,029 0,052 Standard errors are reported in parentheses. *p<0,05, **p<0,01, ***p<0,001 The results indicate that: Established Green Strategy has a positive effect on Environmental Performance on the Construction site. Thus, the hypothesis H1 receives partial support. Effect of Green Monitoring on Firm Performance The results of the regression (see table 38) indicate that (1) Green Monitoring is not significant for predicting EP of Site (R-squared = 0,000, F = 0,03, p>0,05); (2) it was found that Green Monitoring significantly predicts EP of Building (β = 0,146, p<0,05), EcP of the company (β = 0,163, p<0,01) and SP of the company (β = 0,205, p<0,001). The results of the analysis show that: Green Monitoring practices adopted by the company have a positive effect on Sustainable Performance of the company. Therefore, the hypothesis H6 receives partial support.
72 Table 38 Regression Results for Green Monitoring effect on firm Performance Variable Label Model (9) Dependent variable: Env_Perf_B Model (10) Dependent variable: Env_Perf_S Model (11) Dependent variable: Econ_Perf Model (12) Dependent variable: Soc_Perf Monitor Monitoring of GSCM 0,146* (0,054) -0,012 (0,066) 0,163** (0,051) 0,205*** (0,049) Constant 3,075 (0,165) 3,652 (0,201) 2,838 (0,155) 2,996 (0,150) Model Fit F 7,16 0,03 10,05 17,07 Prob>F 0,011 0,854 0,002 0,000 R-squared 0,151 0,000 0,200 0,299 Adjusted R-squared 0,130 -0,024 0,180 0,281 Standard errors are reported in parentheses. *p<0,05, **p<0,01, ***p<0,001 Effect of Green Procurement on Firm Performance The results of the regression (see table 39) indicate that Green Procurement is not significant for predicting EP of Building (R-squared = 0,038, F = 1,21, p>0,05), EP on Site (R-squared = 0,001, F = 0,05, p>0,05), EcP of company (R-squared = 0,001, F = 0,03, p>0,05) and SP of company (R-squared = 0,001, F = 0,06, p>0,05). Table 39 Regression Results for Green Procurement effect on firm Performance Variable Label Model (13) Dependent variable: Env_Perf_B Model (14) Dependent variable: Env_Perf_S Model (15) Dependent variable: Econ_Perf Model (16) Dependent variable: Soc_Perf Procur Green Procurement 0,114 (0,104) 0,024 (0,114) 0,014 (0,083) 0,024 (0,103) Constant 3,211 (0,313) 3,512 (0,345) 3,395 (0,252) 3,554 (0,312) Model Fit F 1,21 0,05 0,03 0,06 Prob>F 0,280 0,830 0,862 0,815 R-squared 0,038 0,001 0,001 0,001 Adjusted R-squared 0,000 -0,031 -0,032 -0,031 Standard errors are reported in parentheses. *p<0,05, **p<0,01, ***p<0,001 The results of the analysis show that: the relationship between Green Procurement practices adopted by the company and its Sustainable Performance has not been found. Therefore, the hypothesis H3 could be neither rejected nor confirmed. Effect of Green Transportation on Firm Performance The results of the regression (see table 40) indicate that Green Transportation is not significant for predicting EP of Building (R-squared = 0,014, F = 0,45, p>0,05), EP on Site
73 (R-squared = 0,111, F = 3,75, p>0,05), EcP of company (R-squared = 0,000, F = 0,00, p>0,05) and SP of company (R-squared = 0,057, F = 1,85, p>0,05). Table 40 Regression Results for Green Transportation effect on firm Performance Variable Label Model (17) Dependent variable: Env_Perf_B Model (18) Dependent variable: Env_Perf_S Model (19) Dependent variable: Econ_Perf Model (20) Dependent variable: Soc_Perf Transp Green Transportation 0,047 (0,071) 0,176 (0,091) -0,003 (0,068) 0,098 (0,072) Constant 3,235 (0,208) 3,125 (0,266) 3,177 (0,201) 3,169 (0,213) Model Fit F 0,45 3,75 0,00 1,85 Prob>F 0,508 0,062 0,955 0,184 R-squared 0,014 0,111 0,000 0,057 Adjusted R-squared -0,018 0,081 -0,033 0,026 Standard errors are reported in parentheses. *p<0,05, **p<0,01, ***p<0,001 The results of the analysis show that: the relationship between Green Transportation practices adopted by the company and its Sustainable Performance has not been found. Therefore, the hypothesis H4 could be neither rejected nor confirmed. Effect of Green Construction on Firm Performance Based on regression results (see table 41) it was found that both predictors related to Green Construction are not significant for predicting EP of Building (R-squared = 0,017, F = 0,17, p>0,05), EP on Site Building (R-squared = 0,179, F = 2,08, p>0,05), EP Building (R-squared = 0,093, F = 0,98, p>0,05) and SP of the company Building (R-squared = 0,237, F = 2,96, p>0,05). Table 41 Regression Results for Green Construction effect on firm Performance Variable Label Model (21) Dependent variable: Env_Perf_B Model (22) Dependent variable: Env_Perf_S Model (23) Dependent variable: Econ_Perf Model (24) Dependent variable: Soc_Perf Sav_Plan Saving plans development 0,014 (0,105) -0,202 (0,122) -0,099 (0,072) -0,172 (0,093) Gr_Techn Green technology used in construction -0,063 (0,111) 0,173 (0,129) 0,032 (0,077) 0,173 (0,099) Constant 3,532 (0,372) 3,589 (0,435) 3,487 (0,258) 3,453 (0,332) Model Fit F 0,17 2,08 0,98 2,96 Prob>F 0,847 0,152 0,394 0,076 R-squared 0,017 0,179 0,093 0,237 Adjusted R-squared -0,086 0,093 -0,002 0,157 Standard errors are reported in parentheses. *p<0,05, **p<0,01, ***p<0,001
80 project (referring to the Green Construction indicators); (2) What competitive advantages enterprises can gain by engaging in various green construction practices in the project (relating to the Sustainable performance indicators); (3) What are the main barriers and drivers the company faces in adopting green practices (referring to the Drivers and Barriers indicators). External Validity The third reccomendation is focused on investigation whether case study findings are generalizable beyond case study (Yin 2003, p.37). Although the case study research design has been developed and followed the GSCM theories previously discussed, it is difficult to claim that the results of this analysis will be similar in other external conditions (e.g., in different case country). The same case study analysis should be conducted in “second/third neighborhood” to test the external validity. However, as the similar research has been already conducted in China (Zhang, Shen and Wu, 2011b) and had comparable results, this study will be considered as having acceptable external validity level. Reliability The aim of the reliability qualitative analysis is to assure that if a later researcher follows the same procedures and conducts precisely the same study, later investigator will get the same findings (Yin 2003, p.37). Thus, the primary goal is to minimize the research bias. In this study, the database of the cases has been created. Moreover, all sources, findings, and analyses were described as explicitly as possible. Furthermore, as the names of the cases are not anonymous, the external auditor has an easy way of retrieving information from secondary sources. 6.2.3 Logical Models Case Study Analysis This study will adopt the logical model analysis technique to stipulate the chain of events over time in case studies following cause-effect-cause-effect patterns (Yin 2003, pp.127- 128). In this analytical technique, first proposed by Wholey in (1979) a dependent variable or event occurred at an earlier stage becomes an independent variable or causal event for the next step. At the first stage of the analysis the data collected, including the secondary source data, has been imported to the NVivo software and coded. Based on the nodes
81 assigned the logical model has been developed and is present in figure 17. The events flow across a series of boxes and arrows reading from left to right in the scheme. In the case A, Auerkulma project apartment building, the parent company of Mestariasunnot Oy Mestaritoiminta Oy is not only the responsible building developer but the real estate maintenance organization. According to the interviewee, one of the main reasons the company puts a lot of attention on the whole building life cycle assessment is whole building LCA. Future tenants have been actively involved throughout the whole project process and their wishes and needs have been taken into account during the design and implementation phases. The Auerkulma apartment building has been designed with consideration for energy efficient lighting, heating (energy source – ground energy), automation, ventilation and other systems. Moreover, the methods of lowering the water consumption have been incorporated. Also, the progress of the project has been actively monitored. Furthermore, to assess the success of the project audits were organized regularly as well as continuous follow-up. Two years after the completion, the monitoring continued to verify that automation and other systems work as designed. One more aspect of the project has been the strong partners’ collaboration and cooperation. The Nordic Ecolabel system sets strict rules to the material used in construction, Therefore, the project supply chain members has been working jointly to meet not only requirements of the end/clients but ensure the minimal whole lifecycle costs and characteristics of materials are as required. As the results of the embedding sustainability principles into construction SCM, the overall environmental performance of the building and company has improved along with the brand image and customer awareness. The importance of this case is in highlighting the significance of managerial cognition and commitment towards sustainability to high environmental performance. Another crucial factor is the LCA, consideration of future costs of the building maintenance and ecologically sustainable materials used in construction process.
