Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015

179 Views - 0 Downloads

Preview

Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015 #0 Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015 #1 Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015 #2 Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015 #3 Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015 #4 Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015 #5 Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015 #6 Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015 #7 Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015 #8 Emergency Response Plan 110kV from Banja to Cerrik Rev.00 22.07.2015 #9

Excerpt

                            EMERGENCY RESPONSE PLAN DHP Transmission Line 110kV from P.S Banja to S.S Cerrik             022/07/ 2 015Appr ovalA.DoganiE.Be risha E . Ba rhaniA. Doko R EVDATE I SSUED FO RISSUED BYCHECKE D BY Q A /QC DPMPM E mployer %   D ATEBYAPP R OVEDREJE CTEDNACOMMENTS C ONTENTS1 . CTION2. SITE DESCR IPTIO N AND CONSTRUCTION OVERVIEW3. HAZARDOUS MATERIALS AND WASTE 4 . R E GU L AT OR Y A ND P E 1 1. FIRST A ID TEAM 1 INTRODUC TONTh i s eme rgency response plan has been prepared for the DOKO C o mp a n y Pr oj ect s. I 3 HAZARD O US MATER IALS AND WASTEThe mater i a ls t hat potentially could spill on the construction sites ar e ty p ic al of any L aw No.10 4 40, date d 7.7.2011 “For th e ass e s smen t of environmental impact “.Law No. 10463, “For integ r at e d s o li d was te m a S pill res p onse act ion planning outli nes s t eps to be taken in case of an incident involving a large o r s i gn i fi ca nt spil l N ame: Arb e r Dogani Title: HSE LeadPho ne:06 8 9 0952 27Emergency Response Coordinator will have training a n d e x pe r ie nc e r elat e 1 . Projec t Manager puty P . Man ager 0682089918 3. ES&H Lead 06890952234. ES&H Rep r es e n ta t iv e 8909 5 T he Emerg e ncy Resp onse Coordinator w ill u s e thi s form Notification Form to capture the circumstances ne c e ss i ta ti ng impl e A bsorbent boom for surface waters (a nd ro p e for securing it)Rubber glovesRubber bootsShovelsBackhoe o n- s i te as p art of c 5 .7. Temp o rary Fac ilitiesThe project will h ave maintenance and support yards. Locations of hazardou s w a s te st or age are a 6 O N PREVEN TION METHODS 6.1. Const r u ctio n Planning and SubcontractorsRegulatory requirements a nd b es t m an age ment

 

Download document

Buy ($6.60)


Rating


Document type

Research Paper


Languages

English.


Categories

Safety, Risk, Reliability and Quality, Emergency Medicine, Emergency Rescue.


Country

Albania.


Related documents

MCTL-000-HS-04-01_HSE_Monthly Report -August 2014. Rev.01

MCTL - Risk Assessment for Tower Erection 110kV rev.00

Waste Management Plan_110kV Transmission Line Rev.00