82 Figure 17 Green Project Construction and possible events occurring GD New Project Decision made by the company to construct a new building / participate in new type of building construction - Case A - Case B - Case C LCA Assessment of the future costs of maintenance: - Case A - Case C - Case D Customer Pressure Establishing of communication channel for with future tenants - Case B Green Design The novel green architectural design with lower environmental impact - Case A - Case B - Case C Idea Competition Crowd based Innovation of architecture design though idea competition - Case B Consideration of sustainable material & systems Consideration of environmental footprint of the materials used in project construction - Case A - Case B - Case C Project Construction Considering the environmental impact of activities on construction site - Case A - Case B - Case C Brand Image Improvement Marketing of the green initiative, becoming ‘trailblazer’ in sustainability, etc. - Case A - Case B - Case C New Knowledge Acquisition Obtaining a new knowledge about embedding sustainability in SCM, innovative technologies ad methods to be used in future projects - Case A - Case B - Case C Certification EMS certification, etc. - Case A - Case D Future Costs reduction Reduction of the future maintenance costs - Case A - Case C GD GD GT SP SP SP GS GP GM EcP EP SP GC
83 The case B, Villa ISOVER project, is the example of Eco House design. According to the interviewee, it was the very first project of this type in which the company participated. The building is a family house and currently is open to the public. Interesting to note that in this case, the crowd based open innovation approach has been effectively adopted for finding the most efficient construction solution though open architectural design competition. The architectural design of the house takes into consideration the provision of natural lightning and wastewater recycling. According to the interviewee the overall sustainability focus of the company played a significant role in deciding on joining the project. Moreover, the project was aimed to be not only environmentally but economical efficient. Lastly, the case has led to the improvement of the social performance of the company though enhanced brand image and customer awareness. The importance of this case is in the effective crowdsourcing of environmentally friendly innovative solutions, pioneering in Eco House construction on Finnish market and overall positive experience from embedding sustainability principles in construction SCM. The case C is NZEB office building, Environment Centre building Ympäristötalo, that at the moment of construction was showing the best energy performance of an office building ever constructed in Finland. Interesting to note that according to interviewee the initiative to construct more sustainable office building came from the future building users and have been endorsed by government entity, City of Helsinki. Currently, the building is used by the City of Helsinki’s Environment Centre and the Faculty of Biological and Environmental Sciences of the University of Helsinki. The office includes 240 workspace, conference rooms, a cafeteria, and an exhibition space. Per interviewee, it is essential that the building is open for all visitors that can follow the office’s energy consumption on screens installed in the lobby. This initiative increases the awareness of the importance of sustainable construction to the public. The project is an excellent illustration of zero-energy building. For example, it is analyzed by some researchers as a case of estimating of real energy consumption of net-zero house in comparison with simulated calculations. Moreover, the interviewee highlighted that although the total costs were estimated being 21,6 million euros, the final expences were remarkably lower - under 17 million. The importance of this case is in illustrating how the future building users can trigger the sustainable SCM initiative, the improved economic performance of the project and increased public awareness through making finished project open for public and future research. As mentioned before the last case is the software One Click LCA, developed by Bionova Ltd. that supports automation of environmental impacts assessment from existing design
84 data while ensuring compliance with various certification schemes (i.e., LEED, BREEAM, DGNB and 30 other systems). According to the interviewee, the LCA is crucial for the company to achieve a competitive advantage. The software acts as a quantitative analysis tool in assessing the environmental hotspots in construction design. The importance of LCA using the software is in project optimization and betters design decisions taken by the developer and other members of the supply chain. For instance, One Click LCA has been successfully applied by Finnish Transport Agency to calculate the environmental impacts of the Kivikko interchange infrastructure project for assessment of the "benefits the planning can have regarding the environmental effects of such infrastructure projects" (Bionova Ltd., 2018). As per interviewee, the case company has a solid sustainability vision and share the common believe that construction specialists need to start thinking about the environmental impact of their construction projects and focus on emissions reduction to establish a "cradle to grave" approach. Moreover, the interviewee discussed that currently Finnish construction sector’s level of sustainable performance could not be considered as leading in term of green solution, although "moving in the right direction" and taking necessary initiatives on the governmental level. Interviewee felt that the future of the construction industry was in advanced technological capabilities that could lead to stronger collaboration between supply chain members and developed solutions to meet needs of sustainable construction and society. In conclusion, all four cases show that GSCM practices have a positive effect on the sustainability of the company. However, while the high costs of construction seemed not to be a case, the initiative of green construction development is still quite novel to the market. In the cases A and C, the critical reason for GSCM practice adoption was the LCA assessment as the companies were adopting two roles in construction: as development and future building maintenance responsible unity. Important to highlight that in all cases the main GSCM initiatives were related mostly either to Green Design (Case A, B, C) or Certification (Case A). Other practices, such as green construction on site, green transportation, etc., were not that important. Worth noting that the lack of sustainability knowledge has not been mentioned as Internal Barrier by any of interviewees. Moreover, the image of the company has improved in all cases. Regarding the most important drivers, the governmental regulations, customer pressure, and top-management commitment have been highlighted by many interviewees.
85 6.3 GSCM practices diffusion analysis The case study analysis revealed that in all GSCM cases the companies were acting as “First Mover,” meaning that their initiative was first to the market. To investigate this matter, it has been decided to conduct an additional analysis to explore the behavioral patterns of the companies and innovation diffusion on Finnish construction market, The main purpose of this investigation is to develop a holistic view on the process and develop more informed and grounded decisions in the conclusion chapter of the thesis. The theory of Diffusion of Innovation (DoI) was first introduced in 1962 by Everett Rogers, and seeks to explain how new ideas, knowledge, and innovation are spreading in populations over time. Many researchers chose DoI model as a theoretical framework to study the supply chain innovation process in the industry (Meade and Islam, 2006; Qi et al., 2011; Zhu, Tian and Sarkis, 2012; Schleper and Busse, 2013). According to Rogers (2003), companies in the market adopt an innovation or practice at different times for two main reasons. First, downstream supply chain members that are closer to the end consumers are comparatively more in the focus of public interest. Thus, it might be more crucial for them to adopt the practices and enhance the public image. Second, the adopters can be more open for innovativeness and be willing for risk-taking. Consequently, such companies as "early adopters" are often highly respected market members and opinion leaders. By adopting the innovation, they generate a lighthouse effect for further adopters. The early majority usually consists of around one-third of the total amount of adopters of innovation. Later, as knowledge has been spread and a number of adopters have achieved a point of critical mass, the diffusion becomes self-sustaining. Innovation in the context of construction could be defined as an application of a non-trivial change regarding improvement in a system or working procedure that is novel to the focus company (Slaughter, 2000). Embedding sustainability in the project management is not a commonly accepted practice in the construction industry in Europe (European Patent Office, 2018). Therefore, it could be viewed as an innovative action and the process of integration of sustainability into management construction systems has to be recognized as an innovation diffusion process (Banihashemi et al., 2017). As this study is focused on investigating the GSCM practices, the analysis of the Finnish market with DoI theory will give insights on the behavioral of the market and potential adaptation path. The ISO 14001 certification has been selected as a GSCM indicator that
86 will be applied for model development. According to Gonzales, Sarkis and Adenso-Diaz (2008) ISO 14001 certification, companies tend to generally increase their environmental management efforts to collaboration and demand other members of the supply chain to adopt greener behavior. Therefore, the number of firms that have obtained ISO 14001 certification might be considered as objective representatives of the GSCM diffusion in Finland. The data used for analysis was obtained from ISOTC (2018) and is presented in Table 45. The number of ISO 14001 certified enterprises in Finland per year and accumulative data used for modeling is shown graphically in figure 18. Table 45 The number of ISO 14001 certified enterprises from 1994 to 2016, (ISOTC, 2018) Year 1994 1995 1996 1997 1998 1999 2000 2001 Increasing number 5 11 31 82 156 470 508 687 Year 2002 2003 2004 2005 2006 2007 2008 2009 Increasing number 750 1128 882 923 935 822 991 1107 Year 2010 2011 2012 2013 2014 2015 2016 Increasing number 1122 1169 1310 1422 1503 1466 1418 Figure 18 The number of ISO 14001 certified enterprises from 1994 to 2016 In 1969, Frank Bass has published his work on "A new product growth model for consumer durables” which contributed mathematical ideas to the DoI concept. The Bass diffusion model unites the classic innovation model and imitation model into one generalized model to combine both effects (Liu et al., 2014) and takes the following form: St#=#pm#+#(q#–#p)Yt#-# . / Yt 2# ###############################################################################################################(1) where Yt is the cumulative number of adopters as of time t, and St is the number of adopters at time t. m represents potential market size. p is the coefficient of innovation, which refers to an external influence or mass advertising effect. q is the coefficient of imitation, and it 0 5000 10000 15000 20000 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Number of ISO 14001 certified enterprises Cummulative number
87 refers to the internal influence or word-of-mouth effect. Both p and q should be equal to or larger than zero by definition. Expression (2) is the cumulative adoption as a function of time: Yt#=# /#(12345 ( 2 ( 56. ) 7 ) ) 16. 5345#(2 ( 56. ) 7) + 37 ### ############################################################################################################(2) The MATLAB software curve-fitting tool has been used to model the data and test the data fit. Graphically, the results of fitting can be seen on figure 19. As can be seen, overall the curve fits the data quite well. The estimated coefficient of innovation, p = 0,046367, coefficient of imitation, q = 0,06483, and potential market size, m = 1 786, values are plausible if compared with similar studies (Sultan, Farley and Lehmann, 1990; Zhu, Tian and Sarkis, 2012b). Figure 19 ISO 14001 curve from the fitted results The results show that p<q (0,06483<0,046367), which indicates that the implementation of GSCM is mainly affected by other leading enterprises (not internally proactively), and the diffusion curve is a logistic curve with diffusion rate rising and then falling (Zhu, Tian and Sarkis, 2012b). The practical implication of these results can be the conclusion that in Finland, the proactive approach and self-motivation towards GSCM are relatively low and companies implement green practices due to imitation. Therefore, it is vital for the government to not only motivate the leading firms in the industry to adopt GSCM practices but to share their green knowledge, solution and initiatives with other stakeholders and market players to develop the necessary pressure towards sustainability.
88 7 CONCLUSION, LIMITATION AND FUTURE RESEARCH In this chapter, the conclusion to the research work of this thesis is discussed with the focus on possible theoretical and managerial applications of the findings. Moreover, the section covers some limitations of the research and describes the potential implications of findings for Finnish policy, industry practitioners and recommendations for future research. 7.1 Discussion and Conclusion The importance of meeting the principles of sustainable development nowadays became visible for all to see. However, while a lot of grounded research has been conducted in the field of GSCM, there are still a number of research gaps to be covered. One of such knowledge gaps has been addressed in this research. This study investigates empirically the effect of GSCM practices on suistainable performance of the company as well as the drivers and barriers that support or prevent such practice adoption. Evidence was collected from a cross-country sample of Finnish construction companies using the mixed research method of data collection and analysis. Although the finding of this study may differ by country, on fundamental level the results of this analysis can be applied to the construction industries in other market conditions taking into consideration the fact that GSCM issues in the construction sector are mostly comparable across the globe. The main results of this thesis research are described next. The systematic literature review conducted as a part of this study revealed that the GSCM field can still be considered as emerging and establishing. The main contributing authors are changing rapidly over time, and at the moment, it is challenging to recognize one article, researcher or research group as being the most influential and leading. On the other hand, there is still a lot of potential fields not discovered; therefore, the further growth of attention to GSCM topic could be expected. Moreover, the geographical mapping revealed that the Asian region contributed remarkably to the amount of the research articles followed by the EU region and rest of the world. Regarding the empirical results, the most of the companies participated in the survey indicated that they take into consideration green strategy practices in their companies. On the other hand, the communication on the environmental issue between all layers of subcontractors is one of the least practiced actions among Finnish companies. The top management commitment is adopted or carefully considered in most of the companiesrespondents. The results of the survey have also revealed that the architectural design is
89 admitted as the most important and widely applied GSCM practice. The reason might be that with the fast development of new solutions the measurement instrument developed by other researchers and applied in this research does not incorporate any more the latest developments and trends in the industry and should be adjusted to include more innovative and featuring architectural solutions and methods. On the other side, the findings of case study methods show, that the green building design concepts such as Eco House or NZEB are relatively novel to the Finnish market. Moreover, the case study findings show the results corresponding to the survey results that green actions and practices on construction site are not very common among Finnish construction companies. On the other hand, the inspections during the construction project process is a widely adopted method among construction firms as well and obtaining EMS or ISO Certification. Green procurement practices are indicated by Finnish firms to be at the average level of adoption. Most of the respondents have stated the initiation of implementation them into practice. Most of the firms require suppliers to disclose information about their environmental practices during the procurement process. Overall, the most prevalent green transportation practice among respondents was the transportation of materials in full truckload quantities. According to the survey results, the most influencing external driver for embedding GSCM practices in the construction supply chain are government regulations. It indicates the substantial impact of legislation concerning construction activities in Finland on the decision-making processes in enterprises. On the other hand, the least influencing external factor among all respondents is the pressure from competitors. The reason behind might be in the current low level of GSCM practices adoption on the national construction market level. Regarding the internal drivers, the costs reduction is seen by Finnish firms as the most important for decision-making process. In line with this result, the most significant external barrier that prevents practicing the GSCM practices in the construction companies is pressure for lower prices. At the same time the most critical internal barrier indicated in the survey result, the lack of sustainability knowledge, has not been perceived as being remarkably important by the interviewees. The rationale for that might be in the selection of case study companies among ones effectively adopting GSCM practices, while at the same time the survey covered all range construction firms GSCM adopters or no-adopters. Overall, the evidence has been obtained in the positive effect of GSCM practices on the sustainable development of the company. The most significant influencing item discovered
96 47. doi: 10.1207/s15327906mbr1201. Chen, C.-C. et al. (2012) ‘A business strategy selection of green supply chain management via an analytic network process’, Computers and Mathematics with Applications, 64(8), pp. 2544–2557. doi: 10.1016/j.camwa.2012.06.013. Chen, Y., Okudan, G. E. and Riley, D. R. (2010) ‘Sustainable performance criteria for construction method selection in concrete buildings’, Automation in Construction, 19(2), pp. 235–244. doi: 10.1016/j.autcon.2009.10.004. Cheng, J.-H. (2011) ‘Inter-organizational relationships and knowledge sharing in green supply chains-Moderating by relational benefits and guanxi’, TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW. THE BOULEVARD, LANGFORD LANE, KIDLINGTON, OXFORD OX5 1GB, ENGLAND: PERGAMON-ELSEVIER SCIENCE LTD, 47(6), pp. 837–849. doi: 10.1016/j.tre.2010.12.008. Cheng, J.-H. and Sheu, J.-B. (2012) ‘Inter-organizational relationships and strategy quality in green supply chains - Moderated by opportunistic behavior and dysfunctional conflict’, INDUSTRIAL MARKETING MANAGEMENT. 360 PARK AVE SOUTH, NEW YORK, NY 10010-1710 USA: ELSEVIER SCIENCE INC, 41(4), pp. 563–572. doi: 10.1016/j.indmarman.2012.04.003. Cheng, J.-H., Yeh, C.-H. and Tu, C.-W. (2008) ‘Trust and knowledge sharing in green supply chains’, SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL. HOWARD HOUSE, WAGON LANE, BINGLEY BD16 1WA, W YORKSHIRE, ENGLAND: EMERALD GROUP PUBLISHING LIMITED, 13(4), pp. 283–295. doi: 10.1108/13598540810882170. Chin-Chun, H. et al. (2013) ‘Supply chain drivers that foster the development of green initiatives in an emerging economy’, International Journal of Operations & Production Management. Bradford: Emerald Group Publishing Limited, 33(6), pp. 656–688. Available at: https://ezproxy.cc.lut.fi/docview/1354757595?accountid=27292. CIRIA (1999) Environmental issues in construction – sustainability indicators for the civil engineering industry. Creswell, J. (2013) ‘Qualitative, quantitative, and mixed methods approaches’, Research design. doi: 10.2307/3152153. Dam, L. and Petkova, B. N. (2014) ‘The impact of environmental supply chain sustainability programs on shareholder wealth’, International Journal of Operations & Production Management, 34(5), pp. 586–609. doi: 10.1108/IJOPM-10-2012-0482. Dang, D. P. T., School, S. P. and Mathews Z. Nkhoma (2013) ‘A Student Retention Model: Empirical, Theoretical and Pragmatic Considerations’, 24th Australasian Conference on Information Systems, (December), pp. 4–6. doi: 10.3127/ajis.v18i3.1094. Das, D. (2017) ‘Development and validation of a scale for measuring Sustainable Supply Chain Management practices and performance’, Journal of Cleaner Production, 164, pp. 1344–1362. doi: 10.1016/j.jclepro.2017.07.006. Edvardsson, K. (2007) ‘Setting rational environmental goals: Five Swedish environmental quality objectives’, Journal of Environmental Planning and Management, 50(2), pp. 297–
97 316. doi: 10.1080/09640560601156540. EeMAP Project (2018) Energy Efficient Mortgages Initiative. Available at: http://energyefficientmortgages.eu (Accessed: 10 August 2018). European Patent Office (2018) Building the future: Four innovation trends that are shaping green construction. Available at: https://www.epo.org/news-issues/technology/sustainabletechnologies/green-construction.html (Accessed: 15 July 2018). Evangelista, P., Santoro, L. and Thomas, A. (2018) ‘Environmental Sustainability in Third- Party Logistics Service Providers: A Systematic Literature Review from 2000–2016’, Sustainability, 10(5), p. 1627. doi: 10.3390/su10051627. Eysenck, M. W. and Keane, M. (2005) Cognitive psychology: A student’s handbook, Cognitive Psychology. doi: 10.1146/annurev.ps.56.121004.100003. Fahimnia, B., Sarkis, J. and Davarzani, H. (2015) ‘Green supply chain management: A review and bibliometric analysis’, International Journal of Production Economics, pp. 101– 114. doi: 10.1016/j.ijpe.2015.01.003. Gahlot, P. S. (2007) Construction Planning and Management. New Age International (P) Ltd. Gephi (2018) Features. Gonzales, P., Sarkis, J. and Adenso-Diaz, B. (2008) ‘Envrionmantal management system certification and its influence on corporate procticies: Evidence from automotive industry’, International Journal of Operations & Production Management, 28(11), pp. 1021–1041. doi: http://dx.doi.org/10.1108/01443570810910179. Gou, Z. and Xie, X. (2017) ‘Evolving green building: triple bottom line or regenerative design?’, Journal of Cleaner Production. Elsevier Ltd, 153, pp. 600–607. doi: 10.1016/j.jclepro.2016.02.077. Graham, J. W. (2009) ‘Missing Data Analysis: Making It Work in the Real World’, Annual Review of Psychology, 60(1), pp. 549–576. doi: 10.1146/annurev.psych.58.110405.085530. Graham, S. and McAdam, R. (2016a) ‘The effects of pollution prevention on performance’, International Journal of Operations & Production Management, 36(10), pp. 1333–1358. doi: 10.1108/IJOPM-05-2015-0289. Graham, S. and McAdam, R. (2016b) ‘The effects of pollution prevention on performance’, International Journal of Operations & Production Management, 36(10), pp. 1333–1358. doi: 10.1108/IJOPM-05-2015-0289. Green Building Council Finland (2014) Examples of green building in Finland. Green Building Council Finland (2018) Key Themes in 2018. Available at: http://figbc.fi/en/themes-2018/ (Accessed: 10 August 2018). Green, K., Morton, B. and New, S. (1996) ‘Purchasing and environmental management: interactions, policies and opportunities’, Business Strategy and the Environment, 5(3), pp. 188–197. doi: 10.1002/(SICI)1099-0836(199609)5:3<188::AID-BSE60>3.0.CO;2-P.
98 Green, K. W. and Inman, R. A. (2005) ‘Using a just-in-time selling strategy to strengthen supply chain linkages’, International Journal of Production Research, pp. 3437–3453. doi: 10.1080/00207540500118035. Guba, E. G. and Lincoln, Y. S. (1994) ‘Competing Paradigms in Qualitative Research’, in Handbook of qualitative research. doi: http://www.uncg.edu/hdf/facultystaff/Tudge/Guba%20&%20Lincoln%201994.pdf. Guo, H. L., Li, H. and Skitmore, M. (2010) ‘Life-Cycle Management of Construction Projects Based on Virtual Prototyping Technology’, Journal of Management in Engineering, 26(1), pp. 41–47. doi: 10.1061/(ASCE)0742-597X(2010)26:1(41). Gurtu, A., Searcy, C. and Jaber, M. Y. (2015) ‘An analysis of keywords used in the literature on green supply chain management’, Management Research Review, 38(2), pp. 166–194. doi: 10.1108/MRR-06-2013-0157. Hair, J. F. et al. (1998) Multivariate Data Analysis, Analysis. Hair, J. F. et al. (1998) Multivariate Data Analysis, International Journal of Pharmaceutics. doi: 10.1016/j.ijpharm.2011.02.019. Hardy, M. and Bryman, A. (2009) The Handbook of Data Analysis. 1 edition. London: SAGE Publications Ltd. Hart, S. L. (1995) ‘A NATURAL-RESOURCE-BASED VIEW OF THE FIRM.’, Academy of Management Review, 20(4), pp. 986–1014. doi: 10.5465/AMR.1995.9512280033. Hart, S. L. and Dowell, G. (2011) ‘Invited Editorial: A Natural-Resource-Based View of the Firm’, Journal of Management, 37(5), pp. 1464–1479. doi: 10.1177/0149206310390219. Hart, S. and Milstein, M. (2003) ‘Creating sustainable value.’, The Academy of Management Executive, 17(2), pp. 56–69. doi: 10.5465/AME.2003.10025194. He, Y. et al. (2018) ‘How green building rating systems affect designing green’, Building and Environment. Elsevier, 133(February), pp. 19–31. doi: 10.1016/j.buildenv.2018.02.007. Hendrickson, C. and Au, T. (1999) Project Management for Construction, Perspective. Available at: http://pmbook.ce.cmu.edu/. Hervani, A. A., Helms, M. M. and Sarkis, J. (2005) ‘Performance measurement for green supply chain management’, Benchmarking: An International Journal, 12(4), pp. 330–353. doi: 10.1108/14635770510609015. Hoejmose, S., Brammer, S. and Millington, A. (2012) ‘“Green” supply chain management: The role of trust and top management in B2B and B2C markets’, Industrial Marketing Management, 41(4), pp. 609–620. doi: https://doi.org/10.1016/j.indmarman.2012.04.008. Hong, J. et al. (2015) ‘Greenhouse gas emissions during the construction phase of a building: A case study in China’, Journal of Cleaner Production. Elsevier Ltd, 103, pp. 249– 259. doi: 10.1016/j.jclepro.2014.11.023. Igarashi, M., De Boer, L. and Michelsen, O. (2015) ‘Investigating the anatomy of supplier selection in green public procurement’, Journal of Cleaner Production, 108, pp. 442–450. doi: 10.1016/j.jclepro.2015.08.010.
99 ISO (2018) ISO 14000 family - Environmental management. Available at: https://www.iso.org/iso-14001-environmental-management.html (Accessed: 1 August 2018). ISOTC (2018) ISO Survey of certifications to management system standards. Available at: https://isotc.iso.org/livelink/livelink?func=ll&objId=18808772&objAction=browse&viewType =1 (Accessed: 1 June 2018). Javed, M., Rashid, M. A. and Hussain, G. (2016) ‘When does it pay to be good – A contingency perspective on corporate social and financial performance: would it work?’, Journal of Cleaner Production, 133, pp. 1062–1073. doi: 10.1016/j.jclepro.2016.05.163. Kai, Q., Wei, C. and Meng-Lin, B. (2014) ‘Green supply chain knowledge sharing mechanism based on principal-agent theory’, Journal of Chemical and Pharmaceutical Research, 6(6), pp. 1631–1639. Available at: https://www.scopus.com/inward/record.uri?eid=2-s2.0- 84924722198&partnerID=40&md5=6902ec6820674ce0a457ebc555f609c0. Kim, M. G. et al. (2016) ‘Environmental capabilities of suppliers for green supply chain management in construction projects: A Case Study in Korea’, Sustainability (Switzerland), 8(1), pp. 1–17. doi: 10.3390/su8010082. Kim, M. G. et al. (2016) ‘Environmental Capabilities of Suppliers for Green Supply Chain Management in Construction Projects: A Case Study in Korea’, SUSTAINABILITY. ST ALBAN-ANLAGE 66, CH-4052 BASEL, SWITZERLAND: MDPI AG, 8(1). doi: 10.3390/su8010082. Kleine, A. and von Hauff, M. (2009) ‘Sustainability-driven implementation of corporate social responsibility: Application of the integrative sustainability triangle’, Journal of Business Ethics. doi: 10.1007/s10551-009-0212-z. Labuschagne, C. and Brent, A. C. (2005) ‘Sustainable Project Life Cycle Management: The need to integrate life cycles in the manufacturing sector’, International Journal of Project Management, 23(2), pp. 159–168. doi: 10.1016/j.ijproman.2004.06.003. Laosirihongthong, T., Adebanjo, D. and Choon Tan, K. (2013) ‘Green supply chain management practices and performance’, Industrial Management & Data Systems, 113(8), pp. 1088–1109. doi: 10.1108/IMDS-04-2013-0164. Little, R. J. A. and Rubin, D. B. (1987) Statistical Analysis with Missing Data, John Wiley Sons Hoboken NJ. Available at: http://sfx.libis.be/sfxlcl3?sid=google. Littvay, L. (2009) ‘Questionnaire design considerations with planned missing data’, Review of Psychology, 16(2), pp. 103–113. Liu, A. X. et al. (2014) ‘Understanding the diffusion of mobile digital content: A growth curve modelling approach’, Information Systems and e-Business Management, 12(2), pp. 239– 258. doi: 10.1007/s10257-013-0224-1. Liu, Y. et al. (2006) ‘Developing regionally specific environmental building tools for China’, in Building Research and Information, pp. 372–386. doi: 10.1080/09613210600766328. Llach, J. et al. (2013) ‘Joint impact of quality and environmental practices on firm performance in small service businesses: An empirical study of restaurants’, Journal of
100 Cleaner Production, 44, pp. 96–104. doi: 10.1016/j.jclepro.2012.10.046. Ltd., B. (2018) Project: EN-standard based study for the Finnish Transport Agency. Available at: https://www.oneclicklca.com/case-study-infrastructure-kivikko/ (Accessed: 10 August 2018). Luthra, S., Garg, D. and Haleem, A. (2014) ‘Green supply chain management’, Journal of Advances in Management Research, 11(1), pp. 20–46. doi: 10.1108/JAMR-07-2012-0027. Maruejols, L., Ryan, D. L. and Young, D. (2013) ‘Eco-houses and the environment: A case study of occupant experiences in a cold climate’, Energy and Buildings. Elsevier B.V., 62, pp. 368–380. doi: 10.1016/j.enbuild.2013.03.018. Mathiyazhagan, K. et al. (2018) ‘Identification and prioritization of motivational factors for the green supply chain management adoption: case from Indian construction industries’, OPSEARCH. 7TH FLOOR, VIJAYA BUILDING, 17, BARAKHAMBA ROAD, NEW DELHI, 110 001, INDIA: SPRINGER INDIA, 55(1), pp. 202–219. doi: 10.1007/s12597-017-0316-7. Mayrand, F. and Clergeau, P. (2018) ‘Green Roofs and Green Walls for Biodiversity Conservation: A Contribution to Urban Connectivity?’, Sustainability, 10(4), p. 985. doi: 10.3390/su10040985. Mercante, I. T. et al. (2011) ‘Life cycle assessment of construction and demolition waste management systems: a Spanish case study’, The International Journal of Life Cycle Assessment, 17(2), pp. 232–241. doi: 10.1007/s11367-011-0350-2. Ministry of the Environment (2018) Sustainable Development. Available at: http://www.ym.fi/en-US/The_environment/Sustainable_development (Accessed: 10 August 2018). Mirhedayatian, S. M., Azadi, M. and Farzipoor Saen, R. (2014) ‘A novel network data envelopment analysis model for evaluating green supply chain management’, International Journal of Production Economics, 147(PART B), pp. 544–554. doi: 10.1016/j.ijpe.2013.02.009. Mitra, S. and Datta, P. P. (2014) ‘Adoption of green supply chain management practices and their impact on performance: An exploratory study of Indian manufacturing firms’, International Journal of Production Research, 52(7), pp. 2085–2107. doi: 10.1080/00207543.2013.849014. Mohemad, R. et al. (2010) ‘Decision Support Systems (DSS) in Construction Tendering Processes’, International Journal of Computer Science Issues, 7(2), pp. 35–45. doi: 10.1109/ICSSSM.2008.4598482. Murphy, P. R. and Poist, R. F. (2003) ‘Green perspectives and practices: A “comparative logistics” study’, Supply Chain Management, 8(2), pp. 122–131. doi: 10.1108/13598540310468724. Murtagh, N., Roberts, A. and Hind, R. (2016) ‘The relationship between motivations of architectural designers and environmentally sustainable construction design’, Construction Management and Economics. Routledge, 34(1), pp. 61–75. doi: 10.1080/01446193.2016.1178392. Newbert, S. (2007) ‘Empirical research on the resource-based view of the firm: an
101 assessment and suggestions for future research’, Strategic Management Journal, 28(2), pp. 121–146. doi: doi: 10.1002/smj.573. Ngai, E. W. T. et al. (2018) ‘Business sustainability and corporate social responsibility: case studies of three gas operators in China’, International Journal of Production Research. doi: 10.1080/00207543.2017.1387303. NordicEcolabelling (2018) Nordic Swan Ecolabel. Available at: http://www.nordicecolabel.org (Accessed: 1 August 2018). Ofori, G. (2000) ‘Greening the construction supply chain in Singapore’, European Journal of Purchasing & Supply Management, 6(3–4), pp. 195–206. doi: 10.1016/S0969- 7012(00)00015-0. OJEC (2018) Tender Search and Alert Service. de Oliveira, U. R. et al. (2017) ‘The ISO 31000 standard in supply chain risk management’, Journal of Cleaner Production, pp. 616–633. doi: 10.1016/j.jclepro.2017.03.054. Olson, E. G. (2008) ‘Creating an enterprise-level “green” strategy’, Journal of Business Strategy, 29(2), pp. 22–30. doi: 10.1108/02756660810858125. Orlitzky, M., Siegel, D. S. and Waldman, D. a. (2011) ‘Strategic Corporate Social Responsibility and Environmental Sustainability’, Business & Society. doi: 10.1177/0007650310394323. Pan, M. et al. (2018) ‘A framework of indicators for assessing construction automation and robotics in the sustainability context’, Journal of Cleaner Production. Elsevier Ltd, 182, pp. 82–95. doi: 10.1016/j.jclepro.2018.02.053. Patton, M. (1990) ‘Qualitative Evaluation and Research Methods’, Qualitative Evaluation and Research Methods. doi: 10.1002/nur.4770140111. Penrose, E. T. (1959) ‘The Theory of the Growth of the Firm. New York: John Wiley & Sons Inc’, Penrose, E. T, 1, pp. 1–23. Persson, O., Danell, R. and Schneider, J. W. (2009) ‘How to use Bibexcel for various types of bibliometric analysis’, Celebrating scholarly communication studies: A Festschrift for Olle Persson at his 60th Birthday, pp. 9–24. Available at: http://lup.lub.lu.se/record/1458990/file/1458992.pdf#page=11. Peuportier, B., Thiers, S. and Guiavarch, A. (2013) ‘Eco-design of buildings using thermal simulation and life cycle assessment’, Journal of Cleaner Production. Elsevier Ltd, 39, pp. 73–78. doi: 10.1016/j.jclepro.2012.08.041. Pokropek, A. (2011) ‘Missing by Design: Planned Missing-Data Designs in Social Science’, Research & Methods ISSN, 20(1), pp. 1234–9224. Porter, M. E. (1991) ‘America’s green strategy’, Scientific American. doi: 10.1038/scientificamerican0491-168. Porter, M. E. and Linde, van der (1995) ‘Green and competitive: Ending the stalemate’, Harvard Business Review. Qi, G. Y. et al. (2010) ‘The drivers for contractors’ green innovation: An industry
102 perspective’, Journal of Cleaner Production. doi: 10.1016/j.jclepro.2010.04.017. Rainville, A. (2018) ‘Standards in green public procurement – A framework to enhance innovation’, Journal of Cleaner Production, 167, pp. 1029–1037. doi: 10.1016/j.jclepro.2016.10.088. Retzlaff, R. C. (2008) ‘Green building assessment systems: A framework and comparison for planners’, Journal of the American Planning Association, 74(4), pp. 505–519. doi: 10.1080/01944360802380290. Roehrich, J. K., Hoejmose, S. U. and Overland, V. (2017) ‘Driving green supply chain management performance through supplier selection and value internalisation: A selfdetermination theory perspective’, International Journal of Operations and Production Management, 37(4), pp. 489–509. doi: 10.1108/IJOPM-09-2015-0566. Roehrich, J. K., Hoejmose, S. U. and Overland, V. (2017) ‘Driving green supply chain management performance through supplier selection and value internalisation’, International Journal of Operations & Production Management, 37(4), pp. 489–509. doi: 10.1108/IJOPM-09-2015-0566. Rouse, M. J. and Daellenbach, U. S. (2002) ‘More thinking on research methods for the resource-based perspective’, Strategic Management Journal, pp. 963–967. doi: 10.1002/smj.256. Rowley, J. and Slack, F. (2004) ‘Conducting a literature review’, Management Research News, 27(6), pp. 31–39. doi: 10.1108/01409170410784185. Rubin, D. B. (1987) Multiple imputation for nonresponse in surveys Donald B. Rubin., Wiley Series in Probability and Statistics. doi: 10.1002/9780470316696. Russell-Smith, S. V. and Lepech, M. D. (2015) ‘Cradle-to-gate sustainable target value design: Integrating life cycle assessment and construction management for buildings’, Journal of Cleaner Production, 100, pp. 107–115. doi: 10.1016/j.jclepro.2015.03.044. Saizarbitoria, I. H. (2011) ‘Mapping out ISO 9001, ISO 14001 and other management system standards’, International Journal of Productivity and Quality Management, 8(1), p. 33. doi: 10.1504/IJPQM.2011.041096. Sandin, G., Peters, G. M. and Svanström, M. (2014) ‘Life cycle assessment of construction materials: the influence of assumptions in end-of-life modelling’, The International Journal of Life Cycle Assessment, 19(4), pp. 723–731. doi: 10.1007/s11367-013-0686-x. Sarkis, J. (2003) ‘A strategic decision framework for green supply chain management’, Journal of Cleaner Production. doi: 10.1016/S0959-6526(02)00062-8. Sarkis, J., Zhu, Q. and Lai, K. H. (2011) ‘An organizational theoretic review of green supply chain management literature’, International Journal of Production Economics, 130(1), pp. 1–15. doi: 10.1016/j.ijpe.2010.11.010. Saunders, M., Lewis, P. and Thornhill, A. (2016) ‘Research Methods for Business Students’, in Research methods for business students, p. 649. doi: 10.1017/CBO9781107415324.004. Sears, S. K. et al. (2015) Construction Project Management A Practical Guide to Field Construction Management, Wiley. doi: 10.1007/s13398-014-0173-7.2.
103 Sellitto, M. A. (2018) ‘Assessment of the effectiveness of green practices in the management of two supply chains’, BUSINESS PROCESS MANAGEMENT JOURNAL. HOWARD HOUSE, WAGON LANE, BINGLEY BD16 1WA, W YORKSHIRE, ENGLAND: EMERALD GROUP PUBLISHING LTD, 24(1), pp. 23–48. doi: 10.1108/BPMJ-03-2016- 0067. Shen, L. et al. (2005) ‘A computer-based scoring method for measuring the environmental performance of construction activities’, Automation in Construction, 14(3), pp. 297–309. doi: 10.1016/j.autcon.2004.08.017. Shen, L. Y. and Tam, V. W. Y. (2002) ‘Implementation of environmental management in the Hong Kong construction industry’, International Journal of Project Management, pp. 535– 543. doi: 10.1016/S0263-7863(01)00054-0. Shen, L., Zhang, Z. and Zhang, X. (2017) ‘Key factors affecting green procurement in real estate development: a China study’, Journal of Cleaner Production. Elsevier Ltd, 153, pp. 372–383. doi: 10.1016/j.jclepro.2016.02.021. Shi, Q. et al. (2013) ‘Identifying the critical factors for green construction - An empirical study in China’, Habitat International, 40, pp. 1–8. doi: 10.1016/j.habitatint.2013.01.003. Shi, V. G. et al. (2012) ‘Natural resource based green supply chain management’, Supply Chain Management. Bradford: Emerald Group Publishing Limited, 17(1), pp. 54–67. doi: http://dx.doi.org/10.1108/13598541211212203. Simpson, D., Power, D. and Samson, D. (2007) ‘Greening the automotive supply chain: a relationship perspective’, International Journal of Operations & Production Management, 27(1), pp. 28–48. doi: 10.1108/01443570710714529. Sintonen, S. et al. (2016) ‘Cross-country cross-survey design in international marketing research’, International Marketing Review, 33(3), pp. 454–482. doi: 10.1108/IMR-11-2014- 0348. Slaughter, E. S. (2000) ‘Implementation of construction innovations’, Building Research and Information, 28(1), pp. 2–17. doi: 10.1080/096132100369055. Smith, J., Love, P. E. D. and Wyatt, R. (2001) ‘To build or not to build? Assessing the strategic needs of construction industry clients and their stakeholders’, Structural Survey, 19(2), pp. 121–132. doi: 10.1108/02630800110393941. Spence, L. and Bourlakis, M. (2009) ‘The evolution from corporate social responsibility to supply chain responsibility: The case of Waitrose’, Supply Chain Management, 14(4), pp. 291–302. doi: 10.1108/13598540910970126. Srivastava, S. K. (2007) ‘Green supply-chain management: A state-of-the-art literature review’, International Journal of Management Reviews, pp. 53–80. doi: 10.1111/j.1468- 2370.2007.00202.x. STATA (2018) Shapiro–Wilk and Shapiro–Francia tests for normality. Available at: https://www.stata.com/manuals13/rswilk.pdf (Accessed: 25 August 2018). Sultan, F., Farley, J. U. and Lehmann, D. R. (1990) ‘A Meta-Analysis of Applications of Diffusion Models’, Journal of Marketing Research. doi: 10.2307/3172552.
104 Tam, C. M., Tam, V. W. Y. and Tsui, W. S. (2004) ‘Green construction assessment for environmental management in the construction industry of Hong Kong’, International Journal of Project Management, 22(7), pp. 563–571. doi: 10.1016/j.ijproman.2004.03.001. Tam, V. W. Y. et al. (2006) ‘Environmental performance measurement indicators in construction’, Building and Environment, 41(2), pp. 164–173. doi: 10.1016/j.buildenv.2005.01.009. Tam, V. W. Y. et al. (2007) ‘Towards adoption of prefabrication in construction’, Building and Environment. doi: 10.1016/j.buildenv.2006.10.003. Tashakkori, A. and Teddlie, C. (2003) ‘Handbook of Mixed Methods in Social & Behavioral Research’, Sage Publication. doi: 10.17051/io.2015.07705. Testa, F. and Iraldo, F. (2010) ‘Shadows and lights of GSCM (green supply chain management): Determinants and effects of these practices based on a multi-national study’, Journal of Cleaner Production, 18(10–11), pp. 953–962. doi: 10.1016/j.jclepro.2010.03.005. Tilastokeskus (2018a) Emissions into air by industry 2008-2015. Available at: http://pxnet2.stat.fi/PXWeb/pxweb/en/StatFin/StatFin__ymp__tilma/statfin_tilma_pxt_001_ en.px/table/tableViewLayout2/?rxid=df1b0330-ca01-48bc-b793-810c7fd986f2 (Accessed: 10 August 2018). Tilastokeskus (2018b) Finland among the best in the world. Tortorella, G. L., Miorando, R. and Marodin, G. (2017) ‘Lean supply chain management: Empirical research on practices, contexts and performance’, International Journal of Production Economics, 193, pp. 98–112. doi: 10.1016/j.ijpe.2017.07.006. Toyota Global Site (2015) Just-in-Time: Philosophy of complete elimination of waste, Toyota. Available at: http://www.toyotaglobal.com/company/vision_philosophy/toyota_production_system/just-in-time.html. Tranfield, D., Denyer, D. and Smart, P. (2003) ‘Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review’, British Journal of Management, 14(3), pp. 207–222. doi: 10.1111/1467-8551.00375. Truxillo, C. (2005) ‘Maximum likelihood parameter estimation with incomplete data’, Proceedings of the Thirtieth Annual SAS® Users Group …, pp. 1–19. Available at: http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.176.880&rep=rep1&type=pdf. United Nations Global Compact (2017) Global Compact Progress Report: Business Solutions to Sustainable Development. New York, USA. Available at: https://www.unglobalcompact.org/docs/publications/UN Impact Brochure_Concept- FINAL.pdf. University of California (2015) Construction Services. Varnäs, A., Balfors, B. and Faith-Ell, C. (2009) ‘Environmental consideration in procurement of construction contracts: current practice, problems and opportunities in green procurement in the Swedish construction industry’, Journal of Cleaner Production, 17(13), pp. 1214–1222. doi: 10.1016/j.jclepro.2009.04.001. Vijayvargy, L., Thakkar, J. and Agarwal, G. (2017) ‘Green supply chain management
105 practices and performance The role of firm-size for emerging economies’, JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT. HOWARD HOUSE, WAGON LANE, BINGLEY BD16 1WA, W YORKSHIRE, ENGLAND: EMERALD GROUP PUBLISHING LTD, 28(3), pp. 299–323. doi: 10.1108/JMTM-09-2016-0123. Villanueva-Ponce, R. et al. (2015) ‘The green supplier selection as a key element in a supply chain: A review of cases studies’, DYNA, 82(194), pp. 36–45. doi: 10.15446/dyna.v82n194.54466. Walker, H., Di Sisto, L. and McBain, D. (2008) ‘Drivers and barriers to environmental supply chain management practices: Lessons from the public and private sectors’, Journal of Purchasing and Supply Management. doi: 10.1016/j.pursup.2008.01.007. Weaver, B. and Maxwell, H. (2014) ‘Exploratory factor analysis and reliability analysis with missing data: A simple method for SPSS users’, The Quantitative Methods for Psychology, 10(2), pp. 143–152. doi: 10.20982/tqmp.10.2.p143. WGBC (2010) ‘The Business Case for Building Optimal Physical Environments’, pp. 1–38. Wholey, J. (1979) Evaluation: Performance and promise. Washington: The Urban Institute. Wong, J. K. W. et al. (2014) ‘Virtual prototyping for construction site Co2 emissions and hazard detection’, International Journal of Advanced Robotic Systems, 11(1). doi: 10.5772/58439. Wong, J. K. W., Chan, J. K. S. and Wadu, M. J. (2016) ‘Facilitating effective green procurement in construction projects: An empirical study of the enablers’, Journal of Cleaner Production. Elsevier Ltd, 135, pp. 859–871. doi: 10.1016/j.jclepro.2016.07.001. Woo, C. et al. (2016) ‘Suppliers’ communication capability and external green integration for green and financial performance in Korean construction industry’, Journal of Cleaner Production. Department of Business and Technology Management, Korea Advanced Institute of Science and Technology, Daejeon, South Korea, 112, pp. 483–493. doi: 10.1016/j.jclepro.2015.05.119. Wood, D. J. (1991) ‘CORPORATE SOCIAL PERFORMANCE REVISITED’, Academy of Management Review. doi: 10.5465/AMR.1991.4279616. Wu, K.-J. et al. (2015) ‘Exploring decisive factors in green supply chain practices under uncertainty’, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS. PO BOX 211, 1000 AE AMSTERDAM, NETHERLANDS: ELSEVIER SCIENCE BV, 159(SI), pp. 147–157. doi: 10.1016/j.ijpe.2014.09.030. Xie, Y. and Breen, L. (2012) ‘Greening community pharmaceutical supply chain in UK: a cross boundary approach’, SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL. HOWARD HOUSE, WAGON LANE, BINGLEY BD16 1WA, W YORKSHIRE, ENGLAND: EMERALD GROUP PUBLISHING LTD, 17(1), pp. 40–53. doi: 10.1108/13598541211212195. Yin, R. K. (2003) ‘Case Study Research . Design and Methods’, SAGE Publications. doi: 10.1097/FCH.0b013e31822dda9e. Ying Liu, J., Pheng Low, S. and He, X. (2012a) ‘Green practices in the Chinese building industry: drivers and impediments’, Journal of Technology Management in China, 7(1), pp.
Please describe the green design practices in your company: Not considering it (1) Planning to consider it (2) Considering it currently (3) Initiate implementation (4) Implementing successfully (5) Consideration for energy efficient lighting system o o o o o Consideration for energy efficient heating system o o o o o Consideration for energy efficient automation systems o o o o o Consideration for energy efficient ventilation and air conditioning systems o o o o o Consideration of materials with high recycled content and low embodied energy o o o o o Consideration to reduce the use of hazardous materials o o o o o End of Block: 2. Green Design Start of Block: 3. Green Purchasing Please describe the green purchasing practices in your company: Not considering it (1) Planning to consider it (2) Considering it currently (3) Initiate implementation (4) Implementing successfully (5) Environmental criteria are included in material purchase decisions o o o o o Information sharing with suppliers regarding the technological developments relating to their operations o o o o o Require suppliers to disclose information about their environmental practices o o o o o Require suppliers to obtain certification of their environmental management systems o o o o o End of Block: 3. Green Purchasing Start of Block: 4. Green Transportation
Please describe the green transportation practices in your company: Not considering it (1) Planning to consider it (2) Considering it currently (3) Initiate implementation (4) Implementing successfully (5) Employees are encouraged to use shared transport and public transport o o o o o Materials are transported in full truckload quantities o o o o o Materials are transported in fuel efficient vehicles o o o o o End of Block: 4. Green Transportation Start of Block: 5. Green Construction Please describe the green construction practices in your company: Not considering it (1) Planning to consider it (2) Considering it currently (3) Initiate implementation (4) Implementing successfully (5) Provision for waste water recycling at project/manufacturing site o o o o o Use of prefabricated components in projects o o o o o Implementation of comprehensive waste abatement plan for project/manufacturing sites o o o o o Implementation of comprehensive material saving plan o o o o o Implementation of comprehensive land saving plan o o o o o Automation is used for onsite construction/manufacturing activities o o o o o Fuel efficient equipment/machinery is used at project/manufacturing site o o o o o Investment in green equipment and technology o o o o o Consideration methods and materials for noise control/ noise reduction during construction o o o o o End of Block: 5. Green Construction Start of Block: 6. Green Monitoring
Please describe the green monitoring/ green improvement practices in your company: Not considering it (1) Planning to consider it (2) Considering it currently (3) Initiate implementation (4) Implementing successfully (5) Implementation of EMS; ISO Certification o o o o o Environmental training o o o o o Inspections during the construction project o o o o o Establishing an environmental communications link to receive environmental complaints and suggestions o o o o o Reporting the company’s environmental initiatives within magazines and other media o o o o o End of Block: 6. Green Monitoring Start of Block: 1. ENVIRONMENTAL PERFORMANCE MEASURES Please assess the environmental performance of your company: Strongly Disagree (1) Disagree (2) Neutral (3) Agree (4) Strongly Agree (5) Number of environmental accidents has declined o o o o o Greenhouse gas emissions have decreased o o o o o Water consumption has decreased o o o o o Energy consumption has decreased o o o o o Landfill waste has decreased o o o o o Hazardous material use has decreased o o o o o A company’s environmental situation has improved o o o o o Site disruption has decreased o o o o o End of Block: 1. ENVIRONMENTAL PERFORMANCE MEASURES Start of Block: 2. ECONOMIC PERFORMANCE MEASURES
Please assess the economic performance of your company: Strongly Disagree (1) Disagree (2) Neutral (3) Agree (4) Strongly Agree (5) Material expenses per unit constructed/manufactured has decreased o o o o o Cost of waste treatment and discharge per unit constructed/manufactured has decreased o o o o o Environmental penalties and fines per unit constructed/manufactured has decreased o o o o o End of Block: 2. ECONOMIC PERFORMANCE MEASURES Start of Block: 3. SOCIAL PERFORMANCE MEASURES Please assess the social performance of your company: Strongly Disagree (1) Disagree (2) Neutral (3) Agree (4) Strongly Agree (5) Corporate image in environmental performance has improved o o o o o Number of environment-related sickness and injuries has reduced o o o o o Aesthetic of design has improved o o o o o Community disturbance during construction has decreased o o o o o End of Block: 3. SOCIAL PERFORMANCE MEASURES Start of Block: 1. DRIVERS Please assess the importance of sustainability drivers to your company: Very low (1) Low (2) Moderate (3) High (4) Very high (5) Government regulations o o o o o Pressure from supply chain stakeholders o o o o o Pressure from competitors o o o o o Pressure from clients (end-customers) o o o o o Enhancing the reputation and brand image o o o o o Top managers' environmental commitment o o o o o Cost Reduction o o o o o Opportunities for internationalisation o o o o o End of Block: 1. DRIVERS Start of Block: 2. BARRIERS
Please assess the importance of sustainability barriers to your company: Very low (1) Low (2) Moderate (3) High (4) Very high (5) Shortage of green professionals o o o o o Lack of partners’ commitment o o o o o Inflexible and tight stakeholders deadlines o o o o o Lack of buyer awareness o o o o o Pressure for lower prices o o o o o Lack of sustainability knowledge o o o o o High costs of implementation o o o o o Lack of management commitment o o o o o End of Block: 2. BARRIERS Start of Block: Results Would you like to receive the summary copy of this study results via email? o Yes o No End of Block: Results
APPENDIX 3: Descriptive statistics of GSCM practices Table 1 The relative weight of GSCM practices for members of the construction process Code All respondents (N=42) (1) Developer (N=6) (2) Architect/ Consultant (N=4) (3) Contractor (N=22) (4) Supplier (N=10) Mean Rank Mean Rank Mean Rank Mean Rank Mean Rank Green Strategy GS1 3,80 1 3,83 2 3,75 2 2,68 3 2,90 2 GS2 3,80 1 3,67 3 4,00 1 2,55 4 - - GS3 3,30 3 3,50 4 3,00 4 2,82 2 - - GS4 3,80 1 4,00 1 3,50 3 - - - - GS5 3,60 2 4,00 1 3,00 4 2,86 1 3,10 1 Green Design GD1 4,20 4 3,67 5 5,0 1 - - - - GD2 3,90 5 3,17 6 5,0 1 - - - - GD3 4,30 3 3,83 4 5,0 1 - - - - GD4 4,20 4 3,67 5 5,0 1 - - - - GD5 4,50 1 4,33 1 4,8 2 - - 2,70 2 GD6 4,50 1 4,17 2 5,0 1 - - 2,20 4 GD7 4,30 3 3,83 5 5,0 1 - - 1,50 6 GD8 4,40 2 4,00 3 5,0 1 - - 1,90 5 GD9 4,20 4 3,67 5 5,0 1 2,81 2 2,40 3 GD1 0 4,30 3 3,83 4 5,0 1 3,00 1 3,10 1 GD1 1 4,20 4 3,67 5 5,0 1 - - - - Green Procurement GP1 2,86 3 3,67 1 - - 2,64 3 - - GP2 3,07 2 3,50 2 4,50 1 2,95 2 - - GP3 3,18 1 3,67 1 1,50 2 3,05 1 - - GP4 2,61 4 3,33 3 1,50 2 2,41 1 - - Green Transportation GT1 2,36 2 - - - - 2,36 2 - - GT2 2,32 3 - - - - 2,32 3 3,00 2 GT3 3,09 1 - - - - 3,09 1 3,30 1 GT4 2,36 2 - - - - 2,36 2 3,00 2 Green Construction GC1 1,81 9 - - 1,00 3 1,81 9 1,00 3 GC2 3,27 1 - - 5,00 1 3,27 1 - - GC3 3,23 2 - - 1,00 3 3,23 2 - - GC4 2,50 7 - - 4,75 2 2,50 7 - - GC5 2,23 8 - - 5,00 1 2,23 8 - - GC6 2,86 4 - - - - 2,86 4 - - GC7 2,36 6 - - - - 2,36 6 2,00 2 GC8 2,64 5 - - - - 2,64 5 2,20 1 GC9 2,95 3 - - - - 2,95 3 - - Green Monitoring and Improvement GMI1 2,96 2 3,17 2 1,00 2 2,91 2 2,40 GMI2 2,54 4 3,00 5 4,75 1 2,41 4 2,20 GMI3 3,57 1 3,83 1 1,00 2 3,50 1 - - GMI4 2,89 3 3,33 3 - - 2,77 3 2,80 GMI5 2,50 5 3,17 4 4,75 1 2,32 5 1,60
Appendix 3 continued Figure 1 Descriptive statistics of GSCM practices: Green Strategy, Green Design, Green Procurement 0 5 10 15 20 25 30 35 40 45 Clear environmental goals in strategy Evaluating effect of the project to society and environment Effective communication on the environmental issue between subcontractors Inclusion of environmental management in tendering requirements Top-management commitment to sustainability Green Strategy 5 4 3 2 1 0 5 10 15 20 25 Environmental impact assessment Flora and fauna populations Natural lighting Wastewater recycling Energy efficient lighting system Green Design (1/2) 5 4 3 2 1 0 5 10 15 20 25 30 35 40 45 Energy efficient heating system Energy efficient automation systems Energy efficient ventilation and air conditioning systems Materials with high recycled content, etc. Reduce the use of hazardous materials Methods and materials for noise control Green Design (2/2) 5 4 3 2 1 0 5 10 15 20 25 30 35 Environmental criteria included in material purchase decisions Information sharing with suppliers regarding the technological developments Require suppliers to disclose information about their environmental practices Require suppliers to obtain certification of their EMS Green Procurement 5 4 3 2 1
Appendix 3 continued Figure 2 Descriptive statistics of GSCM practices: Green Transportation, Green Construction, Green Monitoring and Imporovement 0 5 10 15 20 25 30 35 Provision of accommodation to employees near project sites Employees are encouraged to use public transport Materials are transported in full truckload quantities Materials are transported in fuel efficient vehicles Green Transportation 5 4 3 2 1 0 5 10 15 20 25 30 35 40 Waste water recycling at project/manufacturing site Prefabricated components Waste abatement plan Material saving plan Land saving plan Green Construction (1/2) 5 4 3 2 1 0 5 10 15 20 25 30 35 Automation is used for onsite construction Fuel efficient equipment/machinery Investment in green equipment and technology Noise control/ noise reduction during construction Green Construction (2/2) 5 4 3 2 1 0 5 10 15 20 25 30 35 40 45 Implementation of EMS; ISO Certification Environmental training Inspections during the construction project Environmental communications link Reporting the company’s environmental initiatives within media Green Monitoring and Improvement 5 4 3 2 1
APPENDIX 4: Descriptive statistics of sustainable performance indicators Table 1 The relative weight of sustainable performance for members of the construction process Code All respondents (N=42) (1) Developer (N=6) (2) Architect/ Consultant (N=4) (3) Contractor (N=22) (4) Supplier (N=10) Mean Rank Mean Rank Mean Rank Mean Rank Mean Rank Environmental Performance (EP) EM1 3,57 3 3,50 4 3,75 3 3,64 2 3,40 3 EM2 3,52 4 3,50 4 4,00 2 3,41 5 3,60 2 EM3 3,52 4 4,00 1 4,00 2 3,41 5 3,30 4 EM4 3,38 6 3,50 4 4,25 1 3,41 5 2,90 6 EM5 3,69 1 3,50 4 4,00 2 3,50 3 4,10 1 EM6 3,52 4 3,83 2 3,25 4 3,45 4 3,60 2 EM7 3,64 2 3,50 4 4,00 2 3,68 1 3,50 3 EM8 3,45 5 3,67 3 3,75 3 3,50 3 3,10 5 Social Performance SM1 3,79 1 4,00 1 4,75 2 3,73 1 3,40 2 SM2 3,62 1 4,00 1 3 4 3,68 2 3,50 1 SM3 3,40 3 3,50 2 5 1 3,23 4 3,10 3 SM4 3,43 2 3,33 3 4,5 3 3,27 3 3,40 2 Economic Performance (EcP) ECM1 3,19 3 3,33 3 4,00 1 3,27 1 2,60 3 ECM2 3,29 1 3,50 2 3,75 2 3,05 3 3,50 1 ECM3 3,21 2 3,67 1 3,75 2 3,23 2 2,70 2
Appendix 4 continued Figure 1 Descriptive statistics of GSCM performance indicators 0 5 10 15 20 25 30 35 40 45 Number of environmental accidents has declined GHG emissions have decreased Water consumption has decreased Energy consumption has decreased Environmental Performance (1/2) 5 4 3 2 1 0 5 10 15 20 25 30 35 40 45 Landfill waste has decreased Hazardous material use has decreased A company’s environmental situation has improved Site disruption has decreased Environmental Performance (2/2) 5 4 3 2 1 0 5 10 15 20 25 30 35 40 45 Material expenses per unit constructed/manufactured have decreased Cost of waste treatment and discharge per unit constructed/manufactured has decreased Environmental penalties and fines per unit constructed/manufactured has decreased Economic Performance 5 4 3 2 1 0 5 10 15 20 25 30 35 40 45 The corporate image in environmental performance has improved The number of environment-related sickness and injuries has reduced Aesthetic of design has improved Community disturbance during construction has decreased Social Performance 5 4 3 2 1